to Public - North Sydney Council
Transcription
to Public - North Sydney Council
orth Sydne ey Council No P PUBLIC C AMEN NITIES STRAT TEGY + A ACTION N PLAN N Juune 2016 onybeare Mo orrison Interna ational Pty Ltd d Co 52 2-58 William Sttreet W 2011 Eaast Sydney NSW T: 8244 8888 15 5.058 North Sydney Council PUBLIC AMENITIES STRATEGY + ACTION PLAN June 2016 Conybeare Morrison International Pty Ltd 52-58 William Street East Sydney NSW 2011 T: 8244 8888 15.058 Rev Date Description By A Feb 2016 Draft Final AT B April 2016 Final (For Exhibition) AT C June 2016 Final AT Chk App North Sydney Public Amenities Strategy + Action Plan Contents Executive Summary Key Issues Purpose of the Strategy Key Outcomes Key Recommendations 1 Purpose of the Study Definitions 2 North Sydney Local Government Area Description Infrastructure and Land Use Demography 3 Existing Public Sanitary Facilities Overview of Council’s Public Amenities A. Location B. Condition C. Capacity D. Universal access E. Signage and wayfinding 5 Evaluation of Public Amenities in the North Sydney Local Government Area A. LGA Western Precinct – Wollstonecraft, Waverton and Crows Nest Location of existing public toilets Gap analysis Additional toilets 8 B. LGA Northern Precinct – Cammeray and Cremorne Location of existing public toilets Gap analysis Additional toilets C. LGA Eastern Precinct – Cremorne Point, Kurraba Pont and Neutral Bay Location of existing public toilets Gap analysis Additional toilets D. LGA Central & Southern Precinct – North Sydney, McMahons Point, Lavender Bay, Milsons Point and Kirribilli Location of existing public toilets Gap analysis Additional toilets Key Strategic Outcomes 17 Strategic Objectives 1. Availability/ Location 2. Accessibility 3. Safety 4. Quality 5. Legibility 6. Ecologically/ Environmentally Sustainable Design (ESD) 7. Presentation 8. Connectivity 18 North Sydney Public Amenities Strategy + Action Plan Design Design Requirements 20 Management A. Risk management B. Access management C. Opening and closing times D. Security measures E. Cleaning F. Reporting G. Maintenance H. Graffiti management I. Syringe management J. Reporting of incidents K. Asset condition audits 21 Security 23 Special Events Portable toilets Accessible/ disabled toilets 24 Promoting Community Awareness National Public Toilet Map North Sydney Public Toilet Map Public Toilet Signage 25 Recommendations 1. Availability 2. Accessibility 3. Safety 4. Quality 5. Legibility 6. Ecologically Sustainable Design 7. Presentation 8. Connectivity 26 Strategic Action Plan Action Plan Summary of Actions Schedule of Actions 28 Guidelines for the Design of Public Toilets Design Principles A. Location B. Building design C. Universal accessibility D. Ecologically Sustainable Design (ESD) E. Crime Prevention through Environmental Design (CPTED) F. Signage 35 External Design Requirements A. Location and siting B. External lighting C. External signage D. Landscaping E. Street furniture 40 North Sydney Public Amenities Strategy + Action Plan Internal Design Requirements A. Toilets to be provided B. Toilet cubicle configuration C. Design of toilet cubicles D. Selection and construction of cubicles E. Fitout of toilet cubicles F. Lighting 42 Materials and Finishes to Public Toilets Exterior Finishes Interior Finishes A. Wall surfaces B. Floor surfaces 45 Fixtures and Fittings to Public Toilets A. Toilet pans B. Cisterns C. Urinals D. Basins E. Tapware F. Plumbing fixtures G. Water supply H. Ancillary fixtures and fittings I. Hardware 46 Appendices North Sydney LGA Public Amenities Plan North Sydney LGA Western Precinct – Wollstonecraft, Waverton and Crows Nest North Sydney LGA Northern Precinct – Cammeray and Cremorne North Sydney LGA Eastern Precinct – Cremorne Point, Kurraba Point and Neutral Bay North Sydney LGA Central & Southern Precinct – North Sydney, McMahons Point, Lavender Bay, Milsons Point and Kirribilli North Sydney Public Amenities Strategy + Action Plan Executive Summary North Sydney Council aspires to be the leading edge in serving the community of North Sydney by caring for its assets, improving the appearance of its assets and delivering services to its people in a financially, socially and environmentally responsible manner. The Council has identified its local government area as a place that will attract events (such as major regional and sporting activities, cultural and entertainment activities) and aspiring to be a destination of choice for international and domestic visitors to Sydney. Public amenities, in the form of sanitary facilities, improve the quality of the public domain, its pedestrian amenity and the liveability of the local government area (LGA). North Sydney Council owns, manages and maintains over 35 public sanitary facilities in its LGA. These are located in parks, reserves, sporting fields, recreational and community facilities, civic centres and car parks. Key Issues Key issues, expressed by the community, in regard to public sanitary facilities include: Location/ siting of toilets in key destinations – such as transport nodes, retail areas and public areas. Design excellence Safety Accessibility Sustainability Maintenance Asset management Incorporation of other compatible uses Key Outcomes Key outcomes of the Strategy will: Provide direction on the appropriate location of public toilets throughout the LGA. Ensure provision of well-distributed public sanitary facilities – best practice being within 400m (5-10 minutes’ walk) of major transport nodes, sporting, recreational, community and retail facilities, tourist attractions, entertainment precincts, public event spaces and major gathering places. Provide design guidelines for public sanitary facilities to be used throughout the LGA. Ensure the maintenance and cleaning of sanitary facilities occurs to an appropriate standard. Encourage developments for public use (such as shopping centres, community, institutional and infrastructure facilities) to provide public sanitary facilities in appropriate locations, in compliance with Building Code of Australia requirements. Availability and quality of amenities. Presentation of amenities. Universal accessibility. Implement a public toilet network through a range of media to include compliant signage on toilet doors, wayfinding signage from streets and pathways that access the toilets, and toilet maps at bus stops and public transport terminals. Signage and wayfinding of facilities from the public domain. Provide a 10 year action plan for the improvement of public sanitary facilities throughout the LGA. Safety of amenities in siting and lighting – to enable surveillance. Key Recommendations Purpose of the Strategy The North Sydney Public Amenities Strategy and Action Plan provides a strategic framework that will: Continuously improve the LGA’s network of public amenities. Ensure that amenities are sited in locations that best meet the community’s needs. Ensure that amenities are designed to meet best practice standards in: All public amenities within the LGA are to fulfil the following objectives of: Availability Accessibility Safety Quality Legibility Ecologically sustainable design Presentation Connectivity 1 North Sydney Public Amenities Strategy + Action Plan Purpose of the Study North Sydney Council has identified the need to provide accessible, quality, clean and safe public amenities in their LGA for the use of the community and its visitors. The provision of adequate and quality public amenities is an integral part of the essential community infrastructure and services that public users in the LGA would expect to be available. Public amenities, in the form of sanitary facilities, improve the quality of the public domain, its pedestrian amenity and the liveability of the local government area (LGA). The North Sydney LGA has over 50 amenities in the form of sanitary facilities accessible to the public. These facilities are owned and managed by North Sydney Council, State authorities and public organisations. North Sydney Council specifically owns, manages and maintains over 35 public sanitary facilities in its LGA. These are located in parks, reserves, sporting fields, recreational and community facilities, civic centres and car parks. In preparing the North Sydney Public Amenities Strategy and Action Plan, existing public sanitary facilities within the LGA were evaluated for their siting, physical condition and compliance with statutory building and access requirements. The full inventory of public amenities include: Stand-alone facilities in parks, sports fields and open spaces. Amenities integrated with public car parks, community centres, libraries and recreational/ sporting facilities. Amenities within facilities that are publicly accessible, but not owned and maintained by Council – such as railway stations, shopping centres, petrol stations, etc. The Public Amenities Strategy and Action Plan for the North Sydney LGA incorporates a strategic framework that will: Continuously improve the existing network of public amenities within the LGA. Ensure that the amenities are placed in locations that best meet the community’s needs. Ensure that amenities are designed to meet best practice standards in terms of: Design excellence Safety Accessibility Sustainability Maintenance Asset management Incorporation of other compatible uses Definitions “Public amenities” in this report refers to sanitary facilities and change rooms that are directly accessible to the public. These typologies include: Bespoke/ specifically designed sanitary facilities Automated public toilet which is a public toilet containing one or more of the following features: Automatically operated doors Self-cleaning pan and/ or floor Fault and usage reporting Emergency sensors and security intercom “Adequately located” amenities mean facilities sited within reasonable walking distance (400m of urban nodes), located in public places used or visited by the community. “Quality” means facilities that are in good conditionally (functionally and aesthetically), are clean and well-appointed with fixtures and fittings. “Well-located and safe” means facilities that are visible from the public domain, easy to find, have wayfinding signage at key gathering places such as approaches and entrances to the facility. “Accessible” means facilities that are universally accessible from the public domain of pathways, car parking areas, streets and entrances, in compliance with AS 1428.1-2009 – Design for access and mobility. “MKLAK” means Master Locksmith Access Key System that enables people with disabilities to gain 24/7 access to a network of public facilities. 