Packet
Transcription
Packet
AMADOR WATERAGENCY Board of Directors Regular Meeting 12800 Ridge Road, Sutter Creek, CA gSGBs April23,2015 9:00 a.m. Website Address : www.amadonrater.orq Please Note: Members of the public will have the oppotTunity to directty address the Agency Board of Directors concerning any item listed on the Agenda below before or during consideratlon o¡ tnat item. There is a three minute time limit per person ln order to better accommodate members of the pubtic, specific times above for Agenda ltems witt be heard at the specified time or soon thereafter. Agenda ttems without specific timeã may be rearranged to accommodate the Board's schedule. 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ADDITIONS TO AGENDA a. ltems added to the agenda must be approved by the Board pursuant to Government Code Section 54954.2. 3. PUBLIC COMMENT FOR MATTERS NOT ON THE AGENDA Discussion items only, no action to be taken. Any person may address the Board at this time upon any subject within the jurisdiction of Amador Water Agency; however, any matter that requires action will be referred to Staff for a report and action at a subsequent Board meeting. Please note there is a three (3) minute time limit per person 4. CONSENT AGENDA Items listed on the consent agenda (see attached) are considered routine and may be enacted by one motion. Any item may be removed for discussion and made a part of the regular agenda at the request of a Board member(s). 5. AGENCY GENERAL A. Eagle Scout Service Project 1. Discussion and possible adoption of Resolution No. 2015-09, honoring Logan Moody for his achievement of completing Eagle Scout Service Project - CAWP Fire Hydranl painting- B. Amador County Local Hazard Mitigation plan 1. Discussion and possible adoption of Resolution No. 2015-10, adopting the Amador County Local Hazard Mitigation Plan 1 BOARD OF DIRECTORS Rich Farrington, President Robert Manassero, Vice President Paul Molinelli Art Toy Gary Thomas G. Agency Cost Controls 1. Discussion and possible direction to staff regarding a potential hiring freeze for the Agency 2. Discussion and possible direction to staff regarding expenditure freeze D. Fire Protection Gommittee Report 1. Review and possible action regarding the Agency's Administrative Policy Manual section 3190- Fire Cooperation Policy 2. Update on committee accomplishments E. Project Updates 6. WATER SYSTEM A. Water Rate Adjustment 1. Discussion and possible action to adjust the water usage rates, monthly service charges per Resolution No. 2013-22, adopted by the Board on June 20, 2013. B. Drought Update 1. Update regarding current drought conditions 2. Discussion regarding JVID emergency water request 7. WASTEWATER SYSTEM A. Sutter Creek Contract Amendment #1 1. Discussion and possible action to authorize the General Manager to execute Amendment No.1 to the Agreement between the Amador Water Agency and the City of Sutter Creek regarding sewer service to properties on the southwest Ridge Road area 8. GENERAL MANAGERS REPORT- General discussion of various issues for informationat and communication purposes. Discussion only, no formal action will be taken. Any matter requiring action will be placed on an upcoming agenda for consideration 9. ASSISTANT MANAGERS REPORT- General discussion of various issues for informational and communication purposes. Discussion only, no formal action will be taken. Any matter requiring action will be placed on an upcoming agenda for consideration IO.COMMITTEE REPORTS AND DIRECTOR COMMENTS A. Drought Gommittee I l. BOARD OF DIRECTOR DISTRICT REPORTS - The Board Members may report on various activities, meetings, etc. that they have been involved in within their respective districts. Discussion only, no formal action will be taken. Any matter requiring action will be placed on an upcoming agenda for consideration l2.CLOSED SESSION A. Conference with Legal Counsel Pursuant to Government Code Section 54g56.9(a)Pending Litigation- Kenneth Perano and Ken Berry vs Amador Water Agency (Amador Superior Court Case No. 12-CV-7718) 2 BOARD OF DIRECTORS Rich Farrington, President Robert Manassero, Vice President Paul Molinelli Art Toy Gary Thomas B. Conference with Legal Counsel Pursuant to Government Code Section 54956.g(a) - Pending Litigation- Amador Water Agency v. Lazy Creek Family Trust, et al. (Amador Superior Court Case No. 15-CV-9203) 13. FUTURE AGENDA TOPICS -This item is to provide the Board Members an opportunity to request items to be placed on future agendas. I4.ADJOURNMENT J BOARD OF DIRECTORS Rich Farrington, President Robert Manassero, Vice President Paul Molinelli Art Toy Gary Thomas AMADOR WATER AGENCY CONSENT AGENDA April 23,2015 Items listed on the consent agenda are considered routine and may be enacted by one motion. Any item may be removed for discussion and made a part of the regular agenda at the request oÎ a Board memne4s¡. 1. 2 MINUTES A. Approval of minutes of the Regular Meeting of April g,2O1S MISCELLANEOUS APPROVALS Payable for the month of March, 2O1S A. Approval of Accounts B. Agency Surplus Property 1. Discussion and possible action to declare certain items as surplus property and authorize the General Manger to dispose of these assets in accordance with Administrative Policy Manual Section 3120- Surplus property ln compliance with the Americans with Disabitities Act, if you are a dísabled person and you need a disability'related modification or accommodation to pañicipate in thís meeting, {hen please contact Cris Thompson at (209) 223-3018 or (2Og) 257-5281 ffà4. Reguesfs must be made as early as possib/e, and at least two-ful/ business days before the start of the meeting. Documents and materials relating to an open session agenda item that are provided to the Amador Water Agency Board of Directors /ess fhan 72 hours prior to a regular meeting wilt be avaitable for pubtic inspection and copying at 12800 Ridge Rd, Sutter Creek CA g16gs 4 BOARD OF DIRECTORS Rich Farrington, President Robert Manassero, Vice President Paul Molinelli Art Toy Gary Thomas Oonsent Agendo ltenn l,#, Unapproved AMADOR WATER AGENCY Board of Directors Regular Meeting April 9,2015 MINUTES Directors Present: Rich Farrington, President Robert Manassero, Vice President Paul Molínelli Gary Thomas Art Toy Directors Absent: None Staff Present Gene Mancebo, General Manager Cris Thompson, Assistant General Manager Josh Horowitz, Agency Counsel Damon Wyckoff, Operations Manager Karin Helvey, Finance Director Connie Gagnebin, Administrative Asst CALL ORDER- President Farrington called the meeting to order at g:00 a.m ADDITIONS TO THE AGENDA- None PUBL¡C COMMENT: None GONSENT AGENDA ITEMS l.A. 2.4. and 2.8. (01:29 - 02:491 Resolution No. 2015-06, Approving Revisions to the Administrative Policy Attachment "4" and Resolution No. 2015-08 Authorizing the General Manager to execute and the Secretary of the Board to record a Certificate of Acceptance of a Construction Easement Agreement from John and Verene Teresi and Regular Board meeting minutes of March 26,2015 MOTION: lt was moved by Director Toy, seconded by Director Thomas, and unanimously carried to approve consent agenda with a suggested revision Regular Board Meeting April9,2015 Page 1 DEPAR ENT REPORTS IO3 12:541 istration/Finance Operations Adm in Sierra Highlands Homeowners Association (12:56- 1B:39) update regarding sierra Highlands HoA water conservation Effort Public Gomment: Sherry Curtis, Pioneer Eileen Johnson, President of Sierra Highland HOA WATER CONSERVATION (1 8:40 - 2:17 zùil Water Shortage Analysis and Strategy Presentation by Bob Reed, by the Reed Group, lnc. regarding Water Shortage Analysis Discussion and possíble action regarding the draft Water Shortage Strategy Public Gomment: Sherry Curtis, Pioneer Mike Miller, RABB Park CSD Mike Daly, City Manager, Cíty of Jackson Dutch Green, RABB Park CSD Terry Strange, CCWD Director Jeff Gardner, City Manager, City of Plymouth (3:23=27- 3:38:54) MOTION #1: lt was moved by President Farrington, to adopt the proposed water shortage strategy by Bob Reed and include the 5% increase to service charge rate and direct staff to prepare the Prop 218 notice to send to the public and to includè the transition of flat rate to metered water rates. MOTION #1 FAILED for lack of a second MOTION #2 - lt was moved by Director Thomas, seconded by Director Toy to adopt Bob Reed's water shortage strategy as presented, and to direct staff to convert all flat rate water accounts to metered accounts such that water used will be billed on a volumetric basis and to further direct staff to initiate required Proposition2lB notices to include the water shortage rate surcharges for water service and the transition of flat rate customers to metered water rates. Ayes: Directors Thomas, Toy, Manassero and Farrington Noes: Director Molinelli Absent: None Abstain: None RECESS was called at 11:17 a.m. SESSION resumed at 11:37 a.m Regular Board Meeting April9,2015 Page2 Drought Conditions Executive Order (2:18:08 - 2:39:30) Discussion regarding Governor Brown's April 1 ,201s executive order Public Comment: Paul Johnston, Pine Grove CSD Drought Committee (2:39:35 - 2:48:471 Discussion and possible action regarding Drought Committee recommendation to eliminate flat rate pricing AWA water code section 2.19 water conservation (2:48:4g - 3:06:35) Discussion and possible adoption of Resolution No. 2015-07; Revisions to the Water Code Section 2.19- Water Conservation Policy MOTION: lt was moved by Director Molinelli, seconded by Director Thomas and unanimously carried to adopt Resolution No. 2015-07: Revisíons to the Water Code 2.19, motion amended to accept suggested revisions to the Resolution (3:06:42 - 3:39:00) Discussion and possible action to declare a Stage 2 or higher Water Alert in accordance with the Governors Statewide Mandatory Water Reductions MOTION: lt was moved by Director Molinelli, seconded by Director Thomas and unanimously carried to Declare a Stage 2 Water Warning with a water reduction of 25% or higher Water Alert in accordance with the Governors Statewide Mandatory Water Reductions Ayes: Directors Molinelli, Thomas and Farrington Noes: Directors Toy and Manassero Absent: None Abstain: None AGENCY WATER (3:39:06 - 3:58:59) Pine Grove CSD Presentation Presentation by Director Jay Ollig, Pine Grove CSD regarding their water line project Discussion and possible action regarding cost sharing in the water line project MOTIONI lt was moved by Director Toy, seconded by Director Manassero and unanimously carried to approve the cost share for the Pine Grove Water line project at 17o/o of documented total project cost up to $8b,000. Regular Board Meeting April9,2015 Page 3 RECESS was called at 1:18 p.m. SESSION resumed at 2:31 p.m. wild and scenic River Designation (no staff report) (4:01:46- 4:35:46) Discussion regarding participation in a Collaborative Effort for and Wild and Scenic Direction was given to the General Manager and the Ad-hoc committee to participate in a Collaborative Effort for and Wild and Scenic Public Gomment: Sherry Curtis, Pioneer CAWP Wholesale (4:35:56 - 4:49:33) Discussion to consider the Agency System Wide Water Rate Structure for CAWp Wholesale Customers MOTION: lt was moved by Director Molinelli, seconded by Director Thomas and unanimously carried to