JSKI Installation-, adjustment and user guide
Transcription
JSKI Installation-, adjustment and user guide
JSKI Installation-, adjustment and user guide WWW.JEVEN.COM PAGE 2 JEVEN Kitchen ventilation Table of Contents Installation of hanging brackets 3 Fixture points and connecting the hood modules 4 Light fittings 5 Installation of covering boards 6 Installation of condensation baffles 7 Exhaust air k-coefficient 8 Installation of the fascias 9 Air flow measuring points and location of k-coefficient stickers 10 Adjustment of supply air pattern 11 Supply air measurement chart and k-coefficient 12 Cleaning 13 Contact us: All rights reserved [email protected] 010 231 2030 WWW.JEVEN.COM PAGE 3 JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air INSTALLATION OF HANGING BRACKETS 1 4 1. 2. 3. 4. Hanging bracket Bolt Corner profile Hanging bar (not included in the delivery) 1 Hanging brackets should be mounted in the corner profiles with help of the bolts. 2 2 3 3 ALTERNATIVE 1. 2. 3. 4. Hanging bracket Bolt Corner profile Hanging bar (not included in the delivery) 3 Hanging bracket can be also mounted inside the corner profile close to the lower edge of the hood. Holes for this installation should be drilled to the profile on the site. This alternative installation is advisable when the hood should be mounted on the corner of the kitchen. 2 4 115 1 WWW.JEVEN.COM All rights reserved PAGE 4 JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air FIXTURE POINTS AND CONNECTING THE HOOD MODULES L-40 1 B-40 2 4 3 1. Hanging bar (not included in the delivery ) 2. Hanging bracket 3. Nut 4. Bolt 5. Corner profile 6. Hexagonal tool 6 L B 5 The hood shall be installed by hanging bars (f.ex. M8). These bars are not included in the delivery. Holes for the hanging bars should be drilled to the ceiling of the kitchen by using the shown fixture points. Recommended height position of the hood is 2100-2200 mm. Install plastic protective corner profiles on the lower end. All rights reserved WWW.JEVEN.COM JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air LIGHT FITTINGS 1. Light fitting 2. Cable 2,0m 2 Every hood module incorporates as standard a recessed fluorescent light fitting. Light fitting (IP 65-67) is supplied with cable, which should be connected to brach box (not included in the delivery) and light tubes. All tubes are standard white fittings. 1 Wiring diagram Light N L1 branch box (not included in the delivery) REMOVING TUBES 1. Cover 2. Latch 3. Light tube 2 3 2 3 1 Cover 1 is removed by opening latch 2 , by pulling them shown in the picture. 1 WWW.JEVEN.COM All rights reserved PAGE 5 PAGE 6 JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air INSTALLATION OF COVERING BOARDS Boards shall be placed to right height and the holes shall be drilled and the board shall be riveted. All rights reserved WWW.JEVEN.COM JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air INSTALLATION OF THE CONDENSATE BAFFLES 1. 2. 3. 4. V-plate Condensate baffle Condensate gutter Outer casing 4 1 2 3 The lower edge of the baffle should be placed on the condensate gutter and the upper part should be placed as hanging from V-plate. 1 2 3 1 2 3 WWW.JEVEN.COM All rights reserved PAGE 7 PAGE 8 JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air K-COEFFICIENT EXHAUST AIR Baffle type Hoods length m 1/1 2/1 2/2 K1 m³/h K2 l/s 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 105 115 126 136 147 157 168 178 189 199 210 29,1 32,0 34,9 37,8 40,7 43,7 46,6 49,5 52,4 55,3 58,2 K1 m³/h K2 l/s 130 143 156 168 181 194 207 220 233 246 259 36,0 39,6 43,2 46,8 50,4 54,0 57,6 61,2 64,8 68,4 72,0 K1 m³/h K2 l/s 155 170 186 201 217 232 248 263 279 294 310 43,0 47,3 51,6 55,9 60,2 64,5 68,8 73,1 77,4 81,7 86,0 Baffle type Hoods length m 1/1 2/1 2/2 K1 m³/h K2 l/s 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 220 230 241 251 262 272 283 293 304 314 61,1 64,0 