Technical Drawings AUB
Transcription
Technical Drawings AUB
BECHETEL ENGINEERING BUILDING LAYOUT ACCEPTED STRUCTURE LOCATION ON BUILDING A AND B OPTION A OPTION B 1 2 3 7 4 8 FIXED ON A METALLIC BASE FIXED ON A FLOATING CONCRETE BASE NOTE 1: The minimum distance between rows depends on orientation and inclination of the modules. NOTE 2: No shading on PV generator surface from another row or from any irremovable object is acceptable in the worst case month in the central hours of the day (+-4hours). NOTE 3: The fixing system of the structure on the roof must assure the same grade of waterproofing of the one existing before. NOTE 4: The structure used and its fixing system must assure the structural stability of roof. NOTE 5: All the extra activity related to re-adapt the roof for the panels must be included in the bid. NOTE 6: The final arrangement of components outdoor or inside technical room shall be approved by the project supervisor. NOTE 7:The AC protection box will be located indoors as closer as possible to the building connection point. SCIENTIFIC RESEARCH BUILDING PV LAYOUT ROOF R00 REVISION R.O. 11/12/2015 DATE DESCRIPTION DRAWN CHECKED APPD. CEDRO 4 PROGRAMME- COMMUNITY ENERGY EFFICIENCY AND RENEWABLE ENERGY DEMONSTRATION PROJECT FOR LEBANON Location: Field: Project description: Sheet name: Design Escale: Drawing Number: www.tramatecnoambiental.es [email protected] Av.Meridiana, 153 P.Baixa 08026 BCN-ES Tel.(+34)93 446 3234 Fax.(+34)93 456 6948 PV PLANT CONTROLLER (not included in this ITB) M O M O C C C C C C C O O O O O M M M M M 1 2 3 5 6 4 7 NOTE 1: The total power consumed by the university shall be monitored in order to calculate overall PV solar fraction. 48 kWp SRB 72 kWp BEB (not included in this ITB) (not included in this ITB) AUB POWER STATION (NOTE 1) S1 S1 DC PROTECTIONS GRID CONNECTED INVERTERS (REF: SHEET 5&6) S1 S1 S1 S1 RADIATION SENSOR 9 TEMP. SENSOR 1 10 TEMP. SENSOR 2 S1 S1 S1 S1 1.1 1.2 1.1 1.2 1.1 1.2 1.1 1.2 1.1 1.2 2.1 2.2 2.1 2.2 2.1 2.2 2.1 2.2 2.1 2.2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 1.1 2.2 1.1 2.2 1.1 1.2 1.1 1.n 1.1 1.2 RADIATION SENSOR TEMP. SENSOR 1 11 TEMP. SENSOR 2 G GRID CONNECTED INVERTERS (not included in this ITB) 2.1 AC PROTECTION GRID CONNECTED INVERTERS (REF:SHEET 4 ) 2.2 S3 S3 1.11 1.12 2.3 2.4 S3 S3 1.13 1.14 2.5 S3 1.15 2.1 2.2 S4 S4 MODBUS RTU - RS 485 COMMUNICATION BUS 7 7 8 MDB - SCIENTIFIC RESEARCH BUILDING TO AUB POWER STATION 6 8 TO AUB POWER STATION MDB - BECHETEL ENGINEERING BUILDING 6 R00 REVISION R.O. 11/12/2015 DATE DESCRIPTION DRAWN CHECKED APPD. CEDRO 4 PROGRAMME- COMMUNITY ENERGY EFFICIENCY AND RENEWABLE ENERGY DEMONSTRATION PROJECT FOR LEBANON Ubication: Field: Project description: Sheet name: Design Escale: Drawing Number: www.tramatecnoambiental.es [email protected] Av.Meridiana, 153 P.Baixa 08026 BCN-ES Tel.(+34)93 446 3234 Fax.(+34)93 456 6948 S4 S3 S3 S3 Section description Grid connected inverter building MDB Drop voltage maximum accepted Section name S3 + S4 0,50% Criteria Rated output power The cables be UV-resistant, water resistant and they be flexible (multistranded). The specifications of the cables are of Cu Rv-k 0,6/1kV. S4 S3 S3 R00 REVISION R.O. 11/12/2015 DATE DESCRIPTION DRAWN CHECKED APPD. CEDRO 4 PROGRAMME- COMMUNITY ENERGY EFFICIENCY AND RENEWABLE ENERGY DEMONSTRATION PROJECT FOR LEBANON Ubication: Field: Project description: Sheet name: Design Escale: Drawing Number: www.tramatecnoambiental.es [email protected] Av.Meridiana, 153 P.Baixa 08026 BCN-ES Tel.(+34)93 446 3234 Fax.(+34)93 456 6948 S1 S1 S1 S1 String 1 String 2 String 3 String 4 REFERENCE PV MODULE SPECIFICATIONS AT STC PV MATRIX (4 strings 20 Modules) (NOTE 2) 27 72 Minimum reference capacity (STC) 300 Maximum power point current 8,33 kg Maximum power point voltage Short circuit current Open circuit voltage V A V 1.96 Weight 36,4 8,86 44,9 Wp A .99 (NOTE 3) E1 (NOTE 4) and air mass of 1.5 (In accordance with IEC-61215-2). REFERENCE PV MATRIX CONFIGURATION Number of strings PV Generator 4 Earthed Reference PV Matrix specification @STC Vmp Generator Voc Generator Cp Generator 728 V 777 V 958 V 898 V 24000 Wp 26400 Wp 1 PV module junction box 2 DC protection grid dependent inverter E1 Earthing PV generator E2 Earthing Protection boards E2 (NOTE 4) S2 DESIGN CRITERIA: PV arrays for matrix configuration have to be designed with the following criteria: S2 -+ -+ (NOTE 1) PV Capacity (STC) < 1,10 times higher than rated power of inverter Drop voltage maximum accepted Section description Section name PV-modules - inverter on grid S1 + S2 2,00% Criteria Capacity at STC The cables be UV-resistant, water resistant and they be flexible (multistranded). The specifications of the cables are of Cu Rv-k 0,6/1kV. R00 REVISION R.O. 11/12/2015 DATE DESCRIPTION DRAWN CHECKED CEDRO 4 PROGRAMME- COMMUNITY ENERGY EFFICIENCY AND RENEWABLE ENERGY DEMONSTRATION PROJECT FOR LEBANON NOTE 1: There must be as many circuits as number of DC/MPPT inputs of the grid connected inverter NOTE 2: This configuration is only an example. NOTE 3: Not required if protection is already included in the inverter. NOTE 4: Earthing connection of metallic structure (resistance value 30 ohm < R < 80 ohm) APPD. Ubication: Field: Project description: Sheet name: Design Escale: Drawing Number: www.tramatecnoambiental.es [email protected] Av.Meridiana, 153 P.Baixa 08026 BCN-ES Tel.(+34)93 446 3234 Fax.(+34)93 456 6948 R00 REVISION R.O. 11/12/2015 DATE DESCRIPTION DRAWN CHECKED APPD. CEDRO 4 PROGRAMME- COMMUNITY ENERGY EFFICIENCY AND RENEWABLE ENERGY DEMONSTRATION PROJECT FOR LEBANON Ubication: Field: Project description: Sheet name: Design Escale: Drawing Number: www.tramatecnoambiental.es [email protected] Av.Meridiana, 153 P.Baixa 08026 BCN-ES Tel.(+34)93 446 3234 Fax.(+34)93 456 6948