by Devendra Kumar Pandey, Municipal Commissioner

Transcription

by Devendra Kumar Pandey, Municipal Commissioner
12 MAY, 2015
ALLAHABAD (PRAYAG) : AT A GALANCE
The city of Allahabad is among the largest cities of Uttar Pradesh and situated
at the confluence of three rivers –
Ganga, Yamuna and the invisible Saraswati.
Coordinates: 25.45°N 81.85°E
Elevation : 98 m (322 ft)
Govt Type • Mayor–Council
Area of ULB
• 82 sq Km
Body •Allahabad Municipal Corporation
Municipal Wards • 80;
Zone • 5
Mayor • Smt. Abhilasha Gupta ‘Nandi’
Population • 59,54,391
Growth 20.63%
M.P.
Urban Population
• * 14,72,873;
Urban Population Growth 24.74%
Projected Population
• 20.50 lakh
(as per Master Plan-2021)
Average House Hold-07
Density
•1,087/km2 (2,820/sq mi)
• Shri Shyama Charan Gupta
• Shri Keshav Prasad Maurya
M.L.A.
• Shri Anugrah Narayan Singh
• Shri Hazi Parvez Ahmad
• Smt. Puja Pal
Tel. code 91-532 ;
Sex ratio • 901 ♂/♀;
Demonym •Allahabadi;
Vehicle Reg. • UP-70
Official lang.•Hindi
PIN 211001-18
*Source- Final Census Report of U.P.- 2011; Source & http://allahabad.nic.in
EXISTING/ ONGOING SCHEME
Under Jawahar Lal Nehru National Urban Rehabitation Scheme
(JnNURM)
 Sewerage System
 Water Supply System
 Solid Waste Management
“Sewerage And Non –Sewerage Scheme
For Pollution Abatement of River Ganga At Allahabad, U.P.’’
UNDER NGRBA PROGRAM
 Sewerage System
 Communications & Public Outreach Program
In Allahabad, sanitation becomes more prominent because of city location between Doab of holy
rivers Ganga & Yamuna.
Sewerage Network
CITY SEWERAGE PLAN - ALLAHABAD
F
19
18
17
16
PHAPHAMAU
Phaphamau SPS
District 'A'
District 'B'
District 'C'
District 'D'
District 'E'
District 'F'
District 'G'
Phaphamau STP
10 MLD
14A
14B
11B
RIV
ER
E
RIV
GA
14
E
NG
A
Rambagh
15
14
Jondhwal
F
11C
Balikapur
14
D
14
RAJAPUR INTERCEPTOR
A
NG
A
RG
14C
11D
11F
11
11A
11E
PHAPHAMAU
RASULABAD
BAZAR
KUTI MAHADEV
A
15
Haulipar Purwa
ROA
D
SHILAKHANA
PHA
MAU
Mahdeori
Ghusayna Purwa
B
15
TELIARGANJ
PHA
TARBAGIYA
Jhunsi Town Area
Chilla
15C
Kalakari Purwa
15D
GOBINDPUR
15E
Cantonment Area
PHAPHAMAU ROAD
RAJAPUR MPS
RO
AD
RAJAPUR STP
L AW
REN
CE
60 MLD - 1st STAGE
80 MLD - FINAL
OLD CANTONMENT
Pura
Gadaria
MAIN
Saraiyan
RISING
BISHANPUR
NAYAPURA
Salori
SALORI
D
Cemetry
EY
ROA
RIV
ER
GA
NG
A
ISHAWARSHARANNAGAR
St
Peter
MUIRABAD
NEW PUMP HOUSE INCREASED
