Chris Frabotta

Transcription

Chris Frabotta
FY-16 Ongoing Contracts
FY-16 Scheduled Contracts
Christopher Frabotta
Deputy Chief, Operations Division /
Chief, Navigation Branch
Southwestern Division - Galveston District
8 October 2015
Galveston District – Dredging Meeting
Custodians of the Texas Coast
US Army Corps of Engineers
BUILDING STRONG®
GALVESTON DISTRICT FACTS
 Texas #2 in Nation in Maritime Commerce
 Texas Ports moved 538M+ tons at $320B
in 2013
 Galveston District Ports
National Rank
 Houston
(2)
 Beaumont
(4)
 Corpus Christi
(7)
 Texas City
(13)
 Port Arthur
(18)
 Freeport
(32)
 Galveston
(49)
 Matagorda
(51)
 Brownsville
(73)
Galveston
District – Dredging Meeting
 Victoria
(74)
Custodians of the Texas Coast
 Gulf Intracoastal Waterway
(3)
 GIWW-TX 73M+ tons at $43B in 2013
 21.8% Nation’s Import/Export/Domestic
Tonnage
US
23.9%
of Nation’s
Total Export tonnage
Army Corps
of Engineers
BUILDING
29.6% of Nation’s
Total®Import tonnage
STRONG
50,000 square miles
GALVESTON NAVIGATION OM FUNDING
FY-15 Execution
President’s Budget
FY-15 Allocation
Carry-in
Available to Obligate
$113,351,000
$131,892,000
$ 15,739,000
$147,632,000
Obligated
$126,068,000
Percent Execution
85.4%
FY-16 Funding Outlook
President’s Budget
Carry-in
Total Anticipated
$110,404,000
$ 21,564,000
$131,968,000
BUILDING STRONG®
FY-16 INITIATIVES
 Continue Hydrographic Survey Webpage
• All six (6) Deep Draft Nav. Complexes now online
• Gulf Intracoastal Waterway this year
 Implement of Vertical Datum Conversion
 SNWW Set-Back Policy
 Restore TCOON Functionality to 30 Stations
• Bring new Sentinel Stations online
 Re-Space & Deploy new GIWW Mooring Buoys
BUILDING STRONG®
HYDROGRAPHIC SURVEY WEBSITE
BUILDING STRONG®
HYDROGRAPHIC SURVEY WEBSITE
BUILDING STRONG®
HYDROGRAPHIC SURVEY WEBSITE
BUILDING STRONG®
HYDROGRAPHIC SURVEY WEBSITE
BUILDING STRONG®
ONGOING DEEP-DRAFT
MAINTENANCE DREDGING CONTRACTS
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
GALVESTON HARBOR-GALVESTON ENTRANCE
CHANNEL AND HOUSTON SHIP CHANNEL
BOLIVAR ROADS TO RED FISH
Morgan’s Point
Galveston District – Dredging Meeting
-
Project:
Galveston Harbor Galveston Entrance Channel
and Houston Ship Channel Bolivar to Red Fish
Dredging Depth:
47-49 ft. Required Depth
Dredging Width:
800-1000 ft.
Dredging Length:
Varies
Dredging Quantity:
2,400,000 cubic yards
Material Type:
Silt/Sand
Placement Area:
Offshore/BU
Contractor:
Great Lakes Dredge &
Dock
Type of Equipment:
Hopper
Env. Window:
NA
Reason for Window:
NA
Start Date:
August 2015
Est. Completion Date:
November 2015
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
SIMS BAYOU TO TURNING BASIN
Project:
Galveston District – Dredging Meeting
-
Houston Ship Channel
Sims Bayou to Turning
Basin
Dredging Depth:
38 ft. And 42 ft.
Required Depth
Dredging Width:
300 - 250 ft.
