19 Centrepointe Drive Residential Development Transportation
Transcription
19 Centrepointe Drive Residential Development Transportation
19 Centrepointe Drive Residential Development Transportation Impact Study Prepared for: Richcraft Group of Companies 2280 St. Laurent Boulevard Suite 201 Ottawa, ON K1G 4K1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 September 30, 2011 TO1170TOK00 Address 19 Centrepointe Drive ____________________________________ File # ____________________________________ Date 30 September 2011 ___________________________________ TIS TIS / TB/ CTS Check List Municipal address; Location relative to major elements of the existing transportation system (e.g., the site is located in the southwest quadrant of the intersection of Main Street/ First Street, 600 metres from the Maple Street Rapid Transit Station); Existing land uses or permitted use provisions in the Official Plan, Zoning By-law, etc.; Proposed land uses and relevant planning regulations to be used in the analysis; Proposed development size (building size, number of residential units, etc.) and location on site; Estimated date of occupancy; Planned phasing of development; Proposed number of parking spaces (not relevant for Draft Plans of Subdivision); and Proposed access points and type of access (full turns, right-in/ right-out, turning restrictions, etc. Study area; Time periods and phasing; and Horizon years (include reference to phased development). ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ Existing Conditions ✔ Existing roads and ramps in the study area, including jurisdiction, classification, number of lanes, and posted speed limit; ✔ Existing intersections, indicating type of control, lane configurations, turning restrictions, and any other relevant data (e.g., extraordinary lane widths, grades, etc.); Existing access points to adjacent developments (both sides of all roads bordering the site); Existing transit system, including stations and stops; Existing on- and off-road bicycle facilities and pedestrian sidewalks and pathway networks; Existing system operations (V/C, LOS); and ✔ ✔ ✔ ✔ ✔ Major trip generators/ attractors within the Study Area should be indicated. Demand Forecasting General background growth; Other study area developments; Changes to the study area road network; Future background system operations (V/C, LOS, queue lengths): Trip generation rates; Trip distribution and assignment: ✔ ✔ ✔ ✔ ✔ ✔ Impact Analysis Total future system operations (V/C, LOS, queue lengths); Signal and auxiliary lane (device) warrants; Operational/ safety assessment (e.g., sight line assessment where grades are an issue); Storage analysis for closely spaced intersections; Pedestrian and bicycle network connections and continuity; On-site circulation and design; Potential for neighbourhood impacts; and TDM. Synchro Files ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ CTS Impact Analysis Network Capacity Analysis; Non-auto network connections and continuity; Potential for community impacts, and TDM. Synchro Files Screenline Analysis 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 Table of Contents 1. Introduction ...................................................................................................... 1 2. Existing Conditions ............................................................................................. 3 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Study Area.................................................................................................. 3 Area Road Network ...................................................................................... 3 Pedestrian/Cycling Network ........................................................................... 3 Transit Network ........................................................................................... 4 Existing Study Area Intersections ................................................................... 5 Existing Traffic Operations............................................................................. 6 Existing Road Safety Conditions ..................................................................... 7 3. Demand Forecasting ........................................................................................... 8 3.1 3.2 3.3 3.4 3.5 Planned Study Area Transportation Network Changes........................................ 8 Other Area Development ............................................................................... 8 Background Traffic Growth ............................................................................ 9 Site Trip Generation ................................................................................... 11 Traffic Distribution and Assignment .............................................................. 12 4. Impact Analysis ............................................................................................... 14 4.1 4.2 4.3 4.4 4.5 Projected 2013 Conditions at Full Site Development ........................................ Projected 2018 Conditions at Five Years beyond Site Build-Out ......................... Mitigative Signal Timing and Roadway Modifications ........................................ Impacts to Transit ...................................................................................... Neighbourhood Impacts .............................................................................. 14 15 16 16 17 5. Transportation Demand Management.................................................................. 17 6. Site Plan Review .............................................................................................. 17 7. Findings and Recommendations ......................................................................... 17 List of Appendices Appendix Appendix Appendix Appendix Appendix A: B: C: D: E: Traffic Counts Existing Traffic Conditions Collision Data Traffic Growth Projected Traffic Conditions 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 List of Figures Figure Figure Figure Figure Figure Figure Figure Figure Figure 1: 2: 3: 4: 5: 6: 7: 8: 9: Local Context ............................................................................................ 1 Proposed Site Plan (Conceptual Only) ........................................................... 2 Area Transit Network ................................................................................. 4 Projected 2013 Background Traffic Volumes ................................................ 10 Projected 2018 Background Traffic Volumes ................................................ 10 Site-Generated Vehicular Traffic ................................................................ 13 Site-Generated Pass-by Vehicular Traffic ..................................................... 13 Total Projected 2013 Peak Hour Traffic Volumes........................................... 14 Total Projected 2018 Peak Hour Traffic Volumes........................................... 15 List of Tables Table Table Table Table Table Table Table Table Table 1: 2: 3: 4: 5: 6: 7: 8: 9: Existing Performance at Study Area Intersections ............................................ 7 Baseline/Highgate Historical Background Growth ............................................. 9 ITE Trip Generation Rates .......................................................................... 11 Modified Person Trip Generation.................................................................. 11 Residential Modal Site Trip Generation ......................................................... 12 Retail Modal Site Trip Generation ................................................................ 12 Total Site Vehicle Trip Generation ............................................................... 12 Projected 2013 Performance at Study Area Intersections ................................ 14 Projected 2018 Performance at Study Area Intersections ................................ 16 19 Centrepointe Drive Residential Development Transportation Impact Study 1. September 2011 INTRODUCTION Richcraft is proposing to develop the property located at 19 Centrepointe Drive. From the information provided, it is our understanding that Richcraft is proposing a mixed-use development consisting of 346 residential condominium units and 7,860 ft2 of ancillary commercial uses on a site located on the southeast corner of the unsignalized Centrepointe/Constellation intersection. The site’s local context is depicted in Figure 1 and the Site Plan is depicted in Figure 2. For the purpose of this assessment, horizon years will be analyzed for the year 2013 representing full occupancy and at the year 2018, which is 5-years beyond full build-out. Figure 1: Local Context Delcan has previously prepared a Transportation Impact Study (March, 2004) for a 204 unit residential development on this site, for which Site Plan Approval was received. In January, 2011, Delcan completed a high-level feasibility review of the current development proposal to determine the ability of the surrounding road network to accommodate projected site-generated traffic and further work required to address the requirements of the City’s Transportation Impact Assessment Guidelines. A Transportation Master Plan for the planned Centrepointe Town Centre redevelopment area, adjacent to the proposed site, has also been recently completed. As part of the rezoning and subsequent Site Plan Approval process, the City of Ottawa requires submission of a formal Transportation Impact Assessment (TIA) consistent with their guidelines dated October 2006. A pre-consultation meeting with City staff on April 19, 2011, it was determined that based on the foregoing, a Transportation Impact Study (TIS) is the appropriate type of study for the subject application, based primarily on the fact that larger, community-wide transportation planning issues have been assessed by the City’s Centrepointe Town Centre Transportation Master Plan (Dillon Consulting, 2009). Development of the subject property as a high-rise residential development was included 1 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 Figure 2: Proposed Site Plan (Conceptual Only) 2 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 in this transportation assessment. It is noteworthy that the current application is only for the required Zoning By-law amendment. Additional transportation review will be provided in support of any future Site Plan application for this development. 2. EXISTING CONDITIONS 2.1 Study Area The subject site is location on the southeast quadrant of the unsignalized Centrepointe/Constellation intersection, which is currently a vacant lot. With regard to site access, a full-movement driveway connection is proposed to Constellation Crescent. 2.2 Area Road Network Baseline Road is a major east-west arterial road, which extends from Richmond Road in the west to Prince of Wales Drive in the east where it continues as Heron Road. Within the study area, Baseline Road has a four-lane cross section with auxiliary turn lanes at major intersections and a posted speed limit of 70 km/h. Centrepointe Drive is a collector roadway that forms a crescent south of Baseline Road with connections to Baseline Road at Highgate Road and Cobden Road and a connection is provide to Woodroffe Avenue via Tallwood Drive. Centrepointe Drive is identified as a major collector between Baseline Road and Tallwood Drive and along this stretch, it has a four-lane cross section. The remaining length of Centrepointe Drive has two-lane cross section. Auxiliary turn lanes are provided at major intersections and the posted speed limit is 40 km/h. Woodroffe Avenue is a north-south arterial roadway, which extends from Prince of Wales Drive in the south to the Ottawa River Parkway in the north. Within the study area, Woodroffe Avenue has a six-lane cross-section (including bus only lanes) and auxiliary turn lanes at major intersections. The posted speed limit within the study area is 60 km/h. Constellation Crescent is a collector roadway that forms a crescent east of Centrepointe Drive with ‘T’ intersections with Centrepointe Drive and Baseline Road. Centrepointe Drive has a two-lane cross section and has unposted speed limit of 50 km/h. 2.3 Pedestrian/Cycling Network With regard to pedestrian facilities adjacent to the site, sidewalks are provided on both sides of Baseline Road, Centrepointe Drive and Woodroffe Avenue, connecting pedestrians to nearby transit, employment and recreational areas. According to the City’s 2008 Official Cycling Plan (OCP), Baseline Road and Woodroffe Avenue are classified as “spine or Citywide” cycling routes and Centrepointe Drive is classified as a “community” cycling route. Within the study area, shared bus/bike lanes are provided and signed along the north side Baseline Road only, beginning at approximately 100 meters west of Constellation Crescent. South of Baseline Road, dedicated bike lanes are provided along both sides of Woodroffe Avenue. 3 19 Centrepointe Drive Residential Development Transportation Impact Study 2.4 September 2011 Transit Network Local transit service within the vicinity of the site is provided by OC Transpo Routes #87, 118, and 178. Bus Rapid Transit (BRT) service is also provided within approximately 600 meters from the site, at the Baseline Rapid Transit Station. It is noteworthy that in the City’s Official Plan (OP) and Transportation Master Plan (TMP), the Baseline Rapid Transit station is identified as a “key transfer station” that will connect the existing BRT to future Light Rail Transit (LRT) service, scheduled as a Phase 1 (2011 to 2016) Implementation. Baseline Road is also identified as an “Intensive Bus Transit Corridor” scheduled for Phase 2 (2016 to 2022) Implementation. Bus stops for Routes #87, 118, and 186 are provided Constellation/Constellation Ext. intersection, approximately 200 Bus stops for Routes #118 are located approximately 100 meters Road and a bus stop for Route #178 is provided approximately site on Hemmingwood Way. on the corner of the meters east of the site. from the site on Baseline 150 meters south of the Regular Routes #87, 118, 178 provide frequent all-day service and Red Route # 186 provides weekday morning and afternoon peak hour service only. The current area transit network is illustrated as Figure 3. Figure 3: Area Transit Network 4 19 Centrepointe Drive Residential Development Transportation Impact Study 2.5 September 2011 Existing Study Area Intersections Baseline/Cobden The Baseline/Cobden intersection is a signalized four-legged intersection. The westbound approach consists of single left and right-turn lanes with three through lanes. The eastbound approach consists of single left and right-turn lanes with three through lanes. The northbound and southbound approaches consist of a single right-turn lane and a single left-turn lane. Northbound and southbound through movements are not permitted. During the weekday morning peak hours only, eastbound left-turns and westbound rightturns are not permitted. Baseline/Highgate The Baseline/Highgate intersection is a signalized four-legged intersection. The westbound approach consists of single left and right-turn lanes with three through lanes. The eastbound approach consists of single left and right-turn lanes with three through lanes. The northbound and southbound approaches consist of a single right-turn lane and a single left-turn lane. Northbound and southbound through movements are not permitted. During the weekday morning peak hours only, eastbound left-turns, westbound rightturns and westbound U-turns are not permitted. Baseline/Constellation The Baseline/Constellation intersection is a signalized, ‘T’ intersection. The westbound approach consists of two left-turn lanes and two through lanes. The eastbound approach consists of a single right-turn lane and three through lanes. The northbound approach consists of two leftturn lanes and a single right-turn lane. 5 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 Baseline/Woodroffe The Baseline/Woodroffe intersection is a signalized four-legged intersection. The westbound approach consists of single left and right-turn lanes with two through lanes. The eastbound approach consists of two left-turn lanes, a single right-turn lane and three through lanes. The northbound and southbound approaches consist of two left-turn lanes, a single right-turn lane and three through lanes. All turning movements are permitted, including Uturns. Centrepointe/Constellation The Baseline/Constellation intersection is an unsignalized, ‘T’ intersection with STOP control on the minor approach only. The westbound approach consists of a single all-movement lane. The northbound approach consists of a single right-turn lane and two through lanes. The southbound approach consists of a three through lanes with the curbside lane tapering off approximately 30 meters after the intersection. All turning movements are permitted, including U-turns. 