CAPACITY FROM 8 MLD
TO 55 MLD
A LA
I
M
ROAD
JA
ST
A NL
A KBAR
GALLA BAZAR
FR
I
Chandpur
RO
AD
HUTURKHAN
Shadiabad
MUMFORDGANJ PS
MUMFORDGANJ
SPS
L
ALA
LOCKHA
BA
RO
LE
I R
OA
D
T CHE
RY
GU L
MA
KATRA
D
UN I V ERS
D
SA PRU
MARG
NE
HR
U RD
AL
TIL
RG
RG
D
ROA
SA L I KGAN J
YA ROAD
B
L I DD
LE
AMA
RNA
ROA
D
a Bra
nch
AM
ana
si Chh
apr
DH
I
ROA
S
DARAGANJ SPS
ALOPIBAG SPS
GRA
D
ROAD
LA L
ROA
D
MORIGATE
NALA
MORIGATE 9 MLD
MAIN
ROAD
RO
NEW PUMPING STATION
MORIGATE 12 MLD
H
MAR
ND
RAMBAGH
BA
VA
G
T I
K
ROAD
MARG
GR AND
TRUNK
T R I VEN I
H I MA ROA
D
BAI KA BAG
NETANAGAR
I
RGA
T RUN
N
D ROAD
I
RISING
ND
AD
IT
AR
GAN
Khalasi Line
KYEDGANJ
TR I
V EN
I
SHA
STR
I BRID
GE
ROAD
Kasai Tola
ROAD
KYDGANJ
MINTO
PARK
BHARGAV
RGAV A
GRA
FORT
ROA D
L
BH
GA
AR
VA
CHAUKHANDI
BAN K
Y AMUNA
ROA D
K
ROA
D
ROAD
Y AMUN
A
T RUN
FORT
KYDGANJ
NAIBASTI
A
BANK
SPS
JHUNSI
PIPE
YAMUN
ND
D
SHANK AR L AL
R
M
ROAD
SANGAM NOSE
KATGHAR
GAUGHAT PS
NAINI STP
NA
SPS
G
N
A
A
G
SPS
NU
RU
L
MU
R
YA
ER
E
IV
RIV
R
RO
AD
- Var
WITH ADDITIONAL PUMPING
UPTO 42 MLD
IN
NG MA
H
A
RISI
LA
BHA
SAM I
RD
CHACHAR NALA SPS
LOCAL IMPROVEMENT
PROPOSED
GHAGGAR NALA SPS
RAMPR I
AD
A RO
TH
JH
MAI
N
ANT
EXIS TING
CAPACITY
28 MLD
40 MLD - 1st STAGE
50 MLD - FINAL
N
DARIYABAD
MIRAPUR
NAD I
DR
D
ROA
ID
AH
SH
NEHRU NAGAR
MG
MUTTHIGANJ
ITY
MARG
Gurudwara
SAM I T I
MUTHIGANJ
AV
RO AD
I
HI
SHNAK
AL
T I L AK
ITY MA
IN
T
IE
L MA
LA
PAN
NA
RD
I NG
H
S
AN
SH
RO
RASULPUR
GRAV
AH ROAD
NURUL L
GTB NAGAR
PROPOSED
SASUR KHADERI
SPS
KA
R
S E VA
LAU THER ROAD
ROAD
EE
ER J
GR
AU
LA
LA
RA
CH
AS
SU
BH
NE
RD
L IB
GHA
RZ A
A P
BAN
PANCHKROS
ATM
KR I
MA
IN
Shararabagh
A R MARG
ROAD
KALYANIDEVI
SH
Graveyard
TULARAMBAGH
MAH
BAHRANA
BAHADURGANJ
ALLAHPUR SPS
ad
ALOPIBAGH
MARG
H I ND I SAH I T YA S AMME L AN MARG
RU
NU
MI
AH ROAD
NURUL L
ATARSUIYA
ATARSUIYA
TULSIPUR
Alla
hab
MARG
SITARAMPUR
ROAD
BANS
MANDI
I
KA L
ND
MALVIYA NAGAR
(KARELI)
ITY
K A KK
TRUNK
B HAWAN
SALORI STP - 29 MLD
D
AD
RO
ATALA
I
ROA
RT
FO
GRAND
Rani Mandi
NAYA PURWA
AV
P
Jauharitola
SARAI MIRKHAN
B HART
KARELABAGH
COLONY
ANA
Pan Dariba
TY MAI Mirganj
N
T
Graveyard
GR
V I VEK
KOLHANTOLA
S TR EE
SULTANPUR
DH
MADHAVPUR
L AUDER ROAD
RD
AD
L LA
H
KHUSRU BAGH
ROAD
RO
GRAVI
KO L HAN T OA L
BAKSHI BAZAR
KHULDABAD
AKBARPUR
ER I
GAN
AD
SWAM
I
K
KHULDABAD
K H AD
MA
SOUTH
MALAKA
MOHSINGANJ
CHAUK
SABZI MANDI
ROSHANBAGH
PURSHOTTAM
NAGAR
NIHALPUR
BENIGANJ