Dredging Length:
Varies
Dredging Quantity:
1,117,000 cubic yards
Material Type:
Silt
Placement Area:
House Tract; West
Clinton
Contractor
CJW Construction
Type of Equipment:
Pipeline Dredge
Env. Window:
NA
Reason for Window:
NA
Est. Start Date:
June 2015
Est. Completion Date:
April 2016
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
EXXON TO CARPENTERS REACH
Project:
Houston Ship Channel
Exxon to Carpenters Reach
Dredging Depth:
47 ft. Required Depth
Dredging Width:
300 ft.
Dredging Length:
Varies
Dredging Quantity:
1,500,000 cubic yards
Material Type:
Silt
Placement Area:
Lost Lake PA and Peggy
Lake PA
Contractor:
Weeks Marine, Inc.
Type of Equipment:
Pipeline Dredge
Env. Window:
NA
Reason for Window:
NA
Start Date:
October 2015
Est. Completion Date:
September 2016
Lost Lake
Goat Island
Peggy Lake
Alexander
Island
Spilman
Island
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
ONGOING DEEP-DRAFT
MAINTENANCE DREDGING CONTRACTS
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
FREEPORT HARBOR ENTRANCE CHANNEL
Brazos Harbor
Turning Basin
and Channel
Stauffer Channel
(De-Authorized) Brazosport
Upper
Turning Basin
Turning Basin
Surfside
1
Project:
Quintana
7
Freeport Harbor
Entrance Channel
Dredging Depth:
49 - 47 ft. Required Depth
Dredging Width:
400 ft.
Dredging Length:
Varies
Dredging Quantity:
2,987,000 cubic yards
Material Type:
Sand/Silt
Placement Area:
Offshore
Contractor:
Manson Construction
Type of Equipment:
Hopper
Env. Window:
NA
Reason for Window:
NA
Start Date:
August 2015
Est. Completion Date:
December 2015
85
88
1-A
Buffer
Zone
Limits of
Discharge
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
ONGOING DEEP-DRAFT
MAINTENANCE DREDGING CONTRACTS
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
MATAGORDA SHIP CHANNEL
MATAGORDA PENINSULA TO POINT COMFORT
Palacios
Lavaca Bay
Red
Bluff
Project:
14
13
12
Point Comfort
Carancahua
Bay
11
19
Port
23
18
Lavaca
22
17
21
Lavaca Bay Keller Bay
16
Harbor
20
15
Of Refuge
14
10
9
8
7
6
5
12
11
112-B
112-A
113 112-C
114
115
116
4
Dredging Depth:
38 ft. Required Depth
Dredging Width:
200 ft.
Dredging Length:
Varies
Dredging Quantity:
3,300,000 cubic yards
Material Type:
Sand/Silt
Placement Area:
Open Water/Semi
Confined
Contractor
Orion Marine
Construction, Inc
Type of Equipment:
Pipeline Dredge
Env. Window:
March 1 thru August 31
Reason for Window:
Nesting birds
Est. Start Date:
October 20, 2015
Est. Completion Date:
Nov 2015
10
3
9
2
8
1
76
117-a
5
Port O’Connor
Matagorda Ship Channel
Matagorda Peninsula to
Point Comfort
1
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
ONGOING DEEP-DRAFT
MAINTENANCE DREDGING CONTRACTS
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
BRAZOS ISLAND HARBOR
BROWNSVILLE
SHIP CHANNEL
Aransas
Pass
Nueces
Bay
1
TEXAS
Port Isabel
2
3
4
Port of
Brownsville
5
7
8
MEXICO
Galveston District – Dredging Meeting
-
Project:
Brazos Island Harbor Main Channel & Port Isabel
Dredging Depth:
44 ft. Required Depth
Dredging Width:
300 - 400 ft.
Dredging Length:
Varies
Dredging Quantity:
2,393,000 cubic yards
Material Type:
Silt
Placement Area:
Upland
Contractor:
RLB Construction, Inc.
