Accommodations Task Force
Transcription
Accommodations Task Force
Community Forum Lakeside Chautauqua Board of Directors Accommodations Task Force August 2, 2014 Board Assumptions • Guided by Lakeside Strategic Plan • Provision of accommodations mandated by Articles of Incorporation • Status quo does not meet guest expectations • Preserve and restore Hotel Lakeside • Detailed business plan required (financial, marketing and operations) • Protect tax exempt status • Retain control What We’ve Heard Since 1st Community Forum: • • • • Something needs to be done to the hotel Where is the project now? What are the next steps? How will Lakeside mitigate financial risks? – Homeowner and Association • • • • How will Lakeside preserve its heritage? Won’t beverage service change Lakeside’s culture? What’s the approval process? Board needs to slow process down Today’s Objective • Provide overview of Accommodations Task Force and its purpose • Review assumptions and strategic goals • Articulate current situation • Present plans to substantially upgrade Lakeside’s hotel accommodations • Introduce project partners • Highlight design and marketing strategies • Provide responses to concerns raised • Review project timeline Desired Project Attributes • Must be financially sound • Must meet functional needs of guest and Lakeside • Must meet the criteria for Historic Preservation Tax Credits • Sustainability • Must meet board threshold for mitigating risk • Enhance present income stream from hotel accommodations Strategic Goals Adopted by Board of Directors, 2008 • Address emerging twenty-first century guest expectations • Develop the financial resources needed for long-term sustainability and advancement Why Renovate the Hotel? • Strategic priority • Continue the Lakeside culture of bringing nonproperty owners to Lakeside to share in the Chautauqua experience • Ensure guest expectations met • Preservation of iconic Lakeside structure • Address decades of deferred maintenance • Program support – Program delivery – Hosting guest Chaplains, lecturers, performers, VIPs Project Timeline Nov. 2011 Dec. 2011 Jan. 2012 July 2012 Nov. 2012 Additional Partners Engaged Nov. 2012 March 2013 March 2013 Jan. 2014 June 2014 June 2014 Project Partners • National hospitality consulting firm specializing in: – Feasibility studies, operational reviews, economic impact analysis • Conducted over 2,000 studies on existing and proposed hotels throughout North America ************************************ Blue Spruce Enterprises, LLC • Hospitality consulting firm specializing in private independent ownership • Experience with portfolio of 70+ hotels with 19,000 guest rooms in 24 states Project Partners (cont.) • Cleveland-based business law firm with 7 offices worldwide • 52 attorneys listed in The Best Lawyers in America ® • Extensive Not-For-Profit practice ************************************ • Tax and consulting services including historic preservation tax credits • 6700 professionals, 75 U.S. cities and 100 countries • Directly involved in 60% of downtown Cleveland projects Project Partners (cont.) • Practices sustainable design, applying the principles of historic preservation in its architectural, planning and advocacy services • Founder is vice chair of Heritage Ohio • Historic preservation projects include: – Hyatt Regency Cleveland at The Arcade, 1890 – Bedford Springs Resort, PA, 1806 – Westin Book Cadillac Hotel Detroit, 1924 Project Partners (cont.) • Interior design firm specializing in resort hospitality and historic preservation • Clients include: – The Homestead, The Boar’s Head Inn, Pinehurst Resort, Mt. Washington Resort ************************************ • Global site selection leader for corporate and association businesses conducting event planning • Largest database of hotels, resorts and destinations Current Hotel Lakeside Hotel Lakeside 2013 Occupancy Hotel Lakeside Occupancy by Month 100.0% 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 11.5% Average 10.0% 0.0% Jan Feb Mar Apr May Jun Hotel Lakeside Occupancy (externally rented rooms) Jul Aug Sep Oct Hotel Lakeside Average Occupancy Nov Dec Hotel Lakeside 2013 Occupancy Hotel Lakeside 2013 Room Use Out of Service, 11.8% Rented External, 11.5% Used Internal, 1.2% Unused, 75.6% Voted Best Hotel Room View • Ohio Magazine ‘s 2014 Best of Ohio Reader’s Ballot • Would they vote the same if they weren’t looking out the window? Current Situation Current Situation (cont.) Current Situation (cont.) Current Situation Current Situation (cont.) Current Situation (cont.) Current Situation (cont.) Current Situation (cont.) Current Situation Q: Is there anything else you would like to tell us about your experience with Lakeside’s Religious, Educational & Arts programs during your stay? A: Seemed like a good program. If our room had met expectations, we may have joined in. Q: How likely are to recommend Lakeside Chautauqua to a friend of family member? A: Not at all likely. Current Situation (cont.) Q: What are your reasons for this answer? A: The hotel was a joke. Based on the amenities, the price should have been a max of $75. There was not even a TV in the room. The bathroom was tiny, the bed was old and undesirable. Bugs were flying around the room and there was only a window AC unit. The room smelled musty. I could go on forever. It was amazing that anyone would to stay in that hotel. It was unbelievable! Current Hotel Lakeside Future Hotel Lakeside . . . Proposed Hotel Lakeside Considered Guest Services • • • • • • • • • Approx. 