PSMC 005 – SH 016 Glorit Hall
Transcription
PSMC 005 – SH 016 Glorit Hall
PSMC 005 – SH 016 Glorit Hall Pavement Condition Shoving in pavement 1 Pavement Condition Rutting and Cracking in pavement Pavement Configuration 150 mm cement modified aggregate E = 400 MPa (non-cracked pavement) 100 mm Unbound aggregate E = 50 MPa Infinite depth of subgrade E = 30 MPa 2 Basecourse Properties with 33% GAP 65 Cement Response Test UCS (MPa) 4% Cement 1.3 5% Cement 1.6 6% Cement 3.0 Design Pavement Configuration Used by Beca 180 mm Cemented basecourse layer, E = 2000 MPa Cement content was 7% and depth of stabilisation was 230 mm to allow for site mixing and material variability (Site mixing 50 mm greater than design depth) 100 mm Unbound sub-base E = 50 MPa Infinite depth of subgrade E = 30 MPa 3 Beca Design Philosophy Aggregate at the crack interface will provide lasting load transfer if it is held in a strong matrix Construction Finished product 4 Post Construction Analysis 04/06/2004 Pavement Depth (mm) 10th percentile Modulus (MPa) 200 2190 150 385 Infinite 99 Post Construction Analysis 11/02/05 Pavement Depth (mm) 10th percentile Modulus (MPa) 230 2135 50 184 Infinite 109 5 PSMC 005 – SH 01N Poplar Hill Crawler Lane Condition Cracking & rutting in pavement 6 Basecourse Soaked CBR Additive Nil CBR (%) 30 & 60 3% Lime 55 2% Cement 150 & 220 3% Cement 140 & 265+ Crawler Lane Pavement Design 35 mm, OGPA over chip seal, E = 800 - 1000 MPa 200 mm, 40 mm top size, FBS, 3.5% bit., 2% filler, E = 800 200 mm, 40 & 65 mm top size, fine graded, slightly plastic, E = 150 MPa Infinite depth of clay subgrade E = 50 MPa 7 Post Construction Analysis 27/10/2004 Pavement Layers (mm) 10th percentile Modulus (MPa) 200 FBS basecourse 626 200 unbound aggregate 448 Infinite subgrade 41 Post Construction Analysis 18/02/05 Pavement Layers (mm) 10th percentile Modulus (MPa) 200 FBS basecourse 2222 200 unbound aggregate 354 Infinite subgrade 51 8 Post Construction Analysis 15/06/2006 Pavement Layers (mm) 10th percentile Modulus (MPa) 50 OGP + levelling 3895 200 FBS basecourse 2144 200 unbound aggregate 245 Infinite subgrade 66 Hewletts Road Pavement Design 9 Pavement Configuration Options Thin surfaced flexible )TSF) Modified TSF Cemented treated sub-base (CTSB) Structural asphaltic concrete (SAC) Portland cement concrete (PCC) Modified TSF Pavements The aggregate layers can be modified with small amounts of chemical additive to increase stiffness and shear strength to reduce rutting with the aggregate layers Usually about 2% - 2.5% cement used with < 1.5 MPa UCS 10 Modified TSF Pavement Traffic loading 3 x 107 ESA’s Basecourse and upper S/B modified with 2.5% cement 35 – 40 mm of SMA E= 1500 MPa 150 mm basecourse E = 500 MPa 300 mm sub-base E = 130/250 MPa Subgrade CBR = 10% E = 70 MPa CTSB Pavement – Post Cracked Load causes horizontal tensile strain at the bottom of the bound layer which cracks quickly unless uneconomically thick (AUSTROADS requires ESA’s x 20 plus conservative fatigue criteria) CTSB layer retains high modulus postcracked and subgrade strain criteria rules (AUSTROADS = 500 MPa, actual = 2000 MPa) AUSTROADS requires 230 mm basecourse to stop reflective cracking (100 mm works in practice). 