From individual Projects to coordinated Project and Portfolio
Transcription
From individual Projects to coordinated Project and Portfolio
From individual Projects to coordinated Project and Portfolio Management Rikard Thelander Head of Project Engineering - Nynas Background - Situation Analysis in 2010 - What did we do? - Current Status - Next Step Taking oil further Play the Nynas movie 3 Some key facts & figures 25000 20000 15000 860 employees 30 countries 5 refineries* 10000 * Nynashamn, Gothenburg, Dundee, Eastham, Harburg (subject to EU approval) 4 5000 0 Net Sales (MSEK) Nynas Engineering Global function within Manufacturing Supports all Nynas Group Refineries Depots Services Project Management Engineering Construction & Installation Management Engineering and PM Tools 5 Let’s go back to Q2 2010 Situation in Q2 2010 No Loc. 5905Nhn 238 projects approved or in 2010 budget 156 projects/investments in approved status 82 more projects/investments in the 2010 approved budget 62 projects/investments not in budget Portfolio value of 2 100 MSEK for ongoing projects Investment Budget 2010 870 MSEK ~300 000 h for PM and Eng. ~200 Man Years All investments in need of engineering work should be managed by Nynas Engineering 7 Amt LNG - Front End Engineering Study Prop budg Appr budg 5 3,9 Status Status -----------x--- Approved Bitumen Improvments -----------x--- Approved HF1 - Wash Water Reliability 0,262 Y Y -----------x--- Approved 8006Nhn HT1/HT2 - Purge Gas Re-routing 0,66 Y Y -----------x--- Approved 9,96 Y Y -----------x--- Approved 2,3 Y -----------x--- Approved Y -----------x--- Approved 8017Nhn Replace hot oil heater 8019Nhn New fire boat 8020Nhn Fire lines , South tank farm area 3Y 8022Nhn Upgrading firefighting equipment 12,5 Y Y -----------x--- Approved 8026Nhn Loadingpump from tank 2106 2,5 Y Y -----------x--- Approved 8038Nhn Ventilation - Building 201 0,6 Y Y -----------x--- Approved Y 8042Nhn Machinery cleaning equipment for work shop. 0,5 Y -----------x--- Approved 8053Nhn Bitumen tank farm - Basic Design PMB 0,9 -----------x--- Approved 8054Nhn Bitumen tank farm - Basic Design Emulsion. 2 -----------x--- Approved 8057Nhn VD2 - Upgrade mechanical seals 3,45 -----------x--- Approved 0,23 -----------x--- Approved 2,5 -----------x--- Approved -----------x--- Approved 8059Nhn Repl of cooling water system ship loading pumps 8061Nhn V180 & MS0101 (Pigge and the Blue Mast) 8066Nhn Re-insulation of steam pipes 1,99 0,65 8072Nhn HT2 - Repl of rotative soot-blowers in furnace. -----------x--- Approved 8074Nhn Purchase of thermo camera for Inspection dept 0,4 Y -----------x--- Approved 8077Nhn Equipment for gas detection 0,6 -----------x--- Approved 8078Nhn Bitumen area - Reinsulation of pipes 8079Nhn ET-home step 2 8080Nhn HT 2 Capacity increase, basic design 1,26 -----------x--- Approved 0,8 -----------x--- Approved 18,5 Y -----------x--- Approved 8084Nhn Platforms Bitumen loading 1 Y -----------x--- Approved 8208Gbg Water capacity OSMOS 2,6 Y Y -----------x--- Approved 8218Gbg Heat exchanger E7- Spare internals 4,3 -----------x--- Approved 8220Gbg Bitumen process modification for Reach compliance 2 -----------x--- Approved 9003Nhn VD2: Skin temperature measurements crude, oil furnace -----------x--- Approved 9005Nhn HF1/HT1/HT2 - Safety Valve Doubling 9,528 Y Y -----------x--- Approved 9009Nhn HF1 - Liquid separation in membrane unit 0,742 Y Y -----------x--- 0,55 Y Approved 9010Nhn Crude oil cavern inert gas system 9013Nhn Upgrade of emergency lighting in processarea 1. Part 1 Basic design 9017Nhn HF1 - Coolers in membrane unit 5Y Y -----------x--- Approved 0,22 Y Y -----------x--- Approved 0,742 Y Y -----------x--- Approved 9019Nhn VD2 - Improved bitumen slops system 0,35 Y Y -----------x--- Approved 9028Nhn Optimize VD2 for North Sea Mode - Prestudy 2,8 Y Y -----------x--- Approved 9036Nhn Upgrade electrical network - step 4 16 Y -----------x--- Approved 9039Nhn HG1 - Catalyst and reformer tubes replacement 9043Nhn Bitumentank