gva.co.uk
Transcription
gva.co.uk
3 Brindleyplace Birmingham B1 2JB Our Ref: RT02/01B212793 T: +44 (0)844 902 0304 F: +44 (0121 609 8314 Date: 28 September 2015 Eleanor Overton Hinckley & Bosworth Borough Council The Hinckley Hub Rugby Road Hinckley Leicestershire LE10 0FR gva.co.uk Direct Dial: 0121 6098368 Mobile: 07957 292164 Email: [email protected] Dear Eleanor, PLANNING APPLICATION FOR UP TO 850 DEWLLINGS – BLOOR HOMES LAND NORTH EAST OF TRIUMPH MOTORCYCLES, DODWELLS ROAD, HINCKLEY PLANNING APPLICATION REFERENCE 15/00188/OUT I refer to your consultation letter dated 15 June 2015 regarding the above. Regrettably we are instructed by our client, Jelson Homes, to register a formal objection on its behalf to this planning application. As you will be aware, the Council has now confirmed that the land controlled by Jelson immediately to the south east of the Bloors application site, will be included within the boundary of proposed allocation HIN02 in the Site Allocations DPD. This is an obvious and logical step and it is unfortunate that it took the intervention of the Allocations DPD Inspector to secure this agreement. We had hoped that the Council’s agreement to this would be accompanied by recognition that there was a need to ensure that the whole of the proposed HIN02 allocation (including both the Bloor Homes and Jelson Homes elements) would be planned and delivered in a comprehensive manner. Unfortunately we have received no confirmation that this is the case. We have still received no approach either from the District or County Council’s to discuss how the Jelson element of the site might be delivered, or indeed how its delivery might be affected by the current Bloor Homes scheme. It would appear that the Council is intent on proceeding to determine the Bloor Homes application in isolation, without any reference whatsoever to if, and how, the remaining part of the allocation will be delivered. Moreover it is clear that the Council seems intent on adopting a piecemeal approach to the development of the allocation which will fail to deliver the optimum overall development solution. In particular we note that the current scheme proposed by Bloor Homes (articulated on the attached application plan) generates a number of significant concerns; 1) The failure to incorporate the Jelson land into the master planning of the site results in the Bloor scheme having to be accessed via a single point. This has resulted in a heavily over-engineered site access solution (a dual carriageway), which is both inefficient in terms of land take and inappropriate in urban design terms. 2) The proposed single point of access is a substantial barrier to achieving bus penetration within the site. We understand that this is a significant concern of the County Highway Authority and raises significant sustainability concerns. 3) Dealing with the two elements of the allocation in such a piecemeal way does not allow for efficient use of the total development area. The Jelson land includes a narrow strip along the frontage to Normandy Way which in isolation will be difficult to develop. This would also result in an unsatisfactory relationship in urban design terms between the site and Normandy Way. 4) Bloor Homes have not been required to provide an indicative masterplan for the overall allocation to demonstrate how a comprehensive development could be achieved. The Jelson site offers the opportunity to provide a second point of access which can address points 1 and 2 above. Joint working between the landowners could also clearly address points 3 and 4. All of the above is particularly disappointing given that we have made it clear time and time again to Bloor Homes, the Local Planning Authority and the County Council that Jelson are willing and able to contribute to securing a comprehensive development solution. Instead we have been entirely shut out of the process. Jelson were not even consulted on the application when it was originally submitted and Officers have repeatedly ignored telephone calls and emails seeking dialogue and information. As things stand therefore, we have no alternative but to formally object to