3,000 sq. ft. of quality banquet space Approx. 1000 sq. ft. pre-function space Additional meeting rooms Fitness room and business center Shuttle service during Chautauqua season Restaurant – Breakfast, lunch, dinner Outdoor dining and room service Small retail store 2nd elevator Hotel Lakeside Projected Occupancy Hotel Lakeside Occupancy by Month 100.0% 90.0% 80.0% 70.0% 60.0% 50.0% 55% Average 40.0% 30.0% 20.0% 10.0% 0.0% Jan Feb Mar Apr May Hotel Lakeside Stabilized Occupancy Jun Jul Aug Sep Oct Hotel Lakeside Average Projected Occupancy Nov Dec US Hotel Occupancy U.S. Hotel Performance by Region Occupancy 2010 2011 2012 2013 New England 58.4% 61.2% 61.4% 62.5% Middle Atlantic 63.3% 65.4% 66.5% 66.0% South Atlantic 57.1% 59.4% 60.8% 62.0% East North Central 53.9% 56.5% 58.4% 59.1% East South Central 54.1% 55.5% 56.2% 56.9% West North Central 55.0% 56.2% 57.3% 57.9% West South Central 55.1% 58.1% 60.5% 61.4% Mountain 56.6% 59.1% 59.1% 60.3% Pacific 62.8% 65.6% 67.8% 69.5% Total U.S. 57.5% 59.9% 61.3% 62.3% Source: Smith Travel Research Occupancy – Local Market Occupancy By Month 88 90 82 81 80 Occupancy % 70 64 62 60 55 55 50 44 44 39 40 37 34 29 30 20 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Source: Smith Travel Research Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Year Avg Occupancy – Local Market Occupancy By Month 88 90 80 82 81 Although winter occupancy is low, it is not zero. Occupancy % 70 64 62 60 55 55 50 44 44 39 40 37 34 29 30 20 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Source: Smith Travel Research Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Year Avg Occupancy – Local Market Occupancy By Month 88 90 82 81 80 Occupancy % 70 Projecting the Hotel Lakeside at 55% occupancy is just average 64 62 60 55 55 50 44 44 39 40 37 34 29 30 20 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Source: Smith Travel Research Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Year Avg Rock of Ages • Inn in Marblehead (zoned hotel) – 13 bedrooms, accommodates up to 36 – Typical group size (14-25), 2014 annual occupancy – 70% • Varied market fall, winter, spring – – – – – – – Nationwide online “Mom” groups Mediation teacher training Execs taking direct reports on retreat Para-church ministry retreats University departments Nationwide cancer survivor groups Arts and crafts groups, etc. Rock of Ages (cont.) • Polling on guests and prospective guests – A view of the lake – Ample spaces for meeting and breakout spaces – Comfortable bed and luxury linens – WiFi and Cable TV – Nearly every group brings alcohol, even church and ministry groups – Guests seeking “historical” Project Phases Project Stages – Concept & Cases Concept & Case Development Determine Lead Case Project/Design Development Detailed Design Construction Execution Start up & Operation Note: We are just reaching the end of this phase Actions • Select partners to help develop the concept and to provide industry data • Develop desired attributes • Ascertain the general feasibility of project • Brainstorm options • Gather high level estimates to gauge the feasibility of each option • Compare options • Eliminate non-feasible options Decisions • Parameters and limits regarding project size, etc. • Inclusion and exclusion of desired attributes Project Stages – Lead Case Concept & Case Development Determine Lead Case Project/Design Development Detailed Design Construction Execution Start up & Operation Actions • More detail developed for all deliverables – Business model, cash flows, contingency plans, schedule, funding, permitting, etc. • Spend $ to determine costs, plans, timing & enabling projects • Contractor screening • Develop plans to pursue the funding • More detailed investigation of critical areas (lead or asbestos mitigation, foundation repair, water and sewer projects) Decisions • Budget to proceed with analysis • Many decision points as information is collected – Modification and adaptation of cases • Culminate with the selection of the lead case Project Stages – Project Development Concept & Case Development Determine Lead Case Project/Design Development Detailed Design Construction Execution Start up & Operation Actions • Project deliverables updated in detail for the lead case • Detailed project plans developed • Continue to optimize the layouts and designs • Identify additional areas to reduce costs • Pursue the funding plan • Apply for the historic tax credits • Develop