Presentación de PowerPoint

Transcription

Presentación de PowerPoint
EPC Bester
Business Line
Index
•
Why Bester?
•
Organizational chart
•
Technical Solution
•
Suppliers
•
Engineering
•
Construction
•
Operations & Maintenance
•
Internals Protocols
•
Experience
•
Contact
EPC Bester
Why Bester?
Long experience
in big projects
around the world
Financial
availability
Tested technical
solution
Everything is
ready (Design,
Purchasing,
Logistic,
Insurances, …)
Large suppliers
EPC Bester
Organizational chart
BOARD OF DIRECTORS
COMMITTEES
CEO
AUDIT
RISK
Business
Development
Director
Operations
Director
COMPENSATION
Engineering
Civil
Mechanical
Electrical
EPC
EPC
Construction
Biomass
Wind
Solar
Small Hydro
Substations
Commissioning
Corporate
Director
O&M
National
International
Systems &
Control
Finance
Controller
Tresasury
Fiscal
Suppliers
Procurement
Administration
Human Resources
Marketing &
Comunications
IT System
Logistic
Legal
Quality
EPC Bester
Technical Solution
Project Lifecycle
STUDY
EXECUTION
ENGINEERING & PROCUREMENT
CONSTRUCTION
O&M
STARTUP
SERVICE
Information
Engineering
Project scheduling
Weekly monitoring report
Logistics
TODAY
Hand-Over
EPC Bester
Suppliers
Modules
Jinko
Factories:
Eficiency:
Low:
14%
Medium: 15%
High:
16%
Jinko module
16.19%
(market clasification)
1.
2.
3.
4.
America
Europe
Africa
China
Japan
Total Capacity
4.6 GW/year
Strong Capacity: 4.6 GW/year
Strong Financial statments
High eficiency of product
Strong Agreement with Bester
EPC Bester
Suppliers
Inverters
LT-i - Aros - ABB
1.
2.
3.
4.
5.
Strong Company
Strong Financial Statements
High eficiency of product (99.2%)
Experience in similar conditions (cooling system)
Strongs Agreement with Bester Generacion:
EPC Presentation
Suppliers
Structure
Capacities:
Universal:
Axial:
Asebal:
1.
2.
3.
4.
5.
2,700 MW/year
1,800 MW/year
1,000 MW/year
Total capacity of
manufactures
5,500 MW/year
Our design (according to the site conditions)
Strong Companies
Strong Financial Statements
High quality
Agreement with Bester Generacion:
EPC Bester
Suppliers
Structure
Bester design
EPC Bester
Suppliers
Structure
Machines (accuracy and speed)
EPC Bester
Suppliers
Structure
Machines (accuracy and speed)
EPC Bester
Suppliers
Structure
Installation process
EPC Bester
Suppliers
Cables
1.
2.
3.
4.
5.
Strong Companies
Strong Financial Statements
High quality
International presence
Strong Agreement with Bester Generacion:
EPC Bester
Engineering
Design
Completely closed design by Bester Engineering Department
Considerations:
Maximun production and Minimum area
EPC Bester
Engineering
Design
Layout of a complete plant
EPC Bester
Engineering
Design
Layout of a plant
EPC Bester
Engineering
Design
Single Line and selection cables
EPC Bester
Construction
Project structure
Operations
Director
Civil Works
Mechanical Works
Electrical Works
EPC Bester
Construction
Report
Weekly report for advancing
•
•
•
•
Evolution maping
Production tables (%)
Pictures
Many information and details available for
the investor
EPC Bester
Construction
Report
Weekly report for advancing
PV PLANT SPRIGGS FARM (UK)
PHOTO REPORT
EPC Bester
Construction
Report
Weekly report for advancing
EPC Bester
Operations and Maintenance
Control rooms
•
•
•
Monitoring 24hx 365 days
Control Room on site
Control Room at project location
Control Room in Bester´s Headquarters
EPC Bester
Operations and Maintenance
Scope
Cleanning system
•
•
•
Work continuosly and automatically
•
Certified product
•
Accepted by module´s manufacture
•
•
Satisfactory result in similar areas
Tested product
EPC Bester
Operations and Maintenance
Scope
Basic works
• Revision of inverter status
• Revision of Juntion box
• Supervision of modules using drones
• Thermografic supervisión of modules to prevent faults
EPC Bester
Operations and Maintenance
Reports
Reports to control status
•
Continuosly and automatically reports with:
•
Information of Production
•
Information of Eficiency; actual, weekly, monthly, yearly, …
•
Incidents and actions
•
•
All reports to guaranty:
EPC Bester
Internal Protocols
Management Systems
Bester has Protocols for:
•
•
•
Quality of the solution and works
Health and Safety on site
Human Resources regulation (legal localy and internal)
QUALITY, ENVIRONMENT, AND OCCUPATIONAL RISK PREVENTION POLICIES
Quality Management System
Occupational Health and Safety Assesment Series
Environmental Management System
Quantification and reporting of
greenhouse gas emissions and removals
EPC Bester
Experience
Worlwide projects
More than 3000 MW of experience in renewable energy projects
27
EPC Bester
Experience
Trackrecord (MW)
Before 2010
+ 1500 MW
20
250
172
95
116
12
20
5
64
18
116 112
10.5
5
5
1.5
122
122
65
5
1000
200
1132
2010-2016
DEVELOPMENT
1000
100
14
138
120
EPC
xxx
O&M
28
EPC Bester
Experience
Relevant Projects
Rolleston. 1 Photovoltaic Power Plant
• Installed Capacity:
• Location:
• Runtime:
• Year:
18 MWp
Burton on Trent, Staffordshire, United Kingdom
3 months
Jan-March/ 2015
Rose Cottage. 1 Photovoltaic Power Plant
• Installed Capacity:
• Location:
• Runtime:
• Year:
28 MWp
Wales, United Kingdom
5 months
Jan-May/ 2014
Aricestii. 3 Photovoltaic Power Plants
• Installed Capacity:
• Location:
• Runtime:
• Year:
27 MWp
Aricestii Rahtivani, Muntenia, Romania
5 months
August-Dec/ 2013
EPC Bester
Experience
Relevant Projects
Solaris. 1 Photovoltaic Power Plant
• Installed Capacity:
• Location:
• Runtime:
• Year:
56 MWp
Satu Mare, Transylvania, Romania
5 months
July-Nov/ 2013
Calabria Solar I y II. 2 Photovoltaic Power Plants
• Installed Capacity:
• Location:
• Runtime:
• Year:
38.43 MWp
San Floro, Calabria, Italy
2.5 months
2012-13
Difesa I y II. 22 Photovoltaic Rooftops
• Installed Capacity:
• Location:
• Runtime:
• Year:
19.79MWp
Italy
2 months
Nov-Dec/ 2012
EPC Bester
Contact
locations

Similar documents