AMADOR WATERAGENCY
Board of Directors
Regular Meeting
12800 Ridge Road, Sutter Creek, CA gSGBs
April23,2015
9:00 a.m.
Website Address : www.amadonrater.orq
Please Note: Members of the public will have the oppotTunity to directty address the Agency Board of
Directors concerning any item listed on the Agenda below before or during consideratlon o¡ tnat item.
There is a three minute time limit per person
ln order to better accommodate members of the pubtic, specific times above for Agenda ltems witt be
heard at the specified time or soon thereafter. Agenda ttems without specific timeã may be rearranged
to accommodate the Board's schedule.
1.
CALL TO ORDER AND PLEDGE OF ALLEGIANCE
2.
ADDITIONS TO AGENDA
a. ltems added to the agenda must be approved by the Board pursuant to Government
Code Section 54954.2.
3.
PUBLIC COMMENT FOR MATTERS NOT ON THE AGENDA
Discussion items only, no action to be taken. Any person may address the Board at this time upon any
subject within the jurisdiction of Amador Water Agency; however, any matter that requires action will be
referred to Staff for a report and action at a subsequent Board meeting. Please note there is a three (3)
minute time limit per person
4.
CONSENT AGENDA
Items listed on the consent agenda (see attached) are considered routine and may be enacted by one
motion. Any item may be removed for discussion and made a part of the regular agenda at the request
of a Board member(s).
5.
AGENCY GENERAL
A. Eagle Scout Service Project
1. Discussion and possible adoption of Resolution No. 2015-09, honoring Logan Moody for
his achievement of completing Eagle Scout Service Project - CAWP Fire Hydranl painting-
B. Amador County Local Hazard Mitigation plan
1. Discussion and possible adoption of Resolution No. 2015-10, adopting the Amador
County Local Hazard Mitigation Plan
1
BOARD OF DIRECTORS
Rich Farrington, President
Robert Manassero, Vice
President
Paul Molinelli
Art Toy Gary Thomas
G. Agency Cost Controls
1. Discussion and possible direction to staff regarding a potential hiring freeze for the
Agency
2. Discussion and possible direction to staff regarding expenditure freeze
D. Fire Protection Gommittee Report
1. Review and possible action regarding the Agency's Administrative Policy Manual section
3190- Fire Cooperation Policy
2. Update on committee accomplishments
E. Project Updates
6.
WATER SYSTEM
A. Water Rate Adjustment
1. Discussion and possible action to adjust the water usage rates, monthly service charges
per Resolution No. 2013-22, adopted by the Board on June 20, 2013.
B. Drought Update
1. Update regarding current drought conditions
2.
Discussion regarding JVID emergency water request
7.
WASTEWATER SYSTEM
A. Sutter Creek Contract Amendment #1
1. Discussion and possible action to authorize the General Manager to execute
Amendment No.1 to the Agreement between the Amador Water Agency and the City
of Sutter Creek regarding sewer service to properties on the southwest Ridge Road area
8.
GENERAL MANAGERS REPORT- General discussion of various issues for informationat and
communication purposes. Discussion only, no formal action will be taken. Any matter requiring
action will be placed on an upcoming agenda for consideration
9.
ASSISTANT MANAGERS REPORT- General discussion of various issues for informational
and communication purposes. Discussion only, no formal action will be taken. Any matter
requiring action will be placed on an upcoming agenda for consideration
IO.COMMITTEE REPORTS AND DIRECTOR COMMENTS
A. Drought Gommittee
I l. BOARD OF DIRECTOR DISTRICT REPORTS - The Board Members may report on various
activities, meetings, etc. that they have been involved in within their respective districts. Discussion only,
no formal action will be taken. Any matter requiring action will be placed on an upcoming agenda for
consideration
l2.CLOSED SESSION
A. Conference with Legal Counsel Pursuant to Government Code Section 54g56.9(a)Pending Litigation- Kenneth Perano and Ken Berry vs Amador Water Agency (Amador Superior Court
Case No. 12-CV-7718)
2
BOARD OF DIRECTORS
Rich Farrington, President
Robert Manassero, Vice
President
Paul Molinelli
Art Toy Gary Thomas
B. Conference with Legal Counsel Pursuant to Government Code Section 54956.g(a)
-
Pending Litigation- Amador Water Agency v. Lazy Creek Family Trust, et al. (Amador Superior Court
Case No. 15-CV-9203)
13. FUTURE AGENDA TOPICS -This item is to provide the Board Members an opportunity to
request items to be placed on future agendas.
I4.ADJOURNMENT
J
BOARD OF DIRECTORS
Rich Farrington, President
Robert Manassero, Vice
President
Paul Molinelli
Art Toy Gary
Thomas
AMADOR WATER AGENCY
CONSENT AGENDA
April 23,2015
Items listed on the consent agenda are considered routine and may be enacted by one motion. Any item may be removed
for
discussion and made a part of the regular agenda at the request oÎ a Board memne4s¡.
1.
2
MINUTES
A. Approval of minutes
of the Regular Meeting of April g,2O1S
MISCELLANEOUS APPROVALS
Payable for the month of March, 2O1S
A. Approval of Accounts
B. Agency Surplus Property
1. Discussion and possible action to declare certain items as surplus property and
authorize the General Manger to dispose of these assets in accordance with Administrative
Policy Manual Section 3120- Surplus property
ln compliance with the Americans with Disabitities Act, if you are a dísabled person and you
need a disability'related modification or accommodation to pañicipate in thís meeting, {hen
please contact Cris Thompson at (209) 223-3018 or (2Og) 257-5281
ffà4. Reguesfs must be made
as early as possib/e, and at least two-ful/ business days before the start of the meeting.
Documents and materials relating to an open session agenda item that are provided to the Amador Water
Agency Board of Directors /ess fhan 72 hours prior to a regular meeting wilt be avaitable for pubtic
inspection and copying at 12800 Ridge Rd, Sutter Creek CA g16gs
4
BOARD OF DIRECTORS
Rich Farrington, President
Robert Manassero, Vice
President
Paul Molinelli
Art Toy Gary Thomas
Oonsent Agendo ltenn
l,#,
Unapproved
AMADOR WATER AGENCY
Board of Directors
Regular Meeting
April 9,2015
MINUTES
Directors Present:
Rich Farrington, President
Robert Manassero, Vice President
Paul Molínelli
Gary Thomas
Art Toy
Directors Absent:
None
Staff Present
Gene Mancebo, General Manager
Cris Thompson, Assistant General Manager
Josh Horowitz, Agency Counsel
Damon Wyckoff, Operations Manager
Karin Helvey, Finance Director
Connie Gagnebin, Administrative Asst
CALL
ORDER- President Farrington called the meeting to order at g:00 a.m
ADDITIONS TO THE AGENDA- None
PUBL¡C COMMENT: None
GONSENT AGENDA ITEMS
l.A. 2.4. and 2.8. (01:29 -
02:491
Resolution No. 2015-06, Approving Revisions to the Administrative Policy Attachment
"4" and Resolution No. 2015-08 Authorizing the General Manager to execute and the
Secretary of the Board to record a Certificate of Acceptance of a Construction
Easement Agreement from John and Verene Teresi and Regular Board meeting
minutes of March 26,2015
MOTION: lt was moved by Director Toy, seconded by Director Thomas, and
unanimously carried to approve consent agenda with a suggested revision
Regular Board Meeting
April9,2015
Page
1
DEPAR
ENT REPORTS IO3
12:541
istration/Finance
Operations
Adm
in
Sierra Highlands Homeowners Association (12:56- 1B:39)
update regarding sierra Highlands HoA water conservation Effort
Public Gomment:
Sherry Curtis, Pioneer
Eileen Johnson, President of Sierra Highland HOA
WATER CONSERVATION (1 8:40 - 2:17 zùil
Water Shortage Analysis and Strategy
Presentation by Bob Reed, by the Reed Group, lnc. regarding Water Shortage Analysis
Discussion and possíble action regarding the draft Water Shortage Strategy
Public Gomment:
Sherry Curtis, Pioneer
Mike Miller, RABB Park CSD
Mike Daly, City Manager, Cíty of Jackson
Dutch Green, RABB Park CSD
Terry Strange, CCWD Director
Jeff Gardner, City Manager, City of Plymouth
(3:23=27- 3:38:54)
MOTION #1: lt was moved by President Farrington, to adopt the proposed water
shortage strategy by Bob Reed and include the 5% increase to service charge rate and
direct staff to prepare the Prop 218 notice to send to the public and to includè the
transition of flat rate to metered water rates.
MOTION #1 FAILED for lack of a second
MOTION #2 - lt was moved by Director Thomas, seconded by Director Toy to adopt
Bob Reed's water shortage strategy as presented, and to direct staff to convert all flat
rate water accounts to metered accounts such that water used will be billed on a
volumetric basis and to further direct staff to initiate required Proposition2lB notices to
include the water shortage rate surcharges for water service and the transition of flat
rate customers to metered water rates.
Ayes: Directors Thomas, Toy, Manassero and Farrington
Noes: Director Molinelli
Absent: None
Abstain: None
RECESS was called at 11:17 a.m. SESSION resumed at 11:37 a.m
Regular Board Meeting
April9,2015
Page2
Drought Conditions Executive Order (2:18:08 - 2:39:30)
Discussion regarding Governor Brown's April 1 ,201s executive order
Public Comment:
Paul Johnston, Pine Grove CSD
Drought Committee (2:39:35 - 2:48:471
Discussion and possible action regarding Drought Committee recommendation to
eliminate flat rate pricing
AWA water code section 2.19 water conservation (2:48:4g - 3:06:35)
Discussion and possible adoption of Resolution No. 2015-07; Revisions to the Water
Code Section 2.19- Water Conservation Policy
MOTION: lt was moved by Director Molinelli, seconded by Director Thomas and
unanimously carried to adopt Resolution No. 2015-07: Revisíons to the Water Code
2.19, motion amended to accept suggested revisions to the Resolution
(3:06:42 - 3:39:00)
Discussion and possible action to declare a Stage 2 or higher Water Alert in accordance
with the Governors Statewide Mandatory Water Reductions
MOTION: lt was moved by Director Molinelli, seconded by Director Thomas and
unanimously carried to Declare a Stage 2 Water Warning with a water reduction of 25%
or higher Water Alert in accordance with the Governors Statewide Mandatory Water
Reductions
Ayes: Directors Molinelli, Thomas and Farrington
Noes: Directors Toy and Manassero
Absent: None
Abstain: None
AGENCY WATER (3:39:06 - 3:58:59)
Pine Grove CSD Presentation
Presentation by Director Jay Ollig, Pine Grove CSD regarding their water line project
Discussion and possible action regarding cost sharing in the water line project
MOTIONI
lt was moved by Director Toy, seconded by Director Manassero and
unanimously carried to approve the cost share for the Pine Grove Water line project at
17o/o of documented total project cost up to $8b,000.
Regular Board Meeting
April9,2015
Page 3
RECESS was called at 1:18 p.m. SESSION resumed at 2:31 p.m.
wild and scenic River Designation (no staff report) (4:01:46- 4:35:46)
Discussion regarding participation in a Collaborative Effort for and Wild and Scenic
Direction was given to the General Manager and the Ad-hoc committee to participate
in a Collaborative Effort for and Wild and Scenic
Public Gomment:
Sherry Curtis, Pioneer
CAWP Wholesale (4:35:56 - 4:49:33)
Discussion to consider the Agency System Wide Water Rate Structure for CAWp
Wholesale Customers
MOTION: lt was moved by Director Molinelli, seconded by Director Thomas and
unanimously carried to direct staff to proceed and prepare the necessary contracts to
move the CAWP contract customers to Wholesale Customers within the Agency
System Wide Water Rate Structure.
AGENGY PROJECT UPDATES (4:49:45
-
5:01:08)
AGENCY COUNSEL REPORT (5:01 :10 - S:0G:40)
Legislative Report
Other Matters
COMMITTEE REPORTS (5:06:59 - 5:32:05)
Budget and Finance Committee 4-08-15
Engineering Committee 4-08-1S
Fire Protection Committee 04-07-15
CAWP District Meeting 04-07-15
Personnel Committee 03-26-15
A.
B.
C.
D.
E.
