Remediation Results and Land Use Change
Transcription
Remediation Results and Land Use Change
Planned Upcoming Field Activities 2013 Field Construction Season Eastern Early Transfer Parcel Mare Island, Vallejo, California Presented to Mare Island Restoration Advisory Board March 28, 2013 Discussion Topics • Field Activities – Known Condition Sites IA K Sediments Underlying a Portion of IR03 Area IWPS4 / T-2 OWS Investigation / Remediation IR21 and Building 386/388/390 Area Storm Sewer Investigation / Remediation IR03, IWPS4 / T-2 OWS and IR15 Groundwater Monitoring Underground Storage Tank (UST) 243 – Soil Gas Survey 2 Discussion Topics (Continued) • Field Activities – Unknown Condition Sites Building 637 Area Remediation Building 688 PCB Site UL#01 Characterization / Remediation Building 742 PCB Sites UL#03 through UL#06 • Field Activities – Voluntary Sites Building 781 PCB Site AL#01 Remediation / Demolition • Questions 3 Known Conditions Site - IA K Sediments Underlying a Portion of IR03 4 Field Activities – Known Condition Site IA K Sediments Underlying a Portion of IR03 • Characterization – Lateral and Vertical Extent Assessment Petroleum Hydrocarbons Between Quay Wall to Edge of Wharf Multiple Soil Boring / Sampling Locations 5 N MA SE W I AVE 785 MARE ISLAND VICINITY MAP VALLEJO IR03 FOPL SOURCE AREA A3 Z C1 B.1 B.2-2 4 I1/ 5 98 B.2-1 IR03GB0227 (8.0, 9.5) IR03GB0220 (9.0) Z GRAB SAMPLE HAND-AUGERED BORING SAMPLE } FENCE INDUSTRIAL WASTEWATER PIPELINE ABANDONED FOPL SEGMENT FLUSHED FOPL SEGMENT FOPL SEGMENT NOT FOUND < < Z REMOVED FOPL SEGMENT IR03CSB0571 (9.0) PREVIOUSLY UNIDENTIFIED FOPL SEGMENT SUBSURFACE 6-INCH WOOD DECKING TR3 2009 EXPLORATORY TRENCH Z 2009 POTHOLE < < IR03CSB0569 (11.0) /B /6 I1 IR03CSB0570 (11.0) &B 3A 47 TR8 IR03GB0232 (8.0, 9.5) TR9 GEOPROBE SAMPLE RAILROAD FINAL 2009 SOIL REMOVAL AREA IR03GB0231 (8.0, 9.5) TR7 IT RA ST Z E8 3B /B E 71 4 I1/ B4 << TR6 ND LA << 3 92 4/ I1/ TR4 TR16 ARMY CONCRETE RETAINING WALL (QUAY WALL) IR03GB0219 (9.0) IR03CSB0568 (9.0) I1/6/B473A&B < << 7 47 } Z IR03CSB0567 (11.0) TR15 D1.2 BEGINNING AND END OF FOPL SEGMENT IR03CSB0566 (9.0) TR12 0 Z IR03CSB0564 (9.0) 6/B I1/ Z IR03GB0218 (8.5) IR03CSB0562 (9.0) &B 3A 47 LO AB NP Y SA BA Z C3 D1.1 LEGEND IR03CSB0565 (11.0) IR03GB0217 (9.0) TR14 04 IR03CSB0563 (11.0) IR03GB0215 (9.0) IR03GB0216 (9.0) &B 3A 69 B / 6 I1/ D1.3 H RT BE K IN YL CE BA FFI O Z IR03GB0229 (8.0, 9.5) C3 C2 D1.2 D2 NT RO RF TE VE A Z D1.2 IS E8 3B /B E H2 D1.3 SCHOOL WA IR03GB0228 (8.0, 9.5) E AR M 7 47 4/B I1/ STRUCTURE ROAD TR2 Z TR1 NOTE: SAMPLE DEPTHS NOTED FOR EACH LOCATION (e.g., 8.0, 8.5, 9.0, 9.5, or 11.0 FEET BGS) TR10 TR11 5 51 I1/ &B 3A 69 B 6/ TR13 0 TR17 Feet TR18 289 1.5 I1/ /B 9 28 \\BALDUR\PROJ\MARE_ISLAND_264204\MXDS\SCR_FOPL\B_C1\IRA\IR03\FIG3-3_FOPL_SOURCE_IR03_SAMP_LOCS.MXD ECLARK1 1/4/2011 14:34:34 IR03GB0230 (8.0, 9.5) 30 Z ³ FIGURE 3-3 2009 INTERIM REMOVAL ACTION SAMPLING LOCATIONS BELOW SUBSURFACE WOOD DECKING IMPLEMENTATION REPORT FOR IR03 INTERIM REMOVAL ACTION, FUEL-OIL PIPELINE SOURCE AREA IN INVESTIGATION AREA C1, LENNAR MARE ISLAND, VALLEJO, CALIFORNIA MARE ISLAND VICINITY MAP VALLEJO FOPL SOURCE AREA AT IR03 A3 B.2-1 E AR M B.2-2 H2 D1.2 IS N SA BL PA D1.3 Y BA } K } C3 D1.1 O } C3 C2 D1.2 D2 D1.2 CE FI OF } } } } 4 I1/ / HAND-AUGERED BORING SAMPLE } FENCE INDUSTRIAL WASTEWATER PIPELINE FLUSHED FOPL SEGMENT REMOVED FOPL SEGMENT FINAL 2009 SOIL REMOVAL AREA STRUCTURE ROAD H0 RT BE IR03GB0225 (09) 8,900= (8.0) D 1,000= (8.0) M 0 GEOPROBE SAMPLE RAILROAD T } Z 0 CONCRETE RETAINING WALL (QUAY WALL) I RA } } 71 B4 IR03GB0223 (09) 1,100= (8.0) D 310= (8.0) M 2,200= (9.0) D 91J (9.0) M 110= (10.0) D 13J (10.0) M ST } } 0 } D AN SL } } LEGEND } } } } } } } } } } } EI 0 ARMY } R MA IR03GB0224 (09) 7,500= (8.0) D 1,300= (8.0) M 380= (9.0) D } 91= (9.0) M } } } 3,000= (10.0) D } 690= }(10.0) M IT RA ST D1.3 SCHOOL ND LA E8 3B /B E Z C1 B.1 4 I1/ IN YL BA IR03GB0226 (09) 5,900= (7.5) D 4,700= (7.5) M 940= (8.0) D 170= (8.0) M 51= (9.0) D 42= (9.0) M 4,500J (9.5) D 12,000= (9.5) M WATER 4 Z } } } } } } } } } } } } } } } } } N RO RF TE VE WA A R 8 BE E3 } 6/ I1/ B A& 73 4 B /B } } } } 4 I1/ } } } IR03GB0222 (09) 13,000= (7.5) D 3,700= (7.5) M 8,200= (8.0) D 1000= (8.0) M 13,000= (9.0) D 12,000= (9.0) M 530= (9.5) D 170= (9.5) M NOTES: 1. "<" = NOT DETECTED AT OR ABOVE THE INDICATED CONCENTRATION 2. "=" = ANALYTE WAS DETECTED 3. "J" = ESTIMATED DETECTED RESULT 4. RED LABEL = EXCEEDS TIER 2 SCREENING LEVEL IN SOIL } } } } T SAMPLE LOCATION ID SOIL CONCENTRATION (mg/kg) SAMPLE BEGINNING DEPTH (FEET BGS) SAMPLE COLLECTION YEAR IR14VB219 (93) 86FJ (2.8) } } } } } } } IR03GB0221 (09) 4,300= (7.5) D 4,500= (7.5) M 240= (8.0) D 190= (8.0) M 500= (9.0) D 540= (9.0) M 20J (10.0) D 38= (10.0) M } } } } } } } } } } } } Z TIER 2 SCREENING LEVELS IN 5SOIL 51 Analyte (Abbreviation) Within 300 Fe et From a Potential Aquatic Habitat TPH-DIESEL (D) YES 2,100 TPH-MOTOR-OIL (M) YES 5,000 Screening Level Note: Tier 2 screening level for so il for sites lo cated less than 300 feet from a sensitive recepto r (CH2M HILL 2009) \\BALDUR\PROJ\MARE_ISLAND_264204\MXDS\SCR_FOPL\B_C1\IRA\IR03\FIG4-3_FOPL_SOURCE_IR03_EAST_QUAY.MXD ECLARK1 3/24/2010 13:36:01 P DO TA IN ST 0 20 Feet ³ FIGURE 4-3 SEDIMENT SAMPLE LOCATIONS AND RESULTS EAST OF QUAY WALL IMPLEMENTATION REPORT FOR IR03 INTERIM REMOVAL ACTION, FUEL-OIL PIPELINE SOURCE AREA IN INVESTIGATION AREA C1, LENNAR MARE ISLAND VALLEJO, CALIFORNIA Field Activities – Known Condition Sites Industrial Pump Station 4 / T-2 Oil-Water Separator (IWPS4 / T-2 OWS) 8 Field Activities – Known Condition