by Devendra Kumar Pandey, Municipal Commissioner
Transcription
by Devendra Kumar Pandey, Municipal Commissioner
12 MAY, 2015 ALLAHABAD (PRAYAG) : AT A GALANCE The city of Allahabad is among the largest cities of Uttar Pradesh and situated at the confluence of three rivers – Ganga, Yamuna and the invisible Saraswati. Coordinates: 25.45°N 81.85°E Elevation : 98 m (322 ft) Govt Type • Mayor–Council Area of ULB • 82 sq Km Body •Allahabad Municipal Corporation Municipal Wards • 80; Zone • 5 Mayor • Smt. Abhilasha Gupta ‘Nandi’ Population • 59,54,391 Growth 20.63% M.P. Urban Population • * 14,72,873; Urban Population Growth 24.74% Projected Population • 20.50 lakh (as per Master Plan-2021) Average House Hold-07 Density •1,087/km2 (2,820/sq mi) • Shri Shyama Charan Gupta • Shri Keshav Prasad Maurya M.L.A. • Shri Anugrah Narayan Singh • Shri Hazi Parvez Ahmad • Smt. Puja Pal Tel. code 91-532 ; Sex ratio • 901 ♂/♀; Demonym •Allahabadi; Vehicle Reg. • UP-70 Official lang.•Hindi PIN 211001-18 *Source- Final Census Report of U.P.- 2011; Source & http://allahabad.nic.in EXISTING/ ONGOING SCHEME Under Jawahar Lal Nehru National Urban Rehabitation Scheme (JnNURM) Sewerage System Water Supply System Solid Waste Management “Sewerage And Non –Sewerage Scheme For Pollution Abatement of River Ganga At Allahabad, U.P.’’ UNDER NGRBA PROGRAM Sewerage System Communications & Public Outreach Program In Allahabad, sanitation becomes more prominent because of city location between Doab of holy rivers Ganga & Yamuna. Sewerage Network CITY SEWERAGE PLAN - ALLAHABAD F 19 18 17 16 PHAPHAMAU Phaphamau SPS District 'A' District 'B' District 'C' District 'D' District 'E' District 'F' District 'G' Phaphamau STP 10 MLD 14A 14B 11B RIV ER E RIV GA 14 E NG A Rambagh 15 14 Jondhwal F 11C Balikapur 14 D 14 RAJAPUR INTERCEPTOR A NG A RG 14C 11D 11F 11 11A 11E PHAPHAMAU RASULABAD BAZAR KUTI MAHADEV A 15 Haulipar Purwa ROA D SHILAKHANA PHA MAU Mahdeori Ghusayna Purwa B 15 TELIARGANJ PHA TARBAGIYA Jhunsi Town Area Chilla 15C Kalakari Purwa 15D GOBINDPUR 15E Cantonment Area PHAPHAMAU ROAD RAJAPUR MPS RO AD RAJAPUR STP L AW REN CE 60 MLD - 1st STAGE 80 MLD - FINAL OLD CANTONMENT Pura Gadaria MAIN Saraiyan RISING BISHANPUR NAYAPURA Salori SALORI D Cemetry EY ROA RIV ER GA NG A ISHAWARSHARANNAGAR St Peter MUIRABAD NEW PUMP HOUSE INCREASED CAPACITY FROM 8 MLD TO 55 MLD A LA I M ROAD JA ST A NL A KBAR GALLA BAZAR FR I Chandpur RO AD HUTURKHAN Shadiabad MUMFORDGANJ PS MUMFORDGANJ SPS L ALA LOCKHA BA RO LE I R OA D T CHE RY GU L MA KATRA D UN I V ERS D SA PRU MARG NE HR U RD AL TIL RG RG D ROA SA L I KGAN J YA ROAD B L I DD LE AMA RNA ROA D a Bra nch AM ana si Chh apr DH I ROA S DARAGANJ SPS ALOPIBAG SPS GRA D ROAD LA L ROA