Piled Foundation for the Chiapas Bridge in Mexico
Transcription
Piled Foundation for the Chiapas Bridge in Mexico
Localización de la obra Piled Foundation for the Chiapas Bridge in Mexico God Morgen mine Damer og Herrer ! Wolfgang G. Brunner Maschinen Localización de la obra Location of State Chiapas in Mexico State Chiapas in Mexico Chiapas Bridge Localización de la obra Location of the Jobsite Localización de la obra Veracruz Puente Chiapas Procedimiento no. 1 Chiapas 1 Oaxaca Procedimiento no. 2 Chiapas 2 Chiapas Data of Chiapas Bridge Datos generales de proyecto • Length 1208 m • Drilling depth 56.0 m • Height above water 10 m • Contract amount including • Maximum total length of drilling string 148.5 m • Maximum water depth 92.5 m VAT 100 million US $ • Execution period of foundation 7 month Datos generales de proyecto Construction of Pier Foundations Stage 1: Fabrication on land of steel jacket on its side comprising four 2.80 m dia. steel tubes and struts. Stage 2: Floating jacket into position of pier with side buoyancy tanks. Stage 3: Up-ending of jacket Driving four Ø 1000 mm dia. tubular support leg piles with structural connections to jacket. Stage 4: Construction of working platform on top of jackets, lifting hydraulic casing oscillator onto platform and fixing it onto platform. Installation of 2500 mm dia. drill casing comprising a sacrificial section jointed onto the bottom of the main casing section. Datos generales de proyecto Construction of Pier Foundations Stage 5: Mounting and connecting BA 2500 top drill on drill casing. Stage 6: Installation of drill head, ballast rods and air-lift pipe assembly with casing guides. Stage 7: Drilling down with air-lift flushing as the casing oscillator rotates the 2500 mm dia. drill casing and jacks it down with its powerful hydraulic rams. In order to reduce the frictional resistance on the drill casing, three hydraulically operated roller bits are extend laterally during drilling. They underream the casing shoe. Embedment of drill casing in conglomerate up to 20m. Stage 8: Drilling with fully extended roller bits to final depth. Datos generales de proyecto Construction of Pier Foundations Stage 9: Lifting top drill off drill casing, removing drill string and drill head. Cutting drill casing inside steel jacket tube approximately 5 m above bottom end of steel tube. Stage 10: Raising upper section of drill casing and holding it in position with casing oscillator. Stage 11: Installation of reinforcement cage, which extends from the base of the pile to 5 m above the top of the enlarged pile head. Stage 12: Lowering tremie pipe assembly into drill casing and concreting pile to top of reinforcing cage. Stage 13: Extracting upper drill casing string. Stage 14: Constructing remaining three piles. Steel Jackets: Fabrication Launching Floating into Position Jacket Manufacturing Yard Fabrication of Jackets Fabricación de jackets Launching of Jacket step 1: pull jacket winch step 1: retract jacket step 1: float jacket Launching of Jacket Botado de los jackets 8, 7, 6 y 5 Jacket no 8 Jacket no 7 Jacket no 6 Jacket no 5 Launching of Jacket into Water Floating Jacket into Position Step 1: float to position Step 4: vertical position Step 2: turn through water inflow Step 3: continue turning Step 5: remove floating body Step 6: install steel piles with diesel hammer Floating Jacket into Position floating valves guides for steel piles floating body Transporte Floating Jacket into Position length 70 m Ziele der Bodenverbesserung Floating Jacket into Position Drilling with RC Drill: Drill Installation of Casing Mounting of RC Drill Drilling in Conglomerate and Rock Principle of RC (Reverse Circulation) System 0 -20 -20/25 -30/35 Construction of Working Platform Preparation of Drill Casing Dia 2500 mm Installation of Casing with Oscillator Installation of Casing and RCD Drill RC Drill BA 2500 Installation of Casing and Drilling into Rock RCD drill rig BA 2500 oscillator BV 2500 casing dia 2500 mm open hole drilling Rock Drill Head with Underreamer Dia 2350 mm underreamer roller Stabilizer and Flanged Drill Pipes Stabilizer and Flanged Drill Pipe Stabilizer and Flanged Drill Pipe Drilling with RC Drill and Oscillator Drilling with RC Drill and Oscillator Underreaming the Casing during Drilling hydraulic power pack for moving out the underreamer rollers casing movable roller rock Drilling at Jacket No. 8 Remove Casing cutting drill casing with diver, max water depth 80 m and recover the cut off casing section oscillator BV 2500 cut casing by diver casing dia 2500 mm Rock Completion of Pile: Installation of Reinforcement Cage Placing Concrete Installation of Reinforcement Cage Pipes for concrete inspection Installation of Reinforcement Cage Installation of Reinforcement Cage placing reinforcement cage into the borehole casing dia 2500 mm uncased bore in rock Rock Concreting the Pile c c n o te e r ete r nc o c concrete concrete tremie pipe casing dia 2500 mm uncased bore in rock Rock Concrete Pipe Line from the Shore to the Pier Raked Piles Pile diameter: 1300 mm Pile length: up to 50 m Inclination: 1: 3 Bridge Deck Construction: Construction Construction of Pier Heads Pushing Bridge Deck Concreting of Pier Head Concreting of Pier Head 22.7.2000 Concreting of Pier Head Concreting of Pier Head Concreting of Pier Head Pier Overview Pier 6 Pier 7 Pier 8 Pier 7 Pier 6 Pier 7 Pier 6 Pier 8 Pier 8 152.0 m Abutment 9 jacking attachment Abutment 9 Installation of Bridge Deck by Jacking 152.0 m Fabricación de dovelas Installation of Bridge Deck by Jacking Completed Chiapas Bridge Fabricación de dovelas Thank you for your kind attention ! Takk for Oppmerksomheten !