Sites Industrial Pump Station 4 / T-2 Oil-Water Separator (IWPS4 / T-2 OWS) • Investigation – Multi-Media Sampling and Analysis Petroleum Hydrocarbons and Chlorinated Volatile Organic Compounds (CVOCs) Potential Multiple Sources Multiple Soil Boring / Sampling Locations – Soil, Soil-Gas and Groundwater Install Additional Groundwater Monitoring Wells and Integrate Into Groundwater Monitoring Program Develop and Implement Remediation Plan 9 A3 BA D1.1 ! A ! A D IS A EM N E AV 5 78 T2MW0102 601 (4/10) 397 (5/10) 598 (7/10) 482 (11/10) 396 (4/11) 318 (7/11) 457 (10/11) 670 (1/12) 940Y (6/12) 1000 (8/12) 660 (12/12) ! A OIL/WATER SEPARATOR T-2 ! C ! ( 7 45 ! IWPS No. 4 ! ! A ! A M ! ( ! ( UNK R:\REMEDYLMI20000895\MAPFILES\IWPS4_T2\Q4\FIG4-2_IWPS4_TPHD_Q4.MXD ECLARK 1/11/2013 11:55:34 AM BACKBONE SEWER PIPELINE OTHER WATER PIPELINE GAS PIPELINE ! A D STORMWATER BACKBONE STORMWATER SERVICE LINE MARE ISLAND 1859 BOUNDARY FORMER IWPS 4 2009 IR03 FUEL-OIL PIPELINE SOURCE AREA EXCAVATION TO 8 TO 10 FEET BGS EASTERN EARLY TRANSFER PARCEL STRUCTURE ROAD IR03MW0200D 399J (4/10) 481 (5/10) 553 (7/10) 328 (11/10) 576 (2/11) 731 (4/11) 862 (5/11) 223 (7/11) 577 (10/11) 625 (1/12) 790J (6/12) 710 (8/12) 500 (12/12) 2005 IWPS 4 EXCAVATION (DEPTH IN FEET) 0 TO 5 5 TO 10 10 TO 15 15 TO 20 20 C ! ( 300-FOOT ENVIRONMENTAL SCREENING LEVEL BUFFER 0 BEGIN BUFFER END BUFFER 15 Feet NOTE: 1. "<" = NOT DETECTED AT OR ABOVE THE INDICATED CONCENTRATION 2. "=" = ANALYTE WAS DETECTED 3. "J" = ESTIMATED DETECTED RESULT 4. “Y” = FUEL PATTERN (TPH ONLY) 5. GREEN LABEL D3 = EXCEEDS TPH-DIESEL TIER 2 SCREENING LEVEL OF 640 µg/L SAMPLE LOCATION GROUNDWATER CONCENTRATION (µg/L) D1 D6 SAMPLE COLLECTION (MONTH/YEAR) 3 47 D4 D5 30 $ FIGURE 4-2 IWPS 4 AND OWS T-2 TPH-DIESEL CONCENTRATIONS IN GROUNDWATER D2 C ! ( C UNDERGROUND ELECTRICAL UTILITY IR03MW0200S 1,310 (3/11) 1,240 (5/11) 1,700 (10/11) 4,510 (1/12) C ! ( ! A 3 92 APPROXIMATE GROUNDWATER FLOW DIRECTION 03W07 544 (2/10) 449 (5/10) 582 (4/11) 630Y (6/12) FENCE INDUSTRIAL WASTEWATER PIPELINE (IR14) 1 47 , ! A STORM SEWER MANHOLE INVESTIGATION AREA 3 92 C ! ( IWPS4MW0102 1,290 (2/10) 1,600 (4/10) 1,680 (4/11) 1,510 (7/11) 1,530 (10/11) 1,500 (1/12) 2,100 (6/12) 2,500 (8/12) 1,900 (12/12) } STORM SEWER CATCHBASIN RAILROAD 7 47 C ! ( IWPS4MW0100 2,060 (2/10) 2,560 (4/10) 2,280 (4/11) 2,060 (7/11) 2,200 (10/11) 2,500 (1/12) 3,200 (6/12) 4,000 (8/12) 1,500 (12/12) } IWPS4 AND OWS T-2 DOWNGRADIENT MONITORING WELL SALTWATER PIPELINE K IN YL CE BA FFI O ! A C ! ( M ! ( ! A + D ! A + D T2MW0100 777 (2/10) 942 (5/10) 1,170 (7/10) 1,250 (11/10) 1,250 (4/11) 1,090 (7/11) 1,490 (10/11) 2,230 (1/12) 1,300 (6/12) 2,800 (8/12) 1,100 (12/12) M ! ( IR03 QUARTERLY MONITORING LOCATION SEWER SERVICE LINE 5 98 IWPS4MW0105 550 (2/10) 390 (5/10) 485 (4/11) 1,100Y (6/12) + E AV NT RO RF TE W T2MW0101 213 (2/10) 179 (5/10) M ! ( 286 (7/10) 257 (11/10) 375 (4/11) 303 (7/11) 401 (10/11) 459 (1/12) 460Y (6/12) 700 (8/12) 370 (12/12) IWPS4 AND OWS T-2 QUARTERLY MONITORING LOCATION WA Y ARMY 03W19 223 (2/10) 343 (5/10) 409 (7/10) 375 (11/10) 360 (4/11) 353 (7/11) 457 (10/11) 351 (1/12) 770Y (6/12) 980 (8/12) 610 (12/12) ! H LO D1.3 MONITORING WELL D IT RA ST B PA C2 C1 N SA C3 D2 M ! ( IA SCHOOL T .2 D1 H2 T2MW0104 152 (6/10) 217 (7/10) 207J (11/10) 243 (4/11) 640 (7/11) 241 (10/11) 311 (1/12) 320Y (6/12) 360 (8/12) 250 (12/12) A H B.2-2 I RA ST C ! ( ND LA IS B.2-1 C1 B.1 M ! ( ! A D D AN SL RE MA T2MW0103 183 (6/10) 584 (7/10) 405J (11/10) 748 (4/11) 730 (7/11) 622 (10/11) 669 (1/12) 750Y (6/12) 930 (8/12) 760 (12/12) LEGEND I RE MA VA L L E J O AST VICINITY MAP IR14VB219 <4.8 (6/99) 515 FOURTH QUARTER/ANNUAL 2012 GROUNDWATER MONITORING RESULTS, INDUSTRIAL WASTEWATER PUMP STATION 4 AND OIL/WATER SEPARATOR T-2, INVESTIGATION AREA C1, LENNAR MARE ISLAND, VALLEJO, CALIFORNIA BA D1.1 W IS A EM N E AV 7 45 ! IWPS No. 4 ! ! A ! A M ! ( T2MW0102 <0.19 (4/10) <0.094 (5/10) <0.19 (7/10) 0.23J (11/10) <0.10 (4/11) 0.32J (7/11) <0.070 (10/11) <0.20 (1/12) 0.20J (6/12) 0.50 (8/12) 0.50 (12/12) UNK R:\REMEDYLMI20000895\MAPFILES\IWPS4_T2\Q4\FIG4-7_IWPS4_VC_Q4.MXD ECLARK 1/10/2013 11:28:30 PM } } STORM SEWER CATCHBASIN STORM SEWER MANHOLE FENCE UNDERGROUND ELECTRICAL UTILITY BACKBONE SEWER PIPELINE OTHER WATER PIPELINE GAS PIPELINE SALTWATER PIPELINE C ! ( ! A D IR03MW0200S 9.7 (7/11) 5.9 (10/11) 2.0 (1/12) STORMWATER BACKBONE STORMWATER SERVICE LINE MARE ISLAND 1859 BOUNDARY FORMER IWPS 4 2009 IR03 FUEL-OIL PIPELINE SOURCE AREA EXCAVATION TO 8 TO 10 FEET BGS ! A + D ! A + D EASTERN EARLY TRANSFER PARCEL STRUCTURE ROAD ! A IR03MW0200D 1.1 (7/10) 3.4 (11/10) 10 (4/11) 10.9 (7/11) 3.2 (10/11) 2.3 (1/12) 1.2 (6/12) 7.6 (8/12) 0.90 (12/12) 2005 IWPS 4 EXCAVATION (DEPTH IN FEET) 0 TO 5 5 TO 10 10 TO 15 15 TO 20 20 C ! ( 300-FOOT ENVIRONMENTAL SCREENING LEVEL BUFFER BEGIN BUFFER 0 END BUFFER 15 Feet NOTE: 1. "<" = NOT DETECTED AT OR ABOVE THE INDICATED CONCENTRATION 2. "=" = ANALYTE WAS DETECTED 3. "J" = ESTIMATED DETECTED RESULT 4. GREEN LABEL = EXCEEDS VINYL CHLORIDE D3 LEVEL OF 590 µg/L TIER 2 SCREENING C ! ( D2 SAMPLE LOCATION GROUNDWATER CONCENTRATION (µg/L) D1 D6 SAMPLE COLLECTION (MONTH/YEAR) 3 92 APPROXIMATE GROUNDWATER FLOW DIRECTION C ! ( M ! ( INDUSTRIAL WASTEWATER PIPELINE (IR14) 3 47 D5 D4 1 47 , 03W07 18.7 (2/10) 26.4 (5/10) 14.6 (4/11) 17.0 (6/12) IWPS4 AND OWS T-2 DOWNGRADIENT MONITORING WELL INVESTIGATION AREA 3 92 C ! ( IWPS4MW0102 395 (2/10) 455 (4/10) 533 (4/11) 631 (7/11) 591 (10/11) 478 (1/12) 380 (6/12) 460 (8/12) C ! ( 590 (12/12) ! A D RAILROAD 7 47 C ! ( IWPS4MW0100 385J (2/10) 397 (4/10) 373 (4/11) 453 (7/11) 