S2066 reconditioning 9044Nhn Install fire fighting equipment in cistern O.10091 9049Nhn Heater element in instrumentation boxes 9051Nhn Rock cavern - Rerouting of leakage water 9052Nhn 9053Nhn 2,85 -----------x--- Approved 3,2 -----------x--- Approved 0,715 -----------x--- Approved 0,3 -----------x--- Approved 3 -----------x--- Approved VD2 - Upgrade of top condensate pump PP110 0,3 -----------x--- Approved Ultrasonics wash 0,3 -----------x--- Approved 9055Nhn Nhn - APC study 9056Nhn Waste water treatment plant - Raw water pump 9059Nhn Battery equipment at dieselgenerators Y 1 -----------x--- Approved 0,3 -----------x--- Approved 0,45 -----------x--- Approved 9060Nhn Real Estate: Cooling units 0,3 -----------x--- Approved 9061Nhn High speed Centrifugal pumps, Hydrogen plants 0,43 -----------x--- Approved 9062Nhn New road and area lighting 0,36 Y -----------x--- Approved 0,32 9064Nhn Change of raw water 9067Nhn Increased reliability Amine plants and SWS 9069Nhn Computers - BETAC 300 0,12 1,75 1,2 9073Nhn Replace outer gates in to the Refinery 9074Nhn Rock cavern BCA4 Basic Engineering 7 9075Nhn Crude Oil Cavern Vapour Recovery 9077Nhn Real Estate. Control Unit extinquish panel 9078Nhn WWT-plant - Contamination barrier at inner inspections dam, prestudy 9079Nhn Machinery Cooling water - prestudy 9080Nhn Tank 5100 - New steam coils incl cleaning and inspection Y -----------x--- Approved -----------x--- Approved -----------x--- Approved -----------x--- Approved -----------x--- Approved 8 -----------x--- Approved 0,31 -----------x--- Approved 0,23 Y Y Y -----------x--- Approved 0,552 Y -----------x--- Approved 2,52 Y -----------x--- Approved 9082Nhn VD2 -Safety valves for low pressure steam system 1,15 -----------x--- Approved 9083Nhn HT1 - Filter Optimization 0,844 Y -----------x--- Approved 9084Nhn HF1 - Flow meter misplaced 0,909 -----------x--- Approved 0,247 9085Nhn HT2 - Rerouting of cooling water pipes 9086Nhn HG3 - New Air Cooler 9087Nhn SA2 - Top Reflux Nozzle 6,3 Y Y 0,175 9090Nhn Mechanical Workshop - New overhead travelling cranes 9092Nhn HT2 - Upgrade of material after ejector P24109 9093Nhn 9205Gbg -----------x--- Approved -----------x--- Approved -----------x--- Approved 0,55 -----------x--- Approved 0,388 -----------x--- Approved On line inspection 2010 4,2 -----------x--- Approved Pipe support frame -Tankfarm part 1 1,8 Y -----------x--- Approved 0,7 Y Y -----------x--- Approved 9Y Y -----------x--- Approved 3,6 Y Y -----------x--- Approved 0,7 Y Y 9208Gbg Replacement components oxidation plant 9210Gbg Electrical switchgear equipment - E1 substation part 1 9212Gbg Tank overfill protection 9213Gbg Ground water monitoring wells 9901Isl Orion injection equipment 0,35 HT1/HT2 - Upgrade exchangers TT2406/0206 0,55 Y 10007Nhn Project list without named Sponsor and/or Project Manager Project 7029Nhn 8005Nhn Y Y -----------x--- Approved -----------x--- Approved -----------x--- Approved 10010Nhn HT1/HT2/HF1 - Skin temperature measurments 0,952 Y Y -----------x--- Approved 10011Nhn Hot oil replecement feasibility study 0,42 Y Y -----------x--- Approved 10020Nhn Repl of PLCs in HT2 and VD2 11,9 Y Y -----------x--- Approved 10026Nhn HF1 - Absorber capacity-Basic engineering 0,2 Y Y -----------x--- Approved 10027Nhn Basic engineering, HT1 - Debottlenecking fractionators for NS8 20 Y Y -----------x--- Approved 10039Nhn Fire water line PO2 5,5 -----------x--- Approved 10041Nhn Web based VPN client 0,5 -----------x--- Approved 10042Nhn Pipe support on the way to Brunnsviksholme 0,9 -----------x--- Approved 10043Nhn HT2 - Enhanced control 1,4 -----------x--- Approved 10044Nhn HT2 - Hot oil manifold 0,524 -----------x--- Approved 0,173 -----------x--- Approved 0,4 -----------x--- Approved 0,225 -----------x--- Approved 10045Nhn HF1: Vent and drainage nozzles MS1001 10047Nhn VD2 - Flow instrument 10048Nhn HG3 - Repl of Vortex flow meters 11FT006L / 11FT007L 10051Nhn SR2 - Flame detectors 0,41 -----------x--- Approved 10055Nhn HT1 - Increase