FUTURE AGENDA TOPICS
FERC 137 Recreatíonal flows
Fire Cooperation Policy 3190 review and report
Proposed Hiring and Spending Freeze on any new projects
Boy Scout Resolution
lnflationary increase
Surplus Property
CLOSED SESSION was called at 4:12 p.m.
Conference with Legal Counsel Pursuant to Government Code Section 54956.g(a)Pending Litigation- Kenneth Perano and Ken Berry vs Amador Water Agency (Amador
Superior Court Case No. 12-CV-7718)
Regular Board Meeting
April9,2015
Page 4
Conference with Legal Counsel Pursuant to Government Code Section 54956.g(a) Anticipated Litigation - lnitiation of litigation - One Case.
OPEN SESSION resumed at4:16 p.m. with nothing to report
ADJOURNMENT
President Farrington adjourned the meetin g at 4:17 p.m
Cris Thompson
Clerk of the Board of Directors
Approved
Regular Board Meeting
April9,2015
Page 5
COnsent Agendo ltem
AMADOR WATER AGENCY
ACCOUNTS PAYABLE LTST
FOR PERïOD MAR
02, 2015
THROUGH MAR
31,
201_5
CHECK#
PAYEE
DESCRIPTTON
75278
75278
75279
A.A. ABLE AUTO
A.A. AB],8 AUTO
REFUND FOR
ARAMARK TINTFORM SERVTCES
I]NÏFORM SERVÏCE
REFI-IÑD FOR 145 PATRICTA
7
52BO
75281
75282
75283
75284
7
5285
7
5287
75286
75288
75289
7
7
5290
529r
75292
75293
75294
7 5295
75296
7 5297
75298
5299
75300
7
753 01
75302
753 03
75304
753 0s
75306
7
5307
75308
753 09
753 10
753L7
75312
753L3
753 15
753]-6
7
531,7
753 18
753]-9
75320
75321
7
5322
75323
75324
7532s
75326
7 5327
REPAIR
REPAIR
26TH DISTRICT AG ASSOCIA
STEPHAN]E ARREOLA
AT&T
ATI
PARTS
BARTKÏEWÏCZ, KRONICK &
CABELA'S MARKETING & BRA
CITY OF IONE
DAVID CLARK
CARY CROUSS
SECURTTY & ASSET MANAGEM
DELTA WTRELESS & NETWORK
DITCH WITCH EQUTP, INC.
ENVIRONMENTAL HEALTH DEP
FASTENAL COMPANY
FEDERAL EXPRESS CORP.
FORESTRY SUPPL]ERS, TNC
GEORGE REED, TNC.
GALE HALBAKKEN
HD SUPPIJY CONSTRUCTION
HFC/BENEF]CTAL
SHELLY HTGGTNS
HUNT & SONS INC
MTDWEST MOTOR SUPPLY
LFS ÏNC.
GERALDTNE MC CUTCHEON
MIKE MCFADDEN
PG&E
PACE SUPPLY
CURT PIPER
0
FAIR WINDOW DEPOSTT
CA|NET 2 / c6022234!27
frED 7D
17
LEGAL FEES FOR JAN
SEAT COVERS PO3]-84
DEC VOLUME METRIC FLOVÍ RATE
REFUND FOR 12615 H]LLTOP
REFIIND FOR 372 S SACRAMENTO
TORING/MATNT/ SECURT TY
MOBTLE RADIOS/PO 81940
MONT
FTLTER/LTNE STR.AINER
ÏD#FAo000835/BUCKHORN
REFUND FOR
IJ
L7,545
l_06
7,904
48 )z
56 56
279 56
5/
WTP
L
67.76
18021 N MACE DR
3,563.99
L4.25
5B .68
1,040.38
58.26
ENGTNEERING/ DEs I GN/ TANNER
67.97
41.35
2 ,740 .95
9, 870 . 00
L3 ,7t3 .26
7, 358.04
24.00
SÏERRA FOOTH]LL LAB.
TNC
SPRINGBROOK SOFTWARE TNC
STANDARD TNSURANCE COMPA
SVIEET PEA VENTURES INC
CL]NTON TAYLOR
GARY THOMAS
U.S.
BANK CORPORATE
UNÏVAR USA ]NC
UNÏVERSAL BUII.DTNG SERVI
G
COMP
15809 PIONEER CREEK
cLM soFT Box CORD/TYPE/PLUG
REFUND FOR 220 PATRTCTA LN
OFF]CE SUPPLIES
REFUND FOR 14380 GODS HILL #2
REFUND FOR
AMBER RÏNAUDO
ROBERT HAHN' S AUTOMOTIVE
SÏERRA CHEMICAL COMPANY
304. B4
58. 82
STROKE 3HP PO31B6
REFUND FOR 1]-O DAV]D DR
REFUND FOR 20600 LIVE OAK
GASOI,INE FOR FEB
LUBRÏCANT
roNE PLT/94s730662]-7
PLATT ELECTR]C
NE],LA PRUSSO
QUTLL CORPORÀTTON
18
,362 .00
82 .67
25'1 .26
PLUG BRAss/VALVE/CoPPER/
CORP
16
65
63
2,742 04
RAÏN JACKET ORÄ,NGE PO3 190
REFUND FOR 23190 ALATRE LN
REFUND FOR 16705 DEER TRA]L
PRTNT/MAIL TNVOTCES
TNC
00
100 35
150 00
382 47
15 37
2,L67 34
20 85
SAFETY GLASSES
AB-CLTI
CO
VOLCANO COMMUNICATIONS
24460 HWY BB
24460 HVIY 88
LOCKBOX INFORMATTON
BOOTS PO3189
METRO PRESORT ]NC
N],INE ENERGY
REFI]ND FOR
AMOUNT
CK HEATER/REPLACED
HYDROXIDE PO3]-94
THERMOSTAT
AT GAYLA
-PAGE1-
DsL/ ÏNTER/
269 .0B
75.24
T, 067.40
I,
734.10
E
l_90.00
MANOR
2o92e5
AO
f J . o /
.97
360.00
81.10
86.25
84r .67
27 4 .88
408.29
995.15
1 212
REFUND FOR 2728I FORREST OAK
DIRECTORS EXPENSE
CREDÏT CARD 2247
HYPOCHLORITE PO3193
OFFTCE CLEANING SUPPLIES
BUCKHORN/
114
151.00
FEB T,AB I4IORK
ÏNSTALL BI],LING PROGR.AMS
PREMTUM/00 6492990003
PUMPED WI/I
]-39.52
53 s 6
1
4
)*ü
AMADOR WATER AGENCY
ACCOUNTS PAYABLE LIST
FOR PERTOD MAR 02, 2015 THROUGH MAR
CHECK#
PAYEE
DESCRTPTION
75328
75329
75345
75346
JONATHON WEBSTER
XBYTE TECHNO],OGIES
ABSOLUTE AUTO GI,ASS
DELL
7
5347
75348
75349
75350
7535 1
75352
753 53
75354
7s355
75356
5357
75358
7
75359
75360
7536r
75362
REFUND FOR
ARAMARK UNTFORM SERVTCES
AT&T
PARTS
ATKÏNS NORTH AMERICA, IN
BUS]NESS RECOVERY SERVIC
BOBCAT CENTRAIJ TNC
G.A.M.S. INC
CANYON INDUSTTRES INC
CED
CITY OF ]ONE
CITY OF JACKSON
CITY OF SUTTER CREEK
7
5371,
75372
5373
75374
75375
7
7 53'7
6
7
5377
'7
537 9
75378
75380
75381
75382
75383
75384
75385
75386
75387
753 B8
75389
75390
7539]75392
HUNT
&
SONS INC
HYÐRAFLO INC
FOOTHILL VENTURES TNC
JACKSON T]RE SERVICE ]NC
KENNEDY/JENKS CONSULTANT
LEAF & COLE, LLP
AMAÐOR LEDGER DISPATCH
MEEKS BU]LDING CENTER IN
METRO PRESORT TNC
DUSTTN MTLLER
MOTHER ],ODE PRINTING
PG&E
&
CUTL
PAC MACHINE CO. TNC.
PACE SUPPLY CORP
PACKET FUSTON INC
PETERSON BRUSTAÐ TNC
DENTONIS WELDTNG WORK IN
PLACER TIT],8 COMPANY
PROGRESSIVE BUSINESS PUB
QUII,L
CORPORATTON
RESERVE ACCOUNT
A¡IS CANAL PIPTNG
ENVTRONMENTAL
LOCKBOX SERVICES/FEB
CABLE
LEAF RAKE
15? TO BEGIN DESIGN PO3222
coNDUrT PO3L77
TON ROCK
UPS DROP OFF
G. NINNIS
OVERLAND, PACIFIC
CALNET 2 / 93L0o03495951
BELTS/STRETCH CORD
TWEK/PO3203
GRATNGER TNC.
GRANTTE CONSTRUCTTON COM
GUA],CO GROUP TNC
GTY'S SAW CENTER
HÏ],], RTVKINS BROhIN & ASS
5367
ACETYLENE/OXYGEN
UNTFORM SERVTCES
DÏRECTORS EXPENSE
75366
75368
75369
75370
MANOR COURT
HT].LSIDE PRTNCIPAL/ INTEREST
GEORGE REED, INC.
GOTNI POSTAL
7
241
POWEREDGE SERVER PO3I92
VOLUME ME TRT C FLOW RATE
MARTELL LIFT S TA/ couo01_l_
SETTLEMENT AGREEMENT/RELEASE
STATE OF CALTFORN]A
RTCH FARRTNGTON
FASTENA], COMPANY
DEAN
AMOTJNT
JAN.
75363
75364
75365
2OI5
REPLACED BACK GLASS/PO32I7
sHoP WASTE SERVTCE /gqøA
ACES bIASTE SRVS TNC
ATRGÀS USA LLC
AT]
31,
WASHED SAND
PRESSURE GUAGE/ PO32 O6ICMMS
CI,ASS 3 HOODED SWEATSH]RTS
I,OBBING/ CONSUI.TING SERTVCES
].4ÏN SIGN /PO32t4
LAZY
CREE K
GASO-TNE/DIESEL FOR FEB
HYDRÄ,FLO/VALVE/ COUP / PO32 0s
PROPANE / CLOGBUSTBR/ TORCH
TIRES/ PO3 2 04
RAW WTR SMALL DIAM. PIPELINE
TN SCOPE AUDIT SERVTCESi
TANNER HYDROELECTRIC/ PUBLIC
TREATED DF
PRINT/MArL INVOICES
SAFETY BOOT ALLOT\IANCE
MATLTNG LABELS
SM DIAMETER PIPE
T. C. /S .1,. Pt¡v{P STA 1&2
IMPELLER KTT/WITH AJUSTED INV.