Type of Equipment:
Pipeline
Env. Window:
NA
Reason for Window:
NA
Start Date:
July 2015
Est. Completion Date:
Jan 2016
Custodians of the Texas Coast
BUILDING STRONG®
BRAZOS ISLAND HARBOR
Aransas JETTY CHANNEL
Pass
Project:
1
TEXAS
Port Isabel
2
3
4
Port of
Brownsville
5
7
8
MEXICO
Galveston District – Dredging Meeting
-
Brazos Island Harbor
Brownsville Jetty &
Entrance Channels
Dredging Depth:
46 ft. Required Depth
Dredging Width:
300 - 400 ft.
Dredging Length:
Varies
Dredging Quantity:
670,000 cubic yards
Material Type:
Sand
Placement Area:
Beach/BU
Contractor
Weeks Marine, Inc.
Type of Equipment:
Hopper/Pipeline
Env. Window:
1 Oct- 14Mar
Reason for Window:
Turtle/Tourism
Est. Start Date:
October 2015
Est. Completion Date:
January 2016
Custodians of the Texas Coast
BUILDING STRONG®
ONGOING SHALLOW-DRAFT
MAINTENANCE DREDGING CONTRACTS
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
CHANNEL ACROSS ARANSAS BAY
Galveston District – Dredging Meeting
-
Project:
Gulf Intracoastal Waterway
Channel Across Aransas Bay
Dredging Depth:
16 ft. Required Depth
Dredging Width:
125 ft.
Dredging Length:
Varies
Dredging Quantity:
1,357 ,000 cubic yards
Material Type:
Fine Silt/Sand
Placement Area:
Open/BU Sites
Contractor:
Orion Marine
Type of Equipment:
Pipeline
Env. Window:
Closed 15 Oct to 15 Apr
Reason for Window:
Whooping Crane
Est. Start Date:
June 2015
Est. Completion Date:
October 2015
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
FREEPORT TO CANEY CREEK & COLORADO RIVER TO UPPER MATAGORDA BAY
Colorado
River Locks
Baxter Island
108
108-A
109
110
111
112-A
112-A
112-B
113
Project:
Gulf Intracoastal Waterway
Freeport to Caney Creek &
Colorado River to Upper
Matagorda Bay
Dredging Depth:
16 ft. Required Depth
Dredging Width:
125 ft.
Dredging Length:
Varies
Dredging Quantity:
3,117,000 cubic yards
Material Type:
Fine Silt/Sand
Placement Area:
Open/Upland Confined
Contractor:
Goodloe Marine
Type of Equipment:
Pipeline
Env. Window:
NA
Reason for Window:
NA
Est. Start Date:
October 2015
Est. Completion Date:
April 2016
106
3
112-C
114
115
116
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
HIGH ISLAND TO ROLLOVER PASS & BOLIVAR FLARE
Galveston District – Dredging Meeting
-
Project:
Gulf Intracoastal Waterway
High Island to Rollover &
Bolivar Flare
Dredging Depth:
16 ft. Required Depth
Dredging Width:
125 ft.
Dredging Length:
Varies
Dredging Quantity:
1,000,000 cubic yards
Material Type:
Fine Silt/Sand
Placement Area:
Open/Upland
Confined/BU
Contractor:
Mike Hooks
Type of Equipment:
Pipeline
Env. Window:
N/A
Reason for Window:
N/A
Est. Start Date:
October 2015
Est. Completion Date:
January 2016
Custodians of the Texas Coast
BUILDING STRONG®
ONGOING PLACEMENT AREA
IMPROVEMENT CONTRACTS
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
GALVESTON HARBOR
PELICAN ISLAND LEVEE REPAIR
Pelican
Island
PA
Galveston District – Dredging Meeting
San
Jacinto
PA
-
Project:
Galveston Harbor
Pelican Island Levee Repair
Dredging Depth:
NA
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
Clay
Placement Area:
Pelican Island
Contractor:
RLB Contracting
Type of Equipment:
Earth Moving, Dragline
Env. Window:
NA
Reason for Window:
NA
Est. Start Date:
October 2015
Est. Completion Date:
April 2016
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
ALEXANDER ISLAND CONTAINMENT DIKE RAISE
Project:
Peggy
Lake
Alexander
Island
Alexander Island PA
Levee Raising
La Porte
Spilman
Island
Type of Work:
Levee Raising
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
Silt/Clay
Placement Area:
Alexander Island PA
Contractor:
Southern Contracting,
LLC
Type of Equipment:
Dragline/Earthmoving
equipment
Env. Window:
NA
Reason for Window:
NA
Est. Start Date:
April 2015
Est. Completion Date:
May 2016
Atkinson Is.
