November 10, 2014
Transcription
November 10, 2014
AGENDA REGULAR MEETING OF THE BOARD OF DIRECTORS LA PUENTE VALLEY COUNTY WATER DISTRICT 112 N. FIRST STREET, LA PUENTE, CALIFORNIA MONDAY, NOVEMBER 10, 2014 AT 5:30 PM 1. CALL TO ORDER 2. PLEDGE OF ALLEGIANCE 3. ROLL CALL OF BOARD OF DIRECTORS President Rojas____ Vice President Escalera ___ Director Aguirre____ Director Hastings 4. Director Hernandez____ PUBLIC COMMENT Anyone wishing to discuss items on the agenda or pertaining to the District may do so now. The Board may allow additional input during the meeting. A five-minute limit on remarks is requested. 5. ADOPTION OF AGENDA Each item on the Agenda shall be deemed to include an appropriate motion, resolution or ordinance to take action on any item. Materials related to an item on this agenda submitted after distribution of the agenda packet are available for public review at the District office, located at the address listed above. 6. APPROVAL OF CONSENT CALENDAR There will be no separate discussion of Consent Calendar items as they are considered to be routine by the Board of Directors and will be adopted by one motion. If a member of the Board, staff, or public requests discussion on a particular item, that item will be removed from the Consent Calendar and considered separately. 7. A. Approval of Minutes of the Regular Meeting of the Board of Directors held on October 27, 2014. B. Approval of District Expenses for the Month of October 2014. C. Approval of City of Industry Waterworks System Expenses for the Month of October 2014. D. Receive and file the District’s Water Sales Report for October 2014. E. Receive and file the City of Industry Waterworks System’s Water Sales Report for October 2014. ACTION/DISCUSSION ITEMS Page 1 of 3 8. A. Update from the Ad Hoc Committee on the Puente Valley Operable Unit Intermediate Zone Project. Recommendation: Board discretion. B. Consideration of a proposed Joint Special Board of Directors meeting with Rowland Water District’s Board of Directors on November 18, 2014 at Rowland Water District’s office at 6 p.m. to discuss the Puente Valley Operable Unit Intermediate Zone Project. Recommendation: Approve Joint Meeting with Rowland Water District. C. Consideration of the Third Tolling Agreement with BKK Working Group to Toll Potential Liability at the BKK Landfill Facility. Recommendation: Approve of Third Tolling Agreement. D. Update on the District’s Wellfield Operations and Repair Activities (oral report). Recommendation: Board discretion. E. Update on Proposed Recycled Water System (oral report). Recommendation: Board discretion. FIELD OPERATIONS REPORT Recommendation: Receive and file report. 9. ADMINISTRATIVE REPORT Recommendation: Receive and file report. 10. GENERAL MANAGER’S REPORT (Oral Report) 11. OTHER ITEMS A. Upcoming Events. B. Correspondence to the Board of Directors. C. Newspaper Articles. 12. ATTORNEY’S COMMENTS 13. BOARD MEMBER COMMENTS A. Report on events attended. B. Other comments. 14. FUTURE AGENDA ITEMS 15. CLOSED SESSION A. Conference with Real Property Negotiator pursuant to Government Code §54956.8. Property: 108-112 N. First Street and 15841-15843 Main Street, La Puente: Assessor Parcel No. 8246-009-008. 124 N. Second Street, La Puente: Assessor Parcel No. 8246-008-012. Page 2 of 3 126 N. Second Street, La Puente: Assessor Parcel No. 8246-008-013. Agency Negotiator: Greg Galindo Negotiating Parties: Charles Klinakis Under Negotiation: Price and Terms of Payment. 16. REPORT ON CLOSED SESSION 17. ADJOURNMENT POSTED: FRIDAY, NOVEMBER 7, 2014 PRESIDENT WILLIAM R ROJAS PRESIDING. Any qualified person with a disability may request a disability-related accommodation as needed to participate fully in this public meeting. In order to make such a request, please contact Mrs. Rosa Ruehlman, Board Secretary, at (626) 330-2126 in sufficient time prior to the meeting to make the necessary arrangements. Note: Agenda materials are available for public inspection at the District office or visit the District’s website at www.lapuentewater.com. Page 3 of 3 Page 1 of 5 MINUTES OF THE REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE LA PUENTE VALLEY COUNTY WATER DISTRICT A regular meeting of the Board of Directors of the La Puente Valley County Water District was held on Monday, October 27, 2014 at 5:30 at the District office, 112 N. First St., La Puente, California. Meeting called to order: President Rojas called the meeting to order at 5:30 pm. Pledge of Allegiance President Rojas led the meeting in the Pledge of Allegiance. Directors present: William Rojas, President, John Escalera, Vice President; Charlie Aguirre, Director; David Hastings, Director and Henry Hernandez, Director. Staff present: Greg Galindo, General Manager; Rosa Ruehlman, Board Secretary and Roland Trinh District Counsel. Others Present: No members of the public were present. Adoption of Agenda: President Rojas asked for the approval of the agenda. Motion by Director Aguirre seconded by Vice President Escalera, that the agenda be adopted as presented. Motion approved by following vote: Ayes: Rojas, Escalera, Aguirre, Hastings and Hernandez, Nays: None. Consent Calendar: President Rojas asked for the approval of the Consent Calendar: A. Approval of the Minutes of the Regular Meeting of the Board of Directors held on October 13, 2014. Motion by Director Hernandez seconded by President Rojas, that the agenda be adopted as presented. Motion approved by following vote: Ayes: Rojas, Escalera, Aguirre, Hastings and Hernandez, Nays: None. Financial Reports: A. Summary of Cash and Investments as of September 30, 2014. • Mr. Galindo presented the cash balances and investments for La Puente is $2,589,855 and Industry is $173,298. He added the low balance for Industry is due to the reimbursement paid to the City of the net proceeds from the water system in 2013. Minutes – October 27, 2014 Page 2 of 5 Motion by Director Aguirre, seconded by Director Hernandez to receive and file the Summary of Cash and Investments as of September 30, 2014 as presented. Motion approved by following vote: Ayes: Rojas, Escalera, Aguirre, Hastings and Hernandez, Nays: None. B. Statement of the District’s Revenues and Expenses as of September 30, 2014. • Mr. Galindo provided a summary of the District’s financials; revenues are at $2,680,837 and expenses are $2,665,325 for a net operating income at month end is $3,898. Motion by President Rojas, seconded by Director Hernandez to receive and file the Statement of the District’s Revenues and Expenses as of September 30, 2014 as presented. Motion approved by following vote: Ayes: Rojas, Escalera, Aguirre, Hastings and Hernandez, Nays: None. C. Statement of the City of Industry Waterworks System’s Revenues and Expenses as of September 30, 2014. • Mr. Galindo provided a summary of the CIWS Financials; revenues are at $1,360,379 and expenses are $1,133,224 for a net operating income at month end is $227,154 which is 63% of the budget. Motion by President Rojas, seconded by Director Hastings to receive and file the Statement of the City of Industry Waterworks System’ Revenues and Expenses as of September 30, 2014 as presented. Motion approved by following vote: Ayes: Rojas, Escalera, Aguirre, Hastings and Hernandez, Nays: None. Action/Discussion Items: A. Update on the Puente Valley Operable Unit Intermediate Zone Project. • Mr. Galindo shared there was a kick off meeting, where he met with the project team working on behalf of Northrop Grumman (Northrop) who is doing the design of the proposed treatment plant. He learned from that discussion that six wells have already been drilled and equipped. These wells are in the public right of way in vaults and all their motor control panels are above grade. He reported that to date, none of these sources have been approved under the permitting process of DDW. He added since the District will be operating the facility, we will coordinate with DDW on the permitting process. • Mr. Galindo shared that during that meeting a plan was discussed on how to move forward. Also discussed was the CEQA process. To date, there is no CEQA process completed for this treatment facility, pipelines or for the wells planned to be utilized There are also plans to drill a 7th well There were also discussions on who should be the lead agency for the CEQA process. This would require all planned work to be presented to this Board for it to take action on the CEQA documents and hold the required public hearings. Mr. Galindo stated that the first agreement that needs to be formalized will be to establish how Northrop will compensate for the District’s involvement on this project until it is operational. • Mr. Galindo reported that there is what is called a Section 28 process that must be completed though Watermaster, which includes an application to operate a water treatment facility within the Main San Gabriel Basin and what would be required of us to coordinate this. Minutes – October 27, 2014 Page 3 of 5 • Mr. Galindo reported that Rowland Water District would prefer that we have a joint meeting with the two Boards at their office. He asked District Counsel what is required to have a meeting outside of our service area and can the Board meet as long as it is an informative meeting with no action taken. Mr. Trinh responded that is correct. Mr. Galindo stated the recommendation is to have the joint meeting on Tuesday, November 18, 2014 in the evening. Staff will agenize and post this meeting. Mr. Galindo stated that Northrop Grumman would be providing a presentation of the project. During Board discussion, there was consensus to hold a joint meeting with Rowland Water District at their office on November 18th at a tentative time of 5 p.m. Information only, no action required. B. Discussion on Participation in Upcoming Community Events. • Mr. Galindo shared a list of community events prepared by the Board Secretary, which included the City of La Puente events for the coming year. He stated that with the upcoming projects in the District, he felt it might be a good idea to be more involved with the community. • Mr. Galindo recommended having staff work some of the events such as the Little League Parade, Relay for Life, Main St. Run and the Holiday Parade. He stated that these events would be a lot of good exposure due to the huge crowds. • Mr. Galindo shared how the District could be involved, such as having a booth with our logo and have some water conservations giveaways and information on rebate programs. • President Rojas commented that the next event is the Holiday Parade. He asked besides having vehicles in the parade is there a booth the City puts up. Mrs. Ruehlman responded that we would be the ones to put up a booth in from of our office at no cost. She added that there is no charge to be part of the parade, we just need to be one of 60 participants to be in the parade. • President Rojas stated that if Staff can provided some ideas and