Nr PPtE/ COUP/ quNvrpT PO317 9
SHORECARE PARTNER COVERAGE
IONE ï/'fTP EXPANSION
RACK STANDARD CAB PO3]-83
PRELIM FEE/2717 ,2688,268'7 ,2779
SUPERVISORS SAFETY BULLET]N
OFFICE SUPPLIES
REPLEN]SH POSTAGE MACHINE FUND
-PAGE2-
73.98
5, 695 . o0
469.12
4l
62
35 2 7I
59 l_ 5¿
I,02 2
13
I 2 3B
40 ,36 tr ,(
!,t4 6 11
T7 3 U¿
7
16
55
,07 2 35
35 0 51
I ,66 B
6/
B9
86
33,04 6 95
1 ¿.L 3 L3
atr 5 40
30 B 1B
455.83
24 .49
67 0 .56
893 .94
280.60
8,316.49
857.79
2 ,384 .72
4 ,24 3 .91
a1 0.00
o 4.77
31 4.50
L7 4 ,24 2.80
r0 ,92 0.00
46 B .98
'1 to 2.50
3 ,95 o.2t
10 0.00
18 9.00
15 8.75
20 ,69 7 .23
3 ,5'.77 .32
1,816 37
4,879 OU
l_3
, 181
OA
1,970
9, 000 00
1l- 8
56
505.37
3,000.00
AMADOR V.TATER AGENCY
ACCOI]NTS PAYABLtr L]ST
FOR PERIOD MAR
02, 2O]-5 THROUGH MAR 31, 2075
CHECK#
PAYEE
DESCRTPTT
75393
75394
75395
75396
RIEBES AUTO PARTS LLC
BATTERY
7
7
7
7
s397
5398
5399
5400
7540L
75402
75403
75404
75405
7 5406
7
7
5407
5408
75409
754L0
754t2
7 541,3
75424
75425
7
7
5426
5427
75428
75429
7 5430
7543L
75432
75433
75434
75435
7 5436
75437
75438
75439
75440
7544]75442
75443
75444
75445
7 5446
75447
75448
75449
75450
7545L
75452
75453
RMC TVATER AND ENVTRONMEN
ROBERT HAHN'S AUTOMOTIVE
SAFEGUARD PEST CONTROL
SGS HERGUTH LABORÀTOR]ES
JEFF
SHORTRTDGE
AMOUNT
CARVüSP PHASE
TT
PREDES]GN
REPLACED FRT BRAKE PADS/ROTORS
PEST CONTROL/ADMIN #3871
OÏL ANALYSTS PO31B1
STERRA, TRENCH PROTECT]ON
SÏMMONS LANDSCAPE COMPAN
STATES RECOVERY SYSTEMS
ALFRED AT,I,EN NUNES
SUTTER MEDTCAL FOUNDATTO
SVùEET PEA VENTURES INC
U.S. BANK NAT]ONATJ ASSOC
UNIVAR USA INC
UNIVERSA], BUTIJDING SERVT
UP-COUNTRY POOL CENTER
DOCUTVIENT MANAGEMENT/ SHREDDER
EQU]?MENT T.EASE PO3l-58
],ANDSCAPE MAINT
PAYMENT STEVE PARDO/3541 LAKE
CAR WASH FOR MARCH,
s
HESS MRN10508314 TX26/
PTÏMPED BUCKHORN
RAY MORGAN 2 /20
/ ]-5-3 /20 / 15
MONTHIJY JANITORL SERVTCES
HYPOCHLORITE PO3202
MURIATTC ACTD
VOLCANO COMMUNICÀTTONS G
KEN VAN DER VEEN
AUTO DTALER /
ACI/üA/JPTA
AFLAC
ARAMARK UNIFORM SERVTCES
FTDEI,TTY PROGRAM #FA- 023 032015
NZE ÏNC.
AT&T
PARTS
ATKINS NORTH AMERICA, IN
BRUSATOR] ENTERPRISES IN
G.A.M.S. INC
CA-NV SECTION
AV'ÌI\IA
CÐüI GOVERNMENT ]NC
CLEVERBRIDGE ]NC.
CWEA-TCP
EN POÏNTE TECHNOLOGIES
FEDERAL EXPRESS CORP.
S
GEORGE REED, ]NC.
GEORGE T. HALI, INC.
GOI.DEN STATE FLOI¡¡ MEASUR
GRAINGER INC.
HUNT & SONS INC
ACWA/.]PIA-HBA
KAMPS PROPANE TNC
I,EAF & COLE, LLP
NZE ÏNC.
MEEKS BTJILDING CENTER IN
MSCOM I,],C
METRO PRESORT ]NC
PAUIJ MOLINELLI
68
2,24L
00
175 00
3A2 32
TRAVEL/TRATNTNG
SHRED-TT USA LLC
ATI
1-11
27,307 10
NEWEGG BUSTNESS INC
NI,TNE ENERGY TNC
OCT I'IATER QUALITY ACADEM
2 0 9 29 5 53 49
REFUNÐ FOR PARTICTPAT]ON/METER
POI{ER EDGE R42 0/RETMBURSEMENT
FEBRUARY PREMTT]M #DC731
T]NIFORM SERVICE
cÄt NET 2 / C6022234r2777
BLADE
C.AMANCHE WTR STORAGE TANK
39 34
97.90
4,398.90
300.00
7, 054 .53
r57 .74
2L6 .00
800 .00
7, 579 o1
L, 278 .73
607 .00
36 .24
43 .11
Ttr 792 .00
6, 095 .66
698 .00
66s .36
802 .90
L7t .L6
?
CUTBACK
3/8
HONEYI¡¡ELL/
C
IRCULAR CHART
SENSUS SRTI WTR METER PO32T9
VALVE / pO3232 /CMMS 1_320
GASOLINE FOR MARCH
APRTL 2015 BENEFTT PLAN/INS
BALL
SHOP PROPANE
REVIEI^I/REVTSION BASED
PRO.fECT ONBOARDTNG
READY MTS CONC
UPON
800 soDrMM Po3230
PRTNT/MAIL INVOTCES
CK FOR CK 74036
I¡¡ITH UEFI BOTS
REPIJÄ,CEMENT
MOTHERBOARD
ENGTNEER]NG & DESIGN SERV]CES
SHORTRIDGE G]--2 REV]EW COURSE
PAGE
3
-
ÀÈ
95 .00
46 , ÕJ
TOT^IÏNG
TNSECT K]IJIJER
BACKFLOW REFRESHER/K. MILI,ER
RNW SPS SYMANTIC PROTECTION
MALWAREBYTES ENDPOINT SECURITY
GOSHORN MEMBERSHTP RENEI¡]AL
WTNPRO 8. 1 UPGRADE/PO3195
I,OCKBOX INFORMATION/REPORTS
23
979
195 .00
3, 322 .42
7, 686 .00
3L2 .00
t1. 328 .72
66 .62
) l_06 .53
110
.r7
L, 980 .98
2
571, AÊ
13l- 1a
78, 429 .09
334 .31
L, 480 .00
1,28 .75
42 .L2
564 .43
? 092 .10
!04 .16
E
847 .75
10, 925 .00
240 .00
12
.AMADOR IVATER AGENCY
ACCOUNTS PAYABLE
FOR PERIOD MAR
CHECK#
PAYEE
75454
PG&E
7
7
7
5455
5456
7
7
1,82633
251532
51_533
284931,
284932
284933
1130639
r826231
25L5032
5]-s 03 3
25l.52L5
25L5227
251_5313
25]-5327
300230i.
3
BOWES
SAGE DESIGNS ]NC
STERLTNG I¡IATER TECHNOI.OG
SUTTER MEDTCAL FOUNDAT]O
SWEET PEA VENTURES TNC
USA BIJUE BOOK DIV]S]ON O
WAGNER & BONSTGNORE INC
WILBUR-ELLIS COMPANY INC
TNTERNATJ REVENUE SERVTCE
TNTERNAL REVENUE SERVTCE
75463
75464
75465
L82632
2
PITNEY
5459
5460
75462
2
PACE SUPPLY CORP
QUIL],
75467
0023 10
25150227
251-50313
25t50327
CORPORATTON
ROBERT HAHN'S AUTOMOTTVE
P.E.R.S.
P.E.R.S.
ST. OF CALTF _
ST. OF CALIF _
ST. OF CAI,IF -
EDD
EDD
EDD
BANK OF ÄMERTCA
INTERNAT. REVENUE SERVICE
P.E.R.S.
P.E.R.S.
P.E.R.S.
P.E.R.S.
P.E.R.S.
P.E.R.S.
USDA RURAL DEVETJOPMENT
USDA RURAL DEVELOPMENT
P
P
P
MAR
31,
2OT5
DESCRIPTTON
5457
75458
L]ST
02, 2015 THROUGH
E.R.S
E.R.S
E,R,S
.AMOUNT
BUCKHORN TRMT PLT/1328406L37 4
PTPE VIRAP TAPE PO3226
MATLING SYSTEM/SVBB
OFFTCE SUPPLTES
1GüI5
OIL FILTER/ATR F]LTER
TRAI}ITNG/M. F]NCH
DRUMS PO321O
MTTJLER/TX28 / 27 0OO229
PORTABLE/GOOSE CREEK
FLAGS
WATER RTGHTS CONTRA,CI
PENDULUM AQUA CAP PO3198
D
FED/FICA/MED TAX hIH
FED/F]CA/MED WH
PERS 457 AND EE LOAN
PERS 457 AND EE LOAN
STATE TAX WH
STATE TAX WH
STATE TAX I^]H
PAYMENT
PMT
DWR ],OAN-RTDGE CLUSTER SYSTEM
FED/F]CAI MED WH
PERS
PERS
PERS
PERS
PERS
PERS
RETTREMENT- MISC
RETTREMENT- MISC
RETIREMENT- MTSC
RETIREMENT-CLASSIC
RETIREMENT- CLASSIC
RETTREMENT- CLASSIC
GS], ],OAN INTEREST
PAYMENT
USDA LOAN PAYMENT - LA IUEL
PERS RETIREMENT-PEPRA
PERS PEPRA RETTREMENT
PERS RETIREMENT- PEPRÄ
0
5s3 .8s
l-38.24
435.00
s13.16
243.56
1 6s0.00
1_, 872 .00
42 .00
135.00
LLs.32
L76.25
1 044 .90
29 6vt.¿t
31 600.90
3
3
4
A
5
242
) a,
.5t
tr,1
869.28
524 .6L
037.49
60, 209 .7 6
)a 920 .97
605 . 97
605 .97
605 .97
18, 043.68
18, 531.89
10 300 .47
L02, 7L6.7110 9t2 .00
l_
2
2
807.94
135 . 1_0
135.10
1,058,27L.54
TOTAL
PAGE 4
AMå.DOR WATER AGENCY
ACCOI'NTS PAYABLE LTST
FOR PERIOD MAR
02, 2015
THROUGI{ MAR
3L,
2OL5
CHECK#
PAYEE
DESCRIPTION
L066
1056
LIAM BAII,EY
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
r_068
CI{ARTJES
t067
IJTAM BAITJEY
SIERRA MOT]NTAIN CONST.
A.
CREE
I
GSL
CONSTRUCTTON
ST'RVEYTNG
TOTAL
AMOT]NT
0. 00
2L,937.50
333 , 840 .51
3, 675 . 00
359, 453
-PAGE1-
.
01_
Board Meeting¡ April ?Ji'rÃ)15
Consent Agenda ltem 2.8.1
STAFF REPORT
Declaring Surplus Property
Requested Action:
The Board declare the items listed on the attached sheet as surplus property and
authorize the General Manager to dispose of these assets in accordance with
Administrative Policy Manual Section 3120- Surplus Property
Alternatives:
None
Fiscal lmpact:
Revenue Generated by sale of surplus items
Reviewed bv Committee:
No
Recommendation:
The Board declare the items listed on the attached sheet as surplus property and
authorize the General Manager to dispose of these assets in accordance with
Administrative Policy Manual Section 3120- Surplus Property
Prepared bv:
Cris Thompson, Assistant General Manager
April 23,20L5
SURPLUS
VALUE
DIESEL WHACKER
VEHICLE 467
s200.00
s2,500.00
2OO1 FORD RANGER 4X4
HP COLOR LASER JET PRINTER
$40.00
WITH INK - NEEDS SERVICING
HP DESIGN JET PLOTTER WITH INK
s100.00
NEEDS SERVICING
SCANNER- WIDE FORMAT
s300.oo
CHAMELEON G6OO
2 DRAWER
FrLE CABTNET (2)
S1s.oo
4 DRAWER GREY FILE CABINET
s2s.00
4 DRAWER TAN
FILE CABINET
s2s.00
PIECE EXECUTIVE DESK AND
s20o.oo
5
OFFICE FURNITURE
EXECUTTVE DESK (2)
ss0.00
EACH
wooDEN
s7s.00
EACH
FrLE CABTNETS (2)
MISC OFFICE SUPPLIES
s200.00
5,n, I
RESOLUTION NO. 2OI5-09
OF THE BOARD OF DIRECTORS OF THE AMADOR WATER AGENCY
HONORING LOGAN MOODY FOR HIS AHIEVEMENT OF COMPLETING EAGLE
SCOUT SERVICE PROJECT. CAWP FIRE HYDRANT PAINTING
WHEREAS, at a time when this nation's young people face difficult challenges,
the Boy Scouts of America is one of this country's finest assets, providing youth an
educational program that contributes to their character development, citizenship training
and improved mental and physical fitness; and
WHEREAS, the highest rank a Boy Scout can attain is that of Eagle Scout and
Logan Moody, after considerable effort and diligent preparation willjoin the prestigious
Eagle Court of Honor this summer; and
WHEREAS, Logan Moody ís a member of Boy Scout Troop 63 in Jackson, CA.
