Connerton Corner Site Plan
Transcription
Connerton Corner Site Plan
Prepared For: FCPG R E FUND 09-03 LLC CONNERTON CORNER 1516 East Hillcrest Street, Suite 210 Orlando, FL 32803 Phone: (407) 872-0209 Sheet List Table RL STE WE LAK ES 26 DR S IN 07 08 12 11 10 09 07 08 52 19 17 20 21 13 14 15 16 22 23 R18E R19E 18 24 SUN TER DRIV RA E T AN 18 17 19 20 34 35 DESCRIPTION: A PARCEL OF LAND LYING IN SECTIONS 26 AND 35, TOWNSHIP 25 SOUTH, RANGE 18 EAST, PASCO COUNTY, FLORIDA, AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCE AT THE SOUTHWEST CORNER OF SAID SECTION 26, RUN THENCE ALONG THE F CU TOF 26 LOCATION NT SA EA 32 30 29 POINT ON THE WESTERLY BOUNDARY OF CONNERTON VILLAGE ONE PARCEL 103, AS RECORDED IN PLAT BOOK 52, PAGES 118 THROUGH 131, INCLUSIVE, OF THE PUBLIC RECORDS Y S IN LA 31 25 DR ND 27SITE 34 1216.33 FEET TO A POINT ON THE EASTERLY BOUNDARY OF THE ADDITIONAL RIGHT-OF-WAY FOR U.S. HIGHWAY NO. 301 (STATE ROAD NO. 45), AS RECORDED IN OFFICIAL RECORDS BOOK 7105, PAGE 1783, OF THE PUBLIC RECORDS OF PASCO COUNTY, FLORIDA, SAID POINT ALSO EHR EN RLA STE WE D BLV ES LAK 28 W PK P PL 35 FEET TO A POINT ON A CURVE ON THE NORTHERLY RIGHT-OF-WAY LINE OF PLEASANT PLAINS PARKWAY, AS SHOWN ON SAID PLAT OF CONNERTON VILLAGE ONE PARCEL 103, SAID POINT 36 33 31 32 41 T25S T26S 06 05 04 03 AS SHOWN ON SAID PLAT OF CONNERTON VILLAGE ONE PARCEL 103; THENCE ALONG SAID NORTHERLY RIGHT-OF-WAY LINE OF PLEASANT PLAINS PARKWAY, THE FOLLOWING THREE (3) COURSES: 1) WESTERLY, 241.94 FEET ALONG THE ARC OF A CURVE TO THE RIGHT HAVING A 238.35 FEET) TO A POINT OF REVERSE CURVATURE; 2) WESTERLY, 457.15 FEET ALONG THE ARC OF A CURVE TO THE LEFT HAVING A RADIUS OF 1060.00 FEET AND A CENTRAL ANGLE OF 02 01 LOCATION MAP (NOT TO SCALE) 06 05 FEET ALONG THE ARC OF A CURVE TO THE RIGHT HAVING A RADIUS OF 25.00 FEET AND A THE AFORESAID EASTERLY BOUNDARY OF THE ADDITIONAL RIGHT-OF-WAY FOR U.S. HIGHWAY 383.49 FEET TO THE POINT OF BEGINNING. CONTAINING 6.452 ACRES, MORE OR LESS. DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. HEIDT 1 06/22/2015 DATE DESIGN REVIEW SUBMITTAL DESCRIPTION PLAN REVISIONS DATE DESCRIPTION PLAN REVISIONS R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\COVER.DWG-C-100 2015/06/25 9:16 AM NATALIE BUDEN A PL 36 SITE MAP (NOT TO SCALE) CONNERTON ELEM DO LAN 29 Y PL CONNERTON BLVD 30 W PK S EA MO HWY SCHRADER ME 25 AND D 27 BLV S Sheet Number 1-800-432-4770 DO LAN E Civil Engineering Planning & GIS Transportation Engineering Ecological Services Landscape Architecture Civil Engineering Planning & GIS Transportation Engineering Ecological Services Landscape Architecture CALL 48 HOURS BEFORE YOU DIG SECTIONS 26 & 35 TOWNSHIP 25 SOUTH, RANGE 18 EAST PASCO COUNTY, FLORIDA W DESIGN www.HeidtDesign.com Engineering Business Certificate of Authorization No. 28782 Landscape Architecture Certificate of Authorization No. LC26000405 CONSTRUCTION PLAN N HEIDT 5806-B Breckenridge Parkway Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 OWNERS: (813) 253-5311 FCPG R E FUND 09-03 LLC 1516 E HILLCREST STREET, SUITE 210 ORLANDO, FL 32803 (407) 872-0209 ATTN: CHARLES MITCHELL GEOTECHNICAL ENGINEER: PASCO INVESTMENT LAND LLC C/O ALSOP PROPERTIES INC 77 SARAGOSSA STREET ST AUGUSTINE, FL 32084-3548 MORTENSEN ENGINEERING, INC. RICHARD A. MORTENSEN P.E. 6408 W. LINEBAUGH AVENUE, SUITE 111 TAMPA, FLORIDA 33625 (813) 908-5555 SURVEYOR: DEVELOPER: FCPG R E FUND 09-03 LLC 1516 E HILLCREST STREET, SUITE 210 ORLANDO, FL 32803 (407) 872-0209 ATTN: CHARLES MITCHELL GEOPOINT SURVEYING, INC. DAVID WILLIAMS, P.S.M. 1403 E. 5TH AVENUE TAMPA, FL 33605 (813) 248-8888 Sheet Title C-100 COVER SHEET C-101 GENERAL NOTES C-102 GENERAL NOTES C-103 AERIAL SITE PLAN C-104 DEMOLITION PLAN C-105 PRELIMINARY SITE PLAN C-106 PRELIMINARY SITE PLAN C-200 ROADWAY TYPICAL SECTIONS C-300 MASTER GRADING & DRAINAGE PLAN C-301 GRADING & DRAINAGE PLAN C-302 GRADING & DRAINAGE PLAN C-303 POND CROSS SECTIONS C-304 DRAINAGE DETAILS C-305 DRAINAGE DETAILS C-306 DRAINAGE DETAILS C-400 MASTER UTILITY PLAN C-401 UTILITY PLAN C-402 UTILITY PLAN C-601 WATER AND SEWER DETAILS C-602 WATER & SEWER DETAILS C-701 SIGNING & PAVEMENT MARKING C-702 SIGNING & PAVEMENT MARKING NOTES C-900 CONSTRUCTION STORMWATER MANAGEMENT PLAN C-901 PRE-DEVELOPMENT DRAINAGE BASIN MAP C-902 POST-DEVELOPMENT DRAINAGE BASIN MAP THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THEMANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS, STATE OF FLORIDA IN EFFECT AT THE TIME OF PASCO COUNTY APPROVAL, AND ARE IN COMPLIANCE WITH THE STANDARDS THEREIN. ANY DEVIATIONS NOTED ON THE PLANS SUBSTANTIALLY COMPLY WITH THE INTENT OF THE STANDARDS. PASCO COUNTY SUBMITTAL DATE: JUNE 22, 2015 CIVIL ENGINEER: CONNERTON CORNER HEIDT DESIGN, LLC LARA G. BARTHOLOMEW P.E. 5806-B BRECKENRIDGE PARKWAY TAMPA, FLORIDA 33610 FIRST CAPITAL GROUP FLORIDA PROFESSIONAL ENGINEER ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 COVER FCG CT 1006 FILE: PROJECT NO: GRADING & DRAINAGE NYB NYB DESIGN BY: DRAWN BY: WATER COMMITMENT SEWER COMMITMENT UTILITIES SWFWMD DESIGN BY: DRAWN BY: WATER DEP SEWER DEP TAX PARCEL ID NO. 35-25-18-0000-00100-1040 COVER SHEET 35-25-18-0000-00100-1060 LARA G. BARTHOLOMEW PERMIT / FILE NUMBERS DATE: REGISTRATION NO. 61035 SSM: ---- NYB NYB 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. A). PLACED AS "MULCH" MATERIAL SURFACE DRESSING IN FUTURE LANDSCAPE AREAS, STOCKPILING OF SUCH"MULCHED" MATERIALS (AMOUNTS/LOCATIONS), IF ACCEPTABLE, WILL BE DIRECTED BY THE OWNER/GEOTECHNICAL CONSULTANT//LANDSCAPE ARCHITECT/ENGINEER; ALL TOPSOIL/ORGANIC LADEN SAND DISPOSAL AREAS IN LITTORAL SHELF AREAS, WETLAND MITIGATION POND AREAS, PASSIVE RECREATION/PARK AREAS, OR LANDSCAPE/BERM AREAS WILL REQUIRE ADEQUATE COMPACTION BY THE CONTRACTOR, SUCH THAT NO SIGNIFICANT FUTURE UNACCEPTABLE SETTLEMENT OF A LITTORAL SHELF AREA, CREATED WETLAND AREA, PARK/GRASSED AREA, OR LANDSCAPE BERM WILL OCCUR. C). PLACED ALONG THE BOTTOM OF SELECTED FLOODPLAIN MITIGATION PONDS (NOT IN SIDE BANKS), NOT BELOW THE PERMITTED EXCAVATION DEPTH OF THE POND, BUT WILL REQUIRE ADEQUATE SOIL COVER; D). PLACED ALONG THE BOTTOM OF SELECTED DEEPER STORMWATER PONDS (NOT IN SIDE BANKS), NOT BELOW THE PERMITTED DESIGN DEPTH, BUT WILL REQUIRE ADEQUATE SOIL COVER. IN ALL INSTANCES, THE MINIMUM POND DEPTH (INCLUDING FLOODPLAIN AND WETLAND MITIGATION AREAS) SHALL BE NO LESS THAN REQUIRED BY THE ENGINEER. ALL ORGANIC DEBRIS BURIAL AREAS IN STORMWATER POND AREAS AND FLOODPLAIN MITIGATION POND AREAS WILL REQUIRE ADEQUATE SOIL COVER OF 18 - 24 INCHES (WITH COMPACTION) BY THE CONTRACTOR, MEANING AT LEAST AN ADEQUATE WEIGHT/THICKNESS OF SOIL MATERIAL OVERTOP THE BURIED ORGANIC DEBRIS, SUCH THAT THERE WILL BE NO FUTURE FLOATING UP OF DEBRIS; AND FOR ALL ORGANIC DEBRIS BURIAL AREAS IN LITTORAL SHELF AREAS, WETLAND MITIGATION POND AREAS, AND PASSIVE RECREATION/PARK AREAS, ADEQUATE SOIL/MULCH MIXING (WITH COMPACTION) WILL BE NECESSARY BY THE CONTRACTOR, SUCH THAT NO SIGNIFICANT FUTURE UNACCEPTABLE SETTLEMENT OF A LITTORAL SHELF AREA, CREATED WETLAND AREA, OR PARK/GRASSED AREA WILL OCCUR. IF ANY OF THESE PROCEDURES ARE CONTEMPLATED BY THE CONTRACTOR, THEN THE CONTRACTOR SHALL NOTIFY THE OWNER/GEOTECHNICAL CONSULTANT/ENGINEER IN WRITING, AT THE START OF CONSTRUCTION, WITH SOME SPECIFIC INFORMATION, INCLUDING THE ESTIMATED QUANTITY AND TYPES OF MATERIALS, TO WHICH STORMWATER PONDS, FLOODPLAIN MITIGATION PONDS, WETLAND MITIGATION PONDS, OR PASSIVE RECREATION/PARK AREAS THEY PROPOSE TO USE FOR THIS TYPE OF ORGANIC DEBRIS DISPOSAL, AND WHAT APPROXIMATE ELEVATIONS WILL BE THE TOP AND BOTTOM OF THE ORGANIC DEBRIS. 3. MUCK/PEAT ORGANIC MATERIALS (TYPICALLY GENERATED FROM WETLAND OR LOWLAND AREAS, OR SIMILAR AREAS, PERMITTED FOR IMPACT OR DISPLACEMENT, INCLUDING EXCAVATION OF UNSUITABLE ORGANIC MATERIALS AND REFILLING WITH SUITABLE SANDY SOILS TO ACCOMMODATE DEVELOPMENT; INCLUDES SIGNIFICANT ORGANIC PEAT MATERIALS, ORGANIC SANDY MUCK MATERIALS, AND MUCKY OR ORGANIC SAND MATERIALS, DESIGNATED EITHER PT OR A-8, PER THE UNIFIED AND AASHTO SOIL CLASSIFICATION SYSTEMS, RESPECTIVELY; THOSE ORGANIC MATERIALS WHOSE PRESENCE, OR PLACEMENT BY THE CONTRACTOR, IS UNACCEPTABLE BENEATH ANY TYPE OF STRUCTURE, PAVEMENT, ROADWAY, HOUSE, BUILDING, PIPELINE, SLAB, ETC.) IF ACCEPTABLE TO THE GOVERNING ENVIRONMENTAL AGENCY, THEN ALL SUCH MUCK/PEAT (SIGNIFICANT) ORGANIC MATERIALS, IF APPROVED IN WRITING FIRST BY THE OWNER/GEOTECHNICAL CONSULTANT/ENGINEER,COULD BE: A). PLACED AS "PEAT/MUCK/ORGANIC MATTER" SURFACE LAYER IN NEW OR CREATED WETLAND MITIGATION AREAS, STOCKPILING OF SUCH "SIGNIFICANT ORGANIC" MATERIALS (AMOUNTS/LOCATIONS), IF ACCEPTABLE, WILL BE DIRECTED BY THE OWNER/WETLAND CONSULTANT; B). PLACED IN TEMPORARILY EXCAVATED LITTORAL SHELF AREAS IN SELECTED STORMWATER PONDS, OR IN TEMPORARILY EXCAVATED SELECTED WETLAND MITIGATION PONDS, IN EITHER CASE NOT IN SIDE BANKS AND NOT BELOW THE PERMITTED DESIGN DEPTH OF THE POND, OR SUCH ORGANIC MATERIALS COULD BE BURIED IN TEMPORARILY EXCAVATED PASSIVE RECREATION/PARK AREAS (AT LEAST 30 FEET FROM ANY STRUCTURE) AT APPROVED DEPTHS/LOCATIONS, BUT ALL THESE DISPOSAL AREAS WILL REQUIRE ADEQUATE SOIL MIXING (MIX SOIL WITH THE ORGANIC MATERIALS) AND THEN REFILLING (WITH COMPACTION) TO REQUIRED DESIGN GRADES; C). PLACED ALONG THE BOTTOM OF SELECTED FLOODPLAIN MITIGATION PONDS (NOT IN SIDE BANKS), NOT BELOW THE PERMITTED EXCAVATION DEPTH OF THE POND, BUT WILL REQUIRE ADEQUATE SOIL COVER; D.) PLACED ALONG THE BOTTOM OF SELECTED DEEPER STORMWATER PONDS (NOT IN SIDE BANKS), NOT BELOW THE PERMITTED DESIGN DEPTH, BUT WILL REQUIRE ADEQUATE SOIL COVER. ALL ORGANIC DEBRIS BURIAL AREAS IN STORMWATER POND AREAS AND FLOODPLAIN MITIGATION POND AREAS WILL REQUIRE ADEQUATE SOIL COVER (WITH COMPACTION) BY THE CONTRACTOR, MEANING AT LEAST AN ADEQUATE WEIGHT/THICKNESS OF SOIL MATERIAL OVERTOP THE BURIED ORGANIC DEBRIS, SUCH THAT THERE WILL BE NO FUTURE FLOATING UP OF DEBRIS; AND FOR ALL ORGANIC DEBRIS BURIAL AREAS IN LITTORAL SHELF AREAS, WETLAND MITIGATION POND AREAS, AND PASSIVE RECREATION/PARK AREAS, 1. www.HeidtDesign.com Estimated earthwork quantities are as follows: Connerton Corner Mass Grading Cut = 12,200 Cu. Yd Connerton Corner Mass Grading Fill = 23,800 Cu. Yd. Net Excess Material = 0 Cu. Yd. C). PLACED ALONG THE BOTTOM OF SELECTED FLOODPLAIN MITIGATION PONDS (NOT IN SIDE BANKS), NOT BELOW THE PERMITTED EXCAVATION DEPTH OF THE POND; D.) PLACED ALONG THE BOTTOM OF SELECTED DEEPER STORMWATER PONDS (NOT IN SIDE BANKS), NOT BELOW THE PERMITTED DESIGN DEPTH. R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\GNOTES.DWG-C-101 2015/06/25 9:16 AM NATALIE BUDEN B). PLACED IN TEMPORARILY EXCAVATED LITTORAL SHELF AREAS IN SELECTED STORMWATER PONDS, OR IN TEMPORARILY EXCAVATED SELECTED WETLAND MITIGATION PONDS, IN EITHER CASE NOT IN SIDE BANKS AND NOT BELOW THE PERMITTED DESIGN DEPTH OF THE POND, OR SUCH TOPSOILS/ORGANIC LADEN SAND MATERIALS COULD BE BURIED IN TEMPORARILY EXCAVATED PASSIVE RECREATION/PARK AREAS (AT LEAST 30 FEET FROM ANY STRUCTURE) AT APPROVED DEPTHS/LOCATIONS, BUT ALL THESE DISPOSAL AREAS WILL REQUIRE REFILLING (WITH COMPACTION) TO REQUIRED DESIGN GRADES; EARTHWORK: IF ANY OF THESE PROCEDURES ARE CONTEMPLATED BY THE CONTRACTOR, THEN THE CONTRACTOR SHALL NOTIFY THE OWNER/GEOTECHNICAL CONSULTANT/ENGINEER IN WRITING, AT THE START OF CONSTRUCTION, WITH SOME SPECIFIC INFORMATION, INCLUDING THE ESTIMATED QUANTITY AND TYPES OF MATERIALS, TO WHICH STORMWATER PONDS, FLOODPLAIN MITIGATION PONDS, WETLAND MITIGATION PONDS, PASSIVE RECREATION/PARK AREAS, OR LANDSCAPE BERM AREAS THEY PROPOSE TO USE FOR THIS TYPE OF ORGANIC DEBRIS DISPOSAL, AND WHAT APPROXIMATE ELEVATIONS WILL BE THE TOP AND BOTTOM OF THE ORGANIC DEBRIS. FIRST CAPITAL GROUP A). PLACED AS FILL IN NEW (LARGER) LANDSCAPE/GRASS COMMON AREAS OR LANDSCAPE BERM AREAS (WITH COMPACTION), STOCKPILING OF SUCH "TOPSOILS/ORGANIC LADEN SAND MATERIALS" (AMOUNTS/LOCATIONS), IF ACCEPTABLE, WILL BE DIRECTED BY THE OWNER/LANDSCAPE CONSULTANT; 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 5. NON-STRUCTURAL CLAYEY SAND/CLAY MATERIALS (TYPICALLY GENERATED FROM POND/LAKE EXCAVATIONS OR FROM UTILITY PIPELINE/MANHOLE EXCAVATIONS; SUCH CLAYEY SAND/CLAY MATERIALS, WITH TYPICALLY 40% FINES OR MORE PASSING THE NO. 200 SIEVE, DESIGNATED EITHER SC, CL, CH OR A-4 TO A-7, PER THE UNIFIED AND AASHTO SOIL CLASSIFICATION SYSTEMS, RESPECTIVELY; SUCH CLAYEY SAND/CLAY MATERIALS BEING UNSUITABLE OR UNACCEPTABLE FOR REUSE BY THE CONTRACTOR AS BUILDING PAD FILL, STRUCTURAL FILL, ROADWAY EMBANKMENT FILL, AND PIPELINE OR MANHOLE EXCAVATION BACKFILL.) IF ACCEPTABLE TO THE GOVERNING ENVIRONMENTAL AGENCY, ALL SUCH CLAYEY SAND/CLAY MATERIALS, IF APPROVED IN WRITING FIRST BY THE OWNER/GEOTECHNICAL CONSULTANT/ENGINEER, COULD BE: A). PLACED AS FILL IN NEW (LARGER) LANDSCAPE/GRASS COMMON AREAS OR LANDSCAPE BERM AREAS (WITH COMPACTION), PROVIDE SOME SURFACE DRAINAGE RELIEF, USE WHERE INFILTRATION AND DRAINAGE IS NOT AN IMPORTANT ISSUE, PROVIDE SOME SURFACE SANDY SOILS (MIN. OF 18-INCHES) AS DIRECTED BY THE LANDSCAPE CONSULTANT FOR PLANTING; STOCKPILING OF SUCH "CLAYEY SAND/CLAY MATERIALS" (AMOUNTS/LOCATIONS), IF ACCEPTABLE, WILL BE DIRECTED BY THE OWNER/LANDSCAPE CONSULTANT; B). PLACED IN TEMPORARILY EXCAVATED LITTORAL SHELF AREAS IN SELECTED STORMWATER PONDS, OR IN TEMPORARILY EXCAVATED SELECTED WETLAND MITIGATION PONDS, IN EITHER CASE NOT IN SIDE BANKS AND NOT BELOW THE PERMITTED DESIGN DEPTH OF THE POND, OR SUCH CLAYEY SAND/CLAY MATERIALS COULD BE BURIED IN TEMPORARILY EXCAVATED PASSIVE RECREATION/PARK AREAS (AT LEAST 30 FEET FROM ANY STRUCTURE) AT APPROVED DEPTHS/LOCATIONS, BUT ALL THESE DISPOSAL AREAS WILL REQUIRE REFILLING (WITH COMPACTION) TO REQUIRED DESIGN GRADES, AND THE TOP 2 FEET (MIN.) BEING SAND MATERIALS (NOT CLAYEY MATERIALS) FOR TURBIDITY CONTROL AND PLANTING; C). PLACED ALONG THE BOTTOM OF SELECTED FLOODPLAIN MITIGATION PONDS (NOT IN SIDE BANKS), NOT BELOW THE PERMITTED EXCAVATION DEPTH OF THE POND; HOWEVER, A 12-INCH LAYER (MIN.) OF SAND MATERIAL OVERTOP THE CLAYEY MATERIALS WILL BE NECESSARY FOR TURBIDITY CONTROL. D.) PLACED ALONG THE BOTTOM OF SELECTED DEEPER STORMWATER PONDS (NOT IN SIDE BANKS), NOT BELOW THE PERMITTED DESIGN DEPTH, HOWEVER, A 12-INCH LAYER (MIN.) OF SAND MATERIAL OVERTOP THE CLAYEY MATERIALS WILL BE NECESSARY FOR TURBIDITY CONTROL. ALL CLAYEY SAND/CLAY DISPOSAL AREAS IN LITTORAL SHELF AREAS, WETLAND MITIGATION POND AREAS, PASSIVE RECREATION/PARK AREAS, OR LANDSCAPE/BERM AREAS WILL REQUIRE ADEQUATE COMPACTION BY THE CONTRACTOR, SUCH THAT NO SIGNIFICANT FUTURE UNACCEPTABLE SETTLEMENT OF A LITTORAL SHELF AREA, CREATED WETLAND AREA, PARK/GRASSED AREA, OR LANDSCAPE BERM WILL OCCUR. IF ANY OF THESE PROCEDURES ARE CONTEMPLATED BY THE CONTRACTOR, THEN THE CONTRACTOR SHALL NOTIFY THE OWNER/GEOTECHNICAL CONSULTANT/ENGINEER IN WRITING, AT THE START OF CONSTRUCTION, WITH SOME SPECIFIC INFORMATION, INCLUDING THE ESTIMATED QUANTITY AND TYPES OF MATERIALS, TO WHICH STORMWATER PONDS, FLOODPLAIN MITIGATION PONDS, WETLAND MITIGATION PONDS, PASSIVE RECREATION/PARK AREAS, OR LANDSCAPE BERM AREAS THEY PROPOSE TO USE FOR THIS TYPE OF CLAYEY SAND/CLAY DISPOSAL, AND WHAT APPROXIMATE ELEVATIONS WILL BE THE TOP AND BOTTOM OF THE CLAYEY MATERIALS. PROJECT NO: FCG CT 1006 FILE: GNOTES DESIGN BY: NYB DRAWN BY: NYB 6.) STRUCTURAL SAND FILL MATERIALS (TYPICALLY GENERATED FROM POND/LAKE EXCAVATIONS, CUT FROM HIGHER ELEVATION AREAS, OR FROM UTILITY PIPELINE/MANHOLE EXCAVATIONS; SUCH SAND MATERIALS, WITH TYPICALLY 35% FINES OR LESS PASSING THE NO. 200 SIEVE, DESIGNATED EITHER SP, SP-SM, SM OR A-2-4, A-2-6 OR A-3, PER THE UNIFIED AND AASHTO SOIL CLASSIFICATION SYSTEMS, RESPECTIVELY; SUCH SAND MATERIALS BEING SUITABLE OR ACCEPTABLE FOR REUSE BY THE CONTRACTOR AS BUILDING PAD FILL, STRUCTURAL FILL, ROADWAY EMBANKMENT FILL, AND PIPELINE OR MANHOLE EXCAVATION BACKFILL.) ALL SUCH SAND MATERIALS SHALL BE REUSED ONSITE BY THE CONTRACTOR, PER THE GEOTECHNICAL REPORTS, AS BUILDING PAD FILL, STRUCTURAL FILL, ROADWAY EMBANKMENT FILL, AND PIPELINE OR MANHOLE EXCAVATION BACKFILL; PLACED BY THE CONTRACTOR IN LOOSE LIFTS NOT EXCEEDING 12-INCHES, COMPACTED TO AT LEAST 95% OR 98% MODIFIED PROCTOR (PER ASTM D-1557 OR AASHTO T-180), WHICHEVER IS APPLICABLE DEPENDING UPON THE FUTURE USE OF THE FILLED AREA (SEE GEOTECHNICAL REPORTS); WITH DENSITY TESTING OF EACH FILL LIFT FOR ACCEPTANCE BY THE GEOTECHNICAL CONSULTANT, UPON CONTRACTOR REQUEST, PRIOR TO THE NEXT FILL LIFT BEING PLACED. ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 10. There will be no net earthwork export from Connerton Corner. IF ACCEPTABLE TO THE GOVERNING ENVIRONMENTAL AGENCY, ALL SUCH TOPSOILS/ORGANIC LADEN SAND MATERIALS, IF APPROVED IN WRITING FIRST BY THE OWNER/GEOTECHNICAL CONSULTANT/ENGINEER, COULD BE: IF ACCEPTABLE TO THE GOVERNING ENVIRONMENTAL AGENCY, THEN ALL SUCH "BURNED" OR "MULCHED" SITE CLEARING/GRUBBING DEBRIS, IF APPROVED IN WRITING FIRST BY THE OWNER/GEOTECHNICAL CONSULTANT/ ENGINEER, COULD BE: B). PLACED IN TEMPORARILY EXCAVATED LITTORAL SHELF AREAS IN SELECTED STORMWATER PONDS, OR IN TEMPORARILY EXCAVATED SELECTED WETLAND MITIGATION PONDS, IN EITHER CASE NOT IN SIDE BANKS AND NOT BELOW THE PERMITTED DESIGN DEPTH OF THE POND, OR SUCH DEBRIS COULD BE BURIED IN TEMPORARILY EXCAVATED PASSIVE RECREATION/PARK AREAS (AT LEAST 30 FEET FROM ANY STRUCTURE) AT APPROVED DEPTHS/LOCATIONS, BUT ALL THESE DISPOSAL AREAS WILL REQUIRE ADEQUATE SOIL MIXING (MIX SOIL WITH THE MULCH) AND THEN REFILLING (WITH COMPACTION) TO REQUIRED DESIGN GRADES; 2. DESCRIPTION 9. All acceptable material excavated from stormwater detention ponds will be reused as fill for Connerton Corner mass grading. DATE 8. 1. DESCRIPTION 7. 2. CLEARING AND GRUBBING DEBRIS (SITE CLEARING AND GRUBBING DEBRIS INCLUDES ALL LARGER ORGANIC MATERIALS, SUCH ITEMS AS TREES, STUMPS, LIMBS, BRUSH, VEGETATION, OR SIMILAR; ALL SUCH MATERIALS MUST BE EITHER "BURNED" OR "MULCHED" BY THE CONTRACTOR PRIOR TO REUSE OR DISPOSAL ONSITE.) EARTHWORK NOTE: DATE 6. ALL SITE DEMOLITION DEBRIS SHALL BE REMOVED FROM THE SITE DEVELOPMENT AND DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL APPLICABLE GOVERNING ENVIRONMENTAL AGENCY REQUIREMENTS. Wetland lines permitted under ERP No. 4402 3534.006 PREPARED FOR: 5. 