Installation
Transcription
Installation
Perfect-Integrated Lightning Surge Protection Solution Report for Survey & < eca3G > Installation for Royal Malaysia Police - 6 Sites June 21. 2011 THAMES TECHNOLOGY SDN BHD < eca3G > Installation for Royal Malaysia Police - 6 Sites SITE Name 1. Balai Polis Setapak 2. Balai Polis Trafik KL 3. Balai Polis Sungei Besi 4. Balai Polis Sri Permaisuri Survey date Installation Date Installed <eca3G> Remark MAR 13 (Tue),2012. Apr 10 (Tue),2012. Two <eca3G-LP, 3P> One <eca3G-LP, 1P> SETAPAK Police Station Mar 14 (Wed),2012. Apr 13 (Fri),2012. Apr 20 (Fri),2012 Three <eca3G-LP, 3P> One <eca3G-LP, 1P> Mar 14 (Wed),2012. Apr 16(Thu). 2012 May 29 (Mon). 2012 Two <eca3G-LP, 3P> Sungei Besi Police Station Apr 20 (Fri),2012. Apr 20 (Fri),2012. One <eca3G-LP, 3P> Sri Permaisuri Police Station May 22 (Tue),2012. Jun 05 (Tue),2012. Two <eca3G-LP, 3P> Transport Work shop Branch station May 24(Thu),2012. Two <eca3G-LP, 3P> Police Training Center ( PULAPOL) , Branch Commander Office May 29 (Tue),2012. One <eca3G-LP, 3P> One <eca3G-LP, 1P> Police Training Center ( PULAPOL) , Branch School 5. Cawangan Pengangkutan May 18(Fri),2012. 6.PULAPOL a. Cawangan Kem Komandan 6.PULAPOL May 18 (Fri),2012. b. Cawangan Sekolah Total 6 sites Kuala Lumpur Traffic Control Center 1. Balai Polis Setapak (Setapak Police Station) - Survey Date : Mar 13 (Tue), 2012. - Installation Date : Apr 10 (Tue), 2012. 1. Balai Polis Setapak : <eca3G> Installation / Apr 10 (Tue),2012. SITE Name Balai Polis Setapak Protected Facility Frequent Power Trip PRS Cabinet & PABX Surveyed Date Mar 13 ( Tue), 2012 PDRM : ISP Azizi Thames : Rahim, Norshabudin, JB Installation Date Installed <eca3G> <eca3G> Location Site Status Improvement Work Apr 10 ( Tue),2012. 09:30pm~1:30 am PDRM : ISP Azizi, encik Nazmi, encik Fikri, encik Amier Thames : Rahim, Norshabudin, Anwar, JB , Mr Woo DB at Ground Floor : One <eca3G-LP, 3P> DB at !FL : One <eca3G-LP, 3P> PRS room at 1 FL : One <eca3G-LP, 1P> DB : Inside of DBs PRS : inside of Cabinet - Frequent Power trip - PRS system damages - PABX damage, hang - Power grounding & communication grounding is not connected. - PRS cabinets have not groundings - Combine groundings of PRS cabinets, PABX, connect to <eca3G>. - Improve bonding status of rack & equipment in cabinets - <eca3G> monitors power line surge, reverse surge, induced surge, via Distribution Boards , and eliminate with equi-potential status - N-G : 3.8 V (before) , N-G : 0.026 (after ) 1. Balai Polis Setapak : <eca3G> Installation TNB Meter Ground PRS PABX DB at Ground PRS Room 1 FL DB with TNB Meter / 1 FL Reporting Room /GL 1. Balai Polis Setapak : <eca3G> Installation <eca3G> preparation DB at Ground Floor <eca3G> preparation <eca3G> installation at GL-DB <eca3G> preparation TNB Meter at Ground Floor 1. Balai Polis Setapak : <eca3G> Installation / Apr 10 (Tue),2012. DB at 1st Floor – burn mark <eca3G> installation at 1 FL-DB TNB Meter for 1 FL-DB PRS Room preparation N-G : 0.026V after <ec3G> installation PRS room grounding to <eca3G> 1. Balai Polis Setapak : <eca3G> Installation / Apr 10 (Tue),2012. PRS Cabinet without Grounding Grounding improvement for equipment Bonding improvement for PABX Bonding improvement for PABX <eca3G> for PRS Cabinet grounding Bonding improvement for PRS 2. Balai Polis Trafik KL ( Kuala Lumpur Traffic Control Center Station) - Survey Date : Mar 14 (Wed), 2012. - Installation Date : Apr 13 (Fri), 2012 for Main DB, DBs Apr 20 (Fri), 2012 for PRS cabinet. 