Dear Eleanor,
PLANNING APPLICATION FOR UP TO 850 DEWLLINGS – BLOOR HOMES
LAND NORTH EAST OF TRIUMPH MOTORCYCLES, DODWELLS ROAD, HINCKLEY
PLANNING APPLICATION REFERENCE 15/00188/OUT
I refer to your consultation letter dated 15 June 2015 regarding the above.
Regrettably we are instructed by our client, Jelson Homes, to register a formal objection on its
behalf to this planning application.
As you will be aware, the Council has now confirmed that the land controlled by Jelson
immediately to the south east of the Bloors application site, will be included within the
boundary of proposed allocation HIN02 in the Site Allocations DPD. This is an obvious and
logical step and it is unfortunate that it took the intervention of the Allocations DPD Inspector to
secure this agreement.
We had hoped that the Council’s agreement to this would be accompanied by recognition
that there was a need to ensure that the whole of the proposed HIN02 allocation (including
both the Bloor Homes and Jelson Homes elements) would be planned and delivered in a
comprehensive manner.
Unfortunately we have received no confirmation that this is the case. We have still received no
approach either from the District or County Council’s to discuss how the Jelson element of the
site might be delivered, or indeed how its delivery might be affected by the current Bloor
Homes scheme.
It would appear that the Council is intent on proceeding to determine the Bloor Homes
application in isolation, without any reference whatsoever to if, and how, the remaining part of
the allocation will be delivered. Moreover it is clear that the Council seems intent on adopting
a piecemeal approach to the development of the allocation which will fail to deliver the
optimum overall development solution.
In particular we note that the current scheme proposed by Bloor Homes (articulated on the
attached application plan) generates a number of significant concerns;
1) The failure to incorporate the Jelson land into the master planning of the site results in
the Bloor scheme having to be accessed via a single point. This has resulted in a heavily
over-engineered site access solution (a dual carriageway), which is both inefficient in
terms of land take and inappropriate in urban design terms.
2) The proposed single point of access is a substantial barrier to achieving bus penetration
within the site. We understand that this is a significant concern of the County Highway
Authority and raises significant sustainability concerns.
3) Dealing with the two elements of the allocation in such a piecemeal way does not
allow for efficient use of the total development area. The Jelson land includes a narrow
strip along the frontage to Normandy Way which in isolation will be difficult to develop.
This would also result in an unsatisfactory relationship in urban design terms between the
site and Normandy Way.
4) Bloor Homes have not been required to provide an indicative masterplan for the overall
allocation to demonstrate how a comprehensive development could be achieved.
The Jelson site offers the opportunity to provide a second point of access which can address
points 1 and 2 above. Joint working between the landowners could also clearly address points
3 and 4.
All of the above is particularly disappointing given that we have made it clear time and time
again to Bloor Homes, the Local Planning Authority and the County Council that Jelson are
willing and able to contribute to securing a comprehensive development solution. Instead we
have been entirely shut out of the process. Jelson were not even consulted on the application
when it was originally submitted and Officers have repeatedly ignored telephone calls and emails seeking dialogue and information. As things stand therefore, we have no alternative but
to formally object to the Bloor Homes application on the basis that; it fails to ensure
comprehensive development of the proposed allocation; fails to deliver essential public
transport access and bus penetration; is inefficient in its design and layout and would prejudice
the comprehensive delivery of the remainder of the allocation.
We will also seek to raise these concerns with the Inspector who is examining the Allocations
DPD, re-iterating the need for amendments to draft policy SA2 to incorporate safeguards to
ensure that a comprehensive approach is taken to the development of the allocation. We
would also want to ensure that opportunities to provide an optimal sustainable transport and
access solution are thoroughly investigated as part of that policy.
At this stage I can only repeat our previous offers to discuss the development of the proposed
allocation with the District Council and would hope to hear from you in this regard soon.