1. SITE DEMOLITION DEBRIS (SITE DEMOLITION DEBRIS, NOT GENERALLY CONSIDERED AN ENVIRONMENTAL/CONTAMINATION HAZARD, INCLUDES SUCH ITEMS AS WOOD PIECES, CONCRETE PIECES, PLASTIC PIPE PIECES, CERTAIN METAL/STEEL PIECES, OR SIMILAR. IF ANY SUCH DEBRIS OR OTHER DEMOLITION DEBRIS IS CONSIDERED AN ENVIRONMENTAL/CONTAMINATION HAZARD, OR IF BURIAL ONSITE OF SUCH MATERIALS IS PROHIBITED BY THE GOVERNING ENVIRONMENTAL AGENCY, THEN ALL SUCH MATERIALS SHALL BE HAULED OFF SITE BY THE CONTRACTOR FOR PROPER DISPOSAL, IN ACCORDANCE WITH ALL APPLICABLE GOVERNING ENVIRONMENTAL AGENCY REQUIREMENTS. IN NO CASE, SHALL ANY SUCH DEBRIS MATERIALS REMAIN, OR BE PLACED BY THE CONTRACTOR, BENEATH ANY TYPE OF STRUCTURE, PAVEMENT, ROADWAY, HOUSE, BUILDING,PIPELINE, SLAB, ETC.) 4. TOPSOILS/SITE STRIPPINGS (TYPICALLY GENERATED FROM UPLAND AREAS, AFTER DEMOLITION/CLEARING/GRUBBING/DISCING OPERATIONS; STRIPPING OF SURFICIAL ORGANICS/TOPSOILS BEING A REQUIREMENT OVER AT LEAST ALL STRUCTURE, BUILDING, CONCRETE SLAB AND PAVEMENT AREAS PRIOR TO FILLING TO ACCOMMODATE DEVELOPMENT; INCLUDES TOPSOILS AND ORGANIC LADEN SANDS; THOSE TOPSOILS/ORGANIC SAND MATERIALS WHOSE PRESENCE, OR PLACEMENT BY THE CONTRACTOR, IS UNACCEPTABLE BENEATH ANY TYPE OF STRUCTURE, PAVEMENT, ROADWAY, HOUSE, BUILDING, PIPELINE, SLAB, ETC.) "Conservation Area" designation is given to all protected wetlands per Pasco County requirements. They are not designated as "Conservation Easements" for SWFWMD compensation. REVIEW SUBMITTAL 4. PLEASE NOTE, LOCAL, STATE AND FEDERAL RULES, LAWS, AND REGULATIONS PROHIBITING SOIL REUSE AS DESCRIBED BELOW SHALL TAKE PRECEDENCE AND SHALL BE FOLLOWED TO THE FULLEST EXTENT. IF ANY OF THESE PROCEDURES ARE CONTEMPLATED BY THE CONTRACTOR, THEN THE CONTRACTOR SHALL NOTIFY THE OWNER/GEOTECHNICAL CONSULTANT/ENGINEER IN WRITING, AT THE START OF CONSTRUCTION, WITH SOME SPECIFIC INFORMATION, INCLUDING THE ESTIMATED QUANTITY AND TYPES OF MATERIALS, TO WHICH STORMWATER PONDS, FLOODPLAIN MITIGATION PONDS, WETLAND MITIGATION PONDS, OR PASSIVE RECREATION/PARK/LANDSCAPE BERM AREAS THEY PROPOSE TO USE FOR THIS TYPE OF ORGANIC MATERIAL DISPOSAL, AND WHAT APPROXIMATE ELEVATIONS WILL BE THE TOP AND BOTTOM OF THE ORGANIC MATERIALS. There are no wetland impacts proposed and therefore, no mitigation required. 06/22/2015 3. AT LEAST THE FOLLOWING SIX (6) TYPES OF MATERIALS ARE PRESENT ON-SITE THAT REQUIRE PROPER HANDLING/TREATMENT BY THE CONTRACTOR, DURING THE COURSE OF SITE DEVELOPMENT/CONSTRUCTION ACTIVITIES, IN ACCORDANCE WITH THE NOTED REUSE REQUIREMENTS FOR EACH TYPE. ALTHOUGH SOME SOIL MATERIAL QUALITY CONTROL TESTING WILL BE RANDOMLY AND PERIODICALLY PERFORMED BY THE PROJECT GEOTECHNICAL CONSULTANT, AS REQUIRED, WORKING FOR THE OWNER, IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO REUSE ONSITE SOIL MATERIALS AS DESCRIBED AND SPECIFIED BELOW. ALL DISCOVERED OR FUTURE FILLING OR MATERIAL REUSE WORK ONSITE NOT IN ACCORDANCE OR COMPLIANCE WITH THESE NOTES, OR ANY FUTURE ADVERSE IMPACTS OR CONSEQUENCES RESULTING FROM THE CONTRACTORS FAILURE TO PROPERLY REUSE SOIL MATERIALS ONSITE AS SPECIFICALLY DESCRIBED BELOW, WILL BE THE CONTRACTORS SOLE RESPONSIBILITY FOR REMEDY AND REPAIR AT HIS COST. IF THE CONTRACTOR HAS ANY QUESTIONS REGARDING ANY OF THE SOIL MATERIALS ONSITE, THE PROJECT GEOTECHNICAL REPORTS (WHICH HE NEEDS TO OBTAIN FROM THE OWNER OR GEOTECHNICAL CONSULTANT/ ENGINEER), OR ANY QUESTIONS ASSOCIATED WITH THE NOTES BELOW, IT IS PRESUMED THAT THE CONTRACTOR WILL SATISFACTORILY RESOLVE SUCH QUESTIONS/CONCERNS PRIOR TO SITE DEMOLITION, CLEARING, GRUBBING, STRIPPING AND EXCAVATION OPERATIONS BEGIN. WETLAND NOTES: 1 2. THE SITE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND TURBIDITY CONTROLS AND THE QUALITY AND QUANTITY OF OFFSITE OR WETLAND DISCHARGES. PRIOR TO CONSTRUCTION, THE SITE SUBCONTRACTOR IS RESPONSIBLE FOR HAVING HIS DEWATERING PLAN AND TURBIDITY CONTROL PLAN APPROVED BY THE APPLICABLE REVIEWING AGENCIES. REFER TO THE PROJECT'S PERMIT APPROVALS AND PERMIT CONDITIONS FOR AGENCIES REQUIRING SUCH REVIEW AND APPROVAL. QUESTIONS CONCERNING APPROPRIATE TECHNIQUES SHOULD BE ADDRESSED TO THOSE AGENCIES AND/OR DISCUSSED WITH THE PROJECT ENGINEER AND OWNER. THE APPROPRIATE TURBIDITY AND EROSION CONTROL METHODOLOGIES SELECTED BY THE SITE SUBCONTRACTOR FOR THIS PROJECT SHOULD BE MADE FOLLOWING ASSESSMENT OF THE PLANS AND PROJECT SITE SPECIFIC FACTORS AND AFTER CONSULTATIONS AS NEEDED WITH THE PROJECT ENGINEER AND APPROPRIATE AGENCIES. THE SITE SUBCONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING ANY AND ALL NECESSARY PERMITS FOR SUCH ACTIVITY; SEVERAL FACTORS TO CONSIDER ARE LISTED BELOW: A. CLAY CONTENT IN EXCAVATED MATERIALS AND/OR PERMEABILITIES RATES B. DEPTH OF CUT IN PONDS, TRENCHES, OR UTILITY LINES C. AMBIENT GROUND WATER LEVELS D. ACTUAL RAINFALL AMOUNTS AND TIME OF YEAR RELATIVE TO NORMAL RAINY SEASON E. PROXIMITY TO WETLANDS, WATER BODIES OR OFFSITE PROPERTIES F. 'CLASS' DESIGNATION OF RECEIVING WATER BODIES (I.E., OUTSTANDING FLORIDA WATERS, SHELLFISH HARVESTING AREAS, ETC.) G. DENSITY, TYPE, AND PROXIMITY OF UPLAND VEGETATION TO BE RETAINED DURING CONSTRUCTION (FOR USE AS POSSIBLE FILTRATION AREAS) H. FILL HEIGHT RELATIVE TO NATURAL GRADE AND LENGTH AND STEEPNESS OF THE PROPOSED SLOPES I. EXISTING TOPOGRAPHY AND DIRECTIONS OF SURFACE FLOW J. TYPE OF EQUIPMENT USED K. PROJECT TYPE L. DURATION OF CONSTRUCTION ACTIVITIES M. SEPARATION DISTANCE OF ONSITE PONDS N. AMBIENT QUALITY OF SURFACE AND GROUNDWATER O. TEMPORARY STOCKPILE LOCATIONS AND HEIGHTS AT THE ONSET OF CONSTRUCTION, THE SITE SUBCONTRACTOR, AS THE PARTY RESPONSIBLE FOR IMPLEMENTATION OF THE EROSION AND SEDIMENT CONTROL PLAN, SHALL ASSESS THE ABOVE DESCRIBED CONDITIONS AND FACTORS WITH RESPECT TO RELATIVE COST EFFECTIVENESS AND SELECT THE APPROPRIATE METHODS OF PROTECTION. A FAIRLY EXTENSIVE LIST OF TECHNIQUES ARE PRESENTED BELOW BUT IT MUST BE STRESSED THAT ANY OR ALL OF THE FOLLOWING MAY BE NECESSARY TO MAINTAIN WATER QUALITY AND QUANTITY STANDARDS. THE CONSTRUCTION SEQUENCING SHOULD BE THOUGHT OUT IN ADVANCE OF INITIATION TO PROVIDE ADEQUATE PROTECTION OF WATER QUALITY. DISCHARGES WHICH EXCEED 29 N.T.U.'S OVER THE BACKGROUND LEVELS ARE IN VIOLATION OF STATE WATER QUALITY STANDARDS. DISCHARGES OF WATER QUANTITIES WHICH AFFECT OFFSITE PROPERTIES OR MAY DAMAGE WETLANDS ARE ALSO PROHIBITED BY REGULATING AGENCIES. THE EROSION AND TURBIDITY CONTROL MEASURES SHOWN HEREON ARE THE MINIMUM REQUIRED FOR AGENCY APPROVAL. ADDITIONAL CONTROL AND MEASURES MAY BE REQUIRED DUE TO THE SITE SUBCONTRACTOR'S CONSTRUCTION SEQUENCE & UNFORESEEN WEATHER CONDITIONS. ANY ADDITIONAL MEASURES DEEMED NECESSARY BY THE SITE SUBCONTRACTOR SHALL BE INCLUDED IN THE LUMP SUM BID WITH NO EXTRAS FOR MATERIALS AND LABOR ALLOWED. HAY BALES OR SILT SCREENS SHALL BE INSTALLED PRIOR TO LAND CLEARING TO PROTECT WATER QUALITY AND TO IDENTIFY AREAS TO BE PROTECTED FROM CLEARING ACTIVITIES AND MAINTAINED FOR THE DURATION OF THE PROJECT UNTIL ALL SOIL IS STABILIZED. FLOATING TURBIDITY BARRIERS SHALL BE IN PLACE IN FLOWING SYSTEMS OR IN OPEN WATER LAKE EDGES PRIOR TO INITIATION OF EARTHWORK AND MAINTAINED FOR THE DURATION OF THE PROJECT UNTIL ALL SOIL IS STABILIZED. NO CLAY MATERIAL SHALL BE LEFT EXPOSED IN ANY STORMWATER STORAGE FACILITY. IF CLAY OR SANDY-CLAYS ARE ENCOUNTERED DURING STORMWATER STORAGE EXCAVATION, THE SITE SUBCONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY BEFORE PROCEEDING WITH FURTHER EXCAVATION. IF THE ENGINEER OF RECORD HAS DETERMINED THAT SUCH SOILS ARE NON-CONFINING AND MUST BE EXCAVATED TO MEET PERMIT AND DESIGN CONDITIONS, EXCAVATION MAY PROCEED AFTER OBTAINING WRITTEN AUTHORIZATION FROM THE APPROPRIATE GOVERNING AGENCY. IF SAID SOILS ARE LEFT EXPOSED AT THE PERMITTED AND DESIGNED DEPTH, THE SITE SUBCONTRACTOR SHALL OVER-EXCAVATE THE POND'S BOTTOM AND SIDE SLOPES BY A MINIMUM OF TWELVE (12") INCHES AND BACKFILL WITH CLEAN SANDS TO HELP PREVENT SUSPENSION OF FINE PARTICLES IN THE WATER COLUMN. THE INSTALLATION OF TEMPORARY EROSION CONTROL BARRIERS SHALL BE COORDINATED WITH THE CONSTRUCTION OF THE PERMANENT EROSION CONTROL FEATURES TO THE EXTENT NECESSARY TO ASSURE EFFECTIVE AND CONTINUOUS CONTROL OF EROSION AND WATER POLLUTION THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE. THE TYPE OF EROSION CONTROL BARRIERS USED SHALL BE GOVERNED BY THE NATURE OF THE CONSTRUCTION OPERATION AND SOIL TYPE THAT WILL BE EXPOSED. SILTY AND CLAYEY MATERIAL MAY REQUIRE SOLID SEDIMENT BARRIERS TO PREVENT TURBID WATER DISCHARGE, WHILE SANDY MATERIAL MAY NEED ONLY SILT SCREENS OR HAY BALES TO PREVENT EROSION. FLOATING TURBIDITY CURTAINS SHOULD GENERALLY BE USED IN OPEN WATER SITUATIONS. DIVERSION DITCHES OR SWALES MAY BE REQUIRED TO PREVENT TURBID STORMWATER RUNOFF FROM BEING DISCHARGED TO WETLANDS OR OTHER WATER BODIES. IT MAY BE NECESSARY TO EMPLOY A COMBINATION OF BARRIERS, DITCHES, AND OTHER EROSION/TURBIDITY CONTROL MEASURES IF CONDITIONS WARRANT. WHERE PUMPS ARE TO BE USED TO REMOVE TURBID WATERS FROM CONSTRUCTION AREAS, THE WATER SHALL BE TREATED PRIOR TO DISCHARGE TO THE WETLANDS. TREATMENT METHODS INCLUDE, FOR EXAMPLE, TURBID WATER BEING PUMPED INTO GRASSED SWALES OR APPROPRIATE UPLAND VEGETATED AREAS (OTHER THAN UPLAND PRESERVATION AREAS AND WETLAND BUFFERS), SEDIMENT BASINS, OR CONFINED BY AN APPROPRIATE ENCLOSURE SUCH AS TURBIDITY BARRIERS OR LOW BERMS, AND KEPT CONFINED UNTIL TURBIDITY LEVELS MEET STATE WATER QUALITY STANDARDS. THE PERMITTEE SHALL SCHEDULE HIS OPERATIONS SUCH THAT THE AREA OF UNPROTECTED ERODIBLE EARTH EXPOSED AT ANY ONE TIME IS NOT LARGER THAN THE MINIMUM AREA NECESSARY FOR EFFICIENT CONSTRUCTION OPERATION, AND THE DURATION OF EXPOSED, UNCOMPLETED CONSTRUCTION TO THE ELEMENTS SHALL BE AS SHORT AS PRACTICABLE. CLEARING AND GRUBBING SHALL BE SO SCHEDULED AND PERFORMED SUCH THAT GRADING OPERATIONS CAN FOLLOW IMMEDIATELY THEREAFTER. GRADING OPERATIONS SHALL BE SO SCHEDULED AND PERFORMED THAT PERMANENT EROSION CONTROL FEATURES CAN FOLLOW IMMEDIATELY THEREAFTER IF CONDITIONS ON THE PROJECT PERMIT. WATER DERIVED FROM VARIOUS DEWATERING METHODS SHOULD BE PASSED THROUGH SUFFICIENTLY WIDE AREAS OF EXISTING UPLAND VEGETATION TO FILTER OUT EXCESS TURBIDITY. IF THIS IS NOT SUFFICIENT, THE WATER SHALL BE RETAINED IN PREVIOUSLY CONSTRUCTED PERMANENT STORMWATER PONDS OR ELSE RETAINED IN TEMPORARY SEDIMENTATION BASINS UNTIL THE CLARITY IS SUITABLE TO ALLOW FOR ITS DISCHARGE. PLUGGING THE OUTFALLS FROM COMPLETED STORMWATER PONDS MAY BE NEEDED TO AVOID DISCHARGE. HOWEVER, SUCH SITUATIONS SHOULD BE MONITORED CLOSELY TO PRECLUDE BERM FAILURE IF WATER LEVELS RISE TOO HIGH. WATER CAN BE TRANSPORTED AROUND THE SITE BY THE USE OF INTERNAL SWALES OR BY PUMPS AND PIPES. SHEET FLOW OF NEWLY FILLED OR SCRAPED AREAS MAY BE CONTROLLED OR CONTAINED BY THE USE OF BRUSH BARRIERS, DIVERSION SWALES, INTERCEPTOR DITCHES OR LOW BERMS. FLOW SHOULD BE DIRECTED TOWARD AREAS WHERE SEDIMENTS CAN SUFFICIENTLY SETTLE OUT. EXPOSED SOILS SHALL BE STABILIZED AS SOON AS POSSIBLE, ESPECIALLY SLOPES LEADING TO WETLANDS. STABILIZATION METHODS INCLUDE SOLID SOD, SEEDING AND MULCHING OR HYDROMULCHING TO PROVIDE A TEMPORARY OR PERMANENT GRASS COVER MULCH BLANKETS, FILTER FABRICS, ETC., CAN BE EMPLOYED TO PROVIDE VEGETATIVE COVER. ENERGY DISSIPATERS (SUCH AS RIP RAP, A GRAVEL BED, HAY BALES, ETC.) SHALL BE INSTALLED AT THE DISCHARGE POINT OF PIPES OR SWALES IF SCOURING IS OBSERVED. ATTEMPT TO INSTALL ROADWAY CURB AND GUTTERS AS SOON AS POSSIBLE TO REDUCE THE SURFACE AREA FOR EROSION TO OCCUR. IMPLEMENT STORM DRAIN INLET PROTECTION (HAY BALES OR GRAVEL) TO LIMIT SEDIMENTATION WITHIN THE STORMWATER SYSTEM. PERFORM INSPECTIONS AND PERIODIC CLEANING OF SEDIMENTS WHICH WASH OUT INTO THE STREETS UNTIL ALL SOIL IS STABILIZED. WATER DISCHARGE VELOCITIES FROM IMPOUNDED AREAS AND TEMPORARY SEDIMENTATION BASINS SHALL BE RESTRICTED TO AVOID SCOURING IN RECEIVING AREAS. IF WATER CLARITY DOES NOT REDUCE TO STATE STANDARDS RAPIDLY ENOUGH IN HOLDING PONDS, IT MAY BE POSSIBLE TO USE CHEMICAL AGENTS SUCH AS ALUM TO FLOCCULATE OR COAGULATE THE SEDIMENT PARTICLES. HAY BALES, SILT SCREENS, OR GRAVEL BEDS CAN BE ADDED AROUND THE PIPE OR SWALE DISCHARGE POINTS TO HELP CLARIFY DISCHARGES. SPREADER SWALES MAY HELP DISSIPATE CLOUDY WATER PRIOR TO CONTACT WITH WETLANDS. ALL FUEL STORAGE AREAS OR OTHER HAZARDOUS STORAGE AREAS SHALL CONFORM TO ACCEPTED STATE OR FEDERAL CRITERIA FOR SUCH CONTAINMENT AREAS. VEHICLE OR EQUIPMENT WASHDOWN AREAS WILL BE SUFFICIENTLY REMOVED FROM WETLANDS OR OFFSITE AREAS. FUGITIVE DUST CONTROLS (PRIMARILY BY USING WATER SPRAY TRUCKS) SHALL BE EMPLOYED AS NEEDED TO CONTROL WINDBORN EMISSIONS. IF THE ABOVE CONTROLS REMAIN INEFFECTIVE IN PRECLUDING RELEASE OF TURBID WATER, ESPECIALLY DURING POND OR UTILITY LINE DEWATERING, THEN THE CONTRACTOR MAY BE COMPELLED TO USE A VERTICAL DEWATERING SYSTEM SUCH AS WELL POINTS OR SOCK DRAINS TO WITHDRAW GROUNDWATER WHICH MAY ALREADY BE CLEAR ENOUGH TO ALLOW FOR DIRECT DISCHARGE TO WETLANDS. ONGOING INSPECTIONS AND PERIODIC MAINTENANCE BY THE SITE SUBCONTRACTOR SHALL OCCUR THROUGHOUT CONSTRUCTION AS NECESSARY TO INSURE THE ABOVE METHODS ARE WORKING SUITABLY. THIS MAY BE NEEDED DAILY, IF CONDITIONS SO WARRANT. SITE SUBCONTRACTORS ARE ENCOURAGED TO OBTAIN AND THOROUGHLY REVIEW THE FLORIDA DEVELOPMENT MANUAL: A GUIDE TO SOUND LAND AND WATER MANAGEMENT, WHICH WAS DEVELOPED BY THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION IN 1988. THIS PROVIDES FAIRLY IN-DEPTH DISCUSSIONS OF RECOMMENDED TECHNIQUES AND ALSO PROVIDES SPECIFIC DESIGN AND TECHNICAL STANDARDS. A COPY OF THIS DOCUMENT IS AVAILABLE FOR REVIEW AT HEIDT DESIGN, LLC. THE CONTRACTOR WILL PERFORM DAILY INSPECTIONS OF ALL ON-SITE WETLANDS WITHIN THE CONSTRUCTION AREA TO ENSURE THAT WATER LEVELS WITHIN THOSE WETLANDS ARE NOT EXCESSIVELY IMPOUNDED PRIOR TO THE TIME WHEN THE PERMITTED CONTROL STRUCTURE OR OUTFALL IS BUILT. WATER LEVELS SIGNIFICANTLY ABOVE NORMAL SHOULD BE CORRECTED AT A FREQUENCY THAT PREVENTS A CHANGE IN THE VEGETATIVE CHARACTER OR HEALTH OF ANY WETLANDS. ADEQUATE SOIL/ORGANICS MIXING (WITH COMPACTION) WILL BE NECESSARY BY THE CONTRACTOR, SUCH THAT NO SIGNIFICANT FUTURE UNACCEPTABLE SETTLEMENT OF A LITTORAL SHELF AREA, CREATED WETLAND AREA, OR PARK/GRASSED AREA WILL OCCUR. GENERAL NOTES 1. SOIL REUSE REQUIREMENTS CONNERTON CORNER GENERAL EROSION AND TURBIDITY CONTROL NOTES R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\GNOTES.DWG-C-102 2015/06/25 9:16 AM NATALIE BUDEN WATER, SANITARY SEWER & REUSE WATER CONSTRUCTION NOTES: 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. PROJECT NO: FCG CT 1006 FILE: ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 GNOTES DESIGN BY: NYB DRAWN BY: NYB DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 20. FIRST CAPITAL GROUP 17. 18. 19. DESCRIPTION 13. 14. 15. 16. www.HeidtDesign.com DATE 12. DESCRIPTION 11. 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 DATE 8. 9. 10. PREPARED FOR: 7. RATE 200; DR 21 PER ASTM STANDARD D-2241. WATER MAINS SMALLER THAN 2" IN DIAMETER SHALL BE CLASS 1120 OR 1220; SCHEDULE 80 AND MEET THE REQUIREMENTS OF ASTM D-1785. ALL WATER MAINS SHALL BE DEFLECTED VERTICALLY WHERE CROSSING STORM SEWER PIPE TO OBTAIN A MINIMUM VERTICAL DISTANCE OF 18 INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE STORM SEWER. JOINTS SHALL BE LOCATED SUCH THAT THE DISTANCE FROM THE STORM SEWER AND WATER MAIN JOINT IS AS FAR AS PRACTICAL. WATER MAINS SHOULD BE LAID AT LEAST 10 FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED STORM SEWER. AT NO TIME SHOULD VERTICAL CLEARANCE BETWEEN FORCE MAIN OR GRAVITY SEWER AND WATER MAIN BE LESS THAN 18" AT CROSSING OF SAME. AT NO TIME SHOULD HORIZONTAL CLEARANCE BETWEEN FORCE MAIN OR GRAVITY SEWER AND WATER MAIN BE LESS THAN 10' WHEN SAME ARE PARALLELING EACH OTHER. ADJUSTING MANHOLE TOPS TO MATCH GRADE AND SLOPE OF THE FINISH PAVING SHALL BE INCLUDED IN THE RESPECTIVE CONTRACT UNIT PRICE FOR MANHOLES, PAYMENT OF WHICH WILL CONSTITUTE FULL COMPENSATION FOR THE CONSTRUCTION AND COMPLETION OF THE MANHOLE, AND NO ADDITIONAL PAYMENT WILL BE ALLOWED OR MADE FOR ADJUSTING MANHOLE TOPS. THE LOCATIONS AND ELEVATION OF ALL SERVICE LINES ARE TO BE DETERMINED IN THE FIELD BY OWNER AND/OR CONTRACTOR PRIOR TO CONSTRUCTION OF SAME. BENDS SHALL BE INSTALLED IN FORCE MAIN OR WATER MAIN TO AVOID UNFORESEEN CONFLICTS IN EXISTING OR PROPOSED STRUCTURES. THE JOINT DEFLECTION METHOD SHALL BE USED WHERE PRACTICAL IN LIEU OF INSTALLING BENDS. CONTRACTOR SHALL VERIFY LOCATIONS AND DEPTHS OF EXISTING WATER AND SEWER LINES PRIOR TO BEGINNING CONSTRUCTION. THE EXISTING UNDERGROUND UTILITY LINES SHOWN HEREON WERE TAKEN FROM DOCUMENTS FURNISHED BY OTHERS AND NOT FIELD VERIFIED, THEREFORE, THE ENGINEER CANNOT GUARANTEE THE ACCURACY OF SAME NOR THAT ALL ARE SHOWN. THE CONTRACTOR SHALL EXPOSE ALL UNDERGROUND UTILITY LINES IN COORDINATION WITH THE OWNERS TO HIS SATISFACTION AND MAKE ADJUSTMENTS TO SAME IN THE EVENT THERE ARE CONFLICTS WITH NEW CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL ROAD CROSSING OR UTILITY PERMITS. ALL 8" GRAVITY SANITARY SEWER PIPE SHALL BE CONSTRUCTED AT A 0.40% MINIMUM SLOPE UNLESS OTHERWISE NOTED. ALL VALVE BOX ASSEMBLIES LOCATED WITHIN ROADWAYS OR PARKING AREAS SHALL BE PROTECTED FROM TRUCK TRAFFIC BY USE OF 6" THICK REINFORCED CONCRETE PADS POURED AROUND VALVE BOXES (SEE DETAIL). ALL SUBSURFACE CONSTRUCTION SHALL COMPLY WITH THE "TRENCH SAFETY ACT." THE CONTRACTOR SHALL INSURE THAT THE METHOD OF TRENCH PROTECTION AND CONSTRUCTION IS IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS. CONNECTIONS INTO EXISTING COUNTY-OWNED SYSTEMS SHALL BE VIA WET TAP. WET TAPS SHALL BE PERFORMED BY THE PASCO COUNTY UTILITIES SERVICES BRANCH AT THE DEVELOPER'S EXPENSE. MATERIAL FOR WET TAPS LARGER THAN 2" SHALL BE PROVIDED AND INSTALLED BY THE PROJECT CONTRACTOR. EXCAVATION, BACKFILL AND SURFACE RESTORATION SHALL BE THE CONTRACTOR'S RESPONSIBILITY. GATE VALVES INSTALLED FOR PHASING SHALL BE RESTRAINED PER CURRENT PASCO COUNTY STANDARDS. OFF-ROAD UTILITY EASEMENTS SHALL BE "STABILIZED" FOR ACCESS BY MAINTENANCE VEHICLES. RECLAIMED WATER MAINS, VALVES, AND SERVICES SHALL INCLUDE THE FOLLOWING TO AVOID CONFUSION WITH POTABLE SYSTEM: a. PURPLE PIGMENTED C-900, DR-18 PVC PIPING FOR 4"-12" RECLAIMED WATER MAINS, EXCEPT 2" WHICH SHALL BE SDR 21 PVC PIPING. b. SQUARE TOP VALVE BOXES FOR ISOLATION VALVES IN SYSTEM, WITH COVERS MARKED "EFFLUENT." c. PURPLE STRIPE ON CURB TO IDENTIFY RECLAIMED WATER SERVICES. d. ONE INCH SERVICES FOR RECLAIMED WATER SERVICES. e. PURPLE MAGNETIC LOCATING TAPE, STATING "REUSE MAIN BURIED BELOW" OVER ALL RECLAIMED WATER MAINS (18 INCHES BELOW GRADE). f. RECLAIMED WATER SERVICE ON OPPOSITE LOT LINE FROM POTABLE SERVICE. g. ALL ASPECTS OF RECLAIMED WATER SYSTEM MUST COMPLY WITH CHAPTER 17-610, F.A.C., LATEST EDITION. MAINTAIN 5' MINIMUM HORIZONTAL SEPARATION BETWEEN RECLAIMED MAINS AND WATER MAINS OR FORCE MAINS. STUB-OUT LINES ON THE WATER MAIN, FORCE MAIN, AND RECLAIMED MAIN SHALL HAVE RESTRAINED JOINTS FROM THE MAIN LINE TO THE STUB-OUT. ALL