2. Balai Polis Trafik KL : <eca3G> Installation / Apr 20 (Fri),2012. SITE Name Protected Facility Surveyed Date Installation Date Installed <eca3G> <eca3G> Location Site Status Improvement Work Balai Polis Trafik KL Frequent Power Trip PRS Cabinet & PABX Mar 14 ( Wed), 2012 PDRM : ISP Azizi Thames : Rahim, Norshabudin, JB Apr 13 ( Fri),2012. 09:30pm~3:30 am for Main DB, two DBs Apr 20 ( Fri),2012. 10:00pm~11:30 am for PRS cabinet PDRM : ISP Azizi, encik Nazmi, encik Fikri, encik Amier Thames : Rahim, Norshabudin, Anwar, JB Main DB with TNB Meter , DB for PRS, DB for PABX : Three <eca3G-LP, 3P> PRS Cabinet : One <eca3G-LP, 1P> Main DB : Inside of Main DB DB for PABX : beside of DB, on the wall DB for PRS : beside of DB, on the wall PRS Cabinet : behind of Cabinet - Frequent Power trip - PRS system damages - PABX damage, hang - Power grounding & communication grounding is not connected. - PRS cabinets have not groundings - Improve bonding status of rack & equipment in cabinet , provide grounding & surge protection for PRS - Connect PABX communication grounding to power grounding, with <eca3G > - <eca3G> monitors power line surge, reverse surge, induced surge, via Distribution Boards , and eliminate with equi-potential status - N-G : 2.1 V (before) , N-G : 0.03 (after ) 2. Balai Polis Trafik KL : <eca3G> Installation PRS Room PABX Room TNB TR Main DB DB 2. Balai Polis Trafik KL : <eca3G> Installation <eca3G> preparation N-G potential difference before <eca3G> installation : 2.1 V Connect all <eca3G>s with bomba piping N-G after <eca3G> installation at Main DB : 0.03 V Bonding with conductive conduit <eca3G> connection to Main DB Bus Bar 2. Balai Polis Trafik KL : <eca3G> Installation <eca3G> install at Main DB Grounding connection at Main DB <eca3G> at DB for PRS <eca3G> at DB for PRS <eca3G> for PRS Cabinet grounding Bonding improvement 2. Balai Polis Trafik KL : <eca3G> Installation / Apr 10 (Tue),2012. <eca3G> installation at PABX room DB <eca3G> installation at PABX room DB Pipe Bonding at PABX room Bonding improvement at Cabinet equipment Grounding connection for PRS cabinet, Router cabinet, conductive pipe <eca 3G > for PRS cabinet 3. Balai Polis Sungei Besi ( Sungei Besi Police Station) - Survey Date : Mar 14 (Wed), 2012. - Installation Date : Apr 19 (Thu), 2012 - install <eca3G> Apr 20 (Fri), 2012 - connect to power line May 29 (Mon), 2012 – improve N-G bonding 3. Balai Polis Sungei Besi : <eca3G> Installation / Apr 20 (Fri),2012. SITE Name Protected Facility Surveyed Date Installation Date Installed <eca3G> <eca3G> Location Site Status Improvement Work Balai Polis Sungei Besi Frequent Power Trip PRS Cabinet & PABX Mar 14 ( Wed), 2012 PDRM : ISP Azizi Thames : Rahim, Norshabudin, JB Apr 19 ( Thu ),2012. 09:00pm~1:00 am , cabling, installtion Apr 20 ( Fri),2012. 3:00pm~5:00 pm , power line connect May 29 (Mon). 2012. 