2.6 Existing Traffic Operations The City of Ottawa provided the most recent weekday, peak hour counts for study area intersections. These peak hour volumes were balanced to the Baseline/Highgate intersection and they are depicted in Figure 4. Table 1 provides a summary of existing traffic operations at study area intersections, based on the Synchro (V7) traffic analysis software. The subject intersections were assessed in terms of the volume-to-capacity (v/c) ratio and the corresponding Level of Service (LoS) for the critical movement(s). The subject intersections ‘as a whole’ were assessed based on a weighted v/c ratio. Existing peak hour traffic counts are provided within Appendix A and the Synchro model output of existing conditions is provided within Appendix B. 6 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 Table 1: Existing Performance at Study Area Intersections Intersection Weekday AM Peak (PM Peak) Critical Movement Intersection as a Whole max. v/c LoS or avg. Movement Delay (s) LoS v/c delay (s) Baseline/Cobden C(C) 0.71(0.74) NBL(NBL) 18.0(22.7) A(B) 0.53(0.66) Baseline/Highgate B(C) 0.67(0.74) EBT(WBT) 25.5(35.5) B(B) 0.66(0.70) Baseline/Constellation C(A) 0.74(0.54) WBL(WBT) 11.4(9.9) B(A) 0.61(0.53) Baseline/Woodroffe F(F) 1.10(1.28) SBL(NBL) 52.5(63.5) D(D) 0.83(0.88) Centrepointe/Constellation B(B) 12.3(14.3) WBL(WBL) 1.8(1.3) - - Note: Analysis of signalized intersections assumes a PHF of 0.95 and a saturation flow rate of 1800 veh/h/lane. As shown in Table 1, the signalized study area intersections, ‘as a whole’, are currently operating at an acceptable Level of Service ‘D’ or better during weekday morning and afternoon peak hours, with respect to the City of Ottawa operating standards of LoS ‘D’ or better (0.90 > v/c > 0.00). The majority of the intersection are operating at LoS ‘B’ or better, indicating spare capacity. The notable exception is the Baseline/Woodroffe intersection, which is operating almost at capacity (v/c of 0.88 or LoS D). With regard to ‘critical movements’ at study area intersections, the southbound left-turn and northbound left-turn at the Baseline/Woodroffe intersection are operating poorly during peak periods according to the analysis. The current 95th percentile northbound queues at the Baseline/Highgate/Centrepointe intersection are estimated in Synchro to range from 30 to 60 metres during the weekday morning and afternoon peak hours, respectively. However, field observation indicates that queue lengths are often longer, and regularly block the Centrepointe/Constellation intersection during the weekday afternoon peak hour. 2.7 Existing Road Safety Conditions Collision history for study area roads (2007 to 2009) was obtained from the City of Ottawa. Most of the collisions (78%) involved only property damage, indicating low impact speeds and the remaining 22% were non-fatal. The primary causes of collisions cited by police include rear end (63%), sideswipe (16%) and single vehicle (8%) type collisions. At intersections within the study area, collisions take place at a rate of 0.33, 0.58, 0.18 and 0.18 per million entering vehicles at the Baseline/Cobden, Baseline/Highgate, Baseline/Constellation and Baseline/Woodroffe intersections, respectively. Based on the available data, there does not appear to be any safety issues on Baseline Road adjacent to the proposed site. The source collision data as provided by the City of Ottawa is contained within Appendix C. 7 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 3. DEMAND FORECASTING 3.1 Planned Study Area Transportation Network Changes Notable transportation network changes Transportation Master Plan (TMP) include; within the area identified in the City’s Phase 1 Construction of Baseline/Woodroffe LRT station Shoulder Bus lanes on Woodroffe Avenue, from West Hunt Club Road to CNR rail corridor BRT measures on Woodroffe Avenue, from the CNR rail corridor to Baseline Road Phase 2 “intensive bus transit” measures on Baseline Road, from the H417/H416 split to the St. Laurent/Innes intersection Phase 3 Widening of West Hunt Club Road, from Highway 416 to Bank Street Identified in the City’s Volume 2a Secondary Plans within their Official Plan, Navaho Drive and College Avenue will be extended west of Woodroffe Avenue to Constellation Crescent. While the Baseline rapid-transit station remains at grade, these roads will be intended for bus, bicycle and pedestrian traffic between Constellation Crescent and Woodroffe Avenue only. In the fullness of time, the Baseline Rapid-Transit Station will be reconstructed below grade and auto traffic on Navaho Drive and College Avenue will be unrestricted throughout their entire lengths at this time. 3.2 Other Area Development Area development identified using the City’s online Development Application Search tool includes: 2735 Iris Street The application is a “Site Plan Control” for a one-store, standalone restaurant with an approximate gross floor area (GFA) of 6,000 ft2. The current review status is listed as “Application on Hold” and the status date is July 7, 2010 1385 Woodroffe Avenue The application is a “Site Plan Control” for Algonquin College proposing to construct a new parking lot to relocate the approximate 254 lost parking spaces resulting from the construction of their new student commons building. The current review status is listed as “Application on Hold” and the status date is September 17, 2010. 145-151 Meadowlands Drive The application is a “Zoning By-law Amendment” for a 4-storey condominium apartment building consisting of approximately 50 dwelling units. The current review status is listed as “Comment Period in Progress” and the status date is August 29, 2011. 8 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 Identified in the Centrepointe Town Centre Transportation Master Plan prepared by Dillon Consulting in 2008, approximately 3.7 million square feet of additional development is anticipated by year 2031, which includes the proposed Richcraft residential development. The trips generated by these area developments will be captured in the subsequent analyses. 3.3 Background Traffic Growth Background traffic growth through the immediate study area was determined from the available historical count data (years 2005, 2006 and 2010) provided by the City of Ottawa at the Baseline/Highgate intersection. Average annual background growth is summarized in Table 2 and detailed analysis is attached as Appendix D. Table 2: Baseline/Highgate Historical Background Growth Percent Annual Change Time Period North Leg South Leg East Leg West Leg Overall 8 hrs AM Peak PM Peak 3.68% 7.91% 6.35% -1.92% -5.39% -0.65% 1.90% -1.89% 0.39% 0.04% 0.29% -0.12% 0.59% -1.29% 0.26% As shown in Table 2, Baseline Road has experienced a -1.89% to 0.39% annual growth in past years along the frontage of the proposed site, during peak hours. Therefore, for the purpose of this assessment, the subsequent analysis will assume a background growth rate of 1% along Baseline Road and 1% along Woodroffe Avenue to account for the potential development identified in the Centrepointe Town Centre TMP. For the purpose of this assessment the 1% annual background growth rate was applied to the east, west, north and southbound through movements at the signalized Baseline/Woodroffe intersection and the resulting increase in background vehicles at this intersection was distributed to the through movements at the remaining study area intersections. The resulting future background traffic for the year 2013 (when the site is expected to be fully occupied) and for the horizon year 2018 (5 years after build-out) are depicted in Figures 4 and 5, respectively. 9 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 Figure 4: Projected 2013 Background Traffic Volumes Figure 5: Projected 2018 Background Traffic Volumes The 2018 volumes depicted in Figure 5 are considered generally consistent with the projected volumes identified in the Centrepointe Town Centre TMP. 10 19 Centrepointe Drive Residential Development Transportation Impact Study 3.4 September 2011 Site Trip Generation The proposed development consists of 346 residential condominium units and 7,860 ft2 of ancillary commercial uses. The appropriate trip generation rates for the proposed land uses were obtained from the 8th Edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual and are summarized in Table 3. Table 3: ITE Trip Generation Rates Land Use High‐Rise Condominium Specialty Retail Notes: Data Source ITE 232 ITE 814 Trip Rates AM Peak T = 0.34(du); T = 0.29(du)+29.86 T = 1.36(X); T(0.5) = 2.40(X)+21.48 PM Peak T = 0.38(du); T = 0.34(du)+15.47 T = 2.71(X); T = 2.40(X)+21.48 T = Average Vehicle Trip Ends 2 X = 1000 ft Gross Floor Area du = dwelling units Specialty Retail AM Peak is assumed to be 50% of the PM Peak To convert ITE vehicle trip rates to person trips, an auto occupancy factor and a non-auto trip factor were applied to the ITE vehicle trip rates. Our review of the available literature suggests that a combined factor of approximately 1.3 is considered reasonable to account for typical North American auto occupancy values of approximately 1.15 and combined transit and non-motorized modal shares of less than 10%. As ITE trip generation surveys only record vehicle trips and typically reflect highly suburban locations (with little to no access by travel modes other than private automobiles), appropriate adjustment factors were applied to attain estimates of person trips for the proposed development. The person trip generation for the proposed site is summarized in Table 4. Table 4: Modified Person Trip Generation Land Use High-Rise Condominium Specialty Retail Data Source ITE 232 ITE 814 Area AM Peak (persons) In Out Total PM Peak (persons) In Out Total 575 Units 31 137 168 107 66 173 7,860 ft² 11 15 26 22 30 52 Total 42 152 194 129 96 225 Note: 1.3 factor to account for typical North American auto occupancy values of approximately 1.15 and combined transit and non-motorized modal shares of less than 10% The person trips shown in Table 4 for the proposed site were then reduced by modal share values, including a reduction for ‘pass-by’ trips based on the site’s location and proximity to adjacent communities, employment, other shopping uses and transit availability. Modal share and ‘pass-by’ values for residential and retail land uses within the proposed development are summarized in Tables 5 and 6, respectively, with the total site vehicle trip generation summarized in Table 7. 11 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 Table 5: Residential Modal Site Trip Generation AM Peak (persons/h) PM Peak (persons/h) Mode Share In Out Total In Out Total Auto Driver 60% 19 83 102 65 40 105 Auto Passenger 15% 3 13 16 10 6 16 Transit 20% 6 27 33 21 14 35 5% 3 14 17 11 6 17 31 137 168 107 66 173 19 83 102 65 40 105 Travel Mode Non-motorized Total Person Trips 100% Total ‘New’ Auto Trips Table 6: Retail Modal Site Trip Generation AM Peak (persons/h) PM Peak (persons/h) Mode Share In Out Total In Out Total Auto Driver 60% 7 9 16 14 18 32 Auto Passenger 15% 1 1 2 2 3 5 Transit 20% 2 3 5 4 6 10 Travel Mode 5% 1 2 3 2 3 5 100% 11 15 26 22 30 52 Less 30% Pass-By -3 -3 -6 -6 -6 -12 Total ‘New’ Auto Trips 4 6 10 7 12 20 Non-motorized Total Person Trips Table 7: Total Site Vehicle Trip Generation Land Use High-Rise Condominium Specialty Retail Specialty Retail Pass-by Total ‘New’ Auto Trips In 19 7 -3 23 AM Peak (veh/h) Out Total 83 102 9 16 -3 -6 89 112 In 65 14 -6 73 PM Peak (veh/h) Out Total 40 105 18 32 -6 -12 52 125 As shown in Table 7, the resulting number of potential ‘new’ two-way vehicle trips for the proposed development is 112 and 125 veh/h during the weekday morning and afternoon peak hours, respectively. 3.5 Traffic Distribution and Assignment Traffic distribution was based on existing volume splits at study area intersections and our knowledge of the surrounding area. The resultant distribution is outlined as follows: 15% 20% 35% 30% 100% to/from to/from to/from to/from the the the the north via Baseline Road to Woodroffe Avenue; south via Centrepointe Drive to Tallwood Drive; east via Baseline Road; and west via Baseline Road. 12 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 ‘New’ site-generated trips are illustrated in Figure 6 and the site-generated ‘Pass-By’ trips are illustrated in Figure 7. Figure 6: Site-Generated Vehicular Traffic Figure 7: Site-Generated Pass-by Vehicular Traffic 13 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 4. IMPACT ANALYSIS 4.1 Projected 2013 Conditions at Full Site Development Total projected 2013 volumes illustrated in Figure 8 were determined by superimposing ‘new’ site-generated volumes (Figure 6 and 7) onto projected 2013 background traffic volumes (Figure 4). Figure 8: Total Projected 2013 Peak Hour Traffic Volumes Table 8 provides a summary of projected 2013 performances of study area intersections at full site build-out. The Synchro model output of projected conditions is provided within Appendix E. Table 8: Projected 2013 Performance at Study Area Intersections Intersection Weekday AM Peak (PM Peak) Critical Movement Intersection as a Whole max. v/c LoS or avg. Movement Delay (s) LoS v/c delay (s) Baseline/Cobden C(C) 0.71(0.74) NBL(NBL) 17.9(22.8) A(B) 0.53(0.68) Baseline/Highgate C(C) 0.76(0.75) NBR(WBT) 26.8(35.6) B(C) 0.69(0.71) Baseline/Constellation C(A) 0.74(0.55) WBL(WBT) 12.0(10.5) B(A) 0.64(0.54) Baseline/Woodroffe F(F) 1.10(1.28) SBL(NBL) 53.8(64.4) E(D) 0.91(0.90) Centrepointe/Constellation B(C) 14.4(16.4) WBL(WBL) 3.0(2.4) - - Note: Analysis of signalized intersections assumes a PHF of 0.95 and a saturation flow rate of 1800 veh/h/lane. 14 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 As shown in Table 8, with no signal timing plan modifications, the signalized study area intersections, ‘as a whole’ with exception of the Baseline/Woodroffe intersection, are projected operate at an acceptable Level of Service ‘C’ or better during weekday morning and afternoon peak hours, similar to existing conditions. The Baseline/Woodroffe intersection is currently operating close to capacity with a v/c of 0.91 and 0.90 during the weekday morning and afternoon peak hours, respectively. With regard to ‘critical movements’ at study area intersections, the signalized Baseline/Woodroffe intersection is projected to operate with a failing south left-turn movement and the eastbound left-turn and through movements are projected to operate at capacity during the morning peak hour. During the afternoon peak hour at the Baseline/Woodroffe intersection, the northbound left-turn is projected to operate with a failing v/c of 1.28 and the southbound left-turn, northbound through and westbound through movements are projected to operate at capacity with a v/c of 0.98, 0.91 and 0.90, respectively. 4.2 Projected 2018 Conditions at Five Years beyond Site Build-Out Total projected 2018 (5-years beyond site build-out) volumes illustrated in Figure 9 were determined by superimposing ‘new’ site-generated volumes (Figure 6 and 7) onto projected 2018 background traffic volumes (Figure 5). Figure 9: Total Projected 2018 Peak Hour Traffic Volumes Table 9 provides a summary of projected 2018 performances of study area intersections at 5-years beyond site build-out. The Synchro model output of projected conditions is provided within Appendix E. 15 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 Table 9: Projected 2018 Performance at Study Area Intersections Intersection Weekday AM Peak (PM Peak) Critical Movement Intersection as a Whole max. v/c LoS or avg. Movement Delay (s) LoS v/c delay (s) Baseline/Cobden C(C) 0.71(0.74) NBL(NBL) 18.1(26.0) A(B) 0.55(0.70) Baseline/Highgate C(C) 0.76(0.78) NBR(WBT) 27.0(31.9) C(C) 0.72(0.74) Baseline/Constellation C(A) 0.74(0.57) WBL(WBT) 12.1(11.0) B(A) 0.65(0.56) Baseline/Woodroffe F(F) 1.10(1.28) SBL(NBL) 56.1(67.0) E(E) 0.94(0.93) Centrepointe/Constellation B(C) 14.4(16.4) WBL(WBL) 3.0(2.4) - - Note: Analysis of signalized intersections assumes a PHF of 0.95 and a saturation flow rate of 1800 veh/h/lane. As shown in Table 9, with no signal timing plan modifications, the signalized study area intersections, ‘as a whole’, are projected to continue operating similar to the projected 2013 conditions, 5-years beyond site build-out. Of particular relevance to the development is the extent of northbound queuing at the Baseline/Highgate/Centrepointe intersection. As noted as part of the assessment of existing conditions, the analysis indicates 95th percentile queue lengths of up to 60 m and field observation revealed that queues regularly block the Centrepointe/Constellation intersection during the weekday afternoon peak hour. The Synchro analysis of projected conditions suggests a negligible increase in the 95th percentile queue length, and therefore the proposed development is not expected to exacerbate the current queuing issue. 4.3 Mitigative Signal Timing and Roadway Modifications With regard to possible mitigative measures to achieve acceptable Levels of Service at the Baseline/Woodroffe intersection, modifications to the signal timing plan and widening of Baseline Road to six-lanes would be required. The widening of Baseline Road is not identified in the City’s TMP, however, the “intensive bus transit” measures to be implemented as a Phase 2 project on Baseline Road will provide additional transit capacity and improve reliability, which will ultimately lessen the reliance on the private automobile. 4.4 Impacts to Transit According to the assessment of trip generation to/from the site that assumes a 20% transit modal share, the additional demand for transit is expected to range between 40 and 50 persons during each peak. Given the number of local transit routes serving the area, and proximity to the rapid transit network served by the Baseline Rapid Transit Station, the existing transit service is expected to easily accommodate increases of this scale. 