blinding availability at PC202A and PC202B 0,22 -----------x--- Approved 10056Nhn VD2 - New Position for 01FV111 0,5 -----------x--- Approved 10058Nhn HT2 - Replacement of safety valve 24PSV065 - Basic engineering study 0,22 -----------x--- Approved 10060Nhn HF1 - Replacement of three way valves - 12TV202A and 12 TV204 1,21 -----------x--- Approved 10062Nhn Integration of JDE-API and Primavera 1,94 -----------x--- Approved 10201Gbg Upgrade Material Corrosive Crude: Off gas system replace corroded pipe -----------x--- Approved 10208Gbg 8Y Y Gbg - Workshops for Electrical and instrument 1,85 Y Y -----------x--- Approved 07008-A Nhn Nynäshamn 2020 - step 1 plus step 2 63,7 Y Y -----------x--- Approved 07008-B Nhn Nynäshamn 2020 - step 1 507,7 Y Y -----------x--- Approved -----------x--- Approved Y -----------x--- Approved -----------x--- Approved 07008-C Nhn Nynäshamn 2020 - HG 4 103 07012-07 Nhn NSP reliability - HT2: PD2401 Reliability Improvement 7,9 07012-08 Nhn Add funds: NSP rel - HT2: PD2401 Reliability Improvement Origin investment approved 2007-09-20 (7,9 MSEK) 36 07015-02 Nhn Process Historian Databas 4,1 Y -----------x--- Approved 07031-02 Nhn SR3/TG1- Basic Engineering 17 -----------x--- Approved 07031-03 Nhn SR3 - increased reliability sulphur recovery 3,05 Y -----------x--- Approved 08001-02 Nhn Nhn - Repl frame: PMB plant (unit 62 & 47) - Electrical upgrade 08004-02 Nhn NSP Rel. frame: HT2 - Liquid separation ventgas 08004-05 Nhn NSP Rel. frame: HT1 - Level measurements AS0203. Y 0,6 Y Y -----------x--- Approved 1,52 Y Y -----------x--- Approved 0,5 Y Y -----------x--- Approved 08017-01 Nhn Repl hot oil heater - Basic design Y -----------x--- Approved 08032-01 Nhn New mixed distillate tank - Basic engineering 0,25 Y -----------x--- Approved 08032-02 Nhn Loading and unloading of Mixed Distillate. 3,71 Y -----------x--- Approved 08034-02 Nhn Additional funds: Cooling water system - Prestudy Y -----------x--- Approved 08036-01 Nhn Expansion of quay 4 - Detailed engineering 08036-02 Nhn Expansion of quay 4 08047-01 Nhn HT1 APC - study 08047-01 Nhn Additional funds - HT1 APC - study 08047-02 Nhn HT1 APC 08048-01 Nhn Distillation column - Part 1 0,5 Y 0,4 Y Origin investments 08047-01 was approved 2008-04-07 (0,55 MSEK) 0,36 Y Y -----------x--- Approved 9,5 Y Y -----------x--- Approved 0,55 Y Y -----------x--- Approved 0,2 Y Y -----------x--- Approved 4Y Y -----------x--- Approved 0,25 Y Y -----------x--- Approved 08053-02 Nhn Bitumen tank farm - PMB 16,5 -----------x--- Approved 08059-02 Nhn Additional funds: Repl of cooling water system ship loading pumps Original investment approved 2008-06-02 (0,23 MSEK) 0,28 -----------x--- Approved 08059-03 Nhn Additional funds II: Repl of cooling water system ship loading pumps Original investment approved 2008-06-02 (0,23 MSEK) Additional found I, 0,28 msek 0,15 -----------x--- Approved 08061-02 Nhn Nhn: VD2 rerouting of hydrocarbon waste streams 24,5 08063-01 Nhn Tank 12527 - bund 13,6 08079-02 Nhn Additional funds: ET-home step 2 1,97 08207-01 Gbg Replacement heater - Part 1: Prestudy 1Y Y Y -----------x--- Approved -----------x--- Approved -----------x--- Approved -----------x--- Approved 09004-02 Nhn NSP Rel. frame: HT2 - Level measurements AS2403. 0,5 Y Y -----------x--- Approved 09004-03 Nhn NSP Rel frame: HT2 - Modification of safety valve 0,06 Y Y -----------x--- Approved 09004-04 Nhn NSP Reliability improvements frame: New type check valves on hydrogen compressors NSP 0,35 Y Y -----------x--- Approved 0,14 09004-05 Nhn HT1-Capacity Increase- NS8-Prestudy -----------x--- Approved 09004-06 Nhn NSP Rel frame: HF1 - Temperature measurements PCT1011. 0,1 Y Y -----------x--- Approved 09008-01 Nhn HT1/HT2/HF1 - Heater instrumentation. 1,3 Y Y -----------x--- Approved 09009-02 Nhn Add funds: HF1 - Liquid separation in membrane unit 0,42 -----------x--- Approved 09025-01 Nhn Upgrade W.W.T.