Yours faithfully
Rob Thorley BA (Hons) DipTP, MRTPI
Director - Planning, Development & Regeneration
For and on behalf of GVA
Cc – Site Allocations DPD Planning Inspector - Derek Stebbing (via programme officer)
gva.co.uk
114.9m
6
Wykin House
Barn
4
114.9m
Wykin House
Farm
117.0m
117.0m
Pond
LB
Manor
Cottage
Manor
Farm
Home Farm
White
Cotta
ge
Pond
117.7m
Penlan
Ru
Bungstic
alow
WYK
IN RO
AD
HIGHA
M LA
NE
Beechw
ood
110.9m
Pond
Hall
Cottage
116.7m
106.4m
Wykin
Hall
Pond
Wykin Hall
9
Cycle Track
cle
Cy
Farm
& Path
Tra
ck
&
100.3m
th
Pa
Sheep
Wash
8
Pond
Pond
d
ck
th
Pa
an
Tra
NO
RM
AN
DY
WA
Y
cle
Cy
28
Dra
in
Pond
31
50
23
ET
A 47
L
32
Pond
ING
FIEL
D PAR
K
1
SPRINGFIELD PARK
SPR
Issues
3
Mobile Home
46
19
A 47
36
Park
4
18
37
Pond
45
Pond
Mobile Home Park
SPR
ING
FIEL
D PAR
8
41
K
13
10
9
11
Path (um)
3
CP
Trac
k
Ward Bdy
7
1
51
44
2
37
43
28
in
Dra
OU
TL
AN
33
DS
DR
IVE
18
FB
Pond
11
15
17
21
9
27
Y WAY
MULBERR
8
19
6
Ppg
Sta
172
166
1
Cycle Track & Path
80
OUTLANDS DRIVE
Ward Bdy
95
ESS
183
191
185
187
12
14
74
8
9
7
1
10
4
26
89
22
6
4
72
14
1
20
30
FLORIAN WAY
MARCIAN CLOSE
15
29
5
GALLUS DRIVE
26
34
2
1
79
28
LIVIA CLOSE
20
27
E
OS
CL
62
14
12
21
10
HA
DR
IAN
7
6
9
17
1
9
10
18
24
JO
VIA
N
14
63
DR
IVE
2
8
26
7
21
24
53
4
29
25
WAY
42
6
31
51
SE
CLO
CK
SWI
25
30
FRE
28
Track
Cycle
26
NORM
ANDY
& Path
44
40
FLORIAN
WAY
22
29
32
1
FLORIAN WAY
31
45
9
29
14
12
8
37
43
14
ROAD
El
23
6
16
KIRK
CROSS
Sub
Sta
12
1
27
25
18
20
21
10
CROMARTY DRIVE
LL CLO
11
SE
FLORIAN WAY
11
15
2
12
10
MAR
YWE
L CLOSE
21
MARYWEL
15
15
11
5
35
2
33
6
1
1
2
31
Works
8
10
12
29
14
le
Cyc
23
Tra
16
ck
El Sub Sta
12
& Pat
2
h
1
LEYS
CLOS
14
1
RD CLOSE
LAXFO
1
17
MA
RIE
7
CL
OS
E
RO
SS
16
49
KIL
WA
Y
2
7
3
43
4
9
9
1
19
LOSS
21
IEMO
10
UTH
ROAD
9
E
5
MILL
KIN
17
5
11
11
2
38
1
15
42
2
20
WAY
30
12
12
STO
14
OSS
19
RO
1
9
22
KINR
N DR
1
EL
LS
31
63
28
RO
AD
IVE
DO
DW
2
188
32
25
CO
LD
62
ST
29
26
180
RE
AM
5
CL
OS
RO
AD
E
14
145
CO
TE
11
17
BR
AS
27
56
51
168
23
24
15
162
52
El Sub Sta
26
15
2
24
156
RO
14
19
14
STO
20
12
11
N DR
IVE
14
36
SE
CLO
WA
154
CLO
TE
LCO
12
CLO
1
TTS
LO
TON
VE
LAW
SE
AD
RO
SE
EL
DW
Cana
DO
134
37
10
5
49
136
33
l
32
144
20
6
ng Path
LS
uch
40
Towi
La Zo
30
12
Ashb
y De
6
N
10
22
2
Tank
22
Pond
4
9
28
TCB
1
Gas Gov
41
Tank
47
24
125
7
12
BRASCOTE ROAD
28
2
Tanks
27
143
131
133
20
30
25
29
7
4
15
31
5
8
7
12
45
2
11
8
1
25
1
6
12a
1
SCALE 1:5,000
75
ORE CLOSE
LOCHM
5
10
25
30
39
19
35
1
OD
40
7
STO
125
250
12
50
16
0m
2
7
IVE
4
DR
8
NE
37
Tank
9
Framework
Legend
Approximate Site Boundary
SUDS / Ecology
(predominatly wet or dry areas)
Other Land in Control of Applicant
Residential Development (24.3ha)
Existing PROW
Existing Trees and Hedgerows
School Site (1.0ha)
Pedestrian / Cycle Routes
(Normandy Way)
Proposed Planting
Commercial (0.2ha)
Potential Pedestrian / Cycle Routes
(within development)
‘Parkland’ (2.1ha)
(incorporating Informal / Equipped Play)
Allotments (0.5ha)
Natural and Semi Natural Open Space /
Amenity Green Space
Outdoor Sports Facilities (3.28ha)
Formal Pedestrian / Cycle Crossing
Informal Pedestrian / Cycle Crossing
Potential Future Vehicular Access by others
B
DE155_002
Bloor Homes
Normandy Fields
Development Framework
1:5,000 @ A3
Rev
Drg No
Client
Project
Title
Scale