16 19 Centrepointe Drive Residential Development Transportation Impact Study 4.5 September 2011 Neighbourhood Impacts The proposed site fronts Centrepointe Drive (a major collector roadway), it is in close proximity to Baseline Road (a major arterial roadway) and the operations of the Baseline/Highgate intersection is projected to operate with spare capacity. Therefore, with regard to neighbourhood impacts related to cut through traffic will be negligible. It should be noted, that approximately 25 veh/h two-way trips are projected to access the Woodroffe Avenue via Tallwood Drive, south of the site. This equates to approximately 1 new vehicle every 2.5 minutes during peak hours. 5. TRANSPORTATION DEMAND MANAGEMENT Depending on the nature of a development, Transportation Demand Management (TDM) strategies have the potential to be an integral part of a planned development in order to address and support the City of Ottawa policies with regard to TDM. For this particular site, its proximity to the existing local and rapid transit service is considered very advantageous in lessening the reliance on the private automobile. A number of TDM measures could also be considered, including: improving the quality and safety of pedestrian facilities, such as enhanced sidewalk lighting; and improving bicycle facilities, such as provision of on-site bicycle storage. These are important strategies to encouraging active modes of transportation to/from the site. 6. SITE PLAN REVIEW As previously indicated, the current application is for a Zoning By-law amendment. Additional transportation assessment will be provided at the time a Site Plan application is made for the proposed development. The proposed conceptual Site Plan was previously illustrated in Figure 2. 7. FINDINGS AND RECOMMENDATIONS Based on the foregoing analysis of the transportation-related conclusions are offered: proposed development, the following The pedestrian, bicycle, transit and roadway networks are all well established within the study area; The majority of the intersections directly adjacent to the site are currently operating, as a whole, at acceptable level of service (LoS ‘B’) during both weekday morning and afternoon peak hours, indicating spare capacity; the notable exception is the Baseline/Woodroffe intersection, which is operating almost at capacity as a whole during peak periods (v/c of 0.88 or LoS D) with some individual movements failing; 17 19 Centrepointe Drive Residential Development Transportation Impact Study September 2011 The proposed development (residential and ancillary retail combined) is projected to generate approximately 100 to 125 ‘new’ two-way trips during the morning and afternoon peak hour, respectively; The impact of site traffic on the performance of area intersections was found to be negligible. All intersections directly adjacent to the site are projected to maintain LoS ‘C’ or better operations during both peak periods, similar to existing conditions the notable exception is the Baseline/Woodroffe intersection, which is projected to operate almost at capacity as a whole during peak periods (v/c of 0.94 or LoS E) with some individual movements failing; With regard to possible mitigative measures to achieve acceptable performance at the Baseline/Woodroffe intersection, modifications to the signal timing plan and widening of Baseline Road to six-lanes would be required. The widening of Baseline Road is not identified in the City’s TMP, however, the “intensive bus transit” measures to be implemented as a Phase 2 project on Baseline Road will provide additional transit capacity and improve reliability, which will ultimately lessen the reliance on the private automobile; Therefore, the proposed development is recommended from a transportation perspective. Prepared by: Gordon R. Scobie, E.I.T. Analyst, Transportation Division B. Paul Croft, MCIP, RPP Senior Transportation Planner 18 Appendix A: Traffic Counts Appendix B: Existing Traffic Conditions Existing AM 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 22 23 Prot 5 1619 1704 NA 2 140 147 Perm 32 34 Prot 1 614 646 NA 6 37 39 Perm 175 184 Prot 3! 150 158 custom 83 87 Prot 7 22 23 custom 7! 8 7 7 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.09 16.0 0.0 16.0 B 2 2 1 6 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.28 16.0 0.0 16.0 B 17.5 B 28.7 79.2 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 7.3 0.06 0.24 64.1 0.0 64.1 E 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.52 13.0 0.0 13.0 B 12.9 B 82.6 119.5 159.5 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.15 4.2 0.0 4.2 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.1 0.06 0.32 52.8 0.0 52.8 D 3.7 14.4 8.9 19.6 3276 0 0 0 0.52 1004 0 0 0 0.15 80.0 119 0 0 0 0.29 5.8 14.8 90.0 114 0 0 0 0.20 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 74 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 18.2 Intersection Capacity Utilization 62.9% Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 2297 0 0 0 0.28 6 6 3 3 3 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.04 12.0 0.0 12.0 B 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 None 20.1 0.15 0.71 66.4 0.0 66.4 E None 20.1 0.15 0.44 10.5 0.0 10.5 B 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.34 50.8 0.0 50.8 D 0.3 9.1 45.4 65.7 0.0 17.7 20.1 33.7 0.0 7.5 80.0 1013 0 0 0 0.04 799 0 0 0 0.23 50.0 782 0 0 0 0.20 50.0 374 0 0 0 0.23 352 0 0 0 0.07 7.0 24.0 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: B ICU Level of Service B 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Existing AM 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 1 1 Perm 1495 1574 NA 2 356 375 Perm 175 184 Prot 1 461 485 NA 6 22 23 Perm 150 158 Prot 4 294 309 custom 94 99 Prot 3 72 76 custom 3 2 2 1 6 6 6 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 62.3 0.48 0.42 11.1 0.0 11.1 B 5.0 11.2 24.0 18.5% 3.7 2.5 0.0 6.2 Lead Yes None 12.7 0.10 0.58 65.2 0.0 65.2 E 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 35.3 75.8 19.7 36.7 C-Max 81.2 0.62 0.23 8.0 0.0 8.0 A 23.0 C 18.0 35.0 207.0 150.0 900 0 0 0 0.42 85.0 445 0 0 0 0.41 2 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 62.3 0.48 0.00 17.0 0.0 17.0 B 0.1 m0.0 55.0 394 0 0 0 0.00 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 62.3 0.48 0.68 27.6 0.0 27.6 C 24.4 C 117.0 #167.1 471.0 2310 0 0 0 0.68 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 113 (87%), Referenced to phase 2:EBTL and 6:WBT, Start of Green Natural Cycle: 95 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 25.7 Intersection Capacity Utilization 74.8% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2094 0 0 0 0.23 4 4 4 3 3 C-Max 81.2 0.62 0.03 3.5 0.0 3.5 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 17.5 0.13 0.36 51.3 0.0 51.3 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 17.5 0.13 0.67 12.2 0.0 12.2 B 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.65 76.5 0.0 76.5 E 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.37 16.8 0.0 16.8 B 0.1 3.1 20.3 26.9 0.0 24.5 24.7 43.2 0.0 14.6 100.0 887 0 0 0 0.03 715 0 0 0 0.22 559 0 0 0 0.55 30.0 175 0 0 0 0.57 225 0 0 0 0.34 Intersection LOS: C ICU Level of Service D 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Existing AM 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1790 1884 NA 2 93 98 Perm 395 416 Prot 1 652 686 NA 6 6 6 NA 8 20 21 Perm 2 2 1 6 8 8 8 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.8 0.65 0.10 0.6 0.0 0.6 A 5.0 11.1 25.0 19.2% 3.7 2.4 0.0 6.1 Lead Yes None 22.4 0.17 0.74 45.1 0.0 45.1 D 10.0 28.5 99.0 76.2% 3.7 2.8 0.0 6.5 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 53.6 68.9 None 10.0 0.08 0.02 55.8 0.0 55.8 E 31.1 C 0.7 2.9 132.0 None 10.0 0.08 0.16 24.0 0.0 24.0 C 4.1 m0.3 C-Max 115.9 0.89 0.23 2.9 0.0 2.9 A 18.8 B 12.8 33.0 551.0 45.0 965 0 0 0 0.10 85.0 567 0 0 0 0.73 2989 0 0 0 0.23 600 0 0 0 0.01 2 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.8 0.65 0.60 7.3 0.2 7.5 A 7.1 A 160.4 18.6 207.0 3144 445 0 0 0.70 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 129 (99%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 11.5 Intersection Capacity Utilization 73.1% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 8.4 30.0 294 0 0 0 0.07 Intersection LOS: B ICU Level of Service D 3: Constellation & Baseline Synchro 7 - Report Existing AM 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 539 567 Prot 5 1165 1226 NA 2 106 112 Perm 56 59 Prot 1 468 493 NA 6 144 152 Perm 127 134 Prot 3 995 1047 NA 8 54 57 Perm 296 312 Prot 7 421 443 NA 4 450 474 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 32.0 24.6% 3.7 3.1 0.0 6.8 Lead Yes None 24.9 0.19 0.91 91.0 0.0 91.0 F 10.0 36.8 56.0 43.1% 3.7 3.1 0.0 6.8 Lag Yes C-Max 53.0 0.41 0.90 44.0 0.0 44.0 D 57.0 E 94.2 #200.8 551.0 10.0 36.8 56.0 43.1% 3.7 3.1 0.0 6.8 Lag Yes C-Max 53.0 0.41 0.18 27.5 0.0 27.5 C 5.0 11.8 14.0 10.8% 3.7 3.1 0.0 6.8 Lead Yes None 7.3 0.06 0.63 88.5 0.0 88.5 F 10.0 36.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 32.8 0.25 0.32 7.8 0.0 7.8 A 5.0 11.8 18.0 13.8% 3.7 3.1 0.0 6.8 Lead Yes None 10.0 0.08 0.53 65.6 0.0 65.6 E 5.0 11.8 18.0 13.8% 3.7 3.1 0.0 6.8 Lead Yes None 11.2 0.09 1.11 141.2 0.0 141.2 F 15.1 #35.4 0.0 16.8 17.2 27.7 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 33.9 0.26 0.83 52.0 0.0 52.0 D 51.5 D 91.8 109.0 358.3 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 33.9 0.26 0.13 9.7 0.0 9.7 A 9.3 29.7 10.0 36.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 32.8 0.25 0.58 46.4 0.0 46.4 D 41.6 D 59.6 78.0 237.7 0.0 10.3 ~47.1 #76.4 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 35.1 0.27 0.34 39.0 0.0 39.0 D 55.5 E 33.3 43.7 305.3 25.0 613 0 0 0 0.18 100.0 96 0 0 0 0.61 95.0 480 0 0 0 0.32 115.0 280 0 0 0 0.48 105.0 438 0 0 0 0.13 85.0 280 0 0 0 1.11 80.1 #107.6 55.0 636 0 0 0 0.89 1368 0 0 0 0.90 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 16 (12%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.11 Intersection Signal Delay: 53.2 Intersection Capacity Utilization 93.6% Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 845 0 0 0 0.58 1305 0 0 0 0.80 1313 0 0 0 0.34 4 4 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 35.1 0.27 0.70 14.5 0.0 14.5 B 17.5 58.0 50.0 683 0 0 0 0.69 Intersection LOS: D ICU Level of Service F 4: Woodroffe & Baseline Synchro 7 - Report Existing AM 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 13 Stop 0% 0.95 14 55 389 Free 0% 0.95 409 47 120 0.95 49 0.95 126 411 Free 0% 0.95 433 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 58 None None 99 878 205 459 878 6.8 205 6.9 459 4.1 3.5 95 254 3.3 93 802 2.2 88 1098 WB 1 72 14 58 568 0.13 3.3 12.3 B 12.3 B NB 1 205 0 0 1700 0.12 0.0 0.0 NB 2 205 0 0 1700 0.12 0.0 0.0 0.0 1.8 32.7% 15 NB 3 49 0 49 1700 0.03 0.0 0.0 SB 1 126 126 0 1098 0.12 3.0 8.7 A 2.0 SB 2 216 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 216 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Existing PM 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 41 43 Prot 5 843 887 NA 2 138 145 Perm 110 116 Prot 1 1371 1443 NA 6 98 103 Perm 201 212 Prot 3! 66 69 custom 66 69 Prot 7 30 32 custom 7! 8 7 7 10.0 16.0 23.0 17.7% 4.0 2.0 0.0 6.0 Lag Yes None 21.3 0.16 0.12 14.0 0.0 14.0 B 2 2 1 6 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.67 19.1 0.0 19.1 B 20.7 C 163.0 184.7 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.7 0.07 0.38 66.9 0.0 66.9 E 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.33 17.2 0.0 17.2 B 17.3 B 43.3 62.9 159.5 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.17 3.2 0.0 3.2 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 17.4 0.13 0.52 56.7 0.0 56.7 E 0.0 11.0 23.5 m34.1 2671 0 0 0 0.33 865 0 0 0 0.17 80.0 224 0 0 0 0.52 10.7 22.5 90.0 124 0 0 0 0.35 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 81 (62%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 22.9 Intersection Capacity Utilization 74.1% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 2144 0 0 0 0.67 6 6 3 3 3 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.10 3.4 0.0 3.4 A 10.0 16.0 56.0 43.1% 4.0 2.0 0.0 6.0 10.0 16.0 56.0 43.1% 4.0 2.0 0.0 6.0 None 22.1 0.17 0.74 66.3 0.0 66.3 E None 22.1 0.17 0.22 11.0 0.0 11.0 B 10.0 16.0 23.0 17.7% 4.0 2.0 0.0 6.0 Lag Yes None 21.3 0.16 0.25 47.0 0.0 47.0 D 4.5 m9.4 52.2 73.7 0.0 12.0 15.5 27.3 0.0 8.4 80.0 985 0 0 0 0.10 645 0 0 0 0.33 50.0 606 0 0 0 0.11 50.0 292 0 0 0 0.24 288 0 0 0 0.11 7.0 24.0 33.0 25% 4.0 2.0 Lead Yes None Intersection LOS: C ICU Level of Service D 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Existing PM 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 36 38 Prot 5 729 767 NA 2 210 221 Perm 229 241 Prot 1 1171 1233 NA 6 112 118 Perm 343 361 Prot 4 266 280 custom 63 66 Prot 3 65 68 custom 3 5 2 2 2 1 6 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 8.4 0.06 0.35 51.4 0.0 51.4 D 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 55.4 0.43 0.37 29.7 0.0 29.7 C 28.1 C 64.2 81.6 471.0 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 55.4 0.43 0.31 18.3 0.0 18.3 B 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 14.6 0.11 0.66 58.1 0.0 58.1 E 23.7 52.0 26.7 39.5 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 64.0 0.49 0.75 40.0 0.0 40.0 D 40.4 D 174.7 #215.5 207.0 150.0 716 0 0 0 0.31 85.0 407 0 0 0 0.59 9.7 21.0 55.0 204 0 0 0 0.19 2055 0 0 0 0.37 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 17 (13%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 95 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay: 35.5 Intersection Capacity Utilization 66.0% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1650 0 0 0 0.75 6 6 4 4 4 3 3 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 64.0 0.49 0.18 8.7 0.0 8.7 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 23.8 0.18 0.61 52.4 0.0 52.4 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 23.8 0.18 0.58 9.8 0.0 9.8 A 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.49 68.6 0.0 68.6 E 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.37 18.1 0.0 18.1 B 6.4 21.2 42.0 57.2 0.0 23.6 16.5 30.4 0.0 13.7 100.0 660 0 0 0 0.18 721 0 0 0 0.50 528 0 0 0 0.53 30.0 214 0 0 0 0.31 251 0 0 0 0.27 Intersection LOS: D ICU Level of Service C 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Existing PM 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1054 1109 NA 2 4 4 Perm 49 52 Prot 1 1488 1566 NA 6 24 25 NA 8 38 40 Perm 2 2 1 6 8 8 8 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.9 0.77 0.00 1.2 0.0 1.2 A 5.0 11.1 23.0 17.7% 3.7 2.4 0.0 6.1 Lead Yes None 7.5 0.06 0.28 53.3 0.0 53.3 D 10.0 28.5 93.0 71.5% 3.7 2.8 0.0 6.5 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 7.1 m7.7 None 10.0 0.08 0.10 56.9 0.0 56.9 E 34.8 C 3.1 7.7 132.0 None 10.0 0.08 0.26 20.9 0.0 20.9 C 0.0 m0.2 C-Max 111.2 0.86 0.55 12.5 0.0 12.5 B 13.8 B 149.7 m155.8 551.0 45.0 1154 0 0 0 0.00 85.0 423 0 0 0 0.12 2868 0 0 0 0.55 750 0 0 0 0.03 2 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.9 0.77 0.30 3.2 0.0 3.2 A 3.2 A 14.3 20.9 207.0 3704 0 0 0 0.30 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 8 (6%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.55 Intersection Signal Delay: 10.1 Intersection Capacity Utilization 63.0% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 11.4 30.0 377 0 0 0 0.11 Intersection LOS: B ICU Level of Service B 3: Constellation & Baseline Synchro 7 - Report Existing PM 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 338 356 Prot 5 686 722 NA 2 68 72 Perm 79 83 Prot 1 873 919 NA 6 250 263 Perm 375 395 Prot 3 896 943 NA 8 116 122 Perm 383 403 Prot 7 858 903 NA 4 288 303 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 25.0 19.2% 3.7 3.1 0.0 6.8 Lead Yes None 17.4 0.13 0.82 84.3 0.0 84.3 F 10.0 36.8 47.0 36.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 46.8 0.36 0.60 51.7 0.0 51.7 D 60.9 E 90.3 121.3 551.0 10.0 36.8 47.0 36.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 46.8 0.36 0.13 37.3 0.0 37.3 D 5.0 11.8 25.0 19.2% 3.7 3.1 0.0 6.8 Lead Yes None 11.8 0.09 0.55 69.1 0.0 69.1 E 10.0 36.8 47.0 36.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 41.2 0.32 0.42 7.9 0.0 7.9 A 5.0 11.8 19.0 14.6% 3.7 3.1 0.0 6.8 Lead Yes None 12.2 0.09 1.30 200.6 0.0 200.6 F 5.0 11.8 23.0 17.7% 3.7 3.1 0.0 6.8 Lead Yes None 16.2 0.12 1.00 100.1 0.0 100.1 F 20.7 36.3 4.3 25.3 ~66.4 #98.0 10.0 33.8 35.0 26.9% 3.7 3.1 0.0 6.8 Lag Yes None 28.0 0.22 0.91 62.8 0.0 62.8 E 95.6 F 86.8 #110.2 358.3 10.0 33.8 35.0 26.9% 3.7 3.1 0.0 6.8 Lag Yes None 28.0 0.22 0.30 9.1 0.0 9.1 A 9.9 27.6 10.0 36.8 47.0 36.