Playa Verde Project, Rehabilitation of Chañaral Beach
Transcription
Playa Verde Project, Rehabilitation of Chañaral Beach
PLAYA VERDE PROJECT Environmental Rehabilitation & Clean Copper Production Status to April 2015 Workshop on Sustainable Mining Possibilities for Chile and EU Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 1 OVERVIEW Chañaral located at 875 Km North of Santiago de Chile. Copper Bay Limited (CBL) holds exploitation licences, 15.25sqkm, at Chañaral where at least 116 million tonnes of copper tailings have been deposited on the beach and bay. CBL plans to remove the copper from the tailings and therefore substantially reduce the toxic nature of this material. CBL hopes that the revenue from the sale of the removed copper will pay for the whole operation at Chañaral and reward its backers with a return on their investment. Economic value will be added to the natural and social environment by detoxifying the existing beach in Chañaral Because of the low grade of the tailings as compared with conventional copper projects the strategy must be focussed on low operating and capital costs. Planned production is in 3 years from now Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 2 HISTORY of TAILINGS DISPOSAL 1938 to 1975 the Potrerillos and El Salvador copper mines disposed of their tailings in the Rio Salado, which opens out into Chañaral Bay An estimated 225 million tonnes of tailings were discharged into the bay A further 100 million tonnes are estimated to have been discharged into the next bay a few kilometres to the North of Chañaral Several studies have been made of the beach at Chañaral but so far no workable solution to the pollution problem has been found. In the current copper price forecast scenario CBL thinks that it has a sound proposal to stakeholders and investors. Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 3 OVERVIEW of the BEACH and BAY Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 4 DRILLING CAMPAIGNS PRE-CBL B E A C H Company B A Y Year Drillholes % CuT CuSol BRGM 1972 86 0.24 51% SERNAGEOMIN 1991 8 0.29 85% TECSAMIN 1994 9 0.40 75% SPRINGHILL 2000 30 0.28 CEYGE 2005 6 0.29 2008/9 43 0.27 182 0.27 MNI/PUCOBRE Totals Drillholes % CuT CuSol Tonnes 9 0.14 56% 25 0.13 48% 37 0.24 46% 116 Million 53% 71 0.19 48% 253 Holes No JORC (or equivalent) resources are supported by the historic information Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 5 INITIAL STEPS OF CBL • 2010, Private entreprenuers organize CBL in UK and provide seed capital • 2010, 4th quarter. First actions in Chile. Base initiative: a mining venture on beach and bay tailings-resources. • 2010- 2011 Due Diligence on Legal, Technical and Environmental issues • Post Due Diligence, early involvement of Stakeholder was incorporated to the Project concept, and • CBL´s Chilean Cos organized: Minera Playa Verde as operational unit to develop the Playa Verde Project. • IPO in London Stock Exchange did not succeded in 2012 – 2013. • 2013 CAML take 50% stake and fund project development. Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 6 STAKEHOLDERS, EARLY PARTICIPATION Two stages carried out so far: Situational Diagnostic and Feedback & Project Introduction Surveyed entities: Authorities Community organisations Fishers organization (Local Federation) Concerned Risk Issues Peoples health by dust and arsenic pollution Impact of pollution to marine resources Employment in short and long term Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 7 STAKEHOLDERS, EARLY PARTICIPATION, 2 Outcomes No opposition to the Project in the Audience, but People want to be approached in good time, and to be informed about the Project and its development progress. Environmental characterization of new tailings, a key issue CBL Committment Execute PF Study in the way it was planned. Inform Stackeholders about Project findings when complete. No intervention in the sea at this stage. Appreciated by fishermen. Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 8 WHY TWO PHASES OF DEVELOPMENT 1. Original scenario: Beach and Bay resources did not have coherent background information. 2. Important financial resources and time required to place both on the same level 3. To initiate the engineering works the resources under water in the Bay require longer and expensive studies than those in the Beach. 4. Development Critical Path goes through the environmental studies, Authorities and community early participation, previously to set the final technical-economic solution. 5. Two phases have proved to be a better strategy to motivate private investors to fund the Project development (in the recent and current business scenario). 6. Initial stage, pre-PFS funded by seed capital from private entreprenuers. 7. Funds for PFS and DFS by CAML. 8. Funds to implement the facilities and start up the Project TBD. Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 9 Rehabilitation Project, a Sustainable Balance EFFECTIVE TECHNICAL SOLUTION GET A CLEANER ENVIRONMENT, SOCIO-ECONOMIC ADDED VALUE CHAÑARAL BEACH REHABILITATION • • • • • • • Tailings Processing for cleaning the beach. Reclamation by dredging techniques. No Bay intervention. Get metals for the market, recycle in the market. Final tailings suitable for beach reforming. Get reformed beach back to the community uses, by stages through the mine life. Study the Bay rehabilitation during beach operation (same business model) ECONOMIC FEASIBILITY, SUPPORT FROM PRIVATE INVESTORS Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 10 Key Actors for Success Stakeholders: Authorities & Community CBL – MPV Project Management GET A CLEANER ENVIRONMENT, SOCIO-ECONOMIC ADDED VALUE EFFECTIVE TECHNICAL SOLUTION CHAÑARAL BEACH REHABILITATION • • • • • • • Tailings Processing for cleaning the beach Reclamation by dredging techniques. No Bay intervention. Get metals for the market, recycle in the market. Final tailings suitable for beach reforming. Get reformed beach back to the community uses, by stages through the mine life. Study the Bay rehabilitation during beach operation (same business model) ECONOMIC FEASIBILITY, SUPPORT FROM PRIVATE INVESTORS Investors Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 11 Materials Handling 14,000 t/d TAILINGS RECLAMATION, AND PROCESS. POLLUTED BEACH PRODUCTS Metals / Cons to recycle in the Market DEPOLLUTED BEACH REGULATION, TERRITORIAL PLAN AND COMMUNITY THOUGHTS Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 12 THE PROJECT, A BRIEF Minera Playa Verde Ltda, subsidiary of Copper Bay Ltd (UK), manage the Playa Verde Project in Chile. Close to 50 Mt of tailings, 0.24% Cu, disposed in the Chañaral Beach will be dredged and processed to produce copper cathodes and concentrates, both to be reclycled into the market. Process will produce final tailings to Reform / rebuild the beach. Economical return from sales must pay the costs and generate an adequate profit to investors. This is to motivate private funds for development, implementing and operating the Project in a sustainable and responsible business way. An efficient operation will contribute to add economic value to the beach by a substantial reduction of pollution in the sands to level permitting recreational uses at least. Low grade of tailings set a challenge to comply the rehabilitation purpose together the motivation to private investors to finance the initiative. Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 13 DEVELOPMENT PLAN I. Phase 0 1. Comprehensive scoping study by a Competent Person. Historial resources and bench scale metallurgical tests. II. Phase 1, Beach Resources . Reforming the Beach 1. Prefeasibility Study Stage a. Drilling campaign. b. Resources JORC qualification c. Metallurgical Studies. d. Reclamation e. Tailings Disposal f. Environmental and social 2. Definitive Feasibility Study Stage III. Phase 2, Bay Resources, on the seabed Studies to be carried out during the operation of Phase 1 Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 14 PROGRESS SO FAR All PFS studies completed Drilling and Resource Estimation Metallurgical testing Dredging Tailings disposal Environmental and Social Impact – PF level Power / acid Extended (2015) Studies on Dredging and Process • • Viability estimated to PFS level or better PFS study completed as planned Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 15 RESOURCES ESTIMATE Drilling campaign in Beach completed 136 holes 1,246 metres 1,022 samples JORC RESOURCE ESTIMATE Class Mt Grade, % Cu, kt Indicated 42.7 0.244 104 Inferred 8.5 0.234 19 Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 16 Process Sketch Reclamation Sand Preparation Raffinate PLS Cathodes SX/EW Leaching Slimes Dam Primary flotation Classifier Beach Cons. Cleaning & Regrind Cu/Au Concentrate Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 17 REFORMING THE BEACH, by STAGES New reformed beach will be returned to public domain in the way the dredging plan and disposal of coarse final tailings progress. Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 18 PROCESS OVERVIEW 5mtpa Dredging Pond Trash Screen 83ktpa >1.0mm Coarse Waste To TMF Shell Screen Excess Water 178ktpa >0.425mm De-watering Raffinate Acid Leach Neutralise Recycled middlings Flotation De-watering SX/E W solids 6.3ktpa Copper Cathodes 98ktpa Cu/Au Concentrate Residue Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 19 ENVIRONMENTAL ISSUES Environmental Permitting Timeline • Initial assessments conducted • No fatal flaws found • Preliminary baseline commenced • Different study elements for EIA identified Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” • EIA preparation and approval expected to take up to 24 months • Initial community engagement − Clear local support − Ongoing community engagement plan important 20 KEY MATTERS FOR THE EIA • Evaluate new baselines after traumatic experience, infrastructure damages and impact to natural resources by Aluvion in Chañaral. • Early Community Participation • Depollute the beach to improve alternatives in Territorial Plans • EIA including Risk Analysis to Human Health by ASTM RBECA methodology, at Tier 2 level • Coordination with Authorities regarding RBCA application in Risk Analysis • Facing decisions regarding conflics on techical - environmental matters to advance in a fast-track route subject to regulatory compliance and Community participation. Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 21 NEXT STEPS 2015 2016 2017 2018 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 DFS Reserve Definition Dredging Plan Pilot Plant/Met Testing Environmental Engineering/DFS PROJECT Fundraising Detailed Engineering Construction Operation Community Copper Bay Ltd – “Sustainable Mining Solutions for Chile and EU” 22