His achievement includes many Merit Badges and the completion of the Eagle Scout
Service Project; and
WHEREAS, Logan's Eagle project greatly contributed to the betterment of his
community and the County of Amador, and reflected the true spirit of volunteerism, as
he lead a crew of eighteen in painting one hundred nineteen fire hydrants in zones one
through five of the Central Amador Water Project area, these hydrants were located in
roadways, high traffic areas and in fields. This project accounted for a hundred and
forty-eight hours of cleaning and painting;
NOW THEREFORE BE lT RESOLVED, by the Board of Directors of the Amador Water
Agency THAT WE HERBY APPLAUD AND HONOR Logan Moody on completing his
Eagle Scout Service Project. We extend to him our best wishes for every future success
in attaining his rank of Eagle Scout by summer 2015.
The foregoing resolution was duly passed and adopted by the Board of Directors of the
Amador water Agency at a meeting held on this 23rd day of April, 201s, by the
following vote:
Ayes:
Noes:
Absent:
Abstain:
signed and approved by me after its passage this 23rd day of Aprir 2o1s
ATTEST:
Richard L. Farrington, President
Cris Thompson, Clerk of the Board
*lBoY
scours oF AMERT.A'
Eagh S<out Scrvlcc Projcct Namr
Proi.ctrtÌtfu.
u20no14.
Pror.ctcomplrtlondrtc ln6n0ß
This report is to be completed after your service þroject has been concluded¡ lt is not necessary to provide lengthy
answers. Be prepared to dlscuss your project and thls repórt at your board of revlew.
Project Execution:
Once planning was completed, when did the work
begin?
8/20/2014
When was it
finished? jl26l2}ts
Project Description
Plcase provide a brief clescription of yclur cornplctecl project and the impact it will have.
I' with the maps and counsel of Amaclor Water Agency (AWA), organized groups of youth and a few adults to clean and
paint äre hydrants and cover them ¡n a reflectivê powder. These newly paiãteO'nyOránts are
much brighter in color, do
not blend in as well as the old color did, and with the reflective powder they are much more visibie at ñignt. rnis
wili helo
the community in reoards ro fire-Ttonters speed at which thev cen resoond erfectiveiv to house iires.
r-rescnbe what yeu ciic aiter you!'p!'opos3: was appreved to complele lhe planning
ot yr¡r¡¡r p!.ojef.
Seoufeo âr-lt area to checr. Io!' 3l!'eaay p!'ohlem hyc!.anrs enq! ro mike su!"e thet the ones !.napped cut we!"e eecesablle
and petntarrìe. use{ tne ''=agie :ìcount Ftnal plan,, r¡.,ot-!rsheet.
utlServalrons
tÀrL-+,..--¡.._-ilviitdL YYLI¡L ii(:¡l:
\,!heni..,eh da!.:r.gegrcr-rpof..,elr_rnteers'¡rcculdkncckclitzonesver;,qr-tickly.
What was challenging?
It was hard to get boys to volunteer. competing with sports, and it was hard working around some weather
in the winter months.
Changes
Many successful projects require changes from the original proposal. What significant changes did you make
and why did,you
make them (be brief)?
I had to reduce the number of boys or each work day as we simply didn't have the volunteers, had
to increase amount of work
day, and overall lengthen projected length ofproject.
Project Report Page A
Logan Moody
Leadership
ln what ways did you demonstrate leadership?
was the primary navigator, surveyed and quality-checked the boy's wor( delegated zones for boys to work ad managed the
groups, and gave directions on how to appropriately paint.
I
What was most dÍfficult about being the leader?
Making sure all hydrants were painted to the same standard, and getting to boys to have internal mot¡vation to do their best.
What was most rewarding about being the leader?
Camaraderie, knowing I was capable of bringing the group together myself,
What did you learn about leadership, or how were your leadership skills further developed?
I learned how to more effectiely and positively get others motivated. I also learned how to give more cohesive directions.
Materials, Supplies, Tools, Other
Were there significant shortages or overages of materials, supplies, tools, and other? lf so, what effect did this have?
There was a shortage of gloves toward the end of the project, so we ha to use paper towels and be very careful. This slowed us
down quite a bit.
Entering Service Project Data
Ihe B5A collects information on the hours
worked on Eagle Scout service projects* because it points to achievement of our
citizenship aím. To assist with the data collection, please refer to your list of people who helped and the number of hours they
worked. Then please provide the information requested below. lnclude hours spent doing planning underTotal Hours Worked.
Be sure
to include yourself, and the time spent on planning.
Number of
Total Hou¡s
Worked
Worker¡
The Eagle Scout candidate
Registered BSA youth members
Other youth (brothers,
siste¡s, ftîends, etc., who
are not
BSA members)
Registered B5A adult S<outing volunteers and leaders
Othe¡ adults (parents. grandparcnts.
I
28.00
12
81.00
1
4.00
5
35.00
19
148,00
etc., who ore not BSA members)
Grand Total of Hours (Enter hete and
on your Eagle Scout Ronk Apptícotion.)
+
There ls no requirement for a minimum number of hours that must be worked on an Eagle Scout service project.
lf you have been told you must meet a minimum number of hours then you rnoy lodge a complaint with your d¡sttict or council. tf you
hove given leadership to an otherwise worthy project and ate tumed down by your board of review solely because of a lack of hours,
you should appeal the decislon.
Project Report Page
B
Logan Moody
Fundlng
Descrlbe your fu ndralsing efforts:
Nofunds needed.
collected?
How much was
How much w¿s spcnt?
ffyour expcnses exceeded funds available, qplain why thls happened and how cxcess expcnses werc paid.
lf you had money lcft over after proJect completlon, dld you tum lt over to the proJcct beneflciary? lf 'No," when will that be
done, or if your beneficlary is not allowcd to accept the lcft over fr¡nds, which chadty will receive them?
How wcrc the donorsthanked?
Photo¡ rnd Odrcr Documontrtion
lf you have them, attach photographs taken before, during, and after proJect completlon. You may physically attach lctters, maps,
handout$ prlnted materlals, or similar items that might bc helpful to your board of revlcw.
Before
After
The boys keeping motivated
Teamworkpay:offt
ProjectReportPage C
Logan Moody
Beginning to palnt
Halñrvaytrough
Anothcr hydrant almost done
Hydrant Prep
Fq,
{
?
Even got
rcmc non-scout ìro{¡nteets
Somc hydrants realþ needcd the
work
Vcryvisiblc, bdght, a great increase in overall quality.
Project Report Page C - 2
Logan Moody
C¡ndldrtr'¡Prolnh
sþnbeluvbúorcyutseckthedherapprovals
On my honor as a Scout, I vms the leoder of ryy Eagle Sr;out scrlrícc proJcct and completed lt as reportcd he¡e.
l'Ìlgd//
Comphûlon Approvds
ssna=@4
tn my oryltnioa this Eagle
Bancf,ctawnamy
tf*n
9cwt selice projæt mees Eaglekout rquircment 5, as slatad on
tt¡ltteadarnømct
Af&øn h¡" lkn\olr
Z+Nü*-Ð*e: zleil¿gs srsned:
ProjcctReportFage
C-¡
Dat*l/uet¡;
poge 4 of thls
wo¡kbú-
Date:
Logan Moody
5 ß.1
INTER-OFFICE MEMORANDUM
TO:
AMADOR WATER AGENCY
FROM:
JOHN SILVA. SERGEANT
SUBJECT:
LOCAL HAZARD MITIGATION PLAN ADOPTION REQUEST
DATE:
o4l09lL5
CC:
An approved and updated Local Hazard Mitigation Plan (LHMP) is necessaryto maintain eligibilityfor
mitigation funding from the Federal Emergency Management Agency (FEMA). The development of
this plan involved multi-agency coordination and public meetings. Receiving no additional
comments, the draft plan was submitted to the California Governor's Office of Emergency Services
(Cal-OES) and FEMA for review pending formal adoption. FEMA has since advised that the LHMP is
eligible for final approval pending its adoption by the participating jurisdictions in the plan.
Please set this olan on vour sovernins bodv's aeenda as quicklv as possible with a request to pass a
resolution to adopt the plan. lt is also verv important that vou use the FEMA approved language in
the sample resolution attached to this memorandum.
Once you obtain your resolution adopting the LHMP, please email me a copy to:
[email protected]Ê at which point I will forward all of the participating jurisdictions resolutions
to
FEMA.
Please note that while most of the contents of your LHMP.binder were printed in black & white,
I
printedyourjurisdictional annexincolor. lfyouwishtoseetheentireplanincolor, lincludedacopy
of the plan on a CD located on the inside front cover of your binder.
lf you have any questions, please don't hesitate to contact me.
Thanks in advance & l'll look forward to receiving your resolution!
>-áy-w
U
-
Sergeant/Emergency Services Coordinator
isi lva (Ða m adorgov.org
John Silva
700 Court Street, Jackson,
CA
95642
Direct Office # - 209-223-6834
RESOLUTTON NO. 2015-10
OF THE BOARD OF DIRECTORS OF THE AMADOR WATER AGENCY
ADOPTING THE AMADOR COUNTY LOCAL HAZARD MITTGATION PLAN
Whereas, the Amador Water Agency recognizes the threat that natural hazards
pose to people and property within our community; and
Whereas, undertaking hazard mitigation actions will reduce the potential for
harm to people and property from future hazard occurrences; and
Whereas, the U. S. Congress passed the Disaster Mitigation Act of 2000
("Disaster Mitigation Act") emphasizing the need for pre-disaster mitigation of potential
hazards;
Whereas, the Disaster Mitigation Act made available hazard mitigation grants to
state and local governments;
Whereas, an adopted Local Hazard Mitigation Plan is required as a condition of
future funding for mitigation projects under multiple FEMA pre- and post-disaster
mitigation grant programs; and
Whereas, the Amador Water Agency fully participated in the FEMA-prescribed
mitigation planning process to prepare this local hazard mitigation plan; and
Whereas, the California Office of Emergency Services and Federal Emergency
Management Agency, Region lX officials have reviewed the Amador County Local
Hazard Mitigation Plan and approved it contingent upon this official adoption of the
participating governing body;
Whereas, the Amador Water Agency desires to comply with the requirements of
the Disaster Mitigation Act and to augment its emergency planning efforts by formally
adopting the Amador County Local Hazard Mitigation Plan;
Whereas, adoption by the governing body for the Amador Water Agency
demonstrates the jurisdiction's commitment to fulfilling the mitigatíon goals and
objectives outlined in the Local Hazard Mitigation Plan.
Whereas, adoption of this legitimacies the plan and authorizes responsible
agencies to carry out their responsibilities under the plan.
Now, therefore, be
it
resolved, that the Amador Water Agency adopts the
Amador County Local Hazard Mitigation Plan as an official plan; and
Be it resolved, that the Amador Water Agency adopts the Amador County Local
Hazard Mitigation Plan by reference into the safety element of their general plan in
accordance with the requirements of AB 2140; and
Be it further resolved, the Amador Water Agency will submit this adoption
resolution to the California Office of Emergency Services and FEMA Region lX officials
to enable the plan's final approval in accordance with the requirements of the Disaster
Mitigation Act of 2000 and to establish conformance with the requirements of AB 2140.
The foregoing resolution was duly passed and adopted by the Board of Directors of the
Amador Water Agency at a meeting held on this 23rd day of April, 2015, by the
following vote:
Ayes:
Noes:
Absent:
Abstain
signed and approved by me after its passage this 23rd day of April 2015.
ATTEST
Richard L. Farrington, President
Cris Thompson, Clerk of the Board
Annex F AmnooR Wnren AcENcY
F.1 lntroduction
This Annex details the hazard mitigation planning elements specific to the Amador Water
Agency, a participating jurisdiction to the Amador County LHMP Update. This annex is not
intended to be a standalone document, but appends to and supplements the information contained
in the base plan document. As such, all sections of the base plan, including the planning process
and other procedural requirements apply to and were met by the Agency. This annex provides
additional information specific to the Amador ÏVater Agency, with a focus on providing
additional details on the risk assessment and mitigation strategy for this community.
F.2 Planning Process
As described above, the Agency followed the planning process detailed in Section 3.0 of the base
plan. ln addition to providing representation on the Amador County Hazard Mitigation Planning
Committee (HMPC), the Agency formulated their own internal planning team to support the
broader planning process requirements. Internal planning participants included staff from the
following Agency departments :
a
Chris McKeage, Operations Manager
Additional details on plan participation and Agency representatives are included in Appendix A.
F.3 Agency Profile
The profile for the Amador Water Agency is detailed in the following sections. Figure F.l
displays a map and the location of the Amador Water Agency service area within Amador
County.