2 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan N North Sydne S ey Loc cal Gov vernm ment A Area De escription Th he North Sydn ney LGA is lo ocated directlyy on the no orthern side of o Sydney Harrbour encomp passing 2 an n area of apprroximately 10 0 km (1,049 h hectares). he LGA has a population of o over 70,000 0 people Th (70,339 – June e 2014), with an a average p population de ensity of 56 persons/ hecta are. The LGA A is bounded bby: Willou ughby LGA – to the north Mosm man LGA – too the East Sydne ey Harbour/ P Port Jackson – to the south Lane Cove LGA – to the west. Refer to Figure 1. Th he LGA has a relatively afffluent commu unity with ab bove average e incomes. Fig gure 1: North Sydney S local gov vernment area he LGA includ des the suburrbs of: Th Cammeray Cremorne P Cremorne Point Crows Nestt Kirribilli Kurraba Point nder Bay Laven McMa ahons Point Neutrral Bay North Sydney St Leo onards (part)) Wave erton Wollstonecraft 3 North Sydney Public Amenities Strategy + Action Plan Infrastructure and Land Use The North Sydney LGA is served by the key transport infrastructure of Bradfield Highway, the Pacific Highway and the Warringah Freeway, as well as the North Shore railway line with stations at Milsons Point, North Sydney, Waverton and Wollstonecraft. The LGA is both urban and green in character comprising central business districts (CBDs), smaller suburban business centres, high and low density residential areas, and foreshore and inland parklands. The LGA has distinct retail and commercial precincts to include: North Sydney CBD (B3 Commercial Centre and B4 Mixed Use zones) Crows Nest (B1 Neighbourhood Centre zone) Milsons Point (B4 Mixed Use zone) and Kirribilli (B1 Neighbourhood Centre zone) Military Road, Neutral Bay and Cremorne (B4 Mixed Use zone) Blues Point (B1 Neighbourhood Centre zone) Despite being only 10 km2 in area, LGA has a wide range of recreational opportunities from organised sports activities to passive recreation (walking, swimming, etc.) with: 188 areas zoned for public open space (RE1 Public Recreation under North Sydney Local Environmental Plan 2013), making up 15-20% of the LGA’s open space. These open spaces range from large parklands to neighbourhood/ pocket parks, as well as distinctive reserves and foreshore parks fronting Sydney and Middle Harbours. 7 parks with multi-purpose sports fields. The Coal Loader site in Waverton (which is of regional significance), located on the Sydney Harbour foreshore between Balls Head Bay and Berry’s Bay – comprising 2.8 hectares (28,000m2) of open space. An indoor sports centre (North Sydney Sports Centre, Crows Nest). An aquatic centre (North Sydney Olympic Pool, Milsons Point). North Sydney is additionally a popular tourist destination – with the iconic Luna Park, the northern pylons of Sydney Harbour Bridge, Coal Loader parklands, foreshore parklands, Mary MacKillop Place, Kirribilli House (Prime Minister’s official Sydney residence) and Admiralty House (Governor General’s official residence). The LGA attracts large numbers of holiday makers during event and festival periods. Demography North Sydney is culturally diverse with 36.5% of its residents born overseas, with 28% of non-English speakers. Demographically, North Sydney has a large residential population of between 25-44 years which account for 44.8% of its population in 2011. Almost half of its residents are aged between 2549 years. Dominant family types in the LGA in 2011 are couple families without children accounting for 56.8% and lone person households at 37.6%. The North Sydney population is forecast to grow from just over 70,000 people in 2014 to 76,861 people by 2031, with an additional 9,711 people (14.46%) or an average of 0.71% per annum change during this period. Dwelling density is higher in North Sydney than in other parts of Sydney, with: 25.7% residing in medium density dwellings – compared with the 19.7% for the Sydney average. 60.8% living in high density dwellings (apartments) – compared with 20.7% for the Sydney average. Over 50,000 people travel to North Sydney for work and study. There are 15,000 students attending schools and tertiary institutions in the LGA, with only 1 in 5 of students living in the LGA. 4 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan E Existin ng Pub blic Sa anitary y Facillities Lo ocation and d Ownership of Public c Am menities/ Sanitary S Fac cilities The e North Sydn ney LGA has over 50 amen nities in the e form of sanitary facilities accessible to o the pub blic, sited in various v locatio ons in: A. Public parrks and open spaces Ovver 26 public sanitary s facilitties, owned a and ma aintained by North N Sydney y Council, are located in p parks, reserves and sports s fields. Thesse are cle eaned daily, at a a minimum by Council con ntractors. A number n of the ese toilets are e auttomated public toilets. ese are gene The erally open 7 days d a week during dayylight hours. Key Community Co oncerns The key concerns in reggard to sanitary facilities, raised by th he communityy include: Locatio on – with poteential lack of amenities a in key pub blic destinationns such as transport nodes, retail r areas a nd parklands s. Quality of amenities – which inclu ude quality off building, availability aand functiona ality of fixturess, fittings and a sanitary aaccessories. Presenttation of ameenities – whic ch include cleanliness, maintenaance regime,, avoidance of o odour, presence p of tooilet paper, etc. Access sibility of ameenities – requ uiring compliance with DDA A requiremen nts. Safety of o siting – reqquiring compliance with Crime Prevention P thrrough Environ nmental Design (CPTED) prinnciples. Wayfind ding of and ssignage to am menities – requiring g provision off universally recognisable r signage e to all amenitties and to ac ccessible/ disabled d toilets in com mpliance with h AS 1428.12009. B. Communitty facilities (Council ow wned), libraries, museums m an nd car parks s 14 publically accessible sanitary facilities are wned by North h Sydney Cou uncil. These a are wellow ma aintained, safe e and secure facilities. Ho ours of ope eration are ge enerally restricted to hourss of ope ening of the associated a facilities. C. Sports cen ntres Sanitary facilitie es are located d in the 2 spo rts faccilities owned by North Syd dney Council – at the No orth Sydney In ndoor Sports Centre and N North Syd dney Olympicc Pool. These are accesssible durring the facilitties’ opening hours. D. Railway sttations 4 ssanitary facilitties located in n railway stati ons witthin the LGA at: a North Sydne ey Milsons Poin nt Waverton Wollstonecra aft P1: Anderson Park, Neutral Bay On nly North Sydn ney Station has a disabled d toilet. The ese toilets are open when the stations are in ope eration. E. Retail cen ntres and petrol outlets Public toilets are e provided in large shoppiing ntres. At leasst 5 public toilets are locatted in cen keyy shopping ce entres and pe etrol stations in the LG GA. These are e accessible when the faccilities are e opened. P2: Cremorn ne Reserve, Creemorne 5 North Sydney Public Amenities Strategy + Action Plan Overview of Council’s Public Amenities Public amenities/ sanitary facilities owned by Council, State and under other management companies comprise both stand-alone amenities and amenities integrated with community and recreational (including sporting) facilities. 51 public amenities were inspected and evaluated for the following elements: A. Location Public toilets within the LGA are located in: Parklands and Council owned and managed 26 Recreational facilities Council owned 2 Community facilities Council owned 14 sports fields Shopping centres Independently and petrol outlets owned & managed 5 Railway stations 4 State owned and managed B. Condition Evaluation of the sanitary facilities included the: Condition of the facility Availability of sanitary accessories Availability of accessible/ disabled toilet Public amenities vary in condition with: 40 sanitary facilities: In Good condition Requiring general maintenance and little to minor rectification works. 7 sanitary facilities: In Fair condition Requiring moderate upgrading and refurbishment, with some general maintenance. 4 sanitary facilities: In Poor condition C. Capacity The provision of adequate numbers of public toilets is the capacity of the facility. There is no capacity requirement by the Building Code of Australia for toilets that are not part of a building of another use. The number of pans provided in a public toilet will be informed by the expected usage of the facility. Where it is expected that high numbers of people will be using the facility, resulting in long waiting times, additional pans should be considered. Community feedback should be encouraged to address any deficiencies in the supply of toilet pans. D. Universal access These have been evaluated for their proximity to each other (within 400m radius), locational visibility and CPTED features, availability of wayfinding signage and universally recognisable identification signage to each toilet. 2 buildings, in which these facilities are located, are in poor condition. Requiring substantial upgrading and refurbishment works. These buildings may require demolition, if the cost of rectification outweighs reconstruction works. The majority of public amenities have accessible/ disabled toilets. Only 15 toilets or change facilities at the 51 sites are equipped with a disabled toilet (approximately 15%). These accessible sanitary facilities were visually evaluated for general compliance with AS 1428.1, but as the disabled toilets have been constructed over a period of time, the toilets may be compliant with earlier versions of the standard. The facilities have not been fully assessed for compliance with AS 1428.1-2009 in terms of: Size of compartment, clear distance of fixtures; Clear widths of door openings; Correct location and heights of handrails; Compliance of basin and associated plumbing to the current AS 1428.1; Compliance of location and heights of accessories such as mirrors, hand dryers/ paper towel dispensers, toilet roll holders, etc.; Compliance of toilet suite accessories and door handle; Signage, etc. Disabled toilets were additionally assessed for their compliance in the ability to achieve an accessible path of travel from the public domain of street, car park or pedestrian path. 6 North Sydney Public Amenities Strategy + Action Plan Council has been implementing the MLAK system to disabled toilets. It is an innovative, universal key system that enables people with disabilities to gain 24/7 access to a network of public facilities. For location of North Sydney LGA’s existing public amenities – refer to Figure 6. The system is available only to people with a disability, ageing and disability support organisations. People with a disability are able to purchase a MLAK master key which will open all facilities fitted with this specially designed lock. MLAK keys are purchased from the Master Locksmiths Association of Australia. To locate specific locksmiths with these locks, access their website at www.masterlocksmith.com.au. The keying system ensures that the facilities meet the requirements for use by people with a disability and maintain a high level of cleanliness. E. Signage and wayfinding Public amenities classified as in “Good” condition have signage to toilet doors of written and pictogram signs. Amenities in “Fair” or “Poor” condition generally lacked compliance in door signage. Wayfinding to public amenities in most instances was poor, with lack of direction at the entrance to parks and on park identification signs. F. Hours of operation Hours of opening/ operation of the sanitary facilities have been recorded. These were evaluated for their capability to address user needs. Extension of hours will be considered by Council in regard to safety, security and potential/ anticipated vandalism issues. 