389 (10/11) 373 (1/12) 330 (6/12) 300 (8/12) 230 (12/12) IR03 QUARTERLY MONITORING LOCATION SEWER SERVICE LINE K IN YL CE BA FFI O ! A + 5 78 T2MW0100 8.2J (2/10) 117 (5/10) 156 (7/10) 27.9J (11/10) 1,420 (4/11) 12.2 (7/11) 168 (10/11) 268 (1/12) 140 (6/12) 530 (8/12) 15.0 (12/12) M ! ( IWPS4MW0105 3.1 (2/10) 5.6 (5/10) 2.9 (4/11) 2.9 (6/12) IWPS4 AND OWS T-2 QUARTERLY MONITORING LOCATION E AV NT RO RF TE ! A D C ! ( 5 98 ! WA Y ARMY MONITORING WELL H LO T2MW0103 3.0 (6/10) 13.7 (7/10) ! A 10.7 (11/10) 11.1 (4/11) 13.4 (7/11) 8.5 (10/11) 7.9 (1/12) M 11.0 (6/12) T2MW0101! ( 64.2 (2/10) 15.0 (8/12) 55.1 (5/10) 9.3 (12/12) 78.2 (7/10) ! A 83.9 (11/10) 61.8 (4/11) 72.5 (7/11) 69.1 (10/11) 69.0 (1/12) 70.0 (6/12) 96.0 (8/12) 57.0 (12/12) OIL/WATER SEPARATOR T-2 ! C1 B PA D1.3 C2 IA N SA C3 D2 IT RA ST T SCHOOL .2 D1 H2 I RA ST B.2-2 C ! ( ND LA IS B.2-1 C1 D AN SL RE MA B.1 03W19 M ! ( 0.87J (2/10) <0.94 (5/10) <1.9 (7/10) M (11/10) 2.4J ! ( <0.91 (4/11) <0.91 (7/11) 1.6J (10/11) <2.0 (1/12) <5.0 (6/12) 14.0J (8/12) <3.0 (12/12) ! A D A H A3 LEGEND AST VA L L E J O I RE MA T2MW0104 4.6 (6/10) 4.4 (7/10) 4.9 (11/10) 3.9 (4/11) 4.2 (7/11) 3.4 (10/11) 4.6 (1/12) 4.2 (6/12) 5.0 (8/12) 5.0 (12/12) VICINITY MAP 30 $ FIGURE 4-7 IWPS 4 AND OWS T-2 VINYL CHLORIDE CONCENTRATIONS IN GROUNDWATER IR14VB219 <4.8 (6/99) 515 FOURTH QUARTER/ANNUAL 2012 GROUNDWATER MONITORING RESULTS, INDUSTRIAL WASTEWATER PUMP STATION 4 AND OIL/WATER SEPARATOR T-2, INVESTIGATION AREA C1, LENNAR MARE ISLAND, VALLEJO, CALIFORNIA Known Condition Sites Installation Restoration Program Site (IR) 21 and Building 386/388/390 Area Storm Sewers 12 Field Activities – Known Condition Sites IR 21 and Building 386/388/390 Area Storm Sewers • Investigation – Petroleum Hydrocarbons and Polynuclear Aromatic Hydrocarbons (PAHs) Advance Soil Borings Install and Monitoring Additional Groundwater Wells Develop and Implement Remediation Plan 13 MH ! ( * } Z Z } H C // C C ) C C CC F C ) H H H H C LEGEND H H < H H H H H H H H !! H H H G C F ( B388W01 C! ! =C C! = ! IR21MH7H } = C ! = ! = H H ! == C INSET 2 } <100 (5/99) D / F H F F H } ) Z FFFF CIR21MH1 ! =! Z M ! C F = C F H = C H ! F F F ( ! C = C 830Z (5/99) M C ! = F } C ! ( H F F ! / C = F H F H C ! C F H = C F FFF FFF *Z ! ! )) M ! =! ( } ! C ( =C ( F Z =! FF FF <100J (7/99) D FFF C H HT F C )C) FF F FF FF H H } } HM Y S FFF C C F ( C ** ! F C F ! C = C C <100J (7/99) M F C F ! =! EH D ) CC = CC IR21CB11 FF } =! HZ H } A DC Z GL C C 300Y (10/99) D C C F / C * BAH ! = Z } C Z C ) F C)C C Z H } C (10/99) M C H 190Y ( Y * )) C )/ H ( ) M 686 110Z (1/00) D! )C ! = ! = * CH! ! = ! = C C ( C H } } Z Z Z H C C G Z ) * Z * * Z H C Z C } ( C Z ) \ Z 120Z (1/00) M AZ C C Z MH C H } \ \A ( C *C C( UST \ Z810 Z! * C ( Z Z * \ H } <14 (11/03) D )\ \ E C* A G C C Z Z Z Z Z 498 *CC H * C Z C Z ( ! C IR21MH6 A =( } C Z Z \Z \ Z Z A C M Z Z M <28 (11/03) M C Z 386 ! ( }Z ! H ( * C C ( Z * Z Z 0ZZ Z 0 ( C C \ H } C Z * ZZ C H C Z Z 50J (4/04) D F * ! Z Z ( Z Z FC ( C \\ C H } Z} *Z Z * Z ZZ Z Z Z 290J (4/04) M \\ 0 15 F 7.5 C C M Z A Z \\\ \ 0 * Z ! ( * } C F G / ) C ( \ * ( M C H } Z \ \! M Z C Z ( <500 (5/05) ! Z C ( Z Z! C D Feet C * Z* C \ Z C Z\Z\A C \ ! Z ( C <500 (5/05) M H Z } }Z * IR21CB10 ! \ = C Z Z ! = \ ! \ =! Z Z A Z Z ) ! = * \ M Z \ = Z Z ! \ = } Z (686 (1) \UST ! =! \! C! Z Z ! =! <520 (10/05) D ! *Z = C = C H \ IR21CB8 C C \ = C Z C = ! = \ ! ! IR21CB8 ( \ = } ! Z = A C ! \ CC = \ ! CC ! = = ! \Z ZZ Z C ! =! ! Z = ! ( ! =! C! == =C C == (10/05) MY C\ =! A IR21MW0106 (02) C 680 ! = ! = ! <520 =! (Y \! (Y \ C = ! \ = = \\\\ =! H } } Z Z 390 C ( \\\! C! ! (Y ! = ! = \ \ Z A = = ! = \D Y =! =C\686 C 27= (0.5) D C MARE ISLAND VICINITY MAP CF ! <530 (2/07) D } \}\UST (A Z! = =! ! ( Z \ Z Z H } } Z \ 0Z (2)(3) Z\ \C\ \ C E FM ( ! ( 170=)(0.5)C <530 (2/07) M \\ G ( C }Z C / G Z C ( 0 0 G ( )( C * * Z } C VALLEJO B382GB002 (98) ) <15 (4.5) D * ( G Z 420= (7/08) D ( C( 0 CE C 0 G ) * C ZZ A3 * D0 C * ZCCCC CC <1.3 (2.0) D ( 600= (7/08) M A<75 C(4.5) M CC( ) D CCCC C C CC CC Z C * G C ( F Z C ) C 686A / 210Y (2.0) M C CC C <17 (9.5) D C C 500= (10/08) D D C ! CD =*CC C ( CC Y C ( Z C C CH C CC C ! C ZY ( ( <13 (4.0) D C CCM C C ! 0 <87 (9.5) B390GB016 (98) = 600= (10/08) M C CC CC C Z CCC CC C ! = ! C = ! = D C ( Y Z 688 CC C B.2-1 H C ! = <13 (4.0) M C C C <14 (1/03) D <110 (3.0) D C Z Z 350= (2/09) D C1 Z C C C C ! = ! = ! = Z C = B.1 <17 (6.0) D ! ( = C H* <28 (1/03) M ! = 1,500Y (3.0) M ! 390A CC ! =! 950=! (2/09) M (( C C ! ( = ! = Z ! ( ! = ! = C C ! = CH B.2-2 C Z 5,200Y (6.0) M ! ( <14 (12/03) DC C 210= (4/09) D C ! ( 388 3.6Y (5.0) D ( H2 D1.2 ( Y Z Y <1.5 (8.0) D C M Z 37Y (5.0) M <28 (12/03) C ! ( 490J (4/09) M ( M H! ( CC Z C Z D D1.3 ! = MHD ! 520Y (8.0) M ( ! = ! 68J (4/04)! = C IR21CB7 ! 5.4Y (7.0) D ( = ! = C3 320= (9/09) D CZ ! = C Z } ! ( Y = * C IR21CB2 ! Z ( = C SCHOOL CC C C Z* }Z Z F * C C Z ( C2 <1.7 (10.0) D * 290J (9/09) M 230J (4/04) M! 23Y CF (7.0) M Z*ZZ H D2 *Z Z 34Y (10.0) M Z ( <500 (5/05) D 386 120Y 440= (11/09) D D1.2 CH ( Z (9.0) D ! ( Z ) D1.3 Z <100 (8/98) D Z ZUST 688 (3) <500 (5/05) M 1,700Y (9.0) M C3 890= (11/09) M Z H ! D1.1 = Z ! = ! = ! = <100 (8/98) M C <510 (2/07) D Z C22Y (11.0) D 330= (2/10) D UST 688 (1)(2) ! = Z Z IR21/BUILDING 386, D1.2 ! H = ! C = ! = 858 320J (2/10) M <510 (2/07) M 190Y (11.0) M ARMY * 388, AND 390 AREA H 230= (7/08) D C ! Z <1.4 (13.0) D ( A Z Z Z Z CHH 380J (7/08) M ! = 15Y (13.0) M ! = ! ! = ! ( ( Y = ! = ! = ! = Z C D ! ( Z 240= (10/08) H IR21CB4 Z 750 D NOTES: INSET 2 430J (10/08) M 1. < = NOT DETECTED AT OR ABOVE THE Z Z H Z C Z* ( INSET 1 IR19CB6 ! C INDICATED CONCENTRATION IR21CB1 D 180= (2/09) D * Z ( Z H! 386 C Z 2. = = ANALYTE WAS DETECTED Z M ! Z = 500J (2/09) M ! ( ! = Z A ! = ! = H 3. J = ESTIMATED DETECTED RESULT Z ! = = Z ! = ! =! IR21MH5 = OBSTRUCTION 160= (4/09) D Z IR21MH3 ! H 4. Y = FUEL PATTERN (TPH ONLY) Z M ! ( Z M ! 