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Annex F.1
Ðeé
Figure
F.1.
Amador Water Agency Service Area Map
tA MEL
CITY OF
I
YMOUTH
OW'l
D
srr
S.H.C
¡l
PINE
P.G.
,Í.
i
L
tt,,,
TÂBXÂtt!
Source: Amador County Water Agency Urban Waier Management Plan, 2011
F.3.1 History and Background
In 1959, the Amador Water Agency (AWA) was formed for the purpose of providing water and
wastewater services to the residents of Amador County. The AWA is the main water supplier
for the western portion of Amador County. The Agency has two sources of water: surface water
and groundwater. Surface water accounts for approximately 94o/o of total supply.
The primary source of consumptive water is the Mokelumne River which is supplied from
rainfall and snowmelt from the Sierra Mountain Range. This water is diverted from the Tiger
Creek afterbay or Lake Tabeaud forebay and then either it gravity flows or is pumped to AWA
treatment plants. The Agency's two main water systems are the Amador Water System (AWS)
and the Central Amador Water Project System (CAWP). The Agency supplies drinking water to
the communities of Jackson, Ione, Sutter Creek, Amador Clty, Drytown, Plymouth, the
communities along the Highway 88 corridor, and the Lake Camanche and LaMel Heights areas.
The agency is located on Ridge Road in Sutter Creek; however, their assets are located
throughout the County and beyond.
Agency)
Update
January 2014
Annex F.2
afnep
Water Sources
The North Fork of the Mokelumne River, located in the Califomia Sierua Nevada Mountains, is
the primary source for the CAWP system, the AWS, and the PG&E Tiger Creek Powerhouse
system. Water supplied from rainfall and snowmelt is stored in Tiger Creek Afterbay and
gravity feeds to the PG&E Tiger Creek Powerhouse Memcor Plant where it is treated and serves
the PG&E Conference Center. Water from the Tiger Creek Afterbay is also pumped to the
Buckhorn Water Treatment Plant where it is treated and ready for use by Agency customers in
Pine Grove, Pine Acres, Sunset Heights, Fairway Pines, Jackson Pines, Pioneer, Gayla Manor,
Ranch House Estates, Pine Park East, Toma Lane, Sierra Highlands, Silver Lake Pines,
Ridgeway Pines, Rabb Park, and Mace Meadows. Water from the Mokelumne River is also
stored in Lake Tabeaud and conveyed by pipeline to the Tanner Water Treatment Plant where it
is treated for use by the customers of Jackson, Sutter Creek, Amador City, Dr¡own, and
Plymouth. The Ione Pipeline transports raw water from the Tanner Reservoir to the Ione Water
Treatment Plant where it is treated for use by customers of Ione. The Agency's La Mel Heights
customers get their water from a pair of wells located in the La Mel Heights Subdivision and
Lake Camanche residents get their water from three wells located in the Lake Camanche area.
Recently the agency acquired the small, membrane water treatment plant form PG&E at the
Tiger Creek Power Plant.
F.3.2 Population
The population served by the Agency is in excess of 25,000.
F,4 Hazard ldentification and Summary
This section details how the risk varies across the Amador County planning area. The Agency's
planning team identified the hazards that affect the Agency and summarized their frequency of
occurrence, spatial extent, potential magnitude, and significance specific to the Amador Water
Agency (see Table F.1). In the context of the plan's planning area, there are no hazards that are
unique to the Agency.
Information on past occuriences and the likelihood of future occuffences is detailed in Section 4,
Risk Assessment, of the base plan. Additional information for high and medium significant
hazards for the Agency is included in the Vulnerability Assessment section of this Annex.
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Annex F.3
ame&
Table
F.1.
Amador Water Agency Hazard ldentification Table
Hazard
Geographic
Extent
Probability of Future
Occurrences
Magnitude/Severity Significance
Avalanche
Limited
Unlikely
Negligible
Low
Dam Failure
Limited
Unlikely
Limited
Medium
Drought
Significant
Likely
Limited
Medium
Earthquake
Limited
Occasional
Limited
Medium
Floods: 100/500 year
Limited
Unlikely
Negligible
Low
Floods: Localized/Stormwater Limited
Unlikely
Negligible
Low
lnvasive Species: lnsecVPests Limited
Unlikely
Negligible
Low
Landslide/Debris Flows
Limited
Likely
Negligible
Medium
Land Subsidence
Limited
Unlikely
Negligible
Low
Levee Failure
Limited
Likely
Negligible
Low
Limited
Unlikely
Negligible
Low
Severe Weather: Extreme
Heat
Limited
Unlikely
Negligible
Low
Severe Weather: Fog
Limited
Likely
Negligible
Low
Severe Weather: Heavy rain,
thunderstorm, hail, and
lightning
Limited
Likely
Limited
Low
Limited
Unlikely
Negligible
Low
Limited
Likely
Negligible
Low
Severe Weather: Winter Storm Limited
and Freeze
Likely
Limited
Medium
Wildfire
Significant
Likely
Critical
Medium
Volcanoes
Limited
Unlikely
Negligible
Low
Marine lnvasive
Species
Severe Weather:
Tornado
Severe Weather: Wind
Geographic Extent
Limited: Less than 10% ol planning area
Significant: 10-50% of planning area
Extensive: 50-100% of planning area
Probability of Future Occurrences
Highly Likely: Near 100% chance of occurrence in
next year, or happens every year.
Likely: Between 10 and 100% chance of
occurrence in next year, or has a recurrence
interval of 10 years or less.
Occasional: Between 1 and 10o/o chance of
occurrence in the next year, or has a recurrence
interval of 11 to '100 years.
Unlikely: Less than 1% chance of occurrence in
next 100 years, or has a recurrence interval of
greaterthan every 100 years.
Amador County (Amador Water Agency)
Local Hazzrd Mitigation Plan Update
January 2014
Magnitude/Severity
Catastrophi+More than 50 percent of property severely
damaged; shutdown of facilities for more than 30 days; and/or
multiple deaths
Critical-25-50 percent of property severely damaged;
shutdown of facilities for at least two weeks; and/or injuries
and/or illnesses result in permanent disability
Limited-10-25 percent of property severely damaged;
shutdown of facilities for more than a week; andior
injuries/illnesses treatable do not result in permanent disability
Negligible-Less than 10 percent of property severely
damaged, shutdown of facilities and services for less lhan 24
hours; and/or injuries/illnesses treatable with first aid
Significance
Low: minimal potential impact
Medium: moderate potential impact
High: widespread potential impact
Annex F.4
arneé
F.5 Vulnerability Assessment
The intent of this section is to assess Amador Water Agency's vulnerability separate from that of
the planning area as a whole, which has already been assessed in Section 4.3 Vulnerability
Assessment of the base plan. This vulnerability assessment provides an inventory of the
population, property, and other assets owned by the Agency and further analyzes those assets at
risk to identified hazards ranked of medium or high signifîcance (as listed in Table F.1) to the
community. For more information about how hazards affect the County as a whole, see Chapter
4 Risk Assessment in the main plan.
F.5.1 Total Assets at Risk
This section identifies Biggs's total assets at risk, including values at risk, critical facilities and
infrastructure, natural resources, and historic and cultural resources. Growth and development
trends are also presented for the community. This data is not hazard specific, but is
representative of total assets at risk within a community.
Values at Risk
Significant assets directly within the each district include a range of properties and infrastructure.
These may include District-owned property and infrastructure. An inventory of key district
assets is provided in Table F.2. Total value of these assets exceeds $24 million for the Agency.
Table
F.2.
Key Assets in the District
Replacement
Value
Service Area
Facility type
Facility Name
AWS/Ione
Pump Station
Preston Pump Station
AWS/Ione
Tank
Prison Tank
AWS/Ione
WTP
lone WTP
$2,245,726
AWS/Sutter Creek
AWA
Admin Offices and Shop
$1,626,073
$77,516
$599,880
AWS/Sutter Creek
Pump Station
Ridge Pump Station
$186,6'17
AWS/Sutter Creek
Pump Station
Canal Bypass Pump Station
$386,008
AWS/Sutter Creek
Pump Station
Trent Pump Station
$161,941
AWS/Sutter Creek
Pump Station
Airport Pump Station
$168,296
AWS/Sutter Creek
Supply Pump
Lake Tabeaud Canal Supply
AWS/Sutter Creek
Tank
Ridge Tank, bolted steel
AWS/Sutter Creek
WTP
TannerWTP
AWS/Sutter Creek
WTP
Tanner Reservoir
Camanche
Lift Station
Lift Station A
Camanche
Lift Station
Lift Station B
$49,475
Camanche
Lift Station
Lift Station C
$260,393
Camanche
Lift Station
Lift Station D
$125,101
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
Jatnary 2014
$50,000
$210,267
$1,768,583
$249,883
$49,475
Annex F.5
afneÉ
Replacement
Facility type
Facility Name
Camanche
Pump
Well#10
$137,235
Camanche
$353,744
Service Area
Value
Tank
124,12b Wood Storage Tank
Camanche
Tank
#6 Storage Tank, wood
$44,527
Camanche
Tank
Well #9 Storage, wood
$129,871
Camanche
Tank
Tank#10, redwood
$197,310
Camanche
Tank
Tank #9 Storage, redwood
$197,310
Camanche
Tank
Tank #8, redwood
Camanche
Tank/Booster Pump
Tank 8, bolted steel
$122,717
Camanche
Warehouse
Camanche Warehouse
$507,983
Camanche
Well
Well#12
$628,774
Camanche
Well
Well#6
$112,386
Camanche
Well
Well#14
$128,720
Well#9
$62,026
Camanche
Camanche
Well
\
\ /TP
^
Buckhorn WïP
Camanche
$94,650
$136,821
CAWP system
^^/TP
Buckhorn WTP
CAWP system
Storage Shed
CAWP system
Tank
CAWP system
Tank
McKenzie Tank, bolted steel
$45,7ô4
CAWP system
Tank
Madrone Tank, bolted steel
$54,669
CAWP system
Tank
Frank's Tank, welded steel
$113,841
CAWP system
Tank
CSA 2 Tank 1, wood
$71,738
CAWP system
Tank
Jackson Pines , bolted steel
$94,032
CAWP system
Tank
Mace Meadows #5 Tank, bolted steel
$85,250
CAWP system
Tank
CAWP Tank, bolted steel
$64,718
CAWP system
Tank
Rabb Park Tank, bolted steel
$61,2s5
CAWP system
Tank
Sunset Heights Tank, welded steel
$107,637
CAWP system
Tank
Tank C, redwood
$142,240
CAWP system
Tank
Mace Meadows #3, redwood
$116,914
CAWP system
Tank
Mace Meadows #4, bolted steel
$97,000
CAWP system
Tank
Alpine Tank #2, welded steel
$228,820
CAWP system
Tank
Tank B Storage Tank, bolted steel
$128,016
CAWP system
Tank
Tank A Storage Tank, welded steel
$424,245
Chlorine Station
Eaglesnest Chlorine Station
$6,166
Gayla Manor\Mly'TP
s47,611
Eaglesnest
Gayla Manor
LaMel Heights
\
$6,897,917
Storage Shed
$35,1 1 6
Alpine Tank
$53,185
1
^¡/TP
Pump Station
LaMel Hts Pump Station
$135,313
$104,199
Tank
LaMel Hts Tank, bolted steel
Martell
Lift Station
Martell Lift Stations
Martell
Lift Station
Wal-Mart Lift Station
$68,028
Martell
Lift Station
Kmart Lift Station
$68,028
LaMel Heights
Amador County (Amador Water Agency)
Local Hazard Mitigation Plari Update
Ianuary 2014
$1,182,196
Annex F.6
ame&
Replacement
Service Area
Facility type
Facility Name
Martell
Lift Station
Lift Station 'l
$142,240
Martell
Lift Station
Lift Station 2
$161,535
Martell
Lifl Station
Sierra West Lift Station
$68,028
Martell
Value
Lift Station
Amador Central List Station
$74,212
Mt Crossman
Pump Station
Mt. Crossman Pump Station
$75,383
Pine Acres
Pump Station
Pine Acres Pump Station
Pine Acres
Tank
Pine Acres tank, wood
$129,871
Pine Acres
Tank
Pine Acres tank, wood
$129,871
Tank
Pine Acres tank, welded steel
$299,074
Pine Acres
$41,495
Ranch House
Pump Station
Ranch House Pump Station
Ranch House
Tank
Ranch House Tank, bolted steel
Raven Rd
Vault
Raven Rd Vault Pit A & B
Ridge Rd
Lift Station
Ridge Lift Station
Tank
Ridgeway Pines Tank, Redwood
$82,870
$31,936
Ridgeway Pines
Rocky Lane
$45,566
$463,825
$31,936
$185,530
Pressure Regulating Station
Rocky Lane Pressure Sta.