11 CTSB Pavement - Cracked Traffic loading 3 x 107 ESA’s S/B treated with 5-6% cement (UCS > 3.0 MPa) 35 – 40 mm of SMA E= 1500 MPa 100 mm basecourse E = 500 MPa Subgrade CBR = 7% E = 70 MPa, 200mm cracked CTSB (180 mm GAP 65 + 50 mm sand subgrade) E = 1000 MPa Possible CTSB Pavement – Non-cracked Traffic loading 3 x 107 ESA’s S/B treated with 5-6% cement (UCS > 3.0 MPa). Designed NOT to crack for design life. 35 – 40 mm of SMA E= 1500 MPa 30 mm OGPA E = 1000 MPa Subgrade CBR = 7% E = 70 MPa, 340mm CTSB (230 mm GAP 65 + 110 mm sand subgrade) E = 5000 MPa 12 Examples of CTSB Pavements Site Loading Pavement Profile Date Comments Macandrew Rd, Dunedin Kirkcaldy to Forbury 4,200 vpd 2% HCV’s Chip Seal 70 – 100 mm M4 150 mm design depth AP40 + 4% cement, UCS = 3 – 4 MPa 100 mm Sub-base Subgrade CBR 2% 1983 Not pre-cracked but calculated strain in cemented layer would mean fatigue cracking would have occurred early in the life of the CTB. Design assumed residual stiffness = 1500MPa. No reflective cracking or deformation to date on the surface. Bay View Rd, Dunedin Kirkcaldy to King Edward 4,400 vpd 2% HCV’s Prime and seal G4 70 – 100 mm M4 170 mm design depth AP 40 + 4% cement, UCS = 3 – 4 MPa 100 mm Sub-base Subgrade CBR 2% 1984 Not pre-cracked and calculated strain in cemented layer would mean fatigue cracking would not occur early in life in the CTB. Shrinkage cracking at 3 – 5 m centres very likely. No reflective cracking or deformation to date on the surface. Bay View Rd Forbury Rd to Surrey St ADT 4,400 2%HCV’s Two coat emulsion first coat 150 mm M4 230 mm design depth AP 40 + 4% cement, UCS = 3 – 4 MPa 100 mm Sub-base Subgrade CBR 2% 1985 Not pre-cracked. Expect design life before fatigue. No sign of cracks Examples of CTSB Pavements Site Loading Pavement Profile Date Comments Main South Rd, Dunedin City First Section 8,000 vpd 5% HCV’s 40 mm dense graded AC 170 mm design depth AP40 + 4% cement, UCS = 3 – 4 MPa 100 mm Sub-base Subgrade CBR 4% 1986 Not pre-cracked but calculated strain in cemented layer would mean fatigue cracking would have occurred early in the life of the CTB. Design assumed residual stiffness = 1500MPa. Reflective cracking occurred after several years on the surface but not wide cracking. Resurfaced with OGPA (prep with chip seal to waterproof). Some fine reflective cracking again showing, no crack sealing carried out. Shape is still good. Main South Rd, Dunedin City Second Section 8,000 vpd 5% HCV’s 40 mm dense graded AC 220 mm design depth AP40 + 4% cement, UCS = 3 – 4 MPa 100 mm Sub-base Subgrade CBR 4% 1987 Not pre-cracked and calculated strain in cemented layer would mean fatigue would not occur for 20 years in the CTB. No reflective cracking to date. Shape good. Fox St, Dunedin City 600 vpd 6% HCV’s Thin AC Two coat emulsion first coat 150mm Basecourse, 250 Cemented M/4, 150 insitu material, 2%CBR 1989 Not pre-cracked, no fatigue expected in design period, no signs of cracking at surface to date. This is a light industry area. Road recently resurfaced with thin AC. SH 16, Waimauku 10,000 vpd 8% HCV’s Chip Seal 220 mm design depth AP40 + 7% cement 200 mm sub-base? Subgrade CBR 2% 2002 Pavement constructed over a section of soft subgrade, within a long length of AWPT where basecourse was modified with 3% cement. No reflective cracking or deformation evident yet. 13 SAC + CTB Pavement at Intersections Traffic loading 3 x 107 ESA’s 35 – 40 mm of SMA E= 1500 MPa 100 mm Superpave14 E = 2500 MPa Polymer modified (4% sbs) seal 200mm Subgrade CBR = 7% E = 70 MPa cracked CTSB (180 mm GAP 65 + 50 mm sand subgrade) E = 1000 MPa 14
Similar documents
Product range 2008/2009
Further measures for even more safety Over and above the statutory requirements, we have had the nora® products certified by several independent and approved test institutes. These certificates are g...
More information