Presentación de PowerPoint
Transcription
Presentación de PowerPoint
EPC Bester Business Line Index • Why Bester? • Organizational chart • Technical Solution • Suppliers • Engineering • Construction • Operations & Maintenance • Internals Protocols • Experience • Contact EPC Bester Why Bester? Long experience in big projects around the world Financial availability Tested technical solution Everything is ready (Design, Purchasing, Logistic, Insurances, …) Large suppliers EPC Bester Organizational chart BOARD OF DIRECTORS COMMITTEES CEO AUDIT RISK Business Development Director Operations Director COMPENSATION Engineering Civil Mechanical Electrical EPC EPC Construction Biomass Wind Solar Small Hydro Substations Commissioning Corporate Director O&M National International Systems & Control Finance Controller Tresasury Fiscal Suppliers Procurement Administration Human Resources Marketing & Comunications IT System Logistic Legal Quality EPC Bester Technical Solution Project Lifecycle STUDY EXECUTION ENGINEERING & PROCUREMENT CONSTRUCTION O&M STARTUP SERVICE Information Engineering Project scheduling Weekly monitoring report Logistics TODAY Hand-Over EPC Bester Suppliers Modules Jinko Factories: Eficiency: Low: 14% Medium: 15% High: 16% Jinko module 16.19% (market clasification) 1. 2. 3. 4. America Europe Africa China Japan Total Capacity 4.6 GW/year Strong Capacity: 4.6 GW/year Strong Financial statments High eficiency of product Strong Agreement with Bester EPC Bester Suppliers Inverters LT-i - Aros - ABB 1. 2. 3. 4. 5. Strong Company Strong Financial Statements High eficiency of product (99.2%) Experience in similar conditions (cooling system) Strongs Agreement with Bester Generacion: EPC Presentation Suppliers Structure Capacities: Universal: Axial: Asebal: 1. 2. 3. 4. 5. 2,700 MW/year 1,800 MW/year 1,000 MW/year Total capacity of manufactures 5,500 MW/year Our design (according to the site conditions) Strong Companies Strong Financial Statements High quality Agreement with Bester Generacion: EPC Bester Suppliers Structure Bester design EPC Bester Suppliers Structure Machines (accuracy and speed) EPC Bester Suppliers Structure Machines (accuracy and speed) EPC Bester Suppliers Structure Installation process EPC Bester Suppliers Cables 1. 2. 3. 4. 5. Strong Companies Strong Financial Statements High quality International presence Strong Agreement with Bester Generacion: EPC Bester Engineering Design Completely closed design by Bester Engineering Department Considerations: Maximun production and Minimum area EPC Bester Engineering Design Layout of a complete plant EPC Bester Engineering Design Layout of a plant EPC Bester Engineering Design Single Line and selection cables EPC Bester Construction Project structure Operations Director Civil Works Mechanical Works Electrical Works EPC Bester Construction Report Weekly report for advancing • • • • Evolution maping Production tables (%) Pictures Many information and details available for the investor EPC Bester Construction Report Weekly report for advancing PV PLANT SPRIGGS FARM (UK) PHOTO REPORT EPC Bester Construction Report Weekly report for advancing EPC Bester Operations and Maintenance Control rooms • • • Monitoring 24hx 365 days Control Room on site Control Room at project location Control Room in Bester´s Headquarters EPC Bester Operations and Maintenance Scope Cleanning system • • • Work continuosly and automatically • Certified product • Accepted by module´s manufacture • • Satisfactory result in similar areas Tested product EPC Bester Operations and Maintenance Scope Basic works • Revision of inverter status • Revision of Juntion box • Supervision of modules using drones • Thermografic supervisión of modules to prevent faults EPC Bester Operations and Maintenance Reports Reports to control status • Continuosly and automatically reports with: • Information of Production • Information of Eficiency; actual, weekly, monthly, yearly, … • Incidents and actions • • All reports to guaranty: EPC Bester Internal Protocols Management Systems Bester has Protocols for: • • • Quality of the solution and works Health and Safety on site Human Resources regulation (legal localy and internal) QUALITY, ENVIRONMENT, AND OCCUPATIONAL RISK PREVENTION POLICIES Quality Management System Occupational Health and Safety Assesment Series Environmental Management System Quantification and reporting of greenhouse gas emissions and removals EPC Bester Experience Worlwide projects More than 3000 MW of experience in renewable energy projects 27 EPC Bester Experience Trackrecord (MW) Before 2010 + 1500 MW 20 250 172 95 116 12 20 5 64 18 116 112 10.5 5 5 1.5 122 122 65 5 1000 200 1132 2010-2016 DEVELOPMENT 1000 100 14 138 120 EPC xxx O&M 28 EPC Bester Experience Relevant Projects Rolleston. 1 Photovoltaic Power Plant • Installed Capacity: • Location: • Runtime: • Year: 18 MWp Burton on Trent, Staffordshire, United Kingdom 3 months Jan-March/ 2015 Rose Cottage. 1 Photovoltaic Power Plant • Installed Capacity: • Location: • Runtime: • Year: 28 MWp Wales, United Kingdom 5 months Jan-May/ 2014 Aricestii. 3 Photovoltaic Power Plants • Installed Capacity: • Location: • Runtime: • Year: 27 MWp Aricestii Rahtivani, Muntenia, Romania 5 months August-Dec/ 2013 EPC Bester Experience Relevant Projects Solaris. 1 Photovoltaic Power Plant • Installed Capacity: • Location: • Runtime: • Year: 56 MWp Satu Mare, Transylvania, Romania 5 months July-Nov/ 2013 Calabria Solar I y II. 2 Photovoltaic Power Plants • Installed Capacity: • Location: • Runtime: • Year: 38.43 MWp San Floro, Calabria, Italy 2.5 months 2012-13 Difesa I y II. 22 Photovoltaic Rooftops • Installed Capacity: • Location: • Runtime: • Year: 19.79MWp Italy 2 months Nov-Dec/ 2012 EPC Bester Contact locations