direct staff to proceed and prepare the necessary contracts to move the CAWP contract customers to Wholesale Customers within the Agency System Wide Water Rate Structure. AGENGY PROJECT UPDATES (4:49:45 - 5:01:08) AGENCY COUNSEL REPORT (5:01 :10 - S:0G:40) Legislative Report Other Matters COMMITTEE REPORTS (5:06:59 - 5:32:05) Budget and Finance Committee 4-08-15 Engineering Committee 4-08-1S Fire Protection Committee 04-07-15 CAWP District Meeting 04-07-15 Personnel Committee 03-26-15 A. B. C. D. E. FUTURE AGENDA TOPICS FERC 137 Recreatíonal flows Fire Cooperation Policy 3190 review and report Proposed Hiring and Spending Freeze on any new projects Boy Scout Resolution lnflationary increase Surplus Property CLOSED SESSION was called at 4:12 p.m. Conference with Legal Counsel Pursuant to Government Code Section 54956.g(a)Pending Litigation- Kenneth Perano and Ken Berry vs Amador Water Agency (Amador Superior Court Case No. 12-CV-7718) Regular Board Meeting April9,2015 Page 4 Conference with Legal Counsel Pursuant to Government Code Section 54956.g(a) Anticipated Litigation - lnitiation of litigation - One Case. OPEN SESSION resumed at4:16 p.m. with nothing to report ADJOURNMENT President Farrington adjourned the meetin g at 4:17 p.m Cris Thompson Clerk of the Board of Directors Approved Regular Board Meeting April9,2015 Page 5 COnsent Agendo ltem AMADOR WATER AGENCY ACCOUNTS PAYABLE LTST FOR PERïOD MAR 02, 2015 THROUGH MAR 31, 201_5 CHECK# PAYEE DESCRIPTTON 75278 75278 75279 A.A. ABLE AUTO A.A. AB],8 AUTO REFUND FOR ARAMARK TINTFORM SERVTCES I]NÏFORM SERVÏCE REFI-IÑD FOR 145 PATRICTA 7 52BO 75281 75282 75283 75284 7 5285 7 5287 75286 75288 75289 7 7 5290 529r 75292 75293 75294 7 5295 75296 7 5297 75298 5299 75300 7 753 01 75302 753 03 75304 753 0s 75306 7 5307 75308 753 09 753 10 753L7 75312 753L3 753 15 753]-6 7 531,7 753 18 753]-9 75320 75321 7 5322 75323 75324 7532s 75326 7 5327 REPAIR REPAIR 26TH DISTRICT AG ASSOCIA STEPHAN]E ARREOLA AT&T ATI PARTS BARTKÏEWÏCZ, KRONICK & CABELA'S MARKETING & BRA CITY OF IONE DAVID CLARK CARY CROUSS SECURTTY & ASSET MANAGEM DELTA WTRELESS & NETWORK DITCH WITCH EQUTP, INC. ENVIRONMENTAL HEALTH DEP FASTENAL COMPANY FEDERAL EXPRESS CORP. FORESTRY SUPPL]ERS, TNC GEORGE REED, TNC. GALE HALBAKKEN HD SUPPIJY CONSTRUCTION HFC/BENEF]CTAL SHELLY HTGGTNS HUNT & SONS INC MTDWEST MOTOR SUPPLY LFS ÏNC. GERALDTNE MC CUTCHEON MIKE MCFADDEN PG&E PACE SUPPLY CURT PIPER 0 FAIR WINDOW DEPOSTT CA|NET 2 / c6022234!27 frED 7D 17 LEGAL FEES FOR JAN SEAT COVERS PO3]-84 DEC VOLUME METRIC FLOVÍ RATE REFUND FOR 12615 H]LLTOP REFIIND FOR 372 S SACRAMENTO TORING/MATNT/ SECURT TY MOBTLE RADIOS/PO 81940 MONT FTLTER/LTNE STR.AINER ÏD#FAo000835/BUCKHORN REFUND FOR IJ L7,545 l_06 7,904 48 )z 56 56 279 56 5/ WTP L 67.76 18021 N MACE DR 3,563.99 L4.25 5B .68 1,040.38 58.26 ENGTNEERING/ DEs I GN/ TANNER 67.97 41.35 2 ,740 .95 9, 870 . 00 L3 ,7t3 .26 7, 358.04 24.00 SÏERRA FOOTH]LL LAB. TNC SPRINGBROOK SOFTWARE TNC STANDARD TNSURANCE COMPA SVIEET PEA VENTURES INC CL]NTON TAYLOR GARY THOMAS U.S. BANK CORPORATE UNÏVAR USA ]NC UNÏVERSAL BUII.DTNG SERVI G COMP 15809 PIONEER CREEK cLM soFT Box CORD/TYPE/PLUG REFUND FOR 220 PATRTCTA LN OFF]CE SUPPLIES REFUND FOR 14380 GODS HILL #2 REFUND FOR AMBER RÏNAUDO ROBERT HAHN' S AUTOMOTIVE SÏERRA CHEMICAL COMPANY 304. B4 58. 82 STROKE 3HP PO31B6 REFUND FOR 1]-O DAV]D DR REFUND FOR 20600 LIVE OAK GASOI,INE FOR FEB LUBRÏCANT roNE PLT/94s730662]-7 PLATT ELECTR]C NE],LA PRUSSO QUTLL CORPORÀTTON 18 ,362 .00 82 .67 25'1 .26 PLUG BRAss/VALVE/CoPPER/ CORP 16 65 63 2,742 04 RAÏN JACKET ORÄ,NGE PO3 190 REFUND FOR 23190 ALATRE LN REFUND FOR 16705 DEER TRA]L PRTNT/MAIL TNVOTCES TNC 00 100 35 150 00 382 47 15 37 2,L67 34 20 85 SAFETY GLASSES AB-CLTI CO VOLCANO COMMUNICATIONS 24460 HWY BB 24460 HVIY 88 LOCKBOX INFORMATTON BOOTS PO3189 METRO PRESORT ]NC N],INE ENERGY REFI]ND FOR AMOUNT CK HEATER/REPLACED HYDROXIDE PO3]-94 THERMOSTAT AT GAYLA -PAGE1- DsL/ ÏNTER/ 269 .0B 75.24 T, 067.40 I, 734.10 E l_90.00 MANOR 2o92e5 AO f J . o / .97 360.00 81.10 86.25 84r .67 27 4 .88 408.29 995.15 1 212 REFUND FOR 2728I FORREST OAK DIRECTORS EXPENSE CREDÏT CARD 2247 HYPOCHLORITE PO3193 OFFTCE CLEANING SUPPLIES BUCKHORN/ 114 151.00 FEB T,AB I4IORK ÏNSTALL BI],LING PROGR.AMS PREMTUM/00 6492990003 PUMPED WI/I ]-39.52 53 s 6 1 4 )*ü AMADOR WATER AGENCY ACCOUNTS PAYABLE LIST FOR PERTOD MAR 02, 2015 THROUGH MAR CHECK# PAYEE DESCRTPTION 75328 75329 75345 75346 JONATHON WEBSTER XBYTE TECHNO],OGIES ABSOLUTE AUTO GI,ASS DELL 7 5347 75348 75349 75350 7535 1 75352 753 53 75354 7s355 75356 5357 75358 7 75359 75360 7536r 75362 REFUND FOR ARAMARK UNTFORM SERVTCES AT&T PARTS ATKÏNS NORTH AMERICA, IN BUS]NESS RECOVERY SERVIC BOBCAT CENTRAIJ TNC G.A.M.S. INC CANYON INDUSTTRES INC CED CITY OF ]ONE CITY OF JACKSON CITY OF SUTTER CREEK 7 5371, 75372 5373 75374 75375 7 7 53'7 6 7 5377 '7 537 9 75378 75380 75381 75382 75383 75384 75385 75386 75387 753 B8 75389 75390 7539]75392 HUNT & SONS INC HYÐRAFLO INC FOOTHILL VENTURES TNC JACKSON T]RE SERVICE ]NC KENNEDY/JENKS CONSULTANT LEAF & COLE, LLP AMAÐOR LEDGER DISPATCH MEEKS BU]LDING CENTER IN METRO PRESORT TNC DUSTTN MTLLER MOTHER ],ODE PRINTING PG&E & CUTL PAC MACHINE CO. TNC. PACE SUPPLY CORP PACKET FUSTON INC PETERSON BRUSTAÐ TNC DENTONIS WELDTNG WORK IN PLACER TIT],8 COMPANY PROGRESSIVE BUSINESS PUB QUII,L CORPORATTON RESERVE ACCOUNT A¡IS CANAL PIPTNG ENVTRONMENTAL LOCKBOX SERVICES/FEB CABLE LEAF RAKE 15? TO BEGIN DESIGN PO3222 coNDUrT PO3L77 TON ROCK UPS DROP OFF G. NINNIS OVERLAND, PACIFIC CALNET 2 / 93L0o03495951 BELTS/STRETCH CORD TWEK/PO3203 GRATNGER TNC. GRANTTE CONSTRUCTTON COM GUA],CO GROUP TNC GTY'S SAW CENTER HÏ],], RTVKINS BROhIN & ASS 5367 ACETYLENE/OXYGEN UNTFORM SERVTCES DÏRECTORS EXPENSE 75366 75368 75369 75370 MANOR COURT HT].LSIDE PRTNCIPAL/ INTEREST GEORGE REED, INC. GOTNI POSTAL 7 241 POWEREDGE SERVER PO3I92 VOLUME ME TRT C FLOW RATE MARTELL LIFT S TA/ couo01_l_ SETTLEMENT AGREEMENT/RELEASE STATE OF CALTFORN]A RTCH FARRTNGTON FASTENA], COMPANY DEAN AMOTJNT JAN. 75363 75364 75365 2OI5 REPLACED BACK GLASS/PO32I7 sHoP WASTE SERVTCE /gqøA ACES bIASTE SRVS TNC ATRGÀS USA LLC AT] 31, WASHED SAND PRESSURE GUAGE/ PO32 O6ICMMS CI,ASS 3 HOODED SWEATSH]RTS I,OBBING/ CONSUI.TING SERTVCES ].4ÏN SIGN /PO32t4 LAZY CREE K GASO-TNE/DIESEL FOR FEB HYDRÄ,FLO/VALVE/ COUP / PO32 0s PROPANE / CLOGBUSTBR/ TORCH TIRES/ PO3 2 04 RAW WTR SMALL DIAM. PIPELINE TN SCOPE AUDIT SERVTCESi TANNER HYDROELECTRIC/ PUBLIC TREATED DF PRINT/MArL INVOICES SAFETY BOOT ALLOT\IANCE MATLTNG LABELS SM DIAMETER PIPE T. C. /S .1,. Pt¡v{P STA 1&2 IMPELLER KTT/WITH AJUSTED INV. Nr PPtE/ COUP/ quNvrpT PO317 9 SHORECARE PARTNER COVERAGE IONE ï/'fTP EXPANSION RACK STANDARD CAB PO3]-83 PRELIM FEE/2717 ,2688,268'7 ,2779 SUPERVISORS SAFETY BULLET]N OFFICE SUPPLIES REPLEN]SH POSTAGE MACHINE FUND -PAGE2- 73.98 5, 695 . o0 469.12 4l 62 35 2 7I 59 l_ 5¿ I,02 2 13 I 2 3B 40 ,36 tr ,( !,t4 6 11 T7 3 U¿ 7 16 55 ,07 2 35 35 0 51 I ,66 B 6/ B9 86 33,04 6 95 1 ¿.L 3 L3 atr 5 40 30 B 1B 455.83 24 .49 67 0 .56 893 .94 280.60 8,316.49 857.79 2 ,384 .72 4 ,24 3 .91 a1 0.00 o 4.77 31 4.50 L7 4 ,24 2.80 r0 ,92 0.00 46 B .98 '1 to 2.50 3 ,95 o.2t 10 0.00 18 9.00 15 8.75 20 ,69 7 .23 3 ,5'.77 .32 1,816 37 4,879 OU l_3 , 181 OA 1,970 9, 000 00 1l- 8 56 505.37 3,000.00 AMADOR V.TATER AGENCY ACCOI]NTS PAYABLtr L]ST FOR PERIOD MAR 02, 2O]-5 THROUGH MAR 31, 2075 CHECK# PAYEE DESCRTPTT 75393 75394 75395 75396 RIEBES AUTO PARTS LLC BATTERY 7 7 7 7 s397 5398 5399 5400 7540L 75402 75403 75404 75405 7 5406 7 7 5407 5408 75409 754L0 754t2 7 541,3 75424 75425 7 7 5426 5427 75428 75429 7 5430 7543L 75432 75433 75434 75435 7 5436 75437 75438 75439 75440 7544]75442 75443 75444 75445 7 5446 75447 75448 75449 75450 7545L 75452 75453 RMC TVATER AND ENVTRONMEN ROBERT HAHN'S AUTOMOTIVE SAFEGUARD PEST CONTROL SGS HERGUTH LABORÀTOR]ES JEFF SHORTRTDGE AMOUNT CARVüSP PHASE TT PREDES]GN REPLACED FRT BRAKE PADS/ROTORS PEST CONTROL/ADMIN #3871 OÏL ANALYSTS PO31B1 STERRA, TRENCH PROTECT]ON SÏMMONS LANDSCAPE COMPAN STATES RECOVERY SYSTEMS ALFRED AT,I,EN NUNES SUTTER MEDTCAL FOUNDATTO SVùEET PEA VENTURES INC U.S. BANK NAT]ONATJ ASSOC UNIVAR USA INC UNIVERSA], BUTIJDING SERVT UP-COUNTRY POOL CENTER DOCUTVIENT MANAGEMENT/ SHREDDER EQU]?MENT T.EASE PO3l-58 ],ANDSCAPE MAINT PAYMENT STEVE PARDO/3541 LAKE CAR WASH FOR MARCH, s HESS MRN10508314 TX26/ PTÏMPED BUCKHORN RAY MORGAN 2 /20 / ]-5-3 /20 / 15 MONTHIJY JANITORL SERVTCES HYPOCHLORITE PO3202 MURIATTC ACTD VOLCANO COMMUNICÀTTONS G KEN VAN DER VEEN AUTO DTALER / ACI/üA/JPTA AFLAC ARAMARK UNIFORM SERVTCES FTDEI,TTY PROGRAM #FA- 023 032015 NZE ÏNC. AT&T PARTS ATKINS NORTH AMERICA, IN BRUSATOR] ENTERPRISES IN G.A.M.S. INC CA-NV SECTION AV'ÌI\IA CÐüI GOVERNMENT ]NC CLEVERBRIDGE ]NC. CWEA-TCP EN POÏNTE TECHNOLOGIES FEDERAL EXPRESS CORP. S GEORGE REED, ]NC. GEORGE T. HALI, INC. GOI.DEN STATE FLOI¡¡ MEASUR GRAINGER INC. HUNT & SONS INC ACWA/.]PIA-HBA KAMPS PROPANE TNC I,EAF & COLE, LLP NZE ÏNC. MEEKS BTJILDING CENTER IN MSCOM I,],C METRO PRESORT ]NC PAUIJ MOLINELLI 68 2,24L 00 175 00 3A2 32 TRAVEL/TRATNTNG SHRED-TT USA LLC ATI 1-11 27,307 10 NEWEGG BUSTNESS INC NI,TNE ENERGY TNC OCT I'IATER QUALITY ACADEM 2 0 9 29 5 53 49 REFUNÐ FOR PARTICTPAT]ON/METER POI{ER EDGE R42 0/RETMBURSEMENT FEBRUARY PREMTT]M #DC731 T]NIFORM SERVICE cÄt NET 2 / C6022234r2777 BLADE C.AMANCHE WTR STORAGE TANK 39 34 97.90 4,398.90 300.00 7, 054 .53 r57 .74 2L6 .00 800 .00 7, 579 o1 L, 278 .73 607 .00 36 .24 43 .11 Ttr 792 .00 6, 095 .66 698 .00 66s .36 802 .90 L7t .L6 ? CUTBACK 3/8 HONEYI¡¡ELL/ C IRCULAR CHART SENSUS SRTI WTR METER PO32T9 VALVE / pO3232 /CMMS 1_320 GASOLINE FOR MARCH APRTL 2015 BENEFTT PLAN/INS BALL SHOP PROPANE REVIEI^I/REVTSION BASED PRO.fECT ONBOARDTNG READY MTS CONC UPON 800 soDrMM Po3230 PRTNT/MAIL INVOTCES CK FOR CK 74036 I¡¡ITH UEFI BOTS REPIJÄ,CEMENT MOTHERBOARD ENGTNEER]NG & DESIGN SERV]CES SHORTRIDGE G]--2 REV]EW COURSE PAGE 3 - ÀÈ 95 .00 46 , ÕJ TOT^IÏNG TNSECT K]IJIJER BACKFLOW REFRESHER/K. MILI,ER RNW SPS SYMANTIC PROTECTION MALWAREBYTES ENDPOINT SECURITY GOSHORN MEMBERSHTP RENEI¡]AL WTNPRO 8. 1 UPGRADE/PO3195 I,OCKBOX INFORMATION/REPORTS 23 979 195 .00 3, 322 .42 7, 686 .00 3L2 .00 t1. 328 .72 66 .62 ) l_06 .53 110 .r7 L, 980 .98 2 571, AÊ 13l- 1a 78, 429 .09 334 .31 L, 480 .00 1,28 .75 42 .L2 564 .43 ? 092 .10 !04 .16 E 847 .75 10, 925 .00 240 .00 12 .AMADOR IVATER AGENCY ACCOUNTS PAYABLE FOR PERIOD MAR CHECK# PAYEE 75454 PG&E 7 7 7 5455 5456 7 7 1,82633 251532 51_533 284931, 284932 284933 1130639 r826231 25L5032 5]-s 03 3 25l.52L5 25L5227 251_5313 25]-5327 300230i. 3 BOWES SAGE DESIGNS ]NC STERLTNG I¡IATER TECHNOI.OG SUTTER MEDTCAL FOUNDAT]O SWEET PEA VENTURES TNC USA BIJUE BOOK DIV]S]ON O WAGNER & BONSTGNORE INC WILBUR-ELLIS COMPANY INC TNTERNATJ REVENUE SERVTCE TNTERNAL REVENUE SERVTCE 75463 75464 75465 L82632 2 PITNEY 5459 5460 75462 2 PACE SUPPLY CORP QUIL], 75467 0023 10 25150227 251-50313 25t50327 CORPORATTON ROBERT HAHN'S AUTOMOTTVE P.E.R.S. P.E.R.S. ST. OF CALTF _ ST. OF CALIF _ ST. OF CAI,IF - EDD EDD EDD BANK OF ÄMERTCA INTERNAT. REVENUE SERVICE P.E.R.S. P.E.R.S. P.E.R.S. P.E.R.S. P.E.R.S. P.E.R.S. USDA RURAL DEVETJOPMENT USDA RURAL DEVELOPMENT P P P MAR 31, 2OT5 DESCRIPTTON 5457 75458 L]ST 02, 2015 THROUGH E.R.S E.R.S E,R,S .AMOUNT BUCKHORN TRMT PLT/1328406L37 4 PTPE VIRAP TAPE PO3226 MATLING SYSTEM/SVBB OFFTCE SUPPLTES 1GüI5 OIL FILTER/ATR F]LTER TRAI}ITNG/M. F]NCH DRUMS PO321O MTTJLER/TX28 / 27 0OO229 PORTABLE/GOOSE CREEK FLAGS WATER RTGHTS CONTRA,CI PENDULUM AQUA CAP PO3198 D FED/FICA/MED TAX hIH FED/F]CA/MED WH PERS 457 AND EE LOAN PERS 457 AND EE LOAN STATE TAX WH STATE TAX WH STATE TAX I^]H PAYMENT PMT DWR ],OAN-RTDGE CLUSTER SYSTEM FED/F]CAI MED WH PERS PERS PERS PERS PERS PERS RETTREMENT- MISC RETTREMENT- MISC RETIREMENT- MTSC RETIREMENT-CLASSIC RETIREMENT- CLASSIC RETTREMENT- CLASSIC GS], ],OAN INTEREST PAYMENT USDA LOAN PAYMENT - LA IUEL PERS RETIREMENT-PEPRA PERS PEPRA RETTREMENT PERS RETIREMENT- PEPRÄ 0 5s3 .8s l-38.24 435.00 s13.16 243.56 1 6s0.00 1_, 872 .00 42 .00 135.00 LLs.32 L76.25 1 044 .90 29 6vt.