Graf Zeppelin (II) D
Transcription
Graf Zeppelin (II) D
Detailed Technical Drawings of the Graf Zeppelin D-LZ130 Scale 1/600 A set of Technical Drawings of the Passenger Airship Graf Zeppelin (II) Scale is 1/200 except as otherwise noted Drawings by David Fowler ©2009 by David Fowler Unauthorized reproduction in whole or in part is prohibited. 20160423 The Graf Zeppelin (II) © 2009 by David Fowler Gas Cell No. 0 2 3.5 Frame No. I II 20 III 33.5 Feet 0 Meters 0 IV 47 10 20 5 30 10 40 50 15 V 62 VI 77 VI Feet 0 Meters 0 Gas Cell No. Frame No. 92 10 20 30 5 10 40 The Graf Zeppelin (II) © 2009 by David Fowler 50 15 VII VIII 107 IX 123.5 X 140 XI 156.5 Feet 0 Meters 0 10 20 5 30 40 10 The Graf Zeppelin (II) © 2009 by David Fowler 50 15 Embarking/ Disembarking Gangway XI Gas Cell No. XII Frame No. 173 XIII 188 XIV 203 XV 218 XVI 233 244.5 247 Front Elevation Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Rear Elevation Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Passenger Area “B” Deck “C” Deck Ring 188 "Bridge" over Keel Corridor Observation Windows Passenger Cabins "Luxury" Cabins Observation Windows "Bridge" over Keel Corridor Smoking Lounge Stairway to “B” Deck Stairway to “C” Deck Stairway to “B” Deck Writing Tables Office Embarking/Disembarking Gangway Kitchen Stairway to “C” Deck Serving Pantry Promenade Passengers’ Lavatories Promenade Officers’ Mess Dining Area Electrical Room Crew’s Mess Keel Corridor Ring 173 “D” Deck “A” Deck Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Control Gondola Elevator Wheel Engine Car (forward) Ballast Board Navigator’s Station Rudder Wheel Gas Cell Board Ladder to Hull Engine Telegraph Ring 203 Landing Rail Pneumatic Landing Wheel 4 Engine Cars Forward Engine Cars mounted 4° outward from ship’s axis Aft Engine Cars mounted at 3° outward from ship’s axis Engine specifications: Daimler Benz LOF 6 diesel V16, 4 valve per cylinder 770 kW (1050 hp) maximum at 1500 rpm 690 kW (940 hp) cruising at 1350 rpm 225 g/kWh (0.37 lbs./hp/h) fuel consumption (cruising) Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Control Gondola (detail) Drift Measurement Device A B Gas Valve Control Board Barometric Altimeter Ballast Control Board Inclinometer Radio Direction Finders A-A’ Airship Hull Magnetic Compass Gyroscopic Compass Magnetic Compass Rudder Wheel Ground Handling Rail Elevator Wheel Pneumatic Landing Wheel Navigation Room A’ Elevator Wheel Pneumatic Landing Wheel B’ Ballast Control Board Ballast Control Board B-B’ Rudder Wheel Engine Telegraph Gyroscopic Compass Control Room Observation Room Ground Handling Rail Engine Telegraph Telephone Switchboard Gas Valve Control Board Feet 0 Meters 0 5 1 10 2 3 Scale 1/50 15 4 5 The Graf Zeppelin (II) © 2009 by David Fowler Engine Car (detail) Water Jacket (Stage 1 Exhaust Cooling) Engine Control Board Bypass Exhaust B Exhaust Cooling Radiators (Stage 2) Engine Car Supports Water Jacket (Stage 1 Exhaust Cooling) A A–A’ Exhaust Cooling Radiators (Stage 2) Final Exhaust Port Engine Starter Compressed Air Tank Hull Access Door Engine Exhaust Water Separator Ducted Fan (ten-bladed, to draw air through radiators) B’ Engine Exhaust A’ Exhaust Water Separator Bypass Exhaust Propeller Propeller B–B’ Engine Cooling Water Radiators Telegraph from the Control Gondola Ducted Fan (ten-bladed, to draw air through radiators) Engine Exhaust Cooling Radiators (Stage 2) Hull