Main Injection Grouting Technologies
•
•
•
Permeation Grouting
Jet Grouting
Compaction Grouting
•
•
•
•
Cavity Grouting
Compensation Grouting
Hyrofracture Grouting
Rock Grouting
Raine Square Tunnel, Perth CBD
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Main Objectives of Grouting
•
Improving geotechnical
parameters
•
•
•
Increased bearing capacity
Reduced settlement
Liquefaction mitigation
•
•
Reduction of permeability
Retaining ground
•
•
Remediation
Solidification
Balannup Pump Station II, Perth
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Permeation Grouting
Grout filling of accessible pores between the solid particles in a permeable soil. This
technique is generally used to reduce permeability and/or to strengthen and stiffen the
ground
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Permeation Grouting: Material
cement
bentonite
micro fine cement
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Permeation Grouting: Spearing
Perth Station Forward Works
www.gfwa.com.au
Delphia Apartments
Remedial Works by Grouting in Subaqueous Environments
Permeation Grouting: Drilling
Mine Site, WA
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Permeation Grouting: Tube à Manchette
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Permeation Grouting: Plant
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Permeation Grouting: end product
Delphia Apartments
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Jet Grouting
Jet grouting is a family of processes that employs combinations of high energy jets of air, water and grout to disaggregate, partially or
fully replace and remix soil in situ.
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Jet Grouting: Parameters
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Jet Grouting: Plant
Cement silo
Mixing plant & agitator High pressure pump
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Jet Grouting: Test Samples
Cube samples from spoil
www.gfwa.com.au
Core samples
Remedial Works by Grouting in Subaqueous Environments
Jet Grouting: Below Groundwater Applications
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Jet Grouting: Soft – Hard Walls
Jet Grouted columns installed between gaps
www.gfwa.com.au
Structural Piles
Remedial Works by Grouting in Subaqueous Environments
Compaction Grouting
The injection of stiff mortar or paste instead of grout to displace
and compact the soil in situ, thus improving its engineering
characteristics
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Compaction Grouting
D
C
B
grout
Plastic deformations
Pseudo-elastic deformations
www.gfwa.com.au
A
Remedial Works by Grouting in Subaqueous Environments
Compaction Grouting: Material
Mortar shall be pumpable under high pressure;
Injection should not induce soil fracturing;
Mortar pressure should not limit expansion due
to segregation of material or water expulsion
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Compaction Grouting: Material
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Case Study 1: Sydney Aquarium Quay Wall
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Sydney Aquarium: Condition
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Sydney Aquarium: Solution
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Sydney Aquarium: Construction
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Sydney Aquarium: Construction
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Sydney Aquarium: Construction
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Sydney Aquarium: Construction
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Sydney Aquarium: Construction
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Case Study 2: Port of Brisbane Wharves 4 & 5
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Port of Brisbane: Conditions
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Port of Brisbane: Solution
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Port of Brisbane: Compaction Grouting
Triangular grid with spacing= 2 m
5 depths, Max treatment depth= 6 m
Grout Mix
Cement
Fly ash
Coarse sand
Medium sand
Fine sand
Plasticizer
Slump
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Port of Brisbane: Compaction Grouting
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Port of Brisbane: Jet Grouting
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Port of Brisbane: Jet Grouting
www.gfwa.com.au
Remedial Works by Grouting in Subaqueous Environments
Port of Brisbane: Jet Grouting
www.gfwa.com.au