The Rivers - Stage 4 Building Design Guidelines
Transcription
The Rivers - Stage 4 Building Design Guidelines
Building Design Guidelines Family Lots The Rivers - Stage 4 Lots 1070, 1157 to 1192, 1195 to 1202, 1305 to 1307, 1323 to 1325 and 1331 to 1333 (inclusive) Rev. 23 January 2015 MillBridge Private Estate - Building Design Guidelines The Rivers Stage 4 Family Lots - 23 January 2015 Family Lots (coded R20) Provisions These building design guidelines (Guidelines) have been adopted to achieve the urban design vision shared by the Shire of Dardanup (the Shire) and Ardross Estates (SA) Pty Limited (the Developer) for MillBridge Private Estate and are intended to be annexed to each contract for the sale of land in the Estate (Contract). Setbacks These Guidelines explain this vision to lot owners and ensure similar standards are maintained for the contract, it is a requirement for each lot owner to ! for Planning Approval or a Building Licence. Background MillBridge Private Estate, situated on the banks of the Collie River and Millars Creek, envisages a high " " # These Guidelines have been adopted to secure a character of the Estate and its environs. It is intended that subsequent stages of the development of the MillBridge masterplan will also be subject to design guidelines maintaining high standards of urban design throughout the Estate. Purpose These provisions primarily protect the landscape " $ % an appropriate style of housing, including materials # maintaining a consistent quality of development & " Setbacks are to be dealt with in accordance with ' % * (R-Codes) and Shire policies. Dwelling size +/4 otherwise expressly stated in the applicable Deed of ' % The minimum dwelling size is 155 square metres. This area is measured over the external walls assuming a 230mm external wall thickness but excludes the area of any porches, garages, carports, eaves, verandas, pergolas, storerooms, outbuildings or unenclosed areas. Al-fresco dining areas will not be included for the or not the al-fresco dining area is contained either wholly or partly under the main roof of the residence. Building Form In keeping with the typically Australian landscape Australian house designs are favoured along with the 6 Housing designs other than simulated Mediterranean, Renaissance, Georgian, Tuscan and Tudor styles are encouraged. The external walls of the dwelling, except for glazing, windows or minor features, must be constructed in either double brick, brick veneer, reverse brick veneer, rammed earth, rammed limestone, stonework or painted/coloured render, or other Roof Form In harmony with the general principles of house design as outlined above, the dominant roof area must have a minimum pitch of 24.4 degrees (or other pitch as ; < = > Buyer’s initials ................... 2 Seller’s initials .................... MillBridge Private Estate - Building Design Guidelines The Rivers Stage 4 Family Lots - 23 January 2015 ? @K workshop or outbuilding, except in the case of a N OQU V ! / provided that they do not detract from the visual amenity of the Estate. The use of eaves is strongly encouraged. /4 where: - it is no higher than 3.0m above natural ground level; - no greater than 9.0m in length; and - has been approved by the Local Authority. in the R-Codes) or within 7.5m of a boundary adjoining a Reserve must be constructed in the same materials as the main dwelling. Y + ]; Outbuilding(s) (including any detached garage, workshop, garden shed, storage shed or the like) that is setback more than 10.0 metres (in the case of a Primary Street Boundary or 7.5 metres in the case of a Secondary Street \ > '>%; from a Road Reserve must be constructed using either the same materials as used in the main dwelling or%Kor similar materials using a colour that complements the colour/s of the main dwelling. • Garaging and Access Driveways and car parking must be designed to achieve the following: • Crossovers and driveways to be constructed 6 concrete or similarly earth-shaded material. Clay brick or concrete block paving is also / Y Z/ or “Tilt-A-Door” facing the driveway must be provided under the main dwelling roof and must accommodate at least two cars side> materials as used in the rest of the dwelling. All outbuildings must comply with the Shire < ^ ! ? Z District Scheme, clause 4.12 “Outbuildings in '@_ Landscaping All areas that are visible from Public or Road Reserves must be completely landscaped within ` ]6; Please note that the verge must be landscaped in accordance with the Shire of Dardanup verge policy. Primary Frontage noted on Figure 2 with a “P”. This is the main access and frontage for that property. Servicing Y% !