Access Door Exhaust Cooling Water Radiators 4 Engine Cars Forward Engine Cars mounted 2° outward from ship’s axis Aft Engine Cars mounted at 1° outward from ship’s axis Oil Radiators Engine specifications: Daimler Benz LOF 6 diesel V16, 4 valve per cylinder Exhaust cooling system to reclaim water for ballast. Stage 1: Cool Water Jacket (temperature in = 400˚C, temperature out = 50˚C) Stage 2: Cooling Radiator (temperature in = 50˚C, temperature out = 20˚C) Final: Water is condensed and separated from the exhaust in collector (baffles) and transferred to ballast water tanks and bladders within the airship. Engine Exhaust Feet 0 Meters 0 5 10 15 Final Exhaust Port Exhaust Water Separator 1 2 3 Propeller Scale 1/50 4 5 The Graf Zeppelin (II) © 2009 by David Fowler Main Rings 3.5 20 Hull Fabric Covering Tail Fin Cruciform Structure Bracing Cable (40,000 pound) Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Main Rings 33.5 Gas Vent Maneuvering Valve (Cell 3) 47 Pressure Relief Valve (Cell 3) Maneuvering Valve (Cell 2) Pressure Relief Valve (Cell 2) Axial Corridor Hull Fabric Covering Bulkhead Bracing Wires Axial Corridor Tail Fin Cruciform Structure Keel Corridor Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Main Rings Gas Vent 62 77 Maneuvering Valve Pressure Relief Valve Axial Corridor Ladder Shaft to Axial Corridor Hull Fabric Covering Bulkhead Bracing Wires Keel Corridor Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Main Rings Gas Vent Bulkhead Bracing Wires 92 107 Maneuvering Valve Pressure Relief Valve Axial Corridor Ventilation Shaft “Stub” Keel for Engine Car Access Hull Fabric Covering Engine Car 2 Access Ways to Engine Cars Feet 0 Meters 0 10 20 30 40 50 Engine Car 1 5 10 15 Keel Corridor The Graf Zeppelin (II) © 2009 by David Fowler Main Rings Gas Vent Bulkhead Bracing Wires 123.5 Maneuvering Valve Pressure Relief Valve Axial Corridor Ladder Shaft to Axial Corridor Hull Fabric Covering Feet 0 Meters 0 10 20 5 30 10 40 50 15 Keel Corridor The Graf Zeppelin (II) © 2009 by David Fowler Main Rings Bulkhead Bracing Wires 140 Hull Fabric Covering Axial Corridor “Stub” Keel for Engine Car Access Keel Corridor Bridge Engine Car 3 Feet 0 Meters 0 10 20 5 30 10 40 Engine Car 4 50 15 Access Ways to Engine Cars The Graf Zeppelin (II) © 2009 by David Fowler Main Rings Gas Vent Bulkhead Bracing Wires 156.5 Maneuvering Valve Pressure Relief Valve Axial Corridor Ventilation Shaft “Stub” Keel for Engine Car Access Hull Fabric Covering Feet 0 Meters 0 10 20 5 30 10 40 50 15 Keel Corridor The Graf Zeppelin (II) © 2009 by David Fowler Main Rings Gas Vent Bulkhead Bracing Wires 173 188 Hull Fabric Covering Maneuvering Valve Pressure Relief Valve Axial Corridor Ladder Shaft to Axial Corridor Passenger Area Drinking Water "A" Deck Dining Area Extent of LZ-129 "Hindenburg" Passenger Area "B" Deck Passenger Area “B” Deck Observation Windows "B" Deck Passenger Area Extension for Passenger Area Promenade "C" Deck Windows Embarking/Disembarking Gangway “D” Deck Windows Feet 0 Meters 0 10 20 30 40 50 Keel Corridor "C" Deck Passenger Area "D" Deck Crew Mess 5 10 15 The Graf Zeppelin (II) © 2009 by David Fowler Main Rings Bulkhead Bracing Wires Gas Vent 203 218 Maneuvering Valve Pressure Relief Valve Axial Corridor Ventilation Shaft Hull Fabric Covering Keel Corridor Control Gondola Pneumatic Landing Wheel Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Main