16
15
14
Galveston District – Dredging Meeting
-
Houston Ship Channel
Alexander Island
Containment Dike Raise
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
MID-BAY PA DEWATERING
Project:
Morgan’s Point
Galveston District – Dredging Meeting
-
Houston Ship Channel
Mid-Bay PA - Dewatering
Type of Work:
Dewatering
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
Silt
Placement Area:
Midbay Placement Area
Contractor:
Affolter Contracting, Co.
Inc.
Type of Equipment:
Marsh Buggy
Env. Window:
NA
Reason for Window:
NA
Est. Start Date:
August 2015
Est. Completion Date:
November 2015
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL – SPILMAN ISLAND PA
SPILL BOX REPLACEMENT
Project:
Houston Ship Channel
Spilman Island PA Spill Box
Replacement
Type of Work:
Dewatering
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
Silt/Clay
Placement Area:
Spilman Island
Contractor:
RLB Contracting, Inc.
Type of Equipment:
Marsh Buggy/ Excavation
Equipment
Env. Window:
NA
Reason for Window:
NA
Start Date:
September 2015
Est. Completion Date:
March 2016
Lost Lake
Goat Island
Peggy Lake
Alexander
Island
Spilman
Island
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
PA15 and Mid Bay PA Shoreline Stabilization
Project:
Spillman Is.
La Porte
Houston Ship Channel
PA No. 15 and Mid Bay PA
Type of Work:
Shoreline Stabilization
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Atkinson Is.
16
Material Type:
15
14
Galveston District – Dredging Meeting
-
Placement Area:
PA 15 & Mid Bay
Contractor:
Bertucci Contracting, Inc.
Type of Equipment:
Crane/Earthmoving
equipment
Env. Window:
NA
Reason for Window:
NA
Start Date:
September 2015
Est. Completion Date:
April 2016
Custodians of the Texas Coast
BUILDING STRONG®
FY16 CONTRACT SCHEDULES
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
SABINE-NECHES WATERWAY
OUTER BAR AND BANK CHANNEL
Project:
4
3
2
Sabine Neches Waterway
Outer Bar and Bank
Channel
Dredging Depth:
44 ft. Required Depth
Dredging Width:
800 ft.
Dredging Length:
Varies
Dredging Quantity:
2,500,000 cubic yards
Material Type:
Silt/Clay
Placement Area:
Offshore
Distance to Placement
Area:
3 Mile Avg.
Type of Equipment:
Hopper
Env. Window
NA
Est. Start Date
September 2016
Est. Completion Date
December 2016
1
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
SABINE-NECHES WATERWAY
PORT ARTHUR CANAL,TURNING BASIN,
JUNCTION AREA AND TAYLORS BAYOU
Project:
Port Arthur
Port Arthur
Turning Basins
8
9
Junction Area
Galveston District – Dredging Meeting
-
Sabine-Neches Waterway
Port Arthur Canal, Turning
Basin, Junction Area and
Taylors Bayou
Dredging Depth:
42 ft. Required Depth
Dredging Width:
400 - 1200 ft.
Dredging Length:
Varies
Dredging Quantity:
3,000,000 cubic yards
Material Type:
Silt/Clay
Placement Area:
PA 8 and PA 9
Distance to Place Area:
1.5 - 2 Miles Avg.
Type of Equipment:
Pipeline
Env. Window:
NA
Est. Start Date
May 2016
Est. Completion Date
October 2016
Custodians of the Texas Coast
BUILDING STRONG®
FY16 CONTRACT SCHEDULES
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
GALVESTON HARBOR
Project:
Pelican
Island
PA
Galveston District – Dredging Meeting
San
Jacinto PA
-
Galveston Inner Harbor
Dredging Depth:
41 - 46 ft. Required Depth
Dredging Width:
1000 ft.
