Case Study "Zimbi"
Transcription
Case Study "Zimbi"
Project “Zimbi” A PV/Diesel Hybrid Power Case Study MINING CRONIMET Mining AG is Mining >>> Processing >>> Trading >>> Energy 1. CRONIMET Mining Group 2. Innovative Trade Finance: Commodity Energy Swap 3. Case Study “Zimbi” – PV/Diesel Hybrid Power 4. Contact 2 CRONIMET Mining Group Intro 3 1. CRONIMET Mining Group 2. Innovative Trade Finance: Commodity Energy Swap 3. Case Study “Zimbi” – PV/Diesel Hybrid Power 4. Contact 4 Innovative Trade Finance Commodity y for Energy gy Swap p • Innovative Trade Financing • No Up-front Cost for Miner • Secured PPA with Mineral Ore • Energy Hedge against Diesel • Lower Annual Opex for Miner • Reduced Cash Conversion Cycle 5 1. CRONIMET Mining Group 2. Innovative Trade Finance: Commodity Energy Swap 3. Case Study “Zimbi” – PV/Diesel Hybrid Power 4. Contact 6 Case Study – “Zimbi” Chromite Mine in South Africa “W sought “We ht immediate i di t di diesell reduction d ti and dd demanded d d llower opex”” Moritz Hill, Director, CRONIMET Chrome South Africa (Pty.) Ltd. Ch Chromite it Mi Mine, South S th Africa Af i CRONIMET Chrome Ch South S th Africa Af i (Pty.) (Pt ) Ltd. Ltd Location and Deposit North Western Bushveld complex, 250 km NW of Johannesburg Size 2,444.2 ha Resources 5.6 Mt LG 6 and MG with 38% Cr203 (opencast) 33.0 Mt LG 6 with 43.6% Cr203 (underground) Mining Right 30 years (granted in March 2010) Processing Up to 40 ktpm (opencast) By developing the underground mine up to 90 ktpm Products Energy Resource Energy Consumption Mining Product: Chromium ores and concentrates Captive Diesel Fired Generators / Photovoltaic Hybrid 1.6 MVA 7 Case Study – “Zimbi” PV/Diesel Hybrid y System y ((Thabazimbi)) Thabazimbi PV Diesel Hybrid y Plant Location: South Africa Installed Diesel Power: 1.6 MVA Voltage: g 525V Annual Diesel Burn (Liters) 1.9 million liters/yr Annual Diesel Fuel Cost $ 2.18 million/yr Installed PV Power: 1 MW PV Penetration Ratio: 60% Annual PV Energy p.a.: 1,800,000 kWh Ratio of PV to Total Energy: up to 30% Annual Diesel Savings: 450,000 liters Planning, Development & Financing: Three Months Construction: Three Months Commissioning: November 2012 From Concept to Commissioning in 6 Months 8 Case Study – “Zimbi” Planning g DEVELOP BUILD OPERATE > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > Solar irradiation energy yield (per year): 1850 kWh/kWp 1 MW of Photovoltaic (97% Availability) x 1000 kWp Total Annual Electricity from PV 1,800,000 kWh Genset Efficiencyy Ratio ((1/4 liter = 1kWh)) x 0.25 Annual Diesel Savings (liters) 450,000 liters Cost of Diesel / liter (2012) x $ 1.15 / liter Annual Diesel Savings ($$$) $500,000 PV Plant E Expense pense (CAPEX) $2 66 million $2.66 9 Case Study – “Zimbi” Planning g - Financial Feasibility y DEVELOP BUILD OPERATE > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > 4,50 $ 4,00 $ CAPEX Cumulated Diesel OPEX Savings Diesel g gensets 2 x 800 kVA PV Plant 1000 kWp 2,50 $ CAPEX $ 2.66 million 2,00 $ O&M 1% of CAPEX Di Diesel l Price P i (2012) $ 1.15 1 15 / liter lit PV OPEX 3 50 $ 3,50 3,00 $ Dies sel PV Break Even 3.6 years 1,50 $ 1,00 $ 0,50 $ Annual Diesel Fuel Savings Diesel Inflation p.a. 12% PV M Millionen Simple PV Break Even vs. Diesel Operating Costs - $ FY1 FY2 FY3 FY4 FY5 Breakeven in just under four years! 