7 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan E Evalua ation of o Public Am menitie es in th he N North Sydne S ey Loc cal Gov vernm ment A Area A A. LGA Wes stern Precinct – Wollsttonecraft, Waverton W a and Crows s Nest Lo ocation of existing public toilets Additional toilets Th he Western Precinct P of the e North Sydne ey LGA is generally we ell serviced by y public sanita ary faccilities located at: Additional toilets, to provvide increase ed public amenity, co ould be considdered in: Foreshore parklands p at: Berry Islland Reserve e Balls He ead Park Waverto on Park and Oval O Interior parkklands of: Brennan n Park, Wollsttonecraft St Thom mas Rest Park k, Crows Nesst Railway sta ations of: Wollston necraft Waverto on St Leona ards (not with hin the LGA), but at its north-western periimeter. sed facilities a at: Communityy/ publically us Hume Street S car park, Crows Nesst North Sydney Indoorr Sports Centtre, Crow’s Nest Crows Nest N Commun nity Centre Badangi Reserve, Trryon Avenue, necraft – locaated at the no orthern Wollston foreshore of Balls Heead Bay (Potential New Site 1 – P3) Pocket park located oon the south--western side e of the Pacific Highwaay (east of the e Mater Hospital) and west off North Sydne ey Girls’ High h School (zoned ( RE1 uunder NSLEP P 2013) (Potential New Site 2 – P4) These open n space areass/ parks are generally g in visible and publicly acceessible locatio ons. Refer to Fig gure 2 Ga ap analysis Sa anitary facilitie es are desired to be locate ed at not mo ore than 5-10 0 minutes wallking distance e (approximatelyy 400m) from each other, a and from ke ey transport ro outes and destination nod es. he southern portion p of the Western Pre cinct Th (in ncluding foresshore headlan nds/ peninsullas) and the e northern po ortion of this Precinct P (St L Leonards an nd Crows Nesst) are adequately serviced d by sa anitary facilitie es accessible e to the publicc. P3: Bandang gi Reserve, Wol lstonecraft ghway he precinct so outh-west of the t Pacific Hig Th is poorly servicced. However, these comp prise g both prredominantly mixed use prrecincts along sid des of the Pa acific Highway y with residen ntial prrecincts beyon nd. P4: Pacific Highway H pocket park, Crows Ne est 8 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan Fig gure 2: LGA Western Precinct – Wollstonecra aft, Waverton an nd Crows Nest: Amenities netw work 9 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan cinct B.. LGA Norrthern Prec – Cammeray and Cremorne C Lo ocation of existing e pub blic toilets Additional toilets Th he Northern Precinct P of the e North Sydn ney LGA is generally we ell serviced by y public sanita ary fa acilities locate ed within the: Additional toilets, t to provvide increase ed public amenity, co ould be considdered in: Parks and reserves r of: Tunks Park, P Cammerray Green Park, P Cammeray Cammeray Park (sou uth-eastern po otion), Cammeray Primrose e Park, Crem morne – along the southern n foreshore of Willoughby Bay Communityy facility of: Cremorn ne Early Child dhood Centre e Independen nt public facility of: Coles Exxpress, Camm meray Ga ap analysis Sa anitary facilitie es are desired to be locate ed at not mo ore than 5-10 0 minutes wallking distance e nd from (approximatelyy 400m) from each other an ey transport ro outes and destination nod es. ke Th he majority off the Northern n Precinct is ad dequately serrviced by saniitary facilities acccessible to th he public. Th here are pockkets wiithin the preciinct poorly se erviced by pub blic menities at: am Cremorne mmeray, soutth-west Southern prrecinct of Cam of the Gore Hill Expressw way. Anzac Park, P Anzac A Avenue, Cam mmeray – located at the westerrn side of the Expresswayy (Potential New Site 1 – P5) Fred Hu untley Reservve, Hamilton Avenue, A Camme eray – locatedd at the north--western side e of Camm meray. Fred Huntley Reserve has playground equipmeent, seats and d tables (Potential New Site 2 – P6) Lodge Road R Park, E llalong Road, Cremorne – the park k has playgroound equipme ent, seats and d tables (Potential New w Site 3 – P7) et, Cremorne – Brightmore Reserve,, Young Stree the rese erve has a plaayground and d learner cycle track. New N toilets arre proposed in the vicinity of the track in the 20155/ 16 financial year (Potential New Site 4 – P8) These open n space areas as/ parks are generally g in visible and publicly acceessible locatio ons. Refer to Fig gure 3 P5 5: Anzac Park, Cammeray P6: Fred Hun ntley Reserve, C Cammeray P7 7: Lodge Road Park, Cremorne e P8: Brightmo ore Reserve, Crremorne 1 10 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan Fig gure 3: LGA No orthern Precinctt – Cammeray a and Cremorne: Amenities netw work 11 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan C. LGA Eas stern Precinct C – Cremo orne Point, Kurraba P oint and Ne eutral Bay Lo ocation of existing e pub blic toilets Additiona al toilets Th he Eastern Precinct of the North Sydne ey LGA is not well servviced by public amenities d due to al nature of p precinct. the predominantly residentia Sa anitary facilities are locate ed within the: Additional toilets, t to prov ovide increase ed public amenity, co ould be consiidered in: May Gibbs Place, ccorner of Barrry Street and Cheal Lane – with a new public sanitary faciliity being constructed c ((Potential New w Site – P9) Kurrab ba Reserve, K Kurraba Road d, at the Kurrab ba Point peninnsula – the re eserve is a larrge open fo oreshore areaa with views and access to o Sydney Harbour. T The reserve is s accessible by b bus or car, but with limited on-street parking. Facilities include a llaunching ram mp for small water craft c (Potentiaal New Site 2 – P10) nt public facilities of: Independen Big Bear Shopping Centre, C Neutra al Bay Coles Exxpress, Neutrral Bay Prior Avenue A Reserrve, Prior Ave enue, Cremo orne – a smal l reserve with h playground equipm ment, surrounnded by reside ential properrties (Potentiaal New Site 3 – P11) Ga ap analysis Sirius Street S Park, M Milson Road, on the westerrn side of Creemorne Point – the park has pla ayground equuipment, seatts, tables and d harbou ur views (Poteential New Site 4 – P12) Ilbery Reserve R Parkk, Barry Stree et, Neutral Ba ay – the park p has play equipment, tennis t court, seats and a tables (P Potential New Site 5 – P13) Parks and reserves r of: Forsyth Park (westerrn side), Neuttral Bay on Park (south hern side), Ne Anderso eutral Bay Cremorn ne Reserve (s southern tip o of peninsula), Cremorne e Point Communityy facility of: Neutral Bay Commun nity Centre Sa anitary facilitie es are desired to be locate ed at not mo ore than 5-10 0 minutes wallking distance e nd from (approximatelyy 400m) from each other an ke ey transport ro outes and destination nod es. Th he western an nd northern areas a of the E Eastern Prrecinct are ad dequately serviced by publlic sa anitary facilitie es accessible e to the publicc. The following easte ern areas of th he Eastern Prrecinct arre poorly servviced by public amenities, o of: Neutral Bayy East Kurraba Point Cremorne Point P These open space areaas/ parks are generally in visible and publicly acceessible locatio ons. Refer to Fig gure 4 P9: May Gibbs Place, Neutra al Bay P10: Kurraba Reserve, Kirribilli Point P11: Prior Ave enue Reserve, Cremorne P12: Siriius Street Park, Cremorne 1 12 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan Fig gure 4: LGA Ea astern Precinct – Cremorne Po int, Kurraba Point and Neutral Bay: Amenitiess network 13 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan ntral & Sou uthern Prec cinct D. LGA Cen – North Sydney, S Mc cMahons P Point, Lavender Bay, Milsons M Poi nt and Kirribilli Lo ocation of existing e pub blic toilets Additiona al toilets Th he Central an nd Southern precinct p of the e North Syydney LGA iss well serviced d by public sa anitary faccilities located within the: This precin nct is generallly well service ed by public amenities, except for thee Kirribilli hea adland. p and res serves of: Foreshore parks Kesterto on Park, Kirrib billi Milsons Park, Kirribilli Brennan n Park, Milson ns Point Bradfield d Park (North h and South), Milsons Point Quiberee Park, Lavender Bay Point Blues Po oint Reserve,, McMahons P Interior parkks and sports s fields of: North Syydney Oval St Leona ards Park Communityy/ publically us sed facilities o of: North Syydney Day Ca are Centre McMaho ons Point Com mmunity Cen tre North Syydney Community Centre North Syydney Council Administrattion Building Stanton Library Civic Pa ark Don Ban nks Museum Independen nt public facilities of: Greenwo ood Plaza Berry Sq quare Additional toilets t to provvide increased public amenity to the headlandd could be considered in: Small pocket park/ reeserve at the approach to Beulah Street Wharff, Kirribilli – th he park is, er, not universsally accessib ble and only howeve accesse ed by stairs frrom the stree et to the foreshore, but is at a public transport stop (Potential Site 1 – P114) Refer to Fig gure 5 P13: Ilbery Reserve, R Neutraal Bay Railway sta ations of: North Syydney Milsons Point Ga ap analysis Sa anitary facilitie es are desired to be locate ed at not mo ore than 5-10 0 minutes wallking distance e (approximatelyy 400m) from each other an nd from ke ey transport ro outes and destination nod es. P14: Beulah Street Wharf, K Kirribilli he Central an nd Southern Precinct P is ade equately Th se erviced by pub blic sanitary facilities f acce essible to the e public. A specific area lacking in pu ublic toilets is the Kirribilli headland. This area a contains the e Prime Minister and the Governor-G General’s officcial residences. 1 14 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan Fig gure 5: LGA Ce entral and South hern Precinct – North Sydney, McMahons Point, Lavender Baay, Milsons Poin nt and Kirribilli: Amenitiies network 1 15 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan North Sydney LGA: L Amenities network Figure 6: N 16 North Sydney Public Amenities Strategy + Action Plan Key Strategic Outcomes North Sydney Council aims to facilitate the provision of well-designed and well-located public amenities to cater for the needs of the community, including visitors. As a pre-requisite to the preparation of this Strategy, existing public sanitary facilities in the North Sydney LGA were inspected to: Evaluate their location, current condition, safety and accessibility of public amenities owned by Council, State or private managers. Identify their opening times and maintenance regime. Identify works required to upgrade or replace these facilities. Identify locational gaps and opportunity sites for the location of new facilities. The North Sydney Public Amenities Strategy & Action Plan will: Provide a framework for consistent decisionmaking on the provision, rehabilitation/ upgrading and maintenance of public sanitary facilities. Provide clear guidelines for the location, design and fitout of public sanitary facilities. Set out a process for regular audits of existing facilities to manage and maintain public toilets to appropriate standards. (A star rating system may be used for this purpose). 17 North Sydney Public Amenities Strategy + Action Plan Strategic Objectives The key objectives/ criteria of the North Sydney Amenities Strategy for improving its network and provision of public amenities are: 1. Availability/ Location To ensure the adequate provision of public sanitary facilities to meet the needs of the LGA’s community and visitors 3. Safety To ensure public toilets are sited, oriented and designed appropriately to maximise public surveillance Public amenities are to be: Sited and designed to meet best practice principles of Crime Prevention through Environmental Design (CPTED), particularly in relation to: Safety, security and passive surveillance Entrances orientated to ensure high visibility Lighting Wayfinding Provided with adequate parking facilities (where possible) – located adjacent to parks and recreational facilities. Public amenities are to be: Well-distributed, appropriately and optimally located – with best practice being within 400m (5-10 minutes walking distance) of major transport nodes, sporting, recreational, community and retail facilities, tourist attractions, entertainment precincts, public event spaces and major gathering places. Provided at new public transport stations and terminals constructed by State authorities. Well-integrated into its contextual setting. Open at times to meet the needs of its users. 