400J (4/09) M ( H Z = NOT A FUEL PATTERN (TPH 5. ONLY) H Z Z Z ZZ Z ! =! RED LABEL = EXCEEDS ZZ TIER 2 INDUSTRIAL ! 220= (9/09) D =! = ( Y H 6. SCREENING = * Z * H LEVELS FOR GROUNDWATER A Z IR21MH1 290J (9/09) M Z H Z Z C Z RED LABEL 7. ! = EXCEEDS TIER 2 INDUSTRIAL Z ( MH IR21GB0107 (02) ! ( 240= (11/09) D SCREENING LEVELS FOR SOIL HM H C IR21CB3 IR21MH4 65= (1.0) D ! ( CZ H ! SYMBOL = OTHER SAMPLE LOCATION ( 8. GRAY 340J (11/09) M * IR21GB0103 (02) 382 H C C 950= (1.0) M Y 9. STORMWATER FLOW DIRECTIONS ARE BASED ON ( ! ( Z H ! = 160= (2/10) D ! ! Z = ! = = Z 44= (1.5) D ! = C ! ( FIELD OBSERVATIONS H B382GB001 (98) Z Z Z 170JZ(2/10) M H 340= (1.5) M 10. THE INFERRED CONFIGURATION IN INSET 1 IS BASED 0 <1.6 (2.0) D Z H } Z C ON FIELD OBSERVATIONS <14 (4.5) D Z C /39H 70Y (2.0) M } 8 ! = H * 8 ! = ! = } ! = C <70 (4.5) M ! ( INSET 1 /3 H IR21MH2 C <130 (4.0) D } SAMPLE LOCATION ! ( IR14VB219 (93) 8H6 508* H <15 (8.5) D } Z 3 } M 190J (4.0) M SOIL CONCENTRATION (mg/kg) ! 86FJ (2.8) D ( * } G } <77 (8.5) M D } H GROUNDWATER CONCENTRATION (µg/L) <4.8 (6/99) M <7.5 (6.0) D 0 15 30 Z Z BL H } <500 (11/02) D SAMPLE COLLECTION (MONTH/YEAR) 2,400Y (6.0) M MH } H Z ! ( C Feet D <500 (11/02) M } IR21MH3 ! ( Z SAMPLE BEGINNING DEPTH (FEET BGS) <16 (8.0) D } H H H H H H H S H H H } } } } } } H } } } } } } } } } } } H H H H H ZH C * H } TPH-MOTOR-OIL (M) ! = Within 300 Feet of Z Screening Level (µg/L)H Potential Aquatic Habitat Z H NO 5,000 C ! ( Z H NO 5,000 } H H Z ! ( ! C Z ZV Z Z ZZ < H Z * < } H TIER }2 SCREENING LEVELS FOR GROUNDWATER TPH-DIESEL (D) M H ! ( H H H H H H H H H } } } } } } M < H } } \\BALDUR\PROJ\MARE_ISLAND_264204\MXDS\STORM_SEWER\TWOIMP\FIG3-2_STORM_IR21_SGW_TIER2_TPH.MXD ECLARK1 1/13/2011 16:03:29 ! (! H! ( ! H H } } } } H H H H } } } } } } H H } } } } UNKNOWN FUEL-OIL PIPELINE H H H } } } } H H H H } } } } } } } } } } } } } } } } } } } } H C 508! ( H 5,000 H 5,000 >10 ZZ } Analyte (Abbreviation) C H >3 and ≤10 CH ! ( ! ( H*! ! H 2,500 } } } B382GB0100 F(07) FF 1338 7,300= (5.5) D 8,200= (5.5) M H } } H IR21MH2 ! = H ≤3 H ! (H ! ( C H 5,000 } } 4,300Y (8.0) M } <1.9 (10.0) }D } 210Y (10.0) M } } 54,000,000Y (8/98) D } } 150,000,000Y (8/98) M H 5,000 >10 H >3 and ≤10 H 500 C ! ( C ( H! MH Level ( (m g/kg) H } } H ! H H ! H H } } } } } REMOVED FUEL-OIL PIPELINE SALTWATER PIPELINE STEAM PIPELINE } } FENCE H } } } FUEL-OIL PIPELINE NOT FOUND H } } } FLUSHED FUEL-OIL PIPELINE H } } H } } H } } ABANDONED FUEL-OIL PIPELINE H H EXISTING FRESHWATER PIPELINE H H } EXISTING DREDGE PIPELINE H H COMPRESSED AIR PIPELINE H H AIR PIPELINE H H } H } } H H H H } } H } H } H OTHER WATER PIPELINE H H STORMWATER FLOW DIRECTION GAS PIPELINE H H SECTION OF BOTTOM OF STORM SEWER PIPELINE MISSING SEWER SERVICE LINE H H TWO 1-INCH-DIAMETER LIVE ELECTRICAL CABLE OBSERVED BACKBONE SEWER PIPELINE ! H H } } H <H H NOT VISIBLE DURING 2009 SITE VISIT INDUSTRIAL WASTEWATER PIPELINE H } Z CLEANED IN 2009 H } H H M D So urce: CH2M HILL 2009a So urce:}CH2M HILL 2009a CLEANED IN 2001 UNDERGROUND ELECTRICAL UTILITY H H } STORM SEWER MANHOLE STORM SEWER SERVICE LINE H ! H H M Screening ≤3 H NO H ( !! ( CHC Depth (feet) } } STORM SEWER CATCHBASIN STORM SEWER BACKBONE H } H H Z H ! ( M H! ( NO C H } < H } H H INDUSTRIAL H LO BINDUSTRIAL H PA H ! M H ( H N A S UNDERGROUND STORAGE TANK H H H TPH-MOTOR-OIL (M) H H !! !! ! < << <<< H H < H H H 90 8/ 3 C2 .1 ( C! ! ( H Z ! H << <<< 38 6/ IA D1 H H UNDERGROUND STORAGE TANK UNKNOWN STORM SEWER PIPELINE FLUSHED/RINSED SECTION OF STORM SEWER PIPELINE COULD NOT BE VIDEOTAPED ON MAY 19, 2009 !! H H 38 DR IA ! ( H H H E AV < << < << < H H AR H H C 300 Feet of Within Potential Aquatic Habitat MH H H H AD } H H H } H < } H ! !! < H DG BL U AZ TPH-DIESEL H H (D) M1C } } H O ILR RA H < << << < << < < << < << < < < < <<< < < < << < < <<< < < << <<<< < < < < << < < < < << < < < < < < < < < < < < < < < << < < < < < <<< < < < T AI H R ST } Land Use < H H D H AN } !!( ! ! IR21CB3 M ( H C! ! H( Analyte (Abbreviation) H H H H L IS } H Z ! ! ! ! ! ! ! C ( TIER 2 SCREENING! LEVELS FOR SOIL H! CH ( H S H H <<< << < < < < << < < < < < < <<< < < < < < < << < << < < < < < < < < << < << < < <<< < 21 E 11 IR } ! M1 MONITORING WELL ! H < IR R MA O BL PA Y N SA BA ! A C ! ( M ! ( H < << < ! ANALYTE ABBREVIATION SAMPLE COLLECTION YEAR H H < < << < < < < <<<< << < < < < <<< < < < < << !! ! !! GEOPROBE SAMPLE H < <<<< << < < < < <<< < << < << <<< < < << < < < < < << << << <<< <<< < <<< <<<<< < << << ! Z S H 208 H H H H H } } } RAILROAD INVESTIGATION AREA GROUP I SITE GROUP II, III SITE BUILDING FOOTINGS STRUCTURE ROAD 0 ³ 50 100 Feet FIGURE 3-2 TPH-DIESEL, TPH-MOTOR-OIL CONCENTRATIONS IN SOIL AND GROUNDWATER NEAR THE BROKEN PIPELINE SEGMENT AT THE STORM SEWER SYSTEM NEAR THE IR21/BUILDINGS 386/388/390 AREA SITE SUMMARY REPORT FOR THE STORM SEWER SYSTEM NEAR IR19, IR21/BUILDINGS 386/388/390 AREA, PCB SITE BUILDING 678 AL#04, AND PCB SITE BUILDING 830 UL#01 IN INVESTIGATION AREA C2, LENNAR MARE ISLAND, VALLEJO, CALIFORNIA Known Condition Sites IWPS4 / T-2 OWS, IR03 and IR15 IWPS4 / T-2 OWS IR03 IR15 15 VICINITY MAP M ! ( ! A B.2-1 C1 N SA D2 + + ! A 03W19 C3 C2 ! A LO M ! ( BA D1.1 T2MW0101 ! A W Y ARMY VE IA T2MW0100 ! A M ! ( K IN YL CE BA FFI O M ! ( PROPOSED WELL TO MONITOR ONE TIME (1Q2013) FOR COMPARISON TO TIER 2 