Presentation - June 7th - Mindaugas Butnorius
Transcription
Presentation - June 7th - Mindaugas Butnorius
Experience in developing East-West transport corridor – challenges and opportunities Mindaugas Butnorius Freight Flows in 2001-2011 mln. Tkm 60 50 43,4 20 Mln.t. 50,2 55,0 52,3 48,1 14 373 14 748 29,2 11 457 11 637 12 457 12 896 13 431 20000 16000 42,7 36,7 40 30 45,6 49,3 53,5 15 088 12000 11 888 9 767 8000 7 741 4000 10 0 0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Mln.tkm mln. T 0 Liechtenstein Ireland Luxembourg Greece Denmark Croatia 80000 Bulgaria 100000 Slovenia Norway Portugal Belgium Netherlands Estonia Slovakia Spain Hungary Finland Turkey Switzerland Romania Lithuania Czech Republic Latvia Italy United Kingdom Austria Sweden France Poland Germany mill.tkm Railways freight transportation volumes in Europe (mill.ton kilometers) 120000 2008 2009 2010 60000 40000 20000 Lithuanian Railways are at the crossroads of International Freight Transportation Corridors Corridor “EAST-WEST” FINLAND RAIL BALTICA EU Baltic-Adriatic Corridor St. Petersburg EU freight corridor No.8 Container train VIKING Klaipėda DENMARK UK Rotterdam Berlin GERMANY POLAND Moscow TransSiberian Railroad Kazakhstan China Kaunas LITHUANIA Vilnius Minsk BELARUS Warsaw Kiev RUSSIA UKRAINE FRANCE ITALY Odessa Illichivsk Black Sea TURKEY Lithuanian logistic hubs Klaipėda Port Logistic centers Klaipeda Railway network Rail Baltica Container terminals Kaunas Vilnius Šeštokai EU Kena CIS Development of the IX Corridor in 2012-2015 Seconds track Kūlupėnai-Kretinga 102.2 million LTL Seconds track Plungė-Šateikiai 67.7 million LTL Seconds track Telšiai-Dūseikiai 22.8 million LTL Reconstruction of Pauostis railway bed 85.6 million LTL Modernization of alarm system of Radviliškis-Šiauliai line 90.5 million LTL Šiauliai Reconstruction of Klaipėda station tracks 8.6 million LTL Seconds track Telšiai-Lieplaukė 63.9 million LTL Radviliškis Seconds track Pavenčiai-Raudėnai 45.6 million LTL Seconds track Lukšiai-Ţeimiai Klaipėda Reconstruction of Draugystė station 109.1 million LTL Reconstruction of Rimkai station 22.8 million LTL Pagėgiai Seconds track Gimbogala-Linkaičiai 92.5 million LTL Modernization of alarm system of ŠilainiaiKėdainiai seconds track Modernization of alarm system of GaiţiūnaiJonava seconds track Reconstruction Vilnius-Kaunas 305.5 million LTL 92.5 million LTL Modernization of alarm, telecommunication and power equipment of Kaunas bypass and Kaunas-Kybartai line 138 million LTL Traffic control center 74.2 million LTL Kaunas Kybartai Kaišiadorys Vilnius Kena N.Vilnia -Kena railway line modernization for 160 km/h speed 62.2 million LTL Reconstruction of Vilniaus bypass 166.4 million LTL Public logistic centers • Creation of three public logistic centers in the regions of Vilnius, Kaunas and Klaipėda is specified in the Transport Strategy adopted by the Government of the Republic of Lithuania; • As per the resolution of the Government of the Republic of Lithuania and order of the Minister of Transport and Communications of the Republic of Lithuania, the main development engineer for the public logistic centers in Vilnius, Kaunas and Klaipėda is JSC Lithuanian Railways; • The Government of the Republic of Lithuania accepted the projects of public logistic centers in Vilnius and Kaunas as economically significant projects. Vilnius public logistic centre A joint venture together with Vilnius city municipalty was established in 2011 for development of logistic park Logistic park are– 4 land pots for a firs stage are offerd for private investment into warehouses (2.5 ha to 13.6 ha). More than 300 hectares are there for expansion; It is planned to start construction of inland intermodal terminal beggining of 2013 Storage capacity of the terminal – 1 500 containers TEU. Loading area – 600 m (in the Ist stage of the project) and 1000 m (in the IInd stage of the project). Loading capacity – more than 100 thousand TEU per year. Close to one of a biggest rail marshalling yeard of IX International Transport Corridor. Kaunas public logistic centre Dviejų vėžių intermodalinis terminalas Palemonas 1435 mm vėžė ,,europinė” 1520 mm vėžė ,,rusiška” Kaunas LC Layout plan Two gauge intermodal terminal in Kaunas LC 1435 mm railway gauge New “European” gauge “Rail Baltica” line Main highway „Klaipeda-Vilnius“ Transhipment sheme Klaipėdos viešasis logistikos centras Intermodal trains 1. «MERKURIJUS» Klaipėda\Kaliningradas – Minskas – Maskva 2. «SAULĖ» Čongčingas (Kinija) – Antverpenas (Belgija), tranzitu per Šeštokus (Lietuva) Klaipėda (Lietuva) – Gudogai (Baltarusija) – Ozinki (Rusija) – Alma-Ata (Kazachstanas) 3. «ŠEŠTOKAI EХPRESS» Western Europe– Šeštokai – Smolensk – Šeštokai – Western Europe 4. «VIKING TRAIN» Klaipėda – Minsk – Kijev– Iljičiovsk 5. «VILNIAUS SHUTTLE» Vilnius – Klaipėda – Vilnius Container tornover in Klaipėda seapor according to countries of origin, TEU 250 000 202 862 200 000 150 000 100 000 55 241 50 000 41 926 24 487 0 15 854 14 933 11 564 5 107 4 398 2 892 2 555 368 326 ‚196 ro-ro units: -94‘788 trucks and trailers; -62‘299 trailers Oil products Fertilizers Ro-Ro Containerized cargo Thank you!