¿t 31 600.90 3 3 4 A 5 242 ) a, .5t tr,1 869.28 524 .6L 037.49 60, 209 .7 6 )a 920 .97 605 . 97 605 .97 605 .97 18, 043.68 18, 531.89 10 300 .47 L02, 7L6.7110 9t2 .00 l_ 2 2 807.94 135 . 1_0 135.10 1,058,27L.54 TOTAL PAGE 4 AMå.DOR WATER AGENCY ACCOI'NTS PAYABLE LTST FOR PERIOD MAR 02, 2015 THROUGI{ MAR 3L, 2OL5 CHECK# PAYEE DESCRIPTION L066 1056 LIAM BAII,EY CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT r_068 CI{ARTJES t067 IJTAM BAITJEY SIERRA MOT]NTAIN CONST. A. CREE I GSL CONSTRUCTTON ST'RVEYTNG TOTAL AMOT]NT 0. 00 2L,937.50 333 , 840 .51 3, 675 . 00 359, 453 -PAGE1- . 01_ Board Meeting¡ April ?Ji'rÃ)15 Consent Agenda ltem 2.8.1 STAFF REPORT Declaring Surplus Property Requested Action: The Board declare the items listed on the attached sheet as surplus property and authorize the General Manager to dispose of these assets in accordance with Administrative Policy Manual Section 3120- Surplus Property Alternatives: None Fiscal lmpact: Revenue Generated by sale of surplus items Reviewed bv Committee: No Recommendation: The Board declare the items listed on the attached sheet as surplus property and authorize the General Manager to dispose of these assets in accordance with Administrative Policy Manual Section 3120- Surplus Property Prepared bv: Cris Thompson, Assistant General Manager April 23,20L5 SURPLUS VALUE DIESEL WHACKER VEHICLE 467 s200.00 s2,500.00 2OO1 FORD RANGER 4X4 HP COLOR LASER JET PRINTER $40.00 WITH INK - NEEDS SERVICING HP DESIGN JET PLOTTER WITH INK s100.00 NEEDS SERVICING SCANNER- WIDE FORMAT s300.oo CHAMELEON G6OO 2 DRAWER FrLE CABTNET (2) S1s.oo 4 DRAWER GREY FILE CABINET s2s.00 4 DRAWER TAN FILE CABINET s2s.00 PIECE EXECUTIVE DESK AND s20o.oo 5 OFFICE FURNITURE EXECUTTVE DESK (2) ss0.00 EACH wooDEN s7s.00 EACH FrLE CABTNETS (2) MISC OFFICE SUPPLIES s200.00 5,n, I RESOLUTION NO. 2OI5-09 OF THE BOARD OF DIRECTORS OF THE AMADOR WATER AGENCY HONORING LOGAN MOODY FOR HIS AHIEVEMENT OF COMPLETING EAGLE SCOUT SERVICE PROJECT. CAWP FIRE HYDRANT PAINTING WHEREAS, at a time when this nation's young people face difficult challenges, the Boy Scouts of America is one of this country's finest assets, providing youth an educational program that contributes to their character development, citizenship training and improved mental and physical fitness; and WHEREAS, the highest rank a Boy Scout can attain is that of Eagle Scout and Logan Moody, after considerable effort and diligent preparation willjoin the prestigious Eagle Court of Honor this summer; and WHEREAS, Logan Moody ís a member of Boy Scout Troop 63 in Jackson, CA. His achievement includes many Merit Badges and the completion of the Eagle Scout Service Project; and WHEREAS, Logan's Eagle project greatly contributed to the betterment of his community and the County of Amador, and reflected the true spirit of volunteerism, as he lead a crew of eighteen in painting one hundred nineteen fire hydrants in zones one through five of the Central Amador Water Project area, these hydrants were located in roadways, high traffic areas and in fields. This project accounted for a hundred and forty-eight hours of cleaning and painting; NOW THEREFORE BE lT RESOLVED, by the Board of Directors of the Amador Water Agency THAT WE HERBY APPLAUD AND HONOR Logan Moody on completing his Eagle Scout Service Project. We extend to him our best wishes for every future success in attaining his rank of Eagle Scout by summer 2015. The foregoing resolution was duly passed and adopted by the Board of Directors of the Amador water Agency at a meeting held on this 23rd day of April, 201s, by the following vote: Ayes: Noes: Absent: Abstain: signed and approved by me after its passage this 23rd day of Aprir 2o1s ATTEST: Richard L. Farrington, President Cris Thompson, Clerk of the Board *lBoY scours oF AMERT.A' Eagh S<out Scrvlcc Projcct Namr Proi.ctrtÌtfu. u20no14. Pror.ctcomplrtlondrtc ln6n0ß This report is to be completed after your service þroject has been concluded¡ lt is not necessary to provide lengthy answers. Be prepared to dlscuss your project and thls repórt at your board of revlew. Project Execution: Once planning was completed, when did the work begin? 8/20/2014 When was it finished? jl26l2}ts Project Description Plcase provide a brief clescription of yclur cornplctecl project and the impact it will have. I' with the maps and counsel of Amaclor Water Agency (AWA), organized groups of youth and a few adults to clean and paint äre hydrants and cover them ¡n a reflectivê powder. These newly paiãteO'nyOránts are much brighter in color, do not blend in as well as the old color did, and with the reflective powder they are much more visibie at ñignt. rnis wili helo the community in reoards ro fire-Ttonters speed at which thev cen resoond erfectiveiv to house iires. r-rescnbe what yeu ciic aiter you!'p!'opos3: was appreved to complele lhe planning ot yr¡r¡¡r p!.ojef. Seoufeo âr-lt area to checr. Io!' 3l!'eaay p!'ohlem hyc!.anrs enq! ro mike su!"e thet the ones !.napped cut we!"e eecesablle and petntarrìe. use{ tne ''=agie :ìcount Ftnal plan,, r¡.,ot-!rsheet. utlServalrons tÀrL-+,..--¡.._-ilviitdL YYLI¡L ii(:¡l: \,!heni..,eh da!.:r.gegrcr-rpof..,elr_rnteers'¡rcculdkncckclitzonesver;,qr-tickly. What was challenging? It was hard to get boys to volunteer. competing with sports, and it was hard working around some weather in the winter months. Changes Many successful projects require changes from the original proposal. What significant changes did you make and why did,you make them (be brief)? I had to reduce the number of boys or each work day as we simply didn't have the volunteers, had to increase amount of work day, and overall lengthen projected length ofproject. Project Report Page A Logan Moody Leadership ln what ways did you demonstrate leadership? was the primary navigator, surveyed and quality-checked the boy's wor( delegated zones for boys to work ad managed the groups, and gave directions on how to appropriately paint. I What was most dÍfficult about being the leader? Making sure all hydrants were painted to the same standard, and getting to boys to have internal mot¡vation to do their best. What was most rewarding about being the leader? Camaraderie, knowing I was capable of bringing the group together myself, What did you learn about leadership, or how were your leadership skills further developed? I learned how to more effectiely and positively get others motivated. I also learned how to give more cohesive directions. Materials, Supplies, Tools, Other Were there significant shortages or overages of materials, supplies, tools, and other? lf so, what effect did this have? There was a shortage of gloves toward the end of the project, so we ha to use paper towels and be very careful. This slowed us down quite a bit. Entering Service Project Data Ihe B5A collects information on the hours worked on Eagle Scout service projects* because it points to achievement of our citizenship aím. To assist with the data collection, please refer to your list of people who helped and the number of hours they worked. Then please provide the information requested below. lnclude hours spent doing planning underTotal Hours Worked. Be sure to include yourself, and the time spent on planning. Number of Total Hou¡s Worked Worker¡ The Eagle Scout candidate Registered BSA youth members Other youth (brothers, siste¡s, ftîends, etc., who are not BSA members) Registered B5A adult S<outing volunteers and leaders Othe¡ adults (parents. grandparcnts. I 28.00 12 81.00 1 4.00 5 35.00 19 148,00 etc., who ore not BSA members) Grand Total of Hours (Enter hete and on your Eagle Scout Ronk Apptícotion.) + There ls no requirement for a minimum number of hours that must be worked on an Eagle Scout service project. lf you have been told you must meet a minimum number of hours then you rnoy lodge a complaint with your d¡sttict or council. tf you hove given leadership to an otherwise worthy project and ate tumed down by your board of review solely because of a lack of hours, you should appeal the decislon. Project Report Page B Logan Moody Fundlng Descrlbe your fu ndralsing efforts: Nofunds needed. collected? How much was How much w¿s spcnt? ffyour expcnses exceeded funds available, qplain why thls happened and how cxcess expcnses werc paid. lf you had money lcft over after proJect completlon, dld you tum lt over to the proJcct beneflciary? lf 'No," when will that be done, or if your beneficlary is not allowcd to accept the lcft over fr¡nds, which chadty will receive them? How wcrc the donorsthanked? Photo¡ rnd Odrcr Documontrtion lf you have them, attach photographs taken before, during, and after proJect completlon. You may physically attach lctters, maps, handout$ prlnted materlals, or similar items that might bc helpful to your board of revlcw. Before After The boys keeping motivated Teamworkpay:offt ProjectReportPage C Logan Moody Beginning to palnt Halñrvaytrough Anothcr hydrant almost done Hydrant Prep Fq, { ? Even got rcmc non-scout ìro{¡nteets Somc hydrants realþ needcd the work Vcryvisiblc, bdght, a great increase in overall quality. Project Report Page C - 2 Logan Moody C¡ndldrtr'¡Prolnh sþnbeluvbúorcyutseckthedherapprovals On my honor as a Scout, I vms the leoder of ryy Eagle Sr;out scrlrícc proJcct and completed lt as reportcd he¡e. l'Ìlgd// Comphûlon Approvds ssna=@4 tn my oryltnioa this Eagle Bancf,ctawnamy tf*n 9cwt selice projæt mees Eaglekout rquircment 5, as slatad on tt¡ltteadarnømct Af&øn h¡" lkn\olr Z+Nü*-Ð*e: zleil¿gs srsned: ProjcctReportFage C-¡ Dat*l/uet¡; poge 4 of thls wo¡kbú- Date: Logan Moody 5 ß.1 INTER-OFFICE MEMORANDUM TO: AMADOR WATER AGENCY FROM: JOHN SILVA. SERGEANT SUBJECT: LOCAL HAZARD MITIGATION PLAN ADOPTION REQUEST DATE: o4l09lL5 CC: An approved and updated Local Hazard Mitigation Plan (LHMP) is necessaryto maintain eligibilityfor mitigation funding from the Federal Emergency Management Agency (FEMA). The development of this plan involved multi-agency coordination and public meetings. Receiving no additional comments, the draft plan was submitted to the California Governor's Office of Emergency Services (Cal-OES) and FEMA for review pending formal adoption. FEMA has since advised that the LHMP is eligible for final approval pending its adoption by the participating jurisdictions in the plan. Please set this olan on vour sovernins bodv's aeenda as quicklv as possible with a request to pass a resolution to adopt the plan. lt is also verv important that vou use the FEMA approved language in the sample resolution attached to this memorandum. Once you obtain your resolution adopting the LHMP, please email me a