PVC PRESSURE PIPE SHALL HAVE A MINIMUM 36" COVER. SANITARY SEWERS, FORCE AND RECLAIMED MAINS AND STORM SEWERS SHOULD CROSS UNDER WATER MAINS. SANITARY SEWERS, FORCE AND RECLAIMED MAINS AND STORM SEWERS CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18 INCHES BETWEEN THE INVERT OF THE UPPER PIPE AND THE CROWN OF THE LOWER PIPE WHENEVER POSSIBLE. WHEN SANITARY SEWERS, FORCE AND RECLAIMED MAINS AND STORM SEWERS MUST CROSS A WATER MAIN WITH LESS THAN 18 INCHES VERTICAL DISTANCE, BOTH THE SEWER AND THE WATER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE (DIP) AT THE CROSSING. (DIP IS NOT REQUIRED FOR STORM SEWERS IF IT IS NOT AVAILABLE IN THE SIZE PROPOSED.) SUFFICIENT LENGTHS OF DIP MUST BE USED TO PROVIDE A MINIMUM SEPARATION OF 10 FEET BETWEEN ANY TWO JOINTS. ALL JOINTS ON THE WATER MAIN WITHIN 20 FEET OF THE CROSSING MUST BE LEAK FREE AND MECHANICALLY RESTRAINED. A MINIMUM VERTICAL CLEARANCE OF 6 INCHES MUST BE MAINTAINED AT THE CROSSING. WHERE THERE IS NO ALTERNATIVE TO SEWER AND RECLAIMED PIPES CROSSING OVER A WATER MAIN, THE CRITERIA FOR MINIMUM SEPARATION OF 18 INCHES BETWEEN LINES AND 10 FEET BETWEEN JOINTS SHALL BE REQUIRED. ALL CROSSINGS SHALL BE ARRANGED SO THAT THE SEWER AND RECLAIMED PIPES JOINTS AND THE WATER MAIN PIPE JOINTS ARE EQUIDISTANT FROM THE POINT OF CROSSING (PIPES CENTERED ON THE CROSSING). WHERE A NEW PIPE CONFLICTS WITH AN EXISTING PIPE, THE NEW PIPE SHALL BE CONSTRUCTED OF DIP AND THE CROSSING SHALL BE ARRANGED TO MEET THE REQUIREMENTS ABOVE. A MINIMUM 10-FOOT HORIZONTAL SEPARATION SHALL BE MAINTAINED IN PARALLEL INSTALLATIONS BETWEEN ANY TYPE OF SEWER (INCLUDING DRAINAGE INLETS) AND WATER MAIN WHENEVER POSSIBLE. A MINIMUM 5-FOOT HORIZONTAL SEPARATION SHALL BE MAINTAINED IN PARALLEL INSTALLATION BETWEEN RECLAIMED WATER MAINS AND WATER MAINS, AND BETWEEN RECLAIMED WATER MAINS AND SANITARY SEWERS WHENEVER POSSIBLE. IN CASES WHERE IT IS NOT POSSIBLE TO MAINTAIN A 10-FOOT HORIZONTAL SEPARATION BETWEEN ANY TYPE OF PARALLEL SEWER AND WATER MAIN, OR A 5-FOOT SEPARATION BETWEEN RECLAIMED MAIN AND WATER MAIN, THE WATER MAIN MUST BE LAID IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SEWER, RECLAIMED MAIN, OR FORCE MAIN AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER. WHERE IT IS NOT POSSIBLE TO MAINTAIN A VERTICAL DISTANCE OF 18 INCHES OR A HORIZONTAL DISTANCE OF 10 FEET IN PARALLEL INSTALLATIONS, THE WATER MAIN SHALL BE CONSTRUCTED OF DIP AND THE SEWER, RECLAIMED MAIN OR THE FORCE MAIN SHALL BE CONSTRUCTED OF DIP (IF AVAILABLE IN THE SIZE PROPOSED) WITH A MINIMUM VERTICAL DISTANCE OF 6 INCHES. THE WATER MAIN SHOULD BE ABOVE THE SEWER, RECLAIMED MAIN, OR FORCE MAIN. JOINTS ON THE WATER MAIN SHALL BE LOCATED AS FAR APART AS POSSIBLE FROM JOINTS ON THE SEWER, RECLAIMED MAIN, OR FORCE MAIN (STAGGERED JOINTS). IN CONSIDERATION OF PASCO COUNTY'S AGREEMENT TO PROVIDE POTABLE WATER AND/OR RECLAIMED WATER TO THE SUBJECT PROPERTY, DEVELOPER/OWNER, AND ITS SUCCESSORS ASSIGNS, AGREE TO THE FOLLOWING: a. IN THE EVENT OF PRODUCTION FAILURE OR SHORTFALL BY TAMPA BAY WATER, AS SET FORTH IN SECTION 3.19 OF THE INTERLOCAL AGREEMENT CREATING TAMPA BAY WATER, DEVELOPER/OWNER SHALL TRANSFER TO PASCO COUNTY ANY AND ALL WATER USE PERMITS OR WATER USE RIGHTS THE DEVELOPER/OWNER MAY HAVE TO USE OR CONSUME SURFACE OR GROUND WATER WITHIN PASCO COUNTY. b. PRIOR TO DEVELOPER/OWNER SELLING WATER OR WATER USE PERMITS OR WATER USE RIGHTS, DEVELOPER/OWNER SHALL NOTIFY PASCO COUNTY, AND PASCO COUNTY SHALL HAVE A RIGHT OF FIRST REFUSAL TO PURCHASE SUCH WATER OR WATER USE PERMITS OR WATER USE RIGHTS. CONTRACTOR'S RESPONSIBILITIES REGARDING WET TAPS TWO INCHES AND LARGER SHALL BE AS FOLLOWS: a. 2" ONLY- THIS EXCAVATED TRENCH MUST BE DRY OR THE TRENCH WILL REQUIRE ROCK AND A PUMP TO BE IN PLACE. THE MINIMUM DISTANCE FROM THE FACE OF THE VALVE TO THE WALL OF THE TRENCH IS TO BE SIX FEET. b. 3" AND LARGER- THE CONTRACTOR WILL SUPPLY A TAPPING SADDLE BEING EPOXY COATED, A TAPPING VALVE WITH MECHANICAL JOINT AND THE EQUIPMENT TO PROVIDE, AND CONDUCT A PRESSURE TEST. COUNTY PERSONNEL WILL WITNESS THE PRESSURE TEST WHICH MUST BE AT 150 PSI FOR DURATION OF THIRTY MINUTES. c. THE CONTRACTOR IS RESPONSIBLE FOR THE EXCAVATION BEFORE ANY COUNTY PERSONNEL WILL ENTER AN EXCAVATED AREA. IF THE TRENCH IS FOUR FEET IN DEPTH OR DEEPER, IT WILL REQUIRE A TRENCH BOX OR SLOPING, AND A LADDER ACCORDING TO OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS. d. THE TAPPING VALVE WILL REQUIRE A BLOCKING DEVICE MADE OF SUITABLE MATERIAL OR DEVICE. THIS BLOCKING DEVICE OR MATERIAL WILL BE PLACED UNDER THE VALVE AND REMAIN IN PLACE UNTIL THE TAP MACHINE IS REMOVED AND THE TAP IS COMPLETED. e. NOTE: IF THE CONTRACTOR HAS NOT FULFILLED HIS RESPONSIBILITIES, AS STATED ABOVE, PRIOR TO THE ARRIVAL OF PASCO COUNTY UTILITIES OPERATIONS AND MAINTENANCE TAPPING CREW, THERE WILL BE AN ADDITIONAL CHARGE OF $95.00. f. IF YOU HAVE ANY QUESTIONS REGARDING THIS INFORMATION, CONTACT NELSON D. HOLT, FIELD SUPERVISOR, UTILITIES SERVICES BRANCH, AT (727) 847-8145, OR E-MAIL [email protected]. FIRE HYDRANTS SHALL BE FLOW TESTED AND COLOR CODED BASED UPON FLOW RESULTS. REVIEW SUBMITTAL 6. 06/22/2015 5. 1. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN FROM THE ENGINEER OR OWNER A COPY OF ALL PERTINENT PERMITS RELATED TO THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASSURE THAT ALL CONSTRUCTION ACTIVITIES ARE IN COMPLIANCE WITH THE CONDITIONS OF ALL PERMITS AND APPROVALS. CONTRACTOR IS ALSO RESPONSIBLE FOR HAVING HIS DEWATERING PLAN APPROVED BY SWFWMD. 2. ALL CONSTRUCTION, MATERIALS AND WORKMANSHIP ARE TO BE IN ACCORDANCE WITH PASCO COUNTY LAND DEVELOPMENT CODE AND DOT SPECIFICATIONS, LATEST EDITIONS. 3. GRASS AND MULCH, OR SOLID SOD, ALL AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION. IN THE PROPOSED RIGHTS-OF-WAY A 16" WIDE AREA BEHIND THE BACK OF CURB SHALL BE SOLID SODDED. THE REMAINDER OF THE PROPOSED RIGHTS-OF-WAY TO BE SEEDED AND MULCHED IF THE SLOPE IS GREATER THAN 6:1. 4. IN ACCORDANCE WITH THE UNDERGROUND FACILITY DAMAGE PREVENTION AND SAFETY ACT (CHAPTER 556, F.S.) THE CONTRACTOR SHALL CALL THE SUNSHINE STATE ONE CALL OF FLORIDA (SSCOF) AT 1-800-432-4770 FORTY EIGHT (48) HOURS IN ADVANCE OF ANY EXCAVATION. 5. SUITABLE FILL OBTAINED THROUGH EXCAVATION OF STREETS AND DETENTION PONDS SHALL BE PLACED ON LOTS AND ADJACENT LAND IN ACCORDANCE WITH THE MASTER DRAINAGE AND GRADING PLAN AS DIRECTED BY THE ENGINEER. 6. SOD/SEED & MULCH SHALL BE PLACED IN ACCORDANCE WITH APPLICABLE CITY/COUNTY STANDARDS AS WELL AS IN ACCORDANCE WITH STANDARD AND SPECIFIC CONDITIONS IN THE SWFWMD PERMIT, IF APPLICABLE. AT A MINIMUM THIS SHALL INCLUDE SODDING OF ALL POND EMBANKMENTS OF A SLOPE 4:1 OR GREATER TO THE NW LINE, AS WELL AS SEEDING AND MULCHING OF THE BALANCE OF THE POND TRACTS (INCLUDING POND BERMS, EXCLUDING THE AREA BELOW NW), SODDING AT A MINIMUM OF 16" FROM THE BACK OF CURB, AND SEEDING AND MULCHING OF ANY PROJECT AREA WITH A SLOPE OF 4:1 OR STEEPER. 7. ROADWAY UNDERDRAIN HAS BEEN LOCATED ON THESE PLANS TO ENSURE ADEQUATE BASE PROTECTION. PRIOR TO CURB CONSTRUCTION, THE GEOTECHNICAL ENGINEER SHALL REVIEW THE PREDESIGN BORINGS AND, ALONG WITH THEIR FIELD INSPECTION, MAKE A RECOMMENDATION REGARDING ADDITIONAL UNDERDRAIN REQUIREMENTS. 8. SITE CLEARING SHALL BE PERFORMED PER THE APPROVED CONSTRUCTION PLANS AND IN ACCORDANCE WITH PASCO COUNTY LAND DEVELOPMENT CODE. INSTALLATION AND MAINTENANCE OF THE REQUIRED BARRICADING AND EROSION CONTROL SHALL BE THE RESPONSIBILITY OF THE SITE DEVELOPMENT CONTRACTOR UNLESS OTHERWISE DESIGNATED. 9. PRIOR TO BEGINNING CONSTRUCTION, CONTRACTOR SHALL EXPOSE ALL EXISTING UTILITY INVERTS TO WHICH A TIE-IN IS PROPOSED AND HAVE ENGINEER VERIFY THE ELEVATION AND ADEQUACY OF THESE INVERTS. 10. ALL SUBSURFACE CONSTRUCTION SHALL COMPLY WITH THE "TRENCH SAFETY ACT". THE CONTRACTOR SHALL ENSURE THAT THE METHOD OF TRENCH PROTECTION AND CONSTRUCTION IS IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS. 11. SILTATION ACCUMULATIONS GREATER THAN THE LESSER OF 12 INCHES OR ONE-HALF THE DEPTH OF THE SILTATION BARRIER SHALL BE IMMEDIATELY REMOVED AND PLACED IN UPLAND AREAS. 12. DURING LAND ALTERATION AND CONSTRUCTION ACTIVITIES, IT SHALL BE UNLAWFUL TO REMOVE VEGETATION BY GRUBBING OR TO PLACE SOIL DEPOSITS, DEBRIS, SOLVENTS, CONSTRUCTION MATERIAL, MACHINERY OR OTHER EQUIPMENT OF ANY KIND WITHIN THE DRIPLINE OF A TREE TO REMAIN ON THE SITE UNLESS OTHERWISE APPROVED BY THE COUNTY. 13. ALL EROSION CONTROL INSTALLATION AND INSTALLATION COORDINATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. BE ADVISED THAT THE CONSTRUCTION APPROVAL AND MAINTENANCE OF THE EROSION CONTROL SHALL BE THE SOLE RESPONSIBILITY OF THE SITE CONTRACTOR. 14. BUILDING DOWNSPOUTS TO BE DIRECTED TO THE ON-SITE STORM DRAINAGE SYSTEM. 15. FUTURE EXPANSION AREAS, IF DISTURBED, TO BE SEEDED AND MULCHED OR SODDED TO PREVENT EROSION TO EXISTING PAVEMENT SURFACES. 16. IT IS THE WATERGRASS CDD'S RESPONSIBILITY TO INSPECT AND MAINTAIN THE WATER RETENTION SYSTEM ON A REGULAR BASIS. 17. ALL DEMOLITION DEBRIS SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED OF. 18. ALL FIRST FLOOR ELEVATIONS (FF) SHALL BE A MINIMUM OF 1' ABOVE THE BASE FLOOD ELEVATION OR AS REQUIRED BY THE LCD SECTION 701. 19. PRIOR TO COMMENCEMENT OF CLEARING & GRUBBING, CONTRACTOR SHALL COORDINATE WITH HEIDT DESIGN, LLC TO SCHEDULE A SEDIMENT CONTROL AND SOIL EROSION PRE-CONSTRUCTION INSPECTION WITH THE PASCO COUNTY STORM WATER DIVISION. 1 4. STREET & DRAINAGE CONSTRUCTION NOTES: GENERAL NOTES 2. 3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN FROM THE ENGINEER OR OWNER A COPY OF ALL PERTINENT PERMITS RELATED TO THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASSURE THAT ALL CONSTRUCTION ACTIVITIES ARE IN COMPLIANCE WITH THE CONDITIONS OF ALL PERMITS AND APPROVALS. SOLID SOD, ALL AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION. CONTRACTOR IS TO COORDINATE ALL WORK WITHIN, BUT NOT LIMITED TO, PASCO COUNTY RIGHTS-OF-WAY WITH UTILITY COMPANIES IN ORDER TO PREVENT DAMAGE TO UTILITY LINES AND THE MAKING OF ADJUSTMENTS TO SAME, IF REQUIRED. IN ACCORDANCE WITH THE UNDERGROUND FACILITY DAMAGE PREVENTION AND SAFETY ACT (CHAPTER 556, F.S.) THE CONTRACTOR SHALL CALL THE SUNSHINE STATE ONE CALL OF FLORIDA (SSCOF) AT 1-800-432-4770 FORTY EIGHT (48) HOURS IN ADVANCE OF ANY EXCAVATION. ALL UTILITY MATERIALS AND WORKMANSHIP MUST COMPLY WITH STANDARDS FOR DESIGN AND CONSTRUCTION OF WATER, WASTEWATER AND RECLAIMED WATER FACILITIES SPECS., JUNE 1995 EDITION. FIRE HYDRANT, GATE VALVE AND BLOW-OFF VALVE ASSEMBLIES SHALL CONSIST OF ALL PIPE, VALVES, TEES, FITTINGS, AND ANY AND ALL OTHER APPURTENANCES COMPRISING A COMPLETE, WORKING UNIT. ALL 4"-12" PVC WATER MAIN PIPE SHALL CONFORM TO THE REQUIREMENTS FOUND IN AWWA STANDARD C-900, LATEST EDITION AT THE TIME OF PLAN CONNERTON CORNER 1. 200 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\ASP.DWG-C-103 2015/06/25 9:17 AM NATALIE BUDEN 0 400 GRAPHIC SCALE: 1" = 200' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 www.HeidtDesign.com GENERAL LEGEND WETLAND LINE WCAS WETLAND CONS. AREA SETBACK UNPLATTED PREPARED FOR: TRACT B-2 TRACT B-3 ZONE A TRACT C-2 ZONE X ZONE A AY NT PLE ASA DESCRIPTION KW PAR NS I A PL UNPLATTED OWNER: CONNERTON LAND ACQUISITION, LLC GROVES-PHASE 1A PROJECT NO: FILE: DESIGN BY: DRAWN BY: DATE: REGISTRATION NO. FCG CT 1006 ASP NYB NYB 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. REVIEW SUBMITTAL DESCRIPTION OWNER: FAMILTAT HOLDINGS LLC OWNER: FAMILTAT HOLDINGS LLC DATE OWNER: FAMILTAT HOLDINGS LLC DATE (PLAT BOOK 39, PAGES 120-150) 06/22/2015 41 TRACT C-1 1 No. ZONE AE EL. 74.8 (NAVD 88) EL. 75.6 (NGVD 29) Y WA o.45) rtation 5 N IGH ad po . H e Road f Trans 44B-Ro t U.S o 5 (Sta ment No. 4) tion age 44 art Sec Dep ,P rida y Map k 102 Flo a fW Boo ht o (Deed Rig ZONE X ZONE A TRACT B-1 FIRST CAPITAL GROUP FEMA FLOOD ZONE BOUNDARY (TYP.) AERIAL SITE PLAN PROPERTY LINE CONNERTON CORNER FEMA FLOOD ZONE BOUNDARY 50 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\DEMO.DWG-C-104 2015/06/25 9:17 AM NATALIE BUDEN 0 100 GRAPHIC SCALE: 1" = 50' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 www.HeidtDesign.com WETLAND 425 CATEGORY I GENERAL LEGEND WCAS A37 Southeast SH= 75.50 NP= 74.40 ZONE A A37 Southeast SH= 75.50 NP= 74.40 WETLAND LINE WETLAND CONS. AREA SETBACK 12" Oak EXISTING TREE TO BE REMOVED 12" Oak EXISTING TREE TO BE PROTECTED PROPOSED TREE BARRICADE STAKED EROSION CONTROL UNPLATTED REMOVE AND DISPOSE CURB REMOVE AND DISPOSE UTILITY FEMA FLOOD ZONE BOUNDARY REMOVE AND DISPOSE SIDEWALK TO EXISTING JOINTS REMOVE AND DISPOSE PAVEMENT REMOVE AND RELOCATE EXISTING UTILITY POLE PREPARED FOR: ZONE A REMOVE AND DISPOSE 33 LF 4" PVC RM, BLOWOFF, AND GATE VALVE. PLUG AT EX. TEE. ZONE X REMOVE AND DISPOSE 5' STORM MH DESCRIPTION < REMOVE AND DISPOSE 82 LF 48" RCP AND 48" MES FIRST CAPITAL GROUP EPCWL DEMOLITION PLAN WETLAND 425 CATEGORY I CONNERTON CORNER FLOODPLAIN/ WETLAND MITIGATION AREA M-12 NW=75.5 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 ZONE A DATE < X < AY OWNER: CONNERTON LAND ACQUISITION, LLC PROJECT NO: FILE: DESIGN BY: DRAWN BY: OWNER: FAMILTAT HOLDINGS LLC FCG CT 1006 DEMO NYB NYB OWNER: FAMILTAT HOLDINGS LLC DIP 16" N G N I TI EXIS ATER MA W DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. REMOVE AND DISPOSE TREE (TYP.) PLE DATE REVIEW SUBMITTAL TP N ASA DESCRIPTION UNPLATTED P 06/22/2015 ZONE AE EL. 74.8 (NAVD 88) EL. 75.6 (NGVD 29) NS LAI W ARK 1 1 o. 4 Y N LVD) WA IGH KES B A . H U.S D O' L N (LA GROUT N. INV. IN EXISTING CATCH BASIN R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\SITE.DWG-C-105 2015/06/25 9:17 AM NATALIE BUDEN GENERAL LEGEND EPCWL WETLAND LINE WCAS WETLAND CONS. AREA SETBACK 12" Oak EXISTING TREE TO BE REMOVED 12" Oak EXISTING TREE TO BE PROTECTED PROPOSED TREE BARRICADE 0 STAKED EROSION CONTROL 60 120 GRAPHIC SCALE: 1" = 60' PROPOSED UTILITY EASMENT PROPOSED LANDSCAPE EASEMENT ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 FEMA FLOOD ZONE BOUNDARY PROPOSED SIDEWALK 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 PROPOSED MASS GRADING AREA WETLAND 425 CATEGORY I ZONING: MPUD FUTURE LAND USE: NT RELOCATE EXISTING UTILITY POLE ZONING: MPUD FUTURE LAND USE: NT A37 Southeast SH= 75.50 NP= 74.40 TURNOUT TO BE CONSTRUCTED PER FDOT INDEX 515 ZONE A A37 Southeast SH= 75.50 NP= 74.40 R50' 10' UTILITY EASEMENT (TYP.) UNPLATTED FIRST CAPITAL GROUP WETLAND 425 CATEGORY I CONNERTON CORNER FLOODPLAIN/ WETLAND MITIGATION AREA M-12 NW=75.5 PRELIMINARY SITE PLAN www.HeidtDesign.com PROPOSED PAVEMENT 69.5 PROPOSED 28.0' DRANAGE EASEMENT 2-3 2-2 ZONING: MPUD FUTURE LAND USE: NT GROVES-PHASE 1A 120' 06/22/2015 ' 50.0 PROPOSED SIGN EASEMENT OWNER: CONNERTON LAND ACQUISITION, LLC ' 50.0 (PLAT BOOK 39, PAGES 120-150) ZONING: MPUD FUTURE LAND USE: RES-3 1 ROW PROJECT NO: FILE: DESIGN BY: DRAWN BY: OWNER: FAMILTAT HOLDINGS LLC ZONING: MPUD FUTURE LAND USE: NT FCG CT 1006 SITE NYB NYB OWNER: FAMILTAT HOLDINGS LLC ZONING: MPUD FUTURE LAND USE: NT DIP 16" N G N I I T EXIS ATER MA W DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. IN IST (EX DESCRIPTION UNPLATTED DATE ' R35 R2 5' DATE X AY) W Y D A W OA ARKTOR R P C NS LAI COLLE P T AN BLIC S 0' A U 200. PLE VED P A GP AD ROW 120' UBLIC RO P ALT ZONE AE EL. 74.8 (NAVD 88) EL. 75.6 (NGVD 29) R7' ' 36.0 1 o. 4 Y N MASS GRADING AREA (TYP.) ALL PROPOSED IMPROVEMENTS IN US-41 ROW TO BE APPROVED BY DOT 15' X 15' UTILITY PB-40 EASEMENT (TYP.)) ' 49.3 ' ' 59.0 R25 ASPH 15' X 15' UTILITY EASEMENT (TYP.)) PB-19 DESCRIPTION R2 4' 137. ' ZONE A 120' ROW 79.7' ' 25.4' 24.0 ' 24.0 2-1 12.0' 12.0 TURNOUT TO BE CONSTRUCTED PER FDOT INDEX 515 15' h Rig A HW No.45 D) n HIG ad 0' LV o atio . B t 5 300. U.S State R AKES anspor -Road B O' L of Tr 544 ND ent No. (LA 44) tion artm e4 Dep p Sec 2, Pag 0 rida Ma y k1 Flo Wa Boo t of ed (De MASS GRADING RIDGE LINE (TYP.) 15' LANDSCAPE EASEMENT (TYP.) OWNER: PASCO TRACT C-1 INVESTMENT LAND, LLC 5' ' 28.0 ROW OAD 200' UBLIC R TP HAL PB-115 PB-42 TRACT B-3 REVIEW SUBMITTAL ZONE X 12.5' OWNER: FCPG R E FUND 09-03, LLC 61.5 X TRACT C-2 ZONE A X ' ' 15.5 X POND 100 DHW100=77.65 DHW25=77.38 DLW=76.30 DNW=75.50 ZONE X ASP TRACT B-2 TRACT B-1 R50 ' 43.5 PREPARED FOR: 78.5 10' TRACT I.D. TRACT ACREAGE TRACT USES B-1 0.67 DRAINAGE & ACCESS EASEMENT B-3 1.67 C-1 1.92 C-2 1.00 5) 6) 7) 8) 9) 10) 11) 12) CONSERVATION, & MITIGATION EASEMENT 1.20 B-2 3) 4) 13) 14) 15) 16) 17) 18) DRAINAGE & ACCESS EASEMENT FUTURE DEVELOPMENT PARCEL FUTURE DEVELOPMENT PARCEL 19) 20) 21) 22) PASCO COUNTY WETLAND CATEGORY TABLE CATEGORY SIZE (Acres) I 1.20 II 0.00 III 0.00 TOTAL 1.20 23) SITE DATA TABLE PHASE, VILLAGE, AND PARCEL UPLAND ACRES WETLAND ACRES SURFACE WATER (MAN-MADE LAKE) ACRES TOTAL ACRES CONNERTON CORNER 2.91 1.20 2.34 6.45 CONNERTON MPUD DESIGN STANDARDS (PURSUANT TO CONNERTON VILLAGE ONE MPUD) LOT TYPE RETAIL/ PERSONAL SERVICE MINIMUM SETBACKS F (FT) S (FT) R (FT) 0/10/25 0 10 MAXIMUM HEIGHT (FT) MAXIMUM FAR 50' 2.0 F= FRONT SETBACK S= SIDE SETBACK R= REAR SETBACK 1. 2. 3. 4. LOT WIDTH MEASURED HORIZONTALLY AT THE FRONT BUILDING LINE OFFICE USES ALLOWED OVER RETAIL ARCITECTURAL FEATURES, SUCH AS CUPOLAS, SPIRES, PARAPET WALLS, AND FACADES HAVE A MAXIMUM HEIGHT OF 60 FEET. FRONT SETBACKS FROM PLEASANT PLAINS PARKWAY ARE TO BE TEN FEET. FRONT SETBACKS TO US 41 TO BE 25 FEET (SUBJECT TO US 41 CLEAR ZONE), AND FRONT SETBACKS TO INTERNAL ROADS TO BE ZERO. 24) SIDEWALK CLEAR ZONE SHALL BE FREE OF OBSTACLES, INCLUDING BUT NOT LIMITED TO SHRUBS, TREES, FENCES, ABOVE GROUND UTILITIES, I.E. POWER POLES, STREET LIGHTS, GUY ANCHORS, FIRE HYDRANTS, MAIL BOXES, STREET SIGNS AND UTILITY MARKERS. 25) CURB RAMPS SHALL BE PROVIDED PER FDOT INDEX 304 WITH DETECTABLE WARNING STRIPS ALIGNED IN THE DIRECTION OF PEDESTRIAN TRAVEL. 26) ALL LANDSCAPE AND SODDED AREAS WILL BE IRRIGATED. 27) THIS PROJECT WILL COMPLY WITH THE PASCO COUNTY TREE PROTECTION AND RESTORATION ORDINANCE. 28) ALL CONSTRUCTION WORK, INCLUDING ROAD, DRAINAGE AND UTILITIES, SHALL BE CONSTRUCTED IN ACCORDANCE WITH PASCO COUNTY DESIGN STANDARDS AND TESTED IN COMPLIANCE WITH THE PASCO COUNTY ENGINEERING SERVICE DEPARTMENT TESTING SPECIFICATIONS FOR CONSTRUCTION OF ROADS, STORM DRAINAGE AND UTILITIES. 29) THIS PROJECT SHALL BE SUBJECT TO THE PASCO COUNTY NEW DEVELOPMENT FAIR SHARE CONTRIBUTION FOR ROAD IMPROVEMENTS ORDINANCE AND SCHOOL IMPACT FEE ORDINANCE. 30) IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF HISTORIC RESOURCES, INCLUDING BUT NOT LIMITED TO ABORIGINAL OR HISTORIC POTTERY, PREHISTORIC STONE TOOLS, BONE OR SHELL TOOLS, HISTORIC TRASH PITS, OR HISTORIC BUILDING FOUNDATION, ARE DISCOVERED, WORK SHALL COME TO AN IMMEDIATE STOP AND THE FLORIDA DEPARTMENT OF HISTORIC RESOURCES (STATE HISTORIC PRESERVATION OFFICER) AND PASCO COUNTY SHALL BE NOTIFIED WITHIN TWO WORKING DAYS OF THE RESOURCES FOUND ON SITE. 31) IF DURING THE CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE OF STATE AND FEDERALLY PROTECTED PLANT AND/OR ANIMAL SPECIES ARE DISCOVERED, WORK SHALL COME TO AN IMMEDIATE STOP AND PASCO COUNTY SHALL BE NOTIFIED WITHIN TWO WORKING DAYS OF THE PLANT AND/OR ANIMAL SPECIES FOUND ON SITE. 32) ALL 20'x20' CLEAR-SITE AREAS SHALL BE KEPT FREE OF ANY SIGNAGE PLANTINGS, TREES, ETC. IN EXCESS OF THREE-AND-A-HALF (3-1/2) FEET IN HEIGHT. 33) ALL PROPOSED SIGNS MUST BE APPLIED FOR, APPROVED, AND PERMITTED ON AN INDIVIDUAL BASIS APART FROM ANY ULTIMATELY APPROVED SITE PLAN. APPROVAL OF THIS SUBDIVISION PLAN DOES NOT CONSTITUTE APPROVAL OF ANY SIGNAGE. 34) THE ENGINEER CERTIFIES THAT SITE FEATURES HAVE BEEN DESIGNED IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT. 35) THE OWNER/DEVELOPER ACKNOWLEDGES THAT THIS APPROVAL DOES NOT INCLUDE ANY WORK IN COUNTY RIGHT-OF-WAY. ANY RIGHT-OF-WAY WORK SHALL BE A FUNCTION OF AN APPROVED RIGHT-OF-WAY PERMIT. 36) THE OWNER/DEVELOPER ACKNOWLEDGES THAT THE SITE AND ITS SUBSEQUENT BUILDING PERMITS SHALL COMPLY WITH ALL MPUD CONDITIONS. 37) ALL STRUCTURES, INCLUDING BUFFER WALLS, RETAINING WALLS, SIGNAGE, ETC. SHALL REQUIRE A BUILDING PERMIT. 38) ARCHITECT OR LIGHTING CONSULTANT SHALL ENSURE THAT FINAL LIGHTING PLANS MEET THE REQUIREMENTS OF THE PASCO COUNTY LDC, INCLUDING PROHIBITIONS AGAINST OFF-SITE LIGHT SPILLAGE AND GLARE. 39) NO IRRIGATION SYSTEM OR LANDSCAPING SHALL BE INSTALLED IN ANY COUNTY OR STATE RIGHT-OF-WAY WITHOUT ISSUANCE OF APPROPRIATE RIGHT-OF-WAY USE PERMIT. 40) FUGITIVE DUST EMISSIONS SHALL BE CONTROLLED BY SPRINKLING AS NECESSARY. 41) ON-SITE BURNING SHALL NOT BE EMPLOYED WITHOUT APPROVAL FROM THE FIRE MARSHAL. 42) THE SOIL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED PRIOR TO CONSTRUCTION AND MAINTAINED THROUGHOUT CONSTRUCTION UNTIL THE SITE IS PERMANENTLY STABILIZED. 43) ALL PROJECTS MUST COMPLY WITH PASCO COUNTY FIRE HYDRANT ORDINANCE NO. 46-51. 44) FIRE HYDRANTS SHALL BE INSTALLED AND IN SERVICE PRIOR TO THE ACCUMULATION OF COMBUSTIBLES. 45) PER THE NATIONAL FIRE PROTECTION ASSOCIATION, NFPA-1, 16.4.3.1.3: WHERE UNDERGROUND WATER MAINS AND HYDRANTS ARE TO BE PROVIDED, THEY SHALL BE INSTALLED, COMPLETED, AND IN SERVICE PRIOR TO BUILDING CONSTRUCTION WORK 46) PER NFPA-1, 18.3.4.1: CLEARANCES OF 7.5 FEET IN FRONT OF AND TO THE SIDES OF THE FIRE HYDRANT WITH A FOUR-FOOT CLEARANCE TO THE REAR MUST BE MAINTAINED AT ALL TIMES. 47) PRIOR TO CONSTRUCTION, A BUILDING PERMIT SHALL BE OBTAINED FOR ALL STRUCTURES THAT HAVE A FOOTER, REGARDLESS OF SIZE, THROUGH PASCO COUNTY CENTRAL PERMITTING. (E.G., INCLUDING BUT NOT LIMITED TO BUILDINGS, ACCESSORIES, RETAINING WALLS, AND ETC.). 48) ALL DEMOLITION DEBRIS SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED OF. 49) ANY OFF SITE DISTURBANCE SHALL BE RESTORED TO THE PRE-CONSTRUCTION CONDITION OR BETTER. 50) AS APPLICABLE, THE OWNER/DEVELOPER SHALL PROVIDE COPIES OF THE REQUIRED PERMITS FROM THE RESPECTIVE GOVERNING AGENCIES, PRIOR TO ISSUANCE OF THE SITE DEVELOPMENT PERMIT (SDP). 51) THE SUBJECT PROPERTY IS NOT LOCATED WITHIN THE 10-YEAR WELLHEAD PROTECTION AREA. 52) UNDERDRAINS WITHIN THE ROW SHALL BE THE MAINTENANCE RESPONSIBILITY OF THE CONNERTON WEST CDD. A RIGHT-OF-WAY USE PERMIT WILL BE FILED FOR ALL STREETS DESIGNATING THIS ENTITY AS THE O&M ENTITY FOR UNDERDRAINS. 53) THESE PLANS WERE PREPARED WITH THE BENEFIT OF AND IN CONFORMANCE TO THE GEOTECHNICAL RECOMMENDATIONS IN THE REPORTS BY MORTENSEN ENGINEERING, INC. ENTITLED AS FOLLOWS: "LAKE/DETENTION POND AREA SOILS STUDY, CONNERTON VILLAGE AREA PLAN NO. 1" (DATED 5/13/03). 54) SURFACE WATER MANAGEMENT FOR THIS PROJECT IS PROVIDED BY POND 100, WHICH IS AN EXISTING POND PROPOSED FOR MODIFICATION IN THESE PLANS. 55) IN CONSIDERATION OF THE COUNTY'S AGREEMENT TO PROVIDE POTABLE WATER AND/OR RECLAIMED WATER TO THE SUBJECT PROPERTY, THE APPLICANT/DEVELOPER AND ITS OR THEIR SUCCESSORS AND ASSIGNS AGREE TO THE FOLLOWING: 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 www.HeidtDesign.com PROJECT NO: FILE: DESIGN BY: DRAWN BY: FCG CT 1006 SITE NYB NYB a. 58) IN THE EVENT OF PRODUCTION FAILURE OR SHORTFALL BY TAMPA BAY WATER (TBW), AS SET FORTH IN SECTION 3.19 OF THE INTERLOCAL AGREEMENT CREATING TBW, THE APPLICANT/DEVELOPER SHALL TEMPORARILY TRANSFER TO THE COUNTY ANY AND ALL WATER-USE PERMITS OR WATER-USERIGHTS THE APPLICANT/DEVELOPER MAY HAVE TO USE OR CONSUME SURFACE WATER OR GROUNDWATER WITHIN THE COUNTY FOR THE DURATION OF THE PRODUCTION FAILURE OR SHORTFALL. b. PRIOR TO THE APPLICANT/DEVELOPER SELLING WATER, WATER-USE PERMITS, OR WATER-USE RIGHTS, THE APPLICANT/DEVELOPER SHALL NOTIFY THE COUNTY, AND THE COUNTY SHALL HAVE A RIGHT OF FIRST REFUSAL TO PURCHASE SUCH WATER OR WATER-USE PERMITS OR WATER-USE RIGHTS. THE APPLICANT/DEVELOPER ACKNOWLEDGES, IN ACCORDANCE WITH THE LDC, SECTION 905.2, LANDSCAPING AND BUFFERING, ANY PLANT MATERIALS OF WHATSOEVER TYPE AND KIND REQUIRED BY THE LANDSCAPE AND BUFFERING REGULATIONS AND THIS APPROVAL, SHALL BE REPLACED WITHIN THIRTY DAYS OF THEIR DEMISE AND/OR REMOVAL. R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\SITE.DWG-C-106 2015/06/25 9:17 AM NATALIE BUDEN CONNERTON CORNER PROPOSED TRACT ACREAGES 2) DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. APPROVED AS PART OF CONNERTON VILLAGE ONE: PARCELS 101, 102, 103 (DR04-1229) ON 04/29/04 FIRST CAPITAL GROUP 1.20 EXISTING POND ON PASCO INVESTMENT LAND, LLC PORTION OF PROJECT DESCRIPTION 0.00 APPROVED WITH CONDITIONS; RZ-7111 04/21/15 DATE 1.20 CONNERTON MPUD REZONING PETITION ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 DESCRIPTION 1.20 NOTES: DATE TOTAL 0.00 INCREMENT / PARCEL I.D. PREPARED FOR: 1.20 UNIMPACTED WETLAND ACRES REVIEW SUBMITTAL WETLAND 425 WETLAND IMPACT ACRES 06/22/2015 ACRES ON SITE 1 WETLAND IDENTIFICATION PRELIMINARY SITE PLAN SUMMARY OF INDIVIDUAL PASCO COUNTY PLAN APPROVALS AND PENDING APPROVALS CONNERTON CORNER WETLAND SUMMARY TABLE DEVELOPER/OWNER: FIRST CAPITAL GROUP 1516 E HILLCREST STREET, SUITE 210 ORLANDO, FL 32803 (407) 872-0209 ENGINEER: HEIDT DESIGN, LLC 5806-B BRECKENRIDGE PARKWAY TAMPA, FLORIDA 33610 (813) 253-5311 SURVEYOR: GEOPOINT SURVEYING, INC. 1403 EAST 5TH AVENUE TAMPA, FL 33605 (813) 248-8888 GEOTECHNICAL ENGINEER: MORTENSEN ENGINEERING, INC. 6408 W. LINEBAUGH AVENUE, SUITE 111 TAMPA, FL 33625 (813) 908-5555 EXISTING ZONING: MPUD PETITION #6045 WAS APPROVED BY BCC 08/12/2003; A SUBSTANTIAL AMENDMENT, PETITION #7111, WAS APPROVED BY BCC ON 04/21/2015; EXISTING LAND USE: VACANT FUTURE LAND USE CLASSIFICATION: NEW TOWN DRI #233 WAS APPROVED BY BCC ON 07/18/2000. NUMEROUS NOTICES OF PROPOSED CHANGE HAVE BEEN ADOPTED. THE MOST RECENTLY AMENDED, RESTATED DEVELOPMENT ORDER WAS APPROVED BY BCC ON 01/13/2005. WATER SERVICE TO BE PROVIDED BY PASCO COUNTY UTILITIES. SEWAGE DISPOSAL SERVICE TO BE PROVIDED BY PASCO COUNTY UTILITIES. ELECTRICAL POWER TO BE PROVIDED BY WITHLACOOCHIE RIVER ELECTRIC COOPERATIVE. TELEPHONE SERVICE TO BE PROVIDED BY VERIZON. STREET LIGHTING TO BE PROVIDED BY A STREET LIGHTING TAXING DISTRICT. FIRE PROTECTION TO BE PROVIDED BY THE EXISTING PASCO COUNTY FIRE STATION #22 LOCATED NEAR US 41 AND SR 52. FIRE HYDRANTS TO BE PROVIDED ON SITE. SITE IS WITHIN A FIRE PROTECTION MSTU. THE SITE IS CURRENTLY MASS GRADED. THE WETLANDS ARE CYPRESS SWAMPS AND GRASSY MARSHES. PREDOMINANT SOIL TYPES ON-SITE CONSIST OF ZOLFO FINE SAND, BASINGER FINE SAND, AND SELLERS MUCKY LOAMY FINE SAND IN THE TRANSITIONAL AREAS; BASINGER FINE SAND AND SELLERS MUCKY LOAMY FINE SANDS WITHIN WETLAND AREAS. CONSERVATION AREAS AND DETENTION PONDS WILL BE OWNED AND MAINTAINED BY THE OWNER OR MERCHANT'S ASSOCIATION. DETENTION PONDS SHALL BE WITHIN DRAINAGE EASEMENTS DEDICATED TO THE OWNER OR MERCHANT'S ASSOCIATION FOR MAINTENANCE. CONTOURS SHOWN ARE BASED ON NATIONAL GEODETIC VERTICAL DATUM OF 1929. TO CONVERT FROM NGVD 1929 TO NAVD 1988 SUBTRACT 0.84 FEET. PROPOSED RIGHTS-OF-WAY FOR LOCAL STREETS SHALL BE A MINIMUM OF FIFTY (50) FEET. ALL ROADWAY STANDARDS TO COMPLY WITH THE MANUAL OF UNIFORM MINIMUM STANDARDS, STATE OF FLORIDA. ALL WATER AND WASTEWATER FACILITIES TO BE INSTALLED IN COMPLIANCE WITH PASCO COUNTY STANDARDS FOR DESIGN AND CONSTRUCTION OF WATER AND WASTEWATER FACILITIES. ALL UTILITY LINES SHALL BE INSTALLED UNDERGROUND. ENTIRE PROJECT LIES WITHIN FLOOD ZONE "X" , "A"AND "AE" ACCORDING TO FLOOD INSURANCE RATE MAP (FIRM) COMMUNITY PANEL NO. 12101C0238F REVISED SEPTEMBER 26, 2014 AND ISSUED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. AREAS IN ZONE AE HAVE A BASE FLOOD ELEVATION OF 74.8 (NAVD88). A MINIMUM OF 16" OF SOD STRIP WILL BE PROVIDED ALONG ALL ROADWAYS PER PASCO COUNTY REQUIREMENTS. SETBACKS FOR POST-DEVELOPED WETLANDS SHALL BE AS FOLLOWS: 25-FOOT MINIMUM AROUND ALL CATEGORY I WETLANDS; BUFFERS AROUND CATEGORY II AND III WETLANDS SHALL BE AS REQUIRED BY SWFWMD. ALLOWABLE USES AND RESTRICTIONS FOR BUFFERS SHALL BE IN ACCORDANCE WITH SECTION 805 OF THE PASCO COUNTY LAND DEVELOPMENT CODE. SIDEWALKS WILL BE PROVIDED IN THE LOCATIONS INDICATED ON THESE PLANS. UNLESS OTHERWISE SHOWN, ALL SIDEWALKS SHALL BE A MINIMUM OF FIVE (5) CONNERTON CORNER 1) R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\RS-PASCO.DWG-C-200 2015/06/25 9:18 AM NATALIE BUDEN PAVEMENT CONSTRUCTION NOTES: 1 0 2% MAX. 05 . 10 .4 10 6. EXISTING 6" CONCRETE SIDEWALK/BIKEPATH TYPICAL (3000 PSI) EXISTING 12' DRIVE LANE EXISTING 'F' CURB EXISTING 12' DRIVE LANE EXISTING 'F' CURB 7. PROPOSED 'F' CURB EXISTING "F" CURB 12" STABILIZATION PLEASANT PLAINS PARKWAY TYPICAL ROADWAY SECTION PROPOSED 'F' CURB 2" TYPE S-1 ASPHALT SURFACE COURSE 120' RIGHT-OF-WAY 8" SOIL CEMENT BASE COURSE (DESIGN SPEED = 35 MPH) TYPE 1A STREET 12.00' 8. 1" TYPE FC-9.5 FRICTION COURSE (110 lbs/sy) 12" STABILIZED SUBGRADE (98% MODIFIED PROCTOR) (LBR 40 Min.) 12.00' PROFILE GRADE LINE 2.0% 2.0% PROPOSED ROADWAY DESIGN FOR ON-SITE DRIVE AISLES LAYER COEFFICIENTS THICKNESS 1.50" 0.44 - TYPE SP-9.5 ASPHALT SURFACE COURSE 0.15 - CRUSHED CONCRETE BASE COURSE (LBR 150) 6" 0.08 - STABILIZED SUBGRADE (12" MIN.) 12" SN = (0.44 x 1.50) + (0.15 x 6) + (0.08 x 12) = 2.52 have a minimum Limerock Bearing Ration (LBR) of 40 or greater. Subgrade shall be compacted to the minimum thickness as shown. Subgrade shall be compacted to a minimum of 98% Modified Proctor per AASHTO T-180. 9. Compacted subgrade (beneath stabilized subgrade, if required, or beneath base materials) shall be prepared in accordance with FDOT Index 505, latest edition. Embankment fills or natural sands to 24 inches below the bottom of the pavement base (if no stabilized subgrade), or to 24 inches below the bottom of stabilized subgrade, shall be sandy soils (A-3 or SP/SP-SM) with typically 15% fines or less passing the No. 200 sieve. 10. Crushed concrete base surface shall be inspected and approved by the engineer prior to any paving operation. 11. stabilized subgrade with a minimum LBR value of 40 (or a minimum FBV of 75) which has been compacted to a minimum density of ninety-eight percent (98%) of the maximum density as determined by AASHTO T-180 for a minimum depth of twelve (12) inches. 12. All Portland Cement Concrete shall have a minimum compressive strength of 3000 psi. 13. Roadway underdrain has been located on these plans to ensure adequate base protection. Prior to curb construction, the Geotechnical Engineer shall review the predesign borings and, along with their field inspection, make a recommendation regarding additional underdrain requirements. 14. Should no underdrain be specified on the plans, the Contractor shall include 1,000 linear feet of underdrain at unit prices for bid purposes. 15. All testing referenced above shall, at a minimum, be at the frequency required by the Governing Agency having jurisdiction, or in the absence thereof, by minimum FDOT standards. 1. 2. PROPOSED ROADWAY DESIGN FOR ON-SITE DRIVE AISLES (FOR SOIL CEMENT BASE ALTERNATIVE) 0.44 - TYPE SP-9.5 ASPHALT SURFACE COURSE THICKNESS 4. 1.50" 0.15 - SOIL CEMENT BASE 8" 0.04 - COMPACTED SUBGRADE 12" 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 www.HeidtDesign.com ALTERNATIVE SOIL-CEMENT BASE MATERIAL 3. LAYER COEFFICIENTS Crushed concrete road base material shall have a minimum compacted dry density of 114.0 pcf (per AASHTO T-180), and a minimum Limerock Bearing Ratio (LBR) of 150 (under-tolerance +/5%), tested at a frequency required by the Governing Agency having jurisdiction, or in the absence thereof, by minimum FDOT standards. Base single-course lifts shall not exceed 6 inches (compacted, 8 inches loose). Crushed concrete road base shall be compacted to a minimum of 100% of Modified Proctor per AASHTO T-180, tested at a frequency required by the Governing Agency having jurisdiction, or in the absence thereof, by minimum FDOT standards. Crushed concrete base shall have a 12-inch thick stabilized subgrade, 5. Soil-cement mix design shall be provided a minimum 30 days in advance of placement of base material for approval by the Engineer. The soil-cement product shall be in accordance with PCA standards. Soil-cement surface shall be inspected and approved by the Engineer prior to any paving operation. Subgrade for soil-cement shall be prepared in accordance with FDOT Index No. 505, latest edition. Embankment fills or natural sands to 24-inches below the bottom of the pavement base (if no stabilized subgrade), or to 24-inches below the bottom of stabilized subgrade, shall be sandy soils (A-3 or SP/SP-SM) with typically 15% fines or less passing the No. 200 sieve. Subgrade under a soil-cement base shall be proof-rolled to grade, as directed by the Engineer and approved by the Engineer with suitable compaction equipment to achieve a density of ninety-eight (98%) percent Modified Proctor for a depth of twelve (12) inches prior to placing soil-cement base. Subgrade under soil-cement base shall NOT be stabilized unless otherwise directed by Engineer of Record. SN = (0.44 x 1.50) + (0.15 x 8) + (0.04 x 12) = 2.34 6" 1 2"R (TYP.) 2"R 2'-0" WHEN USED ON HIGH SIDE OF ROADWAYS, THE CROSS SLOPE OF THE GUTTER SHALL MATCH THE CROSS SLOPE OF THE ADJACENT PAVEMENT. THE THICKNESS OF THE LIP SHALL BE 6", UNLESS OTHERWISE SHOWN. FILE: PAVEMENT TO BE FINISHED FLUSH WITH LIP OF CURB 2"R DESIGN BY: DRAWN BY: FCG CT 1006 RS-PASCO NYB NYB ASPHALT PAV'T. 712" ASPHALT PAV'T. ASPHALT PAV'T. 3000 PSI CONCRETE 2"R (TYP.) 3"R 3"R 6" 71 2" 61 2" 3000 PSI CONCRETE PAVEMENT TO BE FINISHED 1 " ABOVE LIP OF CURB 4 PROJECT NO: 6" 1 1'-0" 3 "R (TYP.) 4 PAVEMENT TO BE FINISHED 1 4" ABOVE LIP OF CURB 1'-6" 1'-6" 1'-0" SLOPE TO MATCH DRIVEWAY 14" 6" 0.53' 8" 10" SLOPE ACCORDING TO PAVEMENT WHERE GRADE SLOPES AWAY FROM CURB 8" 1 06/22/2015 Contractor may propose alternate pavement designs. Contractor shall submit any pavement alternatives to Engineer for approval prior to final subgrade preparations. 3000 PSI CONCRETE 2'-0" 2'-0" DROP CURB TYPE "F" CURB & GUTTER TYPE "F" CURB & GUTTER ROTATED SCALE: 1" = 1' SCALE: 1" = 1' SCALE: 1" = 1' DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 10 5. FIRST CAPITAL GROUP 1/4":1' MIN. 1 5 .4 1/4":1' MIN. 20 EXISTING 12' DRIVE LANE PREPARED FOR: 9. 10 . 0 0.0 EXISTING 12' DRIVE LANE 10 .0 0 0 2 0. DESCRIPTION 2' DATE 5 70 EXISTING 10' UTILITY EASEMENT 21' 2' 12' 9.5 .4 0 10 2% MAX. 2' EXISTING 'F' CURB 10 .0 5 24' 5 9.5 0 7 9. 2% MAX. 2' 11' DESCRIPTION 13' 10' 11' 24' 4. REVIEW SUBMITTAL 21' 60' DATE 60' 3. ROADWAY TYPICAL SECTIONS PROPOSED 12' TURN LANE. SEE SITE PLAN FOR LOCATION. MATCH EXISTING PAVEMENT 120' R/W EXISTING 10' UTILITY EASEMENT PROPOSED 6" CONCRETE SIDEWALK/BIKEPATH. SEE SITE PLAN FOR LOCATION. MATCH EXISTING 2. R/W LINE R/W LINE PROPOSED 13' TURN LANE. SEE SITE PLAN FOR LOCATION. MATCH EXISTING PAVEMENT Pavement wearing surface shall be asphaltic concrete of type and thickness shown in detail and shall meet current Department of Transportation Specifications. Pavement base shall be crushed concrete, as designated in plans, and shall be compacted to a minimum thickness as shown. Crushed concrete road base material shall be of uniform quality, free of all organics, steel rebar, asphalt debris, and any other deleterious materials. Crushed concrete road base material shall generally conform to the gradation chart for graded aggregate base, FDOT Section 204 and 901, tested at a frequency required by the Governing Agency having jurisdiction. In addition, crushed concrete shall conform to the applicable specification contained within Pasco County Design CONNERTON CORNER 1. WETLAND 425 CATEGORY I R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\MD-KEY.DWG-C-300 2015/06/25 9:18 AM NATALIE BUDEN FLOODPLAIN/ WETLAND MITIGATION AREA M-12 NW=75.5 WETLAND 425 CATEGORY I A37 Southeast SH= 75.50 NP= 74.40 A37 Southeast SH= 75.50 NP= 74.40 UNPLATTED 0 80 160 GRAPHIC SCALE: 1" = 80' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 " RCP 180 LF 48 P 48" RC 120 LF 36 LF 24" RCP PB-42 235 2-3 PB-115 8 LF 4 2-2 " RC 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 P 1 LF 66 www.HeidtDesign.com P UNPLATTED P OWNER: CONNERTON LAND ACQUISITION, LLC GROVES-PHASE 1A (PLAT BOOK 39, PAGES 120-150) OWNER: FAMILTAT HOLDINGS LLC 7. 8. 4. DESCRIPTION DATE PROJECT NO: FILE: DESIGN BY: DRAWN BY: DATE: REGISTRATION NO. FCG CT 1006 MD-KEY NYB NYB 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 6. DESCRIPTION 5. 