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 41.2 0.32 0.87 51.8 0.0 51.8 D 43.8 D 118.0 #152.5 237.7 0.0 15.8 53.9 #86.8 10.0 33.8 39.0 30.0% 3.7 3.1 0.0 6.8 Lag Yes None 32.0 0.25 0.76 50.3 0.0 50.3 D 55.6 E 78.8 94.9 305.3 25.0 549 0 0 0 0.13 100.0 235 0 0 0 0.35 95.0 624 0 0 0 0.42 115.0 305 0 0 0 1.30 105.0 411 0 0 0 0.30 85.0 405 0 0 0 1.00 48.3 #67.2 55.0 455 0 0 0 0.78 1207 0 0 0 0.60 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 21 (16%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.30 Intersection Signal Delay: 64.6 Intersection Capacity Utilization 89.7% Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1062 0 0 0 0.87 1045 0 0 0 0.90 1193 0 0 0 0.76 4 4 10.0 33.8 39.0 30.0% 3.7 3.1 0.0 6.8 Lag Yes None 32.0 0.25 0.55 12.2 0.0 12.2 B 9.6 36.9 50.0 557 0 0 0 0.54 Intersection LOS: E ICU Level of Service E 4: Woodroffe & Baseline Synchro 7 - Report Existing PM 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 28 Stop 0% 0.95 29 54 555 Free 0% 0.95 584 14 26 0.95 15 0.95 27 413 Free 0% 0.95 435 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 57 None None 99 856 292 599 856 6.8 292 6.9 599 4.1 3.5 90 288 3.3 92 704 2.2 97 974 WB 1 86 29 57 472 0.18 5.0 14.3 B 14.3 B NB 1 292 0 0 1700 0.17 0.0 0.0 NB 2 292 0 0 1700 0.17 0.0 0.0 0.0 1.3 34.6% 15 NB 3 15 0 15 1700 0.01 0.0 0.0 SB 1 27 27 0 974 0.03 0.7 8.8 A 0.5 SB 2 217 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 217 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Appendix C: Collision Data 2010-09-23 Thu 18:23 Rain 2 Dusk Rear end Daylight Rear end LIGHT IMPACT TYPE 2008-12-09 Tue 21:11 Snow 2009-04-28 Tue 16:43 Clear 4 5 Sideswipe 2008-03-11 Tue 00:47 Clear 2008-07-14 Mo 17:10 Clear 2008-08-08 Frid 17:42 Clear 2008-10-28 Tue 10:00 Rain 2008-11-11 Tue 12:15 Clear 2009-01-03 Sat 10:00 Drifting Daylight Rear end 2009-01-10 Sat 12:30 Clear 9 10 11 12 13 14 15 Daylight Rear end Daylight Rear end (Note: Time of Day = "00:00" represents unknown collision time August 22, 2011 DIR W W E E N N W E E W W E E W W W E E W W P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 V3 E E E E W W W Non-fatal V1 E V2 E Daylight Single vehicle P.D. only V1 E 2008-03-10 Mo 09:44 Clear 8 Daylight Turning 2008-02-28 Thu 14:54 Clear 7 CLASS P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end Non-fatal V1 V2 Dark Single vehicle P.D. only V1 Daylight Rear end Non-fatal V1 V2 IMPACT TYPE Daylight Sideswipe LIGHT DIR Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 V3 CLASS Traffic Control: Traffic signal Daylight Rear end Dark 2008-01-22 Tue 09:00 Snow DAY TIME ENV IMPACT TYPE Daylight Rear end LIGHT Traffic Control: No control 6 DATE Former Municipality: Ottawa BASELINE RD & CENTREPOINTE DR E 2008-04-10 Thu 15:36 Clear DAY TIME ENV 3 DATE Former Municipality: Ottawa DIR P.D. only V1 V2 P.D. only V1 V2 CLASS Traffic Control: No control BASELINE RD, BARBARA ANN PRIV to CENTREPOINTE DR 2009-12-17 Thu 08:11 Clear DAY TIME ENV 1 DATE Former Municipality: Ottawa BASELINE RD, BARBARA ANN PRIV to CENTREPOINTE DR OnTRAC Reporting System Collision Main Detail Summary Packed snow Packed snow Dry Dry Ice Ice Wet Dry Dry SURFACE COND'N Dry Dry Ice Ice Dry Dry Dry Going ahead Changing lanes Going ahead Going ahead Slowing or Stopped Stopped VEHICLE MANOEUVRE Unknown Stopped Turning right Turning right Turning left Turning left Turning left Going ahead Turning right Turning right Turning left Turning left Going ahead Stopped Slowing or Stopped Changing lanes Slowing or Stopped VEHICLE MANOEUVRE Number of Collisions: 33 Dry Dry Loose snow Loose snow Dry Dry Dry Dry Dry Wet Slowing or Slowing or Going ahead Going ahead Number of Collisions: 3 SURFACE COND'N Dry Dry Wet Wet VEHICLE MANOEUVRE Number of Collisions: 2 SURFACE COND'N Automobile, station Passenger van Automobile, station Passenger van Automobile, station Pick-up truck Pick-up truck Bicycle Automobile, station Delivery van Unknown Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Passenger van VEHICLE TYPE Automobile, station Automobile, station Automobile, station Ambulance Automobile, station Automobile, station Automobile, station VEHICLE TYPE Passenger van Pick-up truck Automobile, station Automobile, station VEHICLE TYPE Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Cyclist Pole (sign, parking Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle FIRST EVENT Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle FIRST EVENT Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle FIRST EVENT Page 1 of 10 0 0 0 0 0 0 0 0 0 0 No. PED 0 0 0 No. PED 0 0 No. PED FROM: 2008-01-01 TO: 2011-01-01 2009-06-23 Tue 08:00 Clear 2009-07-27 Mo 13:48 Clear 2009-07-27 Mo 12:55 Clear 2009-10-28 We 12:23 Rain 2009-10-29 Thu 07:15 Clear 22 23 24 25 26 Dawn Rear end Daylight Sideswipe Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end 2009-12-29 Tue 19:45 Clear 2010-01-15 Frid 17:50 Clear 2010-02-27 Sat 09:10 Rain 2010-04-17 Sat 17:11 Rain 2010-06-06 Sun 13:55 Clear 2010-06-06 Sun 13:35 Clear 2010-06-24 Thu 12:45 Rain 29 30 31 32 33 34 35 August 22, 2011 (Note: Time of Day = "00:00" represents unknown collision time 2009-11-26 Thu 08:45 Clear 28 P.D. only V1 V2 P.D. only V1 V2 V3 P.D. only V1 V2 P.D. only V1 V2 V3 P.D. only V1 V2 Non-fatal V1 V2 V3 Non-fatal V1 V2 Non-fatal V1 V2 Daylight Rear end P.D. only V1 V2 Dark Rear end P.D. only V1 V2 Dark Rear end P.D. only V1 V2 Daylight Single vehicle P.D. only V1 Daylight Rear end Non-fatal V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 COMMENTS: EXACT LOCATION UNKNOWN. 2009-11-10 Tue 15:58 Clear Daylight Angle 2009-04-23 Thu 17:50 Clear 27 Daylight Rear end COMMENTS: EXACT LOCATION UNKNOWN 2009-03-24 Tue 12:00 Clear Daylight Turning 2009-02-19 Thu 14:20 Snow P.D. only V1 V2 P.D. only V1 V2 W S E E E E W W W W W W W W W W W W W E E E N S W W W W W W W W E E E E S S P.D. only V1 E V2 N Single vehicle P.D. only V1 E Daylight Angle 2009-01-16 Frid 22:30 Clear Dark COMMENTS: EXACT LOCATION UNKNOWN. 2009-02-15 Sun 12:05 Clear Daylight Rear end 2009-01-11 Sun 10:23 Clear OnTRAC Reporting System 21 20 19 18 17 16 Collision Main Detail Summary Dry Dry Wet Wet Ice Ice Dry Dry Wet Wet Wet Wet Wet Wet Wet Wet Wet Wet Wet Wet Wet Wet Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Wet Wet Dry Dry Wet Wet Wet Wet Ice Going ahead Turning left Slowing or Stopped Going ahead Stopped Going ahead Stopped Turning left Slowing or Stopped Slowing or Stopped Slowing or Stopped Slowing or Stopped Changing lanes Going ahead Slowing or Stopped Stopped Turning left Turning right Slowing or Stopped Stopped Turning right Turning right Going ahead Slowing or Slowing or Going ahead Going ahead Slowing or Stopped Slowing or Stopped Going ahead Turning left Turning right Automobile, station Automobile, station Passenger van Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Pick-up truck Automobile, station Pick-up truck Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Passenger van Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Pole (utility, tower) Skidding/Sliding Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Page 2 of 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FROM: 2008-01-01 TO: 2011-01-01 Other motor vehicle Other motor vehicle Pole (utility, tower) Dark P.D. only V1 V2 P.D. only V1 V2 2009-10-23 Frid 18:55 Rain 2010-12-24 Frid 13:33 Clear 41 42 IMPACT TYPE August 22, 2011 CLASS DIR Dark Single vehicle P.D. only V1 W Daylight Rear end Non-fatal V1 E V2 E V3 E Dark Rear end P.D. only V2 E V1 E Daylight Rear end P.D. only V1 E V2 E LIGHT (Note: Time of Day = "00:00" represents unknown collision time 2009-02-28 Sat 02:33 Snow 2009-06-03 We 10:30 Clear DAY TIME ENV 39 40 DATE Traffic Control: No control BASELINE RD, CENTREPOINTE DR E to CONSTELLATION CRES RAMP Former Municipality: Ottawa W W W W Single vehicle P.D. only V1 E Rear end Daylight Rear end COMMENTS: EXACT LOCATION UNKNOWN. 2010-12-29 We 00:18 Freezing Dark 2010-10-18 Mo 20:24 Clear 37 38 2010-09-03 Frid 17:40 Rain 36 OnTRAC Reporting System Collision Main Detail Summary Ice Dry Dry Dry Wet Wet Dry Dry Turning right Going ahead Turning right Going ahead Stopped Going ahead Going ahead Going ahead Going ahead Merging Merging Slowing or Stopped VEHICLE MANOEUVRE Number of Collisions: 4 SURFACE COND'N Ice Wet Wet Dry Dry Automobile, station Passenger van Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station VEHICLE TYPE Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Ran off road Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle FIRST EVENT Skidding/Sliding Page 3 of 10 0 0 0 0 No. PED 0 0 0 FROM: 2008-01-01 TO: 2011-01-01 Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle 2008-08-29 Frid 12:26 Rain 2008-09-12 Frid 15:15 Rain 2008-09-15 Mo 07:48 Rain 2008-11-18 Tue 14:30 Rain 2009-01-28 We 14:15 Snow 2009-05-14 Thu 11:13 Rain 2009-09-05 Sat 19:40 Clear 2009-09-18 Frid 17:10 Clear 2009-11-05 Thu 18:15 Snow 2009-12-21 Mo 09:00 Clear 45 46 47 48 49 50 51 52 53 54 Angle Rear end Daylight Rear end Dark Daylight Rear end Dark Daylight Rear end Daylight Rear end Daylight Approaching Daylight Rear end Daylight Rear end 2010-05-31 Mo 08:20 Clear 58 Turning Angle Daylight Rear end Dark Dark 2010-11-08 Mo 08:15 Clear 62 August 22, 2011 (Note: Time of Day = "00:00" represents unknown collision time 2010-09-08 We 14:08 Clear 2010-10-29 Frid 08:07 Rain 60 61 DIR P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 V3 Non-fatal V1 V2 P.D. only V1 V2 Daylight Single vehicle P.D. only V1 Daylight Rear end Non-fatal V1 V2 V3 V4 Daylight Rear end Non-fatal V1 V2 V3 COMMENTS: EXACT LOCATION UNKNOWN. 2010-07-14 We 12:35 Clear Daylight Angle 2010-03-23 Tue 19:48 Rain 57 59 2010-03-19 Frid 19:29 Clear 56 CLASS P.D. only V1 V2 Daylight Rear end Non-fatal V1 V2 Daylight Single vehicle P.D. only V1 IMPACT TYPE Daylight Rear end LIGHT Traffic Control: Traffic signal COMMENTS: EXACT LOCATION UNKNOWN. 2009-12-22 Tue 09:50 Clear Daylight Angle 2008-06-03 Tue 09:44 Rain 44 55 2008-03-04 Tue 12:14 Clear DAY TIME ENV 43 DATE Former Municipality: Ottawa BASELINE RD & CENTREPOINTE DR W OnTRAC Reporting System Collision Main Detail Summary N E E E E E E W W W N E N E N S E E E E E E S W W W E E E E W W W W W W E W W E E W Dry Dry Dry Wet Wet Wet Wet Dry Dry Dry Dry Dry Dry Dry Wet Wet Dry Dry Packed snow Ice Wet Wet Dry Dry Dry Dry Wet Wet Dry Dry Wet Wet Wet Wet Wet Wet Wet Wet Dry Wet Wet Wet SURFACE COND'N Turning right Changing lanes Going ahead Slowing or Stopped Stopped Stopped Going ahead Slowing or Stopped Turning left Going ahead Turning left Going ahead Going ahead Turning left Slowing or Stopped Turning left Turning left Going ahead Stopped Going ahead Going ahead Slowing or Stopped Changing lanes Stopped Turning right Turning right Going ahead Slowing or Going ahead Stopped Stopped Going ahead Going ahead Turning left Stopped Slowing or Stopped Turning right VEHICLE MANOEUVRE Number of Collisions: 22 Automobile, station Municipal transit bus Pick-up truck Automobile, station Automobile, station Automobile, station Passenger van Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Passenger van Pick-up truck Pick-up truck Automobile, station Automobile, station Passenger van Automobile, station Automobile, station Truck and trailer Automobile, station Police vehicle Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Passenger van Pick-up truck Automobile, station Automobile, station Automobile, station Passenger van Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station VEHICLE TYPE Other motor vehicle Other motor vehicle Ran off road Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Ran off road FIRST EVENT Page 4 of 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No. PED FROM: 2008-01-01 TO: 2011-01-01 2009-11-18 We 15:15 Clear 2009-12-01 Tue 17:15 Clear 2010-01-21 Thu 16:55 Clear 2010-03-16 Tue 17:55 Clear 2010-03-29 Mo 22:22 Clear 2010-04-14 We 16:45 Clear 2010-08-25 We 15:59 Clear 2010-10-06 We 19:18 Rain 2010-11-12 Frid 14:40 Clear 66 67 68 69 70 71 72 73 74 IMPACT TYPE Rear end Rear end Rear end Turning Daylight Angle Dark Daylight Rear end Daylight Sideswipe Dark Daylight Rear end Dusk Dark Daylight Sideswipe Daylight Angle LIGHT August 22, 2011 Non-fatal V1 V2 P.D. only V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 Non-fatal V1 V2 V3 Non-fatal V1 V2 P.D. only V1 V2 CLASS DIR N E W W W W W W E E W W E E E E E E W E N P.D. only V1 W V2 W Traffic Control: No control (Note: Time of Day = "00:00" represents unknown collision time 2009-08-10 Mo 18:29 Clear DAY TIME ENV 65 DATE Former Municipality: Ottawa BASELINE RD & CONSTELLATION CRES 2010-11-30 Tue 11:30 Clear 64 Single vehicle P.D. only V1 E Daylight Rear end 2010-11-21 Sun 23:35 Freezing Dark 63 OnTRAC Reporting System Collision Main Detail Summary Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Wet Wet Dry Dry Slowing or Stopped Turning right Turning right Going ahead Changing lanes Going ahead Turning left Turning left Slowing or Slowing or Going ahead Stopped Slowing or Stopped Changing lanes Going ahead Going ahead Stopped Stopped Going ahead Turning left Going ahead Turning left VEHICLE MANOEUVRE Number of Collisions: 10 SURFACE COND'N Dry Dry Ice Automobile, station Bicycle Automobile, station Passenger van Automobile, station Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Passenger van Motorcycle Pick-up truck Automobile, station Automobile, station Automobile, station Municipal transit bus Passenger van Automobile, station VEHICLE TYPE Automobile, station Automobile, station Automobile, station Cyclist Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle FIRST EVENT Other motor vehicle Other motor vehicle Curb Page 5 of 10 0 0 0 0 0 0 0 0 0 0 No. PED 0 0 FROM: 2008-01-01 TO: 2011-01-01 2008-07-18 Frid 13:40 Rain 2008-09-03 We 13:02 Clear 2008-09-30 Tue 08:00 Clear 2010-11-02 Tue 08:30 Clear 77 78 79 80 2008-01-15 Tue 10:00 Clear 2008-01-23 We 11:55 Clear 2008-01-27 Sun 15:44 Clear 2008-01-30 We 11:45 Clear 2008-02-06 We 12:50 Snow 2008-02-28 Thu 09:00 Clear 2008-03-04 Tue 13:49 Clear 2008-03-05 We 17:15 Clear 2008-04-14 Mo 15:46 Clear 2008-05-18 Sun 23:09 Rain 82 83 84 85 86 87 88 89 90 91 August 22, 2011 CLASS DIR Angle Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Turning Daylight Rear end Dark CLASS DIR W E E E W W W W W E E E E E P.D. only V1 V2 Non-fatal V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 V3 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 S S S S N N W W W W W S S W W S S N N N N Single vehicle Non-fatal V1 E IMPACT TYPE Daylight Rear end Dark LIGHT Traffic Control: Traffic signal Dark Single vehicle Non-fatal V1 Daylight Sideswipe Non-fatal V1 V2 V3 Daylight Rear end Non-fatal V1 V2 Daylight Rear end P.D. only V1 V2 V3 Daylight Sideswipe P.D. only V1 V2 V3 Daylight Rear end P.D. only V1 V2 LIGHT IMPACT TYPE Traffic Control: No control (Note: Time of Day = "00:00" represents unknown collision time 2008-01-14 Mo 20:33 Snow DAY TIME ENV 81 DATE Former Municipality: Ottawa BASELINE RD & WOODROFFE AVE 2008-05-18 Sun 23:20 Rain 2008-06-26 Thu 16:02 Clear DAY TIME ENV 75 76 DATE Former Municipality: Ottawa BASELINE RD, CONSTELLATION CRES RAMP to WOODROFFE AVE OnTRAC Reporting System Collision Main Detail Summary Wet Wet Dry Dry Wet Wet Wet Wet Dry Dry Wet Wet Wet Dry Dry Dry Dry Dry Dry Dry Dry Wet Making U-Turn Going ahead Changing lanes Going ahead Slowing or Stopped Slowing or Stopped Stopped Changing lanes Changing lanes Slowing or Slowing or Stopped Slowing or Stopped Going ahead Stopped Turning right Slowing or Turning right Stopped Turning left Turning left Slowing or Stopped Stopped Slowing or Stopped Turning left Turning left Turning left Turning left Turning right Stopped Going ahead VEHICLE MANOEUVRE Number of Collisions: 107 SURFACE COND'N Wet Dry Dry Dry Wet Wet Dry Dry Dry Dry Dry Dry Dry Dry VEHICLE MANOEUVRE Number of Collisions: 6 SURFACE COND'N Automobile, station Automobile, station Delivery van Automobile, station Truck - closed Automobile, station Automobile, station Automobile, station Automobile, station Passenger van Motorcycle Automobile, station Pick-up truck Pick-up truck Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station VEHICLE TYPE Motorcycle Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Passenger van Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station VEHICLE TYPE Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Curb FIRST EVENT Other Events Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle FIRST EVENT Page 6 of 10 0 0 0 0 0 0 0 0 0 0 0 No. PED 0 0 0 0 0 0 No. PED FROM: 2008-01-01 TO: 2011-01-01 2008-05-31 Sat 10:56 Rain 2008-06-02 Mo 11:42 Clear 2008-06-19 Thu 17:00 Clear 2008-06-28 Sat 12:50 Clear 2008-06-30 Mo 15:41 Rain 2008-07-03 Thu 08:39 Rain 2008-07-08 Tue 18:00 Rain 2008-08-18 Mo 16:15 Rain 2008-08-27 We 03:21 Clear 2008-09-03 We 12:03 Clear 2008-09-23 Tue 10:30 Clear 2008-09-28 Sun 23:09 Clear 2008-10-07 Tue 19:00 Clear 2008-10-15 We 16:30 Clear 2008-10-21 Tue 19:30 Rain 2008-10-21 Tue 13:50 Rain 2008-11-12 We 07:55 Clear 2008-11-27 Thu 13:10 Clear 2008-12-17 We 11:00 Clear 2008-12-17 We 11:20 Snow 2008-12-22 Mo 09:45 Snow 2008-12-22 Mo 14:40 Clear 2009-01-08 Thu 18:20 Clear 2009-01-08 Thu 10:45 Snow 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 Rear end Rear end Rear end Sideswipe Daylight Sideswipe Dark Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Sideswipe Daylight Rear end Daylight Rear end Dark Daylight Rear end Dark Dark Daylight Rear end Rear end August 22, 2011 P.D. only V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 S S W S S S E E N N W W E E W W E E P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 V3 P.D. only V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 W W S S N N W W W W W N N E E W W W W W W N N E E W W W W P.D. only V1 S V2 S Daylight Single vehicle P.D. only V1 S Dark Daylight Rear end Daylight Rear end Daylight Rear end Daylight Turning Daylight Sideswipe Daylight Sideswipe Daylight Rear end Daylight Angle Daylight Sideswipe (Note: Time of Day = "00:00" represents unknown collision time 2008-05-20 Tue 16:30 Clear 92 OnTRAC Reporting System Collision Main Detail Summary Dry Dry Dry Dry Dry Dry Dry Dry Dry Wet Wet Wet Wet Dry Dry Wet Wet Ice Ice Loose snow Loose snow Loose snow Wet Slush Slush Loose snow Loose snow Ice Ice Dry Dry Dry Dry Dry Wet Wet Dry Dry Wet Wet Wet Wet Wet Wet Wet Wet Wet Wet Wet Wet Turning right Turning right Turning right Turning right Going ahead Stopped Slowing or Slowing or Stopped Going ahead Stopped Turning right Turning right Turning right Turning right Turning right Turning right Turning right Stopped Slowing or Slowing or Slowing or Turning right Slowing or Slowing or Overtaking Stopped Changing lanes Turning left Going ahead