D MORIGATE NALA MORIGATE 9 MLD MAIN ROAD RO NEW PUMPING STATION MORIGATE 12 MLD H MAR ND RAMBAGH BA VA G T I K ROAD MARG GR AND TRUNK T R I VEN I H I MA ROA D BAI KA BAG NETANAGAR I RGA T RUN N D ROAD I RISING ND AD IT AR GAN Khalasi Line KYEDGANJ TR I V EN I SHA STR I BRID GE ROAD Kasai Tola ROAD KYDGANJ MINTO PARK BHARGAV RGAV A GRA FORT ROA D L BH GA AR VA CHAUKHANDI BAN K Y AMUNA ROA D K ROA D ROAD Y AMUN A T RUN FORT KYDGANJ NAIBASTI A BANK SPS JHUNSI PIPE YAMUN ND D SHANK AR L AL R M ROAD SANGAM NOSE KATGHAR GAUGHAT PS NAINI STP NA SPS G N A A G SPS NU RU L MU R YA ER E IV RIV R RO AD - Var WITH ADDITIONAL PUMPING UPTO 42 MLD IN NG MA H A RISI LA BHA SAM I RD CHACHAR NALA SPS LOCAL IMPROVEMENT PROPOSED GHAGGAR NALA SPS RAMPR I AD A RO TH JH MAI N ANT EXIS TING CAPACITY 28 MLD 40 MLD - 1st STAGE 50 MLD - FINAL N DARIYABAD MIRAPUR NAD I DR D ROA ID AH SH NEHRU NAGAR MG MUTTHIGANJ ITY MARG Gurudwara SAM I T I MUTHIGANJ AV RO AD I HI SHNAK AL T I L AK ITY MA IN T IE L MA LA PAN NA RD I NG H S AN SH RO RASULPUR GRAV AH ROAD NURUL L GTB NAGAR PROPOSED SASUR KHADERI SPS KA R S E VA LAU THER ROAD ROAD EE ER J GR AU LA LA RA CH AS SU BH NE RD L IB GHA RZ A A P BAN PANCHKROS ATM KR I MA IN Shararabagh A R MARG ROAD KALYANIDEVI SH Graveyard TULARAMBAGH MAH BAHRANA BAHADURGANJ ALLAHPUR SPS ad ALOPIBAGH MARG H I ND I SAH I T YA S AMME L AN MARG RU NU MI AH ROAD NURUL L ATARSUIYA ATARSUIYA TULSIPUR Alla hab MARG SITARAMPUR ROAD BANS MANDI I KA L ND MALVIYA NAGAR (KARELI) ITY K A KK TRUNK B HAWAN SALORI STP - 29 MLD D AD RO ATALA I ROA RT FO GRAND Rani Mandi NAYA PURWA AV P Jauharitola SARAI MIRKHAN B HART KARELABAGH COLONY ANA Pan Dariba TY MAI Mirganj N T Graveyard GR V I VEK KOLHANTOLA S TR EE SULTANPUR DH MADHAVPUR L AUDER ROAD RD AD L LA H KHUSRU BAGH ROAD RO GRAVI KO L HAN T OA L BAKSHI BAZAR KHULDABAD AKBARPUR ER I GAN AD SWAM I K KHULDABAD K H AD MA SOUTH MALAKA MOHSINGANJ CHAUK SABZI MANDI ROSHANBAGH PURSHOTTAM NAGAR NIHALPUR BENIGANJ S A SU R AT RO AD KALADANDA CHAKIYA RAJRUPPUR RAJROOPPUR KARELI MAR G CHHIDPUR JOHNSTONGANJ GADIWAN TOLA ROA D BADSHAHI MANDI Nakhas Khana SUBEDARGANJ Dhussa I RT RO CHAK NIRATUL Raiway Colony T RUN K U GR AND SHAHGANJ TJ KARBALA LUKAR GANJ SPS KA Jairampur 40 MLD - W/S INTAKE WELL NUMAYA DAHI STP 50 MLD CAPACITY ING MA IN Jhunsi STP 18 MLD RIS Jhalwa AM AN H FO ROAD NORTH MALAKA ROAD DR L UKAR KHUSRU BAGH 14 MLD - FINAL B AND Salori MPS ALLAHPUR MAH LALIT NAGAR L EAD E R LUKARGANJ Railway Colony I NT MA NE KA N I NA I DU MARG SARO J I AMDA L AXM I NARAYAN MARG TT A ND HO JI US PUR Graveyard GEORGE TOWN NORTH EASTERN RAILWAY - MAIN LINE TA D AD UR GEORGE TOWN ROAD SM I T H ROAD DON SH ROA TAN TU NK YUS UF RAILWAY COLONY G MAR S SHERWANI NAGAR