S A SU R
AT
RO
AD
KALADANDA
CHAKIYA
RAJRUPPUR
RAJROOPPUR
KARELI
MAR
G
CHHIDPUR
JOHNSTONGANJ
GADIWAN
TOLA
ROA D
BADSHAHI
MANDI
Nakhas Khana
SUBEDARGANJ
Dhussa
I
RT
RO
CHAK
NIRATUL
Raiway
Colony
T RUN K
U
GR AND
SHAHGANJ
TJ
KARBALA
LUKAR GANJ
SPS
KA
Jairampur
40 MLD -
W/S INTAKE WELL
NUMAYA DAHI STP
50 MLD CAPACITY
ING
MA
IN
Jhunsi STP
18 MLD
RIS
Jhalwa
AM
AN
H
FO
ROAD
NORTH
MALAKA
ROAD
DR
L UKAR
KHUSRU
BAGH
14 MLD - FINAL
B AND
Salori MPS
ALLAHPUR
MAH
LALIT NAGAR
L EAD E R
LUKARGANJ
Railway
Colony
I NT
MA
NE
KA
N I NA I
DU MARG
SARO J I
AMDA
L AXM I NARAYAN
MARG
TT
A ND
HO
JI
US
PUR
Graveyard
GEORGE TOWN
NORTH EASTERN
RAILWAY - MAIN
LINE
TA
D
AD
UR
GEORGE TOWN
ROAD
SM I T H
ROAD
DON
SH
ROA
TAN
TU
NK
YUS UF
RAILWAY COLONY
G
MAR
S
SHERWANI NAGAR
CH
CIVIL LINES
NAWA B
LA
TRU
Y
MO
I MARG
DARBHANGA COLONY
C
HR
U
PATR I KA
( E LG I N
ROAD )
A
MARG
MARG
I
MARG
CIVIL LINES
ROAD
AND
GANDH I
I MP
TAGORE TOWN
MARG
ML
PAT EL
ROAD
SARDAR
SHA ST R
T
AS TURBA
ROAD
PONAPPA
RA J I V GANDH
I
GR
L ANE
SH
TAGORE TOWN
DARBHANGA CASTLE
T A SHK EN
GANDH
BAH ADUR
MA HATMA
M ARG
TMA R AV I DA S M
MAHA
JAYANTIPUR
HA
I ROA D
Dhumanganj
SULEM SARAI
CHURCH
FATEHPUR
BICHHWA
AD
RO
MUNDERA
MAR
MARG
BAGHAMBAR
LAL
RD
BE
BAHADUR
COOPER
MARG
STRACH
ROAD
CL I VE
MARG
I
SAROJ I
SHA S T R
EY ROAD
PUR
ARG
2
H
GA
NG
A
AD
NORTH EASTERN
RAILWAY
ALLAHABAD VARANASI SECTION
TE J
CIVIL LINES
USH
MARG
N I NA I
DU
B AHADUR
OT
T ASHK ENT
NYAY MARG
MARG
DAS
TAM
RO
U
HR
NO .
OS
G
ROA
CIVIL LINES
T
NE
H IG HWA Y
GH
DAYA N AND MARG
L
NA T I O N A L
I
G
MAR
R LA
ROAD
T AM
AN
X
NO
AN
CHOTA BAGHARA
HA
T RUN K
IN
I T Y ROA
D
KA
ALLENGANJ
MAR
G
WA
JA
GRAND
TH
J HA
Dhaurahra
ES
U MA
RG
ROA
AT I
NA
COLONELGANJ
ON
T AND
G
I T YA
BA
N
AN
N
AD
KA
GA
RO
BS
TOM
AD
MAR
C
RO
D
SH I VRA MDA S
CIVIL LINES
SULEM SARAI
ROA D
GAN
MARG
MARG
IR
CANTONMENT
PRITAM NAGAR
T RUN K
RD
L NEHR
OA
Y MAIN
DAYA NAND
MA HARSH I
LAL
GRAND
L
S AN
HR
UL
KATRA
CH
CIVIL LINES
I
PT
ZA
RO AD
MARG
CANTONMENT
NIM SARAI
AGARWA
ROAD
V I K RAMAD
RO
RIV
ER
BE L
MAI
N
ROAD
ER
EE
R
TA
LAL
AN
ST
MARG
LOH I A
MARG
K I MARG
MUKHE R
J
O
GUP
AY
MOT
I LA
RG
DA YANA ND
ROAD
MA
I
C L I VE
A
K
GRAVIT
TH
AR
P
POLICE LINES
MA HARSH
I J NA
COLONY
R AMN
HA
MU I R
N
RAM MANOHAR
RM
VA LM I
VE
N I NA I
DU
I
H I RA LAL
V
MAHA RSH
BA
COLONY
MAIN
AN
ST
GRAVITY MAIN
SARO J I
DE
MARG
HA
NYAY
ROAD
MA
CAR I APPA
AD
RO
E
L AW