11:00 am – 12:00 , N-G improvement PDRM : ISP Azizi, encik Nazmi, encik Fikri, encik Amier Thames : Rahim, Norshabudin, Anwar, JB Main DB with TNB Meter : One <eca3G-LP, 3P> DB for PRS : One <eca3G-LP, 3P> Main DB : Inside of Main DB DB for PRS : beside of DB, on the wall - Frequent Power trip - PRS system damages - Power grounding & communication grounding is not connected. - PRS cabinets have not groundings - Improve bonding status of rack & equipment in PRS cabinet , connect to <eca3G> for grounding & surge protection for PRS - Connect PABX communication grounding to power grounding, - <eca3G> monitors power line surge, reverse surge, induced surge, via Distribution Boards , and eliminate with equi-potential status - N-G : 0.48 V (before) , N-G : 0.035 V (after ) 3. Balai Polis Sungei Besi : <eca3G> Installation Reporting Room DB PRS PABX Main DB IP PABX Room 3. Balai Polis Sungei Besi : <eca3G> Installation Grounding Cable for PRS : float Isolate grounding for PABX PRS Cabinet – improvement of bonding, grounding, connect to <eca3G> PABX communication grounding connect to power grounding < eca 3G > preparation Main DB connection 3. Balai Polis Sungei Besi : <eca3G> Installation <eca3G> connection at Main CB <eca3G> connection at Main DB <eca3G> at DB for PRS <eca3G> at DB for PRS N-G after <eca3G> installation at Main DB : 0.035 V < eca3G> connection at DB 4. Balai Polis Sri Permaisuri ( Sri Permaisuri Police Station) - Survey Date : Apr 20 (Fri), 2012. - Installation Date : Apr 20 (Fri), 2012 4. Balai Polis Sri Permaisuri : <eca3G> Installation / Apr 20 (Fri),2012. SITE Name Protected Facility Balai Polis Sri Permaisuri Frequent Power Trip PRS Cabinet Surveyed Date Mar 20 ( Fri ), 2012 PDRM : ISP Azizi Thames : Rahim, Norshabudin, JB Installation Date Apr 20 ( Fri),2012. 5:30pm~7:30 pm PDRM : ISP Azizi, encik Nazmi, encik Fikri, encik Amier Thames : Rahim, Norshabudin, Anwar, JB Installed <eca3G> DB for building : One <eca3G-LP, 3P> <eca3G> Location beside of DB, on the wall - Frequent Power trip - Power grounding & communication grounding is not connected. - PRS cabinets have not groundings - Improve bonding status of rack & equipment in PRS cabinet , connect to <eca3G> for grounding & surge protection for PRS - Connect antenna grounding to <eca3G> - <eca3G> monitors power line surge, reverse surge, induced surge, via Distribution Boards , and eliminate with equi-potential status - N-G : 4.1 V (before) , N-G : 0.012 V (after ) Site Status Improvement Work 4. Balai Polis Sri Permaisuri : <eca3G> Installation 4. Balai Polis Sri Permaisuri : <eca3G> Installation Power supply to the building DB : 3P 4W PRS Cabinet - no grounding, Wireless system antenna : isolate grounding N-G before install : 4.1 V MGB to external Grounding rod 4. Balai Polis Sri Permaisuri : <eca3G> Installation Grounding connection to PRS cabinet to <eca3G> <eca3G> at DB Grounding cabling : bonding improvement <eca3G> at beside of DB <eca3G> preparation N-G after <eca3G> installation at DB : 0.012 V 5. Cawangan Pengangkutan ( Transport Branch ) - Survey Date : May 22 (Tue), 2012. - Installation Date : June 05 (Tue), 2012 5. Cawangan Pengangkutan ( Transport Branch ) SITE Name Protected Facility Cawangan Pengangkutan ( Transport Branch ) Frequent Power Trip PRS Cabinet and PABX CCTV , DVR, Surveyed Date May 22 ( Tue) , 2012 PDRM : ISP Azizi Thames : Rahim, Norshabudin, JB Installation Date Installed <eca3G> <eca3G> Location Site Status Improvement Work June 05 ( Tue ),2012. 