CH CIVIL LINES NAWA B LA TRU Y MO I MARG DARBHANGA COLONY C HR U PATR I KA ( E LG I N ROAD ) A MARG MARG I MARG CIVIL LINES ROAD AND GANDH I I MP TAGORE TOWN MARG ML PAT EL ROAD SARDAR SHA ST R T AS TURBA ROAD PONAPPA RA J I V GANDH I GR L ANE SH TAGORE TOWN DARBHANGA CASTLE T A SHK EN GANDH BAH ADUR MA HATMA M ARG TMA R AV I DA S M MAHA JAYANTIPUR HA I ROA D Dhumanganj SULEM SARAI CHURCH FATEHPUR BICHHWA AD RO MUNDERA MAR MARG BAGHAMBAR LAL RD BE BAHADUR COOPER MARG STRACH ROAD CL I VE MARG I SAROJ I SHA S T R EY ROAD PUR ARG 2 H GA NG A AD NORTH EASTERN RAILWAY ALLAHABAD VARANASI SECTION TE J CIVIL LINES USH MARG N I NA I DU B AHADUR OT T ASHK ENT NYAY MARG MARG DAS TAM RO U HR NO . OS G ROA CIVIL LINES T NE H IG HWA Y GH DAYA N AND MARG L NA T I O N A L I G MAR R LA ROAD T AM AN X NO AN CHOTA BAGHARA HA T RUN K IN I T Y ROA D KA ALLENGANJ MAR G WA JA GRAND TH J HA Dhaurahra ES U MA RG ROA AT I NA COLONELGANJ ON T AND G I T YA BA N AN N AD KA GA RO BS TOM AD MAR C RO D SH I VRA MDA S CIVIL LINES SULEM SARAI ROA D GAN MARG MARG IR CANTONMENT PRITAM NAGAR T RUN K RD L NEHR OA Y MAIN DAYA NAND MA HARSH I LAL GRAND L S AN HR UL KATRA CH CIVIL LINES I PT ZA RO AD MARG CANTONMENT NIM SARAI AGARWA ROAD V I K RAMAD RO RIV ER BE L MAI N ROAD ER EE R TA LAL AN ST MARG LOH I A MARG K I MARG MUKHE R J O GUP AY MOT I LA RG DA YANA ND ROAD MA I C L I VE A K GRAVIT TH AR P POLICE LINES MA HARSH I J NA COLONY R AMN HA MU I R N RAM MANOHAR RM VA LM I VE N I NA I DU I H I RA LAL V MAHA RSH BA COLONY MAIN AN ST GRAVITY MAIN SARO J I DE MARG HA NYAY ROAD MA CAR I APPA AD RO E L AW RE NC RD RO AD KAB GRA VITY EE D E R J EE RD ROAD N IO MAGDA LA A K BAR RJ S RAJAPUR RAJAPUR R I NT N NE RANIPUR RD ROA M WA BA IS MU I ITY Uchwan Garhi Nawada AV PONAPPA ASHOK NAGAR CANTONMENT NI SH H NA Y ROAD ROA D GR K HAN ROAD AHMED ROAD NAYA KATRA KR RI AD Pura Mau Saraiyan K M ROA HA D VE LOCK TU ROAD K ROAD PONGHAT MPS S YED HAV E LOCK KODARA MPS I Beli RT ROAD BALM I KODARA NALA STP 25 MLD - 1st STAGE 35 MLD - FINAL PONGHAT STP 10 MLD - 1st STAGE 15 MLD - FINAL L A J PAT R A MOT I L A L NE HRU ROAD ROB ERT NAINI G EXISTING/ ONGOING SEWERAGE FACILITIES Parameters Completed works Pre GAP GAP I. Under Construction GAP II. JnNURM Total NGRBA Complete /Progress. Sewer Line 495 km 3 km 1 km 154/79 65/59 856 km Sewage Pumping tation 5 2 No 2 Nos. 2/1 No 3/3 No. 18 Nos. Renovation of SPS/ MPS - 5 1 3/ 2/1 12Nos. Total Treatment Capacity -- 1 No. 60 mld 1 No. 29 mld 1 No. 60 mld 4 Nos. 105 mld 7 Nos. 254 mld 2 Nos. - - 2 Nos 2 Nos. Electric Crematorium River Front Development - 2Nos. - - Community Toilets - 112 Nos - - 48/95 Total Nos of Drains / Nala (Drains discharge into the river Ganga and Yamuna (44+13) 255 Nos 