Brochure - International Contractors, Inc.
Transcription
Brochure - International Contractors, Inc.
9 7 7 S O U TH R O U TE 8 3 • EL M H UR S T , I L L I N O I S 6 0 1 2 6 • T 6 3 0 .8 3 4 .8 0 4 3 • F 6 3 0 .8 3 4 .8 0 4 6 • W W W .ICIINC.COM INTERNATIONAL CONTRACTORS, INC. Retail Experience From the construction of new big box retail and site developments to the renovation of existing grocery stores to small interior build-outs for clothiers; ICI has proven we are an accomplished and dependable general contractor and construction manager. Over the past six years, ICI has delivered more than $150,000,000 in construction projects to retailers and developers. Our retail clients include Wal-Mart Stores, Inc., Supervalu, Aldi, Trader Joe’s, Staples, Akira and Joe Caputo & Son’s Fruit Market, to name a few. Clients Akira Chicago Escada Michelle Tan Aldi Estee Lauder Misako Alternative Shoes Express Car Wash NikeTown Anne Klein II Fields Auto Group Orlando Infiniti Audio Consultants French Connection Banana Republic Gartner Saab Paoli Showroom Bath & Body Works Gateway Country Blu by Antik Denim Great Indoors BP Amoco Grossinger Toyota Brown Jordon Guess Callaway Golf Home Depot CDW Computer Center Izod Cellular One JC Penney’s Century Station Jewel – Osco Chrysler Realty Corporation Joe Caputo & Sons Fruit Market Circuit City JRC Plaza West Cole Haan Kenneth Cole Connexus Larry Roesch Family Auto Container Store Levi’s Cricket Communication Liz Claiborne Top Shop Top Man Currency Exchange Local Charm Trader Joe’s Diesel Loeber Motors Turtle Wax Dockers Main Street Marketplace Wal-Mart Stores, Inc. Donna Karan Malabar Boutique Wards Electric Avenue Merchandise Mart Z-Gallerie INTERNATIONAL CONTRACTORS INC. POLO – Ralph Lauren Prada Ralph Lauren Roundy’s Supermarkets, Inc. Salton, Inc. Sam’s Club Sears Hardware Sears Roebuck & Company Sotheby’s Staples The Custom Shop Time Service, Inc. Tinley Park Commons Tommy Hilfiger WWW.ICIINC.COM Mariano’s Fresh Market Orland Park In the fall of 2014, ICI was hired phase to assist in scheduling and value by developer Bradford Real Estate engineering and ultimately competitively Companies for the construction of bidding the project. Sitework on the a new 74,000 square foot Mariano’s 8.5 acre parcel took place in early 2015 Fresh Market grocery store as well as and construction on the building is LOCATION the associated site work. Located at currently underway. A fall 2015 delivery Orland Park, Illinois 142nd Street and LaGrange Road in is targeted. BRADFORD REAL ESTATE COMPANIES Orland Park, this new location will mark PROJECT DELIVERY Mariano’s 31st store in the Chicago area. Construction Management The project marks ICI’s second Mariano’s store; the interior build-out of the As the Construction Manager for the Ravenswood location was completed by ARCHITECT project, ICI was heavily involved with the ICI team in the spring of 2014. Camburas & Theodore, Ltd. team members from both Bradford and Mariano’s during the preconstruction INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Mariano’s Fresh Market Build-Out In March 2014, ICI completed the Shoppers entering off of Lawrence interior build-out of the new Mariano’s Avenue will experience an impressive BARRETT & PORTO ROUNDY’S INC. Fresh Market in Chicago’s Ravenswood multi-story glass atrium with a cafe and neighborhood. ICI contracted directly casual seating. The northern portion of with Developer/Owner Barrett & Porto the space contains escalators leading to LOCATION but also worked alongside the tenant, the second level. Chicago, Illinois (Ravenswood) Roundy’s Inc., throughout the duration of the project. The 75,000 square foot second level PROJECT DELIVERY Construction Management contains an expansive grocery selection The project is within a multi-tenant as well as specialty areas such as a BBQ retail station, a sushi station, a bakery and a development located on ARCHITECT approximately 3.5 acres at Lawrence Stuart Knosky Architects Street and Ravenswood Street. The store large deli. is approximately 88,300 square feet; The third level contains administrative 10,500 SF on the first floor, 75,000 SF areas and access to the attached parking on the second floor and 2,800 SF on the deck. third floor. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Wal-Mart Stores New Construction ICI’s working relationship with Wal- another individual who is a Certified Mart Stores Inc. began in 2006. Preparer of SWPPP. WAL-MART STORES INC. Since that time, ICI has successfully completed new construction, expansion Please see the following pages LOCATIONS and renovation projects at more than 30 examples of ICI’s success with the Rockton, Illinois locations across the United States. construction of new, ground up WalMart Stores: Freeport, Illinois Joliet, Illinois With a Wal-Mart construction volume Waukesha, Wisconsin totaling more than $140 million over Chicago, Illinois [Pullman Neighborhood] the past 6 years, ICI is well-versed in Cicero, Illinois their stringent processes and rigorous scheduling. One of the initiatives that Wal- PROJECT DELIVERY General Contracting ARCHITECT Various INTERNATIONAL CONTRACTORS INC. for Mart insists upon for each of its projects is mandatory SWPPP Certification for Rockton, Illinois This new 203,000 square foot Supercenter on a 53 acre site was completed in 49 weeks. Delays in municipality permitting led to accelerated schedules, but ICI met the challenge. During construction, ICI’s team also completed $2.2 million all Field Superintendents. The SWPPP in IDOT road work in just 10 weeks. Certification guarantees environmental This project was the first store in the compliance also Midwest Region to incorporate a new incorporates procedures for air quality high-efficiency HVAC system, which control. Currently, ICI has more than 15 is 15% more efficient than standard SWPPP Certified Team Members and systems. with EPA and WWW.ICIINC.COM Wal-Mart Stores New Construction Freeport, Illinois construction instead of the typical pre- Situated on more than 23 acres, ICI cast method used by Wal-Mart and WAL-MART STORES INC. completed the construction of this the discovery of unsuitable soils during [CONT’D.] 197,885 square foot new Supercenter in construction. Moreover, the team also just 36 weeks. This store is a prototype completed installation of 518,400 square and currently serves as a training center feet of parking lot in three weeks. for many Wal-Mart Store Planners and Employees. INTERNATIONAL CONTRACTORS INC. Waukesha, Wisconsin ICI completed the construction of this Joliet, Illinois 140,000 square foot new Wal-Mart For ICI’s third Wal-Mart Supercenter Supercenter and massive 31 acre site project, this in September 2010. In addition to the 205,000 square foot building in 35 typical retail store requirements, the weeks, skimming three weeks off the scope of work also included reclaiming original construction schedule. Despite a site contaminated by a concrete a late construction start due to permit products manufacturing company. The delays and an unseasonably rainy spring, manufacturer produced precast concrete our construction team was able to meet and abandoned much of its discards Wal-Mart’s Grand Opening deadline. on site. ICI’s pre-construction testing Challenges included brick and block revealed our team completed buried concrete WWW.ICIINC.COM structures WAL-MART WAUKESHA, WISCONSIN Wal-Mart Stores New Construction throughout the site. To solve the issue, Chicago, Illinois ICI set up a temporary concrete crushing (Pullman Park Neighborhood) WAL-MART STORES INC. plant to turn the abandoned structures [CONT’D.] and other excavated materials into suitable landfill. Over 19,221 cubic ICI was contracted in early Fall 2012 to construct a new 155,000 SF Wal-Mart in Chicago’s Pullman Park neighborhood. The $16.5 million facility, situated on yards of suitable fill material was crushed more than 15 acres, is unique in the sense and reused on site. that the City outlined specific Minority ICI also recycled 32.84 tons of wood and 10.68 tons of metal on the project. Business Participation (MBE) goals. As such, ICI worked with the Alderman to employee community residents on-site. The new Wal-Mart Store incorporates MBE subcontractors fulfilled several green areas and a retention pond. The major trades. Upon completion, ICI far scope of work also includes constructing exceeded goals and achieved a total of two pad sites for future development. 47.53% (28.16% African-American and Approximately 1.5 miles of highway 19.37% Hispanic) MBE participation development were also included in the levels. project scope. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM WAL-MART CICERO, ILLINOIS Wal-Mart Stores New Construction Cicero, Illinois for Cicero, as it advances the progress on In June 2013, ICI was contracted to their Sportsman’s Park Redevelopment WAL-MART STORES INC. construct a new $19 million Wal-Mart program. The western portion of the [CONT’D.] Store in Cicero, Illinois. The store was Sportsman’s Park Redevelopment site constructed on a vacant parcel in the currently houses the recently constructed heavily industrial area at approximately 604,145 square foot Wirtz Beverage 33rd Street and Cicero Avenue, north of Illinois office and distribution center. Hawthorne Race Course. As part of the project scope, ICI also prepared two of the five surrounding The new 177,557 square foot Wal-Mart outlots for future tenants. Supercenter was constructed throughout the fall and winter months and opened in the spring of 2014. The Supercenter features an easy-to-navigate layout and enhanced services to make the shopping experience more convenient to customers. At the groundbreaking, Town officials remarked on the significance of this construction project INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Wal-Mart Store successfully control. Currently, ICI has more than 15 Expansions & Renovations completed new construction, expansion SWPPP Certified Team Members and WAL-MART STORES INC. and renovation projects at more than 30 another individual who is a Certified Wal-Mart Stores across the United States. Preparer of SWPPP. LOCATIONS Ames, Iowa Benton Harbor, Michigan Bolingbrook, Illinois Bridgeview, Illinois Chicago, Illinois (Back of Yards) Cicero, Illinois Crestwood, Illinois Des Plaines, Illinois [CONT’D. ON FOLLOWING PAGE] Since 2006, ICI has From Oregon to Florida to Wisconsin, ICI has continually met and exceeded Wal-Mart categorizes their renovation expectations with this rigorous client. and expansion projects by level of As a result, our Wal-Mart construction complexity and project size. Please see volume totals more than $250 million the following pages for examples of ICI’s over the past 6 years. success with significant expansions and renovations of Wal-Mart Stores. ICI is well-versed in their stringent processes and precise scheduling. Crestwood, Illinois One of the initiatives that Wal-Mart The renovation and expansion of this adheres to for each of its projects is 150,000 SF retail store in Crestwood mandatory SWPPP Certification for was completed in ten phases of ARCHITECT all Field Superintendents. The SWPPP construction. Various Certification guarantees environmental required compliance also operations staff and strict scheduling and incorporates procedures for air quality safety considerations to accommodate PROJECT DELIVERY General Contracting INTERNATIONAL CONTRACTORS INC. with EPA and Successful heavy completion coordination WWW.ICIINC.COM with Wal-Mart Stores customers while the store maintained Grocery provisions include a new Expansions & Renovations operations. temporary compressor house along with new walk- WAL-MART STORES INC. modifications including construction of in coolers, freezers and refrigerated [CONT’D.] dust walls, the creation of an alternate cases. entrance, moving the vision center to a EMS lines are fed underground through LOCATIONS [CONT’D.] double-wide trailer during construction, refrigeration pits buried in exposed Elk Grove Village, Illinois Hodgkins, Illinois Indianapolis, Indiana Inverness, Florida Joliet, Illinois Niles, Illinois Ottumwa, Iowa Paris, Illinois Romeoville, Illinois Saint Joseph, Missouri Shelton, Washington Sterling, Illinois Washington, Illinois Wisconsin Dells, Wisconsin Woodburn, Oregon and creating an interim customer service integrally colored concrete slabs. The area. refrigeration equipment requires an INTERNATIONAL CONTRACTORS INC. ICI made The site work was also phased to accommodate pedestrians and traffic patterns and included new grease traps, sanitary service, electrical service, independent bale and pallet storage and a water service relocation. Refrigeration, electrical, and additional electrical distribution center fed from a new main switchboard. Elk Grove Village, Illinois ICI completed a 146,000 SF addition to add a new grocery area for this Wal-Mart. The project was completed in seven phases and included renovation of the The primary purpose of the renovation existing 200,000 SF store to construct was to incorporate a larger grocery a new Pharmacy, Dunkin Donuts and area into the existing footprint while Vision Center. Interior finishes included deleting the existing automotive center. new VCT, ceiling tile and painting WWW.ICIINC.COM Wal-Mart Stores throughout the store. A mill and overlay Many projects take place at 24 hour Expansions & Renovations of the existing parking lot will also be operational stores that require additional WAL-MART STORES INC. completed. temporary protection and site safety [CONT’D.] Level Two Renovations For smaller renovation projects, the scope is standardized and they are referred to as “Level Two” Renovations. Level 2 Renovations typically include the remodel of areas like the pharmacy, customer service, service centers, training areas, TLE, tire/battery storage, garden center, rest rooms, photo lab, offices, grocery and vision centers. The