plans for contingencies or unknowns Decisions • Several decision points as details are developed for the lead case – Modification and adaptation of lead case • Acceptance of the updated project plan and deliverables • Decision to initiate detailed design and authorize the associate spending Project Stages – Detailed Design Concept & Case Development Determine Lead Case Project/Design Development Detailed Design Construction Execution Start up & Operation Actions • Project is converted into detailed plans, drawings and specifications • Detailed revisions to estimated costs and timing • All deliverables are refreshed (estimates, business plans) • May start/commit to enabling projects (utility infrastructure) • Monitor design vs cost trade-offs (pressure on the project budget) • Primary construction is bid, but not awarded (bidding process) • Finalize commitments to the funding plan (not yet executed) Decisions • Several decision points as details are developed – Especially upon receipt of construction bids (final/best estimate of project cost) • Decision regarding any funding plan options • Final Go/No Go decision Project Stages - Construction Concept & Case Development Determine Lead Case Project/Design Development Detailed Design Construction Execution Actions • Award the primary construction contracts – Commit to the bulk of the project cost (approximately 80 %) • Significant site activity – Labor, materials, equipment etc. – Traffic, safety & security considerations • Significant “owner” activity – Board – Hotel oversight committee – Periodic reviews and progress reports • Finalize operating budgets, hiring plans, etc. Decisions • Decisions on any change orders, cost additions or reductions • Adjustment of the funding plan if needed • Adjustment of plan as project progresses Start up & Operation Project Stages – Start up Concept & Case Development Determine Lead Case Project/Design Development Detailed Design Construction Execution Start up & Operation Actions • Implement operating plans, hiring, etc. • Determine plan and phase to systematically turn over the completed construction to the owner/operator • Take over the completed hotel from an operational perspective • Implementation of hotel occupancy and marketing plans • Prepare to monitor deliverables versus the plan Decisions • Acceptance of completed construction • Funding plan adjustments, operational cash flow issues Scenario Development • Three cases – October of 2013 – Bracketing cases (small, moderate, large) • Rooms • Estimated Cost • Size 57 to 109 $10-$21 million 40-80,000 sq ft – Development of the initial restoration plan • Four additional options – Spring 2014 – Best options to get every desired goal • • • • Swimming pool versus no pool Fitness center versus fitness room Pre-function space More rooms and more family rooms – Biggest option - 110 rooms; 83,000 sq ft; $22 million • “Too Much” - accommodations committee and Board Scenario Development • Circled back to the moderate original option • Rooms • Estimated Cost • Size 79 $13 million 50,000 sq ft – No pool, fitness room, moderate meeting space • Two variations of that moderate plan – Is a basement possible? No – Kitchen and west wing • Refurbish or new construction • 1 story or 3 stories • Back room functions (mechanicals, storage, housekeeping) – Options – 81 - 87 rooms; 60,000 sq ft; $13-15 million • “Too Much” – Community forum in July Scenario Development • Circle back to the restoration only option • • • • Rooms 57 Estimated Cost $10+ million Size 42,000 sq ft Small addition to the west wing for back room functions • Review various options – Rework the Fern room and dining room to make them more meeting friendly – Dining service for hotel guests during a meeting – Historic restoration requirements – Kitchen and west wing • Back room functions (mechanicals, storage, housekeeping) – Smaller room count – effects on financial plan • Investigate phasing Restoration “by the Numbers” Example Project Cost Historic Renovation New Addition Other Renovation Costs Historic Tax Credits Net Cost to be Funded $ 7,674,850 $ 2,750,000 $ 2,517,731 $ 12,942,581 $ (3,102,558) $ 9,840,023 Current Example Project Rooms 76 79 Guests 175 250 Avg Rate $ 125.00 $ 134.00 Rate Range - season $115-$269 $130-$320 Rate Range - nonseason $95-$239 $100-$270 Family Rooms Room Mix Current Planned Twins 10 0 Full/Queen Double Double Total % Family Full Queens Kings w/Twin Full Queens Suites Total Family Rooms 15 36 1 8 1 3 2 76 14 18% 0 27 6 0 0 22 24 79 46 58% Historic Preservation Tax Credits Hotel Lakeside Tax Credits Historic Tax Credits Available to help renovate the hotel Over $3 million Hotel Lakeside Tax Credit Investors - Can use the tax credits - Can’t invest in a non-profit entity - Wants to invest in a viable “for profit” project Lakeside Association Lakeside Association is a Non-profit entity. It cannot effectively use the tax credits Earnings from a “for profit” hotel would jeopardize the Associations’ non-profit