RE
NC
RD
RO
AD
KAB
GRA VITY
EE
D
E R J EE RD
ROAD
N
IO
MAGDA LA
A K BAR
RJ
S
RAJAPUR
RAJAPUR
R
I NT
N
NE
RANIPUR
RD
ROA
M
WA
BA
IS
MU I
ITY
Uchwan Garhi
Nawada
AV
PONAPPA
ASHOK NAGAR
CANTONMENT
NI
SH
H NA
Y
ROAD
ROA D
GR
K HAN
ROAD
AHMED
ROAD
NAYA KATRA
KR
RI
AD
Pura Mau Saraiyan
K
M
ROA
HA D
VE LOCK
TU
ROAD
K ROAD
PONGHAT MPS
S YED
HAV E LOCK
KODARA MPS
I
Beli
RT ROAD
BALM I
KODARA NALA STP
25 MLD - 1st STAGE
35 MLD - FINAL
PONGHAT STP
10 MLD - 1st STAGE
15 MLD - FINAL
L A J PAT R A
MOT I L A L NE HRU
ROAD
ROB ERT
NAINI
G
EXISTING/ ONGOING SEWERAGE FACILITIES
Parameters
Completed works
Pre GAP
GAP I.
Under Construction
GAP II.
JnNURM
Total
NGRBA
Complete /Progress.
Sewer Line
495 km
3 km
1 km
154/79
65/59
856 km
Sewage Pumping tation
5
2 No
2 Nos.
2/1 No
3/3 No.
18 Nos.
Renovation of SPS/ MPS
-
5
1
3/
2/1
12Nos.
Total Treatment Capacity
--
1 No.
60 mld
1 No.
29 mld
1 No.
60 mld
4 Nos.
105 mld
7 Nos.
254 mld
2 Nos.
-
-
2 Nos
2 Nos.
Electric Crematorium
River Front Development
-
2Nos.
-
-
Community Toilets
-
112 Nos
-
-
48/95
Total Nos of Drains / Nala (Drains discharge into the river Ganga and Yamuna (44+13)
255 Nos
57
Water Supply Scheme
Part-I &II
PROJECT COST
PART I - Rs. 89.69 Cr.
PART II - Rs. 162.34 Cr.
ALLAHABAD WATER SUPPLY
Unit
OHT
CWR
TW
Existing
Part – I
Part – II
13
19
18
3
4
3
168
33
46
DETAILS OF STORAGE RESERVOIR UNDER WATER SUPPLY SCHEME
S.
No
.
Name of Zones
OHT
CWR
TUBE WELL
Existing
Part I
Part II
Existin
g
Part I
Part
II
Existing
1
2
-
15
Part I
Part II
1
Khusroobagh
-
-
-
2
Atala
2
2
-
2
-
13
2
3
3
Lukerganj
2
-
-
-
3
1
1
4
Civil Lines
1
-
-
2
14
4
5
Colonelganj
3
-
-
1
22
5
3
6
Rasoolabad
2
2
1
-
-
13
3
6
7
Daraganj
1
-
2
-
-
16
8
Kydganj
1
1
3
-
-
18
3
5
9
Sulem Sarai
5
8
-
-
-
25
9
11
10
Naini
2
-
7
-
-
19
5
5
11
Phaphamau
-
-
3
-
-
4
1
2
12
Jhunsi
-
2
-
-
6
19
18
4
3
168
Total
13
2
1
4
6
4
33
46
Solid Waste
Management
Introduction : SWM in Allahabad City
Solid Waste Management Project Approved Under JnNURM
Project Cost Rs. 3041.49 Lakh
Allahabad Waste Processing Co. Ltd. (AWPCL) SPV of SPML
selected on PPP Model as a Partner Co. of NNA for
Integrated Solid waste management work at Allahabad city
AWPCL
Start the Work
May, 2010
Terminate the Work
Oct, 2013
Stop the Work
Aug, 2014
AWP approaches for arbitration after termination of contract &
Stop all the Integrated Solid Waste works.