Rings 233 Bulkhead Bracing Wires 244.5 Observation Platform Ladder Hull Fabric Covering Mooring Platform Axial Corridor Keel Corridor Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Intermediate Rings 178 198 (looking aft) Ring 198 is a typical Intermediate Ring Fabric Hull Cover Axial Corridor Axial Corridor 237 Intermediate Rings 237 and 241 are 18 sided. Longitudinal girders create 36 apices. Tube through Gas Cell for Axial Corridor Gas Cell (made from “Goldbeater’s Skin”) Extent of LZ-129 "Hindenburg" Passenger Area Passenger “B” Deck Keel Corridor Hull Fabric Covering Pantry on "A" Deck Passenger “B” Deck Kitchen on "C" Deck Keel Corridor "C" Deck Passenger Cabin Keel Corridor Feet 0 Meters 0 10 20 5 30 10 40 50 15 The Graf Zeppelin (II) © 2009 by David Fowler Bow Mooring Area (detail) 241 241 244.5 241 244.5 Hull Fabric Covering Observation Hatch Guy Rope Hatches 244.5 Observation Platform Guy Rope Platform Observation Platform Ladder Ladder Ladder Observation Platform Anchor Cone Anchor Cone Axial Corridor Axial Corridor Mooring Platform Mooring Platform Ladder Axial Corridor Ladder Ladder Mooring Platform Guy Ropes Guy Ropes Guy Ropes Guy Rope Platform Guy Rope Platform Keel Corridor Feet 0 5 10 15 20 25 30 scale 1/100 Meters 0 5 10 The Graf Zeppelin (II) © 2009 by David Fowler 3 Tail Structure 2c 2b Rudder/Elevator Hinge 2a Main Ribs 3 2b 2c 2a 1c 2 1b 2 1c 1b 1a 1 1a 0b 0a 0 1 Ring 20 Ring 33.5 Ring 47 Main Ring construction of the Tail Fins is braced through the hull to the opposing Fin by the Tail Fin Cruciform Structure 0b Main Ribs constructed using triangular girders; Intermediate ribs constructed using flat girders Tests showed that most of the stress was on the leading edge of the fin, so the intermediate ribs were reduced in number from the center to the trailing edge to save weight. 0a 0 Feet 0 Meters 0 10 20 5 30 10 40 50 15 Ring 20 Ring 33.5 Ring 47 The Graf Zeppelin (II) © 2009 by David Fowler The Graf Zeppelin (II) © 2009 by David Fowler Feet 0 Meters 0 10 20 5 30 10 40 50 15 Diagonal Shear Wire v v u t u t u t Axial Corridor Cell I-II Connector Valve x "Riding Out Car" Anchor Cone (retractable) Pneumatic Landing Wheel Gas Cell No. 0 2 3.5 Frame No. I II 20 Auxiliary Control Station III 33.5 IV 47 V 62 VI 77 Feet 0 Meters 0 10 20 30 5 10 40 The Graf Zeppelin (II) © 2009 by David Fowler 50 15 Intermediate Ring Gas Vent Main Ring Gas Cell Cord Netting* v v Circumferential Wires* v Gas Cell Wire Netting* t t u u Diagonal Shear Wires t Longitudinal Wires* u * wiring and netting extend throughout airship frame, but are omitted in other cells for clarity Axial Corridor w x w “Stub” Keel for Engine Car Access “Stub” Keel for Engine Car Access VI Gas Cell No. Frame No. 92 VII VIII 107 IX 123.5 X 140 XI 156.5 Feet 0 Meters 0 10 20 5 30 40 10 The Graf Zeppelin (II) © 2009 by David Fowler 50 15 v v t t u u Nose Anchor Cone Axial Corridor w Landing Rope x Cell XV-XVI Connector Valve Passenger Area "C" Deck Passenger Cabins Commander’s Cabin Directional Antennae Pneumatic Landing Wheel Kitchen Officer’s Mess XI Gas Cell No. XII Frame No. 173 XIII 188 XIV 203 XV 218 XVI 233 244.5 247 The Graf Zeppelin (II) © 2009 by David Fowler s Axial Corridor* * the axial corridor extends the length of the airship, but is omitted for clarity where it would obscure other details s Feet 0 Meters 0 10 20 5 30 40 10 50 15 g a4 a1 a4 f2 x