ARANETA CENTER, CUBAO, QUEZON CITY, PHILIPPINES
Transcription
ARANETA CENTER, CUBAO, QUEZON CITY, PHILIPPINES
NOVOTEL HOTEL ARANETA CENTER ARANETA CENTER, CUBAO, QUEZON CITY, PHILIPPINES 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER schedule 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance WORKS STARTED COMPLETED EXCAVATION WORKS JANUARY 2011 OCTOBER 2011 FOUNDATION OCTOBER 2011 APRIL 2012 SUPERSTRUCTURE / TOP OFF JULY 2012 JULY 2014 ARCHITECTURAL AUGUST 2012 MARCH 2016 WATER TIGHTNESS DECEMBER 2013 DECEMBER 2015 ID FITOUT 2016 FF AND E 19 MARCH 2016 FEBRUARY 2014 MARCH 2015 MARCH MARCH 2016 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance CONTRACT TIME START ORIGINAL SCHEDULE 16 MARCH 2012 EOT 1 (105 DAYS) 01 JUNE 2014 EOT 2 AND 3 (133 DAYS) 14 SEPTEMBER 2014 23 JANUARY 2015 EOT 4 (132 DAYS) 24 JANUARY 2015 04 JUNE 2015 EOT 5 (171 DAYS) 05 JUNE 2015 23 NOVEMBER 2015 ACTUAL COMPLETION 24 NOVEMBER 2015 31 MARCH 2016 4 YEARS 19 MARCH 2016 COMPLETION 31 MAY 2014 13 SEPTEMBER 2014 NOVOTEL HOTEL ARANETA CENTER prevailing conditions 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER prevailing conditions DESIGN PROBLEM STARTED WITH THE STRUCTURAL DESIGN. CONSTRUCTION WAS HELD IN ABEYANCE WHEN THE OWNER DECIDED TO VALUE ENGINEER THE STRUCTURAL DESIGN WHICH CAUSED THE PROJECT TO STOP FOR ALMOST ONE YEAR. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER prevailing conditions DESIGN INCOMPLETE MEPF AND AUXILLIARY INDIVIDUAL SYTEM DESIGN INCOMPLETE MEPF AND AUXILLIARY INTERFACING SYSTEM DESIGN CONSTANT CHANGES IN THE ARCHITECTURAL AND ID PLANS UNCOORDINATED MEPF AND AUXILLIARY SYSTEMS WITH RESPECT TO THE ARCHITECTURAL AND INTERIOR DESIGN 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER prevailing conditions DESIGN INEFFECTIVE COMBINED SERVICES PLANNING AND IMPROPER IMPLEMENTATION UNIMPLEMENTED HOTEL OPERATOR REQUIREMENTS WHICH BECAME ADDITIONAL WORKS OPERATOR HAS ADDITIONAL REQUIREMENTS AS WISH LIST 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER prevailing conditions STAKEHOLDERS ID PLANNER IS FOREIGN. FILIPINO COUNTERPART CANNOT DECIDE THAT IT TAKES A LONG TIME TO DECIDE. MEPF AND AUXILLIARY CONSULTANTS NOT AVAILABLE FOR MEETINGS. ITEMS NEED LONG LEAD TIME TO DECIDE ON PRIOR TO SET MEETING. IN HOUSE ARCHITECT MENTALITY. LIGHTING CONSULTANTS NOT AVAILABLE FOR MEETINGS 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER prevailing conditions OWNER OWNER TREATS DCI NOT AS PM BUT AS A CONTRACTOR OWNER TREATS DCI NOT AS PM BUT AS A DESIGN MANAGER COMMERCIAL AND BILLING ISSUES PREVENTED BY OWNER FROM BEING DISCUSSED IN COORDINATION MEETINGS OWNER’S REPRESENTATIVE IS IRRATIONAL AND ILLOGICAL 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER prevailing conditions COMMERCIAL LONG PROCESS OF PAPER FACILITATION 01 PMI WITH CVI 02 COCA WITH COC 03 COC CERTIFICATION THAT THE PROJECT IS REALLY COMPLETE 04 COC SHOULD BE WITH SETTLED PUNCHLIST AND PICTURES, BILLINGS OWNER SUPPLIED MATERIALS (OSM) ON IRRATIONAL AWARDING CONTRACTOR’S SCOPE ON ILLOGICAL AWARDING 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance prevailing