Silver Lake Pines
Pump Station
SLP Pump Station
Tiger Creek
Pump Station
Tiger Creek Pump Station
$424,936
Total
$489,059
$24,380,573
WTP - Water Treatment Plant
\ A¡/TP - Wastewater Treatment Plant
Growth and Development
The Amador Water Agency expects population in the service area to increase. Future
development in the service area is shown in Table F.3.
Table
F.3.
Current and Projected Population
Service Population
2010
2015
2020
2025
2030
25,640
27,880
30,448
33,374
36,766
F.5.2 Priority Hazards: Vulnerability Assessment
This section provides the vulnerability assessment, including any quantifiable loss estimates, for
those hazards identified above in Table F.l as high or medium significance hazards. Impacts of
past events and vulnerability of the Agency to specific hazards are further discussed below (see
Section 4.1 Hazard Identification for more detailed information about these hazards and their
impacts on the Amador County planning area). Methodologies for calculating loss estimates are
the same as those described in Section 4.3 of the base plan. In general, the most vulnerable
Amador County (Amador Water Agency)
Local Haza¡d Mitigation Plan Update
January 2014
Annex F.7
AfrEæ
structures are those located within the floodplain, in the wildland urban interface, unreinforced
masonry buildings, and buildings built prior to the introduction of modem building codes.
An estimate of the vulnerability of the Agency to each identified hazard, in addition to the
estimate of risk of future occurrence, is provided in each of the hazard-specific sections that
follow. Vulnerability is measured in general, qualitative terms and is a summary of the potential
impact based on past occurrences, spatial extent, and damage and casualty potential. It is
categorized into the following classifications
a
3
a
a
G
:
Extremely Low-The occurrence and potential cost of damage to life and property is very
minimal to nonexistent.
Low-Minimal potential impact. The occurrence and potential cost of damage to life and
property is minimal.
Medium-Moderate potential impact. This ranking camies a moderate threat level to the
general population and/or built environment. Here the potential damage is more isolated and
less costly than a more widespread disaster.
High-Widespread potential impact. This ranking carries a high threat to the general
population and/or built environment. The potential for damage is widespread. Hazards in
this category may have occurred in the past.
Extremely High-Very widespread with catastrophic impact.
Dam Failure
Vulnerability to Dam Failure
Likelihood of Future Occurrence-Occasional
Vulnerability-Medium
The Agency owns the Ione Canal Dam, the Gayla Manor wastewater storage pond dam, and the
Lake Camanche wastewater storage pond dam, all of which are low hazard dams. The primary
risk involves property and potential environmental damage.
Drought
V u I n erabil
ity to Dro u ght
Likelihood of Future Occurrence Occasional
Vulnerability-Medium
Surface water accounts for approximately 94o/o of the Agency's total water supply. Surface water
is the sole supply source for both the Amador Water System (AWS) and the Central Amador
Water Project (CAWP) and is obtained from the Mokelumne River watershed. The Agency's
main water supply is the Mokelumne River, a snow- and rain-fed river originating in the Sierra
Nevada. The Mokelumne River watershed is a relatively narrow and steep watershed located
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Annex F.8
arneé:
northeast of the Sacramento-San Joaquin Delta on the western slope of the Sierra Nevada. The
watershed, upstream of Camanche Dam, covers an area of 627 square miles and extends from
Highland Peak (elevation 10,934 feet above sea level) near the crest of the Sierra Mountains to
Camanche Reservoir (elevation 235 feú above sea level) looated in the lower western foothills
near Clements.
Annual precipitation (rainfall and snowfall) in the Mokelumne fuver Watershed, and thus river
runoff, is extremely variable in Northem California. Within a year, precipitation is highly
seasonal with most precipitation normally occurring between November and May and very little
occurring between late spring and fall. Peak flows in the Mokelumne River normally occur
during winter storms or during the spring snow-melt season from March through June. River
flows decrease to a minimum in late summer or fall.
Amador County has a varying range of temperature and precipitation. The Sierra Nevada foothill
areas experience hot, dry summers and mild winters. The higher elevations, about 5,000 feet,
experience long and severe winters accompanied by heavy snowfall. The Agency is the main
water purveyor for the western portion of Amador County. The Agency has the legal jurisdiction
to serve water throughout Amador County
Relatively high water losses have been historically attributed to the Agency's raw water ditch
conveyance and delivery system, specifically the Amador Canal and Ione Canal. The new
Amador Transmission Pipeline, completed in July 2007, replaced the majority of the conveyance
requirement for the canal by constructing a 33-inch pipeline between Lake Tabeaud and the
Tanner Reservoir. The new pipeline mitigates for water historically lost during conveyance
through the Amador Canal, lowering effective system demand and allowing the Agency to more
efficiently use its water entitlements. Also, by eliminating canal losses, the Agency has been
able to better identify residential, commercial and industrial losses.
Agency operational experience during normal, dry and multiple dry year conditions, such as
1988 to 1994, indicates that the spring runoff will continue to fill PG&E reservoirs to near
capacity. These reservoirs form the head of both the AWS and CAWP surface water diversions.
Even during unusually severe droughts, such as occurred in 197611977, and the prolonged
drought of 1988 to 1994, the PG&E storage capacity and the priority of the water rights for such
storage enables PG&E to deliver the full annual contract entitlements to the Agency. For the
limited groundwater sources utilized by the Agency, the firm yield determined at the time of well
installation indicates that the supply is consistent for normal, dry or multiple dry years. Climatic
change is not considered to be a factor in the Agency's water supply reliability.
The original La Mel Heights groundwater well has been run continuously through a variety of
seasonal and climatic conditions and has continued to produce a steady yield. The Agency added
a second well in the La Mel Heights area to provide additional supply as well as to provide
redundancy.
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Annex F.9
am€r*
The Agency has completed a Groundwater Sustainability Study for the Lake Camanche Village
service area, as directed by the State Department of Public Health (CDPH). To date, the water
Cosumnes Sub-basin that supplies Lake Camanche Village has supplied sufficient water, but it
should be noted that the Agency did not receive ownership of the system until 2001, therefore
supply data for dry and multiple dry years is not available. With the existing four (4) wells and
the requirement to be able to take the largest producing well (well 14) off line, there is limited
ability to extend services.
Earthquake
Vulnerability to Earihquake
Likelihood of Future Occurrenc*Occasional
Vulnerability-Medium
Due to the Agency's geographic location and the areas seismic classification, service intemrption
due
to seismic activity is considered minimal and is therefore not
addressed in the Emergency
Handbook.
Landslide/Debris Flows
Vulnerability to Landslide/Debris Flow
Likelihood of Future Occurrence-Occasional
Vulnerability-Medium
Landslides in Amador County include a wide variety of processes resulting in downward and
outward movement of soil, rock, and vegetation. Common names for landslide types include
slumps, rockslides, debris slides, lateral spreading, debris avalanches, earth flows, and soil creep.
Although landslides are primarily associated with slopes greater than 15 percent, they can also
occur in relatively flat areas and as cut-and-fiIl failures, river bluff failures, lateral spreading
landslides, collapse of wine-waste piles, failures associated with quamies, and open-pit mines.
Landslides may be triggered by both natural- and human-caused activity. Landslide prone areas
in Amador County are shown in Figure F.2. District boundaries are approximate.
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Annex F.10
afneé
Ftr>
qãi
l!
b sP
(ct
È
$'å
s^
ç
o
u Ho
T
<q
å¡
le
oar
Ðl
Þ
EL DORADO
5o
-Yj
Þè
5Þ
t
È>
!l oa
ALPINE
!t
CL
o
o'
o
3
Ât
J
Legend
='
rct
ndslidès
t-
z
Lâ
U
ã
Lândslide lncidence
Þ
iri
¡-*
o,
É.
()
tt
I r"ì.
Ç
o
I
Moderate
o,
¡r¡gh
lncidèncê & Susæptib¡lity
t'"Í'
Ama-dor'
öounty
CALAVERAS
r
*!
I
SAN
o
3
o
"h
amec.
0
Map cmpiled 10/2012t intended útr planning purpæes onlyDâ1â Source:Amador Comty. CALAï,qS. U,S. Geological Surey
X
FJ
10
r
-- r Mode¡ate Suscept¡bility
fïT HigÌt susceptibitity
i icombGHigh
---{- Râ¡lroads
CL
(Í,
CL
o
J
e.
CL
Primary Roâds
-* Highways
- o Communities
[---l spn r"" of lnlænce
i--l city t-¡-it"
fJcomties
20 Mlles
A
o
J
o
o
In 2005, the north side of Ridge Road near Sutter Creek failed. A landslide took out 300 feet of
water supply ditch. This supply fed 6 cities/towns. The area was affected for one week. No
towns were out of water due to the conservation, stored reserves of water and quick action. No
one was completely out of water. Primary water supply is now delivered via pipeline.
Severe Weather: Winter Storm and Freeze
Vulnerability to Severe Weather: Winter Sform and Freeze
Likelihood of Future Occurrence-Occasional
Vulnerability-Medium
to
excessively cold temperatures are identifìed normally on a nation-wide
assessment scale, which doesn't allow detailed results on specific structures. Secondary impacts
of freeze can affect the supporting mechanisms or systems of a community's infrastructure. For
example, when extreme cold is coupled with high winds or ice storms, power lines may be
downed, resulting in an intemrption in the transmission of that power shutting down electric
furnaces, which may lead to frozen pipes in homes and businesses, such as the Amador Water
Areas prone
Agency.
Like most weather events, periods of heavy snow occur on an annual basis in the higher
elevations of the County. Impacts to the County as a result of winter snow storms include
damage to infrastructure, utility outages, road closures, traffic accidents, and intemrption in
business and school activities. Also of concern is the impact to populations with special needs
such as the elderly and those requiring the use of medical equipment. Delays in emergency
response services can be of significant concem. Further, there are economic impacts associated
with areas prone to heavy snow. Although the eastem portion of the County is the most
vulnerable to the effects of snow, snowfall occurring in the lower elevations can create
significant issues, as they may not be as prepared for snowfall.
In 2003 a severe winter storm hit near Pioneer. Downed powff lines were widely reported.
There were road and school closures. The power outage affected the Agency's ability to run the
water treatment plant and pump stations that pump the water to the required service areas.
Wildfire
Vulnerabil ity to Wil dfi re
Likelihood of Future Occurrence-Occasional
Vulnerability-Medium
fre
hazards are most pronounced in rural-urban interface areas, or where urban
development is located close to open space areas where vegetation serves as fuel. Calculation of
threat from wildfire hazard is based on a number of factors including fuel loading (vegetation),
topography, and climatic conditions such as winds, humidity and temperature, as well as the
Wildland
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
Januæy 2014
Annex
F.l2
afneÉ
proximity of structures and urban development to fire hazards. Generally speaking, the late
summer and early fall, when vegetation is at its driest, are the periods of greatest risk for
wildland fire. Huma¡ activity, including residential and agricultural burning, careless disposal of
cigarettes, campfires, arson and use of fireworks can all trigger fires; natural causes such as
lightning strikes may also be a cause. Figure F.3 maps the wildfire threat to the County, with the
District circled in black. Most of the district is in the moderate to high fire threat risk category,
with some areas considered very high.
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Annex F. 1 3
AfrFÉ
:rt
>
5ã3
f!
(cI
Þ gå
FO
\:
ñsÄ
o
,È
èCLE
|
)+zt¡
?.2
mf
s-. Ë
oia
5o
øl
-Tt
...¿.
fÐ
('1,,,rrrr
...
pr,
l.¿It
r,,.
E
:)
Þ¿
5Þ'
t
õ
-*
=:
o
*c
È>
9qe
@g
ELDO.RADO
|
//!/y' /,
ßf"
. r,ir:Á,t.\ u
@
,r,trt'
o
(D
=.
Cos
I
l;//,5)uirçr
o
Þ
o
tz
U
3
s)
CL
o
4
É.
