LITHONIA TOWN CENTER

Transcription

LITHONIA TOWN CENTER
Blueprints for Successful Communities
A Program of the Georgia Conservancy
LITHONIA TOWN CENTER
Covington, Newton County
Westside, City of Atlanta
Senoia, Coweta County
Collier Village, City of Atlanta
Lakewood Heights, City of Atlanta
Lindbergh/LaVista, City of Atlanta
Home Park, City of Atlanta
& DeKalb County
Athens, Clarke County
Pin Point Community, Chatham County
University Parkway, Barrow,
Neighborhood Planning Unit-G, Atlanta
Oconee Counties
Harrisburg, Augusta
University Parkway, Gwinnett County
Lithonia, DeKalb County
Middle Chattahoochee Watershed
Moreland, Coweta County
Ocmulgee River Corridor,
Macon/Bibb Counties
City of Conyers, Rockdale County
Sandfly Community, Savannah
Berkeley Park, City of Atlanta
Moultrie, Colquitt County
LaVista Road, DeKalb County
Pittsburgh, City of Atlanta
Toccoa, Stephens County
Piedmont Heights, City of Atlanta
Blueprints Communities
Existing MARTA Rail
Proposed MARTA
Rail
Atlanta BeltLine
Existing PATH Trail
Proposed PATH Trail
Arabia Mountain
National Heritage
Area
Regional Context
Arabia Mountain Heritage Area Management
Plan 2005
Arabia Mountain Heritage Area
Existing PATH Trail
Proposed PATH Trail
Existing City Limits
Proposed City Limits
Local Context
HISTORY
SMALL TOWN
COMMUNITY
LITHONIA THEN
LITHONIA NOW
Lithonia: Then and Now
ISSUE: Lack of signage and connectivity
ISSUE: Lack of historical identification
ISSUE: Lack of presence and gathering
space for Main Street businesses
ISSUE: Lack of community space
Challenges
Big Ledge Quarry
Lithonia Downtown
Plaza Redevelopment – Phase 1
Blueprints Lithonia: Community Meeting 3
Downtown Redevelopment
Strategy
Georgia Design
Tech and the Georgia
Conservancy
Plaza Redevelopment –
Phase 2
Blueprints Lithonia: Community Meeting 3
Downtown Redevelopment
Strategy
Georgia Design
Tech and the Georgia
Conservancy
Plaza Redevelopment – Phase 1
Blueprints Lithonia: Community Meeting 3
Stone Mountain
GeorgiaStreet
Tech and theExtension
Georgia Conservancy
Plaza Redevelopment –
Phase 2
Library
Blueprints Lithonia: Community Meeting 3
Illustrative Plan
Georgia Tech and the Georgia Conservancy
Community Garden
Blueprints Lithonia: Community Meeting 3
Plaza Redevelopment – Phase 1
Re-inhabiting
the Conservancy
Plaza
Georgia Tech and the Georgia
Farmer’s Market
Back of Wayfield’s Grocery
Blueprints Lithonia: Community Meeting 3
Re-inhabiting
the Conservancy
Plaza
Georgia Tech and the Georgia
Community Center
Plaza Redevelopment – Phase 1
New City Hall
Blueprints Lithonia: Community Meeting 3
Downtown
Redevelopment
Georgia Tech
and the Georgia Conservancy
New Residential
Build Incrementally
• Plan can be easily phased
Maintain Community Scale
• Respect context and height
Create Visual Interest
• Variety and aesthetic appeal
Plaza Redevelopment –
Phase 2
5 floors
Max Cleland Blvd at Swift St.
Blueprints Lithonia: Community Meeting 3
Downtown
Redevelopment
Georgia Tech
and the Georgia Conservancy
Pedestrian Views of
New Residential
Plaza Redevelopment –
Phase 2
A community celebration on the
Stone Mountain Street extension
Blueprints Lithonia: Community Meeting 3
Downtown
Redevelopment
Georgia Tech
and the Georgia Conservancy
Plaza
Redevelopment
–
Pedestrian Views of the “Point”
Phase 2
Gateway to Main Street
• Sense of arrival
Respect Main Street
• Line street edge
Civic presence at the gateway
Blueprints Lithonia: Community Meeting 3
Downtown Redevelopment:
Gateway
Georgia Tech and the Georgia
Conservancy
Revitalizing the Downtown Plaza and Main Street
Illustrative rendering of possible future
• Maintain two-story character along Main St
• Allow taller buildings along new internal street and maybe along Max Cleland
• Improvements to Max Cleland
• Long-term potential for redevelopment of grocery parking
Downtown Redevelopment: Long Term
TOURS
Introduce visitors and residents to the quarry
sights
- Guided site tours