cost. Mr. Galindo responded that Staff will put together cost for the canopy and select the appropriate giveaways for the upcoming Holiday Parade and based on this event, we will be able to determine the cost for the coming year. • President Rojas asked is $20,000 what is allotted for Public Outreach each year. Mr. Galindo responded that money is also used for conservation programs such as the UHET and this year we did not distribute as many toilets, so there is funds left over. During the discussion the Board and Staff shared some ideas such as pictures of the District’s plant and history about the District and staff will provide costs for doing an event. Discussion only, no action required. General Manager’s Report: Mr. Galindo presented his report. • He provided a summary of the UHET program. • Recycled Water System for Don Julian - He is still awaiting the final list of prop 84 grant award funding. He is also having our Accountant, Cindy Byrruem look into financing for the project. • President Rojas asked when will we find out of the outcome on the funding. Mr. Galindo responded, we should have heard before November and due to some other regions having some issues regarding their awards, we will hopefully get word the 1st week in December. • ACE Grade Separation Project – there is a contract now, there was a groundbreaking ceremony to begin the project, there was a stakeholders meeting. The prime contractor will be performing utility locations by potholing to determine if there is a need to change the design of utility and once it is final then Staff will coordinate to relocate the 16” waterline. Minutes – October 27, 2014 Page 4 of 5 • Main San Gabriel Groundwater levels – He reported that every single week we hit a new historical low. The latest level recorded was 182.3 feet above sea level. • Mr Galindo reported that one of the employees Mr. Molina became a new dad to an 8lb 14oz girl. • He reported that Water Production and Treatment Supervisor Mr. Ortiz, passed his D-3 exam. Here will be certified for D-3 and T-3. • Staff Reorganization Plan – On October 1 five employees have completed their six month introductory period in their new positions and they have received adjustments to their compensation. Water Production and Treatment Supervisor: 5% adjustment, which equates to a salary increase of $282.88 per month and places it within Step 3 of this positions’ salary range; Water Distribution Supervisor: 4% adjustment which equates to a salary increase of $210.84 per month and places it within Step 2 of this positions’ salary range; Water Production and Treatment Operator II: 5% adjustment, which equates to a salary increase of $260.30 per month and places it within Step 5 of this positions’ salary range; Customer Service and Accounting Supervisor: 5% adjustment which equates to a salary increase of $284.20 per month and places it within Step 4 of this positions’ salary range; Field Operations Assistant: 5% adjustment which equates to an increase of approximately $84 per month and places the hourly rate within Step 2 of this positions’ salary range. All these employees will be evaluated in October 2015. Motion by President Rojas, seconded by Vice President Escalera to receive and file the General Managers report. Motion approved by following vote: Ayes: Rojas, Escalera, Aguirre, Hastings and Hernandez, Nays: None. Other Items: President Rojas stated that there are upcoming events, some news articles and information items for the Board to look over. A. Upcoming Events. • Mrs. Ruehlman provided an updated memo listing all the upcoming events that have been approved by the Board at prior meetings and who are attending. • Directors Rojas, Aguirre, Escalera and Hastings indicated they will attend the San Gabriel Valley Water Association on November 12th and the SCWUA on November 20th. B. Correspondence to the Board of Directors C. Newspaper Articles. Attorney comments: • Mr. Trinh provided an update on the acquisition of the Second Street property for a District office he added that he assisted the General Manager in preparing a real property exchange and purchase agreement Term Sheet. This will serve as a foundation for the agreement between the District and Charles Klinakis. It is a three page document that sets forth in real estate terms our understanding of the transaction. This will be presented to the Board and Mr. Klinakis when it is completed and each will be able to review and provided input and once it is completed, it will then be signed off to proceed with the framework of an agreement with the transaction. • Director Aguirre asked if we are dealing with Bill Klinakis or Charlie Klinakis. Mr. Galindo responded that we are dealing with both gentlemen. He has been in contact with Bill regarding the estimate on the construction and Charlie on the property with whom he will submit the Term Sheet. Minutes – October 27, 2014 Page 5 of 5 • • President Rojas asked will some of what is on the Term Sheet be the foundation for the purchase of the property. Mr. Trinh responded yes, it is all the key provisions such as price, term and exchange. Mr. Trinh stated that the Term Sheet is a future item for the next Board meeting. Board member comments: • Director Aguirre asked if Staff is going around checking for anyone wasting water. Mr. Galindo responded that as field staff is doing their rounds, they are looking out for any violations. Mr. Galindo also shared that if our staff notices someone wasting water, we give them a courtesy notice reminding them, we are in a drought and to please conserve. • Director Hastings, Vice President Escalera reported that they attended the SCWUA Meeting on October 16, 2014. • Director Aguirre asked if we could adjourn this meeting in memory of Peggy Reible, the first woman to serve on the City of La Puente’s Planning Commission. Future agenda items: • Mrs. Ruehlman stated there are two future agenda items. Set agenda for the joint meeting with Rowland Water District and the Term Sheet for the property on Second Street. Adjournment: There being no further business or comment, the meeting was adjourned 6:27 p.m. in memory of Peggy Reible a long time resident of La Puente and the first woman to serve on the City of La Puente’s Planning Commission. William R. Rojas, President Rosa B. Ruehlman, Secretary Minutes – October 27, 2014 La Puente October 2014 Disbursements Check # Payee 2233 2234 2235 2236 2238 2239 2240 2241 2242 2243 2244 2245 2246 2247 2248 2249 2250 2251 2252 2253 2254 2255 2256 2257 2258 2259 2260 2261 2262 2263 2264 2265 2266 2267 2268 2269 2270 2271 2272 2273 2274 2275 2276 2277 David H Hastings John P Escalera Charles Aguirre Henry P Hernandez ACWA/JPIA Alliance Communications Services Bobcat of Cerritos Bryan Press CCSInteractive Cell Business Equipment Chevron Collicutt Energy Services CV Strategies Delta Motor Co Eaton Corporation Eva's Cleaning Service Griffith Air Tool IDWTECH Industry Public Utilites Industry Tire Service InfoSend Merritt's Hardware O'Reilly Auto Parts Peck Road Gravel Platinum Consulting Group Registrar‐Recorder Resource Building Materials SC Edison Staples Underground Service Alert Valley Vista Services Verizon Verizon Vulcan Materials Company Weck Laboratories Western Water Works CV Strategies Maria Macaskill William R Rojas So Cal Sanitation Univar USA Weck Laboratories Weck Laboratories CAL/OSHA Amount $ 148.17 $ 206.73 $ 79.82 $ 133.58 $ 4,260.00 $ 57.50 $ 2,018.38 $ 102.19 $ 54.40 $ 62.32 $ 2,781.93 $ 1,741.12 $ 1,142.28 $ 475.00 $ 15,009.10 $ 410.00 $ 328.31 $ 125.00 $ 25,684.55 $ 18.00 $ 756.67 $ 111.49 $ 24.36 $ 80.00 $ 247.50 $ 16.00 $ 54.28 $ 12,830.42 $ 154.67 $ 47.25 $ 281.30 $ 241.46 $ 132.40 $ 552.59 $ 70.50 $ 4,302.31 $ 1,142.27 $ 13.64 $ 119.40 $ 140.00 $ 5,039.60 $ 3,282.50 $ 691.50 $ 1,170.00 Description CSDA Annual Conference Expenses 2014 CSDA Annual Conference Expenses 2014 CSDA Annual Conference Expenses 2014 CSDA Annual Conference Expenses 2014 Workers' Comp for 07/01/14‐09/30/14 Answering Service Equipment Maintenance Water Conservation Expense Monthly Website Hosting Office Expense Truck Fuel Generator Maintenance Water Conservation Expense Well Maintenance Well Maintenance Cleaning Service Equipment Maintenance Technical Support Web Payments September 2014 Truck Expense Billing Expense Field Supplies Truck Expense Asphalt & Concrete Disposal Administrative Support Release of Lien Field Supplies Power Expense Office Supplies Line Notifications Trash Service Telephone Expense Telephone Expense Field Expense‐ Concrete Water Sampling Hill St Hydrant & Valve Expense Water Conservation Expense Customer Overpayment Refund CSDA Annual Conference Expenses 2014 Restroom Service @ Treatment Plant Chemical Expenses Water Sampling Water Sampling Penalty Remittance La Puente October 2014 Disbursements ‐ continued Check # Payee 2279 2280 2281 2282 2283 2284 2285 2286 2287 2288 2289 2290 2291 2292 2293 2294 2295 2296 2297 2298 2299 2300 2301 2302 2303 2304 2305 2306 2307 2308 2309 2310 2310 2311 2312 2313 2314 2315 2316 2317 2318 2319 2320 2321 L.A. Co. Tax Collector State Water Resource Control Board So Cal Water Utilities Association Cesar A Ortiz ACWA/JPIA Airgas American Express Bank of America‐Visa Cell Business Equipment Civiltec Engineering E & M Tech Support InfoSend Jack Henry & Associates Lincoln National Life Insurance Company McCalls Meter Sales & Service MetLife MJM Communications & Fire Pac Comm Technologies Premier Access Insurance Co Reeb Government Relations Resource Building Materials San Gabriel Valley Water Company Staples State Water Resource Control Board Trench Plate Rental Co W.A. Rasic Construction Weck Laboratories Wesco Security Systems Western Water Works Petty Cash So Cal Water Utilities Association Cesar A Ortiz Cesar A Ortiz Johnny's Pool Services Inc SC Edison Staples Verizon Waste Management of SG Valley Eaton Corporation Grainger Jiffy Lube My Fleet Center Lagerlof, Senecal, Gosney & Kruse San Gabriel Valley EAC San Gabriel Valley Water Assoc Amount $ 4,106.65 $ 11,877.36 $ 100.00 $ 60.00 $ 27,589.96 $ 41.89 $ 2,752.80 $ 1,825.77 $ 75.82 $ 165.00 $ 4,070.68 $ 166.64 $ 37.50 $ 497.76 $ 703.78 $ 225.79 $ 600.00 $ 147.50 $ 2,533.56 $ 250.00 $ 289.55 $ 158.70 $ 100.80 $ 3,710.39 $ 220.10 $ 511.72 $ 274.00 $ 282.00 $ 506.00 $ 90.18 $ 75.00 $ 190.00 $ 163.00 $ 43.87 $ 24,737.87 $ 127.04 $ 288.51 $ 173.62 $ 800.00 $ 43.03 $ 43.82 $ 4,731.75 $ 95.00 $ 125.00 Description Property Taxes 07/01/14‐ 06/30/15 Discharge Permit Fee for Well 3 Prop 1 California Water Bond Seminar Reimbursement for Fuel Expense Health Benefits November 2014 Field Supplies Conference & Administrative Expenses Conference & Administrative Expenses Office Expense LPVCWD General Services Annual SCADA Maintenance Billing Expense Web E‐check Fee's Disability Insurance Meter Expense Life Insurance Security Monitoring Service Technical Support Dental Insurance Leglislative Advocacy Field Supplies Water Service @ Treatment