2. Accessibility 4. Quality To provide well designed public sanitary facilities with fixtures and fittings to suit its functional requirements Public amenities are to be: To provide equitable and universally accessible public toilets that fulfils the requirements of the Disability Discrimination Act 1992 Well designed and of high quality – using robust, high quality, vandal-resistant materials and fixtures. Public amenities are to be provided with: Installed with functional and fit-for-purpose sanitary fixtures and fittings. Universally accessible toilet(s) that comply with the requirements of the current Building Code of Australia (BCA), to include: BCA – Part F2.4: Accessible sanitary facilities BCA – Specification D3.6: Braille and tactile signs AS 1428.1-2009: Design for access and mobility – General requirements for access: New building works Accessible paths of travel from the street, parking areas and public paths – to AS 1428.12009. 5. Legibility To implement wayfinding measures for ease of finding and recognition of public amenities Public amenities are to have: Signage at toilets – identifying toilet typologies and hours of operation. Signage at parklands – to identify location, distance, toilet typology and hours of operation. Well publicised public amenity network – with promotion through a wide variety of media, wayfinding and signage for optimum community visual and physical accessibility. 18 North Sydney Public Amenities Strategy + Action Plan 6. Ecologically/ Environmentally Sustainable Design (ESD) To adopt the principles of ecologically/ environmentally sustainable development in the design of public toilets Public amenities are to incorporate: ESD strategies and features – in the siting, optimisation of natural ventilation and lighting, design for minimisation of energy and water consumption. Sustainable strategies and measures – in the maintenance and management of public sanitary facilities. 7. Presentation To implement a maintenance regime that ensures cleanliness of the facility Public amenities are to be: Managed efficiently – with a maintenance regime that ensures cleanliness of the facility, removal of odours, adequate supply of toilet paper, paper towels, soap, etc. Integrated (where feasible) with other publically accessible developments, such as community, recreational and retail facilities. 8. Connectivity To ensure that the network of public amenities are well connected to the public domain, pedestrian areas and public destinations Public amenities are to: Be sited to provide a cohesive, wellconnected, accessible and legible network of public toilets to the public domain, pedestrian areas and public destinations within the North Sydney LGA, and to other adjacent neighbourhoods. Ensure that the network is publically accessible via on the National Public Toilets website, North Sydney Council and adjoining councils’ websites. 19 North Sydney Public Amenities Strategy + Action Plan Design Public sanitary facilities can be purpose-built buildings or integrated within a public facility. Design Intent Public amenities must be: Sited in physically and visually accessible locations. Designed with safe, secure, hygienic and private environments. Equitable in providing for the needs of all genders, ages and the mobility challenged. North Sydney Council is committed to the provision of safe, secure, accessible and clean public toilets that meet best practice Crime Prevention through Environmental Design and Ecologically Sustainable Design Principles. Design Requirements Public sanitary facilities are required to meet a range of design and construction standards to include: Building Code of Australia AS 1428.1-2009: Design for access and mobility: General requirement for access – New building works Crime Prevention through Environmental Design (CTPTED) Environmental sustainability principles 20 North Sydney Public Amenities Strategy + Action Plan Management Management and regular maintenance of sanitary facilities require: Risk management Access management Opening and closing times Security measures Cleaning Maintenance Graffiti management Syringe management Reporting of incidents Asset condition audits A. Risk management Risks can involve threats to users, staff, property or environment. A Risk Management Plan for toilet maintenance should be developed encompassing the following (and other Council identified) risks: Inadequate cleaning standard Vandalism Surface slip resistance Sewerage and drainage Safety of facility B. Access management Public toilets in transport interchanges (such as railway stations) are opened when the station is staffed. Public toilets in parklands are generally opened during daylight hours. D. Security measures Security can be achieved through siting in visible locations, external lighting and CCTV monitoring of the facility. Processes to ensure the safety of cleaners will be by the facilities’ cleaning agencies. Cleaners should be trained on procedures for avoiding and encountering a dangerous situation. E. Cleaning Cleaning of sanitary facilities and change rooms is undertaken to a clean and hygienic condition, in accordance with North Sydney Council’s cleaning contract. The works comprise: Cleaning and disinfecting fixtures and fittings with removal of toilet stains, algae, etc. (daily). Cleaning mirrors, doors, partitions and walls (daily). Replenishing consumables, empting rubbish bins and removal of loose paper from site (daily). Access to public sanitary facilities will be determined by opening, closing and cleaning times of the facilities. Sweeping and removing debris from external pathways within 5m of the building (daily). This information should be prominently indicated at the entrance to the facilities. Council, and their designated contractors, are required to open and lock the facilities at designated times. Deep/ pressure cleaning all floors, ceilings, windows and walls (monthly). Universal access must be provided to all public toilets, with an accessible path of travel provided in accordance with AS 1428.1-2009. C. Opening and closing times Opening and closing times will be site specific and depend on the location of the public facilities: Public toilets, managed by independent management, are only opened during business hours. Major sporting facilities are opened only at hours where sporting events are held. Removal of debris, dirt, dust, cobwebs on surfaces, fixtures and fittings (weekly). Cleaners are required to replace toilet paper and other expendable items. Cleaning of sharps and sanitary disposal units are not the responsibility of cleaners, but are subcontracted to others. Cleaning contracts must consider environmentally preferred cleaning products that are biodegradable, whilst considering best practice hygienic procedures and products. Toilets are closed off whilst cleaning is in progress. Damage and defects and reported to the Supervising Officer within 24 hours. 21 North Sydney Public Amenities Strategy + Action Plan F. Reporting H. Graffiti management The Cleaning Contractor reports immediately to the Supervising Officer any problems observed or detected. To manage graffiti – graffiti resistant materials and paints may be considered during the design process. In addition, the Contractor should keep Council informed of operational matters and data, with: Accumulation of graffiti on and inside public toilets reflects poor maintenance and may convey the impression of poor safety and security for facility users. Weekly reports detailing: Problems such as blocked drains, etc. Dates and times of location attendance Monthly report including: Sites cleaned – when and facility condition WHS report, including any incidents or accidents Site risk assessment reports Comment on the past month Proposals for the coming month List of contracted staff List of plant and equipment used on site Working days lost due to injuries and/ or industrial disputes Suggestions for service improvements Cleaners must report graffiti problems to Council for prompt removal. Prompt removal can deter recurrence. Graffiti must be actioned for removal in public toilets within 24 hours of being identified or reported to Council. I. Syringe management Increased legitimate use of public toilets discourages their inappropriate use. Public toilet can provide a secure space where such activity can occur. Council will undertake all measures to reduce opportunities for drug use in public toilets by providing a safe environment for facility users. G. Maintenance In the interest of public health and safety, and for the welfare of people who require sharps for medical reasons and for those with drug issues, Council provides sharps disposal bins as standard public health fixtures in a majority of its public toilets. This will encourage the unsafe disposal of drugs within the vicinity of public facilities. The sharps disposal bins are serviced regularly by a contracted medical waste disposal service. Facilities should be audited frequently to assess operational wear and maintenance requirements. J. Reporting of incidents Contractors are to notify Council immediately in the case of: Complaints by a resident on incidents An accident on site Any delays in service delivery, including weather conditions Cleaning staff must report maintenance issues (such as broken fixtures and fittings) and test for the functioning of toilet suites, taps and basins. Independent audits are to be introduced in Council’s Customer Service Surveys, to ensure toilets are being well maintained. A contact telephone number and email (optional) for reporting of maintenance issues is to be placed on a sign outside the sanitary facility. Council will record complaints noting: Date, hour and issue(s)/ problem(s) reported Person reporting issue(s) Person receiving call(s) Action and date of action Completion check Information about maintenance, graffiti, security and other issues are to be reported by cleaners to Council or the manager of the facility. Telephone numbers are to be provided on all sanitary facilities to encourage the public to report vandalism, inappropriate behaviour and maintenance issues directly to Council or the facility manager. K. Asset condition audits North Sydney Council undertakes detailed condition audits of all public sanitary facilities. These audits enable the timely repair of facilities, facility infrastructure, fixtures and fittings. Regular monitoring is also undertaken to ensure a high standard of service is being provided. 22 North Sydney Public Amenities Strategy + Action Plan Security North Sydney Council provides public sanitary facilities in frequented locations such as public parklands, sportsgrounds, sporting and community facilities, libraries and retail centres. These facilities with high public usage provide enhanced opportunity for active and public surveillance. The community should feel safe and confident in using public toilets. Council implements best practice Crime Prevention through Environmental Design (CPTED) principles and strategies in the consideration of location, siting, orientation of entrance, design, landscaping and operation of public amenities. Public toilets are generally open 7 days a week, during daylight hours, with the exception of automated public toilets which are open 24 hours. Council will review the operational hours of public toilets, to extend where there are high demands and security of users is assured. 