& Y! / on certain corner lots, once approved by the Local Authority. Refer to Figure 2. Outbuildings • Outbuilding(s) (including any detached garage, workshop, garden shed, storage shed or the like) that are constructed within 10.0 metres of a Road Reserve (in the case of a Primary Street Boundary or 7.5 metres in the case of !! \> • Bin and drying areas must be concealed from public view. Y ! must be installed in a way that they are not visible from the adjoining Public Reserves or '' Y { > connected solar power system panels must be pitch of the roof of the residence and extend no higher than the ridgeline of the roof. Buyer’s initials ................... 3 Seller’s initials .................... MillBridge Private Estate - Building Design Guidelines The Rivers Stage 4 Family Lots - 23 January 2015 Refer to Figures 1.2 and 1.3. Y > must comprise either: - a split reverse cycle system with the condenser unit/s located on the ground and screened with landscaping to conceal them so that they are not visible from the adjoining Public Reserves or Road Reserves; or > so that no part of the unit extends above the roof ridgeline. Fencing • • * Face brick, face block or rendered brick or blockwork; or brick, face block or rendered brick or blockwork. • In the case of Lot 1157, 1.2m high charcoal coloured pool fence which is to be installed by the Developer, but not prior to the commencement Fencing forward of the Primary Street setback must be in accordance with the R-Codes. Y * 6 " Brushwood Fencing on the secondary street boundary (refer to Figure 2), fencing to side and rear boundaries shall be constructed using either: Gates • * V} ! Any gates in road facing fences installed with Hardifence™ System must be clad or covered in similar materials and painted to match the fence %K 6 %KV K fencing system. The fencing must be painted with two coats of 100% PVC acrylic Dulux paint, 6 %K V K '' and must / painted with enamel paint in a matching colour. Hardifence™ must terminate in accordance with Figures 1.1 to 1.3 - Fencing Control Details; or • In the case of brick / blockwork the gates must either be clad in Hardifence™ and be painted with two coats of 100% PVC acrylic Dulux paint, or similar, in a colour that is Dulux Colorbond V Kor %K %KV K * Brushwood Fencing installed in accordance • with the details in Figures 1.4. to 1.6; or * Face brick, face block or rendered brick or blockwork, in a colour similar to natural limestone. • In the case of those corner lots requiring Brushwood Fencing on the secondary street ] ; " / Any gates in road facing fences must be clad or covered in similar material or painted to match the fence in the case of brick / blockwork Y V} ! / within four (4) metres of the boundary of any road reserve, unless: a) it is part of a common boundary fence Secondary Street boundary of a corner lot, or Any gates in road facing fences installed with Brushwood must either be clad or covered in a similar material or = and painted to match the Brushwood fence Lots adjoining Public Reserves (where applicable) < Uniform Fencing along Lot boundaries that adjoin ^ ' ' = ? 4 The Lot Owner may not modify this fencing in any manner whatsoever and is solely responsible for the ongoing maintenance of both sides of the Uniform Fencing. b) it is in fact the Secondary Street boundary fence. Buyer’s initials ................... 