Plant Office Supplies Water System Fee's Equipment Rental Hill St Hydrant & Valve Expense Water Sampling Security Monitoring Service‐ Office Hill St Hydrant , Valve & Inventory Expense Office/Field Expense 2014 Annual Membership Renewal T‐3 Certification & Exam Fee Reimbursement Clothing Allowance Reimbursement Chemical Expenses Power Expense Office Supplies Telephone Expense Trash Service Well Maintenance Field Supplies Truck Maintenance Attorney Fee's Seminar Expense Quarterly Luncheon La Puente October 2014 Disbursements ‐ continued Check # Payee Amount 2322 2323 2324 2325 2326 2327 2328 2329 Online Autodeduct Autodeduct Autodeduct Autodeduct Autodeduct Autodeduct Online Online Online Online SC Edison T‐Mobile Team Viewer US Verizon Verizon Wireless Western Water Works Cesar A Ortiz Cesar A Ortiz Home Depot Bluefin Payment Systems Wells Fargo Wells Fargo First Data Global Leasing Superior Press Co Intuit QuickBooks Lincoln Financial Group CalPERS Employment Development Dept United States Treasury Total Payables $ 2,475.37 $ 42.49 $ 1,159.20 $ 242.24 $ 252.05 $ 731.99 $ 187.00 $ 100.00 $ 245.66 $ 552.50 $ 657.17 $ 114.18 $ 61.04 $ 30.99 $ 235.80 $ 2,814.00 $ 9,955.44 $ 3,136.53 $ 20,898.18 $ 225,841.73 Description Power Expense Air Card SCADA Software Telephone Expense Cell Phone Expense Inventory Expense Reimbursement for Clothing Allowance D‐3 Exam Reimbursement Field Supplies Web Merchant Fee's Bank Fee's Merchant Fee's Credit Card Machine Lease Administrative Supplies Administrative Supplies Deferred Comp Retirement Program California State & Unemployment Taxes Federal, Social Security & Medicare Taxes La Puente October 2014 Payroll Check # Employee 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 10331 10332 10333 10334 10335 10336 10337 10338 10339 10340 10341 10342 10343 10344 10350 10351 10352 10353 10354 10355 10356 10357 10358 10359 Charles Aguirre David H Hastings Henry P Hernandez John P Escalera William R Rojas David H Hastings John P Escalera Charles Aguirre David H Hastings Henry P Hernandez John P Escalera William R Rojas David H Hastings John P Escalera William R Rojas Charles Aguirre David H Hastings Henry P Hernandez John P Escalera William R Rojas Albert J Vazquez Arturo B Briseno Jr Cesar A Ortiz Gina M Herrera Gregory B Galindo Keith R Bowman Miguel A Molina Raymond R Arvizo Rosa B Ruehlman Santiago E Loera Jr Shaunte L Maldonado Tiffany Y Groves Vanessa L Koyama William D Clark Albert J Vazquez Arturo B Briseno Jr Cesar A Ortiz Gina M Herrera Gregory B Galindo Keith R Bowman Miguel A Molina Raymond R Arvizo Rosa B Ruehlman Santiago E Loera Jr Amount Gross $ 471.39 $ 471.39 $ 471.39 $ 471.39 $ 461.39 $ 117.85 $ 117.85 $ 117.84 $ 117.85 $ 117.85 $ 117.85 $ 107.85 $ 117.84 $ 117.84 $ 107.84 $ 117.84 $ 117.85 $ 117.85 $ 117.85 $ 107.85 $ 1,400.46 $ 1,557.03 $ 2,511.43 $ 1,792.92 $ 4,015.45 $ 2,040.01 $ 1,564.60 $ 1,496.47 $ 2,341.33 $ 2,139.74 $ 1,312.64 $ 476.46 $ 712.21 $ 2,645.23 $ 1,735.92 $ 1,956.88 $ 2,979.20 $ 1,965.33 $ 4,015.45 $ 2,055.19 $ 763.80 $ 1,909.60 $ 2,341.34 $ 1,999.74 $ 510.44 $ 510.44 $ 510.44 $ 510.44 $ 510.44 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 127.61 $ 1,940.08 $ 1,841.84 $ 3,157.14 $ 3,081.50 $ 5,534.18 $ 3,174.90 $ 2,099.52 $ 2,160.34 $ 3,288.56 $ 2,824.82 $ 1,913.75 $ 646.79 $ 1,128.40 $ 3,366.90 $ 2,519.37 $ 2,427.82 $ 3,829.73 $ 3,382.76 $ 5,534.18 $ 3,202.56 $ 958.70 $ 2,878.48 $ 3,288.56 $ 2,659.34 La Puente October 2014 Payroll ‐ continued Check # Employee 10360 10361 10362 10363 Shaunte L Maldonado Tiffany Y Groves Vanessa L Koyama William D Clark Total Payroll Amount Gross $ 1,375.36 $ 638.82 $ 855.70 $ 2,589.64 $ 2,018.88 $ 862.38 $ 1,320.57 $ 3,288.05 $ 57,272.60 Total October 2014 Disbursements $ 283,114.33 Invoice No. 4- 2014-10 November 1, 2014 BPOU Project Committee Members RE: BPOU O & M Expense Reimbursement Summary The following cost breakdown represents O & M expenses incurred by the LPVCWD for the month of October 2014. BPOU Acct No. Description Invoice No. Vendor Amount Subtotal LP.02.01.01.00 Power 2-15-629-6188 2-03-187-2179 SC Edison SC Edison $ 13,793.79 $ 10,944.08 $ 24,737.87 LP.02.01.02.00 Labor Costs Oct-14 LPVCWD $ 16,280.64 $ 16,280.64 LP.02.01.05.00 Transportation Oct-14 LPVCWD - miles 1158 @ .56 $ 648.48 $ 648.48 LP .02.01.07.00 Water Testing W4J0460 W4J0461 W4J0476 W4J0477 W4J0479 W4J0480 W4J0481 W4J0482 W4J0483 W4J0544 W4J1337 W4J1338 W4J1339 W4J1342 Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs Weck Labs $ $ $ $ $ $ $ $ $ $ $ $ $ $ 759.00 35.00 307.00 721.50 105.00 360.00 759.00 532.00 759.00 26.00 52.50 779.00 542.00 779.00 $ 6,516.00 2,968.31 $ 2,968.31 LP.02.01.08.00 Reports/Compliance 1910060 State Water Resource Control Board $ LP.02.01.09.00 Permits/Renewals NoIDP;10/14 State Water Resource Control Board $ 11,877.36 $ 11,877.36 LP.02.01.10.00 Operations Monitoring 789199009 10/13/2014 134943.1 Team Viewer Verizon -October 14 WonderWare $ $ $ 652.05 288.51 2,289.76 $ 3,230.32 6,533.46 $ 6,533.46 LP 02 01 12 00 LP.02.01.12.00 Materials/Supplies LP.02.01.12.02 Filter Cartridges 23825 Pall Corporation $ LP.02.01.12.05 Hydrogen Peroxide 201/5742 Trojan $ 11,445.68 $ 11,445.68 LP.02.01.12.06 Sodium Hypochlorite LA059451 LA061512 LA063566 LA065952 Univar Univar Univar Univar $ $ $ $ 687.76 618.60 756.92 979.03 $ 3,042.31 LP.02.01.12.11 Sodium Hydroxide LA063738 Univar $ 2,627.40 $ 2,627.40 LP.02.01.12.15 Other Expendables 9582458247 9073816 1592055 9024019 9591635 63286 82447 Grainger HACH Home Depot Home Depot Home Depot Johnny's Pool Service Merritt's $ $ $ $ $ $ $ 34.01 1,373.05 49.41 115.40 11.94 43.87 52.24 $ 1,679.92 LP.02.01.12.17 Sulfuric Acid LA064406 Univar $ 2,131.95 $ 2,131.95 LP.02.01.14.00 Repair/Replacement 20645 33293 3614301370 SBD00946169 Charles P. Crowley Griffith Air Tool, Inc. Hopkins Technical Support Konecranes $ $ $ $ 1,769.00 292.11 156.98 289.00 $ 2,507.09 SLS/10234447 Trojan UV $ 22,762.50 $ 22,762.50 Stetson Engineers, Inc. $ 5,547.54 $ $ $ $ $ $ $ 231.50 186.00 17.70 140.00 127.04 173.62 LP.02.01.15.00 Contractor Labor LP.02.01.16.00 Direct Eng. Stetson etc./Lega 1960-03 LP.02.01.80.00 Other O & M 37364 Dragon Fire Protection 8722 MJM Communications Aug-Oct 2014 Petty Cash 160021 SoCal Industries 29516 Staples 8906386-2519-8 Waste Management Total Expenditures District Pumping Cost Deduction Total O & M Total Capital Cost Reimbursable Total Cost Reimbursable 5,547.54 $ 875.86 $ 125,412.69 $ 11,584.19 $ 113,828.50 $ $ 113,828.50 Industry October 2014 Disbursements Check # Payee 1198 1199 1200 1201 1202 1203 1204 1205 1206 1207 1208 1209 1210 1211 1212 1213 1214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 1230 1231 1232 1233 1234 1235 1236 1237 1238 1239 1240 ACWA/JPIA Alliance Communications Services Bryan Press CCSInteractive Cell Business Equipment Collicutt Energy Services IDWTECH InfoSend La Puente Valley County Water District Merritt's Hardware Platinum Consulting Group Resource Building Materials Staples Stetson Engineers Underground Service Alert Verizon Vulcan Materials Company Weck Laboratories Arizona Pipeline Co Bank of America‐Visa Cell Business Equipment Civiltec Engineering CV Strategies E & M Tech Support InfoSend Jack Henry & Associates La Puente Valley County Water District MJM Communications & Fire Pac Comm Technologies Peck Road Gravel Resource Building Materials San Gabriel Valley Water Company SC Edison Staples State Water Resource Control Board Sunbelt Rentals The Gas Company Weck Laboratories Maurilio Fabila Grainger Resource Building Materials Team Viewer USA Verizon Amount $ 1,065.00 $ 57.50 $ 102.19 $ 13.60 $ 62.31 $ 805.12 $ 125.00 $ 611.05 $ 37,004.28 $ 9.25 $ 577.50 $ 530.78 $ 154.66 $ 1,231.25 $ 47.25 $ 241.46 $ 552.58 $ 107.50 $ 664.50 $ 288.00 $ 75.82 $ 140.00 $ 802.31 $ 1,017.67 $ 124.37 $ 32.50 $ 604.84 $ 150.00 $ 147.50 $ 200.00 $ 414.07 $ 1,071.59 $ 14,981.53 $ 100.80 $ 3,704.73 $ 590.87 $ 14.79 $ 322.50 $ 99.20 $ 43.03 $ 117.72 $ 289.80 $ 242.23 Description Worker's Comp Insurance Answering Serive Water Conservation Expense Monthly Website Hosting Office Expense Generator Maintenance Technical Support Billing Expense Labor Costs September 2014 Field Supplies Administrative Support Field Supplies Office Supplies Engineering Support Line Notifications Telephone Expense Field Expense‐ Concrete Water Sampling Construction Meter Refund Field Expense Office Expense Engineering Support Water Conservation Expense Annual SCADA Maintenance Billing Expense Web E‐Check Fee's Web CC & Bank Fee's Reimbursement Security Monitoring Service Technical Support Asphalt & Concrete Disposal Field Supplies Purchased Water‐ Salt Lake Workman's Comp Insurance Office Supplies Water System Fee's Equipment Rental Gas Expense Water Sampling Customer Overpayment Refund Field Supplies Field Supplies SCADA Software Telephone Expense Industry October 2014 Disbursements ‐ continued Check # Payee 1241 1242 Online Autodeduct Autodeduct Verizon Verizon Wireless Home Depot Credit Services Wells Fargo Merchant Fee's First Data Global Leasing Amount $ 58.20 $ 252.05 $ 27.23 $ 57.19 $ 61.04 Total October 2014 Disbursements $ 69,994.36 Description Telephone Expense Cell Phone Expense Field Expense Merchant Fee's Credit Card Machine Lease ‐ Monthly WATER SALES REPORT LPVCWD 2014 LPVCWD January February March April May June July August September October November December YTD 1,188 1,223 1,188 1,222 1,184 1,225 1,183 1,222 1,184 1,226 - - 2,408 2014 Consumption (hcf) 38,646 67,979 32,813 65,786 44,866 85,193 54,764 94,412 51,184 89,011 - - 624,654 2013 Consumption (hcf) C i (h f) 35,104 35 104 55,072 55 072 31,954 31 954 64,384 64 384 44,559 44 559 84,505 84 505 57,034 57 034 94,987 94 987 52,969 52 969 96,188 96 188 47,061 47 061 68,221 68 221 732,038 732 038 8 Year Average Consumption (hcf) 38,091 62,772 33,188 61,081 43,516 84,538 55,464 103,259 57,774 92,703 45,143 66,996 744,523 No. of Customers 2014 Water Sales $ 65,658 $ 119,921 $ 55,246 $ 116,143 $ 77,129 $ 151,425 $ 95,525 $ 168,445 $ 88,919 $ 158,172 $ - $ 2013 Water Sales $ 55,519 $ 91,155 $ 50,465 $ 106,696 $ 71,868 $ 141,221 $ 93,554 $ 159,289 $ 86,642 $ 161,735 $ 81,193 $ 2014 Service Fees $ 43,035 $ 51,189 $ 43,102 $ 51,252 $ 42,981 $ 51,386 $ 42,898 $ 51,154 $ 43,064 $ 51,384 $ - $ 2013 Service Fees $ 41,493 $ 49,407 $ 41,630 $ 49,698 $ 41,598 $ 49,572 $ 42,129 $ 49,338 $ 41,594 $ 49,723 $ 43,012 2014 Hyd Fees $ 950 $ 950 $ 950 $ 950 $ 950 $ 950 $ 950 $ 950 $ 950 $ 950 $ 2014 DC Fees $ 286 $ 6,253 $ 286 $ 6,253 $ 286 $ 6,247 $ 286 $ 6,253 $ 286 $ 6,253 2014 System Revenue $ 109,928 $ 178,313 $ 99,584 $ 174,597 $ 121,346 $ 210,009 $ 139,659 $ 226,801 $ 133,219 $ 216,758 - $ 1,096,581 $ 1,219,754 - $ 471,445 $ 51,248 $ 550,443 - $ - $ 9,500 $ - $ - $ 32,689 $ - $ - $ 120,417 1,610,215 110,000 $240,000 100,000 $220,000 $200,000 90,000 $180,000 80,000 $160,000 70,000 $140,000 60,000 $120,000 50,000 $100,000 $100,000 40,000 $80,000 30,000 $60,000 20,000 $40,000 10,000 $20,000 ‐ $‐ January