3. ALL SODDED SLOPES STEEPER THAN 4:1 SHALL BE INSTALLED WITH SOD PEGS. NO EXCAVATION SHALL EXTEND BELOW THE PERMITTED DESIGN DEPTHS/ELEVATIONS SHOWN ON THE DRAWINGS, UNLESS ADDITIONAL TESTING SUPPORTS OTHERWISE; NO LOWER SEMI-CONFINING UNIT CLAYEY SOIL MATERIAL AND/OR NO LIMESTONE MATERIALS SHALL BE EXCAVATED REGARDLESS IF THEY ARE ENCOUNTERED WITHIN THE PERMITTED DEPTHS/ELEVATIONS. IF ANY LOWER SEMI-CONFINING UNIT CLAYEY SOIL MATERIALS OR LIMESTONE MATERIALS ARE ENCOUNTERED ABOVE THE PERMITTED DEPTHS/ELEVATIONS, THEN EXCAVATION OPERATIONS SHALL CEASE IN THE GENERAL LOCATION AND THE ENGINEER OF RECORD SHALL BE NOTIFIED IMMEDIATELY. SHOULD ANY NOTICEABLE SOIL SLUMPING OR SINKHOLE FORMATION BECOME EVIDENT, THE APPLICANT/DEVELOPER SHALL IMMEDIATELY NOTIFY THE COUNTY, TAMPA BAY WATER (TBW), AND SWFWMD, AND ADOPT ONE OR MORE OF THE FOLLOWING PROCEDURES AS DETERMINED TO BE APPROPRIATE BY THE COUNTY AND SWFWMD: A. IF THE SLUMPING OR SINKHOLE FORMATION BECOMES EVIDENT BEFORE OR DURING CONSTRUCTION ACTIVITIES, STOP ALL WORK (EXCEPT FOR MITIGATION ACTIVITIES) IN THE AFFECTED AREA AND REMAIN STOPPED UNTIL THE COUNTY AND SWFWMD APPROVE RESUMING CONSTRUCTION ACTIVITIES. B. TAKE IMMEDIATE MEASURES TO ENSURE NO SURFACE WATER DRAINS INTO THE AFFECTED AREAS. C. VISUALLY INSPECT THE AFFECTED AREA. D. EXCAVATE AND BACKFILL OR GROUT AS REQUIRED TO FILL THE AFFECTED AREA AND PREVENT FURTHER SUBSIDENCE. E. USE SOIL REINFORCEMENT MATERIALS IN THE BACKFILLING OPERATION, WHEN APPROPRIATE. F. IF THE AFFECTED AREA IS IN THE VICINITY OF A WATER-RETENTION AREA, MAINTAIN A MINIMUM DISTANCE OF TWO FEET FROM THE BOTTOM OF THE RETENTION POND TO THE SURFACE OF THE LIME-ROCK OR KARST CONNECTION. G. IF THE AFFECTED AREA IS IN THE VICINITY OF A WATER-RETENTION AREA AND THE ABOVE METHODS DO NOT STABILIZE THE COLLAPSE, RELOCATE THE RETENTION AREA. H. DISCHARGE OF STORM-WATER INTO DEPRESSIONS WITH DIRECT OR DEMONSTRATED HYDROLOGIC CONNECTION TO THE FLORIDIAN AQUIFER SHALL BE PROHIBITED. UPON COMPLETION OF LAND DEVELOPMENT CONSTRUCTION ACTIVITIES, A PROFESSIONAL ENGINEER SHALL PROVIDE A CERTIFICATION TO PASCO COUNTY THAT THE PROJECT, INCLUDING EACH PAD AREA, COMPLIES WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL / GEOLOGICAL ENGINEERING REPORT . DATE 4. 1. 2. REVIEW SUBMITTAL 3. ALL SODDED SLOPES STEEPER THAN 4:1 SHALL BE INSTALLED WITH SOD PEGS. ALL FIRST FLOOR ELEVATIONS SHALL BE A MINIMUM OF ONE FOOT ABOVE THE BASE FLOOD ELEVATION (BFE). ALL FIRST FLOOR ELEVATIONS SHALL BE A MINIMUM OF 16 INCHES ABOVE THE HIGHEST CROWN LINE OF THE STREET LYING BETWEEN THE PROJECTION OF THE SIDE BUILDING LINES. NO EXCAVATION SHALL EXTEND BELOW THE PERMITTED DESIGN DEPTHS/ELEVATIONS SHOWN ON THE DRAWINGS, UNLESS ADDITIONAL TESTING SUPPORTS OTHERWISE; NO LOWER SEMI-CONFINING UNIT CLAYEY SOIL MATERIAL AND/OR NO LIMESTONE MATERIALS SHALL BE EXCAVATED REGARDLESS IF THEY ARE ENCOUNTERED WITHIN THE PERMITTED DEPTHS/ELEVATIONS. IF ANY LOWER SEMI-CONFINING UNIT CLAYEY SOIL MATERIALS OR LIMESTONE MATERIALS ARE ENCOUNTERED ABOVE THE PERMITTED DEPTHS/ELEVATIONS, THEN EXCAVATION OPERATIONS SHALL CEASE IN THE GENERAL LOCATION AND THE ENGINEER OF RECORD SHALL BE NOTIFIED IMMEDIATELY. SHOULD ANY NOTICEABLE SOIL SLUMPING OR SINKHOLE FORMATION BECOME EVIDENT, THE APPLICANT/DEVELOPER SHALL IMMEDIATELY NOTIFY THE COUNTY, TAMPA BAY WATER (TBW), AND SWFWMD, AND ADOPT ONE OR MORE OF THE FOLLOWING PROCEDURES AS DETERMINED TO BE APPROPRIATE BY THE COUNTY AND SWFWMD: A. IF THE SLUMPING OR SINKHOLE FORMATION BECOMES EVIDENT BEFORE OR DURING CONSTRUCTION ACTIVITIES, STOP ALL WORK (EXCEPT FOR MITIGATION ACTIVITIES) IN THE AFFECTED AREA AND REMAIN STOPPED UNTIL THE COUNTY AND SWFWMD APPROVE RESUMING CONSTRUCTION ACTIVITIES. B. TAKE IMMEDIATE MEASURES TO ENSURE NO SURFACE WATER DRAINS INTO THE AFFECTED AREAS. C. VISUALLY INSPECT THE AFFECTED AREA. D. EXCAVATE AND BACKFILL OR GROUT AS REQUIRED TO FILL THE AFFECTED AREA AND PREVENT FURTHER SUBSIDENCE. E. USE SOIL REINFORCEMENT MATERIALS IN THE BACKFILLING OPERATION, WHEN APPROPRIATE. F. IF THE AFFECTED AREA IS IN THE VICINITY OF A WATER-RETENTION AREA, MAINTAIN A MINIMUM DISTANCE OF TWO FEET FROM THE BOTTOM OF THE RETENTION POND TO THE SURFACE OF THE LIME-ROCK OR KARST CONNECTION. G. IF THE AFFECTED AREA IS IN THE VICINITY OF A WATER-RETENTION AREA AND THE ABOVE METHODS DO NOT STABILIZE THE COLLAPSE, RELOCATE THE RETENTION AREA. H. DISCHARGE OF STORM-WATER INTO DEPRESSIONS WITH DIRECT OR DEMONSTRATED HYDROLOGIC CONNECTION TO THE FLORIDAN AQUIFER SHALL BE PROHIBITED. UPON COMPLETION OF LAND DEVELOPMENT CONSTRUCTION ACTIVITIES, A PROFESSIONAL ENGINEER SHALL PROVIDE A CERTIFICATION TO PASCO COUNTY THAT THE PROJECT, INCLUDING EACH PAD AREA, COMPLIES WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL / GEOLOGICAL ENGINEERING REPORT. THE ENGINEER RESPONSIBLE FOR THE PROJECT SHALL CERTIFY TO PASCO COUNTY THAT THE UNDERDRAINS HAVE BEEN PROPERLY INSTALLED PRIOR TO THE INSTALLATION OF ANY ASPHALT. CERTIFICATION SHALL STRICTLY COMPLY WITH THE UNDERDRAIN CERTIFICATION FORM AVAILABLE IN "ENGINEERING SERVICES DEPARTMENT: A PROCEDURAL GUIDE FOR THE PREPARATION OF ASSURANCES OF COMPLETION AND MAINTENANCE" PROPOSED MAINTENANCE EASEMENTS MUST CONTAIN CLEAR OPERABLE ACCESSIBILITY. 06/22/2015 1. 2. MASS GRADING NOTES 1 DRAINAGE & GRADING NOTES DIP 16" TING MAIN S I X E ATER W OWNER: FAMILTAT HOLDINGS LLC FIRST CAPITAL GROUP NT SA LEA PREPARED FOR: PB-40 PAR NS LAI CONNERTON CORNER AY KW 1 o. 4 n Y N WA o.45) ortatio ad 5 N IGH sp Ro . H Road Tran 4BU.S (State ent of No. 54 4) 4 m t ion e4 par ect , Pag De pS 2 rida y Ma ok 10 a Flo o fW dB ht o (Dee PB-19 MASTER GRADING & DRAINAGE PLAN RCP 8" R ig 2-1 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\GD.DWG-C-301 2015/06/25 9:18 AM NATALIE BUDEN WETLAND 425 CATEGORY I INSTALL PLATE OVER TREATMENT WEIR. SEE DRAINAGE DETAILS A37 Southeast SH= 75.50 NP= 74.40 30 0 GRAPHIC SCALE: 1" = 30' 1-3 " RCP 180 LF 48 80.1 ' 2 80.8 80.19 80.8 79.39 78.80 2-1 78.80 79.30 79.25 78.80 78.80 79.26 80.09 80.33 80.5 REPLACE EXISTING 5' STORM MH WITH 7' STORM MH TOP ELEV.= 79.82 INV. IN (W)= 69.34 INV. IN (E)=69.34 INV. OUT (N)= 69.34 15 PROFILE GRADE ELEVATION REFERENCE CONTOUR 15.0 FINISH FLOOR ELEVATION TYPE 'F' CURB LIMITS UDCO UNDERDRAIN WITH CLEANOUT STAKED EROSION CONTROL AB# SOIL BORING LOCATION TEMPORARY SWALE CENTERLINE MASS GRADING RIDGELINE GENERAL LEGEND EPCWL WCAS WETLAND LINE WETLAND CONS. AREA SETBACK 12" Oak EXISTING TREE TO BE REMOVED 12" Oak EXISTING TREE TO BE PROTECTED PROPOSED TREE BARRICADE STAKED EROSION CONTROL AY DATE S AIN PROPOSED LANDSCAPE EASEMENT PL T N ASA PROJECT NO: FILE: DESIGN BY: DRAWN BY: C-301 OWNER: FAMILTAT HOLDINGS LLC FCG CT 1006 GD NYB NYB C-302 OWNER: FAMILTAT HOLDINGS LLC DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 06/22/2015 REVIEW SUBMITTAL PLE 1 41 PB-40 PROPOSED UTILITY EASMENT KW R A P DESCRIPTION C 03 C-3 80.0 80.33 No. ) Y LVD WA IGH AKES B 45 ion 5 . H L rtat o. ' O U.S dN spo -Road D a n N o a (LA 44B f Tr te R o. 5 4) Sta nt o e N 4 tion artm e4 Sec 2, Pag Dep p 0 rida Ma k1 ay Flo fW Boo ht o (Deed Rig PB-19 TOP OF CURB / SIDEWALK EDGE OF PAVEMENT UDCO 8.0' % MASS GRADING RIDGE LINE (TYP.) 15.00 14.50 DIRECTION OF SURFACE FLOW 0.70 80.8 SPOT ELEVATION PAVEMENT FF=000.00 78.80 80.9 15.00 DATE TRACT C-1 SPOT ELEVATION GROUND 03 15.5 ' 5 . 12 80.19 RCP 77.4 STRUCTURE NO. 15.00 15.00 8" F1 80.9 D 75.5 PROPOSED TYPE 'C' GTI TOP ELEV.= 78.65 INV. OUT (S)= 74.60 C-3 77.4 2-3 L 66 PROPOSED 28.0' DRAINAGE EASEMENT PROPOSED TEMPORARY SWALE. SEE MASS GRADING DETAILS. 10 10 2-2 P " RC ALL PROPOSED IMPROVEMENTS IN US 41 ROW TO BE APPROVED BY DOT STORM DRAINAGE STRUCTURE & PIPE FIRST CAPITAL GROUP 8 LF 4 PROPOSED 8' STORM MH TOP ELEV.= 77.70 INV. IN (W)= 69.20 INV. OUT (N)= 69.20 PROPOSED DESCRIPTION 235 PROPOSED TEMPORARY SWALE. SEE MASS GRADING DETAILS. EXISTING 36 LF 24" RCP PREPARED FOR: TRACT C-2 78.0 PROPOSED TEMPORARY SWALE. SEE MASS GRADING DETAILS. PROPOSED TYPE 'C' GTI TOP ELEV.= 77.90 INV. IN (S)= 74.50 INV. OUT (E)=69.55 DRAINAGE LEGEND 0 1-2 www.HeidtDesign.com 1-4 PROPOSED 24" MES INV. ELEV= 69.50 GRADING & DRAINAGE PLAN 1-1 P .0 1 8" RC 20 LF 4 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 15 69.5 PROPOSED 8' STORM MH TOP ELEV.= 78.80 INV. IN (W)= 69.20 INV. OUT (N)= 69.20 .0 80.0 15 TRACT B-1 79.7 ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 SEE SHEET C-302 78.5 77.8 76.6 PROPOSED 48" MES INV. ELEV= 69.20 CONNERTON CORNER 79.6 60 0 WETLAND 425 CATEGORY I 30 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\GD.DWG-C-302 2015/06/25 9:18 AM NATALIE BUDEN FLOODPLAIN/ WETLAND MITIGATION AREA M-12 NW=75.5 60 GRAPHIC SCALE: 1" = 30' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 A37 Southeast SH= 75.50 NP= 74.40 PB-42 TRACT B-3 PB-115 PROPOSED TYPE I INLET TOP ELEV.= 78.13 INV. OUT (S)= 73.95 2-3 79.35 79.00 66 79.23 80.19 LF 18" RCP 78.60 78.30 2-1 79.30 79.30 79.25 5A 79.25 CONVERT EXISTING INLET TO MH. ADJUST TOP TO FINISHED GRADE. CORE EX. STRUCTURE FOR PROPSED 24" INVERT TOP ELEV.= 78.19 INV (N)= 73.90 EX. INV (E) =71.32 EX. INV (S) =70.58 EX. INV (W) =69.93 78.80 78.20 78.80 DESCRIPTION 78.80 78.80 END TYPE 'F' CURB DATE 78.80 X X X X X X 10 15 . 12" Oak EXISTING TREE TO BE REMOVED 15.00 SPOT ELEVATION GROUND 12" Oak EXISTING TREE TO BE PROTECTED 15.00 SPOT ELEVATION PAVEMENT 15.00 14.50 TOP OF CURB / SIDEWALK EDGE OF PAVEMENT 15.00 15 WETLAND CONS. AREA SETBACK STRUCTURE NO. 1 00 15 .0 10 WCAS PROFILE GRADE ELEVATION REFERENCE CONTOUR 15.0 FF=000.00 PROPOSED TREE BARRICADE PROJECT NO: STAKED EROSION CONTROL FILE: PROPOSED UTILITY EASMENT DESIGN BY: PROPOSED LANDSCAPE EASEMENT DRAWN BY: FINISH FLOOR ELEVATION DIRECTION OF SURFACE FLOW UDCO UDCO UNDERDRAIN WITH CLEANOUT STAKED EROSION CONTROL AB# FCG CT 1006 GD NYB NYB SOIL BORING LOCATION C-301 C-302 TEMPORARY SWALE CENTERLINE MASS GRADING RIDGELINE DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. STORM DRAINAGE STRUCTURE & PIPE WETLAND LINE DESCRIPTION EPCWL DATE PROPOSED GENERAL LEGEND 06/22/2015 EXISTING REVIEW SUBMITTAL X DRAINAGE LEGEND X SEE SHEET C-301 61.5 FIRST CAPITAL GROUP 1-4 PREPARED FOR: CONNERTON CORNER TRACT B-2 GRADING & DRAINAGE PLAN www.HeidtDesign.com R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\SEC.DWG-C-303 2015/06/25 9:19 AM NATALIE BUDEN ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 69.5 M 4:1 69.5 AX. 84 80 76 72 68 64 80.8 EXISTING GRADE (TYP.) M M 1 61.5 AX . PROPOSED GRADE (TYP.) . AX 0+00 1+00 2+00 3+00 www.HeidtDesign.com 3+70 CONNERTON CORNER 78.4 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 SECTION A 4:1 MAX. 78.5 AX. MA M 4:1 X. 69.5 M AX 1 AX . 0+00 M 1 2: 61.5 . 69.5 1+00 PROPOSED GRADE (TYP.) 80 76 72 68 64 DESCRIPTION 4:1 EXISTING GRADE (TYP.) PREPARED FOR: 78.5 STAKED EROSION CONTROL (TYP.) 80 76 72 68 64 POND 100A DHW100=77.66 DHW25=77.39 DLW=76.30 DNW=75.50 2: WETLAND SET BACK LINE (TYP.) 10' ACCESS EASEMENT 2+00 DATE SECTION B EXISTING GRADE (TYP.) PROPERTY LINE (TYP.) MATCH EXISTING GRADE AT PROPERTY LINE (TYP.) 80 76 72 68 06/22/2015 80 76 72 68 PROPOSED GRADE (TYP.) 24' ACCESS DRIVE 84 80 76 EXISTING GRADE (TYP.) RIDGE LINE 84 80 76 1 MATCH EXISTING GRADE AT PROPERTY LINE (TYP.) REVIEW SUBMITTAL PROPERTY LINE (TYP.) PROJECT NO: FILE: DESIGN BY: DRAWN BY: 0+00 1+00 SECTION C 0+00 PROPOSED GRADE (TYP.) 1+00 FCG CT 1006 SEC NYB NYB SECTION D DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. X. 78.7 80.9 80.8 FIRST CAPITAL GROUP 4:1 MAX. MA 78.5 77.5 VERTICAL SCALE: 1" = 2' DESCRIPTION 4:1 79.5 POND 100 DHW100=77.65 DHW25=77.38 DLW=76.30 DNW=75.50 40 DATE 78.5 20 HORIZONTAL SCALE: 1" = 20' MATCH EXISTING GRADE AT PROPERTY LINE (TYP.) 2: 84 80 76 72 68 64 0 PROPERTY LINE (TYP.) 1 STAKED EROSION CONTROL (TYP.) 10' ACCESS EASEMENT RIDGE LINE TEMPORARY SWALE 2: WETLAND SET BACK LINE (TYP.) 15' CONTAINMENT BERM POND CROSS SECTIONS 10' MAINTENANCE BERM 7'-4" 6'-6 1"4 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 www.HeidtDesign.com . AD R 4" 3/ WELD (FOR TRAFFIC BEARING GRATES) 0.12 0.15 .3 0 0.15 DESCRIPTION .4 0 DATE 0.12 COVER COVER 0.12 0.42 0.96 (3'-6") 1.20 (4'-6") 0.48 0.14 DESIGN BY: NYB DRAWN BY: NYB 0.16 0.08 0.48 0.12 0.24 0.24 0.96 (3'-6") 1.20 (4'-6") 0.72 0.48 0.12 DD SECTION "A-A" 0.42 0.72 0.08 FCG CT 1006 FILE: 0.48 0.48 DESCRIPTION 0.12 0.36 DATE 0.15 0.12 0.12 0.16 0.48 0.12 0.12 0.12 0.12 0.36 0.08 0.12 0.48 0.12 1.20 (4'-6") 0.96 (3'-6") 0.12 PROJECT NO: 1.68 (5'-0") 1.44 (4'-0") COVER -0 -0 0 -0 .3 0 -0 .4 0.48 0.34 1.20 (4'-6") 0.96 (3'-6") 0.12 0.15 0.68 (2'-8 1/4") 0.52 6" 0.14 COVER 0.08 0.09 0.24 0.24 0.06 HAY BALE 0.48 0.24 0.24 3'-0" GUTTER TRANSITION (TYP) 0.12 0.12 0.08 0.12 0.14 EXISTING GRADE LINE PLAN 0.48 TYPE I SECTION A-A 0.12 0.48 0.48 1.08 FILL 0.96 (3'-6") SLOPE WETLAND SETBACK LINE 0.96 (3'-6") 1.44 (4'-0") 0.96 (3'-6") 0.36 0.48 TYPE II & III SECTION A-A 2.76 (9'-6") 0.12 1.68 (5'-0") 1.44 (4'-0") WETLAND LINE SLOPE 0.12 0.12 1.08 0.12 "A" STAKE CO S M EAL PA W CT IT ED H FI LL WETLAND LINE HAY BALE (TYP.) 0.12 N.T.S. "A" 0.12 0.12 0.96 (3'-6") 0.12 0.12 SILT SCREEN 1.56 (6'-0") 1.20 (4'-6") HAY BALE 0.48 0.48 0.12 STAKE (TYP.) 0.36 0.36 12 0.12 1.44 (4'-0") METHOD OF INSTALLATION 0.48 0.36 0.12 2.76 (9'-6") NATIVE SOIL 3'-0" GUTTER TRANSITION (TYP) 0.12 NATIVE SOIL AS SHOWN .1 2 0.12 TYPE I SECTION A-A 0.36 -0 0.08 0.48 0.48 0.36 06/22/2015 REVIEW SUBMITTAL BACKFILL 0.48 1.20 0.48 (4'-6") -0 . 0.48 TYPE II & III SECTION A-A 1.20 (4'-6") 3'-0" GUTTER TRANSITION (TYP) 0.96 (3'-6") 0.15 6" 0.68 (2'-8 1/4") 0.96 (3'-6") 0.12 BACKFILL 0.09 0.15 0.12 0.36 3'-0" GUTTER TRANSITION (TYP) POST 0.12 6" SILT STOP POST 0.36 0.36 0.08 7" N.T.S. SILT STOP 0.48 0.36 0.68 (2'-8 1/4") STAKED TURBIDITY BARRIER 1.20 (4'-6") 0.08 0.16 9" 3' 18" MIN 5' OR GREATER 0.48 1.20 (4'-6") 0.16 9" 6' MAX. 6" Note: This curb inlet has been approved by Pasco County for use on non-functionally classified roadways, such as local streets and subdivision collector roadways. It does not conform to the Florida Department of Transportation Manual of Uniform Minimum Standards for Design, Construction, and Maintenance for Streets and Highways, the Standard Specifications for Road and Bridge Construction, or the Design Standards for Design, Construction, Maintenance and Utility Operations on the State Highway System. However, we hereby certify that it is suitable for use at the locations depicted herein. POST (OPTIONS: 2"x 4" OR 2-1/2" MINIMUM DIA. WOOD; STEEL 1.33 LBS/FT. MINIMUM) 18 OZ. NYLON REINFORCED P.V.C. FABRIC (300 P.S.I. TEST) PREPARED FOR: NOT TO SCALE FIRST CAPITAL GROUP 2" 5" DRAINAGE DETAILS CONNERTON CORNER #5 ANCHOR BAR (3 REQUIRED) N.T.S. EROSION CONTROL DETAILS NOTE: THE EROSION BARRIERS, AS SHOWN, ARE NOT TO BE CONSTRUED TO MEAN THAT THEY ARE ALL THAT MAY BE REQUIRED. THE CONTRACTOR IS TO TAKE WHATEVER MEASURES NECESSARY TO CONTROL EROSION THROUGHOUT THE PROJECT. PLAN PLAN PLAN PLAN CURB INLET TYPE I CURB INLET TYPE II & III CURB INLET TYPE I CURB INLET TYPE II & III CURB INLETS TYPES I, II & III FOR TYPE F CURB CURB INLETS TYPES I, II & III LARA G. BARTHOLOMEW DATE: REGISTRATION NO. 61035 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, TO DRAWINGS REPRODUCED, OR EXHIBITS) OR DISTRIBUTED MAY BE COPIED, UNLESS REPRODUCED, SPECIFIC WRITTEN OR DISTRIBUTED PERMISSION UNLESS HAS SPECIFIC BEEN OBTAINED WRITTEN FROM PERMISSION HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HAS HEREBY BEEN OBTAINED GRANTED FROM SPECIFICALLY HEIDT DESIGN, TO GOVERNMENTAL LLC. IN ADVANCE. AGENCIES CONSENT TO REPRODUCE IS HEREBY GRANTED THIS DOCUMENTATION SPECIFICALLYIN TOCOMPLIANCE WITH F.S. CHAPTER 119. GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 2" X 2" X 1/4" ANGLE IRON R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\DD.DWG-C-304 2015/06/25 9:19 AM NATALIE BUDEN C PIPE L C PIPE L DIA. + 1'-2" PROJECT NO: FILE: DATE: REGISTRATION NO. DESCRIPTION DATE DESCRIPTION PREPARED FOR: FCG CT 1006 DD DESIGN BY: NYB DRAWN BY: NYB LARA G. BARTHOLOMEW 61035 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\DD.DWG-C-305 2015/06/25 9:19 AM NATALIE BUDEN FIRST CAPITAL GROUP www.HeidtDesign.com 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, TO DRAWINGS REPRODUCED, OR EXHIBITS) OR DISTRIBUTED MAY BE COPIED, UNLESS REPRODUCED, SPECIFIC WRITTEN OR DISTRIBUTED PERMISSION UNLESS HAS SPECIFIC BEEN OBTAINED WRITTEN FROM PERMISSION HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HAS HEREBY BEEN OBTAINED GRANTED FROM SPECIFICALLY HEIDT DESIGN, TO GOVERNMENTAL LLC. IN ADVANCE. AGENCIES CONSENT TO REPRODUCE IS HEREBY GRANTED THIS DOCUMENTATION SPECIFICALLYIN TOCOMPLIANCE WITH F.S. CHAPTER 119. GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. DATE 06/22/2015 REVIEW SUBMITTAL DRAINAGE DETAILS CONNERTON CORNER 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 B 4:1 10:1~20:1 A A Y 12" PVC PIPE NOT TO SCALE 12" TEE W/RISER M P 30" 5:1 14" 14" 15' SECTION AA NOT TO SCALE NOT TO SCALE POND 5' MASS GRADING (SEEDED) SEE DIVERSION SWALE DETAIL 200' MAX CL SWALE NOTE: ALL PERFORATED PIPE SHALL HAVE A FILTER FABRIC SOCK MEETING SECTION 948 4:1 TYPICAL TEMPORARY SUMP OUTFALL DETAIL 10:1~20:1 18" DEEP NOT TO SCALE MAINTENANCE BERM 2' 6" SEE OVERFLOW SPILLWAY DETAIL 12" Y AR S R 4:1 36' MIN. 5' 50' 12" PVC PIPE P 12" M ANCHOR MAT PER MANUFACTURER'S SPEC TURF REINFORCEMENT MAT (INSTALLED PER MANUFACTURER'S SPEC) SEE OVERFLOW SECTION DETAIL 12" TEE W/RISER SU 5' PO DNW MAT TO BE PLACED AND ANCHORED UNDERNEATH THE SOD PE LO M TEMPORARY SUMP POND TE 6' WIDE OVERFLOW SPILLWAY (SEE DETAIL) NOTE: APPURTENANCES NOT SHOWN FOR CLARITY PREPARED FOR: 6" SPILLWAY ENDS AT THE 4:1 SLOPE TEMPORARY SUMP EMERGENCY OVERFLOW SECTION DETAIL NOT TO SCALE NOTE: ALL TEMPORARY SWALES/SUMPS SHALL BE BACKFILLED/COMPACTED (95% MODIFIED PROCTOR) AND GRADED TO FINAL ELEVATION AT THE TIME OF HOME CONSTRUCTION IN ACCORDANCE WITH THE APPROVED GRADING PLAN. ACCEPTABLE EROSION CONTROL MATERIALS FOR FLOW CHANNELS AND STEEP SLOPES (>4:1) NORTH AMERICAN GREEN VMAX C350 ERO-GUARD EG-2 C NORTH AMERICAN GREEN VMAX SC250 ERO-GUARD EG-2 S/C 10' 6' 4:1 TYP. FOR EMBANKMENT STABILIZATION (<4:1) NORTH AMERICAN GREEN BIONET SC150 BN NORTH AMERICAN GREEN SC150 ERO-GUARD BG-2 SIC 24" 12" NOTE: ALL PERFORATED PIPE SHALL HAVE A FILTER FABRIC SOCK MEETING SECTION 948 TYPICAL TEMPORARY POND PROTECTION PLAN (FOR LARGE AREAS OF MASS GRADING) NOT TO SCALE NOTE: ALL MATERIAL SHALL AT A MINIMUM BE INSTALLED MANUFACTURER'S INSTALLATION INSTRUCTIONS/ SPECIFICATIONS/GUIDELINES TURF REINFORCEMENT MAT (INSTALLED PER MANUFACTURER'S SPEC) DESCRIPTION SOD FIRST CAPITAL GROUP NOTE: ALL TEMPORARY SWALES/SUMPS SHALL BE BACKFILLED/COMPACTED (95% MODIFIED PROCTOR) AND GRADED TO FINAL ELEVATION AT THE TIME OF HOME CONSTRUCTION IN ACCORDANCE WITH THE APPROVED GRADING PLAN. 6' WIDE OVERFLOW SPILLWAY DETAIL THROUGH BERM DATE NOT TO SCALE MAINTENANCE BERM (10') STORMWATER FACILITY DISTRICT PARK CONTAINMENT 2'-7" DNW 4: POND 5' SLOPE VARIES 10:1 TO 20:1 ANCHOR MAT PER MANUFACTURER'S SPEC TURF REINFORCEMENT MAT (INSTALLED PER MANUFACTURER'S SPEC) NOTE: APPURTENANCES NOT SHOWN FOR CLARITY 12" NW 5:1 12" MIN. X MA 5:1 3" (SODDED) ELEV. 76.24 SEE TEMP SWALE DETAIL THIS SHEET MAINTENANCE BERM POND EMBANKMENT 1'-3" NOTE: ALL TEMPORARY SWALES/SUMPS SHALL BE BACKFILLED/COMPACTED (95% MODIFIED PROCTOR) AND GRADED TO FINAL ELEVATION AT THE TIME OF HOME CONSTRUCTION IN ACCORDANCE WITH THE APPROVED GRADING PLAN. NOTE: ALL TEMPORARY SWALES/SUMPS SHALL BE BACKFILLED/COMPACTED (95% MODIFIED PROCTOR) AND GRADED TO FINAL ELEVATION AT THE TIME OF HOME CONSTRUCTION IN ACCORDANCE WITH THE APPROVED GRADING PLAN. 3" 1'-1" MAX 4:1 NOT TO SCALE 6" MASS GRADING (SEEDED) POST-DEVELOPED (FUTURE) GRADE SECTION 