Stopped Going ahead Turning left Turning left Going ahead Turning left Turning right Turning right Changing lanes Turning left Changing lanes Stopped Going ahead Turning right Slowing or Changing lanes Slowing or Stopped Slowing or Stopped Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Passenger van Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Passenger van Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Delivery van Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Truck - closed Automobile, station Passenger van Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Passenger van Automobile, station Automobile, station Pick-up truck Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Snowbank / drift Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Curb Page 7 of 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FROM: 2008-01-01 TO: 2011-01-01 Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle 2009-01-09 Frid 12:40 Clear 2009-01-15 Thu 10:00 Clear 2009-01-28 We 13:00 Snow 2009-02-02 Mo 10:45 Clear 2009-02-09 Mo 09:12 Clear 2009-02-22 Sun 17:27 Clear 2009-02-25 We 23:55 Clear 2009-02-25 We 13:31 Clear 2009-03-24 Tue 16:00 Clear 2009-03-26 Thu 18:15 Rain 2009-04-09 Thu 07:02 Clear 2009-04-30 Thu 07:45 Clear 2009-05-01 Frid 12:30 Clear 2009-05-06 We 14:45 Clear 2009-05-21 Thu 07:16 Clear 2009-06-09 Tue 07:30 Rain 2009-06-18 Thu 14:01 Rain 2009-07-31 Frid 16:15 Clear 2009-08-08 Sat 11:15 Clear 2009-08-21 Frid 14:46 Clear 2009-09-10 Thu 20:36 Clear 2009-09-15 Tue 13:30 Clear 2009-09-15 Tue 07:40 Clear 2009-09-29 Tue 12:54 Rain 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 P.D. only V1 V2 Daylight Single vehicle P.D. only V1 Daylight Rear end P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Sideswipe P.D. only V1 V2 V3 V4 Dark Rear end P.D. only V1 V2 Daylight Sideswipe P.D. only V1 V2 Daylight Sideswipe P.D. only V1 V2 Daylight Rear end Non-fatal V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end Non-fatal V1 V2 Daylight Rear end P.D. only V1 V2 Dusk Single vehicle P.D. only V1 Dark Angle Non-fatal V1 V2 Daylight Sideswipe Non-fatal V1 V2 Daylight Rear end P.D. only V1 V2 Dusk Sideswipe P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Rear end P.D. only V1 V2 Daylight Sideswipe P.D. only V1 V2 Daylight Rear end Non-fatal V1 V2 Daylight Rear end August 22, 2011 (Note: Time of Day = "00:00" represents unknown collision time 2009-01-08 Thu 10:00 Clear 117 OnTRAC Reporting System Collision Main Detail Summary E E E W W W W S S S S E E W W S S E E E E E E W W W W N N W W E E S S S E E E E N N E E W W S S W W Wet Wet Wet Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Wet Wet Slush Slush Dry Dry Ice Ice Slush Slush Wet Wet Wet Wet Wet Dry Dry Dry Dry Dry Dry Wet Wet Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Slowing or Stopped Turning left Going ahead Stopped Slowing or Slowing or Going ahead Going ahead Slowing or Slowing or Turning left Turning left Changing lanes Going ahead Overtaking Going ahead Slowing or Slowing or Going ahead Slowing or Slowing or Stopped Turning right Turning right Slowing or Stopped Turning right Turning right Slowing or Stopped Turning right Going ahead Going ahead Changing lanes Going ahead Turning right Turning right Changing lanes Turning right Going ahead Going ahead Turning right Turning right Going ahead Stopped Turning left Turning left Going ahead Stopped Pick-up truck Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Pick-up truck Automobile, station Automobile, station Pick-up truck Automobile, station Passenger van Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Passenger van Automobile, station Truck - dump Automobile, station Automobile, station Automobile, station Passenger van Automobile, station Passenger van Passenger van Automobile, station Pick-up truck Automobile, station Truck - closed Pick-up truck Automobile, station Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Curb Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Page 8 of 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FROM: 2008-01-01 TO: 2011-01-01 2009-10-06 Tue 13:00 Clear 2009-10-08 Thu 11:47 Clear 2009-10-19 Mo 15:10 Clear 2009-10-21 We 20:49 Rain 2009-11-05 Thu 17:46 Rain 2009-11-15 Sun 03:28 Rain 2009-11-15 Sun 21:34 Clear 2009-11-15 Sun 17:55 Clear 2009-11-16 Mo 09:00 Clear 2009-11-20 Frid 10:00 Rain 2009-11-25 We 16:46 Rain 2009-12-15 Tue 14:45 Clear 2010-01-08 Frid 15:30 Clear 2010-01-14 Thu 09:00 Clear 2010-01-30 Sat 08:30 Clear 2010-01-31 Sun 08:00 Snow 2010-02-09 Tue 19:40 Clear 2010-02-28 Sun 20:52 Rain 2010-03-23 Tue 15:30 Rain 2010-04-19 Mo 19:28 Clear 2010-04-26 Mo 16:30 Clear 2010-05-01 Sat 15:59 Clear 2010-05-08 Sat 13:05 Clear 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 Sideswipe Rear end Rear end Daylight Sideswipe Daylight Rear end Daylight Sideswipe Dusk August 22, 2011 P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 Sideswipe P.D. only V1 V2 Turning P.D. only V1 V2 Sideswipe P.D. only V1 V2 Rear end P.D. only V1 V2 Rear end Non-fatal V1 V2 Rear end P.D. only V1 V2 Rear end P.D. only V1 V2 Rear end P.D. only V1 V2 Rear end P.D. only V1 V2 Rear end P.D. only V1 V2 Single vehicle P.D. only V1 Turning Rear end Daylight Rear end Dark Dark Daylight Daylight Daylight Daylight Daylight Dusk Daylight Daylight Dark Dark Dark Dark Dark Daylight Rear end Daylight Sideswipe Daylight Sideswipe Daylight Sideswipe (Note: Time of Day = "00:00" represents unknown collision time 2009-10-02 Frid 11:00 Clear 142 OnTRAC Reporting System Collision Main Detail Summary E E S S W W W W E E W W W W S N S S E W N N S S S S N N S S W W N N N N S N N E E S S W W W W Dry Dry Dry Dry Wet Wet Dry Dry Wet Wet Wet Wet Dry Dry Wet Wet Wet Wet Dry Dry Dry Dry Dry Dry Wet Wet Wet Wet Wet Wet Ice Ice Wet Wet Dry Dry Ice Dry Dry Dry Dry Dry Dry Dry Dry Wet Wet Merging Stopped Slowing or Stopped Changing lanes Going ahead Turning right Turning right Turning left Turning left Slowing or Stopped Turning right Turning right Going ahead Turning left Going ahead Going ahead Going ahead Turning left Changing lanes Turning left Turning right Turning right Slowing or Slowing or Turning left Turning left Going ahead Stopped Slowing or Stopped Turning right Turning right Going ahead Slowing or Turning left Turning left Turning left Changing lanes Going ahead Turning left Turning left Turning right Turning right Turning right Turning right Unknown Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Pick-up truck Pick-up truck Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Pick-up truck Truck and trailer Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Pole (utility, tower) Page 9 of 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FROM: 2008-01-01 TO: 2011-01-01 Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle 2010-07-05 Mo 13:15 Clear 2010-07-10 Sat 12:36 Clear 2010-07-12 Mo 08:55 Clear 2010-07-16 Frid 11:51 Clear 2010-07-19 Mo 17:00 Rain 2010-07-24 Sat 16:15 Clear 2010-08-03 Tue 13:20 Unknow Daylight Rear end 2010-08-15 Sun 11:09 Rain 2010-08-19 Thu 15:50 Rain 2010-08-26 Thu 18:23 Clear 2010-09-09 Thu 10:10 Rain 2010-09-09 Thu 20:10 Clear 2010-09-30 Thu 08:02 Rain 2010-10-19 Tue 14:15 Clear 2010-10-28 Thu 16:15 Clear 2010-11-12 Frid 18:53 Clear 2010-11-16 Tue 21:30 Clear 2010-11-18 Thu 07:30 Clear 2010-12-09 Thu 21:46 Clear 2010-12-19 Sun 15:14 Clear 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 Other Rear end Sideswipe Rear end August 22, 2011 (Note: Time of Day = "00:00" represents unknown collision time Daylight Angle Dark Daylight Other Dark Dark Daylight Rear end Daylight Sideswipe Daylight Rear end Dusk Daylight Rear end Daylight Angle Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end Daylight Rear end 2010-06-26 Sat 11:10 Clear 167 Daylight Sideswipe 2010-05-18 Tue 11:00 Clear 166 OnTRAC Reporting System Collision Main Detail Summary P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 Non-fatal V1 V2 V3 Non-fatal V1 V2 V3 V4 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 P.D. only V1 V2 V3 P.D. only V1 V2 W W N S W W E E W W N N W W E E W W N W S S W W N N S S E E E W W W W N N W W W W W W S S S N E Dry Dry Dry Dry Wet Wet Dry Dry Dry Dry Dry Dry Wet Wet Dry Dry Dry Dry Wet Wet Dry Dry Wet Wet Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Wet Wet Dry Dry Dry Dry Wet Wet Wet Wet Wet Dry Dry Slowing or Stopped Reversing Turning left Turning right Turning right Changing lanes Going ahead Going ahead Slowing or Turning left Turning left Going ahead Stopped Unknown Unknown Going ahead Stopped Going ahead Turning right Turning left Changing lanes Turning right Turning right Changing lanes Slowing or Turning right Turning right Slowing or Stopped Stopped Slowing or Stopped Stopped Stopped Turning right Turning right Turning right Turning right Turning left Turning left Turning left Turning left Slowing or Stopped Stopped Going ahead Going ahead Truck and trailer Automobile, station Police vehicle Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Passenger van Passenger van Automobile, station Pick-up truck Automobile, station Pick-up truck Automobile, station Unknown Automobile, station Automobile, station Automobile, station Automobile, station Automobile, station Pick-up truck Automobile, station Automobile, station Automobile, station Tow truck Automobile, station Automobile, station Automobile, station Passenger van Pick-up truck Automobile, station Automobile, station Passenger van Pick-up truck Automobile, station Automobile, station Pick-up truck Pick-up truck Automobile, station Passenger van Automobile, station Pick-up truck Passenger van Automobile, station Automobile, station Automobile, station Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Page 10 of 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FROM: 2008-01-01 TO: 2011-01-01 Other motor vehicle Other motor vehicle Skidding/Sliding Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Other motor vehicle Appendix D: Traffic Growth Baseline/Highgate 8 hrs Year Date 2005 2006 2010 Wednesday, May 4 Thursday, June 29 Monday, June 7 North Leg North Leg SB NB 843 683 564 485 914 692 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change West Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change East Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change South Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change 2005 2010 NB 683 485 692 588 668 2.60% EB 9036 8221 8864 8664 8771 0.25% EB 8949 2658 9391 5911 8632 7.87% NB 2999 3499 3536 3186 3583 2.38% South Leg NB SB 2999 4416 3499 4339 3536 3359 SB 843 564 914 Counts NB+SB 1526 1049 1606 703 879 4.56% WB 8070 7848 7925 WB 9240 9090 8053 SB 4416 4339 3359 -29.0% 42.7% % Change SB NB+SB -33.1% 62.1% -31.3% 53.1% INT -17.0% 16.4% INT 44236 36704 42734 EB -9.0% 7.8% % Change WB EB+WB -2.8% 1.0% -6.1% 4.5% INT -17.0% 16.4% INT 44236 36704 42734 EB -70.3% 253.3% % Change WB EB+WB -1.6% -11.4% -35.4% 48.5% INT -17.0% 16.4% 15193 16695 1.90% Counts NB+SB 7415 7838 6895 4480 3375 -5.51% NB Total 44236 36704 42734 16642 16673 0.04% Counts EB+WB 18189 11748 17444 9282 8063 -2.77% INT 44236 36704 42734 West Leg EB WB 9036 8070 8221 7848 8864 7925 1291 1547 3.68% Counts EB+WB 17106 16069 16789 7978 7902 -0.19% East Leg WB EB 9240 8949 9090 2658 8053 9391 7666 6958 -1.92% INT 44236 36704 42734 NB 16.7% 1.1% % Change SB NB+SB -1.7% -22.6% 5.7% -12.0% INT -17.0% 16.4% Baseline/Highgate AM Peak Year Date 2005 2006 2010 Wednesday, May 4 Thursday, June 29 Monday, June 7 North Leg North Leg SB NB 122 39 68 18 166 23 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change West Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change East Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change South Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change 2005 2010 NB 39 18 23 31 21 -7.31% EB 1986 1590 1852 1810 1808 -0.02% EB 1865 1511 1883 1695 1840 1.66% NB 333 400 444 354 449 4.87% South Leg NB SB 333 909 400 927 444 531 SB 122 68 166 Counts NB+SB 161 86 189 92 159 11.47% WB 665 612 683 WB 1037 1010 658 SB 909 927 531 -53.8% 27.8% % Change SB NB+SB -44.3% 144.1% -46.6% 119.8% 6956 6136 6240 INT -11.8% 1.7% INT 6956 6136 6240 EB -19.9% 16.5% % Change WB EB+WB -8.0% 11.6% -16.9% 15.1% INT -11.8% 1.7% INT 6956 6136 6240 EB -19.0% 24.6% % Change WB EB+WB -2.6% -34.9% -13.1% 0.8% INT -11.8% 1.7% 2755 2504 -1.89% Counts NB+SB 1242 1327 975 954 542 -10.68% NB Total 2448 2484 0.29% Counts EB+WB 2902 2521 2541 1060 664 -8.94% INT 6956 6136 6240 West Leg EB WB 1986 665 1590 612 1852 683 123 179 7.91% Counts EB+WB 2651 2202 2535 638 676 1.17% East Leg WB EB 1037 1865 1010 1511 658 1883 1308 991 -5.39% INT 6956 6136 6240 NB 20.1% 11.0% % Change SB NB+SB 2.0% -42.7% 6.8% -26.5% INT -11.8% 1.7% Baseline/Highgate PM Peak Year Date 2005 2006 2010 Wednesday, May 4 Thursday, June 29 Monday, June 7 North Leg North Leg SB NB 125 116 69 81 128 148 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change West Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change East Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change South Leg 2005 2010 Year 2005 2006 2010 Regression Estimate Regression Estimate Average Annual Change 2005 2010 NB 116 81 148 96 143 8.24% EB 1001 936 975 973 968 -0.10% EB 992 1013 1058 996 1059 1.24% NB 557 629 609 586 616 1.00% South Leg NB SB 557 516 629 467 609 439 SB 125 69 128 Counts NB+SB 241 150 276 98 121 4.34% WB 1609 1549 1579 WB 1550 1476 1512 SB 516 467 439 -30.2% 82.7% % Change SB NB+SB -44.8% 85.5% -37.8% 84.0% 6466 6220 6448 INT -3.8% 3.7% INT 6466 6220 6448 EB -6.5% 4.2% % Change WB EB+WB -3.7% 1.9% -4.8% 2.8% INT -3.8% 3.7% INT 6466 6220 6448 EB 2.1% 4.4% % Change WB EB+WB -4.8% 2.4% -2.1% 3.3% INT -3.8% 3.7% 2514 2563 0.39% Counts NB+SB 1073 1096 1048 500 435 -2.75% NB Total 2556 2540 -0.12% Counts EB+WB 2542 2489 2570 1518 1504 -0.19% INT 6466 6220 6448 West Leg EB WB 1001 1609 936 1549 975 1579 194 264 6.35% Counts EB+WB 2610 2485 2554 1583 1573 -0.14% East Leg WB EB 1550 992 1476 1013 1512 1058 1086 1051 -0.65% INT 6466 6220 6448 NB 12.9% -3.2% % Change SB NB+SB -9.5% -6.0% 2.1% -4.4% INT -3.8% 3.7% Appendix E: Projected Traffic Conditions Projected 2013 AM 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 22 23 Prot 5 1649 1736 NA 2 140 147 Perm 32 34 Prot 1 649 683 NA 6 37 39 Perm 175 184 Prot 3! 150 158 custom 83 87 Prot 7 22 23 custom 7! 8 7 7 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.09 16.0 0.0 16.0 B 2 2 1 6 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.30 15.5 0.0 15.5 B 17.0 B 30.3 80.6 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 7.3 0.06 0.24 64.1 0.0 64.1 E 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.53 13.1 0.0 13.1 B 13.1 B 84.9 122.9 159.5 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.15 4.4 0.0 4.4 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.1 0.06 0.32 53.0 0.0 53.0 D 3.9 14.7 8.7 19.7 3276 0 0 0 0.53 1003 0 0 0 0.15 80.0 119 0 0 0 0.29 5.8 14.8 90.0 114 0 0 0 0.20 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 74 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 18.1 Intersection Capacity Utilization 63.5% Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 2297 0 0 0 0.30 6 6 3 3 3 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.04 11.4 0.0 11.4 B 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 None 20.1 0.15 0.71 66.4 0.0 66.4 E None 20.1 0.15 0.44 10.5 0.0 10.5 B 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.34 50.8 0.0 50.8 D 0.4 8.6 45.4 65.7 0.0 17.7 20.1 33.7 0.0 7.5 80.0 1013 0 0 0 0.04 799 0 0 0 0.23 50.0 782 0 0 0 0.20 50.0 374 0 0 0 0.23 352 0 0 0 0.07 7.0 24.0 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: B ICU Level of Service B 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Projected 2013 AM 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 1 1 Perm 1517 1597 NA 2 364 383 Perm 182 192 Prot 1 469 494 NA 6 22 23 Perm 177 186 Prot 4 340 358 custom 94 99 Prot 3 72 76 custom 3 2 2 1 6 6 6 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.43 11.3 0.0 11.3 B 5.0 11.2 24.0 18.5% 3.7 2.5 0.0 6.2 Lead Yes None 13.0 0.10 0.59 65.5 0.0 65.5 E 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 36.5 78.0 21.9 37.7 C-Max 80.6 0.62 0.24 8.0 0.0 8.0 A 23.4 C 21.7 35.0 207.0 150.0 896 0 0 0 0.43 85.0 445 0 0 0 0.43 2 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.00 16.0 0.0 16.0 B 0.1 m0.0 55.0 385 0 0 0 0.00 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.70 28.6 0.0 28.6 C 25.2 C 122.1 #177.1 471.0 2277 0 0 0 0.70 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 113 (87%), Referenced to phase 2:EBTL and 6:WBT, Start of Green Natural Cycle: 95 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 27.0 Intersection Capacity Utilization 76.8% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2080 0 0 0 0.24 4 4 4 3 3 C-Max 80.6 0.62 0.03 3.5 0.0 3.5 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 18.1 0.14 0.41 52.0 0.0 52.0 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 18.1 0.14 0.76 19.0 0.0 19.0 B 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.65 76.5 0.0 76.5 E 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.37 16.8 0.0 16.8 B 0.3 3.0 23.8 31.0 10.4 40.4 24.7 43.2 0.0 14.6 100.0 881 0 0 0 0.03 715 0 0 0 0.26 563 0 0 0 0.64 30.0 175 0 0 0 0.57 225 0 0 0 0.34 Intersection LOS: C ICU Level of Service D 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Projected 2013 AM 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1858 1956 NA 2 93 98 Perm 401 422 Prot 1 667 702 NA 6 6 6 NA 8 20 21 Perm 2 2 1 6 8 8 8 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.5 0.65 0.10 0.7 0.0 0.7 A 5.0 11.1 25.0 19.2% 3.7 2.4 0.0 6.1 Lead Yes None 22.7 0.17 0.74 44.5 0.0 44.5 D 10.0 28.5 99.0 76.2% 3.7 2.8 0.0 6.5 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 54.3 69.4 None 10.0 0.08 0.02 55.8 0.0 55.8 E 31.1 C 0.7 2.9 132.0 None 10.0 0.08 0.16 24.0 0.0 24.0 C 3.5 m0.5 C-Max 115.9 0.89 0.23 3.1 0.0 3.1 A 18.6 B 14.5 36.3 551.0 45.0 960 0 0 0 0.10 85.0 574 0 0 0 0.74 2989 0 0 0 0.23 600 0 0 0 0.01 2 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.5 0.65 0.62 8.5 0.2 8.7 A 8.4 A 171.1 23.4 207.0 3130 436 0 0 0.73 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 129 (99%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 12.2 Intersection Capacity Utilization 74.6% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 8.4 30.0 294 0 0 0 0.07 Intersection LOS: B ICU Level of Service D 3: Constellation & Baseline Synchro 7 - Report Projected 2013 AM 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 553 582 Prot 5 1219 1283 NA 2 106 112 Perm 56 59 Prot 1 485 511 NA 6 144 152 Perm 127 134 Prot 3 1015 1068 NA 8 54 57 Perm 296 312 Prot 7 429 452 NA 4 454 478 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 32.0 24.6% 3.7 3.1 0.0 6.8 Lead Yes None 25.0 0.19 0.93 92.1 0.0 92.1 F 10.0 36.8 56.0 43.1% 3.7 3.1 0.0 6.8 Lag Yes C-Max 52.9 0.41 0.94 48.8 0.0 48.8 D 60.4 E ~105.3 #217.5 551.0 10.0 36.8 56.0 43.1% 3.7 3.1 0.0 6.8 Lag Yes C-Max 52.9 0.41 0.18 28.3 0.0 28.3 C 5.0 11.8 14.0 10.8% 3.7 3.1 0.0 6.8 Lead Yes None 7.2 0.06 0.64 89.7 0.0 89.7 F 10.0 36.