February March 8 Year Average Consumption (hcf) April May 2013 Consumption (hcf) June July 2014 Consumption (hcf) August September October 2013 WS and SF Revenue November December 2014 WS and SF Revenue WATER SALES REPORT CIWS 2014 CIWS January February March April May June July August September October November December YTD 954 849 953 847 956 848 954 847 955 849 - - 1,803 2014 Consumption (hcf) 60,857 28,585 51,593 29,800 67,225 36,695 83,072 39,554 79,633 38,042 - - 515,056 2013 Consumption (hcf) 48,634 22,900 46,586 25,880 68,617 37,003 85,367 44,244 81,120 40,475 72,424 27,874 601,124 8 Year Average Consumption (hcf) 52,688 27,519 52,498 28,341 64,172 37,738 81,319 46,765 83,357 40,923 66,675 30,669 612,663 No. of Customers 2014 Water Sales $ 118,796 $ 54,742 $ 108,256 $ 61,733 $ 142,942 $ 77,137 $ 178,284 $ 83,409 $ 170,302 $ 79,836 $ 2013 Water Sales $ 87,040 $ 43,499 $ 90,353 $ 49,362 $ 135,077 $ 71,857 $ 169,624 $ 86,777 $ 160,934 $ 78,939 $ 2014 Service Fees $ 45,451 $ 34,490 $ 51,107 $ 38,925 $ 50,951 $ 38,804 $ 51,127 $ 39,703 $ 51,087 $ 39,194 $ 2013 Service Fees $ 39,558 $ 34,183 $ 45,467 $ 34,266 $ 45,391 $ 34,278 $ 45,445 $ 34,321 $ 45,312 $ 34,266 2014 Hyd Fees $ 1,575 $ 225 $ 1,575 $ 275 $ 1,575 $ 225 $ 1,575 $ 225 $ 1,575 $ 2014 DC Fees $ 7,283 $ 1,452 $ 8,897 $ 1,579 $ 8,897 $ 1,788 $ 8,897 $ 1,825 $ 8,897 $ 173,105 $ 90,908 $ 169,834 $ 102,512 $ 204,364 $ 117,954 $ 239,883 $ 125,161 $ 231,861 2014 System Revenue - $ - $ 1,075,437 $ 53,333 $ 1,169,407 - $ - $ 440,838 $ 45,440 $ 34,387 $ 472,312 225 $ - $ - $ 9,050 $ 1,825 $ - $ - $ 51,337 $ 121,079 $ - $ - $ 1,576,662 142,612 100,000 $240,000 $230,000 $220,000 $210,000 $200,000 $190,000 $180,000 $170,000 $160,000 $150,000 $140,000 $130,000 $120,000 $110,000 $100,000 $90,000 $80,000 $70,000 $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $‐ 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 ‐ January February March 8 Year Average Consumption (hcf) April May 2013 Consumption (hcf) June July August 2014 Consumption (hcf) September October 2013 WS & SF Revenue November December 2013 WS & SF Revenue Memo To: Honorable Board of Directors From: Rosa Ruehlman, Office Administrator and Greg Galindo, General Manager Date: 11/07/14 Re: PVOU Ad hoc Committee Report On November 7, 2014 at 1:55 pm, Vice President Escalera and Director Hastings met with Staff, Greg Galindo and Rosa Ruehlman, for the second meeting of the Puente Valley Operable Unit Intermediate Zone (PVOU IZ). At the Committee meeting, Mr. Galindo provided an overview of the PVOU IZ project. He also shared a map of the area where the existing wells are and where the treatment facility will be constructed. He also shared what the preliminary IZ pumping rates and treatment process. Mr. Galindo discussed the CEQA process, of what action is needed on the CEQA documents and hold the required public hearings. He also shared that Rowland Water District is having a special meeting on November 18, 2014 and to have our Board join them to have discussions about the project and no action to be taken.will have a meeting Mr. Galindo stated that for the Public Outreach, that in order to inform our customers about the new treatment facility, we will provide a fact sheet mailer and also post on the District’s website informing them that the District will operate a treatment facility that will meet all drinking water requirements and provide clean water for future generations. The next Ad hoc meeting will meet in the second week in December. If you have any questions on the information provided or would like additional information, please contact me at your earliest convenience. Memo To: Honorable Board of Directors From: Rosa Ruehlman, Office Administrator RBR Date: 11/07/2014 Re: BKK Tolling Agreement An overview of the Third Tolling Agreement and a draft of the agreement will be provided to you at Monday’s Board of Director’s meeting. If you have any questions, please feel free to give me a call. Thank you. L a Puente Valley County Water District PRODUCTION REPORT - OCTOBER 2014 Jan Feb Mar Apr May Jun July Aug Sept Oct Well No. 2 8.78 0.01 4.07 2.72 28.64 103.12 39.44 0.00 146.03 Well No. 3 15.80 94.37 38.00 16.19 43.45 135.47 50.52 0.00 Well No. 5 266.06 100.75 218.25 265.98 215.78 34.88 174.65 3.26 2.74 3.26 2.18 2.27 4.43 Subtotal 293.91 197.87 263.58 287.06 290.14 Interconnections to SWS 130.64 59.65 135.61 126.95 Interconnections to COI 13.11 6.25 7.06 Interconnections to Others 0.00 0.00 Subtotal 143.75 Total Production for LPVCWD Nov Dec 2014 YTD 2013 96.54 429.35 55.26 0.00 0.00 393.80 74.19 232.91 9.94 155.35 1674.55 3406.75 17.52 40.80 23.58 3.28 103.32 340.06 277.91 282.13 273.71 179.56 255.17 2601.03 3876.26 96.67 85.40 83.16 86.35 25.56 109.15 939.13 1657.86 11.97 17.53 13.03 3.58 0.74 2.62 0.00 75.89 240.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.90 142.67 138.92 114.20 98.43 86.74 87.09 28.18 109.15 0.00 0.00 1015.03 1898.12 150.15 131.97 120.91 148.14 175.94 179.48 195.39 186.62 151.38 146.02 0.00 0.00 1586.00 1914.57 148.66 138.41 145.37 144.46 148.13 145.07 146.39 145.10 133.12 143.28 1437.99 1852.66 0.50 0.48 0.47 0.51 0.66 0.59 0.61 0.64 0.82 0.62 5.90 7.03 100.43 88.78 92.68 107.45 127.72 131.79 156.15 173.41 157.26 131.41 1267.08 1379.38 SGVWC Workman Mill Rd 0.67 0.52 0.43 0.22 0.04 0.01 0.06 0.02 0.10 0.44 2.51 132.67 Interconnections from LPVCWD 13.11 6.25 7.06 11.97 17.53 13.03 3.58 0.74 2.62 0.00 75.89 239.99 Subtotal 114.71 96.03 100.64 120.15 145.95 145.42 160.40 174.81 160.80 132.47 1351.38 1759.07 Interconnections to LPVCWD 3.26 2.73 3.05 2.18 2.27 4.43 10.26 34.86 21.49 3.28 87.81 340.06 Total Production for CIWS 111.45 93.30 97.59 117.97 143.68 140.99 150.14 139.95 139.31 129.19 1263.57 1419.01 LPVCWD PRODUCTION Interconnections to LPVCWD 0.00 0.00 CIWS PRODUCTION COI Well No. 5 To SGVCWD B5 Interconnections to CIWS SGVWC Salt Lake Ave SGVWC Lomitas Ave 0.00 0.00 0.00 0.00 MONTHLY ACTIVITIES REPORT ‐ OCTOBER 2014 January LP CIWS No. of Samples from Distribution System 18 30 No. of Samples from Treatment Plant 160 February LP CIWS 18 30 March April LP CIWS 20 35 May LP CIWS 28 31 June LP CIWS 16 27 July LP CIWS 28 31 August LP CIWS 44 36 LP CIWS 16 27 September LP CIWS 20 33 October LP CIWS 31 27 November December LP LP CIWS CIWS 2014 YTD 2013 Total LP CIWS 239 307 LP CIWS 276 422 Water Quality Monitoring 132 148 137 142 137 168 132 152 137 1445 1943 Distribution Maintenance Repair/Replace Service Line 0 3 4 3 0 1 0 1 1 2 3 1 4 3 7 1 4 1 9 3 26 26 25 57 Repair/Replace Main Line 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 2 1 1 1 0 3 5 3 8 Replace Curb/Angle Stop 2 2 1 2 1 0 0 2 0 1 0 0 2 1 1 1 0 4 4 3 11 16 16 8 New Service Installations 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 1 0 0 0 2 1 0 2 Install New Air Release or Blow Off 2 3 0 1 0 0 0 0 0 1 0 1 0 0 0 2 0 0 0 0 2 8 3 3 Concrete/Asphalt Patch Repairs ‐ Staff 3 2 9 15 3 12 1 20 0 3 8 11 0 1 29 10 0 4 2 4 55 82 34 26 Concrete/Asphalt Patch Repairs ‐ Vendo 3 2 2 1 2 5 0 0 0 3 1 1 0 1 0 1 0 0 0 8 14 12 22 Reset Meter Box to Grade 0 0 0 0 0 0 0 0 1 2 3 0 0 0 1 0 0 0 1 0 6 2 2 0 Replace Slip Can/ Valve Lid 0 0 0 0 0 1 0 0 0 0 0 2 0 3 0 0 0 0 0 0 0 6 0 1 Fire Hydrant Repairs/Replaced 1 0 2 1 0 2 0 1 0 0 1 0 1 2 0 0 1 0 0 0 6 6 6 5 Valves Exercised 1 0 0 17 0 12 0 10 0 0 0 76 1 32 0 0 0 0 0 0 2 147 0 68 Hydrants / Dead Ends Flushed 0 0 0 0 0 15 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 17 49 64 Meter Maintenance Replaced Register/Meter/Guts 5 4 4 0 2 6 0 0 2 1 4 5 6 8 1 4 1 0 29 14 62 65 60 46 Replace Meter Box/Lid 0 0 0 2 0 11 1 2 0 4 0 2 1 3 0 2 2 4 5 1 9 31 24 10 Removed Meter 1 1 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 3 3 5 3 Repaired Meter Leaks 0 0 0 0 1 1 0 0 1 1 0 0 2 0 1 1 3 1 0 0 8 4 9 7 Re‐Reads for Billing 0 0 0 0 0 1 7 1 0 2 15 1 0 1 1 3 3 3 0 0 26 12 16 16 Read for Open/Close 4 4 6 3 4 4 4 5 5 2 8 0 4 5 7 2 3 1 6 4 51 30 63 23 Turn Off/Lock 8 5 6 4 13 9 7 8 11 1 19 3 11 5 4 5 9 7 6 5 94 52 110 62 Turn On 18 14 11 6 12 10 11 19 19 8 15 6 15 9 7 11 13 16 8 14 129 113 146 143 Door Hangers ‐ Miscellaneous 10 8 4 1 6 3 3 5 7 0 7 0 5 8 1/2 3/2 5 4 6 1 14 1 62 39 Door Hangers‐ Delinquents 88 164 80 99 76 117 73 84 105 122 130 95 84 129 76 77 72 118 142 129 926 1134 1032 1362 Shut Off ‐ Non‐Payment Shut Off ‐ Customer Emergency/Request 10 24 10 14 7 10 10 17 11 18 13 18 13 21 11 15 156 227 3 4 1 3 2 4 0 4 2 3 1 1 2 1 0 2 4 3 3 3 18 28 33 22 Locate for USA USA's ‐ Underground Service Alerts Marked 27 27 32 23 21 32 16 24 31 22 29 29 19 24 25 21 30 14 51 26 281 242 152 213 1 3 10 13 1 4 1 3 2 9 7 3 4 5 11 4 6 1 8 3 51 48 29 56 Check for Creeping 9 16 12 6 7 8 13 11 16 14 12 13 16 22 18 13 19 9 16 6 138 118 173 135 Customer Service Door Hangers ‐ Conservation 13 4 5 1 19 3 11 26 11 19 107 182 MONTHLY ACTIVITIES REPORT ‐ OCTOBER 2014 January February March April May June July August September October LP CIWS LP CIWS LP CIWS LP CIWS LP CIWS LP CIWS LP CIWS LP CIWS LP CIWS LP CIWS Check for Leak 2 14 5 3 7 14 5 12 5 8 9 6 15 12 11 9 10 11 14 Check for High/Low Pressure 1 0 2 0 0 1 0 0 1 1 0 1 3 1 2 0 1 1 Check for Meter Tampering 0 6 0 1 0 1 0 1 0 1 0 0 1 0 0 0 0 1 Check for Stopped Meter 27 14 13 6 15 13 11 7 14 13 16 5 13 13 9 6 17 Retro Fit Program Verification 0 0 3 0 1 0 0 0 0 0 1 0 0 0 0 0 Misc ‐Other including UHET Toilet Verification 3 1 12 2 10 6 4 1 5 1 3 1 7 1 1/2 1 Water Quality ‐ Odor/Color/Taste 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 Fire Flow Test 0 2 1 1 0 1 0 0 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 November December LP LP CIWS CIWS 2014 YTD 2013 Total LP CIWS LP CIWS 8 83 97 92 84 0 0 10 5 8 14 0 1 1 12 3 6 24 37 17 172 118 148 135 3 0 1 0 9 0 23 0 5 0 5 1 49 15 99 5 0 0 0 0 0 3 2 3 3 0 0 0 0 2 3 7 4 3 0 0 0 0 Safety Activities Safety Inspection of Facilities 0 0 17 18 Monthly Safety Meeting 0 1 1 1 1 1 1 1 1 1 1 0 10 0 11 0 Weekly Tailgate Safety Mtg 4 3 3 3 4 3 3 4 3 4 34 0 41 0 Administrative Report To: Honorable Board of Directors From: Rosa Ruehlman, Office Administrator Date: RBR 11/07/2014 The following report represents activities for the prior month of October 2014, along with the current status of various items listed under the appropriate heading: Administrative: • Working on Injury and Illness Prevention Policy, Security Policy and Membership Policy. • Worked with the General Manager on the CalOSHA Statement of Abatement of the General Violations, was completed and hand delivered to CalOSHA on October 31, 2014. • Researched Water Conservation giveaways and canopy for future events. • Submitted application to the City of La Puente for the Holiday Parade and Tree Lighting Ceremony. Meetings attended: • October 17th - participated in the perchlorate and RO training provided by Cathy Swanson from Evoqua. Future Board Meetings/Events: • Monday, November 10, 2014 - Regular Board of Directors Meeting at 5:30 pm. • Monday, November 24, 2014 - Regular Board of Directors Meeting at 5:30 pm • Friday, December 5, 2014 – Annual Downtown Christmas Parade at 6:00 pm. • Monday, December 8, 2014 - Regular Board of Directors Meeting at 5:30 pm. • Friday, December 12, 2014 – Annual District Christmas Party at 12:00 pm. • Monday, December 22, 2014 - Regular Board of Directors Meeting at 5:30 pm. If you have any questions on the information provided or would like additional information, please contact me at your earliest convenience. Upcoming Events To: Honorable Board of Directors From: Rosa Ruehlman, Office Administrator RBR Date: 11/07/2014 Upcoming Board Approved Events for 2014: Aguirre Escalera Hastings San Gabriel Valley Water Association Quarterly Luncheon at 11:30 am at the Swiss Park in Whittier, CA X X X X SCWUA monthly luncheon at 11:30 am at the Pomona Fairplex, Pomona, CA X X X X Day/Date Event Wednesday, Nov. 12 Thursday, Nov. 20 Tues -Friday, Dec 2-5 Thursday, Dec. 11 Friday, ACWA Fall Conference in San Diego, CA Hernandez X Rojas X SCWUA Christmas luncheon at 11:30 am at the Pomona Fairplex, Pomona, CA District’s Christmas Party All Directors, past directors and employees Dec. 12 NOTE: Southern California Water Utility Association (SCWUA) Meetings are every 4th Thursday of each month except November and December which are held on the third Thursday of those months. If you have any questions on the information provided or would like additional information, please contact me at your earliest convenience. Southern California Water Utilities Association Established in 1932 Thursday—November 20, 2014 “Doctors of Water” Presentation USC Foundation for Cross-Connection Control & Hydraulic Research “Charter Membership Recognition” Presentation of Annual USC Student Scholarships Presentation of SCWUA’s Grant Recipients Doctors of Water Casey Quinn John Robinson Rosa Ruehlman Jeannette Vagnozzi John Vega Debbie Duran Michael Gualtieri Wayne Goehring Jim Hubert Jerry Mesa Come Join Us for a Great Lunch and Program! Date: Thursday, November 20, 2014 Time: 11:30 a.m. to 1:30 p.m. Location: At the Sheraton Fairplex Cost: $25.00 – payable at the door The reservation deadline is Monday, Nov. 17, 2014 3 Ways to ❶ Register Online: Email: ❷ ❸ [email protected] www.scwua.org Phone: (909) 392-6598 Upcoming Program Thursday: December 11, 2014 Annual Christmas Program Higher Food Prices, Drought Water Bank Possible if 2015 is Dry, Water Officials Tell State Board of Food and Ag acwa.com /news/water-supply-challenges/higher-food-prices-drought-water-bank-possible-if-2015-drywater-offici From a potential drought water bank to increased food prices and assistance for unemployed farmworkers, water planners on the local, state and federal levels are gearing up for a possible dry 2015. That was the overview delivered today by water officials from many agencies who appeared before the California State Board of Food and Agriculture to discuss how another dry year might impact groundwater, agriculture, food prices, and water system operations. The discussion was part of a briefing on plans for 2015. Richard Howitt, a resource economist with the University of California, Davis and its Center for Watershed Sciences, said food prices increased by .3% in 2014 over 2013 prices. He said the “buffer stock” of groundwater helped growers mitigate the loss of surface water and keep operations going. He cautioned that the buffer might not be there in 2015 if aquifers are low due to increased pumping in 2014. Food prices could go up by as much as 10%-15% in 2015 if major cutbacks in water deliveries continue and wells go dry, Howitt added. Howitt also recommended that the state consider adopting some sort of clearing house for information on water sales that are occurring, including the going prices of water and what sales have been completed. He said purchasers of water were provided with little information this year about availability and price. “Farmers this year were flying blind in terms of water markets…and some got blind-sided,” said Howitt. Jay Lund, professor of environmental engineering at UC Davis and director of the UC Davis Center for Watershed Sciences, said California is going into 2015 with 5 million acre-feet less than average of groundwater and 1 million acre-feet less than average of surface water. He added that one positive elements of the drought is it has fostered more cross agency cooperation. Karla Nemeth, deputy secretary for water policy at the California Natural Resources Agency, outlined the food aid and rental assistance the state has deployed to laid off agricultural workers this year. She said such assistance also would be offered if 2015 proves to be another dry year. Nemeth added that state and federal officials are “rolling up their sleeves” and working together to discuss operations of the Central Valley Project and State Water Project should the state experience another dry year. She added that more data on operations may be available in a month. The state also is helping to lead a “guided discussion” about a potential drought water bank if it were needed, Nemeth added. Nemeth said the state has made improvements in water conservation, but more is needed. She said more restrictions on water use and possibly rationing could occur if the drought worsened. Gordon Burns, undersecretary of CalEPA, presented the board with details on the Groundwater Resources Management Act that was passed by the Legislature this year. He said the overarching goal of the act is to empower local entities to manage the groundwater resource. “It’s not aimed at the drought,” Burns said of the act. “Groundwater sustainability is a long-term problem that needs a long-term solution.” Burns added that the state also needs to expand its water storage – both surface and groundwater – and adhere to a statewide plan such as the Gov. Jerry Brown’s California Water Action Plan. Burns said that legislation likely will be introduced next year that seeks to reform the groundwater adjudication process. An informational hearing on potential adjudication reforms is scheduled Nov. 20 from 1:30 p.m. to 3:30 p.m. in room 112 of the Capitol. The hearing is sponsored by the Senate Committee on Natural Resources and Water. California Water Commissioner Kim Delfino also spoke before the board and talked about how passage of Proposition 1 – the water bond – would give the state more money to increase storage projects. The Water Commission will be the entity that disperses that money. She said the process of determining the public benefits of specific projects would begin in earnest in January should the bond pass. “I think it’s an opportunity to make wise investments to improve the Delta and groundwater recharge and also look at additional storage, even surface storage,” Delfino said. Dave Orth, also a member of the California Water Commission who provided significant input on the groundwater management act, said it is critical that the state take an “integrated perspective” on its water and not operate in silos. He said the governor’s water action plan is a good example of an integrated approach. Orth added that there is a lot of misinformation about what the new groundwater act actually does and officials need to help the various stakeholders more thoroughly understand the legislation. State Board Reports Per Capita Water Use Figures for Urban Agencies acwa.com /news/conservation/state-board-reports-capita-water-use-figures-urban-agencies The State Water Resources Control Board today released first-ever monthly estimates of daily per capita water use by residential customers for nearly 400 urban agencies around the state. The monthly estimates, based on data submitted by urban agencies under emergency conservation regulations adopted by the State Board in July, showed that water use varies widely by hydrologic region. Factors such as climate, population density and lot size tend to account for much of the variation, State Board staff noted in presenting the data. The San Francisco Bay region, for example, averaged 85.2 gallons per person per day in September, according to the State Board estimates. The Colorado River hydrologic region, which includes hotter inland areas such as Palm Springs and the Mojave Desert, averaged 251.9 gallons per person per day. State Board staff cautioned against using the water use data to compare water suppliers or even hydrologic regions, saying there are too many complexities and variables involved. The data can be useful, however, for water suppliers to track and self-evaluate their own performance over time, staff said. State Board Chair Felicia Marcus echoed that theme and noted that “people should not be rushing to judgment.” She suggested that water suppliers could use the information to inform local decisions about the need for additional conservation measures. “This (information) really does help us gain a better sense than simply looking at percentage reductions, since different areas of the state have been conserving for longer than other areas,” Marcus said. “This gives us a useful view of what’s possible. The transparency of it should lead some agencies and residents to wonder” whether they need to do more, she said. In addition to the per capita use estimates, the State Board also released monthly water production numbers for September as submitted by water suppliers. The data, which showed that statewide urban water use was down an average of 10.3% in September 2014 as compared to September 2013, suggests that conservation efforts leveled off somewhat in September after three consecutive months of year-overyear improvement. Average reductions in water use also varied by hydrologic region, with the Sacramento River region reporting a 16.6% average reduction in September and the Central Coast region reporting a 15.9% reduction. State Board staff cited several noteworthy reductions by individual agencies, including the City of Oxnard, which reported a 14% reduction in what already was a low baseline; Contra Costa Water District (22% reduction); the City of Davis (28% reduction); the City of Oakdale (20% reduction); the City of Grover Beach (52% reduction); and Desert Water Agency (11% reduction in a region that averaged 6.7%). State Board staff said 87% of urban water suppliers reported they have imposed mandatory restrictions on water use, up 6% from the previous month. Staff also announced that a toll-free phone number would be established for residents to report water waste. The number should be up and running before summer 2015. A workshop on conservation also is being planned for Southern California in December. The State Board per capita water use and monthly production data is available here. Voters Approve Proposition 1 by Decisive Margin acwa.com /news/state-legislation/voters-approve-proposition-1 California voters approved Proposition 1 by a substantial margin Tuesday, authorizing $7.545 billion in funding for a range of water projects and programs as part of a new era in water