Pres11 - Mike McCarthy TRL System validation and evaluation
Transcription
Pres11 - Mike McCarthy TRL System validation and evaluation
PISa WP6 – System Validation and Evaluation Mike McCarthy (TRL) WP6 Aims Validate system function • Track tests – relevant scenarios Evaluate system performance • Performance of system actions (e.g. braking) • Some rider feedback Recommendations for system PISa Final Workshop – TNO, Helmond • Improvements based on testing 03/02/2010 2 PISa systems Malaguti Spidermax 500cc • Distance Support System (DS) • Active Braking (AB) • Enhanced Braking (EB)/Active Suspension PISa Final Workshop – TNO, Helmond TVS Apache 160cc • Combined Braking (CB)/Semi-active suspension 03/02/2010 3 Distance Support System Validation • Two experiments 1) Simulator experiment 2) Pilot track test • Procedure: – Car-following task with and without the DS system PISa Final Workshop – TNO, Helmond 03/02/2010 4 Without DSS TTC 1. Simulator Experiment Results With DSS Throttle position TTC THW THW PISa Final Workshop – TNO, Helmond Throttle position 03/02/2010 5 2.Track Test PISa Final Workshop – TNO, Helmond 03/02/2010 6 -No significant differences -5 subjects -Detection of other objects apart from lead vehicle Results: Performance - Time Headway THW STD 0,75 0,70 STD THW [s] 0,65 0,60 0,55 0,50 0,45 0,40 0,35 DSS No DSS THWSTD High THW = large distance PISa Final Workshop – TNO, Helmond 03/02/2010 7 DSS Validation • Simulator experiment – • DSS algorithm gave very good results increased car-following performance & decreased control effort Pilot track test (only 5 subjects) – – DSS was considered useful DSS should be improved: obstacle detection PISa Final Workshop – TNO, Helmond 03/02/2010 8 PISa systems Malaguti Spidermax 500cc • Distance Support System (DSS) • Active Braking (AB) • Enhanced Braking (EB)/Active Suspension PISa Final Workshop – TNO, Helmond TVS Apache 160cc • Combined Braking (CB)/Semi-active suspension 03/02/2010 9 Active Braking - Static object Test Speed (km/h) AB Trigger setting =3 35 45 55 PISa Final Workshop – TNO, Helmond AB Trigger setting =5 AB Trigger setting =7 AB Trigger setting =9 03/02/2010 10 Crossing scenario Test Object PISa Final Workshop – TNO, Helmond Test Speed (km/h) AB Trigger setting =3 35 45 55 AB Trigger setting =5 AB Trigger setting =7 AB Trigger setting =9 03/02/2010 11 Active Braking - Results • • Reliability of AB activation 56%-91% AB level 3m/s2 appropriate for track setting PISa Final Workshop – TNO, Helmond 03/02/2010 12 PISa systems Malaguti Spidermax 500cc • Distance Support System (DSS) • Active Braking (AB) • Enhanced Braking (EB)/Active Suspension PISa Final Workshop – TNO, Helmond TVS Apache 160cc • Combined Braking (CB)/Semi-active suspension 03/02/2010 13 Enhanced Braking (EB) testing PISa Final Workshop – TNO, Helmond 03/02/2010 14 Enhanced Braking • EB off (baseline) and EB on Suspension setting Test Speed (km/h) 25 30 35 40 45 55 Off Medium Maximum PISa Final Workshop – TNO, Helmond 03/02/2010 15 Enhanced Braking - Results 12.00 10.00 Mean stopping distance (m) 8.00 EB off 6.00 EB on 4.00 EB off = rider applied front and rear brake EB on = rider applied rear brake only 2.00 0.00 20 25 30 35 40 45 Test speed (km/h) PISa Final Workshop – TNO, Helmond 03/02/2010 16 Enhanced Braking - Results Mean straight line stopping distance (m) Test Speed (km/h) EB off Medium EB off Max EB on Normal EB on Medium EB on Max 25 -1.21 -0.54 0.10 -0.58 -0.48 35 -1.50 -0.83 0.49 0.03 -0.45 -1.92 -1.57 -0.52 -0.45 -0.78 -2.36 -3.12 -1.43 -1.78 -0.71 -1.75 -1.52 -0.34 -0.69 -0.61 45 55 Mean EB off Normal Baseline • PISa Final Workshop – TNO, Helmond 03/02/2010 17 PISa systems Malaguti Spidermax 500cc • Distance Support System (DSS) • Active Braking (AB) • Enhanced Braking (EB)/Active Suspension PISa Final Workshop – TNO, Helmond TVS Apache 160cc • Combined Braking (CB)/Semi-active suspension 03/02/2010 18 Combined Braking • • • Straight line braking test CB off (baseline) and CB on Two test riders, 10 tests per condition Suspension setting Test Speed (km/h) 25 35 45 55 Off On PISa Final Workshop – TNO, Helmond 03/02/2010 19 Combined Braking - Results Stopping distance (m) for range of test speeds with and without CB 40 35 Stopping Distance (m) 30 25 20 CBS off CBS on 15 10 5 0 0 10 20 30 40 50 60 Test speed (km/h) PISa Final Workshop – TNO, Helmond 03/02/2010 20 Combined Braking - Results • Results for “Rider B” Test Speed (km/h) Improvement in mean stopping distance with CBS and Semi-active suspension (m) Improvement in stopping distance with CBS and Semi-active suspension (%) 25 2.69m 29.16% 35 2.60m 17.65% 45 6.06m 23.35% 55 7.03m 19.41% Mean 4.60m 22.39% PISa Final Workshop – TNO, Helmond 03/02/2010 21 Conclusions – PISa system tested -“development systems” • • – Active Braking • • – 3m/s2 level was appropriate for test conditions AB trigger successful - e.g. at 45 km/h, triggered at 20.67m – 5.48m (TTC 1.61s-0.44s) depending on AB trigger setting Enhanced Braking • – Recommendations made and further updates required Tests for a range of riders and in more complex environments Effective – system made performance comparable to test rider applying both front and rear brakes Combined Braking • • • Improvement (P<0.001) in mean stopping distance Mean 18.5% improvement over speed range tested Rider dependent effects noted (Rider A=14.6%, Rider B=22.4%) PISa Final Workshop – TNO, Helmond 03/02/2010 22 Thank you for your Attention! PISa Final Workshop – TNO, Helmond 03/02/2010 23
Similar documents
CPG NP 08 - COMP Performance Group
Assembled Heads (Beehive™ Valve Springs) The industry’s finest Small Block Chevy cylinder head is now available fully assembled with the most advanced valve train components available. Highlighted ...
More information