majority of the work takes place at night as not practices to protect customers. These projects are completed on very tight 9 - 10 week schedules and Wal-Mart requires the projects to be completely closed out, including change orders and closeout documents, within thirty days of completion of the work. Successfully completing these projects requires a 100% “complete as you go” mentality to turn over each area within the allotted time frame. to interrupt on-going operation of the store. INTERNATIONAL CONTRACTORS INC. on-time WWW.ICIINC.COM Sam’s Club In January 2013, ICI began construction 2013. Although this schedule was WAL-MART STORES, INC. on a new ground up Sam’s Club on rigorous, the site was pad ready and Weber Road in Romeoville, Illinois. The the façade was comprised of pre-cast new 136,000 square foot retail store is panels; project attributes well-suited positioned on a pad-ready site adjacent for a tight schedule. Several weeks into to an existing Wal-Mart store. Because construction, however, Wal-Mart Stores, the stores share the same ownership, Inc. approached ICI with their goal Wal-Mart Stores, Inc. opted to carry of accelerating the already aggressive PROJECT DELIVERY several design elements from the existing schedule by an additional two weeks. General Contracting Walmart store through to the new Sam’s The project team rose to the challenge Club. Among them is a stone column and delivered this $10.3 million project ARCHITECT detail applied to the south and west in mid-August. Shade Lawrence O’Quinn elevations of the new store. The project LOCATIONS Romeoville, Illinois - New Construction Des Plaines, Illinois - Renovation Waukesha, Wisconsin - Renovation Cicero, Illinois - Renovation also included the construction of a new Since completing the new construction gas station positioned in front of the of the Romeoville, Illinois store, ICI has store along Weber Road. gone on to renovate Sam’s Club locations in Des Plaines, Illinois; Waukesha, The project initially had a 35 week Wisconsin; and Cicero, Illinois. construction schedule and was due to be delivered in early September INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Joe Caputo & Sons Fruit Market Renovation When Dominick’s announced in early all lighting and flooring. The refrigerated 2014 that it would be withdrawing cases were relocated in order to increase from the Chicago market, Joe Caputo & functionality and highlight the grocer’s LOCATION Sons took over several of their existign products. Northbrook, Illinois stores, including the 52,000 square foot PROJECT DELIVERY Dominick’s located on the corner of The walk-in produce, meat and seafood Dundee and Sanders in Northbrook. cases were also all replaced. Murals were Construction Management created along the walls at teh front of the In what marks the second project for the store to reflect a scene from an Italian ARCHITECT gourmet grocer, ICI was hired to quickly countryside. Additionally, the entire Commercial Foodservice Associates re-image the space to the Caputo’s brand space was repainted to further reinforce that has become so well-known in the the Caputo brand. northwest suburbs. The scope of work included the complete removal and replacement of INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Joe Caputo & Sons Fruit Market Expansion ICI constructed a 9,000 square foot, The café features handmade pizza baked 3-wall expansion to Joe Caputo & Sons in a newly installed stone pizza oven. FIREFOX DEVELOPMENT existing Palatine store. Family-owned and operated for over 20 years, Joe Caputo LOCATION & Sons offers customers the freshest Palatine, Illinois fruits and vegetables and specializes in A 3,300 square foot mezzanine above the new coolers and freezers allows for added equipment storage. Italian specialties. Each of their locations Work PROJECT DELIVERY includes produce, a deli, butcher shop remodeling of the bakery and vestibule Construction Management and grocery departments, in addition to and relocation of the freezers. Site work dairy products and a bakery with breads included a new parking lot; expanding ARCHITECT and pastries. Products are stocked from the existing capacity by 25 spaces. Kluber Architects and Engineers all over the country. within the store Remaining open during construction was During construction, ICI removed of utmost importance to the Owner. ICI approximately 90% of the existing coordinated night work for many trades exterior masonry wall to create openings to avoid disruption or inconvenience to for the new building shell. New coolers store employees or patrons and the store and freezers were installed in