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 32.5 0.25 0.32 7.9 0.0 7.9 A 5.0 11.8 18.0 13.8% 3.7 3.1 0.0 6.8 Lead Yes None 10.0 0.08 0.53 65.6 0.0 65.6 E 5.0 11.8 18.0 13.8% 3.7 3.1 0.0 6.8 Lead Yes None 11.2 0.09 1.11 141.2 0.0 141.2 F 15.1 #35.4 0.0 16.8 17.2 27.7 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 34.1 0.26 0.84 52.5 0.0 52.5 D 52.0 D 94.1 111.7 358.3 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 34.1 0.26 0.13 9.6 0.0 9.6 A 12.3 m29.8 10.0 36.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 32.5 0.25 0.61 47.2 0.0 47.2 D 42.4 D 62.1 80.9 237.7 0.0 10.3 ~47.1 #76.4 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 35.3 0.27 0.35 38.9 0.0 38.9 D 55.4 E 34.0 44.5 305.3 25.0 612 0 0 0 0.18 100.0 95 0 0 0 0.62 95.0 477 0 0 0 0.32 115.0 280 0 0 0 0.48 105.0 438 0 0 0 0.13 85.0 280 0 0 0 1.11 82.2 #112.1 55.0 634 0 0 0 0.92 1365 0 0 0 0.94 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 16 (12%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.11 Intersection Signal Delay: 54.7 Intersection Capacity Utilization 94.4% Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 837 0 0 0 0.61 1305 0 0 0 0.82 1317 0 0 0 0.34 4 4 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 35.3 0.27 0.70 15.1 0.0 15.1 B 19.1 60.3 50.0 682 0 0 0 0.70 Intersection LOS: D ICU Level of Service F 4: Woodroffe & Baseline Synchro 7 - Report Projected 2013 AM 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 31 Stop 0% 0.95 33 129 388 Free 0% 0.95 408 52 135 0.95 55 0.95 142 411 Free 0% 0.95 433 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 136 None None 99 909 204 463 909 6.8 204 6.9 463 4.1 3.5 86 239 3.3 83 803 2.2 87 1094 WB 1 168 33 136 551 0.31 9.8 14.4 B 14.4 B NB 1 204 0 0 1700 0.12 0.0 0.0 NB 2 204 0 0 1700 0.12 0.0 0.0 0.0 3.0 39.4% 15 NB 3 55 0 55 1700 0.03 0.0 0.0 SB 1 142 142 0 1094 0.13 3.4 8.8 A 2.2 SB 2 216 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 216 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Projected 2013 PM 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 41 43 Prot 5 879 925 NA 2 138 145 Perm 110 116 Prot 1 1405 1479 NA 6 98 103 Perm 201 212 Prot 3! 66 69 custom 66 69 Prot 7 30 32 custom 7! 8 7 7 5.0 11.0 23.0 17.7% 3.3 2.7 0.0 6.0 Lag Yes None 20.6 0.16 0.12 14.1 0.0 14.1 B 2 2 1 6 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.69 19.4 0.0 19.4 B 21.0 C 165.7 189.7 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.7 0.07 0.38 66.9 0.0 66.9 E 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.35 17.3 0.0 17.3 B 17.4 B 45.6 65.8 159.5 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.17 3.2 0.0 3.2 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 17.4 0.13 0.52 56.9 0.0 56.9 E 0.0 11.0 23.8 m33.7 2671 0 0 0 0.35 865 0 0 0 0.17 80.0 224 0 0 0 0.52 10.7 22.5 90.0 124 0 0 0 0.35 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 81 (62%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 23.0 Intersection Capacity Utilization 72.2% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 2144 0 0 0 0.69 6 6 3 3 3 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.10 3.3 0.0 3.3 A 5.0 11.0 56.0 43.1% 3.3 2.7 0.0 6.0 5.0 11.0 56.0 43.1% 3.3 2.7 0.0 6.0 None 22.1 0.17 0.74 66.3 0.0 66.3 E None 22.1 0.17 0.22 11.0 0.0 11.0 B 5.0 11.0 23.0 17.7% 3.3 2.7 0.0 6.0 Lag Yes None 20.6 0.16 0.26 47.4 0.0 47.4 D 4.4 m9.3 52.2 73.7 0.0 12.0 15.5 27.3 0.0 8.4 80.0 985 0 0 0 0.10 645 0 0 0 0.33 50.0 606 0 0 0 0.11 50.0 292 0 0 0 0.24 288 0 0 0 0.11 7.0 33.0 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: C ICU Level of Service C 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Projected 2013 PM 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 36 38 Prot 5 741 780 NA 2 234 246 Perm 249 262 Prot 1 1187 1249 NA 6 112 118 Perm 361 380 Prot 4 294 309 custom 63 66 Prot 3 65 68 custom 3 5 2 2 2 1 6 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 8.4 0.06 0.35 51.1 0.0 51.1 D 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 54.6 0.42 0.39 30.5 0.0 30.5 C 28.6 C 66.3 83.6 471.0 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 54.6 0.42 0.34 18.9 0.0 18.9 B 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 15.2 0.12 0.69 58.9 0.0 58.9 E 27.1 58.1 29.1 43.5 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 63.7 0.49 0.76 39.7 0.0 39.7 D 40.5 D 177.3 #220.3 207.0 150.0 723 0 0 0 0.34 85.0 411 0 0 0 0.64 9.4 20.4 55.0 204 0 0 0 0.19 2023 0 0 0 0.39 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 17 (13%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 95 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 35.7 Intersection Capacity Utilization 66.6% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1643 0 0 0 0.76 6 6 4 4 4 3 3 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 63.7 0.49 0.18 8.3 0.0 8.3 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 24.1 0.19 0.63 53.0 0.0 53.0 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 24.1 0.19 0.60 9.9 0.0 9.9 A 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.49 68.6 0.0 68.6 E 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.37 18.1 0.0 18.1 B 6.2 20.4 44.4 60.2 0.0 24.8 16.5 30.4 0.0 13.7 100.0 657 0 0 0 0.18 721 0 0 0 0.53 550 0 0 0 0.56 30.0 214 0 0 0 0.31 251 0 0 0 0.27 Intersection LOS: D ICU Level of Service C 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Projected 2013 PM 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1094 1152 NA 2 4 4 Perm 67 71 Prot 1 1524 1604 NA 6 24 25 NA 8 38 40 Perm 2 2 1 6 8 8 8 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.3 0.76 0.00 1.2 0.0 1.2 A 5.0 11.1 23.0 17.7% 3.7 2.4 0.0 6.1 Lead Yes None 8.2 0.06 0.34 52.4 0.0 52.4 D 10.0 28.5 93.0 71.5% 3.7 2.8 0.0 6.5 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 9.6 m10.2 None 10.0 0.08 0.10 56.9 0.0 56.9 E 34.8 C 3.1 7.7 132.0 None 10.0 0.08 0.26 20.9 0.0 20.9 C 0.0 m0.2 C-Max 111.2 0.86 0.56 12.8 0.0 12.8 B 14.5 B 155.6 m160.0 551.0 45.0 1147 0 0 0 0.00 85.0 423 0 0 0 0.17 2868 0 0 0 0.56 750 0 0 0 0.03 2 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.3 0.76 0.31 3.5 0.0 3.5 A 3.4 A 15.3 23.0 207.0 3680 0 0 0 0.31 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 8 (6%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 10.5 Intersection Capacity Utilization 64.1% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 11.4 30.0 377 0 0 0 0.11 Intersection LOS: B ICU Level of Service C 3: Constellation & Baseline Synchro 7 - Report Projected 2013 PM 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 346 364 Prot 5 718 756 NA 2 68 72 Perm 79 83 Prot 1 917 965 NA 6 250 263 Perm 375 395 Prot 3 914 962 NA 8 116 122 Perm 383 403 Prot 7 875 921 NA 4 298 314 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 25.0 19.2% 3.7 3.1 0.0 6.8 Lead Yes None 17.5 0.13 0.83 85.8 0.0 85.8 F 10.0 36.8 48.0 36.9% 3.7 3.1 0.0 6.8 Lag Yes C-Max 47.6 0.37 0.62 51.0 0.0 51.0 D 60.8 E 93.8 126.1 551.0 10.0 36.8 48.0 36.9% 3.7 3.1 0.0 6.8 Lag Yes C-Max 47.6 0.37 0.13 36.8 0.0 36.8 D 5.0 11.8 25.0 19.2% 3.7 3.1 0.0 6.8 Lead Yes None 11.8 0.09 0.55 69.1 0.0 69.1 E 10.0 36.8 48.0 36.9% 3.7 3.1 0.0 6.8 Lag Yes C-Max 41.9 0.32 0.42 7.5 0.0 7.5 A 5.0 11.8 19.0 14.6% 3.7 3.1 0.0 6.8 Lead Yes None 12.2 0.09 1.30 200.6 0.0 200.6 F 5.0 11.8 23.0 17.7% 3.7 3.1 0.0 6.8 Lead Yes None 16.2 0.12 1.00 100.1 0.0 100.1 F 20.7 36.3 3.7 24.1 ~66.4 #98.0 10.0 33.8 34.0 26.2% 3.7 3.1 0.0 6.8 Lag Yes None 27.2 0.21 0.95 70.1 0.0 70.1 E 99.9 F 89.9 #117.5 358.3 10.0 33.8 34.0 26.2% 3.7 3.1 0.0 6.8 Lag Yes None 27.2 0.21 0.30 9.4 0.0 9.4 A 9.4 26.3 10.0 36.8 48.0 36.9% 3.7 3.1 0.0 6.8 Lag Yes C-Max 41.9 0.32 0.89 53.7 0.0 53.7 D 45.4 D 124.6 #162.3 237.7 0.0 15.9 53.9 #86.8 10.0 33.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes None 31.2 0.24 0.80 52.5 0.0 52.5 D 56.7 E 81.7 98.2 305.3 25.0 557 0 0 0 0.13 100.0 235 0 0 0 0.35 95.0 632 0 0 0 0.42 115.0 305 0 0 0 1.30 105.0 400 0 0 0 0.30 85.0 405 0 0 0 1.00 50.7 #70.3 55.0 455 0 0 0 0.80 1228 0 0 0 0.62 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 21 (16%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.30 Intersection Signal Delay: 66.3 Intersection Capacity Utilization 91.5% Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1080 0 0 0 0.89 1008 0 0 0 0.95 1156 0 0 0 0.80 4 4 10.0 33.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes None 31.2 0.24 0.57 13.6 0.0 13.6 B 11.6 40.1 50.0 549 0 0 0 0.57 Intersection LOS: E ICU Level of Service F 4: Woodroffe & Baseline Synchro 7 - Report Projected 2013 PM 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 38 Stop 0% 0.95 40 102 553 Free 0% 0.95 582 31 70 0.95 33 0.95 74 413 Free 0% 0.95 435 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 107 None None 99 947 291 615 947 6.8 291 6.9 615 4.1 3.5 83 240 3.3 85 705 2.2 92 961 WB 1 147 40 107 462 0.32 10.3 16.4 C 16.4 C NB 1 291 0 0 1700 0.17 0.0 0.0 NB 2 291 0 0 1700 0.17 0.0 0.0 0.0 2.4 39.1% 15 NB 3 33 0 33 1700 0.02 0.0 0.0 SB 1 74 74 0 961 0.08 1.9 9.1 A 1.3 SB 2 217 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 217 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Projected 2018 AM 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 22 23 Prot 5 1710 1800 NA 2 140 147 Perm 32 34 Prot 1 674 709 NA 6 37 39 Perm 175 184 Prot 3! 150 158 custom 83 87 Prot 7 22 23 custom 7! 8 7 7 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.09 16.0 0.0 16.0 B 2 2 1 6 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.31 15.9 0.0 15.9 B 17.3 B 33.1 84.8 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 7.3 0.06 0.24 64.1 0.0 64.1 E 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.55 13.5 0.0 13.5 B 13.4 B 90.1 129.7 159.5 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.15 4.6 0.0 4.6 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.1 0.06 0.32 52.6 0.0 52.6 D 4.3 15.2 8.7 19.5 3276 0 0 0 0.55 1002 0 0 0 0.15 80.0 119 0 0 0 0.29 5.8 14.8 90.0 114 0 0 0 0.20 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 74 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 18.3 Intersection Capacity Utilization 64.7% Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 2297 0 0 0 0.31 6 6 3 3 3 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.04 11.5 0.0 11.5 B 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 None 20.1 0.15 0.71 66.4 0.0 66.4 E None 20.1 0.15 0.44 10.5 0.0 10.5 B 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.34 50.8 0.0 50.8 D 0.5 8.8 45.4 65.7 0.0 17.7 20.1 33.7 0.0 7.5 80.0 1013 0 0 0 0.04 799 0 0 0 0.23 50.0 782 0 0 0 0.20 50.0 374 0 0 0 0.23 352 0 0 0 0.07 7.0 24.0 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: B ICU Level of Service C 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Projected 2018 AM 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 1 1 Perm 1578 1661 NA 2 364 383 Perm 182 192 Prot 1 494 520 NA 6 22 23 Perm 177 186 Prot 4 340 358 custom 94 99 Prot 3 72 76 custom 3 2 2 1 6 6 6 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.43 11.1 0.0 11.1 B 5.0 11.2 24.0 18.5% 3.7 2.5 0.0 6.2 Lead Yes None 13.0 0.10 0.59 66.0 0.0 66.0 E 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 36.7 78.0 22.0 37.8 C-Max 80.6 0.62 0.25 7.8 0.0 7.8 A 22.8 C 22.6 35.7 207.0 150.0 896 0 0 0 0.43 85.0 445 0 0 0 0.43 2 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.00 15.0 0.0 15.0 B 0.1 m0.0 55.0 376 0 0 0 0.00 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.73 29.2 0.0 29.2 C 25.8 C 129.7 #189.7 471.0 2277 0 0 0 0.73 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 113 (87%), Referenced to phase 2:EBTL and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 27.1 Intersection Capacity Utilization 78.0% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2080 0 0 0 0.25 4 4 4 3 3 C-Max 80.6 0.62 0.03 3.4 0.0 3.4 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 18.1 0.14 0.41 52.0 0.0 52.0 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 18.1 0.14 0.76 19.1 0.0 19.1 B 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.65 76.5 0.1 76.6 E 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.37 16.8 0.0 16.8 B 0.3 2.9 23.8 31.0 10.7 40.7 24.7 43.2 0.0 14.6 100.0 881 0 0 0 0.03 715 0 0 0 0.26 563 0 0 0 0.64 30.0 175 0 1 0 0.57 225 0 0 0 0.34 Intersection LOS: C ICU Level of Service D 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Projected 2018 AM 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1919 2020 NA 2 93 98 Perm 401 422 Prot 1 692 728 NA 6 6 6 NA 8 20 21 Perm 2 2 1 6 8 8 8 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.5 0.65 0.10 0.6 0.0 0.6 A 5.0 11.1 25.0 19.2% 3.7 2.4 0.0 6.1 Lead Yes None 22.7 0.17 0.74 44.1 0.0 44.1 D 10.0 28.5 99.0 76.2% 3.7 2.8 0.0 6.5 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 54.4 69.6 None 10.0 0.08 0.02 55.8 0.0 55.8 E 31.1 C 0.7 2.9 132.0 None 10.0 0.08 0.16 24.0 0.0 24.0 C 3.4 m0.4 C-Max 115.9 0.89 0.24 3.5 0.0 3.5 A 18.4 B 18.6 42.8 551.0 45.0 959 0 0 0 0.10 85.0 574 0 0 0 0.74 2989 0 0 0 0.24 600 0 0 0 0.01 2 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.5 0.65 0.65 8.8 0.3 9.1 A 8.7 A 178.0 203.1 207.0 3130 436 0 0 0.75 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 129 (99%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 12.3 Intersection Capacity Utilization 75.9% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 8.4 30.0 294 0 0 0 0.07 Intersection LOS: B ICU Level of Service D 3: Constellation & Baseline Synchro 7 - Report Projected 2018 AM 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 553 582 Prot 5 1280 1347 NA 2 106 112 Perm 56 59 Prot 1 510 537 NA 6 144 152 Perm 127 134 Prot 3 1067 1123 NA 8 54 57 Perm 296 312 Prot 7 451 475 NA 4 454 478 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 32.0 24.6% 3.7 3.1 0.0 6.8 Lead Yes None 24.9 0.19 0.94 91.9 0.0 91.9 F 10.0 36.8 56.0 43.1% 3.7 3.1 0.0 6.8 Lag Yes C-Max 52.6 0.40 0.99 57.9 0.0 57.9 E 66.0 E ~191.7 #236.0 551.0 10.0 36.8 56.0 43.1% 3.7 3.1 0.0 6.8 Lag Yes C-Max 52.6 0.40 0.18 29.1 0.0 29.1 C 5.0 11.8 14.0 10.8% 3.7 3.1 0.0 6.8 Lead Yes None 7.0 0.05 0.65 91.6 0.0 91.6 F 10.0 36.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 32.2 0.25 0.32 7.9 0.0 7.9 A 5.0 11.8 18.0 13.8% 3.7 3.1 0.0 6.8 Lead Yes None 10.0 0.08 0.53 65.6 0.0 65.6 E 5.0 11.8 18.0 13.8% 3.7 3.1 0.0 6.8 Lead Yes None 11.2 0.09 1.11 141.2 0.0 141.2 F 15.1 #35.4 0.0 16.8 17.2 27.7 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 34.6 0.27 0.88 54.5 0.0 54.5 D 53.6 D 100.6 118.7 358.3 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 34.6 0.27 0.13 9.6 0.0 9.6 A 13.0 m29.5 10.0 36.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes C-Max 32.2 0.25 0.65 48.4 0.0 48.4 D 43.6 D 65.9 85.3 237.7 0.0 10.3 ~47.1 #76.4 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 35.7 0.27 0.36 38.9 0.0 38.9 D 55.2 E 35.9 46.9 305.3 25.0 607 0 0 0 0.18 100.0 93 0 0 0 0.63 95.0 474 0 0 0 0.32 115.0 280 0 0 0 0.48 105.0 438 0 0 0 0.13 85.0 280 0 0 0 1.11 82.3 #112.2 55.0 630 0 0 0 0.92 1358 0 0 0 0.99 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 16 (12%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.11 Intersection Signal Delay: 57.3 Intersection Capacity Utilization 95.2% Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 830 0 0 0 0.65 1305 0 0 0 0.86 1325 0 0 0 0.36 4 4 10.0 33.8 42.0 32.3% 3.7 3.1 0.0 6.8 Lag Yes None 35.7 0.27 0.70 15.4 0.0 15.4 B 20.3 61.8 50.0 680 0 0 0 0.70 Intersection LOS: E ICU Level of Service F 4: Woodroffe & Baseline Synchro 7 - Report Projected 2018 AM 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 31 Stop 0% 0.95 33 129 388 Free 0% 0.95 408 52 135 0.95 55 0.95 142 411 Free 0% 0.95 433 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 136 None None 99 909 204 463 909 6.8 204 6.9 463 4.1 3.5 86 239 3.3 83 803 2.2 87 1094 WB 1 168 33 136 551 0.31 9.8 14.4 B 14.4 B NB 1 204 0 0 1700 0.12 0.0 0.0 NB 2 204 0 0 1700 0.12 0.0 0.0 0.0 3.0 39.4% 15 NB 3 55 0 55 1700 0.03 0.0 0.0 SB 1 142 142 0 1094 0.13 3.4 8.8 A 2.2 SB 2 216 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 216 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Projected 2018 PM 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 41 43 Prot 5 914 962 NA 2 138 145 Perm 110 116 Prot 1 1450 1526 NA 6 98 103 Perm 201 212 Prot 3! 