Dredging Length:
Varies
Dredging Quantity:
2,000,000 cubic yards
Material Type:
Silt
Placement Area:
Offshore
Distance to Place Area:
8 Miles Avg.
Type of Equipment:
Hopper Dredge
Env. Window:
NA
Reason for Window:
NA
Est. Start Date
April 2016
Est. Completion Date
July 2016
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
MORGANS POINT TO EXXON AND
BARBOURS TERMINAL
Project:
Houston Ship Channel –
Morgans to Exxon and
Barbours Terminal
Lost Lake
Goat Island
Peggy Lake
Alexander
Island
Spillman
Island
Galveston District – Dredging Meeting
-
Dredging Depth:
42 ft. (Barbours) & 49 ft.
(HSC) Required Depth
Dredging Width:
1222 - 300 ft.
Dredging Length:
Varies
Dredging Quantity:
2,500,000 cubic yards
Material Type:
Silt
Placement Area:
Spilman & Alexander Island
Distance to Place Area:
1 Mile Avg.
Type of Equipment:
Pipeline
Env. Window:
NA
Est. Start Date
April 2016
Est. Completion Date
December 2016
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
PLACEMENT AREA NO. 14 DEWATERING
Houston Ship Channel
Placement Area No. 14
Dewatering
Project:
Spillman Is.
La Porte
Atkinson Is.
16
Type of Work:
Dewatering
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
15
14
Galveston District – Dredging Meeting
-
Placement Area:
PA 14
Distance to Place
Area:
NA
Type of Equipment:
Marsh Buggy/Earthmoving
Equipment
Env. Window:
NA
Est. Start Date
April 2016
Est. Completion Date
October 2016
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
BAYPORT FLARE AND RED FISH REEF TO MORGANS
Houston Ship Channel Bayport
Flare and Redfish Reef to
Beacon 78
Project:
Galveston District – Dredging Meeting
-
Dredging Depth:
47 ft. Required Depth
Dredging Width:
530 ft.
Dredging Length:
Varies
Dredging Quantity:
cubic yards
Material Type:
Sand/Silt
Placement Area:
Marsh Cells 7/8/9 and MidBay PA
Distance to Place
Area:
1-4 miles
Type of Equipment:
Pipeline
Env. Window:
Nesting bird window at MidBay PA (avoid impacts to
nesting birds March 1st to
August 31st)
Est. Start Date
September 2016
Est. Completion Date
October 2017
Custodians of the Texas Coast
BUILDING STRONG®
HOUSTON SHIP CHANNEL
ROSA ALLEN CONTAINMENT DIKE RAISE
Project:
Galveston District – Dredging Meeting
-
Houston Ship Channel
Rosa Allen Containment
Dike Raise
Type of Work:
Levee Raising
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
Silt/Clay
Placement Area:
Rosa Allen PA
Contractor:
NA
Type of Equipment:
Dragline/Earthmoving
equipment
Env. Window:
NA
Reason for Window:
NA
Est. Start Date
November 2016
Est. Completion Date
October 2017
Custodians of the Texas Coast
BUILDING STRONG®
FY16 CONTRACT SCHEDULES
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
FREEPORT HARBOR ENTRANCE CHANNEL
Brazos Harbor
Turning Basin
and Channel
Stauffer Channel
(De-Authorized) Brazosport
Upper
Turning Basin
Turning Basin
Surfside
1
Project:
Quintana
7
Freeport Harbor
Entrance Channel
Dredging Depth:
49 - 47 ft. Required Depth
Dredging Width:
600 ft.