SWM in Allahabad City
After termination of contract by AWP,
Municipal Corporation decided
Perform all Integrated work with its own resources
Start DTDC work in 4 Zones
with 20% coverage
Transport the waste from bins & Dhalao Ghar
to the Processing Plant
Processing of Waste and Produce /transfer to
-
Compost
- RDF
- SLF
Solid Waste Management of Allahabad City
Current Status
•Total Municipal Solid Waste (MSW) generated:
- 550 MT/day including Debris
•Total Municipal Solid Waste (MSW) collected:
- 425 MT/day including Debris
- 125 T/day assimilate in surrounding low land area’s
•Total Municipal Solid Waste (MSW) Collected from:
s Door to Door
 100 MT/day
s Dust bins
 175 MT/day
s Others
 150 MT/day
• Waste Dispose to the Processing Plant : 250-300 MT/day
• Waste Dispose to the open dumping
: 150-200 MT/day
Transportation /Waste Collection
Equipments/ Vehicles
Nagar Nigam has been Following Equipment
or Vehicles :
Dhalao Ghar
24 Nos.
DP BINS
70 Nos.
CP BINS
310 Nos.
JCB/ LOADER
12 Nos.
TRUCK/ TIPPER
35 Nos.
GARBAGE COMPACTOR
06 Nos.
TATA ACE & Others
80 Nos.
Worker for Garbage Collection &
Lifting (Including DTDC Worker)
Worker for Sweeping & Cleanliness
450 Nos.
2700 Nos.
Processing Plant Still
Working after
Termination of AWP
(Partner Co.) Contract
Area of
Processing
Plant
62 Acre
Capacity
Pre Sorting
Plant
600
MT/Day
Composting
70-80
MT/Day
RDF Plant
100-120
MT/Day
Recyclable
Item
05-10
MT/Day
Sanitary
Landfill
3,50,000
m3
New Approaches for Specific Mela Area
Hon’ble Central Minister of Water Resources River Development & Ganga Rejuvenation,
Govt of India, Miss UMA BHARTI
Visited on 14-12-2014 at Allahabad
During a Meeting with Officer’s, directed to Municipal Corporation
for Integrated Solid Waste Management Work in the City &
River bank of Ganga-Yamuna.
As per direction of Hon’ble Minister, Govt of India
Municipal Corporation & Allahabad Development Authority
Prepared A Combine Proposal of
ESSENTIAL EQUIPMENTS & MATERIAL FOR
Solid Waste Management Work At Mela Area’s of Allahabad
(A Specific Area’s Of The City)
& has send it to the SPMG & Approved by NMCG
& SECOND PROPOSAL OF SOLID WASTE MANAGEMENT WORK FOR THE CITY
& has send it to the SPMG for Approval
PROPOSAL OF ESSENTIAL EQUIPMENTS & MATERIAL FOR
Solid Waste Management Work At Mela Area’s Of Allahabad
(A Specific Area’s Of The City)
Cost of Combine Proposal Rs. 410-00 Lakh
Essential Equipments for SWM as per Municipal Corporation Allahabad
Sl. No.
1.
Item’s
6.
Tata ACE Vehicles
Dumper
Robot (Skid Steer Loader)
Compactor
Tractor With Hydraulic Trolley
Supply & Installation of 10 Seated Mobile Toilet Van
7.
Supply & fixing Hanging Type Twin Dust Bin
8.
Compactor Placer (CP) Bins
Trace Skimmer Machine On Lease rent for 2 month’s (for Trail basis)
2.
3.
4.
5.
9.
Qty.
02Nos.
02 Nos.
02 Nos.
01 No.
02 Nos.
09Nos.
300 Nos.
70 Nos.
01 No.
Proposed Item’s as per Allahabad Development Authority
Sl. No.
1.
2.
3.
Item’s
Speed Motor Boat
FPR Jetty 18x08 ft
Life Jackets with Neck supporting pad size XXL
Qty.
02 Nos.
02 Nos.
40 Nos.
PROPOSAL OF ESSENTIAL EQUIPMENTS & MATERIAL FOR
Solid Waste Management Work At City Of Allahabad
Cost of Proposal Rs. 777-00 Lakh
Proposed Item’s for SWM as per Municipal Corporation Allahabad
Item’s
Sl. No.
1.
2.
3.
4.
5.
6.