management. Election returns posted by the Secretary of State's office showed Proposition 1 winning by a 66.8%-33.2% margin as of 8:45 a.m. Wednesday, the largest margin for a water bond in recent times. Gov. Jerry Brown, who campaigned for Propositions 1 and 2 and made their passage a top priority, hailed the success of both measures in remarks to reporters Tuesday night. “I just spent the last several months saying, ‘save water, save money,'” said Brown. “These are pillars because water is life. It is the basis of our well-being and also our economy.” ACWA Executive Director Timothy Quinn also applauded the outcome. He called passage of Proposition 1 a victory for California and the culmination of years of effort to advance a water bond that will reinvest in the state's water system and jumpstart the comprehensive, statewide water action plan needed for the future. “The success of Proposition 1 reinforces that the public understands our water supply challenges as we move through a multi-year drought. At its core, Proposition 1 advances an all-of-the-above strategy that includes everything from local resources to water storage to safe drinking water. It makes the single-largest investment ever in programs such as water recycling, conservation, stormwater capture, desalination and groundwater remediation and cleanup. These programs together will play a major role in meeting local and regional water needs in the coming decades," Quinn said. “Those investments will be complemented by the most significant state funding for water storage in a halfcentury. This funding will be matched – on a competitive basis – with local and regional dollars for 21st century water storage projects that add much-needed flexibility and resiliency to our water system. We will also take a major step forward in investing in watersheds and safe drinking water improvements, particularly in disadvantaged communities. “Together with the comprehensive water plan outlined by Gov. Jerry Brown, Proposition 1 is part of an evolution in California water that opens the door to the most substantial progress in decades.” Quinn's statement is available here. Details on Proposition 1 are available here. http://www.whittierdailynews.com/government-and-politics/20141027/central-basin-water-district-picks-montebello-developer-to-head-search-for-new-ge Central Basin Water District picks Montebello developer to head search for new general manager By Mike Sprague , Whittier Daily News WhittierDailyNews.com COMMERCE >> A long-time fundraiser for the Calderon family who recently loaned $5,000 to a Central Basin Municipal Water District board member has been tapped to head up a committee seeking a new general manager for the embattled district. The Central Basin board Monday voted 4-0 with Director Arc Chacon abstaining, to name Phil Pace, a Montebello developer and former Metropolitan Water District chairman, to head the search committee. Pace served as campaign treasurer for Charles and Tom Calderon, former state legislators. He also owns the building that state Sen. Ron Calderon, D-Montebello, used as his office in Montebello. The building was raided by the FBI in connection with a corruption probe. Pace didn’t return a phone call seeking comment. His committee was given the job of finding a successor to Tony Perez, who was fired for cause on Oct. 9 by the board. The decision was criticized by Kathay Feng, executive director for California Common Cause. “Given the cloud of corruption that’s hanging over Central Basin, this appointment raises serious questions of conflict of interest,” Feng said. “It’s unseemly to appoint someone to help select the next general manager who has such intimate ties with individuals who are currently under indictment,” she said, referring to Tom and Ron Calderon. Ron Calderon has been indicted on bribery charges in a massive federal corruption case. Tom Calderon faces federal charges of money-laundering. “It’s not that (Pace) is just a campaign contributor,” she said. “He was the treasurer for (Tom Calderon),” Feng said. Board member Robert Apodaca, who took a $5,000 campaign loan from Pace in this election cycle, defended the choice.. “He’s the most qualified person I can think of,” Apodaca said of Pace who served as chairman for Metropolitan Water District from 1999 to 2005. Advertisement Pace also represented the Central Basin on the MWD board from May 1995 to January 2007. “He knows every water company and every city in our area,” said Apodaca. “He has experience that I and other directors don’t have.” Apodaca has his own ties to the Calderons, having worked for Tom and Ron as an aide. However, Apodaca said he has broken with both and hasn’t talked to either in four or five years. Apodaca said the $5,000 loaned to him by Pace doesn’t represent a conflict of interest because Pace is working for free on the selection process. Gil Aguirre, a San Gabriel Valley open-government activist, agreed the selection of Pace doesn’t break any laws Page 1 ofbut 2 called the decision still questionable. Nov 05, 2014 09:14:30AM MST http://www.whittierdailynews.com/government-and-politics/20141027/central-basin-water-district-picks-montebello-developer-to-head-search-for-new-ge Gil Aguirre, a San Gabriel Valley open-government activist, agreed the selection of Pace doesn’t break any laws but called the decision still questionable. “(Pace) has strong ties to the Calderons and to Apodaca and that’s pretty troubling,” he said. “This agency is under attack for lack of transparency. You would think they would try to correct that. It’s cronyism at its best.” The board also voted to appoint Apodaca and Director Phil Hawkins to sit on the same committee with Pace to handle the search for a successor for Tony Perez, Interim General Manager Richard Aragon told the board he would step down and resume his former position as interim finance director. Aragon said he plans to take leave in December because his wife expecting a child and he needs more time to finish up several projects. Although the board voted to establish a salary of $175,000 annually for interim general manager position, it took no action Monday toward finding a successor. Arnold Alvarez-Glasman, the district’s interim attorney, told the board it couldn’t even discuss the issue Monday because it wasn’t on the agenda. A special meeting will have to be held to appoint a successor, Alvarez-Glasman said. Director Leticia Vasquez suggested the board work with the Association of California Agencies to find a retired general manager who could serve until the district finds a permanent general manager. Central Basin, a water wholesaler, has been under increased scrutiny since receiving a subpoena from the FBI as part of the investigation into Tom Calderon. Calderon had a $12,000 monthly consulting contract with Central Basin until February 2013. In recent months, the district also has lost its insurance carrier, Association of California Water Agencies’ Joint Powers Insurance Authority. This story has been updated from an earlier version to correct the vote count naming Phil Pace to head the search committee. The vote was 4-0 with Director Art Chacon abstaining. Reach the author at [email protected] or follow Mike on Twitter: @WHITREPORTER. Full bio and more articles by Mike Sprague Back to top Mike Sprague Page 2 of 2 Nov 05, 2014 09:14:30AM MST BACKGROUND PAPER San Gabriel Valley Water Association Drought Communications & Action Plan Overcoming the Mixed Message Concerning Drought in Southern California Southern California is in the fortunate position of having reserve water supplies in the midst of the current drought conditions yet there is angst among member agencies of the Metropolitan Water District of Southern California and members of the San Gabriel Valley Water Association over the resulting mixed message. The mixed message begins with the Governor’s drought declaration which, according to common wisdom, should trigger solid steps to conserve water. Instead, the call is for “voluntary” conservation, which is no different from normal times, while MWD and others attempt to explain reserve supplies at Diamond Valley Lake and other regional reservoirs and groundwater basins. This not only creates a mixed message locally but has sparked anger, particularly from officials in areas like Sacramento, who have declared mandatory rationing measures. To overcome the mixed message and refocus attention on the San Gabriel Valley’s preparation, the following steps are proposed: • Make a public announcement that the SGVWA is conducting a “mutual aid” survey to determine impacts to smaller systems. Then, define assistance by larger members and/or the Association in securing supplemental supplies and/or relief for financial impacts under the Governor’s drought declaration. This capitalizes on the Watermaster, WQA, Foothill MWD, Three Valleys and Upper District’s existing programs in IRWMP, conservation, groundwater clean-up and DHS compliance programs. • Issue a public statement by the SGVWA regarding pending water rate increases as the drought compels drawing down the basin and using more imported water. In short: Imported Water = Higher Water Rates. This will help Association members as they prepare to explain rate increases to their customers. To accomplish this, staff will coordinate with consultants and Association member’s staff to ensure that news releases are properly issued, and that legislators are notified and prepared to assist in any requests for relief under the Governor’s drought declaration. http://www.sgvtribune.com/environment-and-nature/20141102/fourth-water-tally-shows-san-gabriel-valley-residents-not-conserving Fourth water tally shows San Gabriel Valley residents not conserving By Steve Scauzillo , San Gabriel Valley Tribune sgvtribune.com That is the preliminary conclusion arrived at by the San Gabriel Valley Water Association on Friday after the fourth week of water watching revealed the region used 182 million gallons more water this week than the same week last year. “Overall, there is not overwhelming conservation,” said Adan Ortega, a consultant hired to work on this campaign by the Association. “If so, you would see that number going down.” Since the Association started tracking water usage pulled from the San Gabriel and Raymond water basins, the results have been up and down. Two weeks showed lower water use as compared to last year, and two weeks have shown higher water use. The Association wanted to bring awareness to what is the fourth straight year of drought in California by publishing water use numbers every Friday since Oct. 10. The Association plans on publishing either “alerts” or “pass” grades through its web site, in print ads and on social media for another six weeks. On Oct. 10, the region used 730 million gallons less than the same week a year before and earned a passing grade. Oct. 17’s reading reflected the mirror opposite: the Valley used 