the new remained fully operational throughout addition, along with additional checkout construction. lanes and a new pizza and gelato café. INTERNATIONAL CONTRACTORS INC. included WWW.ICIINC.COM Jewel-Osco New Construction ICI SUPERVALU LOCATION began its relationship with The new store includes a deli, market, SUPERVALU in 2001 with multiple produce, dairy, bakery, frozen foods, store renovation projects. Due to the meat and seafood sections as well as a success of these projects, ICI then has photo lab and pharmacy. The building’s the opportunity to bid on new store exterior is brick and stone veneer. Downers Grove, Illinois construction projects. PROJECT DELIVERY After a competitive bidding process, ICI General Contracting was awarded the construction of a new 55,102 square foot ground-up grocery ARCHITECT store and 6 acres of site work for the Camburas & Theodore, Ltd. Jewel-Osco in Downer Grove. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Jewel-Osco Renovations ICI began its relationship with Jewel- Evanston, Illinois Renovation supervalu Osco grocery stores in 2001 when we ICI completed 51,384 square feet were awarded the renovation of an of interior and exterior renovations existing store in Evanston, Illinois. From including the produce, deli and bakery that point forward, ICI worked with sections. Renovations took place while Jewel Osco on a variety of renovation the store was fully operational but the projects, as well as one new construction necessary precautions were taken to store. avoid disrupting shoppers. When performing a renovation project, it Oswego, Illinois Renovation is particularly challenging to build while ICI completed this 68,000 square foot project delivery the store is fully operational. Typically, renovation of the Oswego Jewel-Osco Project Delivery ICI’s team barricades the construction in just 23 weeks. The store remained area in order to keep it isolated from open during the construction process architect shoppers. Any demolition, or other work making customer safety a top priority. Architect that might become too disruptive to the Construction areas were barricaded store, is completed after hours. and kept isolated in order to protect location Evanston, Illinois Oswego, Illinois Villa Park, Illinois Melrose Park, Illinois Wheaton, Illinois Frankfort, Illinois Chicago, Illinois shoppers. Renovations included the photo lab, pharmacy, produce, deli and bakery sections. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Jewel-Osco Renovations Villa Park, Illinois Renovation Frankfort, Illinois Renovation supervalu For ICI’s third Jewel-Osco project, our ICI completed the 69,840 square foot [CONT’D.] team completed the 56,097 square foot renovation of an existing Jewel-Osco in renovation of the Villa Park store in Frankfort, Illinois. ICI remodeled the under 30 weeks. ICI’s crew completed liquor, deli, market, bakery and produce concrete demolition after hours in order sections as well as the photo lab and to avoid disrupting shoppers. pharmacy. Melrose Park, Illinois Renovation Chicago, Illinois Renovation This 71,090 square foot renovation ICI was awarded the 71,514 square foot was completed in 19 weeks. Key to the remodel of an existing Jewel-Osco grocery project’s success was the coordination in Chicago, Illinois. Renovations include of the construction while working in an the pharmacy and photo lab as well as the operational grocery store. produce, deli, market, liquor and bakery sections. Exterior renovations also took Wheaton, Illinois Renovation place. The project was completed on- In January 2007, ICI completed the time and within budget in July, 2009 for 62,000 SF renovation of the Wheaton $1.62 million. Jewel-Osco. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM The Arboretum of South Barrington Circuit City Circuit City was located in the The ICI successfully completed Circuit City Arboretum of South Barrington, an under a tight 4 month construction upscale, 86-acre lifestyle center of schedule. The store was open for business circuit city restaurants and shops at the northeast in time for The Aboretum’s grand corner of Route 59 and Higgins Road. opening weekend. This 22,000 SF high-end electronic retail The Arboretum of South Barrington space was built with precast concrete and boasts high profile apparel brands, project delivery a brick facade. Work included 3 offices, home furnishings, restaurants and a General Contracting a tech center, bathrooms, a break room, luxury cinema. The Arboretum is a a receiving area/loading dock and a glass 600,000 square foot, open-air town architect enclosed custom sound room. ICI also center featuring architecture and style Casco Corporation constructed the Firedog Shop, which reminiscent of the past. location South Barrington, Illinois allows customers access to electronic technicians. ICI provided all mechanical, electrical and plumbing for the site. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Staples Build-Out Serving as the General Contractor, ICI A Service Corridor and floor to roof joseph freed & associates prepared a 17,288 square foot retail space demising partitions were erected. A set for occupancy for Staples in they city’s of double, automatic entrance doors and West Town neighborhood. Preparation a security system were also installed. location Chicago, Illinois project delivery General Contracting architect K2N Crest included demolishing the existing space as well as installing one elevator and two Following the upgrading of power and escalators. the installation of lighting, ICI worked closely with Staples to coordinate the ICI re-routed and extended water and owner-installed fixturing package. After sewer lines for the relocation of rest completion, ICI returned and connected rooms. To provide more power to the the lights. site, ICI reworked the electrical power supply, creating new circuits in the electrical panel. The original rooftop AC was removed and three new units with steel supports were added. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Block 37 Base Building Renovations and Management Offices LOCATION Chicago, Illinois (Block 37) In addition to tenant build-out projects, The work also included new framing ICI was also contracted by the developer and drywall, mechanical and electrical for multiple base-building projects within services, distribution and finishes. Block 37. ICI constructed the mall’s management offices, installed utility services for the development’s parking facilities, completed wall insulation in PROJECT DELIVERY tenant spaces throughout the building General Contracting and installation of access panels and 14 aluminum framed glass advertisement panels. Finishes within the spaces include plastic laminate cabinetry, paint, vinyl floor tile, carpet, porcelain tile and accent stone from India. The Building Management System temperature controls tie into a complex, base building, Alerton system that controls the entire building remotely. Additionally, work on the 8,200 square foot build-out for the management offices included tenant spaces, break rooms, and operations spaces in six remote areas on four different floors. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Michelle Tan Tenant Build-Out ICI has completed several tenant finishes. Finishes include exposed painted build-out projects within the Block 37 ceiling structures, painted drywall walls, joseph freed & associates Development. Our first project within painted wood door frames with frosted the new mall was Michelle Tan, a glass lights and Scofield Lithrochrome clothing retailer. stained concrete floors. location Chicago, Illinois (Block 37) project delivery General Contractor The interior build out of this high end designer clothing retail store includes structural steel, framing and drywall, storefront architect electrical glazing, services mechanical and distribution and JPRA Architects INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Malabar Boutique Tenant Build Out This Claudia Kleiner boutique focuses on The interior build-out also included Chicago designers with South American structural steel work, framing and cb richard ellis, inc. Styles and European influences. The drywall, storefront glazing, mechanical interior features of the 730 square foot and electrical services and distribution. location space emphasize the boutique’s style with Chicago, Illinois (Block 37) exposed painted ceiling structures and Scofield Lithrochrome stained concrete project delivery floors. General Contracting architect JPRA Architects INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Local Charm Tenant Build-Out Occupying 1,000 square feet of space Typical of most Block 37 build-outs, on the first floor of the Block 37 Retail ICI also installed new MEP services to joseph freed & associates Development, the façade of the Local the space and ½” tempered glass at the Charm Jewelry Studio space featured a storefront. location hammered aluminum fascia and intricate Chicago, Illinois (Block 37) copper display case with a stainless steel wrapped base. project delivery General Contracting architect JPRA Architects INTERNATIONAL CONTRACTORS INC. Interior finishes include hardwood floors, drywall ceilings, recessed can lighting with pendant display lights, and custom