copy to: [email protected]Ê at which point I will forward all of the participating jurisdictions resolutions to FEMA. Please note that while most of the contents of your LHMP.binder were printed in black & white, I printedyourjurisdictional annexincolor. lfyouwishtoseetheentireplanincolor, lincludedacopy of the plan on a CD located on the inside front cover of your binder. lf you have any questions, please don't hesitate to contact me. Thanks in advance & l'll look forward to receiving your resolution! >-áy-w U - Sergeant/Emergency Services Coordinator isi lva (Ða m adorgov.org John Silva 700 Court Street, Jackson, CA 95642 Direct Office # - 209-223-6834 RESOLUTTON NO. 2015-10 OF THE BOARD OF DIRECTORS OF THE AMADOR WATER AGENCY ADOPTING THE AMADOR COUNTY LOCAL HAZARD MITTGATION PLAN Whereas, the Amador Water Agency recognizes the threat that natural hazards pose to people and property within our community; and Whereas, undertaking hazard mitigation actions will reduce the potential for harm to people and property from future hazard occurrences; and Whereas, the U. S. Congress passed the Disaster Mitigation Act of 2000 ("Disaster Mitigation Act") emphasizing the need for pre-disaster mitigation of potential hazards; Whereas, the Disaster Mitigation Act made available hazard mitigation grants to state and local governments; Whereas, an adopted Local Hazard Mitigation Plan is required as a condition of future funding for mitigation projects under multiple FEMA pre- and post-disaster mitigation grant programs; and Whereas, the Amador Water Agency fully participated in the FEMA-prescribed mitigation planning process to prepare this local hazard mitigation plan; and Whereas, the California Office of Emergency Services and Federal Emergency Management Agency, Region lX officials have reviewed the Amador County Local Hazard Mitigation Plan and approved it contingent upon this official adoption of the participating governing body; Whereas, the Amador Water Agency desires to comply with the requirements of the Disaster Mitigation Act and to augment its emergency planning efforts by formally adopting the Amador County Local Hazard Mitigation Plan; Whereas, adoption by the governing body for the Amador Water Agency demonstrates the jurisdiction's commitment to fulfilling the mitigatíon goals and objectives outlined in the Local Hazard Mitigation Plan. Whereas, adoption of this legitimacies the plan and authorizes responsible agencies to carry out their responsibilities under the plan. Now, therefore, be it resolved, that the Amador Water Agency adopts the Amador County Local Hazard Mitigation Plan as an official plan; and Be it resolved, that the Amador Water Agency adopts the Amador County Local Hazard Mitigation Plan by reference into the safety element of their general plan in accordance with the requirements of AB 2140; and Be it further resolved, the Amador Water Agency will submit this adoption resolution to the California Office of Emergency Services and FEMA Region lX officials to enable the plan's final approval in accordance with the requirements of the Disaster Mitigation Act of 2000 and to establish conformance with the requirements of AB 2140. The foregoing resolution was duly passed and adopted by the Board of Directors of the Amador Water Agency at a meeting held on this 23rd day of April, 2015, by the following vote: Ayes: Noes: Absent: Abstain signed and approved by me after its passage this 23rd day of April 2015. ATTEST Richard L. Farrington, President Cris Thompson, Clerk of the Board Annex F AmnooR Wnren AcENcY F.1 lntroduction This Annex details the hazard mitigation planning elements specific to the Amador Water Agency, a participating jurisdiction to the Amador County LHMP Update. This annex is not intended to be a standalone document, but appends to and supplements the information contained in the base plan document. As such, all sections of the base plan, including the planning process and other procedural requirements apply to and were met by the Agency. This annex provides additional information specific to the Amador ÏVater Agency, with a focus on providing additional details on the risk assessment and mitigation strategy for this community. F.2 Planning Process As described above, the Agency followed the planning process detailed in Section 3.0 of the base plan. ln addition to providing representation on the Amador County Hazard Mitigation Planning Committee (HMPC), the Agency formulated their own internal planning team to support the broader planning process requirements. Internal planning participants included staff from the following Agency departments : a Chris McKeage, Operations Manager Additional details on plan participation and Agency representatives are included in Appendix A. F.3 Agency Profile The profile for the Amador Water Agency is detailed in the following sections. Figure F.l displays a map and the location of the Amador Water Agency service area within Amador County. Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Annex F.1 Ðeé Figure F.1. Amador Water Agency Service Area Map tA MEL CITY OF I YMOUTH OW'l D srr S.H.C ¡l PINE P.G. ,Í. i L tt,,, TÂBXÂtt! Source: Amador County Water Agency Urban Waier Management Plan, 2011 F.3.1 History and Background In 1959, the Amador Water Agency (AWA) was formed for the purpose of providing water and wastewater services to the residents of Amador County. The AWA is the main water supplier for the western portion of Amador County. The Agency has two sources of water: surface water and groundwater. Surface water accounts for approximately 94o/o of total supply. The primary source of consumptive water is the Mokelumne River which is supplied from rainfall and snowmelt from the Sierra Mountain Range. This water is diverted from the Tiger Creek afterbay or Lake Tabeaud forebay and then either it gravity flows or is pumped to AWA treatment plants. The Agency's two main water systems are the Amador Water System (AWS) and the Central Amador Water Project System (CAWP). The Agency supplies drinking water to the communities of Jackson, Ione, Sutter Creek, Amador Clty, Drytown, Plymouth, the communities along the Highway 88 corridor, and the Lake Camanche and LaMel Heights areas. The agency is located on Ridge Road in Sutter Creek; however, their assets are located throughout the County and beyond. Agency) Update January 2014 Annex F.2 afnep Water Sources The North Fork of the Mokelumne River, located in the Califomia Sierua Nevada Mountains, is the primary source for the CAWP system, the AWS, and the PG&E Tiger Creek Powerhouse system. Water supplied from rainfall and snowmelt is stored in Tiger Creek Afterbay and gravity feeds to the PG&E Tiger Creek Powerhouse Memcor Plant where it is treated and serves the PG&E Conference Center. Water from the Tiger Creek Afterbay is also pumped to the Buckhorn Water Treatment Plant where it is treated and ready for use by Agency customers in Pine Grove, Pine Acres, Sunset Heights, Fairway Pines, Jackson Pines, Pioneer, Gayla Manor, Ranch House Estates, Pine Park East, Toma Lane, Sierra Highlands, Silver Lake Pines, Ridgeway Pines, Rabb Park, and Mace Meadows. Water from the Mokelumne River is also stored in Lake Tabeaud and conveyed by pipeline to the Tanner Water Treatment Plant where it is treated for use by the customers of Jackson, Sutter Creek, Amador City, Dr¡own, and Plymouth. The Ione Pipeline transports raw water from the Tanner Reservoir to the Ione Water Treatment Plant where it is treated for use by customers of Ione. The Agency's La Mel Heights customers get their water from a pair of wells located in the La Mel Heights Subdivision and Lake Camanche residents get their water from three wells located in the Lake Camanche area. Recently the agency acquired the small, membrane water treatment plant form PG&E at the Tiger Creek Power Plant. F.3.2 Population The population served by the Agency is in excess of 25,000. F,4 Hazard ldentification and Summary This section details how the risk varies across the Amador County planning area. The Agency's planning team identified the hazards that affect the Agency and summarized their frequency of occurrence, spatial extent, potential magnitude, and significance specific to the Amador Water Agency (see Table F.1). In the context of the plan's planning area, there are no hazards that are unique to the Agency. Information on past occuriences and the likelihood of future occuffences is detailed in Section 4, Risk Assessment, of the base plan. Additional information for high and medium significant hazards for the Agency is included in the Vulnerability Assessment section of this Annex. Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Annex F.3 ame& Table F.1. Amador Water Agency Hazard ldentification Table Hazard Geographic Extent Probability of Future Occurrences Magnitude/Severity Significance Avalanche Limited Unlikely Negligible Low Dam Failure Limited Unlikely Limited Medium Drought Significant Likely Limited Medium Earthquake Limited Occasional Limited Medium Floods: 100/500 year Limited Unlikely Negligible Low Floods: Localized/Stormwater Limited Unlikely Negligible Low lnvasive Species: lnsecVPests Limited Unlikely Negligible Low Landslide/Debris Flows Limited Likely Negligible Medium Land Subsidence Limited Unlikely Negligible Low Levee Failure Limited Likely Negligible Low Limited Unlikely Negligible Low Severe Weather: Extreme Heat Limited Unlikely Negligible Low Severe Weather: Fog Limited Likely Negligible Low Severe Weather: Heavy rain, thunderstorm, hail, and lightning Limited Likely Limited Low Limited Unlikely Negligible Low Limited Likely Negligible Low Severe Weather: Winter Storm Limited and Freeze Likely Limited Medium Wildfire Significant Likely Critical Medium Volcanoes Limited Unlikely Negligible Low Marine lnvasive Species Severe Weather: Tornado Severe Weather: Wind Geographic Extent Limited: Less than 10% ol planning area Significant: 10-50% of planning area Extensive: 50-100% of planning area Probability of Future Occurrences Highly Likely: Near 100% chance of occurrence in next year, or happens every year. Likely: Between 10 and 100% chance of occurrence in next year, or has a recurrence interval of 10 years or less. Occasional: Between 1 and 10o/o chance of occurrence in the next year, or has a recurrence interval of 11 to '100 years. Unlikely: Less than 1% chance of occurrence in next 100 years, or has a recurrence interval of greaterthan every 100 years. Amador County (Amador Water Agency) Local Hazzrd Mitigation Plan Update January 2014 Magnitude/Severity Catastrophi+More than 50 percent of property severely damaged; shutdown of facilities for more than 30 days; and/or multiple deaths Critical-25-50 percent of property severely damaged; shutdown of facilities for at least two weeks; and/or injuries and/or illnesses result in permanent disability Limited-10-25 percent of property severely damaged; shutdown of facilities for more than a week; andior injuries/illnesses treatable do not result in permanent disability Negligible-Less than 10 percent of property severely damaged, shutdown of facilities and services for less lhan 24 hours; and/or injuries/illnesses treatable with first aid Significance Low: minimal potential impact Medium: moderate potential