ß
a
'
|4d;
il,.. ¡,,rt k
ll
irr'¡
s€
"kl!"""'I
o
TUOLUMNE
"2..
(cI
,,¿.:4))2.,.
Fhe Severity Zones
CALAVÊRAS
Í,
ar
[ffi
Moderale
Non-Wldland/Non-Urban
Urban Unzoned
SAN
Rivers
l'---l
-
o
3
ó
1
afnectr
5
@
X
Fr
Map conpiled 10/2012; intended for planning purpûses only.
Ð*a Souce: Amãdor County, CALATIáS"
CALFIRE: SRA1Iã/2007. LRA 5/2008. FRA.4-RA8/2007 Oraft
10
+
very High
High
,T
R¡s¿rr,r/¡'
o
o
Legend
Railroads
Primary Roads
Ø
a
l---l
Highways
o
Communilies
_?.
[]-l
city r-i.it"
spnur". or lnfluence
o
o
Þ
a
o
gt
Counties
1"k".
20 M¡les
À
In 2007 , a wildfire occurred twenty miles east of Pioneer. Roads were closed and forested areas
damaged. There was an increase in water turbidity but it was manageable even with the short
loss of power.
F.6 Gapability Assessment
Capabilities are the programs and policies currently in use to reduce hazard impacts or that could
be used to implementhazard mitigation activities. This capability assessment is divided into five
sections: regulatory mitigation capabilities, administrative and technical mitigation capabilities,
fiscal mitigation capabilities, mitigation outreach and partnerships, and other mitigation efforts.
F,6.1 Regulatory Mitigation Capabilities
Table F.4 lists regulatory mitigation capabilities, including planning and land management tools,
typically used by local jurisdictions to implementhazard mitigation activities and indicates those
that are in place in the Amador Water Agency service area.
Table
F.4.
Amador Water Agency Regulatory Mitigation Capabilities
Regulatory Tool (ordinances, codes,
plans)
Y/N
General plan
N
Zoning ordinance
N
Subdivision ordinance
N
Growth management ordinance
N
Floodplain ordinance
N
Other special purpose ordinance
(stormwater, steep slope, wildfire)
July 2,
N
BCEGS Rating
N
Fire department ISO rating
N
Erosion or sediment control program
N
Stormwater management program
N
Site plan review requirements
N
Capital improvements plan
N
Economic development plan
N
Local emergency operations plan
N
Plans
N
Elevation certificates
N
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Amador Water Agency Water Code
N
Flood insurance study or other
engineering study for streams
Other
Comments
2007
Building code
Community Wildfire Protection
Date
2011
2010
Urban Water Management Plan
Water Conservation Plan
Annex F.15
afne#
Urban Water Management Plan (201'll
The Urban Water Management Plan was prepared in accordance with the Urban Water
Management Act. The Act is defined by the California Water Code, Division 6, Part 2.6, and
$$10610 through $$10657. The Act became part of the California Water Code with the passage
of Assembly Bill 797 duringthe 1983-1984 regular session of the California legislature. The Act
requires urban water suppliers providing municipal water to more than 3,000 connections or
supplying more than 3,000 ac-ft of water annually to adopt and submit a plan every five years to
the Califomia Department of Water Resources (DWR).
Amador Water Agency provides potable and raw water to more than 25,000 people for
municipal, industrial, and irrigation uses as well as wastewater collection and treatment services
to meet the needs of our customers. While demands for Agency water have flattened during this
recession, the Agency intends to use this UWMP to manage the Agency's water supplies and
water demands over a range of normal and emergency conditions.
The Agency is committed to maximizing available water resources and minimizing the need to
obtain additional water supplies. The Agency has done this and will continue to do this by
utilizing water management tools and developing strategic partnerships with upstream,
downstream, and nearby agencies and districts.
Water Conservation Plan (November 2010)
Efficient use of existing water supplies is extremely important to Amador Water Agency. In
reflection of this philosophy, the Agency has developed this Conservation Plan, building upon
conservation strategies identified and documented in the Urban Water Management Plan with the
'Water
intent to further extend the Agency's water resources. Amador
Agency is committed to
maximizing available water resources and minimizing the need to obtain additional water
supplies. The Agency has done this, and will continue to do so, by utilizing water management
tools and developing strategic partnerships with upstream, downstream, and nearby agencies and
districts. Further, the Agency is committed to working with the public to facilitate regional
water management efforts and to educate regarding the importance of water conservation. The
Agency predicts that, by working with their numerous partners and implementing the programs
described in this Conservation Plan, they will be able to continue managing and efficiently using
their existing water supply sources through at least the year 2030.
Water Code (Revised July 2, 2007)
The Amador Water Agency Water Code sets out the general policies for operating its water
system. The Water Code delineates the specifics of how the Agency runs day to day operations,
as well as its rules and regulations. Voluntary and mandatory water conservation measures
during drought situations are set forth.
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
A¡nex
F. 1 6
arneé
F
.6.2 Adm in istrative/Techn ical Miti gation Gapabi I ities
Table F.5 identifies the Agency department(s) responsible for activities related to mitigation and
loss prevention in the Amador Water Agency service area.
Table
F.5.
Amador Water Agency Administrative and Technical Mitigation Capabilities
Yes/No
Personnel Resources
Planner/Engineer with knowledge of land
developmenUland management practices
Engineer/Professional trained in
construction practices related to buildings
andior infrastructure
Planner/Engineer/Scientist with an
understanding of natural hazards
Y
Engineering
Y
Engineering
Y
Engineering
Full time building official
Y
Y
Floodplain Manager
N
Emergency Manager
Y
Grant writer
N
Other personnel
N
Personnel skilled in GIS
GIS Data
-
Hazard areas
DepartmenUPosition
Engineering
Building Department
Amador County
County OES
Amador County
N
GIS Data - Criticalfacilities
N
GIS Data GIS Data -
Building footprints
N
Land use
Y
Engineering
Links to Assessor's data
Y
Engineering
GIS Data
Gomments
Warning Systems/Services (Reverse 9-1
cable override, outdoor warning signals)
1, Y
Administration
Other
F.6.3 Adm
i
n
istrative/Tech nical Miti gation Capabi I ities
Table F.6 identifies the department(s) responsible for activities related to mitigation and loss
prevention in the Amador Water Agency service area.
Table
F.6.
Amador Water Agency Fiscal Mitigation Capabilities
Accessible/Eligible to
Financial,Resources
Use (Y/N)
Comments
Comm unity Development Block
Grants
Capital improvements project
fu
nding
Authority to levy taxes for specific
purposes
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
Jarnary 2014
By voter approval
Annex F.i7
ame&
Accessible/Eligible to
Financial Resources
Use (Y/N)
Comments
Fees for water, sewer, gas, or
electric services
lmpact fees for new development
lncur debt through general obligation
bonds
lncur debt through special tax bonds
N
lncur debt through private activities
N
Withhold spending in hazard prone
areas
Other
F.6.4 Mitigation Outreach and Fartnerships
e
n
r
The Agency partners with the County and Amador City on public education and information
programs.
The Agency has an information booth at the County Fair
The Agency has done presentations at the Lions Club, Rotary Club, TSPN TV, and on
various radio stations.
F.6.5 Other Mitigation Projects and Efforts
.
"
Purchasing and maintenance of mobile and fixed generators
Emergencyinventories
F.7 M¡t¡gation Strategy
This section describes the mitigation strategy process and mitigation action plan for Amador
'Water
Agency's inclusion with the Amador County Local Hazard Mitigation Plan update.
F.7.1 Mitigation Goals and Objectives
The Amador Water Agency adopts the hazard mitigation goals and objectives developed by the
HMPC and described in Chapter 5 Mitigation Strategy of the base plan.
F .7
.2 Mitigation Actions
The planning team for the Amador TVater Agency identified and prioritized the following
mitigation actions based on the risk assessment and in accordance with the process outline in
Section 5, Mitigation Strategy, of the base plan. Background information and information on
how each action will be implemented and administered, such as ideas for implementation,
responsible office, potential funding, estimated cost, and timeline are also included. General
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Annex
F. 1 8
afneé
on plan implementation and maintenance of this LHMP by all
participating jurisdictions is included in Section 7, Plan Implementation and Maintenance, of the
base plan.
processes and information
1.
Gravity Supply Line
Hazards Addressed: Landslide, earthquake
Issue/Background: the entire water supply for Pioneer and Pine Grove, CA come from a pair of
large pump stations. These pump stations and the old transmission line is vulnerable. The
twelve inch (12") line runs up a very steep embankment up to the water treatment plant. The
planned gravity supply line (GSL) project would replace these two pump stations and provide a
more secure raw water supply to the water treatment plant and would not be dependent on
unintemrpted electric power.
Other Alternatives: N/A
Existing Planning Mechanism(s) through which Action Will Be Implemented
Design
complete, pursuing funding.
Priority: Medium
Responsible Office: Amador Water Agency
Cost Estimate: $10,000,000.00
Benefits (Losses Avoided): Prevent loss of potable water
Potential Funding: State and Federal programs
Schedule: Planned for completion by 2014
2.
Sysfem lnterties
Hazards Addressed: Drought and Water Shortage
Issue/Background: Single source of supply; this project provides redundancy.
Project Description: Install four miles of pipe to intertie two major systems.
Other Alternatives: N/A
Existing Planning Mechanism(s) through which Action Will Be Implemented: AWA Master
Plan
Priority: Medium
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
Ianuary 2014
Annex F.19
ameé
Responsible Office: Amador Vy'ater Agency
Cost Estimate: $2,000,000.00
Benefits (Losses Avoided): During a water shortage emergency, this project will allow
potable water to flow to 3,000 to 8,000 residents who would otherwise be cut off.
safe,
Potential Funding: Søte and Federal programs
Schedule: To be determined.
3.
Upgrade Fire Pumps
Hazards Addressed: Wildfire
Issue/Background: Several water systems are old and inadequate for current fire pumping
equipment.
Project Description: Replace and upsize three fire pump installations.
Other Alternatives: N/A
Existing Planning Mechanism(s) through which Action Will Be Implemented: AWA Master
Plan
Priority: Medium
Responsible Office: Amador Water Agency
Cost Estimate: $125,000
Benefïts (Losses Avoided): Prevent loss of potable water
Potential Funding: State and Federal programs
Schedule: To be determined.
Amador County (Amador Water Agency)
Local Hazard Mitigation Plan Update
January 2014
Annex F.20
afrrep
5,0,
I€Z
AMADOR WATER AGENCY
3190 FIRE PROTECTION AGENCY COOPERATION
3190.1 The purpose of this policy is intended to provide direction to staff
regarding the cooperative efforts with fire protection agencies which can enhance the
Water Agency's ability to maintain a large number of various fire hydrants and fire
protection facilities though out its systems, provide a means for information input for
improved fire protection facilities owned by the Water Agency, and maintain excellent
working relationships between fire protection agencies and the Water Agency.
3190.2 Water Agency staff shall provide maps showing fire hydrant and other fire
protection facilities within the Water Agency service area to fire protection agencies
responsible for those areas. These maps shall be periodically updated (but not less than
every three years) and provided to fire protection agencies as changes occur that
materíally alter fire protection equipment owned by the water Agency.
3190.3 Where fire protection agencies have adequate staffing levels and
willingness to work cooperatively with the Water Agency, an inspection program shall be
implemented for reviewing fire hydrants and other fire protection facilities owned by the
Water Agency which provides mutually benefits for both the fire protectíon agency and
the Water Agency while providing early warnings for possible needed maintenance of
facilities.
(a) The inspection program shall include forms for the fire protection agency to fill
out that include identification of the fire hydrant or other fire protection equipment (which
may include items such as backTlow devices for fire sprinkler system) along with various
items to inspect both vísually and physically. The form shall also have provisions to
capture the general condition of the equipment such as missing caps, damaged exterior
parts, access issues, identification of fire hydrant outlets, and apparent operation of
facilities. Other provisions may be included as mutually agreed by the fire protection
agency and Water Agency staff. A guídance document will be created to assist with
inspection activities.
(b) The inspection shall include the momentary activation of fire hydrants only as
a means to confirm that water flow is apparent. Specific guidelines shall be prepared
which províde parameters for this flow confirmation and include notification to Water
Agency personnel.
