to the case study. - Bilfinger Mauell Corporation
Transcription
to the case study. - Bilfinger Mauell Corporation
BILFINGER MAUELL CORPORATION –––––– DICKSON ELECTRIC SYSTEMS –––––– CASE STUDY Sum of Order •(12) 46” HD (1920x1080) LCD Panels arranged in dual 2x3 arrays with adjustable pull-out mounts • (4) 60” LED-based Smart HDTV with tilt wall mounts • Nexus Display Wall Controller • (4) Vented Rack Shelves • Distribution Amplifiers and Multimedia Speaker System • (2) 55” LED-based Smart HDTV with fixed wall mounts • Full-range ceiling speakers • (2) 60” LED-based Smart HDTV with wall mounts • (1) Dual-Position Primary Operator Console • (1) Dual-Position Secondary Operator Console •(1) Single-Operator Control Supervisor Console with Storage Credenza • (1) Conference Table • Large and Medium sized storage credenzas • (3) 3D Blu-Ray DVD player • DVI/HDMI cabling • Communication cabling Construction Period May 2013 – May 2014 Dickson Electric Systems upgrades to first full control room. Overview Dickson Electric Systems has an eye on the future. Through telemetry improvements in the field and deployment of an Outage Management System, DES needed a formal control room. They turned to Bilfinger Mauell Corporation to design a space within their existing building. Working with DES’s architect, Bilfinger Mauell engineered a space to accommodate 2 separate control theaters, a supervisor office, war room, and training space. Bilfinger Mauell was also awarded the supply of the systems and worked directly with DES’s architect and general contractor to manage phasing schedules and oversight of the final construction. 1 2 6 7 5 11 8 13 10 9 Improvements Final Solution ( This was an unfamiliar project for Dickson and their first experience with a full control room. Bilfinger Mauell took this into consideration, guiding the process and relieving stress levels. Bilfinger Mauell updated DES to a new system of video panels, which replaced the old system of computers and physical maps. Dickson was provided with an improved console system for its new control theater. Control Theater 1 HD LCD Panels in 2x3 arrays with adjustable mounts 2 LED-based HDTV, tilt wall mounts 3 Nexus Display Wall Controller 4 Audio/Visual System 5 Primary Operator Console 6 Secondary Operator Console 7 Storage Credenzas (large and medium) Successes Bilfinger Mauell oversaw much of the work done by outside companies, including the creation of construction documents with a local A/E firm, for DES to use with a general contractor. Bilfinger Mauell also converted what was originally a spacious basement into a complete control room with other necessary and useful rooms built in, such as a meeting and training rooms. Thanks to Bilfinger Mauell, Dickson’s system restoration process has been quickened by at least 4 hours over previous outages of similar magnitude. The Companies Dickson Electric Systems is a Tennessee public utility distributing electricity to 35,000 homes, businesses, and industries across five counties. Bilfinger Mauell Corporation engineers, deploys, and supports mission critical control rooms within life services industries. Power Systems Bilfinger Mauell Corporation 31 Old Cabin Hollow Road · Dillsburg, PA 17019 · USA Phone: 717-432-8686 · Fax: 717-432-8688 [email protected] · www.mauell-us.bilfinger.com = not shown) War/Storm/Conference Room 8 LED-based HDTV, fixed wall mounts 9 Audio System 10 Conference Table Training Room 11 LED-based HDTV 12 Audio/Visual System 13 Training desks Supervisor Office 14 Audio/Visual System Control Supervisor Room 15 Single-operator Control Supervisor Console (w/ storage credenza) Bilfinger Mauell also assisted in the Mechanical and IT Room designs, a storage closet and added corridor, and a complete restroom renovation.
Similar documents
bilfinger in north america
Bilfinger develops, builds, maintains and operates plants and buildings for infrastructure, real estate, industry and the energy sector. From hospitals to refineries, from Alaska to Australia, from...
More information