House Hold Bins 20 Ltr
Rickshaw Trolley
E- Rickshaw Trolley
DP Bins
Qty.
4,00,000 Nos.
300 Nos.
50 Nos.
50 Nos.
Compactor
03 Nos.
JCB
02Nos.
BOB Cut Loader
03 Nos.
Maintenance of the Equipments for Next Two Year
FLOATING TRASH SKIMMER MACHINES
for Cleaning Of River Ganga During Magh Mela-2015 At Allahabad.
• Both machines and staff have performed
exceedingly well during this period and
they have collected nearly 250 loads
(estimated at 1200-1500 tons of waste)
• During this period that have been
transferred to the dumping ground
along with other waste by our dumpers.
The primary area of operation aroundSangam Nose, Quila Ghat and Arail Ghat,
shamshan Ghat, New Yamuna Bridge,
• Where there is maximum human activity due
to it being area of prominent importance for
bathing and religious immersion.
• This is also the area with maximum visibility of
the work being done.
FLOATING TRASH SKIMMER MACHINES
for Cleaning Of River Ganga During Magh Mela-2015 At Allahabad.
Whole Machine working operation from collecting the waste to disposal of waste
Floating waste in Ganga
Machine collecting waste
Disposal of waste
Machine collected waste
Challenges faced by MCA
• Lack of awareness amongst general public regarding waste
management.
• Lack of waste segregation at source of its generation, viz.
household segregation
• Lack of liaising with Public Representatives .
• Lack of cooperation from households, consumers.
• Limited environmental awareness, education and attitudes
among the society.
• Open unplanned drainage system all over the city.
• Non Payment of User Charges & lack of enforcement law.
• Unavailability of sufficient funds with Nagar Nigam
Allahabad Nagar Nigam
Detailed Project Report (DPR)Completed -:
1- City Sanitation Plan.
(Prepared by Administrative staff Collage Hyderabad)
2- Comprehensive Mobility Plan.
(Prepared by Urban Mass Transit company Limited New Delhi )
3- City Development Plan (Almost Completed).
(Prepared by CRISIL Risk and Infrastructure Solutions Limited Gurgaon ).
Pollution Mitigation Measures Taken By
Allahabad Nagar Nigam To Clean River
Ganga And Yamuna.
Keeping in view the aim of improvment in pollution status of the city
ANN is Committed for improving
 Sanitation,
 Drainage and
 Greenery of the city.
ANN is doing followings work in this direction:Intregrated Solid Waste Management :
Improvement of Park:
Enforcement Activity:
Community Toilet:
Dhobi Ghats:
Public Awareness &
Communication Outreach Program:
Hkkjr ljdkj ds jk"Vªh; unh laj{k.k funs’kky; ds vkns’k ds }kjk bykgkckn esa
“Sewarage and Non–Sewarage Scheme for Pollution abatement of river Ganga at Allahabad, U.P.’’
Under NGRBA Program ds rgr
uxj ds efyu cfLr;ksa gsrq dqy 143 ‘kkSpky;ksa ds fuekZ.k dk;Z izLrkfor@Lohd`r gS] fooj.k fuEuor~ gS&
Type of Toilet
10 Seated
05 Seated
20 Seated
Total
Proposed Qty.
61
68
14
Complete
29
19
Nil
In Progress
10
6
-
143
48
16
Remark
Rest 17 space try to identify
Rest 49 space try to identify
Rest 14 space try to identify
Rest 80 space try to identify
dqy Lohd`r /kujkf’k :0 10-75 djksM A
ty fuxe ls izkIr /kujkf’k :0 4-50 djksM+ ds lkis{k bl en esa O;; /kujkf’k :0 3-49 djksM+ A
unh esa feyus okys ukys&ukfy;ksa esa iznw”k.k jksdFkke gsrq
bykgkckn esa dqy 57 cM+s ukys gS A ftuesa ls&
44 ukyksa dk mRizokg xaxk unh esa ,oa 13 ukyksa dk mRizokg ;equk unh esa gksrk gSA
bu ukyksa dks VSi fd, tkus ,oa ukyksa esa tkyh yxk;k tkuk vko’;d gSA
• lHkh ?kkVksa dh fu;fer lQkbZ gsrq vko’;d eSu ikWoj ,oa e’khujh dh vko’;drkA
• ?kkVksa ij iznw”k.k fu;a=.k pkSfd;ksa dh LFkkiukA
• esyk {ks= esa ikfdZax dh LFkkiukA
• Qwy&ekyk ,oa iwtu lkexzh nku fd, tkus gsrq dy’k ik= dh LFkkiukA
• i.Mksa @?kkfV;ksa ds fy, ,d:ih; lhesUVsM pcwrjk dk fuekZ.k ,oa iathdj.k }kjk vkoaVuA
Five Dhobi Ghats have been Constructed & Improved under NGRBA
Name & Location
of Dhobi Ghat
Kanpur Road
Panna Lal
Road
Mumfordganj
Kareli
Allahpur IDH
Compound
Lohd`r ,oa izkIr /kujkf’k :0 41-00 yk[k ds lkis{k
O;; /kujkf’k :0 41-00 yk[k A
More than 200 washers man are benefited & using the facilities
The compaign for Ganga awareness has been launch vigourously in the city.