Dredging Length:
Varies
Dredging Quantity:
2,500,000 cubic yards
Material Type:
Sand/Silt
Placement Area:
Offshore
Distance to Place Area:
2.5 Mile Avg.
Type of Equipment:
Hopper
Env. Window:
NA
Reason for Window:
NA
Est. Start Date:
October 2016
Est. Completion Date:
December 2016
85
88
1-A
Buffer
Zone
Limits of
Discharge
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
FREEPORT HARBOR
PLACEMENT AREA #1 CONTAINMENT DIKE RAISE
Project:
Galveston District – Dredging Meeting
-
Freeport Harbor - PA#1
Containment Dike Raise
Dredging Depth:
47- to 49-foot (Req.
Depth)
Dredging Width:
280 - 1190 ft.
Dredging Length:
Varies
Dredging Quantity:
500,000 cubic yards
Material Type:
Sand/Silt
Placement Area (PA):
PA 1/Offshore
Distance to PA:
2.5 Mile (avg.)
Type of Equipment:
Pipeline
Env. Window:
NA
Reason for Window:
NA
Est. Start Date:
October 2016
Est. Completion Date:
May 2017
Custodians of the Texas Coast
BUILDING STRONG®
FY16 CONTRACT SCHEDULES
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
MATAGORDA SHIP CHANNEL
MATAGORDA PEN. TO POINT COMFORT
Project:
Palacios
Lavaca Bay
Red
Bluff
14
13
12
Point Comfort
Carancahua
Bay
11
19
Port
23
18
Lavaca
22
17
21
Lavaca Bay Keller Bay
16
Harbor
20
15
Of Refuge
14
10
9
8
7
6
5
12
11
112-B
112-A
113 112-C
114
115
116
4
Dredging Depth:
38 ft. Required Depth
Dredging Width:
200 ft.
Dredging Length:
Varies
Dredging Quantity:
1,500,000 cubic yards
Material Type:
Sand/Silt
Placement Area:
Open Water/Semi
Confined
Distance to Place
Area:
1 Mile Avg.
Type of Equipment:
Pipeline Dredge
Env. Window:
March 1 thru August 31
Reason for Window:
Nesting birds
Est. Start Date:
July 2016
Est. Completion Date:
May 2017
10
3
9
2
8
1
76
117-a
5
Port O’Connor
1
Galveston District – Dredging Meeting
-
Matagorda Ship Channel
Matagorda Pen. to Point
Comfort
Custodians of the Texas Coast
BUILDING STRONG®
FY16 CONTRACT SCHEDULES
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
CHANNEL TO VICTORIA
LOWER & MIDDLE REACH
Project:
Galveston District – Dredging Meeting
-
GIWW, Ch to Victoria
Middle Reach
Dredging Depth:
14-foot (Req. Depth)
Dredging Width:
125 ft.
Dredging Length:
Varies
Dredging Quantity:
600,000 cubic yards
Material Type:
Silt/Sand
Placement Area (PA):
Upland Confined
Distance to PA:
2.0 Mile (avg.)
Type of Equipment:
Pipeline
Env. Window:
NA
Reason for Window:
NA
Est. Start Date:
March 2016
Est. Completion Date:
September 2016
Custodians of the Texas Coast
BUILDING STRONG®
FY16 CONTRACT SCHEDULES
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
CORPUS CHRISTI SHIP CHANNEL
INNER BASIN TO VIOLA TURNING BASIN & LaQUINTA
Project:
Corpus Christi Ship Channel
Inner Basin to Viola &
LaQuinta
Dredging Depth:
47 – 51 ft. Required Depth
Dredging Width:
600 – 1559 ft.
Dredging Length:
Varies
Dredging Quantity:
(Est.)
1,800,000
Material Type:
Silt / Sand
Placement Area:
Open Water and Upland
Distance to Placement
Area:
1-4 Miles
Type of Equipment:
Pipeline Dredge
Env. Window
(Avoidance Period)
March - November
Est. Start Date
April 2016
Est. Completion Date
August 2016
Aransas
Aransas
Pass Pass
Ingleside
Ingleside
2
PAPA
1010
BCN 82
Corpus
Corpus
Christi
Christi
BCN 82
Nueces
Nueces
Bay
Bay
PA 13
PA 13
Corpus
Christi
Corpus
Christi
Ship
Channel
Ship
Channel
Port
Port
Aransas1
Aransas
Galveston District – Dredging Meeting
-
1
Custodians of the Texas Coast
BUILDING STRONG®
CORPUS CHRISTI ENTRANCE & JETTY CHANNEL
Project:
Aransas
Pass
Ingleside
Nueces
Bay
2
Corpus
Christi
BCN 82
Port
Aransas
Corpus Christi
Ship Channel
Galveston District – Dredging Meeting
-
1
Corpus Christi Entrance
Channel
Dredging Depth:
49 - 47 ft. Required Depth
Dredging Width:
700 - 600 ft.