conditions COMMERCIAL OSM DELAY DELIVERY, WRONG AND DEFECTIVE DELIVERY (AFTER LONG LEAD TIME AND BEING LATE) RESULTING TO MODIFICATION AND REPLACEMENT AND ADDITIONAL PMI PRIOR TO PO AND DELAYED PROJECT TURN OVER ADVANCE ADVANCE DELAY DELAY DELAY MEPF EQUIPMENT WERE ORDERED AND DELIVERED PRIOR TO START OF CONSTRUCTION, HENCE WARRANTY EXPIRED 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER prevailing conditions CONTRACTOR CONTRACTORS ARE HARD HEADED AND UNCOOPERATIVE. THEY STICK TO WHAT IS IN THE PLAN EVEN THOUGH INCOMPLETE. THERE IS NO SENSE OF RESPONSIBILITY. SUBCONTRACTOR’S PROGRESS WORK IS CONTROLLED AND DELAYED DUE TO THE GENERAL CONTRACTOR’S COMMERCIAL ISSUE CONTRACTORS LACK COORDINATION 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER prevailing conditions CONTRACTOR CONTRACTORS WILL NOT ORDER MATERIALS AND WILL NOT START WITHOUT APPROVED PMI AND PURCHASE ORDER (PO) APPROVAL OF CVI THEN PMI FOLLOWED BY PO ISSUANCE NORMALLY TAKES TWO (2) MONTHS PONG PAGONG 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS (MECHANICAL SYSTEM) MECHANICAL SYSTEM (CHILLED WATER) PMI = 67 ITEMS SEE FOLLOWING SLIDES EXAMPLE 1 EXAMPLE 2 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS MECHANICAL SYSTEM (EXAMPLE 1) MECHANICAL WORK ISSUES FCU MIXING BOX FOR FRESH AIR ( MUST BE INCLUDED TO FAN COIL UNIT) 1. FCU MIXING BOX DUCT WORKS SCOPE OF MECHANICAL CONTRACTOR NOTE: 1. FCU MIXING BOX FOR FRESH AIR ( MUST BE INCLUDED TO FAN COIL UNIT) DUCT WORKS SCOPE OF MECHANICAL CONTRACTOR 19 MARCH 2016 2. 3. APPROVED FCU HAS NO MIXING BOX DCI ISSUE PMI TO DO ON SITE FABRICATION OF FCU MIXING BOX Php 636, 080.16 TOTAL OF ADDITIONAL COST NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS MECHANICAL SYSTEM (EXAMPLE 2) MECHANICAL WORK ISSUES 2. FCU MAGNETIC CONTACTOR NOTE: 1. ELECTRICAL PLAN PROVIDES TWIST LOCK OUTLET ONLY AND ECB FOR SOME FCU 2. FCU SUPPLIER CONTRACT IS UP TO DELIVERY AND TESTING OF THE UNIT ONLY, NO CONTROLLER INCLUDED 3. MECHANICAL CONTRACTOR CONTRACT IS TO INSTALL THE FCU ONLY 4. MISSING IS THE FCU MAGNETIC CONTACTOR. PMI ISSUED TO OTHER SUPPLIER 5. Php 4, 200, 000 IS THE TOTAL COST OF FCU MAGNETIC CONTACTOR 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS (ELECTRICAL SYSTEM) ELECTRICAL SYSTEM PMI = 70 ITEMS SEE FOLLOWING SLIDES EXAMPLE 1 EXAMPLE 2 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS ELECTRICA SYSTEM (EXAMPLE 1) ELECTRICAL WORKS ISSUES 1. Neutral Wire from LVSG2 to PP‐25 NOTE: 1. Single line diagram and schedule of loads are designed to be Y50 only meaning Three wires of 50mm2 plus ground of one gauge lower. 2. But in the schedule of loads clearly there are single phase loads to be served. 3. Therefore there is need of Neutral wire to be able to serve and balance the single phase loads. 4. The designation must be “Z50” meaning Four wires (including the Neutral Wire) plus ground of one gauge lower. 