Awareness
Display at
strategic
point/location
Hoarding ,
Wall Painting,
Pumplet,
Stickers,
Banners
Poster
and other
Awareness
display
Some Activities are given as underSensitization by
Awareness Programme
door to door
Nirmal Ganga Rally, Seminar & Conference,
communicate to:
Prabhat Ferries, Nauka Rally, Shramdaan
General Public,
Stakeholder,
Religious group,
and Student
Activities at River Bank,
Nukkad Natak, Ward Cleaning Drive,
No Polythene Please Rally,
Model, Essay Writing & Painting Competition,
Magh Mela Campaigning, Cultural &
Awareness Program,
Pumplet, Handbill & Jhola Distribution,
Announcement of Awareness Massages by
Vehicles, by Control Room, On FM Radio
“No Plastic Bag Please” Campaign & “Ganga Run”
tutkx:drk ,oa tulgHkkfxrk en ds vUrxZr
Lohd`r /kujkf’k :0 415 yk[k ds lkis{k bl en esa O;; dh x;h /kujkf’k :0 108-30 yk[k
ek0 iz/kkuea=h dh egRodka{kh ;kstukvksa ds fdz;kUo;u gsrq
uxj fuxe bykgkckn esa izLrkfor xaxk lsy dk xBu
,d Vhe ds :i fofHkUu izdkj ds dk;Zdykiksa ,oa
dk;Zdzeksa ds lapkyu] i;Zos{k.k ,oa vuqJo.k gsrq
GANGA CELL
MUNICIPAL COMMISSIONER
ADDITIONAL MUNICIPAL COMMISSIONER
CHIEF ENGINEER
•
•
ENVIRONMENT ENGINEER
ASSISTANT ENGINEER
JUNIOUR ENGINEER
ACTOR
PROGRAMME OFFICER
PROGRAMME CO-ORDINATOR
ASST. PROGRAMME CO-ORDINATOR
SOCIAL SUPERVISOR
COMP. OPERATOR/ SOCIAL WORKER
ASSISTANT
MASSENGER
•
•
•
•
•
•
•
dk;Znkf;Ro
,u,elhth ,oa ,uthvkjch, ds ekxZn’kZu ,oa fn’kkfunsZ’kksa
dks fdz;kfUor djukA
okMZ lgk;rk lfefr ,oa fofHkUu ljdkjh&xSj ljdkjh laxBuksa
ds lkFk leUo; dj ;kstukvksa dk fdz;kUo;u djukA
lhojst&ukWu lhojst iznw”k.k dh jksdFkke gsrq tkx:drk
dk;Zdzeksa dk vk;kstu] tuekul dks izsfjr djukA
fofHkUu LVSd gksYMj ds chp esa leUo; LFkkfir djukA
,u0th0vkj0ch0,0] ,l0th0vkj0lh0,0 ,oa uxj fuxe ds
e/; dM+h ds :i esa lg;ksx djukA
u;s&Uk;s vfHkUko rjhdks ls tutkx:drk QSykukA
i=kpkj] fjiksfVZax] Qkbfyax vkfnA
;kstuk ds mn~ns’;ksa dh iwfrZ djukA
fofHkUu dk;Z’kkykvksa ds ek/;e ls dSikflVh fcfYMax dk
fodklA
uxj fuxe ds izR;sd okMZ dk lfdz; lg;ksx izkIr fd, tkus gsrq
izLrkfor xaxk laj{k.k okMZ lgk;rk lfefr dk xBu
7 lnL;h; xaxk laj{k.k okMZ lgk;rk lfefr
laj{kd ¼ek0 ik"kZn½z
6 lnL;
efgyk lnL;
fofHkUu {ks= ds ,d&,d laHkzkUr
;qok ukxfjd
o;kso`} laHkzkUr
ukxfjd
• ek0 ik”kZn lfgr dqy 07 lnL; gksxsaA
•lgk;rk lfefr ds laj{kd lEcfU/kr okMZ ds ek0 ik”kZn gksxsaA
•lfefr ds xBu gks tkus ls 80 okMksZ ls de ls de 480 lfdz; lnL; }kjk dk;ksZ esa lgk;rk
xaxk laj{k.k ,oa LoPNrk okMZ lgk;rk lfefr dk xBu
okMZ lgk;rk lfefr ,oa xaxk lsy ds lg;ksx ls vk;ksftr
fdz;kdykiks dk;Zdzeksa dh izxfr dh leh{kk djukA