780 million gallons more than the same week in 2013. By Oct. 24, or Week Three, the Valley returned to conservation mode by using 208 million gallons less. That was upended on Friday with the greatest number of gallons used in the weekly comparison to 2013 since the campaign started. Why the swings? It could be weather-related, said Tony Zampiello, executive secretary of the Association. Or some agencies could have received a small surge of imported water from Metropolitan Water District of Southern California this past week, attributing to the rise in usage. Either way, the vast underground water reserves that serve as a drought buffer for 1.8 million San Gabriel Valley residents is being tested. Levels are at their lowest since agencies began keeping records. Zampiello, who is also executive officer of the San Gabriel Basin Watermaster, a court-appointed agency that regulates basin water withdrawals, said the basin is 20 feet below its operating range. The operating range is a benchmark set by the Watermaster, or where they’d like to stay above. Advertisement Because less water is being sent south by the state Department of Water Resources, which has only fulfilled 5 percent of its allocation because of extremely low rainfall and non-existent snowmelt in the Sierra Nevada, local ground-water basins are being pumped more often throughout the Golden State. “The (San Gabriel) basin is being used as a shock absorber for the drought. It has done its job,” Zampiello said. Now he’s hoping rain in the forecast will start a progression of storms that can replenish the underground wells. The basin needs close to 30 inches of rainfall to bring it back to normal, he said. The Association’s 60 retail water agencies and 16 local cities want to survey whether homeowners are taking advantage of $40 million worth of water-saving rebates being given out by Metropolitan, including cash end San Page 1 of for 2 removing lawns. Ortega will be trying to determine how many of those rebates Nov 05, up 2014in09:22:31AM MST http://www.sgvtribune.com/environment-and-nature/20141102/fourth-water-tally-shows-san-gabriel-valley-residents-not-conserving taking advantage of $40 million worth of water-saving rebates being given out by Metropolitan, including cash for removing lawns. Ortega will be trying to determine how many of those rebates end up in San Gabriel Valley resident hands. The Association’s campaign has produced mixed results. But Zampiello wants people to take notice and examine their own water bills. “Maybe we can get the average person to think about where they were last year. To get them thinking — what could they do this year to save water,” he said. Earlier this week, the state’s secretary of natural resources, John Laird, announced California’s growing population and dwindling water supplies will require up to $500 billion in additional investment in water in the coming decades. The expensive price tag was part of an updated plan for managing the state’s water supply as far into the future as 2050. The Associated Press contributed to this report. Reach the author at [email protected] or follow Steve on Twitter: @stevscaz. Full bio and more articles by Steve Scauzillo Back to top Steve Scauzillo Page 2 of 2 Nov 05, 2014 09:22:31AM MST Drought: Beverly Hills is big water user; East L.A. is the lowest - LA Times Page 1 of 6 L.A. Now California: This just in Drought: Beverly Hills is big water user; East L.A. is the lowest Water flows into a small pool in the back courtyard of a home in Beverly Hills. The city is Southland's biggest water user, officials announced Tuesday. (Robert Gauthier / Los Angeles Times) By MATT STEVENS NOVEMBER 4, 2014, 12:23 PM C alifornians continued to use less water in September, but the reductions were more modest than in the summer months, and water use varied greatly by community, officials said Tuesday. This marked the first time that state officials released data on per-capita water use for scores of communities across California. The full list will be released later this afternoon. In an interview, State Water Resources Control Board scientist Max Gomberg offered one contrast: The city of Beverly Hills used 286 gallons per person per day in September. http://www.latimes.com/local/lanow/la-me-ln-drought-beverly-hills-is-big-water-user-east-l... 11/05/14 Drought: Beverly Hills is big water user; East L.A. is the lowest - LA Times Page 2 of 6 Meanwhile, the East Los Angeles district of the California Water Service Co. used just 48 gallons per day, the lowest in the Southland. On average, Southern California residents used 119 gallons per person per day. But Gomberg cautioned that significant variation exists within large districts such as the Los Angeles Department of Water and Power, where residents used 93 gallons per day. Overall, the State Water Resources Control Board announced that Californians cut their water consumption 10.3% -- about 22 million gallons -- in September, versus the same month a year ago. That was down from 11.5% in August, representing the first dip since officials began keeping close track of monthly water use in June. “We are now moving into the cooler and hopefully rainier part of the year,” Gomberg said during his presentation. “That’s not reason for people to let up.” Statewide, officials said per-capita usage ranged widely with some areas using more than 500 gallons per capita per day and others using less than 50. State water officials and other experts have long maintained that Southern Californians have been conserving water aggressively for years. Although many Northern California hydrologic regions have shown steeper cuts at each checkpoint, officials have warned against drawing compositions because many southern residents are already using less water than their northern neighbors. “People should not be rushing to judgment or celebration, or ‘we’re better than you guys,’” said Felicia Marcus, chair of the state water board said in the meeting. Though she added that percapita data would provide a “useful view of what’s possible.” “The transparency of it should lead some agencies and residents to wonder why they aren’t doing more,” she said. After a slow start, Southern California has rallied to cut its water use in recent months. In May, the board report showed an 8% increase in the region's water use, but by August, use was down 7.8%. The board’s latest report showed the region’s September water use down by 7.5% -mirroring the state’s trend. The state’s 10.3% cut falls far short of Gov. Jerry Brown’s 20% reduction goal. Water officials did not speculate at length about why water conservation had declined, but said cooler temperatures and lower overall water use could be contributing factors. http://www.latimes.com/local/lanow/la-me-ln-drought-beverly-hills-is-big-water-user-east-l... 11/05/14 Drought: Beverly Hills is big water user; East L.A. is the lowest - LA Times Page 3 of 6 “We’re doing well. We saw a really impressive response from June through August," Gomberg said. "It’s not about making it to 20%.” Follow @MattStevensLAT for drought coverage, Westside reports and breaking news Copyright © 2014, Los Angeles Times FROM AROUND THE WEB Sponsored Links by Taboola Drivers Feel Stupid For Not Knowing This New Rule Improve Insurance Your Cable Company Doesn’t Want You To Know This! The Motley Fool 4 Things You Should Never Buy at Trader Joe's Reviewed.com Top Foods to Avoid with High Blood Pressure Remedy Health 5 Richest Oscar Winners And Their Staggering Net Worths Bankrate You NEED To See These 20 Pictures of Kobe Bryant With Wife Vanessa Bryant Through the Years Rant Sports 12 Great Movies We Just Dont Ever Want to See Again Movieseum Learn About the History of the Diesel Engine Chevron http://www.latimes.com/local/lanow/la-me-ln-drought-beverly-hills-is-big-water-user-east-l... 11/05/14 BACKGROUND PAPER San Gabriel Valley Water Association Non-Storm Water Discharges By Public Water Systems Under the Los Angeles MS4 Permit or State NPDES Permit Started in 2011 and led by Public Water Systems (PWS’s) in the San Gabriel Valley, a process has been under way by which PWS’s can discharge water, as required by the California Health Code and other regulations to meet safe drinking water standards, while holding cities (that possess MS4 Permits) harmless if such water picks up contaminants in municipal storm water systems that may exceed limits under the MS4. This flexibility was provided by the Los Angeles Regional Board as a component of the MS4 storm water permit they approved in November, 2014. Generally, to qualify, PWS’s must agree to institute best management practices (BMPs) that include dechlorinating discharges and other guidelines mostly established by the American Water Works Handbook. Other requirements include notifications to MS4 permittees and the Los Angeles County Department of Public Works/Flood Control of discharges of 100,000 gallons or more and the maintenance of records including water quality data and discharge events. On February 6, 2014, the Los Angeles Regional Board will conduct its regularly scheduled meeting with an item on the agenda to discuss the Los Angeles County MS4 Permit as it applies to PWS’s, with a presentation on the stakeholder process between PWS’s, Los Angeles County Public Works Department and MS4 permittees. The State Water Resources Control Board (SWRCB), with participation from Region 2 (BayArea), Region 5 (Central Valley), and later Region 4 (Los Angeles/Ventura), started working on a joint Multi-Regional NPDES Permit for PWS’s during the summer of 2013. A stakeholder workshop was held on November 18, 2014, drawing 200 water agency representatives from throughout the state to the City of Glendale in person or by phone. Opposition to the State Permit approach for PWS’s was unanimous given that water suppliers are already covered under several permits in our local regions. Region 5 (Central Valley) subsequently dropped out of the multi-regional effort releasing their own draft NPDES Permit for PWS’s on November 21st. The SWRCB and Regions 2 and 4 are still proceeding with the Multi-Regional Permit. We have been advised by LA Board staff that they are “…still working together with regards to how a permit or permits may look. Region 2 sent out a draft permit so that folks in their region could take a look at what a permit might look at, but we are still working on a joint permit with them and the State Board.” Most interesting are those stipulations that require that after each discharge of 50,000 gallons or more the PWS must send a “qualified biologist” into the receiving water to determine if the beneficial uses have been impaired; as well as the requirement to determine the chlorine residual and pH “every 15 minutes on each occurrence until steady flow is achieved; hourly thereafter.” On February 6th, the Los Angeles Regional Board will be asked to decide, by March 2014, if it will adopt the