SCREENING LEVELS STORM SEWER CATCHBASIN STORM SEWER MANHOLE FENCE INDUSTRIAL WASTEWATER PIPELINE (IR14) UNDERGROUND ELECTRICAL UTILITY BACKBONE SEWER PIPELINE SEWER SERVICE LINE OTHER WATER PIPELINE GAS PIPELINE STORMWATER SERVICE LINE ! A IWPS4MW0100 MARE ISLAND 1859 BOUNDARY IR03MW0201D 03W07 7 47 C ! ( ! IWPS No. 4 ! ! A A IR03 QUARTERLY MONITORING LOCATION STORMWATER BACKBONE ! A IR03MW0201S FORMER IWPS 4 2009 IR03 FUEL-OIL PIPELINE SOURCE AREA EXCAVATION TO 8 TO 10 FEET BGS A + A + EASTERN EARLY TRANSFER PARCEL IWPS4MW0102 STRUCTURE ROAD AS C ! ( 3 92 2005 IWPS 4 EXCAVATION (DEPTH IN FEET) T 03W06 A + 0 TO 5 D3 C 10 TO 15 15 TO 20 D2 ! ( 20 D6 + D 300-FOOT ENVIRONMENTAL SCREENING LEVEL BUFFER D5 3 47 IR03MW0202S 4 3 92 IR03MW0204 A D1 D C ! ( 5 TO 10 1 47 IWPS4MW0106 C ! ( IR03MW0200D IWPS4 AND OWS T-2 QUARTERLY MONITORING LOCATION SALTWATER PIPELINE IWPS4MW0105 ! ( IR03MW0200S PROPOSED WELL TO ELIMINATE FROM IR03 MONITORING PROGRAM INVESTIGATION AREA IT RA ST C1 M ! ( ! A + ! A + MONITORING WELL RAILROAD D AN SL E AV 7 45 5 98 A + } I RE MA N TA A EM C ! ( T2MW0102 ! A IWPS4MW0104 C ! ( A + } ON IS 5 78 OIL/WATER SEPARATOR T-2 ! M C ! ( M ! ( R RF TE WA B PA D1.3 ! T SCHOOL .2 D1 H2 D T2MW0103 I RA ST B.2-2 A M ! ( ND LA IS B.1 LEGEND H A3 T2MW0104 RE MA C ! ( VA L L E J O IR03MW0202D A + D A + D H 757 C ! ( 0 BEGIN BUFFER END BUFFER 20 Feet 5 51 C ! ( 04 1S1 1 29 C ! ( 289 IR03MW0203D 03W18 C UNK R:\REMEDYLMI20000895\MAPFILES\IWPS4_T2\Q4\FIG5-1_IWPS4_PW_BEGINQ1_Q4.MXD ECLARK 1/28/2013 10:15:29 AM C ! ( ! ( $ FIGURE 5-1 PROPOSED MONITORING WELL NETWORK IWPS4 AND OWS T-2 BEGINNING FIRST QUARTER 2013 1 29 5 79 C ! ( M ! ( 40 A + A + FOURTH QUARTER/ANNUAL 2012 GROUNDWATER MONITORING RESULTS, INDUSTRIAL WASTEWATER PUMP STATION 4 AND OIL/WATER SEPARATOR T-2, INVESTIGATION AREA C1, LENNAR MARE ISLAND, VALLEJO, CALIFORNIA C ! ( W VICINITY MAP A EM IS N A3 LEGEND A D FENCE RAILROAD INVESTIGATION AREA MARE ISLAND 1859 BOUNDARY FORMER IWPS 4 E8 IR03 FOPL SOURCE AREA C1 ROAD IT RA ST T H 300-FOOT ENVIRONMENTAL SCREENING LEVEL BUFFER H D3 BEGIN BUFFER END BUFFER D6 4 D /B &B STRUCTURE 03 IR 71 1 47 3 47 / I1 6/ 6 I1/ 3A 47 EASTERN EARLY TRANSFER PARCEL D5 3 92 D1 IR03 SITE BOUNDARY D AN SL IA 4 4 /B AS 3 92 D2 2009 INTERIM REMOVAL ACTION SOIL EXCAVATION FOOTPRINT I RE MA A + A + I1/ A + D } 3B /B E IR03MW0201S IR03MW0204 T Y INDUSTRIAL WASTEWATER PIPELINE (IR14) ! A + ! A + IR03MW0201D 7 47 IWPS4MW0100 REMOVED FOPL SEGMENT } K IN YL CE BA FFI O ! A ! ! A A BEGINNING AND END OF FOPL SEGMENT SUBSURFACE 6-INCH WOOD DECKING IWPS4MW0105 03W07 IR03 QUARTERLY MONITORING LOCATION NOT LOCATED FOPL SEGMENT IR03MW0200D T2MW0100 IWPS4 AND OWS T-2 QUARTERLY MONITORING LOCATION FLUSHED FOPL SEGMENT D1.1 IR03MW0200S ! A PROPOSED WELL TO ELIMINATE FROM MONITORING PROGRAM CONCRETE RETAINING WALL (QUAY WALL) ! A ! A .2 D1 BA 7 47 MONITORING WELL ABANDONED FOPL SEGMENT C2 4 I1/ 7 45 5 98 C3 ARMY E T2MW0102 /B + AV 5 78 D2 D1.3 LO T2MW0101 4 I1/ B PA T ON FR ER AT ! A ! A N SA /B SCHOOL W 4 I1/ 03W19 8 BE E3 4 /B I1/ E8 3B /B E ! A 7 47 H2 ! I RA ST B.2-2 4 I1/ T2MW0103 B.2-1 C1 ND LA IS 757 RE MA E AV B.1 ! A T2MW0104 IWPS4MW0102 VA L L E J O B4 IR03MW0202S A 73 IR03MW0202D A + D A + D &B 4 I1/ 3B /B E I1/6/B473A&B E8 5 79 5 51 NOTE: S-PREFIX WELLS AND WELL 03W18 ARE COMPLETED ABOVE THE SUBSURFACE 6-INCH WOOD DECK AND D-PREFIX WELLS ARE COMPLETED BELOW THE SUBSURFACE 6-INCH WOOD DECK. 1 29 1S1 04 U 69 ST 3D9 , APPROXIMATE REGIONAL GROUNDWATER DIRECTION I1/ 6 6 /B A 93 1 29 &B IR03MW0203D 03W18 1 I1/ . 28 5 /B 9 UNK R:\REMEDYLMI20000895\MAPFILES\IR03\Q4\FIG5-1_IR03_PROP_REM_Q4.MXD ECLARK 1/28/2013 10:09:46 AM 9 28 851 0 A + A + 25 Feet 50 $ FIGURE 5-1 PROPOSED MONITORING WELL NETWORK BEGINNING WITH FIRST QUARTER 2013 FOURTH QUARTER/ANNUAL 2012 GROUNDWATER MONITORING RESULTS, IR03 FUEL OIL PIPELINE SOURCE AREA, INVESTIGATION AREA C1, LENNAR MARE ISLAND, VALLEJO, CALIFORNIA X X } X X X X } A % X } X } X } X X VA L L E J O A3 A % X } X X X X X X X Y X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X } ! ( X X X IR15MW0240D X A % COOLING-WATER LOOP X X CONCRETE OBSTRUCTION X A % MARE ISLAND 1859 BOUNDARY X X IR15MW0241D PRB UNDER CONCRETE OBSTRUCTION A % X X A % PRB FOR CHLORINATED ETHENE PLUME CORE AREA IR15MW0205D X X IR15MW0243D X A % QUAY WALL TIE-BACK X X 273 X X X X EASTERN EARLY TRANSFER PARCEL X IR15MW0206D A % X X X X X X X X X X X X X X X X X X X X X X X X X X X 15W04 } X } X X } X X } X X } X X X X } } } } C ! ( X } } } C ! ( R X R X C ! ( R X X C ! ( C ! ( X X X X X X X X X X } 225 101 X X X X X 0 12.5 Feet 25 $ FIGURE 5-1 PROPOSED MONITORING WELL NETWORK BEGINNING WITH FIRST QUARTER 2013 X C ! ( X X X X X A % UNK R:\REMEDYLMI20000895\MAPFILES\IR15\2012_Q4\FIG5-1_IR15_PROPMWNTWRK_Q4.MXD ECLARK 1/14/2013 10:29:50 AM X X X R ROAD M ! ( X R77 APPROXIMATE GROUNDWATER FLOW DIRECTION STRUCTURE F ! ( X IR15MW0214B X M X R75 X M IR15 SITE BOUNDARY X R IR15MW0214D A A % A% ! (% ! ( A % FENCE INVESTIGATION AREA IR15MW0204D X C ! ( } RAILROAD IR15MW0104 A % A % X A % IR15MW0234D M X A % A % STORMWATER SERVICE LINE A % } X X IR15MW0232D PURE WATER PIPELINE STORMWATER BACKBONE IR15MW0236D R X STEAM PIPELINE IR15MW0239D } X IR15MW0107 M ! ( X SALTWATER PIPELINE } X A % } X X A % REMOVED FUEL-OIL PIPELINE X } X X IR15MW0203D A % NOTE: 1. QUAY WALL TIE-BACK LOCATIONS INFERRED FROM THOSE OBSERVED WITHIN PRB ALIGNMENT DURING EXCAVATION OF PRB; DISTANCE OF TIE-BACKS FROM QUAY WALL NOT DETERMINED. FLUSHED FUEL-OIL PIPELINE } X X A % } X X X A % EXISTING FRESHWATER PIPELINE IT RA ST IR15MW0225D COMPRESSED AIR PIPELINE } X X A % IR15MW0238D