23 North Sydney Public Amenities Strategy + Action Plan Special Events North Sydney’s foreshore parklands, major civic spaces and community centres are host to a variety of community events. Events are held at: The Coal Loader Centre for Sustainability – with open markets. Ernest Place civic precinct/ Crows Nest Centre – Crows Nest market. Burton Street Tunnel and Bradford Park: Kirribilli market (artisan and fresh food). Kirribilli Market is held every 1st and 3rd Saturday of each month; Kirribilli Art, Design and Fashion Market is held every 2nd Sunday of each month. Miller Street, North Sydney – with open markets. Civic Centre/ North Sydney Community Centre (220 Miller Street, North Sydney) – Northside Produce Market, held every 3rd Saturday of each month. Civic Park (200 Miller Street, North Sydney) – Twilight Food Fair, held every Friday evening. Public toilets are located within these facilities and urban open spaces. Major events, such as New Year’s Eve celebrations along the harbourside foreshore parklands, are organised and supported by Council. These foreshore parklands, attracting over 91,000 people (2013/ 2014), include: Bradfield Park Blues Point Reserve Cremorne Reserve Lavender Bay Kirribilli Balls Head Reserve and Carradah Portable Toilets The number of temporary toilets provided to adequately service an outdoor event is influenced by: Duration of event Weather condition Crowd numbers Proximity and adequacy of existing facilities. Crowd size Average hours of event 2 hours 500 1000-2000 5,000 4 6 15 10,000 20,000 25 50 4 hours (½ day) 5 8 25 50 100 8 hours (1 day) 9 12 50 100 200 Accessible/ Disabled Toilets Temporary accessible/ disabled toilets are provided at the ratio of 1 disabled toilet/ 10 standard cubicles, with the minimum of 1 disabled toilet for outdoor events. Temporary disabled toilets are to be located on firm, level ground and sited where there are accessible paths of travel linking the facilities to accessible site entrances and the public domain. These parklands have public toilets but are augmented by portable toilets at Bradfield Park and Blues Point Reserve where crowds are anticipated to reach over 70,000 people. The portable toilets are erected from 8:00am, 30 December and removed by 5pm, 2 January. 24 North Sydney Public Amenities Strategy + Action Plan Promoting Community Awareness Providing information about the network of public sanitary facilities in the North Sydney LGA improves the accessibility of these amenities for the community and communicates their location to users. North Sydney Public Toilet Map Wayfinding of public toilets can be with: The Public Amenities Strategy proposes that large format public toilet maps are installed at bus stops, public transport interchanges, railway stations, community and publically used facilities, and at key public gathering places. Wayfinding maps located in areas frequented by the public, such as at public transport nodes, bus stops, railway stations, retail and community centres. Wayfinding maps located on websites. Signage at entries to parks and community facilities, on street signs, at bus stops nearest to the facility identifying: Location, direction and approximate distance to facilities. Types of toilets (male, female, disabled) – in universally recognised pictogram. Operational times. A printable public toilet map identifying the location of sanitary facilities within the North Sydney LGA is to be provided on North Sydney Council’s website in PDF format: Public Toilet Signage Signage is to be provided on toilet facilities with: Universally recognised pictograms on toilet doors indicating male, female and disabled toilets. Information on opening hours. Location of the nearest alternative facilities. National Public Toilet Map The National Public Toilet Map, a project of the National Continence Management Strategy, identifies the location of public toilets in Australian urban areas, owned and managed by local government authorities, other agencies and independent facilities. The National Public Toilet Map and its website are designed specifically to assist people in locating public sanitary facilities. A number of mobile apps are available which link to its database. However, the system relies on toilet providers to supply and update information. 25 North Sydney Public Amenities Strategy + Action Plan Recommendations All public amenities within the North Sydney LGA will fulfil the objectives of: Availability Accessibility Safety Quality Legibility Ecologically sustainable design Presentation Connectivity Explore new opportunities for locating public amenities as part of new developments, particularly where developments are sited in close proximity to areas that are close to public gathering places. Require developments with community facilities to provide toilets, accessible to the general public, at minimum during daylight hours, 7 days a week. Ensure public toilets at key parklands be open during daylight hours, 7 days/ week. 1. Availability Implement public toilet design guidelines for all new and refurbished toilets. Public toilets are to be well-distributed, appropriately and optimally located – with best practice being within 400m (5-10 minutes walking distance) of major transport nodes, sporting, recreational, community and retail facilities, tourist attractions, entertainment precincts, public event spaces and major gathering places. 2. Accessibility Provide accessible/ disabled toilets to all existing amenity buildings. Ensure disabled toilets installed to new public facilities are to AS 1428.1-2009. Public toilets are to be provided at all railway stations – in locations accessible to the public, including non-rail users. Ensure accessible paths of travel are provided to all public amenities, with widths, gradients and falls to comply with AS 1428.1-2009. Investigate siting and installation of new public sanitary facilities (automated or standard) at the following parks to meet the locational gaps of public amenities within 400m of each other, at: Where modifications are not feasible, facilities are to be replaced or augmented with compliant unisex public toilets. Bandangi Reserve LGA Western Precinct Implement CPTED design principles in the planning, design and maintenance of public toilets. LGA Northern Precinct Increase public awareness – with the installation of display panels in public amenities to promote community awareness of public safety issues, strategies and to report any public safety issues. Pocket park on Pacific Highway Anzac Park Fred Huntley Reserve Lodge Road Park Brightmore Reserve May Gibbs Place Kurraba Reserve LGA Eastern Precinct 4. Quality Replace damaged fixtures to existing public sanitary facilities with high quality, robust fixtures. Prior Avenue Reserve Sirius Street Park Ilbery Reserve Park Beulah Street Wharf 3. Safety LGA Central & Southern Precinct Install high quality, vandal-resistant fixtures and fittings to the toilets. Ensure existing and new sanitary facilities are provided with required sanitary accessories. 26 North Sydney Public Amenities Strategy + Action Plan 27 North Sydney Public Amenities Strategy + Action Plan 5. Legibility Provide wayfinding signage for the location of public toilets – through street signage, park signage and signage on the exterior of the facility. Upgrade exterior signage to public amenities to compliant pictogram signs with contrasting background to foreground colours. Install signage at entrance to public amenities – indicating opening times and contact telephone numbers for reporting of facility issues. Implement Wayfinding and Signage Designs for the “branding” of public amenities signage. 6. Ecologically Sustainable Design Implement passive and active ESD features in the design of new public amenities and in the refurbishment of existing facilities. 7. Presentation Implement regular auditing of the servicing of Council’s public sanitary facilities to ensure that high standards of cleanliness are maintained and anti-social practices are avoided/ minimised, to meet community expectations. 8. Connectivity Ensure public sanitary facilities are connected to the public domain of streets, pedestrian pathways and car parking areas, via an accessible path of travel. Update public toilet network data to indicate location of current toilets. Promote the public toilet network through a variety of media, including network maps of installed facilities, Council’s website and the National Public Toilet Map website. Make available a Public Toilet Map for the North Sydney LGA in both hand and soft copy formats for distribution at all customer service centres, libraries, community and retail facilities. 28 North Sydney Public Amenities Strategy + Action Plan Strategic Action Plan The Strategic Action Plan outlined is a work plan for North Sydney Council to achieve the North Sydney Public Amenities Strategy’s recommendations. Out of 51 sanitary facilities available for public use within the North Sydney LGA: 15 (29.4%) do not incorporate an accessible (disabled) toilet, with: 7 of the amenities are in private ownership or at a railway station. 8 sanitary facilities (15.7%), owned by North Sydney Council. Action Plan The Action Plan outlines the specific actions/ works that are to be implemented and the priority/ target timeframe for achieving these actions. The Action Plan provides North Sydney Council with guidelines for obtaining funding for the works. The priority of the actions is rated as follows: Immediate: Action to be completed within 1 year High: Action to be undertaken within 1 year and completed by 2 years Medium: Action to be undertaken within 2 years and completed 5 years Low: Action to be undertaken within 5 years and completed by 10 years Summary of Actions Works identified in the Strategic Action Plan are prioritised as follows: Actions Priority Timeframe Immediate 0 – 1 year Rectification and refurbishment works High 1 – 2 years Current projects High 1 – 2 years Provision of accessible/ disabled toilets High 1 – 2 years Implementation of wayfinding signage strategy High 1 – 2 years Major refurbishment or replacement works High 1 – 3 years Medium – Low 3 – 10 years Maintenance works Installation of new public amenities in 400m radius sites 29 North Sydney Public Amenities Strategy + Action Plan Schedule of Actions The following is a Schedule of Actions that are to be implemented for the maintenance, refurbishment and construction of new public amenities in the North Sydney LGA: Actions: Maintenance works Priority: Immediate Timeframe: 0 – 1 year Recommendations: Undertake maintenance work to upgrade existing toilets. Ensure existing toilets within the local government area are functional, in good condition, and equipped with necessary accessories and signage. These comprise toilet facilities in: Location Suburb 9 Brennan Park Wollstonecraft 10 Cammeray Park Cammeray 11 Civic Park North Sydney 12 Coal Loader Centre for Sustainability Waverton 17 Crows Nest Community Centre Crows Nest 18 Don Bank Museum North Sydney 19 Forsyth Park Neutral Bay 22 Hume Street Car Park Crows Nest 23 Kendall Community Centre Cammeray 25 Kirribilli Neighbourhood Centre Kirribilli 27 Milson Park Milsons Point 29 Neutral Bay Community Centre Neutral Bay 30 North Sydney Community Centre North Sydney 31 North Sydney Council Administration Building North Sydney 33 North Sydney Indoor Sports Centre North Sydney 35A North Sydney Oval Change Rooms North Sydney 35D North Sydney Oval – The Bob Stand North Sydney 35E North Sydney Oval – Function Centre North Sydney 38 Quibaree Park Lavender Bay 41 St Thomas Rest Park Crows Nest 43 Tunks Park Cammeray 44 Waverton Oval Waverton 45 Waverton Park Waverton 30 North Sydney Public Amenities Strategy + Action Plan Actions: Rectification and refurbishment works (minor and major) Priority: High Time frame: 1 – 2 years Recommendations: Upgrade toilets with minor refurbishment works to defective items to improve the overall quality of the facility. Installation of compliant and missing fixtures and fittings. Install additional accessories for improved functionality of facility. Installation of compliant signage to facility. Install/ improve external accessible path of travel to facility. These comprise toilet facilities in: Location Suburb 10 Cammeray Park Cammeray 29 Neutral Bay Community Centre Neutral Bay 33 North Sydney Indoor Sports Centre North Sydney 35C North Sydney Oval – Ken Irvine Scoreboard North Sydney 35D North Sydney Oval – The Bob Stand North Sydney 35E North Sydney Oval – Function Centre North Sydney 37 Primrose Park Cremorne Actions: Current projects Priority: High Time frame: 1 – 2 years Recommendations: Refurbishment of public amenities. Provision of new public amenities on new sites. These comprise toilet facilities in: Location Suburb 40 Bon Andrews Oval – Cunningham Pavilion St Leonards B4 Brightmore Reserve (Northern Precinct) Cremorne C1 May Gibbs Place (Eastern Precinct) Neutral Bay 31 North Sydney Public Amenities Strategy + Action Plan Actions: Provision of accessible/ disabled toilet Replacement with new accessible sanitary facility Priority: High Time frame: 1 – 2 years Recommendations: Requirement of unisex disabled toilet to public sanitary facilities currently lacking in accessible facilities – to comply with DDA requirements (to AS 1428.1-2009). Provision of new sanitary facilities to include disabled toilet within these public recreational areas. These comprise toilet facilities in: Location Suburb 20 Green Park Modest facility of approx. 