1'-7" TYPICAL TEMPORARY DIVERSION SWALE DETAIL (TO BE USED ALONG POND AREAS) ELEV. 75.50 3 16" THICK FIBERGLASS PLATE FASTENED TO CONTROL STRUCTURE OUTSIDE WALL W/ FASTENERS @ 12" O.C. ELEV. 75.44 NOT TO SCALE PROJECT NO: ELEV. 74.99 12' TYPICAL 20' 4:1 SLOPE 10' to 20' FCG CT 1006 FILE: COMMON LOT LINE FASTENER (TYPICAL) DESCRIPTION MAT TO BE PLACED AND ANCHORED UNDERNEATH THE SOD E P LO 1S 6" 3" SOD PERMANENT MAINTENANCE BERM 2' 12" MAX. TYPICAL POND DATE (SEED & MULCH) TYPE V SWALE 06/22/2015 REVIEW SUBMITTAL 6" DNW SLO 5:1 12" PVC FLEXIBLE PIPE PE 4:1 FUTURE GRADE HIGH POINT 12" DEEP DRAINAGE DETAILS 5:1 www.HeidtDesign.com CONNERTON CORNER 3' TYP. NW 200' MAX CONTAINMENT BERM 3'TYP. 10:1~20:1 FILL/SURROUND PERFORATED PIPE W/ ROCK BALLAST MAINTENANCE BERM 24" 6" TYP. POND 5' 4:1 CL TEMPORARY SUMP DETAIL 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 6' SWALE 8' PERFORATED PIPE SECTION NON-PERFORATED PIPE 15' MAINTENANCE BERM B VARIES 10' to 20' NW 5' REAR LOT LINE 15' 18" DEEP 12" TEE w/RISER DD DESIGN BY: NYB DRAWN BY: NYB TURF REINFORCEMENT MAT (INSTALLED PER MANUFACTURER'S SPEC) CONTROL STRUCTURE 100 TREATMENT WEIR RETROFIT PLAN POND EMBANKMENT STABILIZATION DETAIL FOR CONCENTRATED SHEET FLOW NOT TO SCALE SCALE - 1"= 1' ACCEPTABLE EROSION CONTROL MATERIALS FOR FLOW CHANNELS AND STEEP SLOPES (>4:1) NORTH AMERICAN GREEN VMAX C350 ERO-GUARD EG-2 C NORTH AMERICAN GREEN VMAX SC250 ERO-GUARD EG-2 S/C FOR EMBANKMENT STABILIZATION (<4:1) NORTH AMERICAN GREEN BIONET SC150 BN NORTH AMERICAN GREEN SC150 ERO-GUARD BG-2 SIC EXISTING CONTROL STRUCTURE DATA EX. STR. NO. NOTE: ALL MATERIAL SHALL AT A MINIMUM BE INSTALLED MANUFACTURER'S INSTALLATION INSTRUCTIONS/ SPECIFICATIONS/GUIDELINES 100 DISCHARGE PIPE FDOT BOX TYPE WALL TOP EL. BOTT. EL. (FT.) (FT.) 78.00 - TYPE - ATTENUATION AND TREATMENT CONTROLS SIZE (IN.) INV. EL. (FT.) STR. TYPE - - CS-5 ATTENUATION OPENING A B 16'-0" 1'-9" EL. (FT.) 76.24 TREATMENT OPENING C D 1'-7 1/4" 9 5/8" EL. (FT.) 75.44 REMARKS LARA G. BARTHOLOMEW DATE: REGISTRATION NO. 61035 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, TO DRAWINGS REPRODUCED, OR EXHIBITS) OR DISTRIBUTED MAY BE COPIED, UNLESS REPRODUCED, SPECIFIC WRITTEN OR DISTRIBUTED PERMISSION UNLESS HAS SPECIFIC BEEN OBTAINED WRITTEN FROM PERMISSION HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HAS HEREBY BEEN OBTAINED GRANTED FROM SPECIFICALLY HEIDT DESIGN, TO GOVERNMENTAL LLC. IN ADVANCE. AGENCIES CONSENT TO REPRODUCE IS HEREBY GRANTED THIS DOCUMENTATION SPECIFICALLYIN TOCOMPLIANCE WITH F.S. CHAPTER 119. GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 15' AR NOT TO SCALE 10 LF 12" PERFORATED PIPE (TYP.) SU NONPERFORATED PIPE TYPICAL TEMP. SWALE SECTION 50' SECTION BB 12" TEE W/RISER 10' R 12" PERFORATED PIPE ELEVATION PER PLAN PO 8' SECTION OF PERFORATED PIPE 5' 2' MIN. M A ROCK BACKFILL 5:1 TE 5:1 6' WIDE OVERFLOW SPILLWAY (SEE DETAIL) 5:1 A 5:1 5:1 6: 1 1 6: 15' 10' 6" MIN. SOD EXPOSED SOIL R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\DD.DWG-C-306 2015/06/25 9:19 AM NATALIE BUDEN STABILIZE WITH SOD WETLAND 425 CATEGORY I R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\WS-KEY.DWG-C-300 2015/06/25 9:19 AM NATALIE BUDEN FLOODPLAIN/ WETLAND MITIGATION AREA M-12 NW=75.5 WETLAND 425 CATEGORY I A37 Southeast SH= 75.50 NP= 74.40 A37 Southeast SH= 75.50 NP= 74.40 UNPLATTED 0 EXISTING 12" FM 80 160 GRAPHIC SCALE: 1" = 80' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 " RCP 180 LF 48 120 LF P 48" RC 36 LF 24" RCP PB-42 EXISTING 4" RM 235 2-3 PB-115 8 LF 4 2-2 " RC 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 P www.HeidtDesign.com RCP 8" < 1 LF 66 EXISTING 16" RM R ig 2-1 < UNPLATTED P OWNER: CONNERTON LAND ACQUISITION, LLC EXISTING 6" FM EXISTING 12" RM shall be PVC Pressure Pipe; Pressure Rate 200; DR 21 per ASTM Standard D-2241. Water mains smaller than 2" in diameter shall be Class 1120 or 1220; Schedule 80 and meet the requirements of ASTM D-1785. 7. All water mains shall be deflected vertically where crossing storm sewer pipe to obtain a minimum vertical distance of 18 inches between the outside of the water main and the outside of the storm sewer. Joints shall be located such that the distance from the storm sewer and water main joint is as far as practical. 8. Water mains should be laid at least 10 feet horizontally from any existing or proposed storm sewer. 9. At no time should vertical clearance between force main or gravity sewer and water main be less than 18" at crossing of same. 10. At no time should horizontal clearance between force main or gravity sewer and water main be less than 10' when same are paralleling each other. 11. Adjusting manhole tops to match grade and slope of the finish paving shall be included in the respective contract unit price for manholes, payment of which will constitute full compensation for the construction and completion of the manhole, and no additional payment will be allowed or made for adjusting manhole tops. 12. The locations and elevation of all service lines are to be determined in the field by Owner and/or Contractor prior to construction of same. 13. Bends shall be installed in force main or water main to avoid unforeseen conflicts in existing or proposed structures. 14. The joint deflection method shall be used where practical in lieu of installing bends. 15. Contractor shall verify locations and depths of existing water and sewer lines prior to beginning construction. 16. The existing underground utility lines shown hereon were taken from documents furnished by others and not field verified, therefore, the Engineer cannot guarantee the accuracy of same nor that all are shown. The Contractor shall expose all underground utility lines in coordination with the Owners to his satisfaction and make adjustments to same in the event there are conflicts with new construction. 17. Contractor shall be responsible for obtaining any and all road crossing or utility permits. 18. All 8" gravity sanitary sewer pipe shall be constructed at a 0.40% minimum slope unless otherwise noted. 19. All valve box assemblies located within roadways or parking areas shall be protected from truck traffic by use of 6" thick reinforced concrete pads poured around valve boxes (see detail). 20. All subsurface construction shall comply with the "Trench Safety Act." The Contractor shall insure that the method of trench protection and construction is in compliance with the Occupational Safety and Health Administration (OSHA) Regulations. 21. Connections into existing county-owned systems shall be via wet tap. Wet taps shall be performed by the Pasco County Utilities Services Branch at the developer's expense. Material for wet taps larger than 2" shall be provided and installed by the project contractor. Excavation, backfill and surface restoration shall be the contractor's responsibility. 22. Gate valves installed for phasing shall be restrained per current Pasco County standards. 23. Off-road utility easements shall be "stabilized" for access by maintenance vehicles. 24. Reclaimed water mains, valves, and services shall include the following to avoid confusion with potable system: a. Purple pigmented C-900, DR-18 PVC piping for 4"-12" reclaimed water mains, except 2" which shall be SDR 21 PVC piping. b. Square top valve boxes for isolation valves in system, with covers marked "Effluent." c. Purple stripe on curb to identify reclaimed water services. d. One inch services for reclaimed water services. e. Purple magnetic locating tape, stating "REUSE MAIN BURIED BELOW" over all reclaimed water mains (18 inches below grade). f. Reclaimed water service on opposite lot line from potable service. g. DESCRIPTION PREPARED FOR: DATE 1. Prior to construction, the Contractor shall obtain from the Engineer or Owner a copy of all pertinent permits related to this project. It is the Contractor's responsibility to assure that all construction activities are in compliance with the conditions of all permits and approvals. 2. Solid sod, all areas in existing rights-of-way disturbed by construction. 3. Contractor is to coordinate all work within, but not limited to, Pasco County rights-of-way with utility companies in order to prevent damage to utility lines and the making of adjustments to same, if required. In accordance with the Underground Facility Damage Prevention and Safety Act (Chapter 556, F.S.) the Contractor shall call the Sunshine State One Call of Florida (SSCOF) at 1-800-432-4770 forty eight (48) hours in advance of any excavation. 4. All utility materials and workmanship must comply with Standards for Design and Construction of Water, Wastewater and Reclaimed Water Facilities Specs., June 1995 Edition. 5. Fire hydrant, gate valve and blow-off valve assemblies shall consist of all pipe, valves, tees, fittings, and any and all other appurtenances comprising a complete, working unit. 6. All 4"-12" PVC water main pipe shall conform to the requirements found in AWWA Standard C-900, latest edition at 25. All aspects of reclaimed water system must comply with Chapter 17-610, F.A.C., latest edition. 26. Maintain 5' minimum horizontal separation between reclaimed mains and water mains or force mains. 27. Stub-out lines on the water main, force main, and reclaimed main shall have restrained joints from the main line to the stub-out. 28. All PVC pressure pipe shall have a minimum 36" cover. 29. Sanitary sewers, force and reclaimed mains and storm sewers should cross under water mains. Sanitary sewers, force and reclaimed mains and storm sewers crossing water mains shall be laid to provide a minimum vertical distance of 18 inches between the invert of the upper pipe and the crown of the lower pipe whenever possible. 30. When sanitary sewers, force and reclaimed mains and storm sewers must cross a water main with less than 18 inches vertical distance, both the sewer and the water main shall be constructed of ductile iron pipe (DIP) at the crossing. (DIP is not required for storm sewers if it is not available in the size proposed.) Sufficient lengths of DIP must be used to provide a minimum separation of 10 feet between any two joints. All joints on the water main within 20 feet of the crossing must be leak free and mechanically restrained. A minimum vertical clearance of 6 inches must be maintained at the crossing. 31. Where there is no alternative to sewer and reclaimed pipes crossing over a water main, the criteria for minimum separation of 18 inches between lines and 10 feet between joints shall be required. 32. All crossings shall be arranged so that the sewer and reclaimed pipes joints and the water main pipe joints are equidistant from the point of crossing (pipes centered on the crossing). 33. Where a new pipe conflicts with an existing pipe, the new pipe shall be constructed of DIP and the crossing shall be arranged to meet the requirements above. 34. A minimum 10-foot horizontal separation shall be maintained in parallel installations between any type of sewer (including drainage inlets) and water main whenever possible. A minimum 5-foot horizontal separation shall be maintained in parallel installation between reclaimed water mains and water mains, and between reclaimed water mains and sanitary sewers whenever possible. 35. In cases where it is not possible to maintain a 10-foot horizontal separation between any type of parallel sewer and water main, or a 5-foot separation between reclaimed main and water main, the water main must be laid in a separate trench or on an undisturbed earth shelf located on one side of the sewer, reclaimed main, or force main at such an elevation that the bottom of the water main is at least 18 inches above the top of the sewer. 36. Where it is not possible to maintain a vertical distance of 18 inches or a horizontal distance of 10 feet in parallel installations, the water main shall be constructed of DIP and the sewer, reclaimed main or the force main shall be constructed of DIP (if available in the size proposed) with a minimum vertical distance of 6 inches. The water main should be above the sewer, reclaimed main, or force main. Joints on the water main shall be located as far apart as possible from joints on the sewer, reclaimed main, or force main (staggered joints). 38. In consideration of Pasco County's agreement to provide potable water and/or reclaimed water to the subject property, Developer/Owner, and its successors assigns, agree to the following: a. In the event of Production Failure or Shortfall by Tampa Bay Water, as set forth in section 3.19 of the Interlocal Agreement creating Tampa Bay Water, Developer/Owner shall transfer to Pasco County any and all water use permits or water use rights the Developer/Owner may have to use or consume surface or ground water within Pasco County. b. Prior to Developer/Owner selling water or water use permits or water use rights, Developer/Owner shall notify Pasco County, and Pasco County shall have a right of first refusal to purchase such water or water use permits or water use rights. 39. Contractor's Responsibilities regarding wet taps two inches and larger shall be as follows: a. 2" Only- This excavated trench must be dry or the trench will require rock and a pump to be in place. The minimum distance from the face of the valve to the wall of the trench is to be six feet. b. 3" and Larger- The contractor will supply a tapping saddle being epoxy coated, a tapping valve with mechanical joint and the equipment to provide, and conduct a pressure test. County personnel will witness the pressure test which must be at 150 psi for duration of thirty minutes. c. The contractor is responsible for the excavation before any County personnel will enter an excavated area. If the trench is four feet in depth or deeper, it will require a trench box or sloping, and a ladder according to Occupational Safety and Health Administration (OSHA) standards. d. The tapping valve will require a blocking device made of suitable material or device. This blocking device or material will be placed under the valve and remain in place until the tap machine is removed and the tap is completed. e. Note: If the contractor has not fulfilled his responsibilities, as stated above, prior to the arrival of Pasco County Utilities Operations and Maintenance tapping crew, there will be an additional charge of $95.00. f. If you have any questions regarding this information, contact Nelson D. Holt, Field Supervisor, Utilities Services Branch, at (727) 847-8145, or e-mail [email protected]. 40. Fire hydrants shall be flow tested and color coded based upon flow results. 41. Contractor is responsible for replacing, relocating and reconnecting any existing valves on-site that may be damaged during construction. Contact Connerton West CDD for instruction. DESCRIPTION WATER, SEWER & RECLAIMED WATER CONSTRUCTION NOTES: DATE DIP 16" TING MAIN S I X E ATER W OWNER: FAMILTAT HOLDINGS LLC REVIEW SUBMITTAL OWNER: FAMILTAT HOLDINGS LLC GROVES-PHASE 1A (PLAT BOOK 39, PAGES 120-150) FIRST CAPITAL GROUP P 06/22/2015 NT SA LEA 1 PB-40 MASTER UTILITY PLAN < AY KW PAR NS LAI CONNERTON CORNER EXISTING 8" WM 1 o. 4 n Y N WA o.45) ortatio ad 5 N IGH sp Ro . H Road Tran 4BU.S (State ent of No. 54 4) 4 m t ion e4 par ect , Pag De pS 2 rida y Ma ok 10 a Flo o fW dB ht o (Dee PB-19 PROJECT NO: FILE: DESIGN BY: DRAWN BY: DATE: REGISTRATION NO. FCG CT 1006 WS-KEY NYB NYB 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. EXISTING OVERHEAD UTILITY R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\WS.DWG-C-401 2015/06/25 9:20 AM NATALIE BUDEN WETLAND 425 CATEGORY I A37 Southeast SH= 75.50 NP= 74.40 30 0 60 GRAPHIC SCALE: 1" = 30' 1-3 ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 78.5 TRACT B-1 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 1-1 69.5 www.HeidtDesign.com 1-4 DRAINAGE LEGEND 1-2 EXISTING PROPOSED STORM DRAINAGE STRUCTURE & PIPE 15.00 SPOT ELEVATION PAVEMENT .0 15 2-2 15.00 14.50 TOP OF CURB / SIDEWALK EDGE OF PAVEMENT 15.00 15 CONTOUR 15.0 FF=000.00 1 PROPOSED 1" PLUG (RM) 225 LF 8" PVC (WM) PROPOSED 1" BALL VALVE (RM) PROPOSED FIRE HYDRANT (WM) UDCO UNDERDRAIN WITH CLEANOUT STAKED EROSION CONTROL AB# SOIL BORING LOCATION WATER & SEWER LEGEND EXISTING PROPOSED WATER MAIN (WM) RECLAIMED WATER MAIN (RM) FIRE HYDRANT PROPOSED 8" GATE VALVE (WM) VALVE & BOX REDUCER 240 LF 8" PVC (WM) 41 DESCRIPTION 37 LF 1" PVC (RM) PLUG BLOW-OFF SEE DETAIL THIS SHEET FOR WATER CONNECTION BENDS PB-40 DATE No. ) Y WA S BLVD n IGH E . H O' LAK No.45 ortatio ad 5 U.S d o sp D a N o ran 44B-R (LA te R 5 of T Sta No. ent 44) tion artm e4 Dep ap Sec 2, Pag 0 M rida k1 ay Flo fW Boo ht o (Deed Rig FIELD VERIFY EXISTING 6" FM LOCATION. DEFLECT 6" FM AS NECESSARY TO ENSURE A PB-19 MINIMUM 12" SEPARATION FROM PROPOSED 12" STORM. SEE SHEET C-402 UDCO 2-1 PROPOSED MH TOP ELEV.= 80.24 INV. IN (N) (6")=75.74 INV. OUT (NE)= 75.54 FINISH FLOOR ELEVATION DIRECTION OF SURFACE FLOW 240 LF 8" PVC TRACT C-1 PROFILE GRADE ELEVATION REFERENCE FIRST CAPITAL GROUP SPOT ELEVATION GROUND PREPARED FOR: .0 15.00 0 2-3 15 CORE EXISTING MH. CONSTRUCT OUTSIDE DROP FOR NEW INVERT. ADJUST TOP TO FINISHED GRADE TOP ELEV.