built millwork fixtures surrounding the entire sales floor. WWW.ICIINC.COM Alternative Shoes Tenant Build-Out On the ground floor of the Block 37 wrapped support beams, carpeting, Retail built-out drywall ceilings, track and recessed can joseph freed & associates 1,440 square feet of space for this lighting systems, framed mirror niches, Chicago-based retailer featuring men’s and white melamine shelving around the location and women’s European style shoes, boots sales floor. Chicago, Illinois (Block 37) and sandals. project delivery General Contracting architect JPRA Architects INTERNATIONAL CONTRACTORS INC. Development, ICI The work included installation of new mechanical, electrical and plumbing services to the space from base building tie-ins. Finishes include ½” tempered storefront glass with painted MDF WWW.ICIINC.COM Akira Tenant Build-Out ICI completed several tenant build-outs Construction was completed in just eight cb richard ellis, inc. as well as base building modifications to weeks and finishes included imported the Block 37 Retail Development. The Italian tile and a painted, exposed Akira space comprises 4,229 square feet ceiling. location Chicago, Illinois (Block 37) project delivery General Contractor architect of the malls first floor. Akira is a rapidly growing trendy clothing store based in the Chicago area. Their Block 37 store marks their seventh Chicago area location. OKW Architects INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Explore Store Build-Out To date, ICI has completed seven proj- tions. Five flat panel TVs, dynamic light- CHICAGO TROLLEY & DOUBLE DECKER CO. ects within Chicago’s Block 37. The ing and bright color choices aim to draw Chicago Trolley & Double Decker Co.’s customers into the space. The project Explore Store is the newest build-out was completed within a very compressed within this popular retail development schedule and delivered to the owner in for Chicagoans and tourists. early May. LOCATION 108 North State Street, Chicago, IL PROJECT DELIVERY General Contracting ARCHITECT The new 1,500 square foot retail store features merchandise and travel gear depicting the city’s many sightseeing attrac- Tria Architecture, Inc. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Topshop Michigan Ave. World-famous clothier Topshop entered ICI was contracted for the prominent, DYNAMIC RESOURCES the Chicago market in September, 2011 high-profile Chicago location. Our scope on the corner of Michigan Avenue and of work included the implementation of East Pearson Street in the heart of the new retail displays, fixtures, carpeting, city’s Magnificent Mile. painting and interior upgrades and LOCATION Chicago, Illinois PROJECT DELIVERY General Contracting renovations. The brand came into existence in 1964 in the basement of a department store. As with all retail projects, the contract Today, the women’s fashion brand has had an aggressive schedule and was grown to over 300 stores in the UK alone driven by a strict opening date for the and within the past several years, further store. ICI achieved the schedule and the expansion has taken place in the United project successfully opened on time. States in cities such as Chicago, New York, Las Vegas and Los Angeles. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM Retail Fixturing When the need arises for new retail Among the clients that we have served DYNAMIC RESOURCES displays, fixtures, carpeting, painting via Dynamic Resources are Anne Klein and even Christmas lighting, many II, Banana Republic, Bath and Body chain stores turn to ICI for the Works, Callaway Golf, Cole Haan, implementation The Container Store, Diesel, Dockers, LOCATION Various Locations Nationally PROJECT DELIVERY General Contracting of these interior upgrades and renovations. Donna Karan, Estee Lauder, Electric ICI provides site surveys, management of construction, production, assembly, ARCHITECT installation and handling of logistical Various issues. Our capabilities include demolition and clearance of old space Avenue, Escada, French Connection, Gateway Country, Great Indoors, Guess, Izod, Kenneth Cole, Levi’s, Liz Claiborne, NikeTown, Prada, Ralph Lauren, Sotheby’s and Z-Gallerie. in preparation of new roll-out; ceiling In addition, ICI is often called upon to and wall repair; painting; electrical complete in-store fixturing for our many alterations; retail clients including those listed above. back wall installation; display wall fixtures; signage and graphic installation; column and beam cover installation; casework; pallet racking; cash wrap and seasonal light box installation. INTERNATIONAL CONTRACTORS INC. WWW.ICIINC.COM