57 Water Supply Scheme Part-I &II PROJECT COST PART I - Rs. 89.69 Cr. PART II - Rs. 162.34 Cr. ALLAHABAD WATER SUPPLY Unit OHT CWR TW Existing Part – I Part – II 13 19 18 3 4 3 168 33 46 DETAILS OF STORAGE RESERVOIR UNDER WATER SUPPLY SCHEME S. No . Name of Zones OHT CWR TUBE WELL Existing Part I Part II Existin g Part I Part II Existing 1 2 - 15 Part I Part II 1 Khusroobagh - - - 2 Atala 2 2 - 2 - 13 2 3 3 Lukerganj 2 - - - 3 1 1 4 Civil Lines 1 - - 2 14 4 5 Colonelganj 3 - - 1 22 5 3 6 Rasoolabad 2 2 1 - - 13 3 6 7 Daraganj 1 - 2 - - 16 8 Kydganj 1 1 3 - - 18 3 5 9 Sulem Sarai 5 8 - - - 25 9 11 10 Naini 2 - 7 - - 19 5 5 11 Phaphamau - - 3 - - 4 1 2 12 Jhunsi - 2 - - 6 19 18 4 3 168 Total 13 2 1 4 6 4 33 46 Solid Waste Management Introduction : SWM in Allahabad City Solid Waste Management Project Approved Under JnNURM Project Cost Rs. 3041.49 Lakh Allahabad Waste Processing Co. Ltd. (AWPCL) SPV of SPML selected on PPP Model as a Partner Co. of NNA for Integrated Solid waste management work at Allahabad city AWPCL Start the Work May, 2010 Terminate the Work Oct, 2013 Stop the Work Aug, 2014 AWP approaches for arbitration after termination of contract & Stop all the Integrated Solid Waste works. SWM in Allahabad City After termination of contract by AWP, Municipal Corporation decided Perform all Integrated work with its own resources Start DTDC work in 4 Zones with 20% coverage Transport the waste from bins & Dhalao Ghar to the Processing Plant Processing of Waste and Produce /transfer to - Compost - RDF - SLF Solid Waste Management of Allahabad City Current Status •Total Municipal Solid Waste (MSW) generated: - 550 MT/day including Debris •Total Municipal Solid Waste (MSW) collected: - 425 MT/day including Debris - 125 T/day assimilate in surrounding low land area’s •Total Municipal Solid Waste (MSW) Collected from: s Door to Door 100 MT/day s Dust bins 175 MT/day s Others 150 MT/day • Waste Dispose to the Processing Plant : 250-300 MT/day • Waste Dispose to the open dumping : 150-200 MT/day Transportation /Waste Collection Equipments/ Vehicles Nagar Nigam has been Following Equipment or Vehicles : Dhalao Ghar 24 Nos. DP BINS 70 Nos. CP BINS 310 Nos. JCB/ LOADER 12 Nos. TRUCK/ TIPPER 35 Nos. GARBAGE COMPACTOR 06 Nos. TATA ACE & Others 80 Nos. Worker for Garbage Collection & Lifting (Including DTDC Worker) Worker for Sweeping & Cleanliness 450 Nos. 2700 Nos. Processing Plant Still Working after Termination of AWP (Partner Co.) Contract Area of Processing Plant 62 Acre Capacity Pre Sorting Plant 600 MT/Day Composting 70-80 MT/Day RDF Plant 100-120 MT/Day Recyclable Item 05-10 MT/Day Sanitary Landfill 3,50,000 m3 New Approaches for Specific Mela Area Hon’ble Central Minister of