a2 a1 f1 a1 a1 e f1 a1 g Crew’s Quarters Gas Cell No. 0 2 3.5 Frame No. I II 20 III 33.5 IV 47 V 62 VI 77 Feet 0 Meters 0 10 20 30 5 40 50 10 15 h b1 h The Graf Zeppelin (II) © 2009 by David Fowler Forward Engine Car (angled 2° outward) b1 a3 b2 “Stub” Keel for Engine Car Access b2 a3 “Stub” Keel for Engine Car Access r r Crew’s Quarters Large Cargo Space 2,500 kg 500 kg Cargo Space 500 kg Cargo Spaces a5 a1 b1 a5 a1 d a2 a1 f1 500 kg Cargo Space a1 a1 a1 a1 a1 f2 f1 x a1 a1 k k a1 a1 q b1 o n f1 a2 c n a1 f1 a1 f1 a2 500 kg Cargo Spaces 600 kg Large Cargo Cargo Spaces Space 2,500 kg Crew’s Quarters r r “Stub” Keel for Engine Car Access h b1 a3 b2 “Stub” Keel for Engine Car Access h b1 a3 b2 Rear Engine Car (angled 1° outward) VI Gas Cell No. Frame No. 92 VII VIII 107 IX 123.5 X 140 XI 156.5 Feet 0 Meters 0 10 20 5 30 40 The Graf Zeppelin (II) © 2009 by David Fowler 50 10 15 Forward Observation Windows Passenger Area Crew’s Quarters 500 kg Cargo Post Office l m d a1 a1 a2 a1 a1 e Control Gondola g Landing Rope Hatches s Commander’s Cabin f1 a1 a1 f1 a1 Nose Anchor Cone Axial Corridor l a4 c1 x a1 Radio Room Crew’s Quarters Gas Cell No. XII Frame No. 173 XIII 188 g Air Vents Rope Platform Mooring Platform XIV 203 a4 Landing Ropes Officer’s Quarters Access Door to Control Gondola XI s 500 kg Cargo l XV 218 XVI 233 244.5 247 Explanation of Letters on Longitudinal Cross Section and Plan Views a1 a2 a3 a4 a5 b1 b2 c c1 d e f1 f2 g h i k l m n o p q r s t u v w x y Fuel Oil Barrels [2,500 liters] (28) Fuel Oil Valve Barrels [2,500 Liters] (4) Fuel Oil Operation Barrels [800 liters] (4) Fuel Oil Barrels [1,250 liters] (4) Fuel Oil Barrels [850 liters] (2) Lubrication Oil Barrels [500 liters] (6) Lubrication Oil Barrels [380 liters] (4) Drinking Water Barrel [2,500 liters] Passenger Drinking Water Barrels (200 Liters) (2) (elevated to maintain faucet pressure) Fresh Water Barrels [2,500 liters] (2) Waste Water Barrels [2,500 liters] (2) Barrels for Recovered Ballast Water [2,500 liters] (9) Barrels for Recovered Ballast Water [2,000 liters] (2) Double Ballast Bags [500 liters] (4) Cooling Water Barrels [400 liters] (4) Baggage Room [500 kg] (2) Spare Parts Storage Room [500 kg] (2) Food/Storage Room [500 kg] Food/Storage Room [250 kg] Engineer’s Room Exhaust Washroom and Toilet Workshop Access Way to Engine Cars (4) Access Ways to Ballast Bags (4) Maneuvering Valve (14) Pressure Relief Valve (14) Gas Shaft (7) Ventilation Shaft (3) Ladder Shafts (3) Anchor Cones (2) Ring No. (meters) 2 2.5 3.5 9 14.5 20 24.5 29 33.5 38 42.5 47 52 57 62 67 72 77 82 87 92 97 102 107 112.5 118 123.5 129 134.5 140 145.5 151 156.5 162 167.5 173 178 183 188 193 198 203 208 213 218 223 228 233 237 241 244.5 246.5 247 Diameter (meters) 0 2.2 3.8 9.1 12.7 15.9 18.3 20.5 22.6 24.6 26.3 28.0 29.6 31.2 32.6 33.8 34.8 35.8 36.6 37.3 38.0 38.6 39.2 39.7 40.1 40.4 40.7 41.0 41.2 41.2 41.2 41.2 41.2 41.1 40.8 40.4 39.9 39.4 38.9 38.3 37.5 36.4 35.1 33.5 31.6 29.3 26.4 22.4 18.5 13.0 5.9 0.8 0 Diameter (feet) 0 7.06 12.38 29.75 41.78 52.17 59.92 67.31 74.24 80.61 86.43 91.78 97.25 102.25 106.96 110.76 114.12 117.45 120.08 122.38 124.60 126.64 128.53 130.25 131.56 132.55 133.53 134.51 135.17 135.17 135.17 135.17 135.17 134.84 133.91 132.55 131.02 129.40 127.78 125.69 122.99 119.56 115.28 110.07 103.67 96.13 86.61 73.49 60.70 42.65 19.63 2.60 0 The Graf Zeppelin (II) © 2009 by David Fowler