5. Php 480,000.00 Total Cost 5. Php 480,000.00 Total Cost 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS ELECTRICA SYSTEM (EXAMPLE 2) ELECTRICAL WORKS ISSUES 2. Magnetic Contactor for Keycard Room Switch 1. In the schematic diagram of the electrical designer as you can see there is no contactor placed but rather only the Keycard switch to carry all the loads inside the hotel room. (Right photo) 2. Through series of meetings it was discuss and concluded that there should be a magnetic contactor involved in the circuit for it to carry all loads as its contacts connects and disconnects. (Left photo) 3. Otherwise if only the Keycard which has only the maximum ampacity of 20 Amps to be used as switch to carry the whole hotel room electrical load, it cannot withstand the load and might just melt and burn. 4. Php 1,800,000.00 Total Cost 5. Php 480,000.00 Total Cost 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS (PLUMBING SYSTEM) PLUMBING SYSTEM PMI = 46 ITEMS EXAMPLE 1 EXAMPLE 2 EXAMPLE 3 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS PLUMBING SYSTEM ( EXAMPLE 1) PLUMBING ISSUES 1. Wiring from lineside to loadside for power supply requirement of heat pumps ‐ QS (BK Asia) missed including this in anybody’s scope; later declined (due to commercial issues) by EEI when requested, finally convinced heat pump supplier Amici. Lapse by QS team caused delay that had the heat pump system almost not making the deadline. TOTAL COST 19 MARCH 2016 PHP 528,000.00 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS PLUMBING SYSTEM ( EXAMPLE 2) PLUMBING ISSUES 2. Ancillary for circulating pumps – only 2 out of 9 sets included in EEI contract, same declined (commercial issue, again) the remaining 7 sets; Amici took on the scope. Caused delay due to incomplete scoping, late acceptance by contractor and procurement lead time. TOTAL COST 19 MARCH 2016 PHP347,000.00 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance major obstacles and solutions COMPLETENESS OF PLANS PLUMBING SYSTEM ( EXAMPLE 3) PLUMBING ISSUES 3. Power supply for blowers of heat pumps – requires 230V, design provision is 380V. Transformers provided since no neutral line was laid up to the heat pump room. Consultant DCCD lapse, PMI issued to Amici. TOTAL COST 19 MARCH 2016 PHP 147,000.00 NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COMPLETENESS OF PLANS EACH OF THE MISSED OUT PLAN IN THE MEPF AND AUXILLIARY IS IDENTIFIED, LISTED AND COLLECTED BY DCI THEN SETTLED GRADUALLY BY REQUESTING EACH OF THE CONSULTANT’S PRESENCE IN THE WEEKLY MEETING. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COMPLETENESS OF PLANS CONSULTANTS ARE REQUESTED TO APPROVE HAND WRITTEN DRAWINGS INSTANTLY IN THE MEETING AS ADVANCE COPY BUT USED FOR IMPLEMENTATION. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COMPLETENESS OF PLANS OWNER SIDE EXECUTIVES, THROUGH DCI RECOMMENDATION DECIDE TO STOP ALL KINDS OF CHANGES IN THE PLANS AND REQUIRE THE FILIPINO ID REPRESENTATIVE TO DECIDE INSTANTLY REGARDING ID ISSUES, OTHERWISE WILL BE SUPERSEDED BY THEM. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COMMERCIAL ISSUE DCI REQUESTED FOR A FULL TIME ENGINEER FROM BK ASIA (QUANTITY SURVEYOR) TO FINALIZE AND CONFIRM ALL THE SCOPE OF WORK THAT WERE MISSED OUT IN THE AWARDING FROM TIME TO TIME 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COORDINATION OF TRADES TABULATION OF MISSED OUT ITEMS AND DESIGN IN THE SCOPE AWARDED WITH COMPLETION SCHEDULE 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COORDINATION OF TRADES 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COORDINATION OF TRADES 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COORDINATION OF TRADES 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions COORDINATION OF TRADES TROUBLE SHOOTING IN THE IMPLEMENTATION DAILY COORDINATION MEETING, 8:30AM, MONDAY TO SUNDAY, STARTED LAST SEPTEMBER 2015 TO JANUARY 2016 AND MONDAY TO SATURDAY FROM FEBRUARY 2016 TO MARCH 2016. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions DCI MULTI TASKING DCI RENDERED A 1 HOUR PER SATURDAY (AFTER OFFICE HOURS) MEPF AND AUXILLIARY SYSTEM FAMILIARITY TRAINING FOR ALL NOVOTEL DCI STAFF, AS WELL AS DISCUSSION OF THE TOPIC PRINCIPLES AND PROBLEMS ENCOUNTERED. DCI STAFF WERE INDIVIDUALLY ASSIGNED PER FLOOR, OBLIGED TO ACCOMMODATE ALL OF THE BALANCE OF WORKS AND OTHER CONCERNS (AT THE ASSIGNED FLOOR), INVOLVING ALL DISCIPLINE, BACKED-UP BY THE CONSTRUCTION PROJECT MANAGER 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions QUICK RESPONSE CONTRACTORS TO HELP OUT IN THE COMPLETION OF WORK MISSED OUT IN THE DESIGN AND AWARD, DCI WAS ABLE TO REQUEST THE PROJECT OWNER REPRESENTATIVES TO INSTRUCT CONTRACTORS TO START IMMEDIATELY EVEN WITHOUT A PURCHASE ORDER. A PMI SIGNED BY DCI CPM ALONE PRIOR TO ROUTING WOULD SUFFICE. FOUR (4) MORE CONTRACTORS WERE GIVEN BY THE PROJECT OWNER. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions MAJOR INCIDENT AFFECTING COMPLETION ELECTRICAL SYSTEM EXPLOSION IN THE TRANSFORMER VAULT ROOM CREATING FLASHOVER DAMAGES TO THE LOW VOLTAGE SWITCH GEAR. THIS INCIDENT WAS SETTLED WITH THE HELP OF QCMD AS PROJECT SUPPORT. MAJORITY OF THE OSM EQUIPMENT IN THIS AREA ARE OLD AND DELIVERED 1 TO 3 YEARS PRIOR TO OPERATION, HENCE THE WARRANTY COVERAGE HAS ALREADY EXPIRED. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions MAJOR INCIDENT AFFECTING COMPLETION MECHANICAL SYSTEM LED MONITORS OF CHILLERS MALFUNCTIONING, CHILLER OCCASIONAL TRIPPING AND NEED DESCALING AND SWABBING FOR NORMAL OPERATION. THE CHILLERS WERE DELIVERED THREE (3) YEARS AGO PRIOR TO OPERATION, HENCE THE WARRANTY COVERAGE HAS ALREADY EXPIRED. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions MAJOR INCIDENT AFFECTING COMPLETION PLUMBING AND SANITARY SYSTEM THERE ARE NUMEROUS WATER LEAK AND CLOGGING (BACK FLOW) INCIDENTS, MALFUNCTIONING PUMPS. MAJORITY OF THE WATER LEAK INCIDENT IS CAUSED BY ILLOGICAL AWARDING OF SCOPE OF WORK WITH FIT-OUT CONTRACTOR TAPPING AND INSTALLING ALL THE PLUMBING FIXTURES, WHILE STUB-OUT IS PROVIDED BY PLUMBING CONTRACTOR. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions MAJOR INCIDENT AFFECTING COMPLETION PLUMBING AND SANITARY SYSTEM A QUICK RESPONSE TEAM WAS FORMED TO SETTLE ALL OF THE CLOGS AND LEAKS, MONITORED AND DIRECTED BY DCI. DCI ALSO REQUIRED ALL THE MEPF CONTRACTORS TO PROVIDE STUB-OUT AUDIT, TO FINALLY AVOID THE SAME LEAKS PRIOR TO WATER OPERATION, ON A PER FLOOR BASIS. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions MAJOR INCIDENT AFFECTING COMPLETION HOUSEKEEPING SOME CONTRACTORS WERE INSTRUCTED BY DCI TO HAUL OUT ALL KINDS OF TRASH AND DEBRIS AND BACK CHARGE TO ALL CONTRACTORS, ON A PRO-RATA BASIS. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER major obstacles and solutions MAJOR INCIDENT AFFECTING COMPLETION STEALING INCIDENT DCI PROVIDED A COLLECTIVE TURNOVER TO THE FITOUT CONTRACTOR SINCE SAME IS THE ONE IN CONTROL OF THE AREA THAT WILL BE AFFECTED. AS A PREREQUISITE TO THE COLLECTIVE TURNOVER, MEPF CONTRACTORS ARE REQUIRED TO CONDUCT INVENTORY OF INSTALLED MATERIALS, SIGNED AND CONFIRMED BY THE FITOUT CONTRACTOR. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER learnings 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER learnings MANAGING STAKEHOLDERS MANAGING STAKEHOLDERS IS NOT EASY SPECIALLY WHEN THE STRUCTURE IS CORPORATE BUT RAN AS AUTONOMOUS OWNER. ALTHOUGH THE TEMPERAMENTS OF THE OWNER STAKEHOLDERS ARE UNIQUE, DCI LEARNED TO ADAPT AND COMPLY WITH THEIR SOMETIMES ILLOGICAL REQUESTS. LUCKY ARE THE YOUNG DCI PROFESSIONALS AS THEY HAVE EXPERIENCED HANDLING STAKEHOLDERS WHO ARE STAGE GRABBERS AND ‘PAPOGI’. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER learnings PLAN REVIEW IT STARTED AS VALUE ENGINEERING FOR THE STRUCTURAL WORKS WHICH PROMPTED THE CONSTRUCTION TO STOP FOR ALMOST ONE (1) YEAR. THERE WERE A LOT OF CLASHES BETWEEN DESIGN TRADES WHICH PRODUCED NUMEROUS PMIs AND CHANGE ORDERS. FOR MANY SITUATIONS, FOR FASTER RESULTS, THE PM TEAM IS ABLE TO DOUBLE CHECK EACH PROVIDED DESIGN, HENCE THE DESIGN MANAGEMENT FEE SHOULD BE BUILT IN INTERNALLY IN THE PM COST PROPOSAL. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER learnings PRESSURE OF DEADLINES THE PROJECT EXPERIENCED 4 EXTENSIONS THAT PUSHED IT TO 4 YEARS OF CONSTRUCTION UNTIL COMPLETION. THE ORIGINAL COMPLETION TIME WAS ON 31 MARCH 2014 BUT DUE TO ITEMS MENTIONED PREVIOUSLY, THE EXTENSION HAPPENED DCI LEARNED THAT IN SITUATIONS LIKE THESE THERE ARE WAYS TO FAST TRACK THINGS THAT ARE SUPPOSED TO BE COMPLETED WITH THE HELP OF THE ENTIRE TEAM BUT DCI AS THE FLAG BEARER. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER learnings AUGMENTATION OF DIRECT REPORTS THE PM PROPOSAL SHOULD ALREADY CONTAIN AUGMENTATION OF STAFF SPECIALLY ON THE FINISHING AND FIT OUT STAGE. BASED ON THE NOVOTEL EXPERIENCE, WE HAD TO AUGMENT WITH 3 CPID AND 3 CPA INCLUDING MEPF COMPARED TO A DEPLOYMENT OF 1 EACH. THE AUGMENTATION WAS APPROVED BY OWNER SEEING THE NECESSITY OF SUCH, SO THE ORIGINAL MANPOWER WAS DOUBLED AND WE WERE CONSEQUENTLY PAID. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER learnings TIME MANAGEMENT BECAUSE OF PRESSURE TO DELIVER THE PROJECT ON A 24 / 7 WORK SCHEDULE WAS PROPOSED BY DCI AND IMPLEMENTED, EACH OF OUR STAFF IS REQUIRED TO RENDER AT LEAST 12 HOURS A DAY ON A ROTATION SCHEDULE. A COMMITMENT WAS INSTILLED IN EVERY DCI STAFF. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER learnings SUGGESTIONS HOUSEKEEPING SHOULD BE A PROCURED ON A SEPARATE COMPANY, WHICH ACTIVITY WILL BE LED BY PROJECT MANAGER. SECURITY SHOULD ALSO BE BY A SEPARATE COMPANY, TO BE PROVIDED BY THE OWNER, AFTER DEMOBILIZATION OF THE GENCON SECURITY. OWNER SUPPLIED EQUIPMENT SHOULD BE DELIVERED ONLY AT THE TIME NEEDED. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER learnings SUGGESTIONS FOR ELECTRICALLY RELATED OSM, ONLY 70% OF THE SUPPLIERS CONTRACT SHOULD BE ALLOTTED FOR DELIVERY, WHILE THE 30% SHOULD BE RELEASED AFTER TESTING AND COMMISSIONING. DESIGN MANAGEMENT COST SHOULD BE A COST ITEM IN THE PM PROPOSAL. 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER video 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance square restaurant/all day dining (ground floor) 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER ballroom (2nd floor) 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER swimming pool (6th floor) 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER pool bar (6th floor) 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER wedding garden (6th floor deck) 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER presidential suite (25th floor) 19 MARCH 2016 pioneer, people, performance NOVOTEL HOTEL ARANETA CENTER in passing after 4 years… 19 MARCH 2016 pioneer, people, performance NOVOTEL FOM START TO FINISH NOVOTEL HOTEL ARANETA CENTER 2012 2016 2014 19 MARCH 2016 pioneer, people, performance 2015 2013 NOVOTEL HOTEL ARANETA CENTER epilogue 19 MARCH 2016 pioneer, people, performance NOVOTEL FOM START TO FINISH NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance BECAUSE OF THE COMMITMENT INSTILLED TO THE WHOLE MEMBERS OF NOVOTEL DCI TEAM, EVERY QUESTION’S ANSWER IS ‘NOVOTEL” ‘BAKIT MASAKIT ULO MO - KASI NOVOTEL’ ‘BAKIT NAPUPUYAT SI SIR SONNY - KASI NOVOTEL’ ‘BAKIT ANDYAN SI BOSS JAY-O SA DAILY MEETING - KASI NOVOTEL’ ‘BAKIT PRESENT KA KAHIT ME TRANGKASO - KASI NOVOTEL’ BUT AFTER COMPLETION, IBA NA NGAYON. ‘BAKIT NATAPOS ANG NOVOTEL – KASI DCI’ ‘BAKIT ME PROJECT BONUS – KASI DCI’ 19 MARCH 2016 NOVOTEL FOM START TO FINISH NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance SINCE WE STARTED THE PROJECT IN 2012, NOVOTEL HAD… FOUR (4) CONSTRUCTION MANAGERS, FOUR (4) TIME EXTENSIONS FOR DCI PM SERVICES, FOUR (4) YEARS OF AGONIZING AND CHALLENGING EXPERIENCES AND FOUR (4) YEARS OF LOVE LIFE… …IT SEEMS IT IS TRUE THAT THERE IS REALLY A EVER’… 19 MARCH 2016 2015 2012 2014 2012 2015 2014 2016 2013 2016 2013 NOVOTEL FOM START TO FINISH NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance FOR ALL THE TIME AND EFFORT WE HAVE DEVOTED IN THE CONSTRUCTION OF AN INTERNATIONAL HOTEL… FOR ALL THE CONSTANT CHANGES IN PEOPLE, MOOD, DECISIONS, TEMPERAMENT AND CHANGES THEMSELVES… FOR ALL THE GOOD AND BAD TIMES THE EMOTIONS AND FEELINGS OF PEOPLE HAVE FELT… AND FOR ALL THE TWO CENTS WORTH OF IDEAS AND ENERGY THAT ALL INVOLVED HAVE CONTRIBUTED… NOVOTELNOVOTELNOVOTELNOVOTELNOVOTELNOVOTELNOVOTELNOVOTELNOVOTEL WE ARE PROUD OF OUR CONTRIBUTION IN MAKING THE ARANETA NOVOTEL A REALITY! 19 MARCH 2016 NOVOTEL HOTEL ARANETA CENTER pioneer, people, performance DCI STAFF INVOLVED IN PROJECT HENRY*ISAY*MEL*DEMY*ERICK*KELLY*HANNAH *ARNEL*MIGS*RIC*JOSEPH*KAREN*ENZE*TR*BETH*GAIL*ANGEL*JASON