= 79.97 INV. (W)= 74.44 INV. DROP(W)= 68.14 EX. INV. (N)=67.79 EX. INV. (S)=67.90 STRUCTURE NO. UTILITY PLAN 10 10 CONNERTON CORNER TRACT C-2 VERTICAL BENDS WDSP # A1 S A1 WATER DISTRIBUTION SAMPLING POINT SANITARY SEWER (SM) SANITARY FORCE MAIN (FM) PROPOSED 4" DOUBLE DETECTOR CHECK VALVE ASSEMBLY (FIRE) PROJECT NO: FILE: PROPOSED 2 1/2" PLUG (WM) PB-40 DESIGN BY: DRAWN BY: PROPOSED 4" GATE VALVE (FIRE) 10 LF 4" PVC (FIRE) PROPOSED 1 1/2" RPZ BACKFLOW PREVENTOR (WM) PROPOSED 8"X 4" TEE (WM) PROPOSED GRADE 80.2 C-401 8" PVC (SM) INV. =74.59 10 LF 2 1/2" PVC (WM) FCG CT 1006 WS NYB NYB C-402 1.0' MINIMUM PROPOSED 8" PLUG (WM) CL 48" RCP (STORM) PROPOSED 8"X 2 1/2" TEE (WM) 69.34 X1 CROSSING DETAIL N.T.S. DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. DESCRIPTION 1 PROPOSED 4" PLUG (FIRE) 06/22/2015 FIELD VERIFY LOCATION OF RM. DEFLECT 12" RM AS NECESSARY TO ENSURE A MINIMUM 12" SEPARATION FROM PROPOSED 12" STORM. DATE REVIEW SUBMITTAL PROPOSED 1" CORPORATION STOP (RM) 0 WETLAND 425 CATEGORY I 30 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\WS.DWG-C-402 2015/06/25 9:20 AM NATALIE BUDEN FLOODPLAIN/ WETLAND MITIGATION AREA M-12 NW=75.5 60 GRAPHIC SCALE: 1" = 30' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 A37 Southeast SH= 75.50 NP= 74.40 www.HeidtDesign.com RELOCATE FM TO MAINTAIN 3' MIN. SEPARATION FROM PROPOSED CATCH BASIN. FIELD VERIFY FORCE MAIN LOCATION 61.5 TRACT B-3 PB-115 < SEE SHEET C-401 2-3 FIRST CAPITAL GROUP 1-4 UTILITY PLAN CONNERTON CORNER TRACT B-2 < < 2-1 PREPARED FOR: EXISTING PUMP STATION RESET FM VALVE COVER TO FINISHED GRADE < RESET RM VALVE COVER TO FINISHED GRADE < RESET GAS VALVE COVER TO FINISHED GRADE DESCRIPTION 5A RELOCATE AND RECONNECT IRRIGATION VALVE (6) < DATE 225 LF 8" PVC (WM) X X X X < X X < 10 15 . SPOT ELEVATION GROUND 15.00 SPOT ELEVATION PAVEMENT 15.00 14.50 TOP OF CURB / SIDEWALK EDGE OF PAVEMENT REDUCER FILE: PROFILE GRADE ELEVATION REFERENCE PLUG DESIGN BY: CONTOUR BLOW-OFF FINISH FLOOR ELEVATION BENDS DIRECTION OF SURFACE FLOW VERTICAL BENDS 15.0 FF=000.00 UDCO RECLAIMED WATER MAIN (RM) 15.00 15.00 15 STRUCTURE NO. UDCO FIRE HYDRANT VALVE & BOX PROJECT NO: WDSP # UNDERDRAIN WITH CLEANOUT STAKED EROSION CONTROL AB# SOIL BORING LOCATION 1 00 15 .0 10 WATER MAIN (WM) A1 S A1 WATER DISTRIBUTION SAMPLING POINT SANITARY SEWER (SM) DRAWN BY: C-401 FCG CT 1006 WS NYB NYB C-402 SANITARY FORCE MAIN (FM) DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. STORM DRAINAGE STRUCTURE & PIPE DESCRIPTION PROPOSED DATE EXISTING 06/22/2015 PROPOSED REVIEW SUBMITTAL X EXISTING X WATER & SEWER LEGEND DRAINAGE LEGEND PROJECT NO: DATE: REGISTRATION NO. DATE DESCRIPTION 06/22/2015 REVIEW SUBMITTAL 03/27/2014 UTILITY COMMENT REVISIONS DATE DESCRIPTION PREPARED FOR: FILE: FCG CT 1006 WSD DESIGN BY: NYB DRAWN BY: NYB LARA G. BARTHOLOMEW 61035 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\WSD.DWG-C-601 2015/06/25 9:20 AM NATALIE BUDEN FIRST CAPITAL GROUP www.HeidtDesign.com 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 1 4' MIN WATER AND SEWER DETAILS CONNERTON CORNER 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 2' MIN NOTE: PRECAST CONCRETE SHALL ATTAIN A MINIMUM COMPRESSIVE STRENGTH OF 4,000 p.s.i. AT 28 DAYS. NOTE: ECCENTRIC CONES ARE ACCEPTABLE, SET IN LINE WITH FLOW. EXTERIOR COATING, KOPPERS BITUMASTIC BLACK SOLUTION, 2 COATS. OR TYPE II PORTLAND CEMENT MUST BE USED IN THE MANUFACTURING PROCESS FIRST CAPITAL GROUP PREPARED FOR: WATER & SEWER DETAILS CONNERTON CORNER www.HeidtDesign.com R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\WSD.DWG-C-602 2015/06/25 9:20 AM NATALIE BUDEN 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 2" BELOW MANHOLE (TYP. ALL MANHOLES) DESCRIPTION C.I. MANHOLE FRAME & COVER USF NO. 170-E 0RS OR EQUAL W/ WORD "SANITARY", H-20 LOAD RATED. FINISHED GRADE BRICK LEVELING COURSE ALL PRECAST UNITS MFG. IN ACCORDANCE W/ A.S.T.M. SPEC. C-478 DATE 12" MAX. WRAPID SEAL JOINTS TO BE SEALED W/ O-RING SEALS OR SINGLE OFFSET SEAL (ASTM C-443) FLEXIBLE BOOT W/ S.S. STRAP CLAMPS (ASTM C-923) POURED IN PLACE CONC. OR PRE-CAST PROJECT NO: NO. 4 REBAR AT 12" O.C. EACH WAY GROUT FILLET SLOPE GROUT ON EACH SIDE OF FLOW CHANNELS REINFORCE PER A.S.T.M. C-478 PIPE & FITTINGS NOTE: FCG CT 1006 FILE: WSD DESIGN BY: NYB DRAWN BY: NYB 1. WRAPID SEAL MUST BE USED ON ALL JOINTS, CASTINGS AND RISER RINGS: ON ALL JOINTS ON AIR RELEASES, MANHOLES, GREASE/WATER, OIL/WATER SEPARATORS, AND WETWELLS. 2. WRAPID SEAL MUST BE USED IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS. 3. PASCO COUNTY SHALL HAVE THE OPTION OF SPECIFYING THE TYPE OF INTERIOR LINING TO BE INSTALLED FOR EACH INDIVIDUAL MANHOLE. 4. PASCO COUNTY SHALL HAVE THE OPTION OF REQUIRING A NEGATIVE PRESSURE TEST PER ASTM C-1244 5. LIFT HOLES MUST NOT PENETRATE THE WALLS CREATED REVISED 02/24/03 DROP MANHOLE PASCO COUNTY UTILITIES PROVIDED FOR INFORMATIONAL PURPOSES ONLY. NO MODIFICATIONS WITHOUT WRITTEN PCU APPROVAL DETAIL 42 LARA G. BARTHOLOMEW DATE: REGISTRATION NO. 61035 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. INLET SEWER DESCRIPTION WRAPID SEAL DATE 06/22/2015 REVIEW SUBMITTAL WRAPID SEAL WETLAND 425 CATEGORY I 40 0 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\SPM.DWG-C-701 2015/06/25 9:20 AM NATALIE BUDEN FLOODPLAIN/ WETLAND MITIGATION AREA M-12 NW=75.5 80 GRAPHIC SCALE: 1" = 40' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 78.5 TRACT B-2 TRACT B-1 69.5 PROPOSED ADA CURB RAMP WITH DETECTABLE WARNING TRACT C-2 6" WHITE 61.5 PB-115 TRACT B-3 6" WHITE PROPOSED ADA CURB RAMP WITH DETECTABLE WARNING 12" STOP BAR DESCRIPTION 1 6" WHITE PB-19 DATE DELINEATOR POST PER FDOT INDEX 17346 6" YELLOW Y WA K AR 6" WHITE SIGN NAME QUANTITY R1-1 2 PL OWNER: CONNERTON LAND ACQUISITION, LLC PROJECT NO: FILE: DESIGN BY: DRAWN BY: OWNER: FAMILTAT HOLDINGS LLC FCG CT 1006 SPM NYB NYB OWNER: FAMILTAT HOLDINGS LLC DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. SIGN QUANTITY TABLE DESCRIPTION NT A S EA SP N I PLA REVIEW SUBMITTAL PB-40 6" YELLOW DATE ALL PROPOSED IMPROVEMENTS WITHIN US 41 ROW TO BE APPROVED BY DOT 1 1 o. 4 Y N WA IGH . H U.S TRACT C-1 06/22/2015 PROPOSED 24" WHITE CROSSWALK FIRST CAPITAL GROUP R1-1 30" x 30" 12" STOP BAR PREPARED FOR: = 1 SIGNING & PAVEMENT MARKING A37 Southeast SH= 75.50 NP= 74.40 www.HeidtDesign.com CONNERTON CORNER SIGNAGE LEGEND PROPOSED ADA CURB RAMP WITH DETECTABLE WARNING R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\SPM.DWG-C-702 2015/06/25 9:20 AM NATALIE BUDEN SIGNING AND PAVEMENT MARKING NOTES (PRIVATE ROADWAYS): 1. ALL TRAFFIC CONTROL DEVICES SHALL BE INSTALLED IN CONFORMANCE WITH THE FEDERAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES AND FLORIDA DEPARTMENT OF TRANSPORTATION STANDARDS. 2. STREET NAME SIGNS SHALL BE 6" ON LOCAL ROADS AND 9" ON COLLECTOR AND ARTERIAL ROADS. SIX-INCH SIGNS SHALL HAVE 4" SERIES C LETTERS AND 9" SIGNS SHALL HAVE 6" SERIES B LETTERS. ALL STREET NAME SIGNS ON PRIVATE STREETS (NON-COUNTY MAINTAINED) SHALL BE STANDARD D3 STREET NAMES WITH THE COLORS REVERSED, WHITE BACKGROUND WITH GREEN LETTERS AND BORDER. AT INTERSECTIONS WITH COUNTY MAINTAINED ROADS, THE COUNTY MAINTAINED ROAD SHALL BE GREEN BACKGROUND WITH WHITE LETTERS. 3. CONTRACTOR MUST CONTACT ENGINEER OF RECORD PRIOR TO ORDERING STREET NAME SIGNS. APPROVED STREET NAMES CANNOT BE DETERMINED UNTIL RECORDING OF THE PLAT. 4. EXISTING STRIPING AND OTHER PAVEMENT MARKINGS TO BE REMOVED SHALL BE DONE AS NECESSARY BY HYDROBLASTING. GRINDING IS NOT PERMITTED. SPECIFICATIONS FOR DESIGN AND INSTALLATION OF TRAFFIC CONTROL DEVICES ON COUNTY ROADS 1) PURPOSE: THESE SPECIFICATIONS HAVE BEEN DEVELOPED TO PROVIDE DEVELOPERS WITH A UNIFORM SYSTEM FOR INSTALLATION OF TRAFFIC CONTROL DEVICES ON THE COUNTY ROAD SYSTEM. A UNIFORM SYSTEM PROVIDES FOR REDUCED MAINTENANCE COSTS AND A HIGH STANDARD OF VISIBILITY FOR DRIVERS. ALL REQUIRED TRAFFIC CONTROL DEVICES SHALL BE INSTALLED BY THE DEVELOPER OF THE PROJECT. 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 www.HeidtDesign.com 4) TRAFFIC CONTROL SIGNS: 4.1) ALL SIGN BLANKS SHALL BE OF A TYPE CURRENTLY CERTIFIED BY THE FDOT FOR USE IN THE STATE OF FLORIDA. 4.2) ALL SIGN FACES SHALL BE HIGH INTENSITY GRADE AND OF A TYPE CURRENTLY CERTIFIED BY THE FDOT FOR USE IN THE STATE OF FLORIDA. 4.3) ALL SIGNS SHALL BE NO LESS THAN THE STANDARD SIZE AS SPECIFIED BY THE FEDERAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. NO MINIMUM SIZE SIGNING SHALL BE ACCEPTED. LARGER SIGNS SHALL BE USED WHEN REQUIRED BY DESIGN SPEED, ETC. 4.4) STREET NAME SIGNS SHALL BE 6" ON LOCAL ROADS, AND 9" ON COLLECTOR AND ARTERIAL ROADS. SIX INCH SIGNS SHALL HAVE 4" SERIES C LETTERS AND 9" SIGNS SHALL HAVE 6" SERIES B LETTERS. ALL STREET NAME SIGNS ON PRIVATE ROADS SHALL BE STANDARD D3 STREET NAME SIGNS WITH THE COLORS REVERSED. WHITE BACKGROUND WITH GREEN LETTERS AND BORDER. AT INTERSECTIONS WITH COUNTY MAINTAINED ROADS, THE COUNTY MAINTAINED ROAD SHALL BE GREEN BACKGROUND WITH WHITE LETTERS AND BORDER. STREET NAME SIGN BRACKETS FOR 6" SIGNS 30" LONG OR LESS, OR 9" SIGNS 24" LONG OR LESS, SHALL HAVE A 5 INCH BLADE OR CROSS. ALL OTHER STREET NAME SIGNS SHALL BE MOUNTED WITH BRACKETS WITH A 12 INCH BLADE OR 8 INCH CROSS. ALL STREET NAME SIGN BRACKETS SHALL BE SUPPLIED WITH BOLTS, SET SCREWS WILL NOT BE ACCEPTED. 4.5) ON ROADS TO BE MAINTAINED BY PASCO COUNTY, ALL SIGNS OTHER THAN STREET NAMES SHALL BE DATE CODED WITH A YELLOW REFLECTIVE LABEL AFFIXED TO THE BACK OF THE SIGN. IT WILL BE PUNCHED TO SHOW MONTH, DAY AND YEAR OF INSTALLATION (SEE SAMPLE LABEL). ALTERNATE LABEL DESIGNS PROVIDING THE DATE CODE INFORMATION MAY BE USED IF A SAMPLE IS SUBMITTED AND APPROVED BY PASCO COUNTY PRIOR TO INSTALLATION. FIRST CAPITAL GROUP 3.1) ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC OR PREFORMED TAPES; RAISED PAVEMENT MARKERS SHALL BE CLASS "B". 3.2) PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS SHALL BE INSTALLED ON ALL ROADS CLASSIFIED OTHER THAN RESIDENTIAL WITH AN ADT GREATER THAN 500 VEHICLES, OR IF OTHER CONDITIONS EXIST THAT REQUIRE PAVEMENT MARKINGS, (SEE M.U.T.C.D. SECTION 3B-1). PREPARED FOR: 3) PAVEMENT MARKINGS: SIGNING & PAVEMENT MARKING NOTES 2.1) ANY AND ALL TRAFFIC CONTROL DEVICES INSTALLED ON THE COUNTY ROAD SYSTEM SHALL CONFORM TO FLORIDA STATE STATUTE 316.0745, UNIFORM SIGNALS AND DEVICES. 2.2) THIS STATUTE REQUIRES THAT ALL DEVICES CONFORM TO FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) SPECIFICATIONS. THE FDOT HAS ADOPTED THE FEDERAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES AS THE STANDARDS TO BE USED IN THE STATE OF FLORIDA. CONNERTON CORNER 2) FLORIDA STATE STATUTE 316.0745: SAMPLE LABEL: SIZE 2" X 4" DESCRIPTION WARNING DATE REMOVAL OF, OR DEFACING ANY TRAFFIC CONTROL DEVICE IS PUNISHABLE BY FINE AND/OR IMPRISONMENT REPORT DAMAGE BY CALLING (727) 847-2411 INSTALLED J F M A M J J A S O N D 10'S 20'S 30'S - 1 2 3 4 5 6 7 8 9 1 06/22/2015 5.1) ALL TRAFFIC CONTROL DEVICES AND MATERIALS SHALL BE ON THE CURRENT FDOT APPROVED PRODUCTS LIST. PROOF OF CERTIFICATION IS REQUIRED FOR ALL TRAFFIC CONTROL DEVICES. 5.2) A TRAFFIC CONTROL DEVICES SUBMITTAL DATA FORM SHALL BE SUBMITTED FOR APPROVAL PRIOR TO INSTALLATION OF ANY TRAFFIC CONTROL DEVICE. NO TRAFFIC CONTROL DEVICE SHALL BE INSTALLED UNTIL THE CERTIFICATION SUBMITTAL HAS BEEN APPROVED BY THE TRAFFIC OPERATIONS DIVISION. THESE FORMS ARE AVAILABLE FROM THE TRAFFIC OPERATIONS DIVISION. COPIES OF THE APPROVED TRAFFIC CONTROL DEVICES SUBMITTAL DATA FORM SHALL BE SENT TO THE CONTRACTOR AND THE ENGINEERING INSPECTIONS DIVISION. 6) TRAFFIC CONTROL DEVICES PLAN: 6.1) A DETAILED SET OF PLANS FOR REQUIRED TRAFFIC CONTROL DEVICES SHALL BE SUBMITTED FOR ALL ROAD CONSTRUCTION, SITE DEVELOPMENT, SUBDIVISION, AND RIGHT-OF-WAY USE PERMITS. THESE PLANS SHALL BE IN CONFORMANCE WITH FDOT DESIGN STANDARDS. ALL PLANS SHALL BE SIGNED AND SEALED BY A REGISTERED PROFESSIONAL ENGINEER IN THE STATE OF FLORIDA. 6.2) WITH THE SUBMITTAL OF FINAL PLANS TO THE DEVELOPMENT REVIEW DIVISION, TWO ADDITIONAL SETS OF THE TRAFFIC CONTROL PLAN PORTION OF THE ENTIRE PLAN SHALL BE SUBMITTED. THESE TWO SETS WILL BE FORWARDED TO THE TRAFFIC OPERATIONS DIVISION. PROJECT NO: FILE: DESIGN BY: DRAWN BY: FCG CT 1006 SPM NYB NYB 7) COST ESTIMATE: AN ENGINEER'S COST ESTIMATE SHALL BE REQUIRED FOR ALL PROPOSED TRAFFIC CONTROL DEVICES. THE ESTIMATE SHALL BE PROVIDED IN CONJUNCTION WITH THE TRAFFIC CONTROL DEVICES SUBMITTAL DATA FORM (SEE SECTION 5.2). 8) INSPECTION AND ACCEPTANCE: 8.1) UPON COMPLETION OF THE INSTALLATION OF THE TRAFFIC CONTROL DEVICES, THE CONTRACTOR SHALL CALL THE ENGINEERING INSPECTIONS DIVISION FOR AN INSPECTION AT (727) 847-8154. 8.2) THE INSPECTION SHALL BE MADE BY THE ENGINEERING INSPECTION DIVISION WITHIN 48 HOURS (TWO WORKING DAYS) OF THE REQUEST. 8.3) AN INSPECTION REPORT SHALL BE MADE BY THE ENGINEERING INSPECTIONS DIVISION. COPIES OF THE REPORT SHALL BE SENT TO THE ENGINEER AND THE DEVELOPER. 8.4) NO ROADWAY SHALL BE OPEN TO THE PUBLIC UNTIL ALL TRAFFIC CONTROL DEVICES HAVE BEEN INSPECTED AND ACCEPTED BY PASCO COUNTY. DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 5) CERTIFICATION OF MATERIALS: DATE REVIEW SUBMITTAL 4.6) ALL POST SYSTEMS, MOUNTING BRACKETS AND HARDWARE SHALL BE OF A TYPE CURRENTLY IN USE BY THE PASCO COUNTY PUBLIC WORKS DEPARTMENT AND CURRENTLY CERTIFIED BY THE FLORIDA DEPARTMENT OF TRANSPORTATION FOR USE IN THE STATE OF FLORIDA. ALTERNATIVE SYSTEMS, ETC., SHALL ONLY BE USED IF APPROVED BY THE COUNTY ENGINEER. DESCRIPTION 01 02 03 04 05 06 07 08 09 B. SUBMIT AND OBTAIN THE NECESSARY DESIGN RELATED STORM WATER PERMITS FROM THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION, THE SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND OTHER APPLICABLE GOVERNMENTAL BODIES. 2. SUCCESSFULLY COMPLETED A SIMILAR TRAINING PROGRAM. 3. 3. HAS ENOUGH PRACTICAL ON THE JOB TRAINING TO BE QUALIFIED TO PERFORM THE INSPECTIONS. RETAIN INSPECTION REPORTS AND CERTIFICATIONS FOR AT LEAST THREE YEARS. G. SITE STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICAL BUT IN NO CASE MORE THAN 7 DAYS, IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. H. RELEASES IN EXCESS OF REPORTABLE QUANTITIES. 1. THE DISCHARGE OF HAZARDOUS SUBSTANCES OR OIL IN THE STORMWATER DISCHARGE(S) FROM A FACILITY OR ACTIVITY SHALL BE PREVENTED OR MINIMIZED IN ACCORDANCE WITH THE APPLICABLE STORMWATER POLLUTION PREVENTION PLAN FOR THE FACILITY OR ACTIVITY. THIS PERMIT DOES NOT RELIEVE THE OPERATOR OF THE REPORTING REQUIREMENTS OF 40 CFR PART 117 AND 40 CFR PART 302. WHERE A RELEASE CONTAINING A HAZARDOUS SUBSTANCE IN AN AMOUNT EQUAL TO OR IN EXCESS OF A REPORTING QUANTITY ESTABLISHED UNDER EITHER 40 CFR 117 OR 40 CFR 302, OCCURS DURING A 24 HOUR PERIOD: C. UPON NOTIFICATION BY THE DEVELOPER OF HIS INTENT TO COMMENCE CONSTRUCTION, SUBMIT A NOTICE OF INTENT TO THE FDEP ON BEHALF OF THE DEVELOPER AND COPY THE CONTRACTOR INCLUDING SWPPP CERTIFICATION AND COPY OF THE PERMIT. A. THE OPERATOR IS REQUIRED TO NOTIFY THE STATE WARNING POINT (800-210-0519 OR 850-413-9911) AS SOON AS HE OR SHE HAS KNOWLEDGE OF THE DISCHARGE; D. SUBMIT TO SWFWMD AND THE OPERATOR OF THE MUNICIPAL SEPARATE STORM WATER SYSTEM, IF APPLICABLE, A LETTER OF CONSTRUCTION COMMENCEMENT. B. THE OPERATOR SHALL SUBMIT WITHIN 14 CALENDAR DAYS OF KNOWLEDGE OF THE RELEASE A WRITTEN DESCRIPTION OF: THE RELEASE (INCLUDING THE TYPE AND ESTIMATE OF THE AMOUNT OF MATERIAL RELEASED), THE DATE THAT SUCH RELEASE OCCURRED, THE CIRCUMSTANCES LEADING TO THE RELEASE, AND REMEDIAL STEPS TO BE TAKEN, TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION, NPDES STORMWATER SECTION, MAIL STATION 2500, 2600 BLAIR STONE ROAD, TALLAHASSEE, FLORIDA 32399-2400; AND E. COMPLETE AND SUBMIT A NOTICE OF TERMINATION AND CERTIFICATION FOR DEVELOPER. THE NOT'S SHALL BE SUBMITTED NO MORE THAN 30 DAYS AFTER; (a) COMPLETION OF THE PROJECT AND FINAL STABILIZATION OF THE SITE OR (b) WHEN RESPONSIBILITY FOR THE SITE HAS ENDED. FINAL STABILIZATION AS DEFINED BY EPA IS WHEN ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED AND A UNIFORM (E.G. EVENLY DISTRIBUTED, WITHOUT LARGE BARE AREAS) PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70% OF THE NATIVE BACKGROUND VEGETATIVE COVER FOR THE AREA HAS BEEN ESTABLISHED ON ALL UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES. AS AN ALTERNATIVE, EQUIVALENT PERMANENT STABILIZATION MEASURES (SUCH AS RIPRAP, GABIONS, OR GEOTEXTILES) MAY BE EMPLOYED. THE CLIENT SHALL NOTIFY HEIDT DESIGN, LLC WHEN ONE OF THESE CRITERIA HAS BEEN MET. C. THE STORMWATER POLLUTION PREVENTION PLAN REQUIRED UNDER PART V OF THIS PERMIT MUST BE MODIFIED WITHIN 14 CALENDAR DAYS OF KNOWLEDGE OF THE RELEASE TO: PROVIDE A DESCRIPTION OF THE RELEASE, THE CIRCUMSTANCES LEADING TO THE RELEASE, AND THE DATE OF THE RELEASE. IN ADDITION, THE PLAN MUST BE REVIEWED TO IDENTIFY MEASURES TO PREVENT THE REOCCURRENCE OF SUCH RELEASES AND TO RESPOND TO SUCH RELEASES, AND THE PLAN MUST BE MODIFIED WHERE APPROPRIATE. 2. THIS PERMIT DOES NOT AUTHORIZE THE DISCHARGE OF HAZARDOUS SUBSTANCES OR OIL RESULTING FROM AN ON-SITE SPILL. 4. 5. 6. CONTRACTOR: DEVELOPER: A. SIGN AND RETURN TO HEIDT A CONTRACTORS CERTIFICATION FORM CERTIFYING YOUR UNDERSTANDING OF AND WILLINGNESS TO COMPLY WITH THE STORM WATER POLLUTION PREVENTION PLAN NO LATER THAN 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. ALSO, EACH SUBCONTRACTOR AFFECTED BY THE SWPPP MUST CERTIFY TO THE CONTRACTOR THAT THEY UNDERSTAND AND SHALL COMPLY WITH THE NPDES PERMIT AND SWPPP. A RECORD OF THESE CERTIFICATIONS SHALL BE MAINTAINED BY THE CONTRACTOR ON SITE. A. NOTIFY HEIDT DESIGN, LLC OF YOUR INTENT TO COMMENCE CONSTRUCTION. SIGN THE NOTICE OF INTENT FORM AS OPERATOR OF THE STORM WATER DISCHARGE FACILITY AND PERMITTEE AND RETURN TO HEIDT DESIGN, LLC. 7. B. SIGN A CERTIFICATION OF STORM WATER POLLUTION PREVENTION PLAN AND RETURN TO HEIDT DESIGN, LLC. 8. C. NOTIFY HEIDT DESIGN, LLC WHEN IT IS TIME TO SUBMIT A NOTICE OF TERMINATION AS DEFINED UNDER PART E OF THE HEIDT DESIGN, LLC SECTION OF THE SWPPP. SIGN AND RETURN TO HEIDT DESIGN, LLC FOR SUBMITTAL TO FDEP A NOTICE OF TERMINATION FORM AND CERTIFICATION. 9. D. UNDERTAKE ALL REASONABLE BEST MANAGEMENT PRACTICES (BMP'S) TO ASSURE THAT SILTED OR OTHERWISE POLLUTED STORM WATER IS NOT ALLOWED TO DISCHARGE FROM THE SITE DURING ALL PHASES OF CONSTRUCTION. STABILIZATION BMP'S THAT MAY BE USED INCLUDE: TEMPORARY OR PERMANENT SEEDING, MULCHING, GEOTEXTILES, SODDING, VEGETATIVE BUFFER STRIPS, PROTECTION OF TREES AND PRESERVATION OF MATURE VEGETATION. STRUCTURAL EROSION AND SEDIMENT CONTROL BMP'S THAT MAY BE USED INCLUDE: STRAW BALE DIKES, SILT FENCES, EARTH DIKES, BRUSH BARRIERS, DRAINAGE SWALES, CHECK DAMS, SUBSURFACE DRAIN, PIPE SLOPE DRAIN, LEVEL SPREADERS, STORM DRAIN INLET PROTECTION, OUTLET PROTECTION, SEDIMENT TRAPS, AND TEMPORARY SEDIMENT BASINS. DETENTION PONDS MAY ALSO BE USED AS TEMPORARY SEDIMENT BASINS. ADDITIONAL BMP'S THAT MAY NEED TO BE IMPLEMENTED INCLUDE: PROVIDING PROTECTED STORAGE AREAS FOR CHEMICALS, PAINTS, SOLVENTS, FERTILIZERS, AND OTHER POTENTIALLY TOXIC MATERIALS. PROVIDING WASTE RECEPTACLES AT CONVENIENT LOCATIONS AND PROVIDING REGULAR COLLECTION OF WASTES, INCLUDING BUILDING MATERIAL WASTES. MINIMIZING OFF-SITE TRACKING OF SEDIMENTS. MAKING ADEQUATE PREPARATIONS, INCLUDING TRAINING AND EQUIPMENT TO CONTAIN SPILLS OF OIL AND HAZARDOUS MATERIALS. COMPLYING WITH APPLICABLE STATE OR LOCAL WASTE DISPOSAL, SANITARY SEWER OR SEPTIC SYSTEM REGULATIONS AND THE USE OF APPROPRIATE POLLUTION PREVENTION MEASURES FOR ALLOWABLE NON-STORM WATER COMPONENTS OF DISCHARGE. E. NOTIFY HEIDT DESIGN, LLC AND THE DEVELOPER IN WRITING OF ANY NON-STORM WATER POLLUTION SOURCES WHICH ARE BEING STORED, OR OTHERWISE USED DURING THE CONSTRUCTION OF THE PROJECT, I.E., FERTILIZERS, FUELS, PESTICIDES, OTHER CHEMICALS. THIS NOTIFICATION SHOULD BE ACCOMPANIED WITH THE CONTRACTOR'S DESIGN AND METHODS TO PREVENT POLLUTION RUN-OFF FROM THESE SOURCES. F. DEVELOP A MAINTENANCE AND INSPECTION PLAN WHICH INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: A. THE SPECIFIC AREAS TO BE INSPECTED AND MAINTAINED THAT INCLUDES ALL THE DISTURBED AREAS AND MATERIAL STORAGE AREAS OF THE SITE. B. THE EROSION AND SEDIMENT CONTROLS IDENTIFIED IN THE SWPPP TO BE MAINTAINED AND INSPECTED AND THOSE ADDITIONAL CONTROLS THAT THE CONTRACTOR DEEMS NECESSARY. C. MAINTENANCE PROCEDURES. PRE-DEVELOPED SITE INFORMATION: 1. TOTAL SITE ACREAGE: 6.45 AC. 2. LAND USE: COMMERCIAL 3. VEGETATION: NATURAL GRASSES 4. RECEIVING WATERS OR MUNICIPAL SEPARATE STORM WATER SYSTEM: FIVE MILE CREEK 5. 