Dredging Length:
Varies
Dredging Quantity:
800,000 cubic yards
Material Type:
Silt/Sand
Placement Area:
Offshore
Distance to Placement
Area:
2.5 Mile Avg.
Type of Equipment:
Hopper
Est. Start Date:
May 2016
Est. Completion Date:
July 2016
Custodians of the Texas Coast
BUILDING STRONG®
CORPUS CHRISTI - PLACEMENT AREA #13
Project:
Aransas
Pass
Ingleside
Nueces
Bay
2
Corpus
Christi
BCN 82
Port
Aransas
Corpus Christi
Ship Channel
Galveston District – Dredging Meeting
-
1
Corpus Christi – Placement
Area #13
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
NA
Placement Area:
PA 13
Distance to Place Area:
NA
Type of Equipment:
Marine Construction
Earthmoving Equipment
Env. Window:
NA
Est. Start Date
September 2016
Est. Completion Date
April 2017
Custodians of the Texas Coast
BUILDING STRONG®
FY16 CONTRACT SCHEDULES
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
BRAZOS ISLAND HARBOR
Aransas JETTY CHANNEL
Pass
Project:
1
TEXAS
Port Isabel
2
3
4
Port of
Brownsville
5
7
8
MEXICO
Galveston District – Dredging Meeting
-
Brazos Island Harbor
Brownsville Jetty Channel
Dredging Depth:
46 ft. Required Depth
Dredging Width:
300 - 400 ft.
Dredging Length:
Varies
Dredging Quantity:
350,000 cubic yards
Material Type:
Sand
Placement Area:
Beach/BU
Distance to Place Area:
2 Miles Avg.
Type of Equipment:
Hopper/Pipeline
Env. Window:
1 Oct- 14Mar
Reason for Window:
Turtle/Tourism
Est. Start Date
October 2016
Est. Completion Date
January 2017
Custodians of the Texas Coast
BUILDING STRONG®
FY16 CONTRACT SCHEDULES
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
CORPUS CHRISTI TO PORT ISABEL
193
171
Corpus Christi
194
195
196
197
John F. Kennedy
Causeway
174
176
177
178
179
180
181
182
183
184
185
186
188
190
191
192
193
194
199
200
201
204
205
206
207-A
208
208-A
208
208-B
Galveston District – Dredging Meeting
14 ft. Required Depth
Dredging Width:
125 ft.
Dredging Length:
Varies
Dredging Quantity:
1,500,000 cubic yards
Material Type:
Fine Silt/Sand
Placement Area:
Open/BU Sites
Distance to Placement
Area:
3 Miles Avg.
Type of Equipment:
Pipeline
Env. Window:
1 Nov. - 28 Feb.
Reason for Window:
Seagrass
Est. Start Date
November 2015
Est. Completion Date
April 2016
207-B
197
199
Dredging Depth:
203
208
198
Gulf Intracoastal Waterway
Corpus Christi to Port Isabel
202
195
196
Project:
198
187
189
Sheet 1
-
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
CORPUS CHRISTI TO PORT ISABEL
207-B
Sheet 2
Project:
Gulf Intracoastal Waterway
Corpus Christi to Port Isabel
Dredging Depth:
14 ft. Required Depth
Dredging Width:
125 ft.
