Overview of AI Motorway Corridor Vc and Corridor X
Transcription
Overview of AI Motorway Corridor Vc and Corridor X
Overview of the Adriatic-Ionian Motorway (Mediterranean corridor) Albanian and Montenegrin sections • Start: Neum Northwest/CRO border/Debeli Brijeg (MNE) • End: Kakavije (ALB-GRE border) • Length: approx. 342 km (MNE:110 km, ALB: 232 km) • Average daily traffic : 9,593 veh/day (Route 1), 6,302 veh/day (Route 2b) ADRIATIC-IONIAN MOTORWAY Ongoing projects: 1) Feasibility Study for the Adriatic-Ionian Motorway/Expressway • WBIF grant, 4 million EUR (2.5 ml Euro to Albania and 1.5 ml Euro to Montenegro) 2) Route 2c – Construction of Levan – Tepelene (95% completed) • Total cost 106 million EUR Projects in preparation (*) 1) Adriatic-Ionian Motorway/Expressway - Route 1 (MNE) • Total est. cost 880 million EUR 2) Adriatic-Ionian Motorway/Expressway - Route1/Route 2b/Corridor VIII/Route 2c (ALB) • Total est. cost 698 million EUR I. Route 2b - Upgrade of Thumane-Kashar-Vore Road connection node • Total est. cost 90 million EUR II. Route 2b – Construction of Tepelene bypass • Total est. cost 38 million EUR III. Route 2b – Construction of Lezha bypass • Total est. cost 24 million EUR (*) Based on the Multi-annual Plan (MAP) Priority project list ADRIATIC-IONIAN MOTORWAY Total estimated cost for these sections : 1.850 M€ of which 200 M€ already spent. 1.650 M€ still to be invested Overview of Corridor Vc (Mediterranean Corridor road and rail) Start: Bosanski Samac (BiH/Croatian border - North) End: Bijaca (BiH/Croatian border – South) Length: 400 km AADT: 9,120 veh/day Start: Bosanski Samac (BiH) End: Capljina (BiH) Length: 428 km Ton km: 1,020 million tkm (24% of regional freight traffic) PROJECTS ON CORRIDOR Vc ROAD PROJECTS: Ongoing projects: 1) Construction of motorway section Svilaj- Odžak, Border Crossing and Interstate Bridge on the Sava River”. WBIF Contribution of 22 million EUR (investment co-financing grant) + 350,000 (TA grant) Ø est. cost of project: 109,35 million EUR (WBIF financing approved in 2015) 2) Upgrade of motorway section Zenica North-Zenica South/Drivusa Ø est. cost of project: 227,9 million EUR ROAD PROJECTS: Potential projects for funding (*) : 1) Ø Construction of motorway section Odzak Vukosavlje – Podnovolje – Rudanka – Doboj south est. cost :356 million EUR 2) Completion of motorway section Tarcin – Konjic Ø est. cost: 400 million EUR 3) Completion of motorway section Mostar north – Pocitelj Ø est. cost: 350 million EUR 4) Motorway section: Buna – Počitelj Ø est. cost : 35,5 million EUR 5) Motorway section: Mostar south–Buna Ø Test. cost: 183 million EUR 6) Motorway section: Nemila–Zenica North Ø est. cost : 146,06 million EUR 7) Motorway section: Tunnel Zenica- Tunnel Pečuj est. cost : 37,47 million EUR (*) Based on the Multi-annual Plan (MAP) Priority project list, Single Pipeline projects ROAD PROJECTS corridor Vc: Total amount estimated : 1.827 M€ of which 227 M€ on going activities and 109 M€ allocated from WBIF Investment still needed: approx. 1.600 M€ RAILWAY PROJECTS: Ø Ongoing project: 1) Track rehabilitation and signalling improvement of section Sarajevo - Bradina Ø Total est. cost- 41 million EUR (EBRD loan) Ø Projects Eligible for Funding - Multi- annual Plan (MAP) Priority project list : 1) Overhaul of railway section Sarajevo – Podlugovi (nominated in MAP 2016 and pre-identified list of Core Network projects) Ø Total est. cost – 22,5 million EUR Total investment forseen in rail on Corridor Vc = 65 M€ How much still needed to improve the corridor's performance? Overview of Corridors X, Xb,Xc (Orient East Road Corridor : road) Corridor X Start: Batrovci R/Croatian border) End: Bogorodica (MKD/Greek border) Branch Xb Start: Hungarian border/Horgos End: New Belgrade (SER) Branch Xc Start: Nis (SER) End: Gradina/BG Border Length: 1,021 km AADT: 30,129 veh/day Overview of Corridors X, Xb,Xc (Orient East Med : rail) Corridor X Start: Sid (SER) End: Gevgelija/GR border) Branch Xb Start: Hungarian border/Kelebija End: Stara Pazova (SER) Branch Xc Start: Nis (SER) End: Dimitrovgrad/BG Border Length: 985 km Ton km: 2,142 million tkm ROAD PROJECTS ON CORRIDORS X, Xb, Xc ONGOING ROAD PROJECTS ROAD PROJECTS Projects for preparation - Multi-annual Plan (MAP) 2016 Priority project list : 1) Implementation of ITS on Road Corridor X (MKD) Ø Total est. cost: 20 million EUR Projects eligible for funding - Multi-annual Plan (MAP) 2016 Prority project list : 1) Completion of Belgrade bypass, sector 6: Strazevica – Bubanj Potok (SER) Ø Total est. cost: 97 million EUR 2) Rehabilitation of the road section Negotino – Demir Kapija (MKD) Ø Total est. cost: 9 million EUR ROAD PROJECTS ON CORRIDORS X, Xb, Xc Total cost of on-going ROAD PROJECTS : approx 1.560 M€ Investment foreseen : 130 M€ RAILWAY PROJECTS ON CORRIDORS X, Xb, Xc ONGOING RAILWAY PROJECTS RAILWAY PROJECTS Potential projects(*) : 1) Modernization of Nis – Presevo (border with MKD) railway line Ø Total est. cost: 265 million EUR 2) Reconstruction, modernization and construction of the second track on section Stalac – Djunis of the railway Belgrade – Nis Ø Total est. cost: 106 million EUR 3) Modernization for the contemporary double-track traffic of the single-track section of railway line Resnik – Klenje – Mali Pozarevac – Velika Plana Ø Total est. cost: 368 million EUR 4) Corridor Xb: Reconstruction and modernization of track from Belgrade – Novi Sad – Serbian/Hungarian border (Horgos) Ø Total est. cost: 791 million EUR 5) Corridor Xc: Electrification and upgrading of Nis – Dimitrovgrad – Serbian/Bulgarian border (Dimitrovgrad) Ø Total est. cost: 170 million EUR (*) Based on the Multi-annual Plan (MAP) Priority project list Total investment on-going in rail : 214 M€ Investment needed 1.680 M€
Similar documents
- National Tourism Organisation of Serbia
Mokra Gora hill with the railway heritage attraction “Šargan 8”
More information