66 69 custom 66 69 Prot 7 30 32 custom 7! 8 7 7 10.0 16.0 23.0 17.7% 3.3 2.7 0.0 6.0 Lag Yes None 21.3 0.16 0.12 14.0 0.0 14.0 B 2 2 1 6 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.71 26.1 0.0 26.1 C 27.4 C 152.1 196.6 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.7 0.07 0.38 66.9 0.0 66.9 E 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.36 17.5 0.0 17.5 B 17.6 B 47.9 68.8 159.5 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.17 3.2 0.0 3.2 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 17.4 0.13 0.52 57.7 0.0 57.7 E 0.0 11.0 31.8 m42.9 2671 0 0 0 0.36 865 0 0 0 0.17 80.0 224 0 0 0 0.52 10.7 22.5 90.0 124 0 0 0 0.35 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 26.4 Intersection Capacity Utilization 76.4% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 2144 0 0 0 0.71 6 6 3 3 3 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.10 12.2 0.0 12.2 B 10.0 16.0 56.0 43.1% 3.3 2.7 0.0 6.0 10.0 16.0 56.0 43.1% 3.3 2.7 0.0 6.0 None 22.1 0.17 0.74 66.3 0.0 66.3 E None 22.1 0.17 0.22 11.0 0.0 11.0 B 10.0 16.0 23.0 17.7% 3.3 2.7 0.0 6.0 Lag Yes None 21.3 0.16 0.25 47.0 0.0 47.0 D 7.6 m16.1 52.2 73.7 0.0 12.0 15.5 27.3 0.0 8.4 80.0 984 0 0 0 0.10 645 0 0 0 0.33 50.0 606 0 0 0 0.11 50.0 292 0 0 0 0.24 288 0 0 0 0.11 7.0 24.3 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: C ICU Level of Service D 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Projected 2018 PM 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 36 38 Prot 5 776 817 NA 2 234 246 Perm 249 262 Prot 1 1232 1297 NA 6 112 118 Perm 361 380 Prot 4 294 309 custom 63 66 Prot 3 65 68 custom 3 5 2 2 2 1 6 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 8.4 0.06 0.35 88.4 0.0 88.4 F 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 54.6 0.42 0.40 16.9 0.0 16.9 B 16.0 B 26.4 25.6 471.0 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 54.6 0.42 0.34 1.6 0.0 1.6 A 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 15.2 0.12 0.69 59.7 0.0 59.7 E 0.0 2.5 29.4 43.7 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 63.7 0.49 0.79 40.9 0.0 40.9 D 41.5 D 184.9 #234.4 207.0 150.0 723 0 0 0 0.34 85.0 411 0 0 0 0.64 10.2 22.5 55.0 204 0 0 0 0.19 2023 0 0 0 0.40 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 17 (13%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 32.3 Intersection Capacity Utilization 67.9% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1643 0 0 0 0.79 6 6 4 4 4 3 3 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 63.7 0.49 0.18 8.2 0.0 8.2 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 24.1 0.19 0.63 53.0 0.0 53.0 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 24.1 0.19 0.60 9.9 0.0 9.9 A 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.49 68.6 0.0 68.6 E 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.37 18.1 0.0 18.1 B 6.0 19.9 44.4 60.2 0.0 24.8 16.5 30.4 0.0 13.7 100.0 655 0 0 0 0.18 721 0 0 0 0.53 550 0 0 0 0.56 30.0 214 0 0 0 0.31 251 0 0 0 0.27 Intersection LOS: C ICU Level of Service C 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Projected 2018 PM 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1129 1188 NA 2 4 4 Perm 67 71 Prot 1 1569 1652 NA 6 24 25 NA 8 38 40 Perm 2 2 1 6 8 8 8 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.3 0.76 0.00 2.0 0.0 2.0 A 5.0 11.1 23.0 17.7% 3.7 2.4 0.0 6.1 Lead Yes None 8.2 0.06 0.34 45.3 0.0 45.3 D 10.0 28.5 93.0 71.5% 3.7 2.8 0.0 6.5 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 8.8 m11.6 None 10.0 0.08 0.10 56.9 0.0 56.9 E 34.8 C 3.1 7.7 132.0 None 10.0 0.08 0.26 20.9 0.0 20.9 C 0.0 m0.2 C-Max 111.2 0.86 0.58 17.8 0.0 17.8 B 18.9 B 164.1 188.7 551.0 45.0 1146 0 0 0 0.00 85.0 423 0 0 0 0.17 2868 0 0 0 0.58 750 0 0 0 0.03 2 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.3 0.76 0.32 3.6 0.0 3.6 A 3.6 A 16.8 24.9 207.0 3680 0 0 0 0.32 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 8 (6%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 13.2 Intersection Capacity Utilization 65.4% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 11.4 30.0 377 0 0 0 0.11 Intersection LOS: B ICU Level of Service C 3: Constellation & Baseline Synchro 7 - Report Projected 2018 PM 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 346 364 Prot 5 753 793 NA 2 68 72 Perm 79 83 Prot 1 962 1013 NA 6 250 263 Perm 375 395 Prot 3 961 1012 NA 8 116 122 Perm 383 403 Prot 7 920 968 NA 4 298 314 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 25.0 19.2% 3.7 3.1 0.0 6.8 Lead Yes None 17.5 0.13 0.83 83.4 0.0 83.4 F 10.0 36.8 45.0 34.6% 3.7 3.1 0.0 6.8 Lag Yes C-Max 41.5 0.32 0.52 56.0 0.0 56.0 E 62.9 E 75.3 90.9 551.0 10.0 36.8 45.0 34.6% 3.7 3.1 0.0 6.8 Lag Yes C-Max 41.5 0.32 0.14 35.7 0.0 35.7 D 5.0 11.8 20.0 15.4% 3.7 3.1 0.0 6.8 Lead Yes None 11.0 0.08 0.58 73.3 0.0 73.3 E 10.0 36.8 40.0 30.8% 3.7 3.1 0.0 6.8 Lag Yes C-Max 35.0 0.27 0.45 7.1 0.0 7.1 A 5.0 11.8 26.0 20.0% 3.7 3.1 0.0 6.8 Lead Yes None 18.6 0.14 0.85 71.8 0.0 71.8 E 5.0 11.8 27.0 20.8% 3.7 3.1 0.0 6.8 Lead Yes None 19.3 0.15 0.84 69.6 0.0 69.6 E 20.7 37.4 0.0 21.2 51.2 #74.0 10.0 33.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes None 31.0 0.24 0.88 57.6 0.0 57.6 E 57.4 E 91.9 #109.6 358.3 10.0 33.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes None 31.0 0.24 0.28 8.4 0.0 8.4 A 10.6 22.0 10.0 36.8 40.0 30.8% 3.7 3.1 0.0 6.8 Lag Yes C-Max 35.0 0.27 0.78 49.4 0.0 49.4 D 42.7 D 90.0 107.2 237.7 0.0 15.3 52.0 #73.0 10.0 33.8 39.0 30.0% 3.7 3.1 0.0 6.8 Lag Yes None 31.7 0.24 0.82 53.4 0.0 53.4 D 50.5 D 85.9 102.7 305.3 25.0 497 0 0 0 0.14 100.0 170 0 0 0 0.49 95.0 584 0 0 0 0.45 115.0 480 0 0 0 0.82 105.0 443 0 0 0 0.28 85.0 505 0 0 0 0.80 50.6 #69.6 55.0 455 0 0 0 0.80 1538 0 0 0 0.52 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 21 (16%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 53.1 Intersection Capacity Utilization 90.3% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1297 0 0 0 0.78 1162 0 0 0 0.87 1193 0 0 0 0.81 4 4 10.0 33.8 39.0 30.0% 3.7 3.1 0.0 6.8 Lag Yes None 31.7 0.24 0.59 16.9 0.0 16.9 B 17.3 47.4 50.0 538 0 0 0 0.58 Intersection LOS: D ICU Level of Service E 4: Woodroffe & Baseline Synchro 7 - Report Projected 2018 PM 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 38 Stop 0% 0.95 40 102 553 Free 0% 0.95 582 31 70 0.95 33 0.95 74 413 Free 0% 0.95 435 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 107 None None 99 947 291 615 947 6.8 291 6.9 615 4.1 3.5 83 240 3.3 85 705 2.2 92 961 WB 1 147 40 107 462 0.32 10.3 16.4 C 16.4 C NB 1 291 0 0 1700 0.17 0.0 0.0 NB 2 291 0 0 1700 0.17 0.0 0.0 0.0 2.4 39.1% 15 NB 3 33 0 33 1700 0.02 0.0 0.0 SB 1 74 74 0 961 0.08 1.9 9.1 A 1.3 SB 2 217 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 217 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Projected 2013 AM Optimized 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 22 23 Prot 5 1649 1736 NA 2 140 147 Perm 32 34 Prot 1 649 683 NA 6 37 39 Perm 175 184 Prot 3! 150 158 custom 83 87 Prot 7 22 23 custom 7! 8 7 7 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.09 16.0 0.0 16.0 B 2 2 1 6 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.30 16.0 0.0 16.0 B 17.4 B 27.4 80.6 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 7.3 0.06 0.24 64.1 0.0 64.1 E 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.53 13.1 0.0 13.1 B 13.1 B 84.9 122.9 159.5 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.15 4.4 0.0 4.4 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.1 0.06 0.32 52.2 0.0 52.2 D 3.9 14.7 8.6 19.7 3276 0 0 0 0.53 1003 0 0 0 0.15 80.0 119 0 0 0 0.29 5.8 14.8 90.0 114 0 0 0 0.20 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 74 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 18.2 Intersection Capacity Utilization 63.5% Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 2297 0 0 0 0.30 6 6 3 3 3 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.04 12.2 0.0 12.2 B 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 None 20.1 0.15 0.71 66.4 0.0 66.4 E None 20.1 0.15 0.44 10.5 0.0 10.5 B 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.34 50.8 0.0 50.8 D 0.2 9.1 45.4 65.7 0.0 17.7 20.1 33.7 0.0 7.5 80.0 1013 0 0 0 0.04 799 0 0 0 0.23 50.0 782 0 0 0 0.20 50.0 374 0 0 0 0.23 352 0 0 0 0.07 7.0 24.0 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: B ICU Level of Service B 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Projected 2013 AM Optimized 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 1 1 Perm 1517 1597 NA 2 364 383 Perm 182 192 Prot 1 469 494 NA 6 22 23 Perm 177 186 Prot 4 340 358 custom 94 99 Prot 3 72 76 custom 3 2 2 1 6 6 6 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.43 11.3 0.0 11.3 B 5.0 11.2 24.0 18.5% 3.7 2.5 0.0 6.2 Lead Yes None 13.0 0.10 0.59 60.4 0.0 60.4 E 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 36.5 78.0 23.6 37.7 C-Max 80.6 0.62 0.24 9.9 0.0 9.9 A 23.4 C 37.5 46.0 207.0 150.0 896 0 0 0 0.43 85.0 445 0 0 0 0.43 2 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.00 16.0 0.0 16.0 B 0.1 m0.0 55.0 385 0 0 0 0.00 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.70 28.6 0.0 28.6 C 25.2 C 122.1 #177.1 471.0 2277 0 0 0 0.70 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 113 (87%), Referenced to phase 2:EBTL and 6:WBT, Start of Green Natural Cycle: 95 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 27.0 Intersection Capacity Utilization 76.8% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2080 0 0 0 0.24 4 4 4 3 3 C-Max 80.6 0.62 0.03 5.0 0.0 5.0 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 18.1 0.14 0.41 52.0 0.0 52.0 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 18.1 0.14 0.76 19.0 0.0 19.0 B 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.65 76.5 0.0 76.5 E 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.37 16.8 0.0 16.8 B 0.4 4.6 23.8 31.0 10.4 40.4 24.7 43.2 0.0 14.6 100.0 881 0 0 0 0.03 715 0 0 0 0.26 563 0 0 0 0.64 30.0 175 0 0 0 0.57 225 0 0 0 0.34 Intersection LOS: C ICU Level of Service D 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Projected 2013 AM Optimized 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1858 1956 NA 2 93 98 Perm 401 422 Prot 1 667 702 NA 6 6 6 NA 8 20 21 Perm 2 2 1 6 8 8 8 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.5 0.65 0.10 0.7 0.0 0.7 A 5.0 11.1 25.0 19.2% 3.7 2.4 0.0 6.1 Lead Yes None 22.7 0.17 0.74 44.6 0.0 44.6 D 10.0 28.5 99.0 76.2% 3.7 2.8 0.0 6.5 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 53.9 68.1 None 10.0 0.08 0.02 55.8 0.0 55.8 E 31.1 C 0.7 2.9 132.0 None 10.0 0.08 0.16 24.0 0.0 24.0 C 3.5 m0.5 C-Max 115.9 0.89 0.23 1.6 0.0 1.6 A 17.8 B 10.7 11.2 551.0 45.0 960 0 0 0 0.10 85.0 574 0 0 0 0.74 2989 0 0 0 0.23 600 0 0 0 0.01 2 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.5 0.65 0.62 8.5 0.2 8.7 A 8.4 A 171.1 23.4 207.0 3130 436 0 0 0.73 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 129 (99%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 11.9 Intersection Capacity Utilization 74.6% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 8.4 30.0 294 0 0 0 0.07 Intersection LOS: B ICU Level of Service D 3: Constellation & Baseline Synchro 7 - Report Projected 2013 AM Optimized 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 553 582 Prot 5 1219 1283 NA 2 106 112 Perm 56 59 Prot 1 485 511 NA 6 144 152 Perm 127 134 Prot 3 1015 1068 NA 8 54 57 Perm 296 312 Prot 7 429 452 NA 4 454 478 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 33.0 25.4% 3.7 3.1 0.0 6.8 Lead Yes None 25.6 0.20 0.91 88.6 0.0 88.6 F 10.0 36.8 53.0 40.8% 3.7 3.1 0.0 6.8 Lag Yes C-Max 50.3 0.39 0.69 38.6 0.0 38.6 D 52.7 D 74.2 100.3 551.0 10.0 36.8 53.0 40.8% 3.7 3.1 0.0 6.8 Lag Yes C-Max 50.3 0.39 0.19 27.8 0.0 27.8 C 5.0 11.8 17.0 13.1% 3.7 3.1 0.0 6.8 Lead Yes None 8.9 0.07 0.51 73.7 0.0 73.7 E 10.0 36.8 37.0 28.5% 3.7 3.1 0.0 6.8 Lag Yes C-Max 31.1 0.24 0.33 8.1 0.0 8.1 A 5.0 11.8 16.0 12.3% 3.7 3.1 0.0 6.8 Lead Yes None 8.9 0.07 0.60 70.6 0.0 70.6 E 5.0 11.8 21.0 16.2% 3.7 3.1 0.0 6.8 Lead Yes None 14.2 0.11 0.88 82.5 0.0 82.5 F 14.7 29.1 0.0 17.0 17.4 28.1 10.0 33.8 39.0 30.0% 3.7 3.1 0.0 6.8 Lag Yes None 32.0 0.25 0.90 58.8 0.0 58.8 E 57.9 E 97.3 #120.7 358.3 10.0 33.8 39.0 30.0% 3.7 3.1 0.0 6.8 Lag Yes None 32.0 0.25 0.14 10.3 0.0 10.3 B 12.1 m29.3 10.0 36.8 37.0 28.5% 3.7 3.1 0.0 6.8 Lag Yes C-Max 31.1 0.24 0.44 43.8 0.0 43.8 D 38.7 D 41.4 53.1 237.7 0.0 10.7 41.2 #66.2 10.0 33.8 44.0 33.8% 3.7 3.1 0.0 6.8 Lag Yes None 37.3 0.29 0.33 37.3 0.0 37.3 D 39.2 D 33.5 43.5 305.3 25.0 590 0 0 0 0.19 100.0 132 0 0 0 0.45 95.0 463 0 0 0 0.33 115.0 230 0 0 0 0.58 105.0 406 0 0 0 0.14 85.0 355 0 0 0 0.88 82.2 #108.6 55.0 655 0 0 0 0.89 1864 0 0 0 0.69 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 16 (12%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 48.8 Intersection Capacity Utilization 94.4% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1152 0 0 0 0.44 1193 0 0 0 0.90 1381 0 0 0 0.33 4 4 10.0 33.8 44.0 33.8% 3.7 3.1 0.0 6.8 Lag Yes None 37.3 0.29 0.68 12.8 0.0 12.8 B 15.5 53.8 50.0 707 0 0 0 0.68 Intersection LOS: D ICU Level of Service F 4: Woodroffe & Baseline Synchro 7 - Report Projected 2013 AM Optimized 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 31 Stop 0% 0.95 33 129 388 Free 0% 0.95 408 52 135 0.95 55 0.95 142 411 Free 0% 0.95 433 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 136 None None 99 909 204 463 909 6.8 204 6.9 463 4.1 3.5 86 239 3.3 83 803 2.2 87 1094 WB 1 168 33 136 551 0.31 9.8 14.4 B 14.4 B NB 1 204 0 0 1700 0.12 0.0 0.0 NB 2 204 0 0 1700 0.12 0.0 0.0 0.0 3.0 39.4% 15 NB 3 55 0 55 1700 0.03 0.0 0.0 SB 1 142 142 0 1094 0.13 3.4 8.8 A 2.2 SB 2 216 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 216 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Projected 2013 PM Optimized 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 41 43 Prot 5 879 925 NA 2 138 145 Perm 110 116 Prot 1 1405 1479 NA 6 98 103 Perm 201 212 Prot 3! 66 69 custom 66 69 Prot 7 30 32 custom 7! 8 7 7 5.0 11.0 23.0 17.7% 3.3 2.7 0.0 6.0 Lag Yes None 20.6 0.16 0.12 14.1 0.0 14.1 B 2 2 1 6 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.69 19.3 0.0 19.3 B 20.9 C 165.8 189.8 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.7 0.07 0.38 66.9 0.0 66.9 E 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.35 17.3 0.0 17.3 B 17.4 B 45.6 65.8 159.5 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.17 3.2 0.0 3.2 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 17.4 0.13 0.52 57.0 0.0 57.0 E 0.0 11.0 23.8 m33.7 2671 0 0 0 0.35 865 0 0 0 0.17 80.0 224 0 0 0 0.52 10.7 22.5 90.0 124 0 0 0 0.35 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 81 (62%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 23.0 Intersection Capacity Utilization 72.2% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 2144 0 0 0 0.69 6 6 3 3 3 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.10 3.3 0.0 3.3 A 5.0 11.0 56.0 43.1% 3.3 2.7 0.0 6.0 5.0 11.0 56.0 43.1% 3.3 2.7 0.0 6.0 None 22.1 0.17 0.74 66.3 0.0 66.3 E None 22.1 0.17 0.22 11.0 0.0 11.0 B 5.0 11.0 23.0 17.7% 3.3 2.7 0.0 6.0 Lag Yes None 20.6 0.16 0.26 47.4 0.0 47.4 D 4.3 m9.3 52.2 73.7 0.0 12.0 15.5 27.3 0.0 8.4 80.0 985 0 0 0 0.10 645 0 0 0 0.33 50.0 606 0 0 0 0.11 50.0 292 0 0 0 0.24 288 0 0 0 0.11 7.0 33.0 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: C ICU Level of Service C 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Projected 2013 PM Optimized 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 36 38 Prot 5 741 780 NA 2 234 246 Perm 249 262 Prot 1 1187 1249 NA 6 112 118 Perm 361 380 Prot 4 294 309 custom 63 66 Prot 3 65 68 custom 3 5 2 2 2 1 6 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 8.4 0.06 0.35 51.1 0.0 51.1 D 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 54.6 0.42 0.39 30.5 0.0 30.5 C 28.6 C 66.3 83.6 471.0 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 54.6 0.42 0.34 18.9 0.0 18.9 B 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 15.2 0.12 0.69 58.7 0.0 58.7 E 27.1 58.1 29.1 43.5 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 63.7 0.49 0.76 40.7 0.0 40.7 D 41.3 D 177.6 #220.6 207.0 150.0 723 0 0 0 0.34 85.0 411 0 0 0 0.64 9.4 20.4 55.0 204 0 0 0 0.19 2023 0 0 0 0.39 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 17 (13%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 95 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 36.0 Intersection Capacity Utilization 66.6% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1643 0 0 0 0.76 6 6 4 4 4 3 3 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 63.7 0.49 0.18 8.4 0.0 8.4 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 24.1 0.19 0.63 53.0 0.0 53.0 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 24.1 0.19 0.60 9.9 0.0 9.9 A 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.49 68.6 0.0 68.6 E 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.37 18.1 0.0 18.1 B 6.2 20.4 44.4 60.2 0.0 24.8 16.5 30.4 0.0 13.7 100.0 657 0 0 0 0.18 721 0 0 0 0.53 550 0 0 0 0.56 30.0 214 0 0 0 0.31 251 0 0 0 0.27 Intersection LOS: D ICU Level of Service C 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Projected 2013 PM Optimized 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1094 1152 NA 2 4 4 Perm 67 71 Prot 1 1524 1604 NA 6 24 25 NA 8 38 40 Perm 2 2 1 6 8 8 8 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.3 0.76 0.00 1.2 0.0 1.2 A 5.0 11.1 23.0 17.7% 3.7 2.4 0.0 6.1 Lead Yes None 8.2 0.06 0.34 46.6 0.0 46.6 D 10.0 28.5 93.0 71.5% 3.7 2.8 0.0 6.5 