impact High: widespread potential impact Annex F.4 arneé F.5 Vulnerability Assessment The intent of this section is to assess Amador Water Agency's vulnerability separate from that of the planning area as a whole, which has already been assessed in Section 4.3 Vulnerability Assessment of the base plan. This vulnerability assessment provides an inventory of the population, property, and other assets owned by the Agency and further analyzes those assets at risk to identified hazards ranked of medium or high signifîcance (as listed in Table F.1) to the community. For more information about how hazards affect the County as a whole, see Chapter 4 Risk Assessment in the main plan. F.5.1 Total Assets at Risk This section identifies Biggs's total assets at risk, including values at risk, critical facilities and infrastructure, natural resources, and historic and cultural resources. Growth and development trends are also presented for the community. This data is not hazard specific, but is representative of total assets at risk within a community. Values at Risk Significant assets directly within the each district include a range of properties and infrastructure. These may include District-owned property and infrastructure. An inventory of key district assets is provided in Table F.2. Total value of these assets exceeds $24 million for the Agency. Table F.2. Key Assets in the District Replacement Value Service Area Facility type Facility Name AWS/Ione Pump Station Preston Pump Station AWS/Ione Tank Prison Tank AWS/Ione WTP lone WTP $2,245,726 AWS/Sutter Creek AWA Admin Offices and Shop $1,626,073 $77,516 $599,880 AWS/Sutter Creek Pump Station Ridge Pump Station $186,6'17 AWS/Sutter Creek Pump Station Canal Bypass Pump Station $386,008 AWS/Sutter Creek Pump Station Trent Pump Station $161,941 AWS/Sutter Creek Pump Station Airport Pump Station $168,296 AWS/Sutter Creek Supply Pump Lake Tabeaud Canal Supply AWS/Sutter Creek Tank Ridge Tank, bolted steel AWS/Sutter Creek WTP TannerWTP AWS/Sutter Creek WTP Tanner Reservoir Camanche Lift Station Lift Station A Camanche Lift Station Lift Station B $49,475 Camanche Lift Station Lift Station C $260,393 Camanche Lift Station Lift Station D $125,101 Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update Jatnary 2014 $50,000 $210,267 $1,768,583 $249,883 $49,475 Annex F.5 afneÉ Replacement Facility type Facility Name Camanche Pump Well#10 $137,235 Camanche $353,744 Service Area Value Tank 124,12b Wood Storage Tank Camanche Tank #6 Storage Tank, wood $44,527 Camanche Tank Well #9 Storage, wood $129,871 Camanche Tank Tank#10, redwood $197,310 Camanche Tank Tank #9 Storage, redwood $197,310 Camanche Tank Tank #8, redwood Camanche Tank/Booster Pump Tank 8, bolted steel $122,717 Camanche Warehouse Camanche Warehouse $507,983 Camanche Well Well#12 $628,774 Camanche Well Well#6 $112,386 Camanche Well Well#14 $128,720 Well#9 $62,026 Camanche Camanche Well \ \ /TP ^ Buckhorn WïP Camanche $94,650 $136,821 CAWP system ^^/TP Buckhorn WTP CAWP system Storage Shed CAWP system Tank CAWP system Tank McKenzie Tank, bolted steel $45,7ô4 CAWP system Tank Madrone Tank, bolted steel $54,669 CAWP system Tank Frank's Tank, welded steel $113,841 CAWP system Tank CSA 2 Tank 1, wood $71,738 CAWP system Tank Jackson Pines , bolted steel $94,032 CAWP system Tank Mace Meadows #5 Tank, bolted steel $85,250 CAWP system Tank CAWP Tank, bolted steel $64,718 CAWP system Tank Rabb Park Tank, bolted steel $61,2s5 CAWP system Tank Sunset Heights Tank, welded steel $107,637 CAWP system Tank Tank C, redwood $142,240 CAWP system Tank Mace Meadows #3, redwood $116,914 CAWP system Tank Mace Meadows #4, bolted steel $97,000 CAWP system Tank Alpine Tank #2, welded steel $228,820 CAWP system Tank Tank B Storage Tank, bolted steel $128,016 CAWP system Tank Tank A Storage Tank, welded steel $424,245 Chlorine Station Eaglesnest Chlorine Station $6,166 Gayla Manor\Mly'TP s47,611 Eaglesnest Gayla Manor LaMel Heights \ $6,897,917 Storage Shed $35,1 1 6 Alpine Tank $53,185 1 ^¡/TP Pump Station LaMel Hts Pump Station $135,313 $104,199 Tank LaMel Hts Tank, bolted steel Martell Lift Station Martell Lift Stations Martell Lift Station Wal-Mart Lift Station $68,028 Martell Lift Station Kmart Lift Station $68,028 LaMel Heights Amador County (Amador Water Agency) Local Hazard Mitigation Plari Update Ianuary 2014 $1,182,196 Annex F.6 ame& Replacement Service Area Facility type Facility Name Martell Lift Station Lift Station 'l $142,240 Martell Lift Station Lift Station 2 $161,535 Martell Lifl Station Sierra West Lift Station $68,028 Martell Value Lift Station Amador Central List Station $74,212 Mt Crossman Pump Station Mt. Crossman Pump Station $75,383 Pine Acres Pump Station Pine Acres Pump Station Pine Acres Tank Pine Acres tank, wood $129,871 Pine Acres Tank Pine Acres tank, wood $129,871 Tank Pine Acres tank, welded steel $299,074 Pine Acres $41,495 Ranch House Pump Station Ranch House Pump Station Ranch House Tank Ranch House Tank, bolted steel Raven Rd Vault Raven Rd Vault Pit A & B Ridge Rd Lift Station Ridge Lift Station Tank Ridgeway Pines Tank, Redwood $82,870 $31,936 Ridgeway Pines Rocky Lane $45,566 $463,825 $31,936 $185,530 Pressure Regulating Station Rocky Lane Pressure Sta. Silver Lake Pines Pump Station SLP Pump Station Tiger Creek Pump Station Tiger Creek Pump Station $424,936 Total $489,059 $24,380,573 WTP - Water Treatment Plant \ A¡/TP - Wastewater Treatment Plant Growth and Development The Amador Water Agency expects population in the service area to increase. Future development in the service area is shown in Table F.3. Table F.3. Current and Projected Population Service Population 2010 2015 2020 2025 2030 25,640 27,880 30,448 33,374 36,766 F.5.2 Priority Hazards: Vulnerability Assessment This section provides the vulnerability assessment, including any quantifiable loss estimates, for those hazards identified above in Table F.l as high or medium significance hazards. Impacts of past events and vulnerability of the Agency to specific hazards are further discussed below (see Section 4.1 Hazard Identification for more detailed information about these hazards and their impacts on the Amador County planning area). Methodologies for calculating loss estimates are the same as those described in Section 4.3 of the base plan. In general, the most vulnerable Amador County (Amador Water Agency) Local Haza¡d Mitigation Plan Update January 2014 Annex F.7 AfrEæ structures are those located within the floodplain, in the wildland urban interface, unreinforced masonry buildings, and buildings built prior to the introduction of modem building codes. An estimate of the vulnerability of the Agency to each identified hazard, in addition to the estimate of risk of future occurrence, is provided in each of the hazard-specific sections that follow. Vulnerability is measured in general, qualitative terms and is a summary of the potential impact based on past occurrences, spatial extent, and damage and casualty potential. It is categorized into the following classifications a 3 a a G : Extremely Low-The occurrence and potential cost of damage to life and property is very minimal to nonexistent. Low-Minimal potential impact. The occurrence and potential cost of damage to life and property is minimal. Medium-Moderate potential impact. This ranking camies a moderate threat level to the general population and/or built environment. Here the potential damage is more isolated and less costly than a more widespread disaster. High-Widespread potential impact. This ranking carries a high threat to the general population and/or built environment. The potential for damage is widespread. Hazards in this category may have occurred in the past. Extremely High-Very widespread with catastrophic impact. Dam Failure Vulnerability to Dam Failure Likelihood of Future Occurrence-Occasional Vulnerability-Medium The Agency owns the Ione Canal Dam, the Gayla Manor wastewater storage pond dam, and the Lake Camanche wastewater storage pond dam, all of which are low hazard dams. The primary risk involves property and potential environmental damage. Drought V u I n erabil ity to Dro u ght Likelihood of Future Occurrence Occasional Vulnerability-Medium Surface water accounts for approximately 94o/o of the Agency's total water supply. Surface water is the sole supply source for both the Amador Water System (AWS) and the Central Amador Water Project (CAWP) and is obtained from the Mokelumne River watershed. The Agency's main water supply is the Mokelumne River, a snow- and rain-fed river originating in the Sierra Nevada. The Mokelumne River watershed is a relatively narrow and steep watershed located Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Annex F.8 arneé: northeast of the Sacramento-San Joaquin Delta on the western slope of the Sierra Nevada. The watershed, upstream of Camanche Dam, covers an area of 627 square miles and extends from Highland Peak (elevation 10,934 feet above sea level) near the crest of the Sierra Mountains to Camanche Reservoir (elevation 235 feú above sea level) looated in the lower western foothills near Clements. Annual precipitation (rainfall and snowfall) in the Mokelumne fuver Watershed, and thus river runoff, is extremely variable in Northem California. Within a year, precipitation is highly seasonal with most precipitation normally occurring between November and May and very little occurring between late spring and fall. Peak flows in the Mokelumne River normally occur during winter storms or during the spring snow-melt season from March through June. River flows decrease to a minimum in late summer or fall. Amador County has a varying range of temperature and precipitation. The Sierra Nevada foothill areas experience hot, dry summers and mild winters. The higher elevations, about 5,000 feet, experience long and severe winters accompanied by heavy snowfall. The Agency is the main water purveyor for the western portion of Amador County. The Agency has the legal jurisdiction to serve water throughout Amador County Relatively high water losses have been historically attributed to the Agency's raw water ditch conveyance and delivery system, specifically the Amador Canal and Ione Canal. The new Amador Transmission Pipeline, completed in July 2007, replaced the majority of the conveyance requirement for the canal by constructing a 33-inch pipeline between Lake Tabeaud and the Tanner Reservoir. The new pipeline mitigates for water historically lost during conveyance through the Amador Canal, lowering effective system demand and allowing the Agency to more efficiently use its water entitlements. Also, by eliminating canal losses, the Agency has been able to better identify residential, commercial and industrial losses. Agency operational experience during normal, dry and multiple dry year conditions, such as 1988 to 1994, indicates that the spring runoff will continue to fill PG&E reservoirs to near capacity. These reservoirs form the head of both the AWS and CAWP surface water diversions. Even during unusually severe droughts, such as occurred in 197611977, and the prolonged drought of 1988 to 1994, the PG&E storage capacity and the priority of the water rights for such storage enables PG&E to deliver the full annual contract entitlements to the Agency. For the limited groundwater sources utilized by the Agency, the firm yield determined at the time of well installation indicates that the supply is consistent for normal, dry or multiple dry years. Climatic change is not considered to be a factor in the Agency's water supply reliability. The original La Mel Heights groundwater well has been run continuously through a variety of seasonal and climatic conditions and has continued to produce a steady yield. The Agency added a second well in the La Mel Heights area to provide additional supply as well as to provide redundancy. Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Annex F.9 am€r* The Agency has completed a Groundwater Sustainability Study for the Lake Camanche Village service area, as directed by the State Department of Public Health (CDPH). To date, the water Cosumnes Sub-basin that supplies Lake Camanche Village has supplied sufficient water, but it should be noted that the Agency did not receive ownership of the system until 2001, therefore supply data for dry and multiple dry years is not available. With the existing four (4) wells and the requirement to be able to take the largest producing well (well 14) off line, there is limited ability to extend services. Earthquake Vulnerability to Earihquake Likelihood of Future Occurrenc*Occasional Vulnerability-Medium Due to the Agency's geographic location and the areas seismic classification, service intemrption due to seismic activity is considered minimal and is therefore not addressed in the Emergency Handbook. Landslide/Debris Flows Vulnerability to Landslide/Debris Flow Likelihood of Future Occurrence-Occasional Vulnerability-Medium Landslides in Amador County include a wide variety of processes resulting in downward and outward movement of soil, rock, and vegetation. Common names for landslide types include slumps, rockslides, debris slides, lateral spreading, debris avalanches, earth flows, and soil creep. Although landslides are primarily associated with slopes greater than 15 percent, they can also occur in relatively flat areas and as cut-and-fiIl failures, river bluff failures, lateral spreading landslides, collapse of wine-waste piles, failures associated with quamies, and open-pit mines. Landslides may be triggered by both natural- and human-caused activity. Landslide prone areas in Amador County are shown in Figure F.2. District boundaries are approximate. Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Annex F.10 afneé Ftr> qãi l! b sP (ct È $'å s^ ç o u Ho T <q å¡ le oar Ðl Þ EL DORADO 5o -Yj Þè 5Þ t È> !l oa ALPINE !t CL o o' o 3 Ât J Legend =' rct ndslidès t- z Lâ U ã Lândslide lncidence Þ iri ¡-* o, É. () tt I r"ì. Ç o I Moderate o, ¡r¡gh lncidèncê & Susæptib¡lity t'"Í' Ama-dor' öounty CALAVERAS r *! I SAN o 3 o "h amec. 0 Map cmpiled 10/2012t intended útr planning purpæes onlyDâ1â Source:Amador Comty. CALAï,qS. U,S. Geological Surey X FJ 10 r -- r Mode¡ate Suscept¡bility fïT HigÌt susceptibitity i icombGHigh ---{- Râ¡lroads CL (Í, CL o J e. CL Primary Roâds -* Highways - o Communities [---l spn r"" of lnlænce i--l city t-¡-it" fJcomties 20 Mlles A o J o o In 2005, the north side of Ridge Road near Sutter Creek failed. A landslide took out 300 feet of water supply ditch. This supply fed 6 cities/towns. The area was affected for one week. No towns were out of water due to the conservation, stored reserves of water and quick action. No one was completely out of water. Primary water supply is now delivered via pipeline. Severe Weather: Winter Storm and Freeze Vulnerability to Severe Weather: Winter Sform and Freeze Likelihood of Future Occurrence-Occasional Vulnerability-Medium to excessively cold temperatures are identifìed normally on a nation-wide assessment scale, which doesn't allow detailed results on specific structures. Secondary impacts of freeze can affect the supporting mechanisms or systems of a community's infrastructure. For example, when extreme cold is coupled with high winds or ice storms, power lines may be downed, resulting in an intemrption in the transmission of that power shutting down electric furnaces, which may lead to frozen pipes in homes and businesses, such as the Amador Water Areas prone Agency. Like most weather events, periods of heavy snow occur on an annual basis in the higher elevations of the County. Impacts to the County as a result of winter snow storms include damage to infrastructure, utility outages, road closures, traffic accidents, and intemrption in business and school activities. Also of concern is the impact to populations with special needs such as the elderly and those requiring the use of medical equipment. Delays in emergency response services can be of significant concem. Further, there are economic impacts associated with areas prone to heavy snow. Although the eastem portion of the County is the most vulnerable to the effects of snow, snowfall occurring in the lower elevations can create significant issues, as they may not be as prepared for snowfall. In 2003 a severe winter storm hit near Pioneer. Downed powff lines were widely reported. There were road and school closures. The power outage affected the Agency's ability to run the water treatment plant and pump stations that pump the water to the required service areas. Wildfire Vulnerabil ity to Wil dfi re Likelihood of Future Occurrence-Occasional Vulnerability-Medium fre hazards are most pronounced in rural-urban interface areas, or where urban development is located close to open space areas where vegetation serves as fuel. Calculation of threat from wildfire hazard is based on a number of factors including fuel loading (vegetation), topography, and climatic conditions such as winds, humidity and temperature, as well as the Wildland Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update Januæy 2014 Annex F.l2 afneÉ proximity of structures and urban development to fire hazards. Generally speaking, the late summer and early fall, when vegetation is at its driest, are the periods of greatest risk for wildland fire. Huma¡ activity, including residential and agricultural burning, careless disposal of cigarettes, campfires, arson and use of fireworks can all trigger fires; natural causes such as lightning strikes may also be a cause. Figure F.3 maps the wildfire threat to the County, with the District circled in black. Most of the district is in the moderate to high fire threat risk category, with some areas considered very high. Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Annex F. 1 3 AfrFÉ :rt > 5ã3 f! (cI Þ gå FO \: ñsÄ o ,È èCLE | )+zt¡ ?.2 mf s-. Ë oia 5o øl -Tt ...¿. fÐ ('1,,,rrrr ... pr, l.¿It r,,. E :) Þ¿ 5Þ' t õ -* =: o *c È> 9qe @g ELDO.RADO | //!/y' /, ßf" . r,ir:Á,t.\ u @ ,r,trt' o (D =. Cos I l;//,5)uirçr o Þ o tz U 3 s) CL o 4 É. ß a ' |4d; il,.. ¡,,rt k ll irr'¡ s€ "kl!"""'I o TUOLUMNE "2.. (cI ,,¿.:4))2.,. Fhe Severity Zones CALAVÊRAS Í, ar [ffi Moderale Non-Wldland/Non-Urban Urban Unzoned SAN Rivers l'---l - o 3 ó 1 afnectr 5 @ X Fr Map conpiled 10/2012; intended for planning purpûses only. Ð*a Souce: Amãdor County, CALATIáS" CALFIRE: SRA1Iã/2007. LRA 5/2008. FRA.4-RA8/2007 Oraft 10 + very High High ,T R¡s¿rr,r/¡' o o Legend Railroads Primary Roads Ø a l---l Highways o Communilies _?. []-l city r-i.it" spnur". or lnfluence o o Þ a o gt Counties 1"k". 20 M¡les À In 2007 , a wildfire occurred twenty miles east of Pioneer. Roads were closed and forested areas damaged. There was an increase in water turbidity but it was manageable even with the short loss of power. F.6 Gapability Assessment Capabilities are the programs and policies currently in use to reduce hazard impacts or that could be used to implementhazard mitigation activities. This capability assessment is divided into five sections: regulatory mitigation capabilities, administrative and technical mitigation capabilities, fiscal mitigation capabilities, mitigation outreach and partnerships, and other mitigation efforts. F,6.1 Regulatory Mitigation Capabilities Table F.4 lists regulatory mitigation capabilities, including planning and land management tools, typically used by local jurisdictions to implementhazard mitigation activities and indicates those that are in place in the Amador Water Agency service area. Table F.4. Amador Water Agency Regulatory Mitigation Capabilities Regulatory Tool (ordinances, codes, plans) Y/N General plan N Zoning ordinance N Subdivision ordinance N Growth management ordinance N Floodplain ordinance N Other special purpose ordinance (stormwater, steep slope, wildfire) July 2, N BCEGS Rating N Fire department ISO rating N Erosion or sediment control program N Stormwater management program N Site plan review requirements N Capital improvements plan N Economic development plan N Local emergency operations plan N Plans N Elevation certificates N Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Amador Water Agency Water Code N Flood insurance study or other engineering study for streams Other Comments 2007 Building code Community Wildfire Protection Date 2011 2010 Urban Water Management Plan Water Conservation Plan Annex F.15 afne# Urban Water Management Plan (201'll The Urban Water Management Plan was prepared in accordance with the Urban Water Management Act. The Act is defined by the California Water Code, Division 6, Part 2.6, and $$10610 through $$10657. The Act became part of the California Water Code with the passage of Assembly Bill 797 duringthe 1983-1984 regular session of the California legislature. The Act requires urban water suppliers providing municipal water to more than 3,000 connections or supplying more than 3,000 ac-ft of water annually to adopt and submit a plan every five years to the Califomia Department of Water Resources (DWR). Amador Water Agency provides potable and raw water to more than 25,000 people for municipal, industrial, and irrigation uses as well as wastewater collection and treatment services to meet the needs of our customers. While demands for Agency water have flattened during this recession, the Agency intends to use this UWMP to manage the Agency's water supplies and water demands over a range of normal and emergency conditions. The Agency is committed to maximizing available water resources and minimizing the need to obtain additional water supplies. The Agency has done this and will continue to do this by utilizing water management tools and developing strategic partnerships with upstream, downstream, and nearby agencies and districts. Water Conservation Plan (November 2010) Efficient use of existing water supplies is extremely important to Amador Water Agency. In reflection of this philosophy, the Agency has developed this Conservation Plan, building upon conservation strategies identified and documented in the Urban Water Management Plan with the 'Water intent to further extend the Agency's water resources. Amador Agency is committed to maximizing available water resources and minimizing the need to obtain additional water supplies. The Agency has done this, and will continue to do so, by utilizing water management tools and developing strategic partnerships with upstream, downstream, and nearby agencies and districts. Further, the Agency is committed to working with the public to facilitate regional water management efforts and to educate regarding the importance of water conservation. The Agency predicts that, by working with their numerous partners and implementing the programs described in this Conservation Plan, they will be able to continue managing and efficiently using their existing water supply sources through at least the year 2030. Water Code (Revised July 2, 2007) The Amador Water Agency Water Code sets out the general policies for operating its water system. The Water Code delineates the specifics of how the Agency runs day to day operations, as well as its rules and regulations. Voluntary and mandatory water conservation measures during drought situations are set forth. Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 A¡nex F. 1 6 arneé F .6.2 Adm in istrative/Techn ical Miti gation Gapabi I ities Table F.5 identifies the Agency department(s) responsible for activities related to mitigation and loss prevention in the Amador Water Agency service area. Table F.5. Amador Water Agency Administrative and Technical Mitigation Capabilities Yes/No Personnel Resources Planner/Engineer with knowledge of land developmenUland management practices Engineer/Professional trained in construction practices related to buildings andior infrastructure Planner/Engineer/Scientist with an understanding of natural hazards Y Engineering Y Engineering Y Engineering Full time building official Y Y Floodplain Manager N Emergency Manager Y Grant writer N Other personnel N Personnel skilled in GIS GIS Data - Hazard areas DepartmenUPosition Engineering Building Department Amador County County OES Amador County N GIS Data - Criticalfacilities N GIS Data GIS Data - Building footprints N Land use Y Engineering Links to Assessor's data Y Engineering GIS Data Gomments Warning Systems/Services (Reverse 9-1 cable override, outdoor warning signals) 1, Y Administration Other F.6.3 Adm i n istrative/Tech nical Miti gation Capabi I ities Table F.6 identifies the department(s) responsible for activities related to mitigation and loss prevention in the Amador Water Agency service area. Table F.6. Amador Water Agency Fiscal Mitigation Capabilities Accessible/Eligible to Financial,Resources Use (Y/N) Comments Comm unity Development Block Grants Capital improvements project fu nding Authority to levy taxes for specific purposes Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update Jarnary 2014 By voter approval Annex F.i7 ame& Accessible/Eligible to Financial Resources Use (Y/N) Comments Fees for water, sewer, gas, or electric services lmpact fees for new development lncur debt through general obligation bonds lncur debt through special tax bonds N lncur debt through private activities N Withhold spending in hazard prone areas Other F.6.4 Mitigation Outreach and Fartnerships e n r The Agency partners with the County and Amador City on public education and information programs. The Agency has an information booth at the County Fair The Agency has done presentations at the Lions Club, Rotary Club, TSPN TV, and on various radio stations. F.6.5 Other Mitigation Projects and Efforts . " Purchasing and maintenance of mobile and fixed generators Emergencyinventories F.7 M¡t¡gation Strategy This section describes the mitigation strategy process and mitigation action plan for Amador 'Water Agency's inclusion with the Amador County Local Hazard Mitigation Plan update. F.7.1 Mitigation Goals and Objectives The Amador Water Agency adopts the hazard mitigation goals and objectives developed by the HMPC and described in Chapter 5 Mitigation Strategy of the base plan. F .7 .2 Mitigation Actions The planning team for the Amador TVater Agency identified and prioritized the following mitigation actions based on the risk assessment and in accordance with the process outline in Section 5, Mitigation Strategy, of the base plan. Background information and information on how each action will be implemented and administered, such as ideas for implementation, responsible office, potential funding, estimated cost, and timeline are also included. General Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Annex F. 1 8 afneé on plan implementation and maintenance of this LHMP by all participating jurisdictions is included in Section 7, Plan Implementation and Maintenance, of the base plan. processes and information 1. Gravity Supply Line Hazards Addressed: Landslide, earthquake Issue/Background: the entire water supply for Pioneer and Pine Grove, CA come from a pair of large pump stations. These pump stations and the old transmission line is vulnerable. The twelve inch (12") line runs up a very steep embankment up to the water treatment plant. The planned gravity supply line (GSL) project would replace these two pump stations and provide a more secure raw water supply to the water treatment plant and would not be dependent on unintemrpted electric power. Other Alternatives: N/A Existing Planning Mechanism(s) through which Action Will Be Implemented Design complete, pursuing funding. Priority: Medium Responsible Office: Amador Water Agency Cost Estimate: $10,000,000.00 Benefits (Losses Avoided): Prevent loss of potable water Potential Funding: State and Federal programs Schedule: Planned for completion by 2014 2. Sysfem lnterties Hazards Addressed: Drought and Water Shortage Issue/Background: Single source of supply; this project provides redundancy. Project Description: Install four miles of pipe to intertie two major systems. Other Alternatives: N/A Existing Planning Mechanism(s) through which Action Will Be Implemented: AWA Master Plan Priority: Medium Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update Ianuary 2014 Annex F.19 ameé Responsible Office: Amador Vy'ater Agency Cost Estimate: $2,000,000.00 Benefits (Losses Avoided): During a water shortage emergency, this project will allow potable water to flow to 3,000 to 8,000 residents who would otherwise be cut off. safe, Potential Funding: Søte and Federal programs Schedule: To be determined. 3. Upgrade Fire Pumps Hazards Addressed: Wildfire Issue/Background: Several water systems are old and inadequate for current fire pumping equipment. Project Description: Replace and upsize three fire pump installations. Other Alternatives: N/A Existing Planning Mechanism(s) through which Action Will Be Implemented: AWA Master Plan Priority: Medium Responsible Office: Amador Water Agency Cost Estimate: $125,000 Benefïts (Losses Avoided): Prevent loss of potable water Potential Funding: State and Federal programs Schedule: To be determined. Amador County (Amador Water Agency) Local Hazard Mitigation Plan Update January 2014 Annex F.20 afrrep 5,0, I€Z AMADOR WATER AGENCY 3190 FIRE PROTECTION AGENCY COOPERATION 3190.1 The purpose of this policy is intended to provide direction to staff regarding the cooperative efforts with fire protection agencies which can enhance the Water Agency's ability to maintain a large number of various fire hydrants and fire protection facilities though out its systems, provide a means for information input for improved fire protection facilities owned by the Water Agency, and maintain excellent working relationships between fire protection agencies and the Water Agency. 3190.2 Water Agency staff shall provide maps showing fire hydrant and other fire protection facilities within the Water Agency service area to fire protection agencies responsible for those areas. These maps shall be periodically updated (but not less than every three years) and provided to fire protection agencies as changes occur that materíally alter fire protection equipment owned by the water Agency. 3190.3 Where fire protection agencies have adequate staffing levels and willingness to work cooperatively with the Water Agency, an inspection program shall be implemented for reviewing fire hydrants and other fire protection facilities owned by the Water Agency which provides mutually benefits for both the fire protectíon agency and the Water Agency while providing early warnings for possible needed maintenance of facilities. (a) The inspection program shall include forms for the fire protection agency to fill out that include identification of the fire hydrant or other fire protection equipment (which may include items such as backTlow devices for fire sprinkler system) along with various items to inspect both vísually and physically. The form shall also have provisions to capture the general condition of the equipment such as missing caps, damaged exterior parts, access issues, identification of fire hydrant outlets, and apparent operation of facilities. Other provisions may be included as mutually agreed by the fire protection agency and Water Agency staff. A guídance document will be created to assist with inspection activities. (b) The inspection shall include the momentary activation of fire hydrants only as a means to confirm that water flow is apparent. Specific guidelines shall be prepared which províde parameters for this flow confirmation and include notification to Water Agency personnel. (c) A repair work order form shall also be included in this program which will be used to provide information to Water Agency staff to identify problems or concerns that was noticed during the inspection. (d) lt is recognized that forms may need to be tailored to specific fire protection agencies, but shall be standardized as much as possible. 130 AMADOR WATER AGENCY ADM| N / STRATIVE POLI CY MAN UAL (e) Water Agency staff shall maintain a record for this inspection program that track facilities inspected, work orders, and other pertinent information which can be used for budgeting, refining preventative maintenance programs, repair programs, capital improvement programs, or similar activities. 3190.4 The Water Agency staff shall meet and collect information from fire protection agencies regarding potential areas for improvement or enhancement. This may include areas that need fire hydrants, replacement of current fire hydrants, need for improved fire flow, or other items which may provide better fire protection within Water Agency service areas or facility locations. (a) Fire protection improvement information shall be used to assist staff in prioritizing projects where funding is available for fire protection replacemenUimprovements. This list or acceptance of this information is not a commitment to make improvements to the system. 