AIR PIPELINE ND LA IS IR15MW0235D OTHER WATER PIPELINE } X X A % SEWER SERVICE LINE } X X A % } X X BACKBONE SEWER PIPELINE P51 IR15MW0233D , SEWER MANHOLE UNDERGROUND TELEPHONE UTILITY P31 A % A % IR15MW0219D STORM SEWER OUTFALL R UNDERGROUND ELECTRICAL UTILITY A % IR15MW0103D A % STORM SEWER MANHOLE A % } X X X IR15MW0103S STORM SEWER CATCHBASIN C ! ( M ! ( F ! ( ARMY M ! ( 15W05 PROPOSED WELL TO ELIMINATE FROM MONITORING PROGRAM D1.1 M ! ( IR15MW0244D IR15MW0223D % % PROPOSED QUARTERLY GROUNDWATER MONITORING WELL (WILL BE INCLUDED IN ANNUAL SAMPLING EVENT) } X X X X X X X X X X X X X X X X PROPOSED ANNUAL GROUNDWATER MONITORING WELL E AR M X X M ! ( X C ! ( % C2 D1.3 X X BA M ! ( C3 D2 LO M ! ( R T B PA SCHOOL .2 D1 N SA C ! ( H2 I RA ST B.2-2 } } } B.2-1 C1 B.1 } MONITORING WELL A ND LA IS M ! ( } } X IR15MW0201D R IR15MW0237D RE MA } C1 15 IR 69 } } LEGEND VICINITY MAP IA } } FOURTH QUARTER/ANNUAL 2012 GROUNDWATER MONITORING RESULTS, IR15, INVESTIGATION AREA C1, LENNAR MARE ISLAND, VALLEJO, CALIFORNIA Known Condition Site UST 243 19 Field Activities – Known Condition Site UST 243 Soil Gas Survey • Soil Gas Survey Petroleum hydrocarbons Chlorinated VOCs Additional characterization needed to the east, northeast Goal: cumulative assessment of risk related to petroleum hydrocarbons and chlorinated VOCs in soil vapors 20 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 28,000= (4.5) <10,000 (4.5) ! ! ! ! ! <3,600 (4.5) ! ! } FENCE FORMER STRUCTURE ROAD ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 1327 V V ! ! ! ! ! ! ! ! ! ! \ ! ! ! ! ! ! \ \\BALDUR\PROJ\MARE_ISLAND_264204\MXDS\UST\UST243\IMP\FIG3-3_UST243_SG_TPHG.MXD ECLARK1 1/17/2011 09:01:07 NOTES: 1. = = ANALYTE WAS DETECTED 2. GRAY SYMBOL = OTHER SAMPLE LOCATION 3. DATA FOR SAMPLES COLLECTED ON NORTHEAST SIDE OF DATA EVALUATION BOUNDARY ARE PART OF UST SITE 243; DATA FOR SAMPLES COLLECTED SOUTHWEST OF DATA EVALUATION BOUNDARY ARE PART OF UST SITE 231 25 ³ REQUEST FOR CLOSURE FOR UNDERGROUND STORAGE TANKS 243-1 AND 243-2 IN INVESTIGATION AREA H2, LENNAR MARE ISLAND, VALLEJO, CALIFORNIA ! V ! ! ! ! \ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! <23,000 (4.5) IR14VB219 86J (2.8) FIGURE 3-3 UST SITE 243 SOIL VAPOR SAMPLING LOCATIONS AND TPH-GASOLINE RESULTS ! ! ! ! ! ! ! ! V UST243SV0428 <4,600 (4.0) V SAMPLE LOCATION CONCENTRATION (µg/m 3) SAMPLE BEGINNING DEPTH (FEET BGS) Feet ! ! ! ! LIUST231SV0720 <5,000 (4.5) ! ! ! ! ! ! ! \ V Z STORMWATER PIPELINE STRUCTURE 0 V UST243SV0416 ! ! ! \ <6,800 (4.5) <3,600 (4.5) ! ! ! V \ V UST243SV0418 V UST243SV0411 ! ! ! V * V \ V Z ! <17,000 (4.5) ! ! \ ! ! ! ! ! \ V ! V UST243SV0417 ! ! ! } } \ ! ! ! ! ! ! ! ! ! ! ! ! <4,300 (4.5) V UST243SV0412 V ! } } * } \ ! ! ! ! ! V UST243SV0415 UST243SV0427 V <13,000 (3.0) UST243SV0419 <13,000 (4.5) <3,800 (4.5) ! ! ! } } } } V ! ! ! 231 Z \ * Z ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! } } V \ V V UST243SV0413 <3,600 (4.5) * \ Z ! ! \ V ! ! ! ! ! \ ! ! 243 ! \ *V V ! ! ! ! ! ! ! } \ Z \ V ! ! ZV V UST243SV0408 <9,100 (4.5) V UST243SV0410 ! ! <4,100 (4.5) ! ! ! ! ! ! V V UST243SV0407 ! ! ! UST243SV0430 <3,400 (4.0) V * ! ! ! ! RAILROAD UST SITES 231 AND 243 DATA EVALUATION BOUNDARY 1992 REMOVAL ACTION (NAVY) ASSOCIATED WITH UST SITE 243 2004 REMOVAL ACTION (CH2M HILL) ASSOCIATED WITH UST SITE 243 2005 INFRASTRUCTURE IMPROVEMENT EXCAVATION AREA (ENGEO) ASSOCIATED WITH UST SITE 243 UST243SV0429 <3,500 (4.0) V V UST243SV0501 ! ! ! ! ! ! * ! ! ! } ! ! } ! ! ! ! V ! ! ! ! \ \ ! ! ! Z ! ! ! ! ! ! ! ! ! ! ! ! V ! ! ! ! ! ! ! ! ! ! ! } ! ! ! ! ! ! ! ! ! ! ! UST243SV0420 <8,500 (4.5) * ! ! <8,300 (4.5) Z ! ! } ! V UST243SV0421 ! ! ! ! ! \Z ! \ ! ! ! ! ! ! ! ! ! ! ! ! Z V UST243SV0500 ! ! <4,100 (4.5) ! ! ! ! ! ! V UST243SV0409 ! ! \ A } ! } ! ! ! ! ! ! ! ! ! ! ! V \ ! } ! V UST243SV0502 16,000= (4.5) ! ! ! ! ! ! ! ! ! V \ ! ! ! V V \ ! !! FORMER FUEL PIPELINE UST243SV0414 <3,800 (4.5) ! Z ! * ! OTHER WATER PIPELINE V ! ! ! ! ! ! ! Z ! ! GAS PIPELINE INVESTIGATION AREA 22,000= (4.5) ! ! \ BACKBONE SEWER PIPELINE 131A } ! ! ! ! ! ! ! ! ! ! ! ! \ INDUSTRIAL WASTEWATER PIPELINE UST243SV0422 <12,000 (4.5) V V Z Z Z V UST243SV0503 * 20,000= (4.5) ! ! ! ! ! ! ! ! ! ! VV UNDERGROUND ELECTRICAL UTILITY ! V ! ! ! ! ! ! ! ! <3,600 (4.5) * ! Z V ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! V V * VV V V UST243SV0400 Z V ! ! ! ! ! ! ! ! ! ! ! ! ! * FORMER UNDERGROUND STORAGE TANK 49,000= (5.0) V UST243SV0601 UST243SV0405 <4,200 (4.5) UST243SV0406 <3,800 (4.5) * Z UST243SV0100 * <21,000 (4.5) SOIL VAPOR SAMPLE ) V UST243SV0608 UST243SV0505 32,000= (4.5) ! ! ! <18,000 (5.0) \ H2 V < ! < ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! V ! V V 23,000= (5.0) ) V* UST243SV0101* <19,000 (4.5) <4,400J*(5.0) IA Y ! ! V \ < ! ! \ ! ! ! ! IA ARMY D1.2 LEGEND <14,000 (4.0) Z V V UST243SV0203 \ UST243SV0401 * <19,000 (5.0) ) 2 2B. * BA ! ! A V UST243SV0404 14,000= (4.5) V Z UST243SV0403 \ <3,700 (4.5) UST243SV0402 \ <3,900J (5.0) V UST243SV0204\ \ O ! ! ! ! ! ! Z <3,000 (5.0) BL PA ! ! \ ! V UST243SV0303 < ! ! * ! ! ! ! ! ! ! ! T ! ! UST243SV0301 \ <3,000 (5.0) ! N SA ! ! <2,600 (5.0) I RA ST ! ! \ ! ! ! \ \ V UST243SV0602 UST243SV0600 <17,000 (5.0) ! ! ! ! ! VV \ Z ! ! ! \ ! ! ! 811 ! ! ! \ ! ! ! \ ! ! ! \ ! ! ! ! ! ! ! V UST243SV0309 Z V UST243SV0425Z <3,700 (4.0) <16,000 (4.5) \ \ UST243SV0423 \ V UST243SV0426 Z 110,000= (4.5) <11,000 (4.5) UST243SV0302 <6,100 (5.0) \ \ V \ ND LA IS ! ! ! ! ! ! ! ! ! ! ! ! A V ! ! ! ! V ! ! ! ! ! ! ! ! ! <2,200 (5.0) ! ! ! V \ ! ! ! * Z UST243SV0202 \ 7,700,000= (5.0) ! ! ! ! ! ! ! C3 C2 D1.3 D1.3 D1.1 ! !! ! V UST243SV0315 E AR M ! ! ! ! ! ! ! ! ! ! ! ! ! V \ V ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! V UST243SV0300 ! ! ! ! ! ! ! ! ! ! * ! ! ! ! ! ! ! ! ! ! UST243SV0201 <19,000 V Z (5.0) \ ! <11,000 (5.0) ! ! ! ! AZ <1,900 (4.0) H2 D1.2 D1.3 SCHOOL D2 22,000= (4.5) ! ! ! V UST243SV0603 ! ! <2,400 (4.0) ! ! C1 B.2-2 UST SITE 243 V UST243SV0504 V ! ! ! ! ! ! ! 