10 Case Study – “Zimbi” Planning g – Optimal p PV Penetration DEVELOP BUILD OPERATE > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > Plant Controller Necessary No Controller PLoad 30% Genset Baseload t PLoad L LCOE 30% 30% PLoad Genset Baseload t Optimized 30% 0,1 0,2 0,3 Genset Baseload 0,4 t 0,5 0,6 0,7 0,8 PV Diesel Ratio 11 Case Study – “Zimbi” Planning g - System y Analysis y DEVELOP BUILD OPERATE > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > Interface 1 Industry proven grid connection: > 30GW in Germany alone Photovoltaic 1071 kVA X Load Demand for Energy Eload PV Energy EPV l d load DC Y AC Diesel Energy 1,6 MVA EDiesel G 800 kVA G 800 kVA 997,92 kWp EDiesel = Eload - EPV Interface 2 Necessary for system stability PV Monitoring and Control Power System Monitoring & Control 12 Case Study – “Zimbi” Planning g - System y Analysis y DEVELOP BUILD OPERATE > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > Dynamic Behavior of Diesel Power System Static System Analysis Well known Transient Response • PV must not influence system stability • Sufficient Spinning reserve Apply load or PV power drop Speed dip • PV must not damage the Diesel Generator • Base Load of 30% at all times Remove load or PV power increase Speed increase Dynamic Behavior of PV Power Plant Weather Data Pgenset_max 1 slightly clouded Load Pgenset_min 30% P/P(STC C) 0,8 PV clear sky day cloudy day 06 0,6 0,4 0,2 Genset 0 Time (24 Hours) 13 Case Study – “Zimbi” Financing g – Discounted Diesel Savings g Analysis y DEVELOP BUILD OPERATE > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > Diesel Diesel CAPEX CAPEX & & OPEX OPEX Key Value Drivers Costs Costs HybridPV System Costs PV FY2 20 FY2 20 FY20 0 FY1 FY1 19 FY19 99 FY1 FY1 18 FY18 88 FY1 FY1 17 FY17 77 FY1 FY1 16 FY16 66 FY1 FY1 15 FY15 55 FY1 FY1 14 FY14 44 FY1 FY1 13 FY13 33 FY1 FY1 12 FY12 22 FY1 FY1 11 FY1 11 FY1 FY1 10 FY10 00 FY Y9 FY Y9 FY9 9 FY Y8 FY8 8 FY Y8 FY7 7 FY Y7 FY Y7 FY6 6 FY FY Y6 Y6 FY5 5 FY Y5 FY Y5 FY4 4 FY Y4 FY Y4 FY3 3 FY Y3 FY Y3 Diesel Savings 2 FY2 FY Y2 FY Y2 5,6 5,6 $$ 5,2 5,2 $$ 4,8 $$ 4,8 4 44 $$ 44,4 4,4 4,0 $$ 4,0 3,6 $$ 3,6 3,2 $$ 3,2 2,8 $$ 2,8 2,4 $$ 2,4 2 00 $$ 22,0 2,0 1,6 $$ 1,6 1,2 $$ 1,2 0,8 $$ 0,8 0,4 $$ 0,4 0,0 $$ 0,0 CAPE X CAPE EX FY 1 FY Y1 FY Y1 Millions Millionen Millions Annual Day-time Energy Cost Savings Total Annual Litres Total Annual Daytime Litres Diesel Price/Litre (Year 1) Annual Diesel Inflation 1,900,000 1,051,200 $ 1,15/L 12% PV Investment (CAPEX) PV Plant Operating p g ((Year 1)) Annual Diesel Savings $ 2.66 million $ 34,000 , 450,000 Plant Operating Life 20-years NPV @ 15% Discount Rate: $ 3,150,000 3 150 000 NPV of Diesel Savings = $ 3 million 14 Case Study – “Zimbi” Construction & System y Integration g Onsite System Integration Period of Two Months 15 Case Study – “Zimbi” Completed p 1 MW PV - 1.6 MWA Diesel Hybrid y Power System y PV Power: Area: Electricity: Diesel Savings: CO2 Displacement: 1MW Installed 1.5 Hectares 1,800 MWh/year 450,000 liters/year ~ 2000 tones/year 16 Case Study – “Zimbi” Operating p g Since November 2012 DEVELOP DEVELOPMENT FINANCE BUILD BUILD OPERATE OPERATE > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > PV Power Plant Control Hi h Daily High D il Fuel F l Savings S i Up to 60% Daily Fuel Savings Solea Renewables 17 Case Study – “Zimbi” Operating p g Since November 2012 DEVELOP DEVELOPMENT FINANCE BUILD BUILD OPERATE OPERATE > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > Proof Of Concept › Successful Operation since November 2012 Maintenance › Panel cleaning in dry season necessary two times a month › Cleaning of substation and inverter fans four times per year Operational Experience › Data Analysis and asset management due to power data logging (Solar, Power, efficiency) › Online Monitoring provides worldwide service access to reduce travel costs 18 1. CRONIMET Mining Group 2. Innovative Trade Finance: Commodity Energy Swap 3. Case Study “Zimbi” – PV/Diesel Hybrid Power 4. Contact 19 Contact Thank You Rollie Armstrong Moritz Hill Managing Director Director CRONIMET Mining Power Solutions GmbH Ottobrunner Str. Str 39 82008 Unterhaching CRONIMET Chrome South Africa (Pty.) Ltd. Block B Willowvale Office Park 15 Van Hoof Close, Little Falls 1735 Johannesburg, South Africa Tel.: +49 89 919 290 173 Mobil: +49 176 609 1310 6 E il [email protected] Email: lli t @ Tel.: +27 11 958 0544 Fax: +27 86 631 7742 E il [email protected] Email: it hill@ 20