40 years old Cammeray 41 St Thomas Rest Park Adaptive reuse of heritage building Crows Nest 44 Waverton Oval Provision of new unisex disabled toilet. Waverton 45 Waverton Park Provision of new amenities with disabled toilet. Waverton 32 North Sydney Public Amenities Strategy + Action Plan Actions: Implementation of wayfinding signage strategy Priority: High Time frame: 1 – 2 years Recommendations: Design of a wayfinding signage strategy and implementation of wayfinding signage for ease of wayfinding from the street/ car parking area to amenities. These particularly apply to parklands where amenities are not located in close proximity to the street or public parking areas. These comprise toilet facilities in: Location Suburb 1 Anderson Park Neutral Bay 7 Bradfield Park (North) Kirribilli 8 Bradfield Park (South) Kirribilli 9 Brennan Park Wollstonecraft 10 Cammeray Park Cammeray 11 Civic Park North Sydney 19 Forsyth Park Neutral Bay 20 Green Park Cammeray 24 Kesterton Park North Sydney 25 Kirribilli Neighbourhood Centre Kirribilli 27 Milson Park Milsons Point 38 Quibaree Park Lavender Bay 39 St Leonards Park North Sydney 41 St Thomas Rest Park Crows Nest 43 Tunks Park Cammeray 44 Waverton Oval Waverton 45 Waverton Park Waverton 33 North Sydney Public Amenities Strategy + Action Plan Actions: Major refurbishment or replacement works Priority: High Time frame: 1 – 3 years Recommendations: Refurbishment or replacement of older toilets (particularly the green tiled, c. 1970s parkland toilets) that are 45 years old. The condition of these toilets (internal and external) varies from poor to fair. Some sanitary facilities have been upgraded to include disabled toilets, but not ambulant toilets. These are generally in good condition. Major refurbishment should result in upgrading of toilet facilities to current BCA standards and to include disabled toilets. These comprise toilet facilities in: Location Suburb 2 Balls Head Reserve Waverton 3 Berry Island Reserve Wollstonecraft 6 Blues Point Reserve McMahons Point 9 Brennan Park – refurbishment Wollstonecraft 16 Cremorne Reserve Cremorne 24 Kesterton Park North Sydney 34 North Sydney Olympic Pool Milsons Point 39 St Leonards Park North Sydney 34 North Sydney Public Amenities Strategy + Action Plan Actions: Installation of new public amenities in sites/ gaps within the 400m radius Priority: Medium to Low Time frame: 3 – 10 years Recommendations: Install new public amenities in sites/ gaps within the 400m radius – identified in the Strategy. Identify and evaluate sites suitable for implementation. The priority of these sites for new sanitary facilities will be determined on community and user needs. These comprise toilet facilities in: Location Suburb A. LGA Western Precinct 1 Badangi Reserve – Tryon Avenue Located at the northern foreshore of Balls Head Road. Wollstonecraft 2 Pocket park located on the south-western side of the Pacific Highway (east of the Mater Hospital) and west of North Sydney Girls’ High School. Park is zoned RE1 under NSLEP 2013 North Sydney B. LGA Northern Precinct 1 Anzac Park – Anzac Avenue Located at the western side of the Expressway. Cammeray 2 Fred Huntley Reserve/ Hamilton Reserve – Hamilton Avenue Located at the north-western side of Cammeray, west of Miller Street. Cammeray 3 Lodge Road Park – Ellalong Road Cremorne 4 Brightmore Reserve – Young Street Cremorne C. LGA Eastern Precinct 1 May Gibbs Place – Barry Street Neutral Bay 2 Kurraba Reserve – Kurraba Road Kurraba Point 3 Prior Avenue Reserve – Prior Avenue Cremorne 4 Sirius Street Park – Milson Road Cremorne Point 5 Ilbery Reserve Park – Barry Street Neutral Bay D. LGA Central & Southern Precinct 1 Beulah Street Wharf – Beulah Street Kirribilli 35 North Sydney Public Amenities Strategy + Action Plan Guidelines for the Design of Public Toilets Design Principles The location and siting of a public sanitary facility can cause concern for the local community where it is perceived that the installation of such a building will impact negatively on their neighbourhood. This reaction can be based on the perception that public toilets are associated with anti-social behaviour, and in many cases on experiences where toilets have become rundown, degraded and subject to graffiti and vandalism. A. Location Siting – Provide public toilets at activity generating locations, in proximity to other facilities – such as in sports grounds, parklands, recreational facilities, harbourside areas that attract public gatherings, civic places and transport nodes. Maximise visibility – Site sanitary facilities in an area of highly visibility and activity to increase opportunities for casual surveillance. The siting of the facility is to be considered externally from all angles of approach from public pathways – considering issues of accessibility, visibility and wayfinding to the facility. Entrance orientation – Orientate the facility’s entrances to address a public view or nearby activity. Accessibility – Provide an accessible path of travel, of minimum width of 1200mm (optimally 1500mm), to connect the entries and doorways of the facilities to a public pathway, car parking area, public street or parkland. Accessibility is to comply with AS 1428.1-2009, with compliant ramps and no steps. Setting – Site the facility close to other public facilities such as playgrounds, barbeques, sporting activities and high pedestrian traffic areas. Locate the facility as close as practicable to streets, footpaths and car parking areas. Landscape – Ensure surrounding landscape of shrubs and trees, at maturity, do not obscure the visibility of the facility and its entrances. The design must avoid creating dark areas and potential hiding places, to prevent offender concealment. Clearance under trees should be at least 2m. Safety – Incorporate best-practice Crime Prevention through Environmental Design (CPTED) strategies into the siting and design of the toilets. It is therefore important that public toilets are refurbished, renewed or provided at the level of quality that meets community expectations. Where a toilet is to be renewed, refurbished or a new toilet provided, effective planning and design are to be undertaken to ensure that these installations achieve positive benefits to the community and minimises opportunities for negative impacts. The following guidelines are to ensure that new facilities will be designed and constructed to best practice and optimum standards that meet the expectations of the community. The design of new sanitary facilities and the rehabilitation of existing toilets are to be designed in accordance with the following Design Principles of: Location Building design Universal accessibility Ecologically sustainable design (ESD) Crime Prevention through Environmental Design (CPTED) Signage Life cycle management Maintenance and cleaning 36 North Sydney Public Amenities Strategy + Action Plan B. Building design C. Universal accessibility An amenity building has an impact on the locality in which it is sited. The design approach must consider the building aesthetics of its external form, with materials that are sympathetic to its local context/ setting, whilst enabling a distinctive design approach to be taken. Under the Disability Discrimination Act 1992 (DDA), public facilities are to be designed to provide equitable and dignified access to the premises and its services. Access to public toilets must be easy for both able bodied users and for the mobility challenged. Accessibility of the facility is to comply with AS 1428.1-2009: Design for access and mobility: General requirements for access – New building works. Provide a safe, secure and accessible facility with high levels of visibility, security, light and ventilation. Design to: Building materials used in the construction and finishes of the amenity must be: Robust/ durable Fit for purpose Easy to clean, maintain and replace Appropriate to the locality. Initial cost savings in specifying cheaper and less durable materials may inevitably be out-weighed by future maintenance and replacement costs. Ensure that disabled/ accessible toilets are optimally sited to be accessible by both the local community as well as visitors to the area. Provide barrier-free and accessible paths of travel from the public domain of street, pathways, parklands and urban spaces to the sanitary facility. Provide a sealed or paved pathway, minimum 1200mm wide (optimally 1500mm wide), to provide access for wheelchair users, parents with prams/ strollers and for the mobility challenged and their carers. Gradients and cross falls are to comply with AS 1428.1– 2009. Avoid the use of steps, with ramps and walkways. Ground finishes are to be graded away from entrances to avoid pooling at entrances and access pathways. Rainwater gutters and downpipes near entrances are to be connected to underground drainage. Legislated codes and standards require: Design of new universally accessible disabled and ambulant toilets – is to comply with AS 1428.1-2009. Refurbishment of existing facilities, where disabled toilet(s) exist – is to be compliant at the minimum with AS 1428.1-2001, or be upgraded to AS 1428.1-2009. Sanitary facilities are to comply with BCA: Part D3.0 – Access for people with a disability. Specification D3.6 – Braille and tactile signs. Part F2.4 – Accessible sanitary facilities. Part F2.5 – Construction of sanitary compartments. 