Dredging Length:
Varies
Dredging Quantity:
1,500,000 cubic yards
Material Type:
Fine Silt/Sand
Placement Area:
Open/BU Sites
Distance to Placement
Area:
3 Miles Avg.
Type of Equipment:
Pipeline
Env. Window:
1 Nov. – 28 Feb.
Reason for Window:
Seagrass
Est. Start Date
November 2015
Est. Completion Date
April 2016
Port
Mansfield
208
Cont…
221
208
208-A
208
222
208-B
223
209
224
210
225
226 227
211
Arroyo Colorado
228-A
212
Arroyo City
213
214
228-B
229
230
231
215
232
216
217
233
Rio Hondo
234
218
219
235
220 / 7
236
237 239
Port
Mansfield
Port
Isabel 241 240
3
221
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
GALVESTON CAUSEWAY TO BASTROP BAYOU
Galveston District – Dredging Meeting
-
Project:
Gulf Intracoastal Waterway
Galveston Causeway to
Bastrop Bayou
Dredging Depth:
12 ft. Required Depth
Dredging Width:
125 ft.
Dredging Length:
Varies
Dredging Quantity:
1,000,000 cubic yards
Material Type:
Fine Silt/Sand
Placement Area:
Open/Upland Confined
Distance to Placement
Area:
1 Miles Avg.
Type of Equipment:
Pipeline
Env. Window:
NA
Reason for Window:
NA
Est. Start Date
November 2015
Est. Completion Date
June 2016
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
BENEFICIAL USE SITE B
Project:
Gulf Intracoastal Waterway
Beneficial Use (BU) Site B
Construction
Type of Work:
BU Site
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
Silt/Clay
Placement Area:
NA
Distance to Place Area:
NA
Type of Equipment:
Marine Construction
Env. Window:
NA
Reason for Window:
NA
Est. Start Date
May 2016
Est. Completion Date
November 2017
Aransas Bay
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
SHORELINE STABILIZATION AND
LEVEE RAISE – PA 93 AND PA 112-B
Project:
Sheet 1
Gulf Intracoastal WaterwayShoreline Stabilization and
Levee Raise-PA 93 & 112-B
Type of Work:
Shore Stabilization/ Levee
Raise
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
Galveston District – Dredging Meeting
-
Placement Area:
PA 93
Distance to Place
Area:
NA
Type of Equipment:
Marine Construction
Earthmoving Equipment
Env. Window:
NA
Est. Start Date
August 2016
Est. Completion Date
February 2017
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
SHORELINE STABILIZATION AND
LEVEE RAISE – PA 93 AND PA 112-B
Project:
Cont’d…
Sheet 2
Gulf Intracoastal WaterwayShoreline Stabilization and
Levee Raise-PA 93 & 112-B
Type of Work:
Shore Stabilization/ Levee
Raise
Dredging Width:
NA
Dredging Length:
NA
Dredging Quantity:
NA
Material Type:
Galveston District – Dredging Meeting
-
Placement Area:
PA 112-B
Distance to Place
Area:
NA
Type of Equipment:
Marine Construction
Earthmoving Equipment
Env. Window:
NA
Est. Start Date
August 2016
Est. Completion Date
February 2017
Custodians of the Texas Coast
BUILDING STRONG®
GULF INTRACOASTAL WATERWAY
ROLLOVER PASS TO GALVESTON CAUSEWAY
Galveston District – Dredging Meeting
-
Project:
Gulf Intracoastal Waterway
Rollover to Causeway
Dredging Depth:
16 ft. Required Depth
Dredging Width:
125 ft.
Dredging Length:
Varies
Dredging Quantity:
700,000 cubic yards
Material Type:
Fine Sand/Silt
Placement Area:
Upland/Open Water/BU
Distance to Place Area:
2.0 Mile Avg.
Type of Equipment:
Pipeline
Env. Window:
N/A
Est. Start Date
September 2016
Est. Completion Date
December 2016
Custodians of the Texas Coast
BUILDING STRONG®
GALVESTON DISTRICT NAVIGATION
Questions/Comments?
Galveston District – Dredging Meeting
-
Custodians of the Texas Coast
BUILDING STRONG®