11:00pm~3:30 pm PDRM : ISP Azizi, encik Nazmi, encik Fikri, encik Amier Thames : Rahim, Norshabudin, Anwar, JB DB 1 for PRS cabinet building : One <eca3G-LP, 3P> DB 2 for Monitoring building ( DVR, PABX) : One <eca3G-LP, 3P> beside of DB 1, on the wall beside of DB 2, on the wall - Frequent Power trip - Power grounding & communication grounding is not connected./PABX - PRS cabinet has not grounding, frequent damaged - CCTV, DVR damaged - PC damaged - Improve bonding status of rack & equipment in PRS cabinet , connect to <eca3G> for grounding & surge protection for PRS - Connect PABX grounding to power grounding - <eca3G> monitors power line surge, reverse surge, induced surge, via Distribution Boards , and eliminate with equi-potential status - Surge eliminate through coaxial cable - N-G : 0.46 V (before) , N-G : 0.003 (after ) 5. Cawangan Pengangkutan : <eca3G> Installation Lake side CCTV – 8 units Grounding Rod Work shop <eca3G-LP>, 3P 8 SPD for DVR cable connection GR Office B/D 10M x 20M Meeting B/D 6M x 10M GR GR DB 2 HUB Cabinet DB 1 GR Monitoring 5M x 6M Meer GR GR Monitor DVR GR Motor driven Sliding Door Road side PABX 5. Cawangan Pengangkutan : <eca3G> Installation PRS cabinet bonding improvement < eca3G> at PRS DB ( DB 1) < ROUTER>- grounding point connected to <eca3G> MGB < eca 3G > installation at DB 1 Grounding cabling of PRS to <eca3G> N-G after < eca3G > installation : 0.003 V 5. Cawangan Pengangkutan : <eca3G> Installation < eca 3G > installation at DB 2 ( for DVR, PABX building ) < eca 3G > installation at DB 2 ( for DVR, PABX building ) <video SPD > preparation for DVR < video SPD > installed at DVR input CCTV ( eight ) – 4 CCTV were damaged PABX grounding connect to power groun 6-a. Cawangan Kem Komandan ( PULAPOL) Police Training Center , Branch Commander Office - Survey Date : May 18 ( Fri ), 2012. - Installation Date : May 24 (Thu ), 2012 6-a. Cawangan Kem Komandan ( PULAPOL) SITE Name Protected Facility Cawangan Kem Komandan ( PULAPOL) Frequent Power Trip PRS Cabinet and PCs damages Surveyed Date May 18 ( Fri ) , 2012 PDRM : ISP Azizi Thames : Rahim, Norshabudin, JB Installation Date Installed <eca3G> <eca3G> Location Site Status Improvement Work May 24 ( Thu ),2012. 11:00pm~4:00 pm PDRM : ISP Azizi, encik Nazmi, encik Fikri, encik Amier Thames : Rahim, Norshabudin, Anwar, JB DB 1 for Office 1 : One <eca3G-LP, 1P> DB 2 for Office 2 : One <eca3G-LP, 1P> beside of DB 1, on the wall beside of DB 2, on the wall - Frequent Power trip - Power grounding & communication grounding is not connected./PABX - PRS cabinet has not grounding, frequent damaged - PC damaged - Improve bonding status of rack & equipment in PRS cabinet , connect to <eca3G> for grounding & surge protection for PRS - <eca3G> monitors power line surge, reverse surge, induced surge, via Distribution Boards , and eliminate with equi-potential status - N-G : 6.95 V (before) , N-G : 0.057 (after ) / DB 1 - N-G : 7.19 V (before) , N-G : 0.027 (after ) / DB 1 6-a. Cawangan Kem Komandan ( PULAPOL) : <eca3G> Installation 6-a. Cawangan Kem Komandan ( PULAPOL) : <eca3G> Installation PRS cabinet bonding improvement N-G : 6.95V before install < eca3G> at DB 1 1P 2W power supply from TNB Grounding point of DB is floating, not connected to grounding rod. DB 1 and PRS Cabinet ( no grounding) Grounding improvement for PRS cabinet 6-a. Cawangan Kem Komandan ( PULAPOL) : <eca3G> Installation < eca 3G > installation at DB 1 < eca 3G > installation at DB 1 N-G : 0.053 V after install < eca3G> at DB 1 < eca 3G > installation at DB 2 at Office 2 < eca 3G > installation at DB 2 at Office 2 N-G : 0.019 V after install < eca3G> at DB 2 at Office 2 6-b. Cawangan Sekolah ( PULAPOL) Police Training Center , Branch School - Survey Date : May 18 ( Fri ), 2012. - Installation Date : May 24 (Thu ), 2012 6-b. Cawangan Sekolah ( PULAPOL) SITE Name Protected Facility Surveyed Date Installation Date Installed <eca3G> <eca3G> Location Site Status Improvement Work Cawangan Sekolah ( PULAPOL) Frequent Power Trip ( Whole building ) Hub Cabinet ( 1 FL) : surge damages May 18 ( Fri ) , 2012 PDRM : ISP Azizi Thames : Rahim, Norshabudin, JB May 24 ( Thu ),2012. 