131 Bæld ll/beúing: April zrn-2ft15 AGENDA ITEM 6.A.1 STAFF REPORT l,lffier Sltsferc Inflatiorry Rile A{usffi Requested Action: Board authorization to implement the inflationary rate adjustment of 2.5% for fiscal year 2015-2016, as specified in AWA Board Resolution 2013-22, adopted on June 20,2013 Background: The system wide water rates and charges that were adopted by the Board on June 20, 2013 specified in item 5 that future adjustments to the System-Wide Water Rates and Charges shall occur on July 1 of each year, beginning in 2014 for five consecutive years, with the last adjustment in July of 2018. Adjustments will be made on allwater usage rates and monthly service charges, and the temporary CAWP pumping surcharge (until rescinded when the Gravity Supply Line is put into service) by the change in the Consumer Price lndex (CPI-U) as calculated by the US Bureau of Labor Statístics for the San Francisco-Oakland-San Jose area (Series CUURA422SAO) between February of the then-current year and February of the then-previous year; provided that no annual increase shall exceed 3o/o.In addition, in no event shall any such rate adjustment result in rates that exceed the cost of providing water service. The monthly debt service charges shall not be adjusted for inflation. lt is anticipated that the temporary CAWP pumping surcharge will be rescinded prior to the implementation of this proposed inflationary adjustment. The inflationary rate based on the above is 2.5 %. Staff recommends implementation of the inflationary rate due to the potential loss of revenues associated with the current drought conditions, as well as the increasing cost of operations (power, fuel, chemicals, etc.) Alternatives: Not implement the adjustment or implement a lesser percentage Fiscal lmpact: Approximately $140,000 Reviewed by Gommittee: No Recommendation: Board authorization to implement the inflationary rate adjustment of 2.5o/o for fiscal year 2015-2016, as specified in AWA Board Resolution 2013-22, adopted on June 20,2013 Prepared by: Cris Thompson, Assistant General Manager Ð L THU Rnno Gnoup, INc. March 27,2015 Gene Mancebo Amador Water Agency 12800 Ridge Road Sutter Creek, CA 95685 Subjech Annual Inflationary Adiustment to Water Rates for FY 15-16 Dear Gene, As you know, in June 2013 when the Board of Directors adopted new water rates, the Board also adopted provisions to adjust water rates annually based on changes in the San Francisco consumer price index (SF-CPD, subject to a 3 percent cap. Debt service charges are excluded from the inflationary adjustments. The annual water rate adjustments are intended to help the Agency keep water rates changes in line with inflationary changes in water system costs, and to enable the Agency limit more comprehensive rate reviews once every 5 years. For the period from February 2014 to February 2015, the SF-CPI (Bureau of Labor Statistics Series CUURA422SAO) increased by 2.5 percent. Therefore, consistent with the Board of Directors rate action in June 2013, it is recommended that the Agency increase water rates (excluding debt service charges) by 2.5 percent effective in July 2015. Adjusted water usage rates and monthly service charges for FY 15-16 are listed below. Wøter Usøge Røtes Single family residential Tier 1 Tier 2 Tier 3 fi2.02/CCF fi2.52/CCF $3.15lCCF Multi-family and commercial $2.30/CCF 91.69/CCF Mule Creek State Prison Wholesale Agencies Untreated Water fi1".27/CCF $0.5elccF Untreated Water Treated Water 5f S" meter fi7.87 3/4" meter $e.50 fi12.75 920.91 $30.68 956.76 $86.08 $13.33 fi17.70 Monthly Seraice Charges L" meter '1.'1./2' meter 2" meter 3" metet 4" meter $26.41. fi48.22 fi74.40 ç144.19 fi222.69 Grrur MaNcEno Mancs 6" meter 2" Indus.fPublic meter 3" Indus./Public meter 4" Indus.f Public meter 6" Indus.f Public meter Mule Creek State Prison Drytown CWD City of Plymouth City of Jackson fi167.53 27,201,5 Pecr 2 $440.77 $108.88 fi213.14 $330.43 fi656.26 Pine Grove CSD Mace Meadows MWC Rabb Park CSD fiI1.,998 fi672 92,512 $10,989 fi1,445 fi1,1.02 fi197 While thb inflationary water rate adjustments are intended to help keep water rate revenues in line with changes in ongoing operation and maintenance costs, the Agency's water rates are always subject to constitutional requirements, including the requirement that water rates not exceed the cost of providing service. The purpose of this letter is to outline the reasons why the planned adjustments to water rates for FY 15-16 remain less than the overall cost of providing water service. Even with the water rate adjustment, the Agency's water rates the full cost of providing service, for the following reasons: will continue to be below ' The Agency's water rates have been impacted by reduced water sales, due to statewide drought conditions. This condition creates a financial deficit as revenues fall more than costs (some cost will increase during drought conditions). ' Previously approved water rates include $160,000 annually for the capital improvement program/ even when average planned capital program expenditures were $640,000 annually (a shortfall of $480,000 annually from need). Until the water rates can fully support the ongoing rehabilitation and replacement needs of the water system, the water rates are less than the full cost of providing service. operating reserve is below its target level. Previously approved water rates included $220,000 annually to rebuild the operating reserve over an estimated -year period. The target minimum operating reserve is equal to two months of annual operating and maintenance costs (about $880,000). Until the operating reserve is fully funded any surplus revenue would appropriately be used to meet this prudent financial management target minimum reserve. ' The Agency's water system ' Previously approved water rates did not fully reflect the costs associated with retiree health benefits. Until the water rates fully reflect the financial obligation associated with retiree benefit obligations the water rates are below the full cost of providing service. GENEMeNcnno MARCH 2Z 2015 Pec¡ 3 Until all the financial needs of the water system are fully covered through water rates and other revenues the Agency's water rates will continue to be below the full cost of providing service. The planned 2.5 percent increase in water usage rates, monthly service charges, and the CAWP pumping surcharge are needed to help keep the water system on track for financial stability and sufficiency. As a reminder, customers must be informed of these changes to the water waters at least 30 days before they go into effect. This can be accomplished with a bill insert, or other means. If you have any questions regarding this needs, please call me at (916) 444-9622. Sincerely, Robert Reed The Reed Group,Inc assessment of continuing water rate revenue B€rd lìlleeting: April ?ã|-2015 Agenda ltem No. 7.A.1 STAFF REPORT Amendment No.1 b the Agr€ement beúuæen Amador l/Läbr Agency and The,Crty of Surer Crcek rcgarding Seu,erservice b nopettles along Souümest Ridge RoadArca Requested Action: Discussion and direction to the General Manager to execute Amendment No.1 to the Agreement between the Amador Water Agency and the City of Sutter Creek regarding sewer service to properties on the southwest Ridge Road area. Background: ln recent discussions with representatives from the City of Sutter Creek, I became aware of concerns that the revenue collected for a group of the City's customers was less than what the WaterAgency is chargíng the City. ln 2008 the Water Agency and the City entered into an agreement by where wastewater from City customers along southwest Ridge Road would be transported through Water Agency facilities to a point where it could flow into the City's collection system and avoid the need for duplicative infrastructure. The agreement calculates sewer service charges on each individual customer and totalizes those charges which is then billed to the City. An alternative method would be to calculate the sewer service charge as if there is only one customer which might be considered as a "wholesale" customer. This seems appropriate as the Water Agency accepts the wastewater into the system at a single point, has no responsible for individual service connections, and only sends one bill monthly to the City. It is staffs recommendation to amend the agreement to treat the City as a "wholesale" customer. The Budget and Finance Committee met on April 8, 2015 and agreed with staffs recommendation. Alternatives: Leave the agreement unchanged. Fiscal lmpact: Approximately $200 per month in reduced revenue. Reviewed by Budget and Finance Committee: Yes, with a recommendation to approve the amendment. Reviewed by LegalGounsel: No Recommendation: Discussion and direction to the General Manager to execute Amendment No.1 to the Agreement between the Amador Water Agency and the City of Sutter Creek regarding sewer service to properties on the southwest Ridge Road area. Prepared by: Gene Mancebo, General Manager 2 AMENDMENT NO. 1 AGREEMENT BETWEEN THE AMADOR WATER AGENCY AND THE CITY OF SUTTER GREEK REGARDING SEWER SERVICE TO PROPERTIES IN THE SOUTHWEST RIDGE ROAD AREA THIS AMENDMENT No. I is made this day of April, 2015 in Amador County, - California, by and between the Amador Water Agency, a public entity created by special act of the Legislature of the State of California ("Water Agency"), and the City of Sutter Creek, a municipal corporation ("City") regarding the agreement for sewer service to properties in the southwest Ridge Road area dated January 2,2008; WITNESSETH: WHEREAS, on January 2,2008, the Water Agency and City entered into an agreement ("Agreement") whereby City agreed to compensate the Water Agency for the transport of wastewater from City customers to a point of delivery defined in the Agreement.; and WHEREAS, paragraph 2 of the Agreement describes the compensation for use of the Water Agency sewer facilities; and WHEREAS, the Water Agency and City now desire to amend paragraph 2(b) of the Agreement. NOW, THEREFORE, the parties hereto agree to amend the Agreement by replacing paragraph 2(b) as follows: Commencing with the date first above written, the City shall pay the Agency's prevailing applicable sewer service charge established for \M/r/lD No. 12 for those Southwest Ridge Road Area Customers actually connected to the City Sewer Collection Pipeline. Such sewer service charges shall be based on the actual number of EDUs calculated by dividing the totalized wastewater collected per day by 200 gallons per day. iMonthly flow readings shall be taken j¡usomcer¡at Page I of3 the Delivery Point meter. lf there is not adequate flow to obtain accurate meter readings, the Water Agency shall total the treated potable water used by the individual Southwest Ridge Road Area Customers during the months of February and March to arrive at the total average flow per day and divide that by 200 ballontwnrsD2t per day to arrive at the number of EDUs that shall then be used for the purpose of the sewer charges for the upcoming fiscal year beginning in July. Southwest Ridge Road Area Customers are assumed to be low strength customers; however, should a user be identified as a medium or high strength user a weighted average shall be calculated to determine sewer service charges. The Agency shall bill the City for such sewer charges monthly. Such bills shall be become delinquent if not paid by the City within 30 days after the receipt. Except as otherwise provided herein, the City shall be subject to the ordinances, rules Agency's and regulations governing the billing, collection, and enforcement of payment of sewer charges and sewer connection fees. The City is obligated to pay the amounts due under this Agreement notwithstanding any individual default by any of the Southwest Ridge Road Area Customers. Incorporation by Reference Except as specifically provided herein, the Agreement shall remain in fullforce and effect and its terms are incorporated herein by this reference. lN MIITHNESSI¡wnmn¡l WHEREOF, the parties execute this Amendment No. Agreement on the day and year first above written. AMADOR WATER AGENCY By Gene Mancebo, General Manager Page 2 of 3 I to the C¡TY OF SUTTER CREEK By Amy Gedney, City Manager Page 3 of3