xzqi }kjk frekgh cSBd dj xaxk lsy ds dk;ksZ dh leh{kk dj
izxfr ls ,u,elhth o ,lih,eth dks voxr djkuk
;kstukvksa ds dk;ksZ esa mRiUu ck/kkvksa dks nwj djus dk iz;Ru
djsxhA
fdz;kfUor fd, tkus okys dk;Zdeks@
a fdz;kdykiksa dks
csgrj fodYiksa ds lkFk fdz;kfUor fd, tkus gsrq
lq>ko izkIr djuk ,oa lEikfnr dk;ksZ ij fuxjkuh@
i;Zos{k.k djuk ,oa izxfr dh leh{kk djuk
vkB lnL;h; ekWuhVfjax xzqi esa ek0 egkikSj ¼v?;{k½ lfgr uxj vk;qDr] vij ftykf/kdkjh ¼uxj½] izfrfuf/k jk”Vªh; LoPN xaxk fe’ku
¼,u0,e0lh0th0½] izfrfuf/k jkT; xaxk unh laj{k.k vfHkdj.k ¼,l0th0vkj0lh0,0½] izfrfuf/k xaxk iznw”k.k fu;a=.k bdkbZ] bykgkckn]
phQ okMsZu flfoy fMQsla ] bykgkckn ,oa izfrfuf/k jk”Vªh; foKku ,dkMseh ¼uklh½ bykgkckn lnL; gksxsAa
CAPACITY BUILDING OF NAGAR NIGAM UNDER NGRBA PROGRAME
Infrastructure Development/Enhancement
The infrastructure requirements can be categorized into groups namely
management and engineering infrastructure.
1
Training Hall Building & Decoration /
Hardware and Software & Equipment/Maintenance
2 Communication
3 Human Resource Development
4 Requisite Manpower5 Legal Cell
6 Tariff Recovery
7 Enforcement of legislations
8 Management Training
9 Technical Training10 Financial Training
CAPACITY BUILDING OF COMMUNICATION & PUBLIC OUTREACH PROGRAME
1-
2-
Communications Needs Assessment:
 Mass communication campaigns:
 Support for voluntary public participation:
 Community participation,
 Information Education and Communications campaigns
Mobilization of local communitiesWide range of views, concerns, and sensitivities :
Stakeholder Workshops and Seminars :
Public Private Partnership:
Dissemination of project information’s:
Citizen oversight:
Consultancies:


3456-
CAPACITY BUILDING OF SOLID WASTE MANAGEMENT
SWM for cleanliness of Ganga & important Ghats situated at Allahabad.
SWM engage & includes
(i) Information of Main Ghats’s; Total 20 Ghat’s Situated at Ganga-Yamuna.
(ii) Essential equipment for Cleanliness of Ghats’s, Collection & Transportation of waste
materials.
(iii) NNA Required Staff for Cleanliness of Ganga-Yamuna Ghats situated at Allahabad on
behalf SWM. i.e., Supervisor, Safayi Nayak, Sweeper, Helper, Vehicles Driver & Operator
for Speed Boat.
(iv) Infrastructural facilities and machinery required for Solid waste collection,
transportation, processing and disposal work for cleanliness of Ghats’s. i,e., Speed Boat,
Skid Steer Loader, Tata ACE, Compactor, DP/CP bins, Skimmer Machine for floating Trash,
Miscellaneous( Broom, Basket, Panja, Favari, etc.,)
THANK YOU
FOR
YOUR ATTENTION

Similar documents