2:00pm~6:00 pm : Install & improving May 29 ( Tue ). 2012. 11:00am~1:00 pm : Connect grounding cable between Switched and Main DB June 20 (Wed ). 2012, 6:00pm~6:30 pm : Grounding cable connection between Main DB eca3G and Hub Cabinet eca3G directly PDRM : ISP Azizi, encik Nazmi, encik Fikri, encik Amier Thames : Rahim, Norshabudin, Anwar, JB Main DB at the Lobby : One <eca3G-LP, 3P> Hub Cabinet at 1 FL : One <eca3G-LP, 1P> Main DB : inside of Main DB Hub Cabinet : inside of Cabinet - Frequent Power trip - Power grounding & communication grounding is not connected. - Grounding cable connection status is poor, between Main DB and Switched, Main DB to upper floor DBs, ( no connectivity from Main DB to Hub Cabinet ) - Hub cabinet has not grounding, Surge damaged - Improve bonding status of rack & equipment in Hub cabinet , connect to <eca3G> for grounding & surge protection for PRS - <eca3G> monitors power line surge, reverse surge, induced surge, via Distribution Boards , and eliminate with equi-potential status - Additional Grounding cabling between Main DB and Switched. - Grounding cable connection between Main DB eca3G and Hub Cabinet eca3G directly - Main DB : N-G : 3.6 V (before) , N-G : 0.054 (after ) - Hub Cabinet : N-G : 6.9 V (before) , N-G : 0.145 (after ) at Receptacle 6-b. Cawangan Sekolah ( PULAPOL ) : <eca3G> Installation Hub Cabinet Room / 1FL Meer Main DB Main Lobby GD FL HUB Cabinet 6-b. Cawangan Sekolah ( PULAPOL ) : <eca3G> Installation <Switches> and Main DB - no grounding connection Grounding cable installed between <Switches> and Main DB ( a little improved at 1 FL ) Grounding cable in Main DB : float ZCT, <eca3G> cable connections in Main DB < eca 3G > preparation < eca 3G > installation at Main DB at the Lobby 6-b. Cawangan Sekolah ( PULAPOL) : <eca3G> Installation N-G : 0.054 V after install < eca3G> at Main DB at the Lobby2 Main DB Grounding Cable in Main DB : connect to MGB ( improvement ) Hub cabinet at 1 FL, no grounding Grounding cable installed between <Switches> and Main DB Bonding improvement of Hub Cabinet at 1 FL 6-b. Cawangan Sekolah ( PULAPOL) : <eca3G> Installation Direct grounding cable connection between Main DB ecaG and Hub cabinet eca 3G Grounding cable connection at <eca3G> of Main DB from <eca3G> of hub cabinet N-G improve 0.145 V from 4.9 V after direct connection for two <eca 3G > at Receptacle , 1 FL <eca3G> at Hub Cabinet - Direct connected grounding cable from Main DB <eca3G> at Hub Cabinet - Direct connected grounding cable from Main DB N-G improve 0.211 V from 4.9 V after direct connection for two <eca 3G > at Cabinet , 1 FL THANK YOU !!
Similar documents
Bandar Kinrara TM Sites survey
Perfect-Integrated Lightning Surge Protection Solution Ebor North Toll , Shah Alam Report for < eca3G > Installation
More informationN Washington State Convention Center Level One: Entrances
3. Theater, Classroom and “At Rounds” sets in the following meeting rooms include front of room space adequate for head table on a riser: Rooms 602-614 @ 10’ to 12’ deep; Rooms 615-620, 4C1-4 and ...
More information