stakeholder-developed MOU process or give up the flexibility provided for under the MS4 and opt for a state permit. Rancho Santa Fe water district agreements aim to protect water rights, save money | Ranc... Page 2 of 8 Rancho Santa Fe water district agreements aim to protect water rights, save money By Joe Tash Two agreements approved Wednesday, Oct. 29, by the Santa Fe Irrigation District are expected to clarify the district’s storage rights for water in Lake Hodges, as well as save money by partnering with neighboring water districts on maintenance projects. Both agreements were approved on 3-0 votes by the board of directors of the water district. The first agreement was between the city of San Diego, the San Dieguito Water District and Santa Fe. The agreement amends a deal struck back in the 1920s that gave the two water districts rights to some of the water in Lake Hodges. Under the amendment approved by the board Oct. 29 — which had previously been approved by the two other agencies — Santa Fe and San Dieguito can collectively store up to 5,000 acre-feet of water in Lake Hodges. The two districts also split with San Diego the rights to water that flows into the reservoir from rainfall. Santa Fe sells about 10,000 acre feet of water each year to its customers in Rancho Santa Fe, Solana Beach and Fairbanks Ranch, and, historically, about 30 percent of that supply has come from Lake Hodges. The available amount of local water varies from year to year, depending on the amount of rainfall. The rest of the district’s water is purchased from outside sources, and is more expensive than local water. The agreement was needed to clarify the two district’s water rights after Lake Hodges was connected to the regional aqueduct system as part of the County Water Authority’s emergency storage project. The two districts sued the city of San Diego in 2008 over the water rights issue, and the lawsuit was later set aside. Since then, the three parties have been working on an updated agreement. “It has been at the top of our priority list to resolve this issue,” said Santa Fe board President Michael Hogan. “It’s very important to the ratepayers of our district. It secures our local water rights in a way that we can better manage our long-term water supplies, and reduce our reliance on imported water.” Maximizing the use of local water allows the district to control costs and keep rates down, said Hogan. Santa Fe also expects to save about $70,000 per year in operating and maintenance costs for the Lake Hodges reservoir, because those costs will be shared more equitably with other agencies. The other agreement approved by the board Wednesday involves “cathodic protection” systems, which use an electrical current to prevent corrosion of steel water pipes. The agreement is between Santa Fe and its neighbors, the San Dieguito and Olivenhain water districts. According to a district press release, the partnership will save each district about $100,000 in capital costs, as well as small ongoing savings over the 20-year life of the contract. The agreement arose from a tri-agency committee set up in 2013 to explore a range of partnership opportunities between the three water districts, including consolidation of key functions. The committee identified a number of short- and long-term projects that provided opportunities for collaboration and cost-sharing, said Hogan. http://www.ranchosantafereview.com/2014/11/03/rancho-santa-fe-water-district-agreements... 11/05/14 Rancho Santa Fe water district agreements aim to protect water rights, save money | Ranc... Page 3 of 8 “This is the first one that’s actually resulted in a mutual agreement between the three agencies that will result in cost savings,” said Hogan. “It’s a direct result of the agencies getting together to see how they can leverage assets and resources to be more efficient and control costs.” Also on Oct. 29, the board recognized General Manager Michael Bardin’s 10th anniversary with the district, and re-appointed Hogan as the district’s representative to the board of the County Water Authority. Share this: Like 0 Tweet 1 Email • Stum Share Related posts: 1. Rancho Santa Fe water district reaches new agreement regarding long-term local water supplies from Lake Hodges 2. Rancho Santa Fe water district board gives raise to general manager 3. Rancho Santa Fe water district board gives raise to general manager 4. Costs to purchase water will increase next year for Rancho Santa Fe water district 5. Rancho Santa Fe water district may not have to increase water rates in the new year Short URL: http://www.ranchosantafereview.com/?p=37575 Share with a Friend: Posted by Staff on Nov 3 2014. Filed under News, Rancho Santa Fe. You can follow any responses to this entry through the RSS 2.0. You can skip to the end and leave a response. Pinging is currently not allowed. Comments Login Login or signup now to comment. There are no comments posted yet. Be the first one! Subscribe to our email newsletter http://www.ranchosantafereview.com/2014/11/03/rancho-santa-fe-water-district-agreements... 11/05/14 http://www.sgvtribune.com/environment-and-nature/20141026/san-gabriel-valley-getting-graded-on-local-ground-water-basin-usage San Gabriel Valley getting graded on local ground water basin usage By Steve Scauzillo , San Gabriel Valley Tribune sgvtribune.com Workers on a floating dock survey the San Gabriel Reservoir in February. The San Gabriel Valley Water Association is tallying the amount of water drawn from wells in local ground water basins every week, then handing out grades based on water usage of previous years. STAFF FILE PHOTO Nearly 1.8 million San Gabriel Valley water users are being put to the test. In an effort to shine a light on the effects of the drought, the San Gabriel Valley Water Association is tallying the amount of water drawn from wells in local ground water basins every week, then handing out grades. If the region used less water that week as compared to one year ago, it receives a “passing” grade. More water use yields an “alert,” according to the Association. So far, results have been up and down. During the first three weeks of the 10-week campaign, the San Gabriel Valley received two passing grades and one alert. On Oct. 10, the region used 730 million gallons less than the same week a year before and earned a passing grade. Week Two produced the mirror opposite: the Valley used 780 million gallons more than the same week in 2013. On Friday, the end of Week Three, the Valley returned to conservation mode by using 208 million gallons less than the same week in 2013, the Association announced. Of note is the fact that the group of 60 retail water agencies, including San Gabriel Valley Water Co., Suburban Water Systems, Golden State Water Co., Covina Irrigating Co. and 16 local cities is reporting on how the Main San Gabriel Basin and the Raymond Basin are doing as a whole; it’s not releasing city-by-city comparisons. “The Association wanted to stress, regardless of where you get your water in the San Gabriel Valley, your fate is tied to everyone else,” said Adan Ortega, a water consultant hired by the Association to work on the campaign. Except for cities outside the basin, such as Walnut, Rowland Heights and most of La Verne, that same boat would be the vast San Gabriel Basin, an underground lake that stretches from the 710 to the 57 freeways and from the base of the San Gabriel Mountains to the Whittier Narrows. The Raymond Basin includes Pasadena, La Cañada Flintridge and La Crescenta. The region gets 85 percent of its water from underground sources, i.e. well water. But the statewide, four-year drought has forced water agencies and cities to rely more heavily on well water, dropping the San Gabriel Basin to an historic low and threatening to leave some wells bone dry if the winter doesn’t bring rain. Advertisement Page 1 of 3 Nov 05, 2014 09:12:52AM MST http://www.sgvtribune.com/environment-and-nature/20141026/san-gabriel-valley-getting-graded-on-local-ground-water-basin-usage Advertisement “We are making these announcements every week. That in itself should send the message that things are serious,” Ortega said. The Association is using print ads, digital media, social media, email blasts and posts on its website to deliver the message. “The idea is not to let the ground water levels go down anymore. We need to stop it,” Ortega said. Added SGVWA President Dan Arrighi in a prepared statement: “Publishing the groundwater level on a weekly basis will help track our progress and help residents understand the importance of looking at drought solutions as a community effort.” The swings from more water saved to more water used to more water saved gives a murky picture of water use but one that carries lessons. Ortega surmised that the second week, in which 780 million more gallons were drawn from the basin, may have been due to operators at the Los Angeles County Arboretum and Botanic Gardens in Arcadia and Descanso Gardens in La Cañada Flintridge re-filling ponds and fountains. “If I was a facility manager, and I have a large pond, I may think a second time before I fill that pond,” Ortega said. Water agencies flushing water due to ineffectual blending is also a cause of usage spikes. Flushing lines must be done if water quality does not meet health and safety standards, he said. Pinpointing large water use week-by-week would take more surveys and finer detection tools, he said. The omnibus look at basin usage, especially during an “alert,” should signal everyday customers that they could do better. For example, all homeowners should stop watering their St. Augustine lawns from mid-October through April, he said, because the popular variety in the San Gabriel Valley goes dormant in the winter. “If you have St. Augustine (grass), turn off your sprinklers,” he said. He recommends no watering until April, or May if it rained in the winter. People with gardens and lawns usually think October through December means the hot weather is over. But in Southern California, this is when temperatures can spike and humidity can drop. “It is during this season you can watch the groundwater table plummet,” he said. The Upper San Gabriel Valley Municipal Water District declared a water supply emergency for the region this week and asked Metropolitan Water District of Southern California for more replenishment water to soak into the basin. If it doesn’t happen naturally, or if not enough imported water is filtered in from Northern California, the drought could permanently change the geology of the local aquifers. “The real danger is if we dry out the basin ... and we can’t replenish it. It is like corrugated cardboard. It flattens out,” Ortega warned. “Then we may not be able to store water there in the future.” Reach the author at [email protected] or follow Steve on Twitter: @stevscaz. Page 2 of 3 Full bio and more articles by Steve Scauzillo Nov 05, 2014 09:12:52AM MST