-plant - Part 1: Sand filter building 0,22 Y Y -----------x--- Approved 09034-01 Nhn Maintenance stop 2011 Phase 1: Preparation of TA 2011 Q3 and Q4 2009 95 Y Y -----------x--- Approved 09038-01 Nhn LNG: Basic engineering for Natural gas infrastructure and rebuilding of HG3 22,5 Y Y -----------x--- Approved 09038-02 Nhn LNG implementation: Natural gas infrastructure and rebuilding of HG3/HG4 49,5 Y Y -----------x--- Approved 09074-02 Nhn Rock cavern BCA4 Basic Engineering - extended scope 10 Y Y -----------x--- Approved 09201-01 Gbg Minor repl projects: New heat exchanger E13 0,7 Y Y -----------x--- Approved 09201-04 Gbg Minor replacement projects - Positioners 0,6 Y Y -----------x--- Approved 09201-05 Gbg Minor repl projects - Upgrading of backupssystem for boiler feed water 0,1 Y Y -----------x--- Approved 09201-06 Gbg Minor replacement - Instrument tools Y -----------x--- Approved 0,225 09201-07 Gbg Minor replacement - New Air compressor oxidation unit 0,7 Y Y -----------x--- Approved 09202-04 Gbg Minor Safety Projects: Extra filter for process water 0,1 Y Y -----------x--- Approved 09205-02 Gbg Pipe support frame -Tankfarm part 2 1,9 Y Y -----------x--- Approved 09206-01 Gbg Gothenburg Refinery Expansion - Pre-engineering study 60 Y Y -----------x--- Approved 09206-02 Gbg Replacement heater/Natural gas - Basic engineering 65 Y Y -----------x--- Approved 09207-02 Gbg Hot oil heater upgrade - Basic Design 12 Y Y -----------x--- Approved 09210-02 Gbg Electrical switchgear equipment, part 2 and 3 9Y Y -----------x--- Approved 09211-01 Gbg Bunding of tanks - Basic Design 20 Y Y -----------x--- Approved 09216-02 Gbg Administration building refurbishment 5,5 Y Y -----------x--- Approved 09216-03 Gbg Administration building improvements 9,2 Y -----------x--- Approved 10001-01 Nhn Level measurements -Frame NSP Reliability Improvements 10002-01 Nhn HT1/HT2 Heater improvements 10008-01 Nhn HT2 - Freeze protection - prestudy 1,518 Y Y -----------x--- Approved 0,4 Y Y -----------x--- Approved 0,86 Y Y -----------x--- Approved Y 10040-01 Nhn APC - HT2 2,75 Y 10101-01 Nhn Nytex 4700, Basic design 19,5 10204-01 Gbg Gbg - Minor Repl Proj: Replace waste water feed pipe 0,2 Y Y -----------x--- Approved -----------x--- Approved -----------x--- Approved Situation in Q2 2010 2010 Project Portfolio 120 700 600 100 500 80 400 No of projects 300 MSEK 60 40 200 20 100 0 0 <2 8 2-5 5-15 15-25 25-100 >100 Situation in Q2 2010 - Resources 5 Process Engineers 9 Project Managers/Project Engineers 100+ Consultants Project Managers Deputy Project Managers Project Engineers Designers Construction Managers Etc… Many investments managed by refinery organisations 9 Situation in Q2 2010 - Planning Tools PrimaVera P6 MS Project Excel – Action list, milestones… Word – Action list, MoM… Notes on the white board In the back of PMs head Etc…. 10 Situation Analysis Basic Structure in place Project Manual NTS – Nynas Technical Standard Common CBS A lot of very small ”projects” Driving administration cost Capex decisions only based on user needs and economy, not on resouce capacity 48 different consultant companies were used in the projects 11 Highly committed people All PMs have many projects Optimum would be 1 major projects 2-4 smaller assignments Project Management knowledge on very different levels What to do??!! Engineering Vision Through our dedicated and experienced team Nynas Engineering is the obvious choice for providing Engineering and Project Management services and tools within Nynas Group What we did and are doing!! Project Management Project Control (Time and Cost) Monthly reporting Training Project Managers And Project Sponsors And Line Managers Project Model Develop model based on existing Project Manual Project Portfolio Management tool Selection and implementation of a tool that supports portfolio management Supplier Management Evaluation and selection of a few strategic suppliers for Engineering Services Cooperation with Procurement Department 14 Project Management Monthly Report Report template as an A3 Report All projects >2 MSEK reported