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 8.7 m12.2 None 10.0 0.08 0.10 56.9 0.0 56.9 E 34.8 C 3.1 7.7 132.0 None 10.0 0.08 0.26 20.9 0.0 20.9 C 0.0 m0.2 C-Max 111.2 0.86 0.56 16.6 0.0 16.6 B 17.8 B 156.7 176.9 551.0 45.0 1147 0 0 0 0.00 85.0 423 0 0 0 0.17 2868 0 0 0 0.56 750 0 0 0 0.03 2 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.3 0.76 0.31 3.5 0.0 3.5 A 3.4 A 15.3 23.0 207.0 3680 0 0 0 0.31 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 8 (6%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 12.5 Intersection Capacity Utilization 64.1% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 11.4 30.0 377 0 0 0 0.11 Intersection LOS: B ICU Level of Service C 3: Constellation & Baseline Synchro 7 - Report Projected 2013 PM Optimized 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 346 364 Prot 5 718 756 NA 2 68 72 Perm 79 83 Prot 1 917 965 NA 6 250 263 Perm 375 395 Prot 3 914 962 NA 8 116 122 Perm 383 403 Prot 7 875 921 NA 4 298 314 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 26.0 20.0% 3.7 3.1 0.0 6.8 Lead Yes None 18.0 0.14 0.81 83.2 0.0 83.2 F 10.0 36.8 46.0 35.4% 3.7 3.1 0.0 6.8 Lag Yes C-Max 42.5 0.33 0.48 52.0 0.0 52.0 D 60.5 E 71.2 86.7 551.0 10.0 36.8 46.0 35.4% 3.7 3.1 0.0 6.8 Lag Yes C-Max 42.5 0.33 0.14 34.5 0.0 34.5 C 5.0 11.8 20.0 15.4% 3.7 3.1 0.0 6.8 Lead Yes None 11.0 0.08 0.58 73.3 0.0 73.3 E 10.0 36.8 40.0 30.8% 3.7 3.1 0.0 6.8 Lag Yes C-Max 35.5 0.27 0.45 7.0 0.0 7.0 A 5.0 11.8 27.0 20.8% 3.7 3.1 0.0 6.8 Lead Yes None 19.1 0.15 0.83 69.0 0.0 69.0 E 5.0 11.8 27.0 20.8% 3.7 3.1 0.0 6.8 Lead Yes None 19.3 0.15 0.84 69.6 0.0 69.6 E 20.7 37.4 0.0 21.2 50.7 #69.0 10.0 33.8 37.0 28.5% 3.7 3.1 0.0 6.8 Lag Yes None 30.0 0.23 0.87 57.3 0.0 57.3 E 56.4 E 87.1 104.2 358.3 10.0 33.8 37.0 28.5% 3.7 3.1 0.0 6.8 Lag Yes None 30.0 0.23 0.28 8.6 0.0 8.6 A 10.5 22.1 10.0 36.8 40.0 30.8% 3.7 3.1 0.0 6.8 Lag Yes C-Max 35.5 0.27 0.73 47.4 0.0 47.4 D 41.0 D 84.7 101.4 237.7 0.0 15.5 52.0 #73.0 10.0 33.8 37.0 28.5% 3.7 3.1 0.0 6.8 Lag Yes None 30.1 0.23 0.82 54.6 0.0 54.6 D 51.3 D 82.6 99.3 305.3 25.0 510 0 0 0 0.14 100.0 170 0 0 0 0.49 95.0 589 0 0 0 0.45 115.0 505 0 0 0 0.78 105.0 433 0 0 0 0.28 85.0 505 0 0 0 0.80 50.7 67.3 55.0 480 0 0 0 0.76 1577 0 0 0 0.48 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 21 (16%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 52.2 Intersection Capacity Utilization 89.7% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1317 0 0 0 0.73 1125 0 0 0 0.86 1128 0 0 0 0.82 4 4 10.0 33.8 37.0 28.5% 3.7 3.1 0.0 6.8 Lag Yes None 30.1 0.23 0.61 18.0 0.0 18.0 B 17.9 48.8 50.0 520 0 0 0 0.60 Intersection LOS: D ICU Level of Service E 4: Woodroffe & Baseline Synchro 7 - Report Projected 2013 PM Optimized 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 38 Stop 0% 0.95 40 102 553 Free 0% 0.95 582 31 70 0.95 33 0.95 74 413 Free 0% 0.95 435 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 107 None None 99 947 291 615 947 6.8 291 6.9 615 4.1 3.5 83 240 3.3 85 705 2.2 92 961 WB 1 147 40 107 462 0.32 10.3 16.4 C 16.4 C NB 1 291 0 0 1700 0.17 0.0 0.0 NB 2 291 0 0 1700 0.17 0.0 0.0 0.0 2.4 39.1% 15 NB 3 33 0 33 1700 0.02 0.0 0.0 SB 1 74 74 0 961 0.08 1.9 9.1 A 1.3 SB 2 217 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 217 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Projected 2018 AM Optimized 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 22 23 Prot 5 1710 1800 NA 2 140 147 Perm 32 34 Prot 1 674 709 NA 6 37 39 Perm 175 184 Prot 3! 150 158 custom 83 87 Prot 7 22 23 custom 7! 8 7 7 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.09 16.0 0.0 16.0 B 2 2 1 6 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.31 16.2 0.0 16.2 B 17.6 B 29.1 84.9 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 7.3 0.06 0.24 64.1 0.0 64.1 E 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.55 13.5 0.0 13.5 B 13.4 B 90.1 129.7 159.5 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 88.4 0.68 0.15 4.6 0.0 4.6 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.1 0.06 0.32 52.5 0.0 52.5 D 4.3 15.2 8.6 19.5 3276 0 0 0 0.55 1002 0 0 0 0.15 80.0 119 0 0 0 0.29 5.8 14.8 90.0 114 0 0 0 0.20 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 74 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 18.4 Intersection Capacity Utilization 64.7% Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 2297 0 0 0 0.31 6 6 3 3 3 10.0 28.0 47.0 36.2% 3.7 2.3 0.0 6.0 Lag Yes C-Max 89.0 0.68 0.04 12.2 0.0 12.2 B 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 10.0 16.0 68.0 52.3% 3.3 2.7 0.0 6.0 None 20.1 0.15 0.71 66.4 0.0 66.4 E None 20.1 0.15 0.44 10.5 0.0 10.5 B 10.0 16.0 35.0 26.9% 3.3 2.7 0.0 6.0 Lag Yes None 20.1 0.15 0.34 50.8 0.0 50.8 D 0.2 9.2 45.4 65.7 0.0 17.7 20.1 33.7 0.0 7.5 80.0 1013 0 0 0 0.04 799 0 0 0 0.23 50.0 782 0 0 0 0.20 50.0 374 0 0 0 0.23 352 0 0 0 0.07 7.0 24.0 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: B ICU Level of Service C 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Projected 2018 AM Optimized 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 1 1 Perm 1578 1661 NA 2 364 383 Perm 182 192 Prot 1 494 520 NA 6 22 23 Perm 177 186 Prot 4 340 358 custom 94 99 Prot 3 72 76 custom 3 2 2 1 6 6 6 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.43 11.1 0.0 11.1 B 5.0 11.2 24.0 18.5% 3.7 2.5 0.0 6.2 Lead Yes None 13.0 0.10 0.59 60.3 0.0 60.3 E 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 10.0 23.7 74.0 56.9% 3.7 2.0 0.0 5.7 36.7 78.0 22.9 37.8 C-Max 80.6 0.62 0.25 9.5 0.0 9.5 A 22.6 C 39.6 46.7 207.0 150.0 896 0 0 0 0.43 85.0 445 0 0 0 0.43 2 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.00 15.0 0.0 15.0 B 0.1 m0.0 55.0 376 0 0 0 0.00 2 10.0 23.7 50.0 38.5% 3.7 2.0 0.0 5.7 Lag Yes C-Max 61.4 0.47 0.73 29.2 0.0 29.2 C 25.8 C 129.7 #189.7 471.0 2277 0 0 0 0.73 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 113 (87%), Referenced to phase 2:EBTL and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 27.1 Intersection Capacity Utilization 78.0% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2080 0 0 0 0.25 4 4 4 3 3 C-Max 80.6 0.62 0.03 5.0 0.0 5.0 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 18.1 0.14 0.41 52.0 0.0 52.0 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 18.1 0.14 0.76 19.1 0.0 19.1 B 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.65 76.5 0.1 76.6 E 5.0 11.4 20.0 15.4% 3.3 3.1 0.0 6.4 Lead Yes None 11.8 0.09 0.37 16.8 0.0 16.8 B 0.4 4.4 23.8 31.0 10.7 40.7 24.7 43.2 0.0 14.6 100.0 881 0 0 0 0.03 715 0 0 0 0.26 563 0 0 0 0.64 30.0 175 0 1 0 0.57 225 0 0 0 0.34 Intersection LOS: C ICU Level of Service D 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Projected 2018 AM Optimized 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1919 2020 NA 2 93 98 Perm 401 422 Prot 1 692 728 NA 6 6 6 NA 8 20 21 Perm 2 2 1 6 8 8 8 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.5 0.65 0.10 0.6 0.0 0.6 A 5.0 11.1 25.0 19.2% 3.7 2.4 0.0 6.1 Lead Yes None 22.7 0.17 0.74 44.7 0.0 44.7 D 10.0 28.5 99.0 76.2% 3.7 2.8 0.0 6.5 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 10.0 30.0 31.0 23.8% 3.0 4.0 0.0 7.0 53.3 68.4 None 10.0 0.08 0.02 55.8 0.0 55.8 E 31.1 C 0.7 2.9 132.0 None 10.0 0.08 0.16 24.0 0.0 24.0 C 3.4 m0.4 C-Max 115.9 0.89 0.24 1.7 0.0 1.7 A 17.5 B 10.7 13.7 551.0 45.0 959 0 0 0 0.10 85.0 574 0 0 0 0.74 2989 0 0 0 0.24 600 0 0 0 0.01 2 10.0 28.5 74.0 56.9% 3.7 2.8 0.0 6.5 Lag Yes C-Max 84.5 0.65 0.65 8.8 0.3 9.1 A 8.7 A 178.0 203.1 207.0 3130 436 0 0 0.75 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 129 (99%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 12.0 Intersection Capacity Utilization 75.9% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 8.4 30.0 294 0 0 0 0.07 Intersection LOS: B ICU Level of Service D 3: Constellation & Baseline Synchro 7 - Report Projected 2018 AM Optimized 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 553 582 Prot 5 1280 1347 NA 2 106 112 Perm 56 59 Prot 1 510 537 NA 6 144 152 Perm 127 134 Prot 3 1067 1123 NA 8 54 57 Perm 296 312 Prot 7 451 475 NA 4 454 478 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 31.0 23.8% 3.7 3.1 0.0 6.8 Lead Yes None 24.4 0.19 0.96 94.8 0.0 94.8 F 10.0 36.8 54.0 41.5% 3.7 3.1 0.0 6.8 Lag Yes C-Max 50.4 0.39 0.72 39.0 0.0 39.0 D 54.3 D 79.7 106.2 551.0 10.0 36.8 54.0 41.5% 3.7 3.1 0.0 6.8 Lag Yes C-Max 50.4 0.39 0.19 28.1 0.0 28.1 C 5.0 11.8 14.0 10.8% 3.7 3.1 0.0 6.8 Lead Yes None 7.0 0.05 0.65 91.6 0.0 91.6 F 10.0 36.8 37.0 28.5% 3.7 3.1 0.0 6.8 Lag Yes C-Max 30.5 0.23 0.33 8.2 0.0 8.2 A 5.0 11.8 16.0 12.3% 3.7 3.1 0.0 6.8 Lead Yes None 8.9 0.07 0.60 70.6 0.0 70.6 E 5.0 11.8 21.0 16.2% 3.7 3.1 0.0 6.8 Lead Yes None 14.2 0.11 0.88 82.5 0.0 82.5 F 15.1 #35.4 0.0 17.0 17.4 28.1 10.0 33.8 41.0 31.5% 3.7 3.1 0.0 6.8 Lag Yes None 33.8 0.26 0.90 56.7 0.0 56.7 E 56.1 E 101.7 #120.6 358.3 10.0 33.8 41.0 31.5% 3.7 3.1 0.0 6.8 Lag Yes None 33.8 0.26 0.13 9.9 0.0 9.9 A 12.8 m28.9 10.0 36.8 37.0 28.5% 3.7 3.1 0.0 6.8 Lag Yes C-Max 30.5 0.23 0.48 44.6 0.0 44.6 D 40.9 D 43.8 55.8 237.7 0.0 10.4 41.2 #66.2 10.0 33.8 46.0 35.4% 3.7 3.1 0.0 6.8 Lag Yes None 39.1 0.30 0.33 36.0 0.0 36.0 D 39.3 D 34.5 44.7 305.3 25.0 590 0 0 0 0.19 100.0 93 0 0 0 0.63 95.0 457 0 0 0 0.33 115.0 230 0 0 0 0.58 105.0 427 0 0 0 0.13 85.0 355 0 0 0 0.88 82.3 #115.7 55.0 609 0 0 0 0.96 1868 0 0 0 0.72 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 16 (12%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.96 Intersection Signal Delay: 49.4 Intersection Capacity Utilization 95.2% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1129 0 0 0 0.48 1268 0 0 0 0.89 1453 0 0 0 0.33 4 4 10.0 33.8 46.0 35.4% 3.7 3.1 0.0 6.8 Lag Yes None 39.1 0.30 0.68 14.5 0.0 14.5 B 21.8 61.5 50.0 704 0 0 0 0.68 Intersection LOS: D ICU Level of Service F 4: Woodroffe & Baseline Synchro 7 - Report Projected 2018 AM Optimized 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 31 Stop 0% 0.95 33 129 388 Free 0% 0.95 408 52 135 0.95 55 0.95 142 411 Free 0% 0.95 433 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 136 None None 99 909 204 463 909 6.8 204 6.9 463 4.1 3.5 86 239 3.3 83 803 2.2 87 1094 WB 1 168 33 136 551 0.31 9.8 14.4 B 14.4 B NB 1 204 0 0 1700 0.12 0.0 0.0 NB 2 204 0 0 1700 0.12 0.0 0.0 0.0 3.0 39.4% 15 NB 3 55 0 55 1700 0.03 0.0 0.0 SB 1 142 142 0 1094 0.13 3.4 8.8 A 2.2 SB 2 216 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 216 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report Projected 2018 PM Optimized 1: Centrepointe/Cobden & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR ø8 41 43 Prot 5 914 962 NA 2 138 145 Perm 110 116 Prot 1 1450 1526 NA 6 98 103 Perm 201 212 Prot 3! 66 69 custom 66 69 Prot 7 30 32 custom 7! 8 7 7 10.0 16.0 23.0 17.7% 3.3 2.7 0.0 6.0 Lag Yes None 21.3 0.16 0.12 14.0 0.0 14.0 B 2 2 1 6 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.71 26.1 0.0 26.1 C 27.4 C 152.1 196.6 471.0 5 2 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 8.7 0.07 0.38 66.9 0.0 66.9 E 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.36 17.5 0.0 17.5 B 17.6 B 47.9 68.8 159.5 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 72.1 0.55 0.17 3.2 0.0 3.2 A 5.0 11.4 15.0 11.5% 3.7 2.7 0.0 6.4 Lead Yes None 17.4 0.13 0.52 57.7 0.0 57.7 E 0.0 11.0 31.8 m42.9 2671 0 0 0 0.36 865 0 0 0 0.17 80.0 224 0 0 0 0.52 10.7 22.5 90.0 124 0 0 0 0.35 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 26.4 Intersection Capacity Utilization 76.4% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 2144 0 0 0 0.71 6 6 3 3 3 10.0 28.0 59.0 45.4% 3.7 2.3 0.0 6.0 Lag Yes C-Max 83.1 0.64 0.10 12.2 0.0 12.2 B 10.0 16.0 56.0 43.1% 3.3 2.7 0.0 6.0 10.0 16.0 56.0 43.1% 3.3 2.7 0.0 6.0 None 22.1 0.17 0.74 66.3 0.0 66.3 E None 22.1 0.17 0.22 11.0 0.0 11.0 B 10.0 16.0 23.0 17.7% 3.3 2.7 0.0 6.0 Lag Yes None 21.3 0.16 0.25 47.0 0.0 47.0 D 7.6 m16.1 52.2 73.7 0.0 12.0 15.5 27.3 0.0 8.4 80.0 984 0 0 0 0.10 645 0 0 0 0.33 50.0 606 0 0 0 0.11 50.0 292 0 0 0 0.24 288 0 0 0 0.11 7.0 24.3 33.0 25% 3.3 2.7 Lead Yes None Intersection LOS: C ICU Level of Service D 1: Centrepointe/Cobden & Baseline Synchro 7 - Report Projected 2018 PM Optimized 2: Centrepointe/Highgate & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBR SBL SBR 36 38 Prot 5 776 817 NA 2 234 246 Perm 249 262 Prot 1 1232 1297 NA 6 112 118 Perm 361 380 Prot 4 294 309 custom 63 66 Prot 3 65 68 custom 3 5 2 2 2 1 6 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 8.4 0.06 0.35 88.4 0.0 88.4 F 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 54.6 0.42 0.40 16.9 0.0 16.9 B 16.0 B 26.4 25.6 471.0 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 54.6 0.42 0.34 1.6 0.0 1.6 A 5.0 11.2 22.0 16.9% 3.7 2.5 0.0 6.2 Lead Yes None 15.2 0.12 0.69 59.7 0.0 59.7 E 0.0 2.5 29.4 43.7 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 63.7 0.49 0.79 40.9 0.0 40.9 D 41.5 D 184.9 #234.4 207.0 150.0 723 0 0 0 0.34 85.0 411 0 0 0 0.64 10.2 22.5 55.0 204 0 0 0 0.19 2023 0 0 0 0.40 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 17 (13%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 32.3 Intersection Capacity Utilization 67.9% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1643 0 0 0 0.79 6 6 4 4 4 3 3 10.0 23.7 49.0 37.7% 3.7 2.0 0.0 5.7 Lag Yes C-Max 63.7 0.49 0.18 8.2 0.0 8.2 A 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 24.1 0.19 0.63 53.0 0.0 53.0 D 5.0 36.4 36.0 27.7% 3.0 4.4 0.0 7.4 Lag Yes None 24.1 0.19 0.60 9.9 0.0 9.9 A 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.49 68.6 0.0 68.6 E 5.0 11.4 23.0 17.7% 3.3 3.1 0.0 6.4 Lead Yes None 10.5 0.08 0.37 18.1 0.0 18.1 B 6.0 19.9 44.4 60.2 0.0 24.8 16.5 30.4 0.0 13.7 100.0 655 0 0 0 0.18 721 0 0 0 0.53 550 0 0 0 0.56 30.0 214 0 0 0 0.31 251 0 0 0 0.27 Intersection LOS: C ICU Level of Service C 2: Centrepointe/Highgate & Baseline Synchro 7 - Report Projected 2018 PM Optimized 3: Constellation & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR WBL WBT NBL NBR 1129 1188 NA 2 4 4 Perm 67 71 Prot 1 1569 1652 NA 6 24 25 NA 8 38 40 Perm 2 2 1 6 8 8 8 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.3 0.76 0.00 2.0 0.0 2.0 A 5.0 11.1 23.0 17.7% 3.7 2.4 0.0 6.1 Lead Yes None 8.2 0.06 0.34 45.3 0.0 45.3 D 10.0 28.5 93.0 71.5% 3.7 2.8 0.0 6.5 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 10.0 30.0 37.0 28.5% 3.0 4.0 0.0 7.0 8.8 m11.6 None 10.0 0.08 0.10 56.9 0.0 56.9 E 34.8 C 3.1 7.7 132.0 None 10.0 0.08 0.26 20.9 0.0 20.9 C 0.0 m0.2 C-Max 111.2 0.86 0.58 17.8 0.0 17.8 B 18.9 B 164.1 188.7 551.0 45.0 1146 0 0 0 0.00 85.0 423 0 0 0 0.17 2868 0 0 0 0.58 750 0 0 0 0.03 2 10.0 28.5 70.0 53.8% 3.7 2.8 0.0 6.5 Lag Yes C-Max 99.3 0.76 0.32 3.6 0.0 3.6 A 3.6 A 16.8 24.9 207.0 3680 0 0 0 0.32 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 8 (6%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 13.2 Intersection Capacity Utilization 65.4% Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 0.0 11.4 30.0 377 0 0 0 0.11 Intersection LOS: B ICU Level of Service C 3: Constellation & Baseline Synchro 7 - Report Projected 2018 PM Optimized 4: Woodroffe & Baseline Lane Group Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 346 364 Prot 5 753 793 NA 2 68 72 Perm 79 83 Prot 1 962 1013 NA 6 250 263 Perm 375 395 Prot 3 961 1012 NA 8 116 122 Perm 383 403 Prot 7 920 968 NA 4 298 314 Perm 5 2 2 2 1 6 6 6 3 8 8 8 7 4 5.0 11.8 25.0 19.2% 3.7 3.1 0.0 6.8 Lead Yes None 17.5 0.13 0.83 83.4 0.0 83.4 F 10.0 36.8 45.0 34.6% 3.7 3.1 0.0 6.8 Lag Yes C-Max 41.5 0.32 0.52 56.0 0.0 56.0 E 62.9 E 75.3 90.9 551.0 10.0 36.8 45.0 34.6% 3.7 3.1 0.0 6.8 Lag Yes C-Max 41.5 0.32 0.14 35.7 0.0 35.7 D 5.0 11.8 20.0 15.4% 3.7 3.1 0.0 6.8 Lead Yes None 11.0 0.08 0.58 73.3 0.0 73.3 E 10.0 36.8 40.0 30.8% 3.7 3.1 0.0 6.8 Lag Yes C-Max 35.0 0.27 0.45 7.1 0.0 7.1 A 5.0 11.8 26.0 20.0% 3.7 3.1 0.0 6.8 Lead Yes None 18.6 0.14 0.85 71.8 0.0 71.8 E 5.0 11.8 27.0 20.8% 3.7 3.1 0.0 6.8 Lead Yes None 19.3 0.15 0.84 69.6 0.0 69.6 E 20.7 37.4 0.0 21.2 51.2 #74.0 10.0 33.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes None 31.0 0.24 0.88 57.6 0.0 57.6 E 57.4 E 91.9 #109.6 358.3 10.0 33.8 38.0 29.2% 3.7 3.1 0.0 6.8 Lag Yes None 31.0 0.24 0.28 8.4 0.0 8.4 A 10.6 22.0 10.0 36.8 40.0 30.8% 3.7 3.1 0.0 6.8 Lag Yes C-Max 35.0 0.27 0.78 49.4 0.0 49.4 D 42.7 D 90.0 107.2 237.7 0.0 15.3 52.0 #73.0 10.0 33.8 39.0 30.0% 3.7 3.1 0.0 6.8 Lag Yes None 31.7 0.24 0.82 53.4 0.0 53.4 D 50.5 D 85.9 102.7 305.3 25.0 497 0 0 0 0.14 100.0 170 0 0 0 0.49 95.0 584 0 0 0 0.45 115.0 480 0 0 0 0.82 105.0 443 0 0 0 0.28 85.0 505 0 0 0 0.80 50.6 #69.6 55.0 455 0 0 0 0.80 1538 0 0 0 0.52 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 21 (16%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 53.1 Intersection Capacity Utilization 90.3% Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1297 0 0 0 0.78 1162 0 0 0 0.87 1193 0 0 0 0.81 4 4 10.0 33.8 39.0 30.0% 3.7 3.1 0.0 6.8 Lag Yes None 31.7 0.24 0.59 16.9 0.0 16.9 B 17.3 47.4 50.0 538 0 0 0 0.58 Intersection LOS: D ICU Level of Service E 4: Woodroffe & Baseline Synchro 7 - Report Projected 2018 PM Optimized 5: Centrepointe & Constellation Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) WBL WBR NBT NBR SBL SBT 38 Stop 0% 0.95 40 102 553 Free 0% 0.95 582 31 70 0.95 33 0.95 74 413 Free 0% 0.95 435 Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) 0.95 107 None None 99 947 291 615 947 6.8 291 6.9 615 4.1 3.5 83 240 3.3 85 705 2.2 92 961 WB 1 147 40 107 462 0.32 10.3 16.4 C 16.4 C NB 1 291 0 0 1700 0.17 0.0 0.0 NB 2 291 0 0 1700 0.17 0.0 0.0 0.0 2.4 39.1% 15 NB 3 33 0 33 1700 0.02 0.0 0.0 SB 1 74 74 0 961 0.08 1.9 9.1 A 1.3 SB 2 217 0 0 1700 0.13 0.0 0.0 ICU Level of Service SB 3 217 0 0 1700 0.13 0.0 0.0 A Synchro 7 - Report