(c) A repair work order form shall also be included in this program which will be
used to provide information to Water Agency staff to identify problems or concerns that
was noticed during the inspection.
(d) lt is recognized that forms may need to be tailored to specific fire protection
agencies, but shall be standardized as much as possible.
130
AMADOR WATER AGENCY
ADM| N / STRATIVE POLI CY MAN UAL
(e)
Water Agency staff shall maintain a record for this inspection program that
track facilities inspected, work orders, and other pertinent information which can be
used for budgeting, refining preventative maintenance programs, repair programs,
capital improvement programs, or similar activities.
3190.4 The Water Agency staff shall meet and collect information from fire
protection agencies regarding potential areas for improvement or enhancement. This
may include areas that need fire hydrants, replacement of current fire hydrants, need for
improved fire flow, or other items which may provide better fire protection within Water
Agency service areas or facility locations.
(a) Fire protection improvement information shall be used to assist staff
in
prioritizing projects where funding is available for fire protection
replacemenUimprovements. This list or acceptance of this information is not a
commitment to make improvements to the system.
131
Bæld ll/beúing: April zrn-2ft15
AGENDA ITEM 6.A.1
STAFF REPORT
l,lffier Sltsferc Inflatiorry Rile
A{usffi
Requested Action: Board authorization to implement the inflationary rate adjustment of
2.5% for fiscal year 2015-2016, as specified in AWA Board Resolution 2013-22, adopted
on June 20,2013
Background:
The system wide water rates and charges that were adopted by the Board on June 20,
2013 specified in item 5 that future adjustments to the System-Wide Water Rates and
Charges shall occur on July 1 of each year, beginning in 2014 for five consecutive years,
with the last adjustment in July of 2018. Adjustments will be made on allwater usage rates
and monthly service charges, and the temporary CAWP pumping surcharge (until
rescinded when the Gravity Supply Line is put into service) by the change in the Consumer
Price lndex (CPI-U) as calculated by the US Bureau of Labor Statístics for the San
Francisco-Oakland-San Jose area (Series CUURA422SAO) between February of the
then-current year and February of the then-previous year; provided that no annual increase
shall exceed 3o/o.In addition, in no event shall any such rate adjustment result in rates that
exceed the cost of providing water service. The monthly debt service charges shall not be
adjusted for inflation. lt is anticipated that the temporary CAWP pumping surcharge will be
rescinded prior to the implementation of this proposed inflationary adjustment.
The inflationary rate based on the above is 2.5 %. Staff recommends implementation of
the inflationary rate due to the potential loss of revenues associated with the current
drought conditions, as well as the increasing cost of operations (power, fuel, chemicals,
etc.)
Alternatives: Not implement the adjustment or implement a lesser percentage
Fiscal lmpact: Approximately $140,000
Reviewed by Gommittee: No
Recommendation: Board authorization to implement the inflationary rate adjustment of
2.5o/o for fiscal year 2015-2016, as specified in AWA Board Resolution 2013-22, adopted
on June 20,2013
Prepared by:
Cris Thompson, Assistant General Manager
Ð
L
THU Rnno Gnoup, INc.
March 27,2015
Gene Mancebo
Amador Water Agency
12800 Ridge Road
Sutter Creek, CA 95685
Subjech
Annual Inflationary Adiustment to Water Rates for FY 15-16
Dear Gene,
As you know, in June 2013 when the Board of Directors adopted new water rates, the
Board also adopted provisions to adjust water rates annually based on changes in the
San Francisco consumer price index (SF-CPD, subject to a 3 percent cap. Debt service
charges are excluded from the inflationary adjustments.
The annual water rate adjustments are intended to help the Agency keep water rates
changes in line with inflationary changes in water system costs, and to enable the
Agency limit more comprehensive rate reviews once every 5 years. For the period from
February 2014 to February 2015, the SF-CPI (Bureau of Labor Statistics Series
CUURA422SAO) increased by 2.5 percent. Therefore, consistent with the Board of
Directors rate action in June 2013, it is recommended that the Agency increase water
rates (excluding debt service charges) by 2.5 percent effective in July 2015. Adjusted
water usage rates and monthly service charges for FY 15-16 are listed below.
Wøter Usøge Røtes
Single family residential
Tier 1
Tier 2
Tier 3
fi2.02/CCF
fi2.52/CCF
$3.15lCCF
Multi-family and commercial
$2.30/CCF
91.69/CCF
Mule Creek State Prison
Wholesale Agencies
Untreated Water
fi1".27/CCF
$0.5elccF
Untreated
Water
Treated
Water
5f S" meter
fi7.87
3/4" meter
$e.50
fi12.75
920.91
$30.68
956.76
$86.08
$13.33
fi17.70
Monthly Seraice Charges
L" meter
'1.'1./2' meter
2" meter
3" metet
4" meter
$26.41.
fi48.22
fi74.40
ç144.19
fi222.69
Grrur MaNcEno
Mancs
6" meter
2" Indus.fPublic meter
3" Indus./Public meter
4" Indus.f Public meter
6" Indus.f Public meter
Mule Creek State Prison
Drytown CWD
City of Plymouth
City of Jackson
fi167.53
27,201,5
Pecr 2
$440.77
$108.88
fi213.14
$330.43
fi656.26
Pine Grove CSD
Mace Meadows MWC
Rabb Park CSD
fiI1.,998
fi672
92,512
$10,989
fi1,445
fi1,1.02
fi197
While thb inflationary water rate adjustments are intended to help keep water rate
revenues in line with changes in ongoing operation and maintenance costs, the Agency's
water rates are always subject to constitutional requirements, including the requirement
that water rates not exceed the cost of providing service. The purpose of this letter is to
outline the reasons why the planned adjustments to water rates for FY 15-16 remain less
than the overall cost of providing water service.
Even with the water rate adjustment, the Agency's water rates
the full cost of providing service, for the following reasons:
will continue to be below
'
The Agency's water rates have been impacted by reduced water sales, due to
statewide drought conditions. This condition creates a financial deficit as
revenues fall more than costs (some cost will increase during drought
conditions).
'
Previously approved water rates include $160,000 annually for the capital
improvement program/ even when average planned capital program
expenditures were $640,000 annually (a shortfall of $480,000 annually from
need). Until the water rates can fully support the ongoing rehabilitation and
replacement needs of the water system, the water rates are less than the full cost
of providing service.
operating reserve is below its target level.
Previously approved water rates included $220,000 annually to rebuild the
operating reserve over an estimated -year period. The target minimum
operating reserve is equal to two months of annual operating and maintenance
costs (about $880,000). Until the operating reserve is fully funded any surplus
revenue would appropriately be used to meet this prudent financial
management target minimum reserve.
' The Agency's water system
'
Previously approved water rates did not fully reflect the costs associated with
retiree health benefits. Until the water rates fully reflect the financial obligation
associated with retiree benefit obligations the water rates are below the full cost
of providing service.
GENEMeNcnno
MARCH 2Z 2015
Pec¡
3
Until all the financial needs of the water system are fully covered through water rates
and other revenues the Agency's water rates will continue to be below the full cost of
providing service. The planned 2.5 percent increase in water usage rates, monthly
service charges, and the CAWP pumping surcharge are needed to help keep the water
system on track for financial stability and sufficiency.
As a reminder, customers must be informed of these changes to the water waters at least
30 days before they go into effect. This can be accomplished with a bill insert, or other
means.
If you have any questions regarding this
needs, please call me at (916) 444-9622.
Sincerely,
Robert Reed
The Reed Group,Inc
assessment
of continuing water rate revenue
B€rd lìlleeting: April ?ã|-2015
Agenda ltem
No.
7.A.1
STAFF REPORT
Amendment No.1
b
the Agr€ement beúuæen
Amador l/Läbr Agency and
The,Crty of Surer Crcek rcgarding
Seu,erservice
b nopettles
along Souümest Ridge RoadArca
Requested Action:
Discussion and direction to the General Manager to execute Amendment No.1 to the
Agreement between the Amador Water Agency and the City of Sutter Creek regarding
sewer service to properties on the southwest Ridge Road area.
Background:
ln recent discussions with representatives from the City of Sutter Creek, I became aware of
concerns that the revenue collected for a group of the City's customers was less than what
the WaterAgency is chargíng the City.
ln 2008 the Water Agency and the City entered into an agreement by where wastewater
from City customers along southwest Ridge Road would be transported through Water
Agency facilities to a point where it could flow into the City's collection system and avoid
the need for duplicative infrastructure. The agreement calculates sewer service charges on
each individual customer and totalizes those charges which is then billed to the City. An
alternative method would be to calculate the sewer service charge as if there is only one
customer which might be considered as a "wholesale" customer. This seems appropriate
as the Water Agency accepts the wastewater into the system at a single point, has no
responsible for individual service connections, and only sends one bill monthly to the City.
It is staffs recommendation to amend the agreement to treat the City as a "wholesale"
customer.
The Budget and Finance Committee met on April 8, 2015 and agreed with staffs
recommendation.
Alternatives: Leave the agreement unchanged.
Fiscal lmpact: Approximately $200 per month in reduced revenue.
Reviewed by Budget and Finance Committee:
Yes, with a recommendation to approve the amendment.
Reviewed by LegalGounsel: No
Recommendation:
Discussion and direction to the General Manager to execute Amendment No.1 to the
Agreement between the Amador Water Agency and the City of Sutter Creek regarding
sewer service to properties on the southwest Ridge Road area.
Prepared by:
Gene Mancebo, General Manager
2
AMENDMENT NO.
1
AGREEMENT BETWEEN THE AMADOR WATER AGENCY
AND
THE CITY OF SUTTER GREEK REGARDING
SEWER SERVICE TO PROPERTIES IN THE SOUTHWEST RIDGE ROAD AREA
THIS AMENDMENT No.
I
is made this
day of April, 2015 in Amador County,
-
California, by and between the Amador Water Agency, a public entity created by special act of
the Legislature of the State of California ("Water Agency"), and the City of Sutter Creek,
a
municipal corporation ("City") regarding the agreement for sewer service to properties in the
southwest Ridge Road area dated January 2,2008;
WITNESSETH:
WHEREAS, on January 2,2008, the Water Agency and City entered into an agreement
("Agreement") whereby City agreed
to compensate the Water Agency for the transport
of
wastewater from City customers to a point of delivery defined in the Agreement.; and
WHEREAS, paragraph 2 of the Agreement describes the compensation for use of the
Water Agency sewer facilities; and
WHEREAS, the Water Agency and City now desire to amend paragraph 2(b) of the
Agreement.
NOW, THEREFORE, the parties hereto agree to amend the Agreement by replacing
paragraph 2(b) as follows:
Commencing with the date first above written, the City shall pay the Agency's
prevailing applicable sewer service charge established for \M/r/lD No. 12 for
those Southwest Ridge Road Area Customers actually connected to the City
Sewer Collection Pipeline. Such sewer service charges shall be based on the
actual number of EDUs calculated by dividing the totalized wastewater collected
per day by 200 gallons per day. iMonthly flow readings shall be taken j¡usomcer¡at
Page
I of3
the Delivery Point meter. lf there is not adequate flow to obtain accurate meter
readings, the Water Agency shall total the treated potable water used by the
individual Southwest Ridge Road Area Customers during the months of February
and March to arrive at the total average flow per day and divide that by 200
ballontwnrsD2t per day to arrive at the number of EDUs that shall then be used for
the purpose of the sewer charges for the upcoming fiscal year beginning in July.
Southwest Ridge Road Area Customers are assumed
to be low strength
customers; however, should a user be identified as a medium or high strength
user a weighted average shall be calculated to determine sewer service charges.
The Agency shall bill the City for such sewer charges monthly. Such bills shall be
become delinquent if not paid by the City within 30 days after the receipt. Except
as otherwise provided herein, the City shall be subject to the
ordinances, rules
Agency's
and regulations governing the billing, collection,
and
enforcement of payment of sewer charges and sewer connection fees. The City
is obligated to pay the amounts due under this Agreement notwithstanding any
individual default by any of the Southwest Ridge Road Area Customers.
Incorporation by Reference
Except as specifically provided herein, the Agreement shall remain in fullforce and effect and its
terms are incorporated herein by this reference.
lN MIITHNESSI¡wnmn¡l WHEREOF, the parties execute this Amendment No.
Agreement on the day and year first above written.
AMADOR WATER AGENCY
By
Gene Mancebo, General Manager
Page 2 of 3