Quarry: Phase Zero
PATHS
Expand recreation for visitors and residents
- Paths
- Overlook Park & Overlook Park Pavilion
- Gateway Park
Quarry: Phase One
GATEWAY (153 lots)
Westledge: Begin development of
infrastructure and place making with range of
housing options
- Community Center at Gateway
- Upper quarry park
- Living machine greenhouse #1
- Zipcar parking
- Community Garden
- Dog park
Quarry: Phase Two
WESTLEDGE NEIGHBORHOOD (83 lots)
Westledge: Continue Smart Growth of
infrastructure, place making and community
activities
- Family park
- Rain garden
- Living machine greenhouse #2
Quarry: Phase Three
WESTLEDGE QUARRY-FRONT (81 lots)
Development of lots and housing along
Westledge Quarry-Front
- Big Ledge Quarry Inn
- Inn Square
- Quarry Ledge pavilions
Quarry: Phase Four
EASTLEDGE NEIGHBORHOOD (74 lots)
Begin development of Eastledge Neighborhood
with connections to existing street network
- Community garden
- Living machine greenhouse #3
- Long meadow
- Rain garden
Quarry: Phase Five
EASTLEDGE QUARRY-FRONT (111 lots)
Development of lots and housing along
Eastledge Quarry-Front
- Playground
- Quarry Ledge pavilion
- Dog park
Quarry: Phase Six
RECREATION
Conversion of industrial properties to park and
recreation space
- Upper Quarry Park
- Gneiss Road Completed
Quarry: Phase Seven
In practice, tactical urbanism is
Short-term, deliberate actions to create long-term,
high value community changes
short term action : long term change
Tactical Urbanism: What?
short term action : long term change
Tactical Urbanism: Example
The Great Recession
The Internet as a
Tool for Building
the Civic
Economy
short term action : long term change
Shifting
Demographics
Tactical Urbanism: Why Now?
Lithonia, Georgia
Challenges
- Lack of public gathering space
- Undocumented history
- Lack of signage throughout city
- Inactive downtown
short term action : long term change
Tactical Urbanism
Challenges
Opportunities
- Lack of public gathering space
+ story-telling bench
story-telling bench by Kelly Darby
short term action : long term change
Tactical Urbanism
Challenges
Opportunities
- Lack of public gathering space
+ story-telling bench
- Undocumented history
+ historical marker
historical marker by Kelly Heyer
short term action : long term change
Tactical Urbanism
Challenges
Opportunities
- Lack of public gathering space
+ story-telling bench
- Undocumented history
+ historical marker
- Lack of signage throughout city
+ bike Lithonia
bike Lithonia by Elizabeth Ward
z
short term action : long term change
Tactical Urbanism
Challenges
Opportunities
- Lack of public gathering space
+ story-telling bench
- Undocumented history
+ historical marker
- Lack of signage throughout city
+ bike Lithonia
- Inactive downtown
+ pop-up cafe
pop-up café by Jacob Davis
short term action : long term change
Tactical Urbanism
Challenges
Opportunities
- Lack of public gathering space
+ story-telling bench
- Undocumented history
+ historical marker
- Lack of signage throughout city
+ bike Lithonia
- Inactive downtown
+ pop-up cafe
short term action : long term change
Tactical Urbanism
Lithonia Urban Projection
short term action : long term change
Tactical Urbanism
Tactical Urbanism
Lessons Learned
-
Applied
Engage residents in the process
Hosting a large event works!
Capitalize on the momentum
short term action : long term change
Tactical Urbanism
Swing[s] by Lithonia
community gardens
+ interactive nodes
Challenges
Opportunities
- Lack of use of City park
+ painted swings
- Lack of public seating
+ pallet chairs
- Desire for community garden
+ community barrel gardens
z
short term action : long term change
Tactical Urbanism
z
short term action : long term change
Tactical Urbanism
+ building
short term action : long term change
Tactical Urbanism
+ painting
short term action : long term change
Tactical Urbanism
+ planting
short term action : long term change
Tactical Urbanism
Questions?

Similar documents