2 YEAR/24 HOUR RAINFALL DEPTH: 4.5" PROJECT INFORMATION: 1. PROJECT TYPE (COMMERICAL) 12. 2. ANTICIPATED CONSTRUCTION SEQUENCE IS AS FOLLOWS: 1. COMPLETE EROSION CONTROL INSTALLATION 2. CLEARING AND GRUBBING 3. EARTHWORK ACTIVITIES 4. STORM WATER SYSTEM CONSTRUCTION 5. UTILITY CONSTRUCTION 6. BASE AND PAVEMENT CONSTRUCTION 7. FINAL STABILIZATION 13. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 www.HeidtDesign.com PLEASE NOTE THAT CONSTRUCTION PHASING MUST ALLOW FOR STORMWATER DISCHARGE OF OFFSITE COLLECTED RUNOFF THROUGHOUT ALL PHASES OF CONSTRUCTION. THE BMP'S LISTED IN PART D OF THE CONTRACTOR SECTION OF THE SWPPP SHALL BE CONSIDERED DURING ALL PHASES OF CONSTRUCTION. 10/2015 4. ANTICIPATED COMPLETION DATE: E. INSPECTIONS AND MAINTENANCE FORMS. 11. 6. SOIL TYPES: BASINGER FINE SAND, ZOLFO FINE SAND 3. ANTICIPATED START DATE: D. THE PROCEDURE TO FOLLOW IF ADDITIONAL WORK IS REQUIRED OR WHOM TO CALL. 10. 16. DESCRIPTION C. MAINTAIN A COPY OF THE CONSTRUCTION PLANS, WHICH INCLUDE THE STORM WATER POLLUTION PREVENTION PLAN,THE NOI, AND ALL INSPECTION REPORTS AND CERTIFICATIONS ON SITE. 15. DATE B. DURING CONSTRUCTION, ASSURE COMPLIANCE WITH THE DESIGNED STORM WATER POLLUTION PREVENTION PLANS PREPARED BY HEIDT DESIGN, LLC AND THE NPDES GENERIC PERMIT FOR STORM WATER DISCHARGES FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES. 14. R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\CSWMP.DWG-C-900 2015/06/25 9:21 AM NATALIE BUDEN A. DEVELOP SWPPP INCLUDING, BUT NOT LIMITED TO, RETENTION/DETENTION PONDS, CONTROL STRUCTURES, EROSION CONTROL METHODS AND LOCATIONS AND STABILIZATION CRITERIA. THIS DESIGN IS INCLUDED WITHIN THESE CONSTRUCTION PLANS AND THE FOLLOWING NOTES AND INSTRUCTIONS. 2. 1. HAS SUCCESSFULLY COMPLETED THE FLORIDA STORMWATER, EROSION AND SEDIMENT CONTROL INSPECTOR TRAINING PROGRAM. THE SITE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND TURBIDITY CONTROLS AND THE QUALITY AND QUANTITY OF OFFSITE OR WETLAND DISCHARGES. PRIOR TO CONSTRUCTION, THE SITE SUBCONTRACTOR IS RESPONSIBLE FOR HAVING HIS DEWATERING PLAN AND TURBIDITY CONTROL PLAN APPROVED BY THE APPLICABLE REVIEWING AGENCIES. REFER TO THE PROJECT'S PERMIT APPROVALS AND PERMIT CONDITIONS FOR AGENCIES REQUIRING SUCH REVIEW AND APPROVAL. QUESTIONS CONCERNING APPROPRIATE TECHNIQUES SHOULD BE ADDRESSED TO THOSE AGENCIES AND/OR DISCUSSED WITH THE PROJECT ENGINEER AND OWNER. THE APPROPRIATE TURBIDITY AND EROSION CONTROL METHODOLOGIES SELECTED BY THE SITE SUBCONTRACTOR FOR THIS PROJECT SHOULD BE MADE FOLLOWING ASSESSMENT OF THE PLANS AND PROJECT SITE SPECIFIC FACTORS AND AFTER CONSULTATIONS AS NEEDED WITH THE PROJECT ENGINEER AND APPROPRIATE AGENCIES. THE SITE SUBCONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING ANY AND ALL NECESSARY PERMITS FOR SUCH ACTIVITY; SEVERAL FACTORS TO CONSIDER ARE LISTED BELOW: A. CLAY CONTENT IN EXCAVATED MATERIALS AND/OR PERMEABILITIES RATES B. DEPTH OF CUT IN PONDS, TRENCHES, OR UTILITY LINES C. AMBIENT GROUND WATER LEVELS D. ACTUAL RAINFALL AMOUNTS AND TIME OF YEAR RELATIVE TO NORMAL RAINY SEASON E. PROXIMITY TO WETLANDS, WATER BODIES OR OFFSITE PROPERTIES F. 'CLASS' DESIGNATION OF RECEIVING WATER BODIES (I.E., OUTSTANDING FLORIDA WATERS, SHELLFISH HARVESTING AREAS, ETC.) G. DENSITY, TYPE, AND PROXIMITY OF UPLAND VEGETATION TO BE RETAINED DURING CONSTRUCTION (FOR USE AS POSSIBLE FILTRATION AREAS) H. FILL HEIGHT RELATIVE TO NATURAL GRADE AND LENGTH AND STEEPNESS OF THE PROPOSED SLOPES I. EXISTING TOPOGRAPHY AND DIRECTIONS OF SURFACE FLOW J. TYPE OF EQUIPMENT USED K. PROJECT TYPE L. DURATION OF CONSTRUCTION ACTIVITIES M. SEPARATION DISTANCE OF ONSITE PONDS N. AMBIENT QUALITY OF SURFACE AND GROUNDWATER O. TEMPORARY STOCKPILE LOCATIONS AND HEIGHTS AT THE ONSET OF CONSTRUCTION, THE SITE SUBCONTRACTOR, AS THE PARTY RESPONSIBLE FOR IMPLEMENTATION OF THE EROSION AND SEDIMENT CONTROL PLAN, SHALL ASSESS THE ABOVE DESCRIBED CONDITIONS AND FACTORS WITH RESPECT TO RELATIVE COST EFFECTIVENESS AND SELECT THE APPROPRIATE METHODS OF PROTECTION. A FAIRLY EXTENSIVE LIST OF TECHNIQUES ARE PRESENTED BELOW BUT IT MUST BE STRESSED THAT ANY OR ALL OF THE FOLLOWING MAY BE NECESSARY TO MAINTAIN WATER QUALITY AND QUANTITY STANDARDS. THE CONSTRUCTION SEQUENCING SHOULD BE THOUGHT OUT IN ADVANCE OF INITIATION TO PROVIDE ADEQUATE PROTECTION OF WATER QUALITY. DISCHARGES WHICH EXCEED 29 N.T.U.'S OVER THE BACKGROUND LEVELS ARE IN VIOLATION OF STATE WATER QUALITY STANDARDS. DISCHARGES OF WATER QUANTITIES WHICH AFFECT OFFSITE PROPERTIES OR MAY DAMAGE WETLANDS ARE ALSO PROHIBITED BY REGULATING AGENCIES. THE EROSION AND TURBIDITY CONTROL MEASURES SHOWN HEREON ARE THE MINIMUM REQUIRED FOR AGENCY APPROVAL. ADDITIONAL CONTROL AND MEASURES MAY BE REQUIRED DUE TO THE SITE SUBCONTRACTOR'S CONSTRUCTION SEQUENCE & UNFORESEEN WEATHER CONDITIONS. ANY ADDITIONAL MEASURES DEEMED NECESSARY BY THE SITE SUBCONTRACTOR SHALL BE INCLUDED IN THE LUMP SUM BID WITH NO EXTRAS FOR MATERIALS AND LABOR ALLOWED. HAY BALES OR SILT SCREENS SHALL BE INSTALLED PRIOR TO LAND CLEARING TO PROTECT WATER QUALITY AND TO IDENTIFY AREAS TO BE PROTECTED FROM CLEARING ACTIVITIES AND MAINTAINED FOR THE DURATION OF THE PROJECT UNTIL ALL SOIL IS STABILIZED. FLOATING TURBIDITY BARRIERS SHALL BE IN PLACE IN FLOWING SYSTEMS OR IN OPEN WATER LAKE EDGES PRIOR TO INITIATION OF EARTHWORK AND MAINTAINED FOR THE DURATION OF THE PROJECT UNTIL ALL SOIL IS STABILIZED. NO CLAY MATERIAL SHALL BE LEFT EXPOSED IN ANY STORMWATER STORAGE FACILITY. IF CLAY OR SANDY-CLAYS ARE ENCOUNTERED DURING STORMWATER STORAGE EXCAVATION, THE SITE SUBCONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY BEFORE PROCEEDING WITH FURTHER EXCAVATION. IF THE ENGINEER OF RECORD HAS DETERMINED THAT SUCH SOILS ARE NON-CONFINING AND MUST BE EXCAVATED TO MEET PERMIT AND DESIGN CONDITIONS, EXCAVATION MAY PROCEED AFTER OBTAINING WRITTEN AUTHORIZATION FROM THE APPROPRIATE GOVERNING AGENCY. IF SAID SOILS ARE LEFT EXPOSED AT THE PERMITTED AND DESIGNED DEPTH, THE SITE SUBCONTRACTOR SHALL OVER-EXCAVATE THE POND'S BOTTOM AND SIDE SLOPES BY A MINIMUM OF TWELVE (12") INCHES AND BACKFILL WITH CLEAN SANDS TO HELP PREVENT SUSPENSION OF FINE PARTICLES IN THE WATER COLUMN. THE INSTALLATION OF TEMPORARY EROSION CONTROL BARRIERS SHALL BE COORDINATED WITH THE CONSTRUCTION OF THE PERMANENT EROSION CONTROL FEATURES TO THE EXTENT NECESSARY TO ASSURE EFFECTIVE AND CONTINUOUS CONTROL OF EROSION AND WATER POLLUTION THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE. THE TYPE OF EROSION CONTROL BARRIERS USED SHALL BE GOVERNED BY THE NATURE OF THE CONSTRUCTION OPERATION AND SOIL TYPE THAT WILL BE EXPOSED. SILTY AND CLAYEY MATERIAL MAY REQUIRE SOLID SEDIMENT BARRIERS TO PREVENT TURBID WATER DISCHARGE, WHILE SANDY MATERIAL MAY NEED ONLY SILT SCREENS OR HAY BALES TO PREVENT EROSION. FLOATING TURBIDITY CURTAINS SHOULD GENERALLY BE USED IN OPEN WATER SITUATIONS. DIVERSION DITCHES OR SWALES MAY BE REQUIRED TO PREVENT TURBID STORMWATER RUNOFF FROM BEING DISCHARGED TO WETLANDS OR OTHER WATER BODIES. IT MAY BE NECESSARY TO EMPLOY A COMBINATION OF BARRIERS, DITCHES, AND OTHER EROSION/TURBIDITY CONTROL MEASURES IF CONDITIONS WARRANT. WHERE PUMPS ARE TO BE USED TO REMOVE TURBID WATERS FROM CONSTRUCTION AREAS, THE WATER SHALL BE TREATED PRIOR TO DISCHARGE TO THE WETLANDS. TREATMENT METHODS INCLUDE, FOR EXAMPLE, TURBID WATER BEING PUMPED INTO GRASSED SWALES OR APPROPRIATE UPLAND VEGETATED AREAS (OTHER THAN UPLAND PRESERVATION AREAS AND WETLAND BUFFERS), SEDIMENT BASINS, OR CONFINED BY AN APPROPRIATE ENCLOSURE SUCH AS TURBIDITY BARRIERS OR LOW BERMS, AND KEPT CONFINED UNTIL TURBIDITY LEVELS MEET STATE WATER QUALITY STANDARDS. THE PERMITTEE SHALL SCHEDULE HIS OPERATIONS SUCH THAT THE AREA OF UNPROTECTED ERODIBLE FIRST CAPITAL GROUP HEIDT DESIGN, LLC: 1. EARTH EXPOSED AT ANY ONE TIME IS NOT LARGER THAN THE MINIMUM AREA NECESSARY FOR EFFICIENT CONSTRUCTION OPERATION, AND THE DURATION OF EXPOSED, UNCOMPLETED CONSTRUCTION TO THE ELEMENTS SHALL BE AS SHORT AS PRACTICABLE. CLEARING AND GRUBBING SHALL BE SO SCHEDULED AND PERFORMED SUCH THAT GRADING OPERATIONS CAN FOLLOW IMMEDIATELY THEREAFTER. GRADING OPERATIONS SHALL BE SO SCHEDULED AND PERFORMED THAT PERMANENT EROSION CONTROL FEATURES CAN FOLLOW IMMEDIATELY THEREAFTER IF CONDITIONS ON THE PROJECT PERMIT. WATER DERIVED FROM VARIOUS DEWATERING METHODS SHOULD BE PASSED THROUGH SUFFICIENTLY WIDE AREAS OF EXISTING UPLAND VEGETATION TO FILTER OUT EXCESS TURBIDITY. IF THIS IS NOT SUFFICIENT, THE WATER SHALL BE RETAINED IN PREVIOUSLY CONSTRUCTED PERMANENT STORMWATER PONDS OR ELSE RETAINED IN TEMPORARY SEDIMENTATION BASINS UNTIL THE CLARITY IS SUITABLE TO ALLOW FOR ITS DISCHARGE. PLUGGING THE OUTFALLS FROM COMPLETED STORMWATER PONDS MAY BE NEEDED TO AVOID DISCHARGE. HOWEVER, SUCH SITUATIONS SHOULD BE MONITORED CLOSELY TO PRECLUDE BERM FAILURE IF WATER LEVELS RISE TOO HIGH. WATER CAN BE TRANSPORTED AROUND THE SITE BY THE USE OF INTERNAL SWALES OR BY PUMPS AND PIPES. SHEET FLOW OF NEWLY FILLED OR SCRAPED AREAS MAY BE CONTROLLED OR CONTAINED BY THE USE OF BRUSH BARRIERS, DIVERSION SWALES, INTERCEPTOR DITCHES OR LOW BERMS. FLOW SHOULD BE DIRECTED TOWARD AREAS WHERE SEDIMENTS CAN SUFFICIENTLY SETTLE OUT. EXPOSED SOILS SHALL BE STABILIZED AS SOON AS POSSIBLE, ESPECIALLY SLOPES LEADING TO WETLANDS. STABILIZATION METHODS INCLUDE SOLID SOD, SEEDING AND MULCHING OR HYDROMULCHING TO PROVIDE A TEMPORARY OR PERMANENT GRASS COVER MULCH BLANKETS, FILTER FABRICS, ETC., CAN BE EMPLOYED TO PROVIDE VEGETATIVE COVER. ENERGY DISSIPATERS (SUCH AS RIP RAP, A GRAVEL BED, HAY BALES, ETC.) SHALL BE INSTALLED AT THE DISCHARGE POINT OF PIPES OR SWALES IF SCOURING IS OBSERVED. ATTEMPT TO INSTALL ROADWAY CURB AND GUTTERS AS SOON AS POSSIBLE TO REDUCE THE SURFACE AREA FOR EROSION TO OCCUR. IMPLEMENT STORM DRAIN INLET PROTECTION (HAY BALES OR GRAVEL) TO LIMIT SEDIMENTATION WITHIN THE STORMWATER SYSTEM. PERFORM INSPECTIONS AND PERIODIC CLEANING OF SEDIMENTS WHICH WASH OUT INTO THE STREETS UNTIL ALL SOIL IS STABILIZED. WATER DISCHARGE VELOCITIES FROM IMPOUNDED AREAS AND TEMPORARY SEDIMENTATION BASINS SHALL BE RESTRICTED TO AVOID SCOURING IN RECEIVING AREAS. IF WATER CLARITY DOES NOT REDUCE TO STATE STANDARDS RAPIDLY ENOUGH IN HOLDING PONDS, IT MAY BE POSSIBLE TO USE CHEMICAL AGENTS SUCH AS ALUM TO FLOCCULATE OR COAGULATE THE SEDIMENT PARTICLES. HAY BALES, SILT SCREENS, OR GRAVEL BEDS CAN BE ADDED AROUND THE PIPE OR SWALE DISCHARGE POINTS TO HELP CLARIFY DISCHARGES. SPREADER SWALES MAY HELP DISSIPATE CLOUDY WATER PRIOR TO CONTACT WITH WETLANDS. ALL FUEL STORAGE AREAS OR OTHER HAZARDOUS STORAGE AREAS SHALL CONFORM TO ACCEPTED STATE OR FEDERAL CRITERIA FOR SUCH CONTAINMENT AREAS. VEHICLE OR EQUIPMENT WASHDOWN AREAS WILL BE SUFFICIENTLY REMOVED FROM WETLANDS OR OFFSITE AREAS. FUGITIVE DUST CONTROLS (PRIMARILY BY USING WATER SPRAY TRUCKS) SHALL BE EMPLOYED AS NEEDED TO CONTROL WINDBORN EMISSIONS. IF THE ABOVE CONTROLS REMAIN INEFFECTIVE IN PRECLUDING RELEASE OF TURBID WATER, ESPECIALLY DURING POND OR UTILITY LINE DEWATERING, THEN THE CONTRACTOR MAY BE COMPELLED TO USE A VERTICAL DEWATERING SYSTEM SUCH AS WELL POINTS OR SOCK DRAINS TO WITHDRAW GROUNDWATER WHICH MAY ALREADY BE CLEAR ENOUGH TO ALLOW FOR DIRECT DISCHARGE TO WETLANDS. ONGOING INSPECTIONS AND PERIODIC MAINTENANCE BY THE SITE SUBCONTRACTOR SHALL OCCUR THROUGHOUT CONSTRUCTION AS NECESSARY TO INSURE THE ABOVE METHODS ARE WORKING SUITABLY. THIS MAY BE NEEDED DAILY, IF CONDITIONS SO WARRANT. SITE SUBCONTRACTORS ARE ENCOURAGED TO OBTAIN AND THOROUGHLY REVIEW THE FLORIDA DEVELOPMENT MANUAL: A GUIDE TO SOUND LAND AND WATER MANAGEMENT, WHICH WAS DEVELOPED BY THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION IN 1988. THIS PROVIDES FAIRLY IN-DEPTH DISCUSSIONS OF RECOMMENDED TECHNIQUES AND ALSO PROVIDES SPECIFIC DESIGN AND TECHNICAL STANDARDS. A COPY OF THIS DOCUMENT IS AVAILABLE FOR REVIEW AT HEIDT DESIGN, LLC. THE CONTRACTOR WILL PERFORM DAILY INSPECTIONS OF ALL ON-SITE WETLANDS WITHIN THE CONSTRUCTION AREA TO ENSURE THAT WATER LEVELS WITHIN THOSE WETLANDS ARE NOT EXCESSIVELY IMPOUNDED PRIOR TO THE TIME WHEN THE PERMITTED CONTROL STRUCTURE OR OUTFALL IS BUILT. WATER LEVELS SIGNIFICANTLY ABOVE NORMAL SHOULD BE CORRECTED AT A FREQUENCY THAT PREVENTS A CHANGE IN THE VEGETATIVE CHARACTER OR HEALTH OF ANY WETLANDS CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL (SILT FENCE) REMOVAL AFTER STABILIZATION. PREPARED FOR: THE FOLLOWING ENTITIES ARE IDENTIFIED AS TEAM MEMBERS OF "SWPPP": HEIDT DESIGN, LLC, THE DEVELOPER AS IDENTIFIED IN THE TITLE BOX OF THESE PLANS, AND THE SITE CONTRACTOR AND HIS SUB-CONTRACTORS. EACH TEAM MEMBER HAS SPECIFIC RESPONSIBILITIES AND OBLIGATIONS. IN GENERAL, ALL TEAM MEMBERS, WITH REGARD TO THEIR INVOLVEMENT AND RESPONSIBILITIES ON THE PROJECT, ARE TO IMPLEMENT ALL NECESSARY STORM WATER MANAGEMENT CONTROLS TO ASSURE COMPLIANCE WITH THE NPDES GENERIC PERMIT FOR STORM WATER DISCHARGES FROM CONSTRUCTION ACTIVITIES, THE SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT PERMIT, THE APPLICABLE LOCAL GOVERNING AGENCY (I.E. HILLSBOROUGH COUNTY, CITY OF TAMPA, ETC) AND THE GUIDELINES LISTED IN THE SWPPP. THE DUTIES AND RESPONSIBILITIES OF THE TEAM MEMBERS AS THEY PERTAIN TO THE SWPPP ARE AS FOLLOWS: GENERAL EROSION AND TURBIDITY CONTROL NOTES CONSTRUCTION STORMWATER MANAGEMENT PLAN CONTAINED ON THESE PLANS AND WITHIN THE FOLLOWING NOTES IS A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) WHICH HAS BEEN DEVELOPED BY HEIDT DESIGN, LLC IN ACCORDANCE WITH THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S (FDEP) "NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM" (NPDES) GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES. REPORT FORM FOR CHANGES IN THE SWPPP SHALL BE COMPLETED AND A COPY SENT TO HEIDT DESIGN, LLC THE ORIGINAL SHALL BE KEPT ON-SITE AS DOCUMENTATION OF THE CHANGE. IF THE INSPECTION PASSES, A CERTIFICATION THAT THE FACILITY IS IN COMPLIANCE WITH THE SWPPP AND THE NPDES PERMIT MUST BE SIGNED BY A DULY AUTHORIZED REPRESENTATIVE OF THE PRINCIPAL EXECUTIVE OFFICIAL OF THE OPERATOR OF THE SWPPP WITH ONE OF THE FOLLOWING QUALIFICATIONS: CONNERTON CORNER STORM WATER POLLUTION PREVENTION PLAN 01/2016 5. TOTAL ACRES DISTURBED: 5.3 0.20 STRUCTURAL CONTROLS. 8. THE STORM WATER MANAGEMENT SYSTEM, UPON COMPLETION OF CONSTRUCTION AND APPROPRIATE CERTIFICATION AND AS-BUILT SUBMITTALS WILL BE OPERATED AND MAINTAINED BY FISHHAWK CDD II. DISCHARGE POINTS. 9. THE POTENTIAL SOURCE OF POLLUTION FROM THIS PROJECT IS ON-SITE DEVELOPMENT AND CONSTRUCTION ACTIVITY. CONSTRUCTION ENTRANCES AND EXITS. AREAS USED FOR STORAGE OF EXPOSED MATERIALS. UNPLATTED 70' MIN. 5:1 3' 12' MIN. 120 LF RCP P 48" RC 36 LF 24" RCP PB-42 1 A 180 LF 48" EXISTING PAVEMENT 06/22/2015 AN INSPECTION FORM SHALL BE COMPLETED FOR EACH INSPECTION. ANY PERMIT VIOLATIONS SHOULD BE NOTED AND CORRECTIVE MEASURES SHALL BE TAKEN NO LATER THAN 7 DAYS AFTER THE INSPECTION OCCURRED. IF REVISIONS TO THE SWPPP ARE NEEDED, A CP 66 18" RCP h Rig 2-1 n Y WA 45) ortatio d 5 . No oa IGH sp . H e Road f Tran 44B-R o U.S .5 at No 444) (St tment on par Secti age De p 2, P rida y Ma ok 10 Flo Wa Bo t of Deed ( 70' MIN. 10' MIN. EXISTING PAVEMENT CSWMP DESIGN BY: NYB DRAWN BY: NYB PB-19 AY KW PAR INS PB-40 LA TP . 41 No 10' MIN. FCG CT 1006 FILE: LF FILTER CLOTH MOUNTABLE BERM (OPTIONAL) EXISTING GROUND 12' MIN.* PROJECT NO: 8" R A 2-2 LF 4 6" MIN. 2-3 235 FILTER CLOTH 3' MIN. 3' MIN. PB-115 UNPLATTED AN AS PLE OWNER: CONNERTON LAND ACQUISITION, LLC GROVES-PHASE 1A 10' MIN. #57 STONE * MUST EXTEND FULL WIDTH OF INGRESS END EGRESS OPERATION (PLAT BOOK 39, PAGES 120-150) TYPICAL CONSTRUCTION ENTRANCE NOT TO SCALE OWNER: FAMILTAT HOLDINGS LLC OWNER: FAMILTAT HOLDINGS LLC ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. 7. POST-DEVELOPED "C" FACTOR: DESCRIPTION STABILIZATION MEASURES (ONCE A MONTH IF FULLY STABILIZED). 0.20 DATE 6. PRE-DEVELOPED "C" FACTOR: THE FOLLOWING SHALL BE INSPECTED A MINIMUM OF ONCE A WEEK OR WITHIN 24 HOURS AFTER 0.50 INCHES OF RAINFALL: REVIEW SUBMITTAL F. THE PERSONNEL ASSIGNED TO EACH TASK. 160 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\DA-PRE.DWG-C-901 2015/06/25 9:21 AM NATALIE BUDEN 0 320 GRAPHIC SCALE: 1" = 160' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 www.HeidtDesign.com BASIN 200 AREA= 7.20 Ac. CN=90.3 Tc= 15 Min. FIRST CAPITAL GROUP DATE DESCRIPTION BASIN 582 AREA= 49.2 Ac. CN=96.7 Tc= 35 Min. PREPARED FOR: BASIN AREA PRE-DEVELOPMENT DRAINAGE BASIN MAP LEGEND CONNERTON CORNER BASIN 1100 AREA= 29.60 Ac. CN=88.1 Tc= 15 Min. 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 IG . H U.S 06/22/2015 A37 Southeast SH= 75.50 NP= 74.40 1 AY HW EX. POND 100 No. AY KW 41 AR SP AIN L TP SAN A PLE OWNER: FAMILTAT HOLDINGS LLC BASIN 100 AREA= 17.7 Ac. CN=94.2 Tc= 15 Min. OWNER: CONNERTON LAND ACQUISITION, LLC PROJECT NO: FILE: DESIGN BY: DRAWN BY: FCG CT 1006 DA-PRE NYB NYB OWNER: FAMILTAT HOLDINGS LLC DIP 16" IN TING EXIS TER MA WA DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. REVIEW SUBMITTAL A37 Southeast SH= 75.50 NP= 74.40 DESCRIPTION WETLAND 425 CATEGORY I DATE FLOODPLAIN/ WETLAND MITIGATION AREA M-12 NW=75.5 WETLAND 425 CATEGORY I 160 R:\CONNERTON\FCG - CONNERTON\WORKING FILES\CURRENT DRAWINGS\CP\DA-POST.DWG-C-902 2015/06/25 9:21 AM NATALIE BUDEN 0 320 GRAPHIC SCALE: 1" = 160' ELEVATIONS BASED ON: NORTH GEODETIC VERTICAL DATUM 1929 CONVERSION: NAVD 29 TO NGVD 88 = -0.84 www.HeidtDesign.com BASIN 200 AREA= 7.20 Ac. CN=90.3 Tc= 15 Min. FIRST CAPITAL GROUP DESCRIPTION BASIN 582 AREA= 49.10 Ac. CN=96.8 Tc= 35 Min. PREPARED FOR: BASIN AREA POST-DEVELOPMENT DRAINAGE BASIN MAP LEGEND CONNERTON CORNER BASIN 1100 AREA= 29.60 Ac. CN=88.1 Tc= 15 Min. 5806-B Breckenridge Pkwy. Tampa, Florida 33610 Office: 813-253-5311 Fax: 813-464-7629 1 o. 4 Y N INS ASA K PAR PLA NT FILE: OWNER: CONNERTON LAND ACQUISITION, LLC DESIGN BY: DRAWN BY: PLE OWNER: FAMILTAT HOLDINGS LLC PROJECT NO: Y WA FCG CT 1006 DA-POST NYB NYB OWNER: FAMILTAT HOLDINGS LLC BASIN 100 AREA= 15.6 Ac. CN=93.8 Tc= 15 Min. DATE: REGISTRATION NO. 61035 ---- 2015, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119. DESCRIPTION DATE 1 WA IGH . H 06/22/2015 U.S REVIEW SUBMITTAL DATE BASIN 100A AREA= 2.2 AC. CN= 98.1 Tc= 15 Min.