Water Resources River Development & Ganga Rejuvenation, Govt of India, Miss UMA BHARTI Visited on 14-12-2014 at Allahabad During a Meeting with Officer’s, directed to Municipal Corporation for Integrated Solid Waste Management Work in the City & River bank of Ganga-Yamuna. As per direction of Hon’ble Minister, Govt of India Municipal Corporation & Allahabad Development Authority Prepared A Combine Proposal of ESSENTIAL EQUIPMENTS & MATERIAL FOR Solid Waste Management Work At Mela Area’s of Allahabad (A Specific Area’s Of The City) & has send it to the SPMG & Approved by NMCG & SECOND PROPOSAL OF SOLID WASTE MANAGEMENT WORK FOR THE CITY & has send it to the SPMG for Approval PROPOSAL OF ESSENTIAL EQUIPMENTS & MATERIAL FOR Solid Waste Management Work At Mela Area’s Of Allahabad (A Specific Area’s Of The City) Cost of Combine Proposal Rs. 410-00 Lakh Essential Equipments for SWM as per Municipal Corporation Allahabad Sl. No. 1. Item’s 6. Tata ACE Vehicles Dumper Robot (Skid Steer Loader) Compactor Tractor With Hydraulic Trolley Supply & Installation of 10 Seated Mobile Toilet Van 7. Supply & fixing Hanging Type Twin Dust Bin 8. Compactor Placer (CP) Bins Trace Skimmer Machine On Lease rent for 2 month’s (for Trail basis) 2. 3. 4. 5. 9. Qty. 02Nos. 02 Nos. 02 Nos. 01 No. 02 Nos. 09Nos. 300 Nos. 70 Nos. 01 No. Proposed Item’s as per Allahabad Development Authority Sl. No. 1. 2. 3. Item’s Speed Motor Boat FPR Jetty 18x08 ft Life Jackets with Neck supporting pad size XXL Qty. 02 Nos. 02 Nos. 40 Nos. PROPOSAL OF ESSENTIAL EQUIPMENTS & MATERIAL FOR Solid Waste Management Work At City Of Allahabad Cost of Proposal Rs. 777-00 Lakh Proposed Item’s for SWM as per Municipal Corporation Allahabad Item’s Sl. No. 1. 2. 3. 4. 5. 6. House Hold Bins 20 Ltr Rickshaw Trolley E- Rickshaw Trolley DP Bins Qty. 4,00,000 Nos. 300 Nos. 50 Nos. 50 Nos. Compactor 03 Nos. JCB 02Nos. BOB Cut Loader 03 Nos. Maintenance of the Equipments for Next Two Year FLOATING TRASH SKIMMER MACHINES for Cleaning Of River Ganga During Magh Mela-2015 At Allahabad. • Both machines and staff have performed exceedingly well during this period and they have collected nearly 250 loads (estimated at 1200-1500 tons of waste) • During this period that have been transferred to the dumping ground along with other waste by our dumpers. The primary area of operation aroundSangam Nose, Quila Ghat and Arail Ghat, shamshan Ghat, New Yamuna Bridge, • Where there is maximum human activity due to it being area of prominent importance for bathing and religious immersion. • This is also the area with maximum visibility of the work being done. FLOATING TRASH SKIMMER MACHINES for Cleaning Of River Ganga During Magh Mela-2015 At Allahabad. Whole