the Bloor Homes application on the basis that; it fails to ensure comprehensive development of the proposed allocation; fails to deliver essential public transport access and bus penetration; is inefficient in its design and layout and would prejudice the comprehensive delivery of the remainder of the allocation. We will also seek to raise these concerns with the Inspector who is examining the Allocations DPD, re-iterating the need for amendments to draft policy SA2 to incorporate safeguards to ensure that a comprehensive approach is taken to the development of the allocation. We would also want to ensure that opportunities to provide an optimal sustainable transport and access solution are thoroughly investigated as part of that policy. At this stage I can only repeat our previous offers to discuss the development of the proposed allocation with the District Council and would hope to hear from you in this regard soon. Yours faithfully Rob Thorley BA (Hons) DipTP, MRTPI Director - Planning, Development & Regeneration For and on behalf of GVA Cc – Site Allocations DPD Planning Inspector - Derek Stebbing (via programme officer) gva.co.uk 114.9m 6 Wykin House Barn 4 114.9m Wykin House Farm 117.0m 117.0m Pond LB Manor Cottage Manor Farm Home Farm White Cotta ge Pond 117.7m Penlan Ru Bungstic alow WYK IN RO AD HIGHA M LA NE Beechw ood 110.9m Pond Hall Cottage 116.7m 106.4m Wykin Hall Pond Wykin Hall 9 Cycle Track cle Cy Farm & Path Tra ck & 100.3m th Pa Sheep Wash 8 Pond Pond d ck th Pa an Tra NO RM AN DY WA Y cle Cy 28 Dra in Pond 31 50 23 ET A 47 L 32 Pond ING FIEL D PAR K 1 SPRINGFIELD PARK SPR Issues 3 Mobile Home 46 19 A 47 36 Park 4 18 37 Pond 45 Pond Mobile Home Park SPR ING FIEL D PAR 8 41 K 13 10 9 11 Path (um) 3 CP Trac k Ward Bdy 7 1 51 44 2 37 43 28 in Dra OU TL AN 33 DS DR IVE 18 FB Pond 11 15 17 21 9 27 Y WAY MULBERR 8 19 6 Ppg Sta 172 166 1 Cycle Track & Path 80 OUTLANDS DRIVE Ward Bdy 95 ESS 183 191 185 187 12 14 74 8 9 7 1 10 4 26 89 22 6 4 72 14 1 20 30 FLORIAN WAY MARCIAN CLOSE 15 29 5 GALLUS DRIVE 26 34 2 1 79 28 LIVIA CLOSE 20 27 E OS CL 62 14 12 21 10 HA DR IAN 7 6 9 17 1 9 10 18 24 JO VIA N 14 63 DR IVE 2 8 26 7 21 24 53 4 29 25 WAY 42 6 31 51 SE CLO CK SWI 25 30 FRE 28 Track Cycle 26 NORM ANDY & Path 44 40 FLORIAN WAY 22 29 32 1 FLORIAN WAY 31 45 9 29 14 12 8 37 43 14 ROAD El 23 6 16 KIRK CROSS Sub Sta 12 1 27 25 18 20 21 10 CROMARTY DRIVE LL CLO 11 SE FLORIAN WAY 11 15 2 12 10 MAR YWE L CLOSE 21 MARYWEL 15 15 11 5 35 2 33 6 1 1 2 31 Works 8 10 12 29 14 le Cyc 23 Tra 16 ck El Sub Sta 12 & Pat 2 h 1 LEYS CLOS 14 1 RD CLOSE LAXFO 1 17 MA RIE 7 CL OS E RO SS 16 49 KIL WA Y 2 7 3 43 4 9 9 1 19 LOSS 21 IEMO 10 UTH ROAD 9 E 5 MILL KIN 17 5 11 11 2 38 1 15 42 2 20 WAY 30 12 12 STO 14 OSS 19 RO 1 9 22 KINR N DR 1 EL LS 31 63 28 RO AD IVE DO DW 2 188 32 25 CO LD 62 ST 29 26 180 RE AM 5 CL OS RO AD E 14 145 CO TE 11 17 BR AS 27 56 51 168 23 24 15 162 52 El Sub Sta 26 15 2 24 156 RO 14 19 14 STO 20 12 11 N DR IVE 14 36 SE CLO WA 154 CLO TE LCO 12 CLO 1 TTS LO TON VE LAW SE AD RO SE EL DW Cana DO 134 37 10 5 49 136 33 l 32 144 20 6 ng Path LS uch 40 Towi La Zo 30 12 Ashb y De 6 N 10 22 2 Tank 22 Pond 4 9 28 TCB 1 Gas Gov 41 Tank 47 24 125 7 12 BRASCOTE ROAD 28 2 Tanks 27 143 131 133 20 30 25 29 7 4 15 31 5 8 7 12 45 2 11 8 1 25 1 6 12a 1 SCALE 1:5,000 75 ORE CLOSE LOCHM 5 10 25 30 39 19 35 1 OD 40 7 STO 125 250 12 50 16 0m 2 7 IVE 4 DR 8 NE 37 Tank 9 Framework Legend Approximate Site Boundary SUDS / Ecology (predominatly wet or dry areas) Other Land in Control of Applicant Residential Development (24.3ha) Existing PROW Existing Trees and Hedgerows School Site (1.0ha) Pedestrian / Cycle Routes (Normandy Way) Proposed Planting Commercial (0.2ha) Potential Pedestrian / Cycle Routes (within development) ‘Parkland’ (2.1ha) (incorporating Informal / Equipped Play) Allotments (0.5ha) Natural and Semi Natural Open Space / Amenity Green Space Outdoor Sports Facilities (3.28ha) Formal Pedestrian / Cycle Crossing Informal Pedestrian / Cycle Crossing Potential Future Vehicular Access by others B DE155_002 Bloor Homes Normandy Fields Development Framework 1:5,000 @ A3 Rev Drg No Client Project Title Scale