4 Seller’s initials .................... MillBridge Private Estate - Building Design Guidelines The Rivers Stage 4 Family Lots - 23 January 2015 - Dwellings constructed on lots located within 100 metres of Millars Creek may be subject to a BAL. The Shire will assess the BAL for all plans that are /\^ < ! Deposited Plans 404751 or 404752. The general _ within the Deposited Plans, however individual lots > <\]; engineering details and earth working as required by their structural engineers. The Seller shall not be liable to compensate the ]; 6 " builder. The lot owner is required to include the following items in its building contract for pre-provisioning of landscaping: > controller box located on the driveway side of the dwelling. - a minimum 90mm diameter conduit under the driveway located one metre from the road reserve boundary of the lot, and in the case of /6 must be located one /6 inside the lot. - a “stop gate” and “T” valve joint (next to the water meter) along with the plumbing for the a powerpoint in the electrical meter box for ? < ]?<; Refer to Figure 3 for more detail on the requirements > The lot owner is to make his agents / consultants / contractors / sub-contractors and suppliers aware of the following: O + the Developer shall not be raised or lowered by Q cellar / basement contained wholly under the <6 " 2. During building, the lot owner must maintain or cause to maintain, a skip bin on the building site and must ensure that at least daily, and more frequently in windy weather, all waste materials that may blow onto roadways, reserves and adjoining lots are collected and properly disposed of. The lot owner will be held responsible for any costs incurred by the Developer or Shire in roadways, reserves or adjoining lots. Z <! $1,000 where / ' ]4/ 1979). The lot owner is required to include the following items in its building contract for pre-provisioning of > '%Q^% adjacent the electrical meter box. Buyer’s initials ................... 5 Seller’s initials .................... MillBridge Private Estate - Building Design Guidelines The Rivers Stage 4 Family Lots - 23 January 2015 Secondary Street boundary Figure 1 - Fencing Control Details B A not drawn to scale C Lot 1 Primary Street boundary corner lot Lot 3 Lot 2 A Figure 1.1 V>< Lot 4 4 metres fence setback 6 metres PLAN kerb roadway pavement Figure 1.3 V><% landscaped verge building setback corner road reserve roadway pavement ELEVATIONS secondary street boundary +O kerb Lot boundary adjoining verge natural ground level Dual Use Path (where applic.) 900mm 1,600 to 1,800mm ELEVATION Dual Use Path (where applic.) + Figure 1.2 V><\ Fence taper 900mm 1,600 to 1,800mm Road Reserve natural ground level 900mm 2 metres fence taper 1,600 to 1,800mm Lot boundary A Road Reserve natural ground level 2 metres road reserve Road Reserve Lot boundary secondary street boundary Lot boundary Lot boundary re et m 5 8. adjoining Fencing panels are all 1,600 to 1,800mm above natural ground level - no tapering required Lot boundary (secondary street) PLAN corner lot PLAN TYPICAL SECTION Finished Ground Level Figure 1.5 Finished Ground Level BRUSHWOOD FENCING ELEVATION Finished Ground Level Figure 1.4 TERMINATION DETAIL PLAN Figure 1.6 6 Buyer’s initials ................... Seller’s initials .................... MillBridge Private Estate - Building Design Guidelines The Rivers Stage 4 Family Lots - 23 January 2015 Cree k Legend 155m² minimum dwelling area Retaining Wall P Millars Primary Frontage Brushwood fencing on top of limestone retaining walls 1.2m pool fence on top of limestone retaining walls !/ BW PF 9 ?