Machine working operation from collecting the waste to disposal of waste Floating waste in Ganga Machine collecting waste Disposal of waste Machine collected waste Challenges faced by MCA • Lack of awareness amongst general public regarding waste management. • Lack of waste segregation at source of its generation, viz. household segregation • Lack of liaising with Public Representatives . • Lack of cooperation from households, consumers. • Limited environmental awareness, education and attitudes among the society. • Open unplanned drainage system all over the city. • Non Payment of User Charges & lack of enforcement law. • Unavailability of sufficient funds with Nagar Nigam Allahabad Nagar Nigam Detailed Project Report (DPR)Completed -: 1- City Sanitation Plan. (Prepared by Administrative staff Collage Hyderabad) 2- Comprehensive Mobility Plan. (Prepared by Urban Mass Transit company Limited New Delhi ) 3- City Development Plan (Almost Completed). (Prepared by CRISIL Risk and Infrastructure Solutions Limited Gurgaon ). Pollution Mitigation Measures Taken By Allahabad Nagar Nigam To Clean River Ganga And Yamuna. Keeping in view the aim of improvment in pollution status of the city ANN is Committed for improving Sanitation, Drainage and Greenery of the city. ANN is doing followings work in this direction:Intregrated Solid Waste Management : Improvement of Park: Enforcement Activity: Community Toilet: Dhobi Ghats: Public Awareness & Communication Outreach Program: Hkkjr ljdkj ds jk"Vªh; unh laj{k.k funs’kky; ds vkns’k ds }kjk bykgkckn esa “Sewarage and Non–Sewarage Scheme for Pollution abatement of river Ganga at Allahabad, U.P.’’ Under NGRBA Program ds rgr uxj ds efyu cfLr;ksa gsrq dqy 143 ‘kkSpky;ksa ds fuekZ.k dk;Z izLrkfor@Lohd`r gS] fooj.k fuEuor~ gS& Type of Toilet 10 Seated 05 Seated 20 Seated Total Proposed Qty. 61 68 14 Complete 29 19 Nil In Progress 10 6 - 143 48 16 Remark Rest 17 space try to identify Rest 49 space try to identify Rest 14 space try to identify Rest 80 space try to identify dqy Lohd`r /kujkf’k :0 10-75 djksM A ty fuxe ls izkIr /kujkf’k :0 4-50 djksM+ ds lkis{k bl en esa O;; /kujkf’k :0 3-49 djksM+ A unh esa feyus okys ukys&ukfy;ksa esa iznw”k.k jksdFkke gsrq bykgkckn esa dqy 57 cM+s ukys gS A ftuesa ls& 44 ukyksa dk mRizokg xaxk unh esa ,oa 13 ukyksa dk mRizokg ;equk unh esa gksrk gSA bu ukyksa dks VSi fd, tkus ,oa ukyksa esa tkyh yxk;k tkuk vko’;d gSA • lHkh ?kkVksa dh fu;fer lQkbZ gsrq vko’;d eSu ikWoj ,oa e’khujh dh vko’;drkA • ?kkVksa ij iznw”k.k fu;a=.k pkSfd;ksa dh LFkkiukA • esyk {ks= esa ikfdZax dh LFkkiukA • Qwy&ekyk ,oa iwtu lkexzh nku fd, tkus gsrq dy’k ik= dh LFkkiukA • i.Mksa @?kkfV;ksa ds fy, ,d:ih; lhesUVsM pcwrjk dk fuekZ.k ,oa