66,9 69,8 72,8 75,7 78,6 81,5 84,4 87,3 K1 m³/h K2 l/s 272 285 298 311 324 337 350 363 376 389 75,6 79,2 82,8 86,4 90,0 93,6 97,2 101 104 108 K1 m³/h K2 l/s 325 341 356 372 387 402 90,3 94,6 98,9 103 108 112 Q=Kx Pm 418 433 449 464 116 120 125 129 2 Pm = (Q/K) Pa Baffle types: 1/1= one line of holes on top of the baffle and one line of holes on the bottom of the baffle 2/1= two lines of holes on top of the baffle and one line of holes on the bottom of the baffle 2/2= two lines of holes on top of the baffle and two lines of holes on the bottom of the baffle All rights reserved WWW.JEVEN.COM JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air INSTALLATION OF THE FASCIAS Attention! There should be min. 15 mm free place between the ceiling and the upper point of the fascia. Attention! Min.15mm The fascias are easily installed by lifting them up so that the upper lip of the fascia goes inside the hood opening. Tilting the lower edge towards the hood and then lowering the fascia until its lower edge is on the same level as the hoods lower edge. WWW.JEVEN.COM All rights reserved PAGE 9 PAGE 10 JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air AIR FLOW MEASURING POINTS K-COEFFICIENT STICKERS xxxxxxxxx xxxxxxxxx Pm Pm Supply air Exhaust air (Behind the condensate baffles) xxxxxxxxx xxxxxxxxx Exhaust air Supply air (Behind the condensate baffles) ADJUSTMENT OF THE SUPPLY AIR Hoods are supplied from factory with suitable air flow rates for pressure loss 25-35 Pa. When fine adjustment is needed, detach the supply air fascia and adjustment units. All supply air fascias should be placed on when the measuring of the air flows is in operation. Adjustment units in the canopies are only for balancing the air flows of the supply air units. The dampers should be placed on the main and branch ducts for adjustment of the total air flows. Adjustment unit All rights reserved WWW.JEVEN.COM JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air ADJUSTMENT OF THE SUPPLY AIR PATTERN By turning the vertical guide profiles inside the fascia, pattern of the air flow can be changed 1 1 1- way throw 2 Displacement throw Throw upside 3 2-way throw Factory setup By turning the horizontal guide profiles inside the fascia can throw direction be changed. The fascias are supplied with adjustable personal supply air nozzles. The kitchen staff can personally adjust the air flow pattern with the help of these nozzles. WWW.JEVEN.COM All rights reserved 3 2 Throw downside PAGE 11 PAGE 12 JEVEN Kitchen ventilation JSKI Condensation Hood with Supply air SUPPLY AIR MEASUREMENT CHART AND K-COEFFICIENT H=500 mm B=200 mm H=290 mm B=500 mm 120 100 80 70 60 50 H 40 B H=500 mm B=500 mm 32 28 24 20 16 14 12 10 8 7 6 5 4 3 25 30 40 100 50 60 200 80 100 120 300 160 200 240 500 700 dm³/s 1000 m³/h Pm(Pa)= Measured pressure difference, Pa H= Height of the supply air unit, mm B= Width of the supply air unit, mm K-coefficient supply air Hood height 330 Supply air unit 540 Width,mm 200 500 500 Height,mm 500 290 500 K1(m3/h) 77.0 96.0 192 K2(l/s) 21.4 26.7 53.3 Q=Kx Pm 540 2 Pm = (Q/K) Pa All rights reserved WWW.JEVEN.COM JEVEN Kitchen ventilation PAGE 13 JSKI Condensation Hood with Supply air CLEANING OF THE CONDENSATE BAFFLES Condensate baffles should be detached by lifting them up and should be washed in a dishwasher. After washing they should be returned to their places. CLEANING OF THE HOOD SURFACES Hood surfaces should be cleaned during normal kitchen cleaning. Normal washing detergent of the stainless steel may be used. CLEANING OF THE FASCIAS 19.8.2015 Fascias should be cleaned during normal kitchen cleaning. About twice a year it is advisable to detach the fascias and wash them in a commercial dishwasher. These fascias are easily removed by lifting them up, tilting the lower edge towards you and then lowering the fascia out of the canopy. WWW.JEVEN.COM All rights reserved