/ Tree pit TP NORTH 9 23.3 6 22.7 8 35.1 4 1090 1 2 1 0.39 4 20.1 700m² 34.7 4 6 700m² 34.7 6 700m² 34.7 1209 4 4 6 20.1 6 4 6 1214 20.1 20.1 34.7 4 21.3 0 739m² 34.7 8 700 1216 1208 683m² 15.3 12 2 6 7 1215 20.1 34.7 21.3 0 740m² Finla y 6 1207 1 34 4 21.3 0 740m² 4 21.3 0 1206 34.7 21.3 0 9 9 15.6 0 21.3 Aven ue 21.3 0 5 20.1 0 0 21.3 6 34.4 19.6 682 m² 740m² 34.7 733m² 733m² 1195 1205 1199 0 21.3 21.3 0 21.3 21.3 0 8 4 5 2 15.9 0 21.3 5 20.1 20.1 5 34.3 8 P P 20.1 1 21.8 14.7 5 Kana lla A venu e 6 1197 34.67 740m² 34.7 731m² 1198 680m² 1204 1200 1196 BW 6 34.3 735m² 28.74 1095 738m² 34.7 730m² TP 20.1 5 P 6 1203 1201 34.6 P 28.7 730m² 34.5 1193 8.5 P 9 4 25.6 4 31.9 3 31.6 715m² 17.1 28.1 9 1305 3 3 5 20.1 5 20.1 25.8 2 31.0 25.0 31.0 20.1 5 20.1 9 5 20.1 5 20.1 5 20.1 23.1 1213 702m² 1211 34.7 6 20.2 6 31.8 8 22.5 1202 2 12 70 TP 1212 1136 1228 7 1137 1096 3 723m² 25.5 3 20.1 3 20.1 3 20.1 5 1194 716m² P 34.2 0 1135 1091 20.5 20.5 3 3 8.5 573 ² 20.5 35.3 20.5 3 1 700m² 6 9 729m² P P TP 1192 34.7 22.5 1092 11.4 7 8.5 6 35.5 2 717m² 6 17.4 TP 1097 Drive TP TP 27.7 31.7 8 25.5 17.5 17.5 8 579m² 8 20.6 1 17.5 17.5 34.0 28.1 743m² 23.9 1094 34.7 8.5 1072 1093 1191 700m² 700m² 704m² 6 5 Way 17.5 11.7 1071 33.9 1079 8 1190 6 1178 22.5 593m² Lila 18.0 6 34.7 1 2 8.5 34.7 700m² 1179 34 23.4 .76 8.5 17.5 6 27.7 33.8 1073 6 8.5 8.5 17.6 1 17.3 595m² 20.1 20.1 3 9 700m² 1180 34.7 8.5 21.2 703m² 22.7 34.7 700m² CPhes BW tnut P Boul 1070 578m² evar d P TP 1189 1181 700m² 11.2 9 TP 19.6 4 6 6 21.1 8 17.3 1176 34.7 19.6 3 705m² 1182 6 20.1 5 1177 700m² 20.1 5 19.9 6 6 23.2 3 1188 20.1 5 8.5 706m² 34.7 9 6 6 TP 1175 697m² 700m² 34.7 34.7 20.1 5 6 22.7 1161 20.1 3 700m² 34.7 1187 1183 3 1174 1162 6 Mya no 20.1 3 6 34.7 20.1 6 6 700m² 700m² TP 5 34.7 6 re W ay 3 20.1 3 20.1 34.7 34.7 23.5 3 20.1 3 3 20.1 3 1163 20.1 5 20.1 3 20.1 Cres 20.1 3 1173 700m² 700m² BW TP 6 6 691m² P 34.7 28.7 1186 702m² 34.7 700m² TP 720m² 17.1 1184 24.7 9 8.5 1164 24.9 9 1172 700m² 700m² 6 TP 5 1306 1 702m² 20.1 5 3 20.1 28.7 6 6 2 674m² 34.7 700m² 30.9 13.8 7 1160 1165 5 1185 34.7 1171 700m² 2 1 24.9 3 34.8 6 6 34.7 19.8 19.8 9 692m² BW rove 6 1159 34.7 700m² 34.7 30.9 1 19.8 9 14.7 19.8 9 683m² 34.8 19.8 9 Haze lg 1158 700m² 1166 34.7 20.1 .89 32 8 5 8 .9 11.1 5 1170 28.7 11.2 0 .61 32.7 6 P P 6 2 8.5 30 TP 710m² 9 PF 1157 34.7 P 8.5 7 23.1 1307 TP 17.3 8.5 cent 34.7 700m² 707m² 7 Drive 9 8.5 TP 9 1323 8.5 699m² 1167 P 22.7 14.0 7 1169 14.7 6 6 TP 8 706m² 17.3 8.5 34.7 2 699m² Adel ine 28.75 20.6 1 14.6 1168 23.3 1324 8.5 P 9 9 7 707m² TP 80 22.7 1325 1 P 8.5 8 7 20.7 17.3 TP 0 ALL DISTANCES ARE IN METRES 23.3 25.0 8 5 9 721m² 22.7 28.7 20 9 20.1 5 P BW 8.5 1331 1 8.5 5 TP 9 720m² 17.3 TP 23.3 1332 720m² 31.6 1333 14.6 TP 31.6 25.5 9 BW 1138 1134 Ches tnut Figure 2 Buyer’s initials ................... 7 Seller’s initials .................... Figure 3 8 p. 1300 667 863 e. [email protected] w. www.lbnco.com.au Starter pipe Front boundary Builder to supply lead in conduit and connect to starter pipe LBNCo to supply NTD Builder to supply GPO in meter box HOUSE meter box • It is recommended that CAT5/6 cable is used for telephone. • It is recommended that CAT5e/6 cable is used for data / internet. • Voice & Data cable. • It is recommended that RG6 quad shielded coaxial cable be used for television cabling. • TV cable. • If more than one TV outlet is desired, it is recommended >/ • !" • Voice, data and TV cables connected from NTD to Smart Wire Hub. • Voice, data and TV distributed through home from Smart Wire Hub. • Smart Wire Hub. Builder / Owner recommended to supply: • TV cable from the NTD to TV outlet. • Telephone cable from the NTD to telephone outlet. • Data cable from the NTD to the data/internet outlet. ! % • #%#%" • '!*+'" LBNCo to supply: • DIN Rail GPO in the electricity meter 6 ? < (NTD). • Power point for NTD. • $ '%Q^% pipe (ID 23.3mm) to match the starter pipe from the Pit. • Must be installed at a minimum depth of 300mm and maximum depth of 500mm. • Radius of bends must be at least 300mm. • The conduit must be terminated adjacent to the electricity (power) meter box and at QQ • Lead-in conduit. Builder / Owner to supply as a minimum: Builder / Owner to supply "#$ • Voice, Data and TV. INSIDE THE HOUSE OUTSIDE THE HOUSE NOTE: AS AT THE DATE OF ISSUE OF THIS INFORMATION, TELSTRA DO NOT OFFER FIXED LINE SERVICES TO THE LOTS ON THIS DEPOSITED PLAN Issued 1 January 2015 INFORMATION FOR BUILDERS AND HOMEOWNERS MillBridge Private Estate - Building Design Guidelines The Rivers Stage 4 Family Lots - 23 January 2015 Buyer’s initials ................... Seller’s initials ....................