SupaLite Building Control Brochure

Transcription

SupaLite Building Control Brochure
Building Control
Information Sheet
Please complete this form in full as instruction to carry out the Building Control function as a Corporate Approved
Inspector as designated under the Building Act 1984 and the Building (Approved Inspectors) Regulations 2010.
The completed form should be returned to SupaLite Tiled Roof System via email to [email protected],
by fax to 01772 828658 or post to Unit 4 Croft Street, Preston, Lancashire PR1 8SU.
PROJECT DETAILS
Be on the right side of
Description of Work
Address of Site
Anticipated Start Date
Project Duration
Estimated Cost of Works
Fee (if agreed)
BUILDING CONTOL
CLIENT DETAILS
Name
Address/Company
Tel/Contact Details
t
n
e
i
l
C
f
o
e
Peac nd
Mi
Email Address
DOMESTIC SCHEME WARRANTY PROVIDER (if applicable)
Address/Company
AGENT DETAILS
Name
SUPALITE TILED ROOF SYSTEM
Address/Company
UNIT 4 CROFT STREET
PRESTON
LANCASHIRE
PR1 8SU
Tel/Contact Details
01772 828060
Email Address
[email protected]
CONTRACTORS DETAILS
can now supply you with a
Building Regulations
Certificate
INVOICE FEE TO
Please indicate to whom
the fee should be invoiced
❏ Tick if same as Contractor
alongside every roof
AUTHORISATION (signed by the client giving authorisation to jhai to proceed with the project and sign the initial notice on their behalf)
Signature
Print Name
Date
Submit Form with Order
Take Installation Photos
Receive your Certificate
the grey area that is
BUILDING CONTROL
Just FIVE Easy Steps
1
We have noticed the demand from building control offices throughout the UK demanding that the
solid roof system require building control approval.
As you probably know that to put this through you local council building control department can be
somewhat tedious with all the misunderstanding about what the SupaLite Roof actually is.
It is NOT an extension, it is merely a roof conversion
So to make life easier we at Supalite Tiled Roof Systems Ltd have jointed in partnership with JHAi, the UK’s
largest independent building control company, and have, after a little negations on their fees, managed to get
JHAi to reduce their fees from £225 plus vat down to £175 plus vat.
For just a small initial outlay you can provide your customer with a building
control certificate and a lifetime peace of mind guarantee.
•
Your customer is more likely to buy from yourself, with the confidence that
you are a thorough reputable company.
•
The home owner is safe in the knowledge that the structure is sound and
that there are no planning issues if the home was ever to be sold.
Simply start the process by completing one of
our Building Control Information Sheet forms,
see reverse of this brochure, and return it to
SupaLite along with your roof order.
2 Take a before photo
It is an important part of the process that we
receive at least one photograph of the
conservatory ‘BEFORE’ any work commences.
We know that from one of our largest customers Tyneside Home Improvements.......
.......
•
Complete the form
It is the installers responsibility to provide SupaLite with these photos.
3 Take a during photo
It is an important part of the process that we
receive at least one photograph during
installation showing the insulation in place.
It is the installers responsibility to provide SupaLite with these photos.
4
Take an after photo
It is an important part of the process that we
receive at least one photograph of the
completed roof conversion.
It is the installers responsibility to provide SupaLite with these photos.
e 2010
1984
0 (“th
g Act
s 201
uildin
ation
the B
Regul
51 of
etc.)
rs
ecto
Insp
t
emen
roved
E
Replac vel at
g (App
ICAT
le
A/15
uildin
RTIF
06/M
floor
The B tions")
AL CE
2061
ound
IN
gr
la
F
k:
u
at
or
Reg
ing w ed works
at
follow
le /
the
associ
e who
s to e roof and
as th 2015.
9UP
relate
lit
ove w
7/
SN11
Supa
cate
ed ab
d 03/0
shire
certifi roof with
ilt
is
W
describ ai ltd date
Th
tory
work
Calne
jh
been
1.
va
e
e
s
er
by
th
os
n
Cl
d
cons
ove ha
tor an notice give
berley
ed ab jhai ltd by
inspec
17 Am
itial
describ
to
proved ed in an in
work assigned
an ap
rib
, the
w
is
sc
ns
lo
de
be
nctio
jhai ltd the work
ty
aph 4
the fu
2.
of
a cavi
paragr
med
part
ial into
said in ve perfor
mater
ha
hat is
.
lating
ai ltd
t to w
lations
of insu
Subjec ed and jh 2010 Regu
n
io
3.
et
in the
sert
of the
compl
the in
scribed
tion 8
volves rried out.
ork de
regula
ca
ove in
the w
been
ed ab
of all
rib
t
t
sc
no
ec
the
resp
/ has
ork de
nt to
ed in
The w d this has
releva
4.
en issu
under
ove.
rance
ated
wall an
now be graph 2 ab
of insu dy design
have
n
ra
s
io
pa
te
at
bo
in
ca
e
declar
by th
certifi referred to
d of a ster kept
Final
al an
5.
gi
notice
approv e on the re
initial
tice of
e ar
the no this notic lations.
of
above
es
in
gu
Re
ed
Copi
scribed
6.
describ of the 2010
ork de
work
the w
tion 3
st in
ork.
regula
intere above.
inor w
m
al
t
ci
ments
2
an
quire
/ is no
or fin paragraph
the re
ork is
sional
in
The w
) that
profes described
7.
idence
d no
ve ev
ve ha itial notice
si
ha
lu
nc
jhai ltd ving the in
not co plied with.
15
8.
gi
(but
m
9/20
since
en co
18/0
idence
is ev te have be
Date
cate
ca
certifi
certifi
e
This
th
9.
ed in
specifi
n
Sectio
5 Receive certificate
You receive a JHAi Building Regulations Certificate
to pass on to your satisfied customer, and for
added peace-of-mind we at SupaLite can send
your customer one of our Product Guarantee
Warranties.
COMPLETE SATISFACTION FOR JUST £175
+VAT
we have negotiated a special discounted rate with JHAi that we pass on to you, the installer,
building trust and reassurance in both the SupaLite brand and your company.
Submit Form with Order
Take Installation Photos
Receive your Certificate
Submit Form with Order
rvic
cal Se
Techni
or of
Andrew
ng
ni
d Lear
es an
Signed
ct
- Dire
Crooks
Ap
jhai ltd
Inspec
proved
tor
Take Installation Photos
s Place
Wigan Stone Cros
7b
Suite
Park
Cross
Stone
rne
Golbo
Receive your Certificate