26,000= (5.0) ! ! ! ! ! ! ! ! ! ! ! V UST243SV0308 UST243SV0424 <19,000 (4.5) ! ! ! ! ! ! ! ! UST243SV0322 <4,900 (5.0) ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! V UST243SV0330 ! ! V V ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! V UST243SV0606 B.1 ! ! ! ! ! ! ! ! UST243SV0306 <3,300 (4.0) Z ! UST243SV0307 <2,700 (4.0) V 20,000= (5.0) * ! ! * V UST243SV0321 <2,000 (5.0) V ! ! UST243SV0314 <2,800 (5.0) ! UST243SV0329 <3,800 (5.0) ! ! ! ! ! ! ! V B.2-1 } V UST243SV0604 ! V <2,100 (5.0) ! ! V UST243SV0328 <3,800 (5.0) V ! ! ! ! ! ! V UST243SV0320 Z UST243SV0327 <1,900 (5.0) ! ! <3,400 (5.0) * ! ! ! ! 0 ! ! ! <6,800 (5.0) } } * ! ! ! ! ! ! 0 ! ! ! ! C 0 * C C C * ! ! ! ! 0 ! ! ! ! V UST243SV0312 * * ( UST243SV0313 <1,500 (4.0) V UST243SV0326 ! ! ! ! ! ! * ( VALLEJO A3 ! ! <1,800 (5.0) ! ! <2,000 (5.0) * ( V UST243SV0325 Z <18,000 (5.0) ! ! * C C * 0 C 0 ! * ( V UST243SV0318 ) C 0 ! ! ! ! ! ! ! ! ! ! ! 0 C 0 0 C* C C 637 0 ! V UST243SV0605 ! ! ! ! ! 0 C * ( ! ! ! ! ! ! Z ) ! * ( ! * ( ! ! 0 ! ! ! ! 0 0 ! ! ! ! ! C C C C C* C C C ! ! ! ! ! ! ! ! ! ! Z ! ! = MARE ISLAND VICINITY MAP ! ! ! ! C ! ! ! 0 ! ! ! C V Unknown Condition Site Building 637 Area 22 Field Activities – Unknown Condition Sites Building 637 Area • Remediation Petroleum Hydrocarbons and PAHs Excavation with Confirmation Soil Sampling Installation of Monitoring Wells Develop and Implement Groundwater Monitoring Program 23 Tier 2 Residential ESLs Soil (0-10 ft bgs) mg/kg TPH G 100 TPH D 100 TPH MO 370 BaP 0.038 T RE NC O C E N CO ET CR E B637NW-SW-1 (4-5) DIRT ) 127 ft2 38 CY B637NW-SW-12 (4-5) TOE EXCAVATIO N CONCRETE ) B637NW-SW-11 (4-5) D D DIRT D CO RE NC TO P B637LT-SW-2 (4.9-5.9) TO E E B637LT-SW-1 (4.8-5.8) ) D EX C AVAT ION XCA VAT IO N ) D D B637NW-SW-4 (4-5) D B637LT-SW-4 (4.7-5.7) TPH-D: 3200 TPH-MO: ND(2500) 994 ft2 335 CY D ) D D D D R UA AZ D B637NW-SW-7 (3.3-4.3) TPH-D: 510 TPH-MO: 1500 FORMER LOCOMOTIVE TURNTABLE AREA ) B637HH-SW-13 (5.2-6.2) B637HH-SW-14 (5-6) ) N ATIO X CAV N TIO AVA D ) 158 ft2 47 CY DIRT FORMER BUILDING 637 NORTHERN TWO-THIRDS AREA B637NW-SW-6 (4-5) B637LT-SW-14 (4.1-5.1) ) ) B637LT-SW-11 (2.6-3.6) EXC D ) B637LT-SW-13 (4.2-5.2) E TO E D DIRT ) ) 3,580 CY 11,676 ft2 (Includes ~1,000 CY demolition pit) ) TO P ) E TO N B637LT-SW-9 (3.7-4.7) TPH-D: 1800 TPH-MO: ND(780) B637LT-SW-10 (2.5-3.5) TPH-D: 2700 TPH-MO: ND(2500) TOP EXC AVATION D TOE EXCAVATION D DIRT ) TI O VA CA X E ) B637LT-SW-3 (3.9-4.9) 1,388 CY 4,924 ft2 EX N TI O VA CA B637LT-SW-12 (4.4-5.4) BENZO(A)PYRENE: 0.058 E T G N ED E ME V PA 307 CY 870 ft2 ) B637NW-SW-9 (3.4-4.4) TPH-MO: 590 TPH-MO SGC: 400 P TO TE ) B637NW-SW-8 (3.2-4.2) TPH-D: 180 TPH-DRO SGC: 150 TPH-MO: 440 ) ) B637LT-SW-6 (4-5) TPH-D: 690 ) 249 ft2 74 CY B637LT-SW-5 (3.8-4.8) ) ) B637NW-SW-10 (3.4-4.4) ) EDGE PAVEMENT 87 ft2 26 CY B637LT-SW-7 (4.4-5.4) TPH-D: 230 B637NW-SW-3 (4-5) TOE EXCAVATION D ) CON CRETE 223 ft2 66 CY B637NW-SW-2 (3.4-4.4) BENZO(A)PYRENE: 0.067 B ) ) TPH-D: 1900 TPH-MO: ND(980) FORMER HYDRAULIC HOIST AREA ) N O TI A V N IO CA AT EX V E CA TO EX P TO D B637HH-SW-1 (5.2-6.2) TPH-D: 2400 TPH-DRO SGC: 2000 TPH-MO: ND(1000) TPH-MO SGC: ND(1000) D D B637HH-SW-2 (4.3-5.3) TPH-D: 700 TPH-MO: ND(490) D D E IV DR ) ) B637HH-SW-3 (4.9-5.9) B637HH-SW-4 (3.3-4.3) TPH-D: 660 D N CO ) TPH-D: 780 TPH-MO: ND(490) CR D ET E D 79 ft2 23 CY D SAMPLE NAMING CONVENTION: B637HH-SW-1 Sample # Sidewall Sample ) D D Location – Building 637 D B637HH-SW-7 (3.1-4.1) ) D B637HH-SW-5 (4-5) TPH-D: 140 ) DIRT 97 CY 342 ft2 ) B637HH-SW-8 (2.6-3.6) D B637HH-SW-10 (3.9-4.9) N )AVATIOON D Area of Investigation – Hydraulic Hoist D N TIO B637HH-SW-6 (3.6-4.6) VA N A C TI O EX VA A P C TO EX E O T D TI C EX AVA P C TO E X E TO D B637HH-SW-11 (3.9-4.9) TPH-D: 6800 TPH-MO: 9700 D D D DDD-2 D D CON D TO C RE XC EE TE TIO AVA D D D B637FSI-SW-2 (4.9-5.9) D DD ) 160 ft2 48 CY D NOTES: • SOIL RESULTS ARE LISTED IN MILLIGRAMS PER KILOGRAM (mg/kg) • TPH = TOTAL PETROLEUM HYDROCARBONS • G = TPH GASOLINE • D = TPH DIESEL • MO = TPH MOTOR OIL • BaP = BENZO(A)PYRENE • J = ESTIMATED DETECTED RESULT • UTILITY PIPING LOCATION SHOWS BURIED UTILITIES BELOW CONNOLLY STREET (REMOVED IN 2004) • SAMPLE LOCATIONS (X, Y, Z) SURVEYED BY KSR PROFESSIONAL LAND SURVEYORS 1 D- D D ) ) E TO E ) 107 CY 404 ft2 B637HH-SW-12 (4-5) 179 ft2 B637FSI-SW-3 (4.7-5.7) 59 CY TPH-D: 1100 TPH-DRO SGC: 1100 TPH-MO: ND(490) TPH-MO SGC: ND(490) ) N 366 CY 1,270 ft2 ION ) B637HH-SW-9 (3.2-4.2) ) B637FSI-SW-4 (5-6) ) AT AV C X N )AVATIO C EX P O T B637FSI-SW-6 (4.9-5.9) FORMER SERVICE ISLAND AREA TPH-D: 1300 TPH-MO: ND(490) B637FSI-SW-1 (5-6) TPH-D: 210 D D REFERENCES: 1. Soil standards listed are from Table 6 Tier 2 Screening Levels for the Eastern Early Transfer Parcel for Soil 0 to 10 Feet Below Ground Surface at Residential Sites, CH2M HILL, Revised December 6, 2011. D FIGURE 2 EXPLANATION EXCAVATION SIDEWALL SAMPLE LOCATION - JULY 2012 ) ) EXCAVATION EXTENT CONCENTRATIONS BELOW TIER 2 PROPOSED STEP OUT EXCAVATION AREA EXCEEDS TIER 2 2009 NAVY DRMO EXCAVATION APPROXIMATE UTILITY PIPING LOCATION NOVEMBER 2008 NAVY DRMO FOLLOW-ON TPH INVESTIGATION TRENCH SAMPLE REMOVED 3-INCH OILY PIPE NATURAL GAS PIPE 2004 CONNOLLY STREET EXCAVATION BOUNDARY 1999 UST637 (1)(2) EXCAVATION BOUNDARY FORMER LOCOMOTIVE TURNTABLE FOUNDATION FORMER HYDRAULIC HOIST PITS FORMER LOCOMOTIVE REPAIR FOUNDATION APPROXIMATE LOCATION OF ABRASIVE BLAST MATERIAL − FORMER BUILDING 0 20 JULY 2012 SAMPLE LOCATIONS AND RESULTS 40 ' 1252 Commerce Drive Laramie, WY 82070 www.trihydro.com (P) 307/745.7474 (F) 307/745.7729 Drawn By: BR Checked By: AR LENNAR MARE ISLAND, LLC VALLEJO, CALIFORNIA Scale: 1" = 20' Date: 8/8/12 File: LMI_Samples_Results_201207.mxd Unknown Condition Site Building 688 PCB Site UL#01 25 Field Activities – Unknown Condition Sites Building 688 PCB Site UL#01 • Characterization / Remediation Characterize Portions of Transformer Pad Scabble/Scarify Portions of Transformer Pad Remove Surrounding Asphalt Collect Confirmation Samples 26 Data results are preliminary and have not been validated. BUILDING VICINITY MAP OK A M HO LA TZ MI NI VE A 146 B688UL01GB0389 0.65 mg/kg ST 8-0376 8.4= (0.0) mg/kg A-1254 B688UL01GB0380 1.1= (0.0) mg/kg 686 MARE ISLAND VICINITY MAP 0 ³ VALLEJO A3 10 } } } } } } } 480V ( ) F ) 8-0358 <1 (0.0) mg/kg } } } } } } 750 C C Sample Location } } B688UL01MH0388 15= (8.0) mg/kg } 8-0359 <1 (0.0) mg/kg } } } ( } } } 12 } C R FD } B688UL01COMP-2C RA-122 0.75 mg/kg C KV } } 6271-0113 <1 (0.0) mg/kg T-1756 C } PCB SITE BUILDING 688 UL#01 } C ) E } 8-0362 <1 (0.0) mg/kg } B688UL01COMP-3C 0.17 mg/kg 6114-0038 <1 (0.0) ppm } } } 8-0379 1.2= (0.0) mg/kg A-1260 ( } 208V 1 T- ( B688UL1GB0376 <0.019 (1.5) mg/kg 1 Z } } 240V } PC7610 0.8J (0.5) mg/kg } B688UL1GB0369 <0.02 (1.5) mg/kg } } B688UL1GB0375 1.2= (1.5) mg/kg PC8610 0.06J (2.0) mg/kg } } * Z Z } ( Y C 8-0364 } <1 (0.0)} mg/kg C Z } D1.3 ARMY D1.1 } } } * PC8684 0.09= (4.0) mg/kg C F )) } } MANHOLE } } } * Z PC8681 0.2= (4.0) mg/kg } } } Z Z 8-0366 <1 (0.0) mg/kg B688UL1GB0363 <0.02 (1.5) mg/kg * B688UL1GB0367 <0.018 (1.5) mg/kg B688UL01COMP-5C 5.24 mg/kg B688UL01GB0390 0.0002 mg/L B688UL01COMP-1S 1.8 mg/kg B688UL1GB0362 <0.019 (1.5) mg/kg D1.2 } } ASPHALT SAMPLE CONCRETE CHIP SAMPLE CHIP SAMPLE GEOPROBE SAMPLE LIQUID CONTENTS SAMPLE SOIL BORING SAMPLE SEDIMENT GRAB SAMPLE SOIL GRAB SAMPLE SURFACE SOIL SAMPLE WIPE SAMPLE FENCE ASPHALT CONCRETE PAD REMOVED SOIL AND ASPHALT TO 18 INCHES BGS (TWD 97-1398, REVISION B) REMOVED SOIL AND ASPHALT TO 28 INCHES BGS (TWD 97-1398, REVISIONS A AND B) SCABBLED TO 0.5 INCH (TWD 97-1398, REVISION A) SCABBLED TO 0.25 INCH (TWD 97-1398, REVISION A) SCABBLED TO 0.75 INCH (TWD 96-1398) STRUCTURE } Z Z SAMPLE LOCATIONS UNKNOWN LOCID CONCENTRATION UNIT PC7611 0.44J mg/kg PC7612 2.1J mg/kg PC7613 0.24J mg/kg PC7614 2.4J mg/kg PC7615 0.33= mg/kg PC8611 2.41= mg/kg PC8612 5.51= mg/kg PC8614 1.5= mg/kg BUILDING 688 } } } 8-0365 <5 (0.0) µg/100 cm2 B688UL01COMP-6C 3.39 mg/kg 59 17 } } B688UL1GB0368 0.014J (1.5) mg/kg T- } ( B688UL01GB0385 0.1= (0.0) mg/kg B688UL01MH0387 17= (8.0) mg/kg } } B688UL01COMP-7C 0.031 mg/kg B688UL01COMP-4C 17.19 mg/kg 78 } B688UL01GB0386 0.18= (0.0) mg/kg 8-0363 3.7= (0.0) mg/kg A-1254 } B688UL01COMP-8C 0.032 mg/kg ( C ( Y Z ) E * F ) G ) = ) 8-0360 <1 (0.0) mg/kg 8-0378 <1 (0.0) mg/kg C3 LEGEND 8-0361 <1 (0.0) mg/kg T-1757 C C2 D1.2 Y 740 B688UL01COMP-1C 0.30 mg/kg BA 8-0377 2= (0.0) mg/kg A-1254 } 688 Sample Area and 3-Meter Grid Boundaries IT RA ST ( B688UL01GB0381 0.53= (0.0) mg/kg 8-0356 <1 (0.0) mg/kg ND LA C O 858 8-0355 <1 (0.0) mg/kg ( IS ( BL PA 388 686A E AV 390 MANHOLE 8-0357 <5 (0.0) µg/100 cm 2 PCB SITE BUILDING 688 UL#01 N SA D OA ILR RA 390A } 680 E AR M B.2-1 C1 B.1 B.2-2 H2 D1.2 D1.3 SCHOOL D2 Feet PC8680 <0.011 (4.0) mg/kg Z* PC8613 0.2= (2.0) mg/kg 8-0393 2.2= (0.0) mg/kg A-1260 8-0394 1.2= (0.0) mg/kg A-1260 B688UL1GB0366 <0.018 (1.5) mg/kg B688UL1GB0361 <0.019 (1.5) mg/kg B688UL1GB0365 <0.019 (1.5) mg/kg Z G ) ( B688UL01GB0382 0.67= (0.0) mg/kg = ( B688UL1GB0364 <0.019 (1.5) mg/kg ( NOTES: 1. "<" = NOT DETECTED AT OR ABOVE THE INDICATED CONCENTRATION 2. "=" = ANALYTE WAS DETECTED 3. "J" = ESTIMATED DETECTED RESULT 4. ANALYTE ABBREVIATIONS: A-1254 = AROCLOR-1254 A-1260 = AROCLOR-1260 5. SSPORTS SAMPLES COLLECTED FROM THE CONCRETE PAD FOLLOWING SCABBLING ACTIVITIES WERE COLLECTED FROM THE SURFACE OF THE SCABBLED AREA AND ARE LISTED AS 0.0 FEET BGS 6. SAMPLE B688UL1GB0361 WAS COLLECTED IN FILL MATERIAL B688UL01GB0384 0.092= (0.0) mg/kg B688UL01GB0383 0.082= (0.0) mg/kg SAMPLE LOCATION PCB CONCENTRATION SAMPLE BEGINNING DEPTH (FEET BGS) UNIT IR14VB219 86J (2.8) mg/kg FIGURE 3 PCB SITE BUILDING 688 UL#01 SAMPLING LOCATIONS AND REMAINING PCB CONCENTRATIONS LENNAR MARE ISLAND, VALLEJO, CALIFORNIA RDD V:\MARE_ISLAND_264204\MXDS\PCB\B688\FIG3_B688PREV_SAMPLE_BLOC11X17_B.MXD ECLARK1 11/3/2011 1:55:27 PM Unknown Condition Sites Building 742 PCB Sites UL#03 through UL#06 28 Field Activities – Unknown Condition Sites Building 742 PCB Sites UL#03 – UL#06 • Remediation Four Pits within Southern Floor of Building 742 Pressure Wash Pits Collect Confirmation Samples Evaluate Other Remediation Options 29 Voluntary Cleanup Site Building 781 PCB Site AL#01 • Characterization / Remediation / Demolition PCBs Decommissioned Electrical Substation Characterize Subsurface Vault Remove Structure Collect Confirmation Samples 32 Path Forward • April 9, 2013 - Meeting with Regulatory Agencies • April 2013 – Development and Review of Work Plans • May 2013 – Submit Draft Work Plans to Regulatory Agencies • May – October 2013 – Complete Characterization/Investigation/ Remediation 33 Questions?
Similar documents
CTL NO SAP 13 NO MAKE TYPE CALIBRE SERIAL NO CODE QTY
38SP 9MMK 9MMP 9MMK 9MMP 9MMP 38SP 9MK 9MP 12BR 9MP 38SP 9MP 38SP 9MP 9MP 44SP 38SP 38SP 9MP 9MP
More information