37 North Sydney Public Amenities Strategy + Action Plan D. Ecologically Sustainable Design (ESD) The design of the sanitary facility will incorporate (as far as practicable) ESD design features, particularly in minimising energy and water use. These include consideration of embedded energy and recycling potential of materials, minimisation of construction waste, energy and potable water, and reducing the impact of cleaning materials used for graffiti removal. Implement ESD strategies and features to: Reduce energy consumption Site and orientate the building to facilitate the use of solar power (now or in the future). Design to optimise natural lighting. This includes: Consider the use of greywater/ stormwater collection for flushing. Incorporate water collection and reuse from roof structures. Use of dual flush cisterns to toilets. Use of automated or waterless urinals (where applicable). Use of automated flow control and sensor taps. Install water efficient fixtures with a minimum AAAA rating. Reduce resource inputs Use recycled and recyclable (and potentially locally sourced) materials in construction. Source materials with low environmental impact. Use of clear or translucent roofing materials. Design to ensure efficient use of resources in construction and operation. Design to optimise natural ventilation. This includes: Use low VOC (volatile organic compounds) paints where appropriate to untiled linings. Provision of robust mesh, perforated screens or louvres – with materials selected for their ability to withstand vandalism and weathering. Use low environmental impact cleaning products. Provision of adequate ventilation such that unpleasant odours can easily be dissipated. This includes unobstructed inward flow of fresh air and extraction of air via vents/ ventilation cowls protected from countervailing winds. Use of solar power (such as photo-voltaic cells) to power lighting systems and water heating (particularly to change rooms with showers). Use of energy efficient lighting (such as LEDs) and appliances. Implement sensor lighting and power controls. Consider the use of recycled materials or materials with low embodied energy. Provision of skylights – with selection of materials for robustness and vandalresistance. Reduce water consumption Vegetation Provide a landscape design incorporating indigenous and drought-tolerant plants. Provide ground treatment of mulch to retain ground moisture. Install an external tap to the facility (using harvested rainwater, if practical) for landscape irrigation. 38 North Sydney Public Amenities Strategy + Action Plan E. Crime Prevention through Environmental Design (CPTED) Design to incorporate features that minimise opportunities for vandalism, graffiti and antisocial behaviour. Implement CPTED strategies and measure of: Safety, security and surveillance Entrances are to be highly visible, easily identifiable and legible. Vegetation is not to obscure or provide areas of concealment. F. Signage Wayfinding signage Wayfinding signage should communicate the following information: Location of and direction to sanitary facilities. Types of sanitary facilities in the form of toilet pictograms. Hours of opening. Contact number if problems with usage. This number will be the Council’s maintenance call centre. Amenities signage Lighting Maximise the use of natural light into the facility. Facility is to be well-lit externally and internally, with avoidance of shadow spots. Use of sensor lighting to supplement external and internal facility lighting and enhance security and safety around and within the facility. Avoid the use of ultraviolet lighting as a means to reduce illicit behaviour as such lighting reduces visibility and safety levels for all users. Signage Public toilets are to be fitted with directional and instructional signage, including tactile and braille signage in compliance with the BCA. Wayfinding signage is to provide operating hours, location of the nearest alternative facility and contact details to report a fault or issue. Signage is to be located on toilet doors to Male, Female, Disabled and Ambulatory Disabled toilets. Signage at entrances is to be legible and recognisable with information provided to consider people with vision impairments and language constraints. Provide minimum luminance contrast of 30% – of icons, letters and tactile characters from the surface on which the characters are mounted. The toilet gender should be clearly identified by use of international symbols for Male, Female, Unisex, Disabled/ Accessible and Ambulatory, with information also provided in Braille. Signage is to comply with Part 8 – Signage of AS 1428.1-2009. The robustness of signage is to be considered in the material and finish of the sign, to enable resistance against graffiti, damage and cleaning solutions. Signage should enable ease of replacement, where damaged. 39 North Sydney Public Amenities Strategy + Action Plan G. Life Cycle Management H. Maintenance and Cleaning The design of sanitary facilities should seek to optimise the total life cycle cost to Council by incorporating features which will reduce operation costs such as utilities, maintenance, replacement of consumables, cleaning, surveillance, opening and closing. The cleanliness and condition of public toilets are major concerns of users and is an important factor in providing user satisfaction. Ensure supportability of selections with provision of Selection Specification at the completion of each new facility construction, fitout or refurbishment of: Selected fixtures and fittings Manufacture/ supplier of selected items Cleanliness is achieved in: Absence of bacteria, removal of surface mould and stains in fixtures, fittings, walls and floors. Absence of graffiti. Absence of odour in the facilities. Absence of litter, mud, dust, dirt and grime. Quality of facility Graffiti vandalism and poorly maintained surfaces create a poor impression and perception of lack of safety. Quality of a facility is achieved by: Providing adequate toilet paper and paper towels in their respective holders. Ensuring workability of flushing mechanisms, taps, hand dryers, soap holders, lights, door hardware, etc. Rectifying damaged fixtures, fittings, damaged surfaces, paint work, etc. Replacing damaged toilet partitions, doors, light fittings, etc. Refurbishing aging facilities, as required. Maintenance of a facility is to be considered in its design and should address issues such as frequency of expected maintenance activities, future repair of sanitary and building elements, and access to replacement parts. Design of facility The design of sanitary facilities must address ease of maintenance, hygiene and appearance. The design should ensure that: The design and selection of exterior building and interior surfaces are easy to clean and remain stain free. Areas where dirt and rubbish may accumulate, or insects, birds and rodents can inhabit, are minimised or eliminated. Fixtures are robust, resistant to vandalism and easily replaceable. Selection of materials and surface finishes are resistant to vandalism, graffiti and cleaning. Surfaces must withstand effective cleaning methods such as high pressure wash. Exposed pipework and cisterns that can be vulnerable to vandalism are avoided. 40 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan E External Design Require ements A A. Location and siting B. Extern nal lighting Locate and orientate am menities within n areas of public activiities and in lo ocations of hig gh visibility from m the public domain. d Provide e external lighhting to the bu uilding – to comply with ASNZS 1158.3.1-200 05: Lighting ds and public spaces, Cate egory P3. for road e proximity to o public pathss, car Site in close parking areas, roadways s and public trransport routes. Provide e consistent aand even lightting along paths of travel to thee facility and avoid a light spills to o surrounding premises. Consider in its siting the location and capacity of existing utility u services s such as: water su upply sewerag ge electricitty Conside er the use of external sens sory lights – to t optimise e safety and security of the building. Siting selecction is to consider the com mpatibility of the amen nities with surrrounding res idential amenity. C. Extern nal signagee Design of th he facility and d its building fform are to be sensittively integratted with its surrounding g context. Provide acccessible paths s of travel to tthe amenity faccility. Locate external lightt fittings out of o normal a in vandal--resistant fittin ngs. reach and Externa al signage is tto be: legib ble in pic ctogram form mat using interrnational symb bols with braille nance contrasst of at least 30%. lumin P1 15: William Nelson Park, Hastings, New Zeala and P16: Propos sed toilets – Maay Gibbs Place, Neutral Bay 17: Sydney Parrk toilets, Sydne ey P1 P18: Tete D’or D Park, Lyon, France 4 41 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan D. Landscap ping E. Streett furniture Landscapin ng is to be enc couraged to: Provide an aesthetica ally pleasing ment. environm Enhance e the setting of o the amenitiies. Contribu ute to microclimate control around the facility. Create an identifiabl e “Amenity Hub” H with the placement of an inteegrated selecttion of externa al street furnituure that contrributes to the externa al amenity for users of the facility. olerant and lo ow Select robust, drought-to maintenancce plant speciies. Shrubs, in close c proximitty to the build ding, are to be no mo ore than 750m mm in height at maturity. Select tree species that will: w Maintain n site lines to the building a and provide shade. s Minimise e root damage to building foundatio ons, drainage e pipes and p paths. Install elements e to innclude: Drin nking fountainn (incorporatin ng pet drinkin ng features) Sea ating Rub bbish bins (witth recycling features) Bicy ycle stands Sign nage (for wayyfinding maps s and other plac ces of interestt) P19: Water fountain f – Northh Sydney Public c Domain Style Manua al P20: Stainless steel bike raacks 4 42 North Sydney Public Amenities Strategy + Action Plan Internal Design Requirements C. Design of toilet cubicles A. Toilets to be provided Number of cubicles is to meet site demand – 1 toilet for 30 daily users. Separate Male, Female and Accessible/ Disabled toilet cubicles (preferable). From floor to ceiling – for unisex facility; and Minimum 1.8m above the floor – within banks of male and female toilets (BCA F2.5). Unisex Disabled toilet cubicle (in areas with minimal use). B. Toilet cubicle configuration Design for optimum visibility and safety of use in the design of sanitary facilities. Design considerations are to include the following options: Sanitary compartments must have doors and partitions that separate adjacent compartments and extend: Self-contained cubicles for male, female, unisex and unisex disabled use, with hand basin and accessories provided in each cubicle. Doors to a fully enclosed sanitary compartment must: Open outward; or Slide; or Be readily removable from the outside of the sanitary compartment; unless there is a clear space of at least 1200mm between the toilet pan and the doorway – (BCA, F2.5). Multiple cubicles containing toilet pan only, with shared hand basins in public space. This arrangement shall apply to standard male/ female and ambulatory disability cubicles only. Cubicle doors – Provide gap from underside of door to finished floor level of 150-300mm. Where toilet cubicles opens directly onto a public space – provide external shelter with a generous overhang or roofed area. Where multiple cubicles are provided – one or more cubicles for people with ambulant disabilities must be provided. Toilet cubicles are to be screened from external view with: Use angled roofs, roof lights, translucent or transparent roof sheeting, or open screens above 2m in height to the roof line – to capture optimum natural light and ventilation to sanitary facilities. Doors provided to separate banks of toilets; or Design for a discreet approach to the cubicles avoiding direct external sight lines to the cubicles. 