iathdj.k }kjk vkoaVuA Five Dhobi Ghats have been Constructed & Improved under NGRBA Name & Location of Dhobi Ghat Kanpur Road Panna Lal Road Mumfordganj Kareli Allahpur IDH Compound Lohd`r ,oa izkIr /kujkf’k :0 41-00 yk[k ds lkis{k O;; /kujkf’k :0 41-00 yk[k A More than 200 washers man are benefited & using the facilities The compaign for Ganga awareness has been launch vigourously in the city. Awareness Display at strategic point/location Hoarding , Wall Painting, Pumplet, Stickers, Banners Poster and other Awareness display Some Activities are given as underSensitization by Awareness Programme door to door Nirmal Ganga Rally, Seminar & Conference, communicate to: Prabhat Ferries, Nauka Rally, Shramdaan General Public, Stakeholder, Religious group, and Student Activities at River Bank, Nukkad Natak, Ward Cleaning Drive, No Polythene Please Rally, Model, Essay Writing & Painting Competition, Magh Mela Campaigning, Cultural & Awareness Program, Pumplet, Handbill & Jhola Distribution, Announcement of Awareness Massages by Vehicles, by Control Room, On FM Radio “No Plastic Bag Please” Campaign & “Ganga Run” tutkx:drk ,oa tulgHkkfxrk en ds vUrxZr Lohd`r /kujkf’k :0 415 yk[k ds lkis{k bl en esa O;; dh x;h /kujkf’k :0 108-30 yk[k ek0 iz/kkuea=h dh egRodka{kh ;kstukvksa ds fdz;kUo;u gsrq uxj fuxe bykgkckn esa izLrkfor xaxk lsy dk xBu ,d Vhe ds :i fofHkUu izdkj ds dk;Zdykiksa ,oa dk;Zdzeksa ds lapkyu] i;Zos{k.k ,oa vuqJo.k gsrq GANGA CELL MUNICIPAL COMMISSIONER ADDITIONAL MUNICIPAL COMMISSIONER CHIEF ENGINEER • • ENVIRONMENT ENGINEER ASSISTANT ENGINEER JUNIOUR ENGINEER ACTOR PROGRAMME OFFICER PROGRAMME CO-ORDINATOR ASST. PROGRAMME CO-ORDINATOR SOCIAL SUPERVISOR COMP. OPERATOR/ SOCIAL WORKER ASSISTANT MASSENGER • • • • • • • dk;Znkf;Ro ,u,elhth ,oa ,uthvkjch, ds ekxZn’kZu ,oa fn’kkfunsZ’kksa dks fdz;kfUor djukA okMZ lgk;rk lfefr ,oa fofHkUu ljdkjh&xSj ljdkjh laxBuksa ds lkFk leUo; dj ;kstukvksa dk fdz;kUo;u djukA lhojst&ukWu lhojst iznw”k.k dh jksdFkke gsrq tkx:drk dk;Zdzeksa dk vk;kstu] tuekul dks izsfjr djukA fofHkUu LVSd gksYMj ds chp esa leUo; LFkkfir djukA ,u0th0vkj0ch0,0] ,l0th0vkj0lh0,0 ,oa uxj fuxe ds e/; dM+h ds :i esa lg;ksx djukA u;s&Uk;s vfHkUko rjhdks ls tutkx:drk QSykukA i=kpkj] fjiksfVZax] Qkbfyax vkfnA ;kstuk ds mn~ns’;ksa dh iwfrZ djukA fofHkUu dk;Z’kkykvksa ds ek/;e ls dSikflVh fcfYMax dk fodklA uxj fuxe ds izR;sd okMZ dk lfdz; lg;ksx izkIr fd, tkus gsrq izLrkfor xaxk laj{k.k okMZ lgk;rk lfefr dk xBu 7 lnL;h; xaxk laj{k.k okMZ lgk;rk lfefr laj{kd ¼ek0 ik"kZn½z 6 lnL; efgyk lnL; fofHkUu {ks= ds ,d&,d laHkzkUr ;qok ukxfjd o;kso`} laHkzkUr ukxfjd • ek0 ik”kZn lfgr dqy 07 lnL; gksxsaA •lgk;rk lfefr ds laj{kd lEcfU/kr okMZ ds ek0 ik”kZn gksxsaA •lfefr ds xBu gks tkus ls 80 