status Hotel Lakeside Tax Credits Historic Tax Credits Available to help renovate the hotel Over $3 million Hotel Lakeside, LLC For Profit Entity Tax Credit Investors - Can use the tax credits - Can’t invest in a non-profit entity - Wants to invest in a viable “for profit” project Lakeside Association Lakeside Association is a non-profit entity. It cannot effectively use the tax credits. Earnings from a “for profit” hotel would jeopardize the Association’s non-profit status. Potential Sources of Funding • State and Federal Historic Preservation Tax Credits – Requires investors to invest in a for profit entity • Qualified Investors – Sale of private bonds • Charitable gifts to Lakeside Association – Supporting Lakeside’s investment and to improve the surrounding infrastructure • Bank loan Other Potential Funding Sources • Toledo Port Authority bonds • Ottawa County Improvement Corporation (OCIC) grants • Ohio Water Development Authority grants • JobsOhio loan and grant programs – Economic Development and Workforce grants – Revitalization Program • State Job Creation Tax Credits and Abatement Programs How Do We Get There? Strategy for Success • Requires year-round operations – Chautauqua season (June – August) – Shoulder season • April –May, September – December • Reliance on group business – Winter season • Anticipate low occupancy • Must attract group business outside Chautauqua season • Requires hotel beverage policy Marketing Strategy • Multiple segments – Historic destination hotel market – Conference market – Family and leisure – Chautauqua season • Target smaller groups (35-70) – Largest market segment – H&LA and Blue Spruce affirm market opportunity within 180 mile drive distance – Strong profit potential Marketing Strategy (cont.) • Offer wide range of price points – Within each hotel and between hotels • Work with Helms Briscoe and other sources to identify groups within 180 mile drive – Social, Military, Educational, Religious and Fraternal (SMERF) • Position Hotel Lakeside for small group gatherings for “celebration of life” events – Weddings, retirements, graduations, remembrances, etc. Marketing Strategy (cont.) • Position for civic, corporate, religious, and academic organizations – Retreats, staff training, continuing education • Establish partnerships with booking services for group meetings, conferences and individual leisure travelers – Examples include: • • • • Helms Briscoe Historic Inns of America Select Registry Web-based providers Marketing Strategy (cont.) • Produce Lakeside stakeholder events throughout the year – Fundraising – 4 Pillars – Holiday (i.e. Thanksgiving to New Years) • Dickens Village, downtown and tree lighting, ice skating/sculpture, caroling, Orchestra Hall holiday flicks – Farm to Table, Murder Mystery Dinners • Develop professional Operations Team Recommended Beverage Policy • Sale of alcoholic beverages permitted only on Hotel Lakeside property, owned by Hotel Lakeside, LLC – Dining room, banquet spaces, courtyard/patio • Only beer and wine, must be served with food • Restricted hours of service – 11 am to 11 pm (Sundays, noon to 10 pm) • Sale of alcoholic beverages on any property owned by Lakeside Association shall remain prohibited Other Considerations • No bar or lounge • No open containers or consumption on Lakeside Association grounds permitted • Mandatory shuttle service for group events to and from dedicated parking in South Lot • Enforcement of all Lakeside Rules and Regulations • Continue to preserve and promote family atmosphere Hotel Lakeside Project Summary 1. Maintain status quo Consequences – Building deteriorates, occupancy further declines 2. Raze the hotel Consequences – Loss of historic treasure; loss of accommodations space, significant change in lakefront presentation 3. Restore the hotel Consequences – Renewed interest in Lakeside and revenue generated for mission; preservation of historic landmark; deepen community pride and support Homeowner Risks Risk of Homeowner losing their home in worst-case scenario is virtually impossible • 99 year lease, renewable forever, doesn’t expire, never loses priority • Tenants must voluntarily grant power to assess leasehold interests • Unbreakable unless tenant breaches lease • If Lakeside financed hotel renovations and defaulted on financing, impossible for bank to seize homeowner property – Leased lots subordinate to leases – Bank has other options and valuable property to use as collateral for loan financing, other than leased lots Homeowner Risks Lakeside is NOT and does NOT OPERATE AS a Homeowners Association • Lakeside’s management is not the same as role of modern homeowner’s association (HOA) • HOA derives powers to manage the development’s property and to assess the HOA’s members for the cost • Lakeside does not have the HOA’s power to issue and enforce assessments to improve its buildings • Benesch preparing formal board brief on all financial risks and continues as process unfolds Questions? THANK YOU!