43 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan D.. Selection and constrruction of cu ubicles Toilet cubiccles/ partitions s are to be ro bust with performancce requiremen nts of: Nominallly 20mm thic ck (preferred) Graffiti and a vandal re esistant Water and chemical resistant r Optimum m impact strength Solid colour (preferre ed) Zero dellamination Easy to clean with minimal mainte enance E. Fitout of toilet cu bicles The fitout of o each toilet ttypology shall provide for the followin ng fixtures: Male and female f toilett cubicles (m multiple) Toilet suite/ toilet paan: al flush cisternn Dua Toilet suite (vitreeous china or stainless steel o suit the circuumstance of the t applicatio on) – to Toilet ro oll holder Sanitary y napkin dispposal unit (in female f cubicles) Ambulant toilet cubiclles Layout, fixttures and fittinngs to comply y with AS 1428.1-200 09, Part 16, w with provision of: P2 21: Toilet partitions Toilet suite/ toilet paan: al flush cisterrn Dua Toilet suite (vitreeous china orr stainless ste eel – to o suit the circuumstance of the applicatio on) Toilet ro oll holder Sanitary y napkin dispposal unit (in female f cubicles) Male and female f toilett areas Basin (v vitreous chinaa or stainless s steel – to su uit the circumstance of the applicatio on) P2 22: Toilet partition wall Doors shou uld be robust, vandal-resisttant and easy to clea an. Locks and door d handles must be able e to be used by the e mobility challenged. Internal doo ors to cubicles s are to have e privacy locks that denotes usage e. o incorporate e design featu ures that Doors are to allow for em mergency acc cess – with hin nges that allows allow doors to o be lifted. s) Mirror(s Taps – dispensing ccold water (ho ot water option nal) Hand dryer(s)/ papeer towel dispenser(s) and bin(s) mper/ vandal proof) Soap dispenser (tam nal Sharps bin disposal unit – Option O Shelving near/ abovee basin(s) – Optional Male/ Fem male/ Unisex ttoilet cubicle e (self-conta ained) Toilet suite/ toilet paan: Dua al flush cisterrn Toillet suite (vitreeous china orr stainless ste eel – to o suit the circuumstance of the t applicatio on) Basin Tap – dispensing colld water (hot water optiona al) oll holder Toilet ro Mirror Soap dispenser (vanndal proof) er and bin Hand drryer/ paper toowel dispense Sanitary y napkin dispoosal unit (in female f cubicle es) Baby ch hange table – Optional 4 44 North Sydney Public Amenities Strategy + Action Plan Disabled toilet cubicle (unisex) Layout, fixtures and fittings are to comply with AS 1428.1-2009, Part 15, with provision of: Toilet suite (vitreous china or stainless steel – to suit the circumstance of the application) Compliant backrest and seat to toilet suite Dual flush cistern Basin Tap – dispensing cold water (hot water optional) Toilet roll holder Mirror Soap dispenser (vandal proof) Hand dryer/ paper towel dispenser and bin Grab rails (Part 17 of AS 1428.1-2009) Shelf Hook Sanitary napkin disposal unit Folding baby change table F. Lighting Adequate and consistent lighting of the area around and within public toilets is essential for users to have confidence when approaching and using the facilities, particularly at night. Lighting design is to: Provide high levels of natural light and artificial light to sanitary facilities – to maintain a high level of visibility and perception of cleanliness. Use efficient light sources (such as LEDs and compact fluorescents). Avoid ultraviolet light fittings. Select quality, robust and vandal resistant light fittings. Install light fittings that are out of public reach (or consider concealed lighting). Select lamps and fittings that are easily sourced and replaced. Consider measures such as automatic switching and motion sensors. 45 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan M Materials s and Fin nishes tto Public c Toilets s All building ma aterials and finishes are to be nt, easily robust, impact resistant, weather resistan eaned and grraffiti resistance. cle All fixtures s and fittingss are to be off quality desig gn, robust, van ndal resistantt and easy to operate. Replacements should bbe readily ava ailable from major man nufacturers. Ex xterior Fin nishes Interior Finishes Materials arre to be robus st and have lo ongevity. A. Wall surfaces s Graffiti resisstant materialls must be co onsidered. Where posssible, walls sh hould be resisstant to etching and d not be painted over easilyy. Interior wa all surfaces arre to be selec cted to enable e ease of cle eaning: Skylights sh hould be vand dal resistant. External doors are to be robust, easilyy relined d. Hinges sho ould be heavy vy duty. or repainted All external doors are to be: m – at least 40mm tthick Solid in material Water re esistant finish Elevated d minimum 50 0mm above fl oor level to facilita ate easy wash hing out of the e toilet Consider th he use of low--level landsca aping along extern nal walls to provide a buffe er against van ndalism (graffiiti) to walls. Provide e vandal or im mpact resistant surface and easy to o clean finishees. If brick walls are to bbe used, morrtar joints ork to be eassily should be flush to eenable brickwo painted d if graffitied, or applied with a paint/ an ntigraffiti finish. a used, seleect epoxy gro out to provide e If tiles are greaterr resistance too graffiti. Doors and trims (if nnot in anodise ed/ powdere coated aluminium oor stainless steel) are to be d in enamel ppaint finish. painted Select splashbacks for ease of cleaning c and andal resistannce properties s. high va B. Floorr surfaces Floor surfa aces selectedd are to consider the follow wing P2 23: Metal finishes P2 25: Natural concrete Floor tiles – the surfface is to be non-slip n (minimum R10 slip rresistance) and fully vitrifie ed, poxy grouting . Darker tiles are preferred d to with ep lighter tiles. ete flooring – is to be finish hed with a nonConcre slip, he eavy-duty seaaler, epoxy pa aint or similarr materia al that is hardd-wearing and d suitable for hosing down (minim mum R10 slip resistance). d should be provided for cleaning Floor drains with flo oors to slope tto the drain to o avoid waterr pooling g. The drainaage grate sho ould have a vandal proof stainleess steel remo ovable cover. P24: External tiless 6: Masonry P26 4 46 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan F Fixtures and Fitttings to Public Toilets T A.. Toilet pan ns D. In high risk k areas prone e to vandalism m, toilet pans are to be wall-faced d, of stainlesss steel (minimum 304 3 gauge) with w integrated d stainless ste eel, close-cou upled with sta ainless steel shroud d to conceal drainage d and d water supply pipework. In lower ris sk areas, porcelain toilet p pans can be used. Toilet pans are e to be wall-fa aced, al pipework. close-coupled to concea he disabled are a to complyy with AS Toilets for th 1428.1-2009. Toilet pan n is to be wall -faced and closed coupled to co onceal pipew work. Basins In high h risk areas pprone to vand dalism – basin ns are to be b of stainlesss steel (minim mum 304 gauge)), wall mounteed with heavy y-duty supporrt frames. Basins are to have an in ntegrated stainles ss steel shrouud to conceal pipework. In lowe er risk areass – porcelain hand h basins can be used. Consiider the selec ction of an integrated basin withh porcelain shroud to concea al plumbing. Bracke ets should hott-dipped galva anised steel or stain nless steel. Basins for disabled toilets are to comply with 28.1-2009. AS 142 P29: Sttainless steel baasin with integra ated shroud – for high risk areeas P P27: Stainless steel pan – for high riss areas B.. P28: Porcelain n pan with conccealed cistern Cisterns Avoid expossed cisterns as a they can b be vandalised. Cisterns should be in-wa all cisterns witth heavy duty accesss panels, insta alled with rem mote or extended bu uttons. Alternativelyy, provide forr cisterns to b be housed in separate room or ductt, of width 750 0-900mm for servicing g, only accessible for main ntenance. C.. P30: Po orcelain basin w with integrated shroud s Each cistern n should be fitted with stop p taps to isolate each h toilet. Urinals Th he provision of o urinals can be undesirab ble as it do oes not offer privacy p loitering. Provide privvacy panels fo or individual u urinals (where posssible). Where a uriinal trough is provided, se lect a non-step tro ough to facilitate easy wasshout of the toilet. 4 47 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan E.. Tapware F. Plumb bing fixturess Tapware is to be robust and vandal-re esistant – of stainless steel or chrome-plated su urface and brass in nteriors. All plum mbing fixturess and fittings are to be selecte ed for whole-oof-life conside erations on installation, maintennance and wa ater conserv vation. nd All tapware must be easiily sourced an replaced. ed for ease-off-use by Tapware is to be selecte people with variable strength and han nd control. pstan For manual operation – a lever or cap handle is prreferred. ap could be Alternativelyy, a sensor ta considered as a water sa aving measurre. egulators Install waterr efficient taps with flow re or time conttrolled to save e water – min nimum AAAA rating g. bicles Tapware forr accessible/ disabled cub must comply with AS 142 28.1-2009. Incomin ng and drainaage pipes sho ould be concea aled (where ppossible), or with w use of basins with shroudss to prevent va andalism. e substantial noggings and d concealed Provide framing g to support aall wall mountted fixtures and fittings, grab raiils and accessories. All fixings and accesss panels are e to be vandalproof. Pipewo ork (water suppply and drain nage) are to be concealed (wherre possible) in n access ductts and ceiling spaces. s panels mustt be secured with stainlesss Access steel an nd vandal-prooof fixings. G. Waterr supply Where possible, greey water (such as roof and d stormw water) should be reticulated d for toilet flushing g. Taps should be suppplied with pottable water. P3 31: Lever tapwa are P32: Sensor tapware Where water tanks aare provided, these should d be loca ated to avoid vvandalism, su uch as underground or secuurely housed. 4 48 N orth Sydne ey Public Am menities Strrategy + Ac ction Plan H.. Ancillary fixtures and d fittings Ite ems Insstall the follow wing fixtures and fittings to o sa anitary facilitie es: Toilet paperr dispenser/ to oilet roll holde er (lockable) Hand dryer (preferred) w integrated d bin Paper towell dispenser with (optional) nser (lockable e) Soap dispen n (Female toilets only) Sanitary bin b change tables Fold-down baby Mirrors Hooks in toiilet cubicle (optional) ear basins (op ptional) Shelving ne Grab rails o be out Sharps conttainers – to be mounted to of reach of children c (1.6m m above floorr level (optional) Selection and installattion All ancillary fixtures aand fittings must m be robusst cure/ lockablee. and sec Hand dryers and soaap dispensers s are to be in ss steel finish with vandal-proof fixings. stainles Grab ra ails for Disableed or Ambula ant toilets are to be se elected and innstalled in accordance with h AS 1428.1-2009. Grrab rails must be secured to the structural fram me or solid ma asonry wall. All fixtures and fixturres in Disable ed toilets are h AS 1428.1to be installed in acccordance with 2009. I. Hardw ware Door ha ardware is to be robust and vandal-proo of. Hardwa are is to be reeadily replaceable from major suppliers and manufacturers. hes should be e All doorr levers, handdles and latch easily operable o by peersons of all abilities, dexterity and hand m mobility. Door ha ardware to Dissabled and Ambulant A toilets is s to comply w with AS 1428.1-2009. P P33: Stainless steel s toilet roll holderr (lockable) P P35: Soap dispenserr P34: P Electric ha and dryer y change table ((foldable) P36: Baby – rec cessed or surfacce moun nted 4 49