separatly Status on HSE, Scope, Time, Resources and Cost Highlight risks Look ahead for next month Took about 3 months to reach acceptable quality on reporting Time Schedules Made in MS Project according to a template based on the Project Manual Current time schedules collected on file server A portfoilio schedule created each month for selected projects as a quick fix 15 Training Selection of training supplier that gives both open and customised training courses based on IPMA Certification Project Managers Project Management program on department level Individual programs Basic training Advanced programs Individual coaching Aim to certify PMs according to IPMA in a 3 year program Project Sponsors Project Sponsor and Steering Committee role in projects 16 Engineering in Nynas Management System (NMS) 17 Business Process Break-Down Management View Stakeholder View Project Management View Project Operational View 18 Project Portfolio Management Why do we need to manage our project portfolio?! Predictable spending of Capex Spend for 2009 and 2010 is far below budget Why is that? Late decisions Lead time between decision and start Linear spend in budget Delays in projects Resource load levelling Planning of project pipeline Timing, prioritization and selection, connections to other activities… 19 Total Investments 2011 Total Capex 100,0 90,0 80,0 70,0 MSEK 60,0 50,0 40,0 30,0 20,0 10,0 0,0 January 20 February March April May June July August September October November December Project Portfolio Management Short Term Project Schedules Project Portfolio Engineering F9 Project Scenario 45 000 9FCDD5 DD Unspecified 9FCDD4 DD Unspecified 9FCDD3 DD Unspecified 9FCDD2 DD Unspecified 8FCDD3 DD Bioran Biotech & FF 8FCDD1 DD Servac 8FCDD2 DD Merck VSBF 1297S VMF102 Sum Project 1286S Lilly Ireland MCC Bulk Manufac 1257S Schering-Plough CN1247 Lyophilization expansion 1290S GSK Belgium - Sum project CH1234 Excelvision, fill & finish 1215S GSK Bio MPL Expansion Facility 9FCBD5 BD Unspecified 9FCBD4 BD Unspecified 9FCBD3 BD Unspecified 9FCBD2 BD Unspecifed 8FCBD3 BD Bioran Biotech & FF 1314BD Merck Syringes Ireland Employees CC Plan F9 by CC-mngr 40 000 35 000 30 000 25 000 20 000 15 000 10 000 5 000 0 Resource Assignment 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 -0 -0 -0 -0 -0 -0 -0 -0 -0 -1 -1 -1 -0 -0 -0 -0 -0 -0 -0 -0 -0 -1 -1 -1 08 08 08 08 08 08 08 08 08 08 08 08 09 09 09 09 09 09 09 09 09 09 09 09 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 Resource Assignment Resource Need Resource Need Resource Pool Forecast JDE 21 • Budget • Procurement • Time Reporting • Forecast • Capex Curve Capex Project Portfolio Management Tool Requirements User friendly Time schedule Resource allocation and leveling Project Economy Budget, Committed, Actual and Forecast Work and material cost Support for distribution Web based Report functions incl. diagrams Possibility for future integration with Business System and other databases Possibility to use for other types of projects 22 Other Possibilities based on evaluated tools Support for project model(s) Project prioritization and selection Time reporting Task management Risk management Team collaboration Document management Effect analysis Antura Projects – Overview Phase 1 Source: Antura AB Nynas Situation in Q4 2010 Tidplanering i Primavera Ek redovisning Primära användargrupper: • Företagsledning • Finance • Linjechefer Tidplanering i MS Projects Projektredovisning Forecast i Excel JD Edwards Tidrapportering i JDE Förkonterade fakturor Faktura Projektdokument i Masterinfo & Smart Plant Foundation Projektmodellstöd i Worddokument (Masterinfo) Process i NMS Manuell projekt- och portföljrapportering i Word/PowerPoint & Notes Riskhantering i Excel Fakturahantering Primära användargrupper: • Project Office • Sponsorer • Projektledare • Projektmedlemmar • Även Företagsledning Ärendehantering i Excel Future situation in Nynas Projektredovisning Ek redovisning Primära användargrupper: • Företagsledning • Finance • Linjechefer Projekt status m.fl Budget, prognoser, allokeringar, tidrapporter, JDE Förkonterade fakturor Faktura Projektportföljer Antura Projects Utfall (ev tidrappo) Fakturahantering Single Sign-on Primära användargrupper: • Project Office • Sponsorer • Projektledare • Projektmedlemmar Data Warehouse Intranät • Även Företagsledning Dokumenthantering Time Schedule 2011/Q2 Antura Projects Pilot Environment Projects managed by Engineering Set-up hosted by 3rd party on shared server hardware Basic configuration based on NPMM, Project Manual and NTS10 (8-step model) Prepare for implementation in 2011/H2 ISIT issues Detailed implementation plan 2011/Q3-Q4 Antura Projects Implementation Environment Include all projects >2 MSEK Hosted internally or externally on dedicated server hardware Developed configuration 2012/Q1-Q2 Include all projects and investments All projects in NAP but not deployed Used for budget work 2012 Moved to Phase 2 2012/Q3 Planning of Implementation Phase 2 2012/Q3-2012/Q2 Implementation Phase 2 26 NAP Miminum Requirements Members Member list Steering Committee members Issues Scope Changes SC Decisions SC Actions Schedule Decision Point Dates Milestones for NTS10 Activities on first Break-down level Costs Budget distributed on global level Forecast distributed on global level Control Performance Report published on 3rd working day each month for ALL projects that has not passed DP7 27 Functions that makes life easier Project Model Project Team Members Today Project Engineering are 14 employees and 156 consultants Resource allocation not yet implemented Issue Management Used for actions lists but also to generate Minutes of Meeting Categories are Actions, Information, Continuous Improvement, Decision and Scope Change Cost Management Import of Actual Cost from JDE Report Generation Customized monthly reports for project and portfolio based on existing template Saves hours of cut and paste! Rising Stars Forecast export to JDE Time reporting in NyProj - Antura Projects 28 Implementation Phase 2 Deployment to all sites Resource Management Integration with Financial System JDE Distributed forecasts from NyProj instead of Excel model Follow the complete investment portfolio for Manufacturing in 2013 Implement an evaluation and selection process for investments and visualise in NAP Phase 3 NAP as a supported software from ISIT Implementation for projects in general for all Nynas Group 29 Summary and Conclusions NAP – Nynas Antura Projects supports all necessary functions for a successful project portfolio management within Nynas Perceived as user friendly by the users Included functions make life easier for PMs and Project Office Implementation plan has created a ”pull” in the organization to start using the tool Promising potential for further use 30 Summary Q1 Situation Analysis Project Management Project control and reporting Distributed Forecasts Consolidated MSP Time Schedules Project Roles & Responsibilities Training Project Managers Program Department Training Sponsors and Managers Project Model Project Model Development Update of Project Model in NMS Further development of Project Model Project & Portfolio Mgmt Tool Requirement Definition Decision Process Basic Tool Configuration Pilot testing in Engineering All Engineering projects in NAP Deployment to all sites All Manufacturing projects in NAP Integration with financial system 31 2010 Q2 Q3 Q4 Q1 2011 Q2 Q3 Q4 Q1 2012 Q2 Q3 Q4 Q1 2013 Q2 Q3 Q4 Critical Success Factors Get the grip of your operations first! A critical mass of followers is needed for success Train stake-holders like Sponsors and Line Managers Select system support based project manager needs and user friendliness 32 Engineering Vision Through our dedicated and experienced team Nynas Engineering is the obvious choice for providing Engineering and Project Management services and tools within Nynas Group Thank You! Rikard Thelander [email protected] 08-520 655 37 34 <footer> <date/time>