okMksZ ls de ls de 480 lfdz; lnL; }kjk dk;ksZ esa lgk;rk xaxk laj{k.k ,oa LoPNrk okMZ lgk;rk lfefr dk xBu okMZ lgk;rk lfefr ,oa xaxk lsy ds lg;ksx ls vk;ksftr fdz;kdykiks dk;Zdzeksa dh izxfr dh leh{kk djukA xzqi }kjk frekgh cSBd dj xaxk lsy ds dk;ksZ dh leh{kk dj izxfr ls ,u,elhth o ,lih,eth dks voxr djkuk ;kstukvksa ds dk;ksZ esa mRiUu ck/kkvksa dks nwj djus dk iz;Ru djsxhA fdz;kfUor fd, tkus okys dk;Zdeks@ a fdz;kdykiksa dks csgrj fodYiksa ds lkFk fdz;kfUor fd, tkus gsrq lq>ko izkIr djuk ,oa lEikfnr dk;ksZ ij fuxjkuh@ i;Zos{k.k djuk ,oa izxfr dh leh{kk djuk vkB lnL;h; ekWuhVfjax xzqi esa ek0 egkikSj ¼v?;{k½ lfgr uxj vk;qDr] vij ftykf/kdkjh ¼uxj½] izfrfuf/k jk”Vªh; LoPN xaxk fe’ku ¼,u0,e0lh0th0½] izfrfuf/k jkT; xaxk unh laj{k.k vfHkdj.k ¼,l0th0vkj0lh0,0½] izfrfuf/k xaxk iznw”k.k fu;a=.k bdkbZ] bykgkckn] phQ okMsZu flfoy fMQsla ] bykgkckn ,oa izfrfuf/k jk”Vªh; foKku ,dkMseh ¼uklh½ bykgkckn lnL; gksxsAa CAPACITY BUILDING OF NAGAR NIGAM UNDER NGRBA PROGRAME Infrastructure Development/Enhancement The infrastructure requirements can be categorized into groups namely management and engineering infrastructure. 1 Training Hall Building & Decoration / Hardware and Software & Equipment/Maintenance 2 Communication 3 Human Resource Development 4 Requisite Manpower5 Legal Cell 6 Tariff Recovery 7 Enforcement of legislations 8 Management Training 9 Technical Training10 Financial Training CAPACITY BUILDING OF COMMUNICATION & PUBLIC OUTREACH PROGRAME 1- 2- Communications Needs Assessment: Mass communication campaigns: Support for voluntary public participation: Community participation, Information Education and Communications campaigns Mobilization of local communitiesWide range of views, concerns, and sensitivities : Stakeholder Workshops and Seminars : Public Private Partnership: Dissemination of project information’s: Citizen oversight: Consultancies: 3456- CAPACITY BUILDING OF SOLID WASTE MANAGEMENT SWM for cleanliness of Ganga & important Ghats situated at Allahabad. SWM engage & includes (i) Information of Main Ghats’s; Total 20 Ghat’s Situated at Ganga-Yamuna. (ii) Essential equipment for Cleanliness of Ghats’s, Collection & Transportation of waste materials. (iii) NNA Required Staff for Cleanliness of Ganga-Yamuna Ghats situated at Allahabad on behalf SWM. i.e., Supervisor, Safayi Nayak, Sweeper, Helper, Vehicles Driver & Operator for Speed Boat. (iv) Infrastructural facilities and machinery required for Solid waste collection, transportation, processing and disposal work for cleanliness of Ghats’s. i,e., Speed Boat, Skid Steer Loader, Tata ACE, Compactor, DP/CP bins, Skimmer Machine for floating Trash, Miscellaneous( Broom, Basket, Panja, Favari, etc.,) THANK YOU FOR YOUR ATTENTION