380 and 380R Dwight Street
Transcription
380 and 380R Dwight Street
3.4 380/380R Dwight St. Part A: Overview Building Overview Property Overview Regulatory Context Existing Conditions Part B: Approach Possible Uses First Phase Occupancy: 380R Dwight 380 Dwight Part C: Development Scenarios 380R Dwight Building Areas Phasing Strategy 380 Dwight Building Areas Phasing Strategy Part D: Pro Formas 380R Dwight 380 Dwight McCabe Enterprises Holyoke 157 158 Holyoke | 380 / 380R Dwight Street McCabe Enterprises Part A: Overview 380 & 380R Dwight Street Image from the Massachusetts Historical Commission Archives Building Overview The Hampden Paper Company was constructed between 18711872. The paper company manufactured fine writing paper there, which continued after the plant was purchased in 1899 by American Writing Paper. The Hampden complex consists of two long multi-story structures, connecting multi-floor bridge buildings, and a number of smaller out-buildings. Total floor area of the study buildings is estimated at approximately 130,500sf. This figure is an estimate, as little documentation on the buildings was available. On the northern end of 380 Dwight sits a smaller structure which housed hydroelectric power generation facilities. On the southern edge of the First Level Canal, the original water wheel which powered the eastern leg of the paper mill complex still remains in the sub-basement of 380R Dwight. Of architectural note is the upper level structural system in both buildings where clear spans are created by hanging floor framing from the roof. In 380R, the third floor is free of columns as the ceiling (attic floor level) is hung from the heavy-timber roof framing. In the attic level the rafters and floor support tie rods closely line the exterior walls, leaving a large central clear space McCabe Enterprises Property Location Holyoke | 380 / 380R Dwight Street 159 property overview approx. 20ft wide down the center of the building. At 380 Dwight, a similar structural system is used to support both the second and third floor framing. The second floor ceiling/ third floor and the third floor ceiling/ attic floor are free of columns or obstructions (with the exception of the tie rods) as the floors are hung from the roof framing. In the attic level the rafters and floor support tie rods are close to the exterior walls, leaving a clear space approx. 10-15ft wide down the center of the building. First Canal Dwight Street A B D C Second Canal 380 DWIGHT STREET: ESTIMATED BUILDING AREAS (sf)1 Bsmnt 10,000 First Second Third 10,000 10,000 10,000 Building B 9,500 9,500 9,500 Building C 12,000 12,000 12,000 Building D 4,000 Building A Attic Subtotal 10,000 28,500 12,000 Totals 50,000 78,500 48,000 4,000 52,000 130,500 1 Note: Building areas are approximate as accurate plans of the buildings were not available. Areas have been approximated based on available Sanborn Map information provided by the City of Holyoke. 160 Holyoke | 380 / 380R Dwight Street McCabe Enterprises Regulatory Context The 380 and 380R Dwight Street property consists of two parcels which each have frontage onto the canal system and are zoned IG-General Industry. 380 and 380R Dwight Street are situated in two overlay zoning districts, namely the Arts and Industry Overlay District (AIOD) and the Downtown Smart Growth Zoning Overlay (40R) District. The AIOD overlay district seeks to encourage reuse, redevelopment and revitalization of historic mill structures along the canals in Holyoke’s traditional city center. Existing permitted uses in the underlying district, in this case the IG-General Industry zone, continue to be allowed as of right, along with multifamily dwellings by renovation of an existing building; live-work space; and arts-related uses, such as photographic studios, crafts, dance, performing arts, advertising, theater, film or video production, galleries, or auctions, for example. The Downtown Smart Growth Zoning Overlay District also seeks to encourage mixed-use development, redevelopment and adaptive re-use of existing structures. Mixed-use development is allowed as-of-right at this site. The Downtown Smart Growth Zoning Overlay (40R) District requires twenty percent of new housing units be affordable. Rents for affordable housing in Holyoke are comparable to market rate rents. The regulations enable the Planning Board to grant relief from the affordable housing requirement, if needed. The City’s intent is to encourage a diversity of housing types and opportunities for a mix of incomes in the Downtown. Permitted uses in the IG-General Industry zone include manufacturing, wholesale, warehousing, parking, indoor commercial recreation, retail, personal services, business or professional offices, banks, financial services, restaurants, cultural services, non-exempt educational services, child care, and convenience stores. Parking requirements for residential uses in the AIOD is one unit per residential unit. There are no parking requirements for other uses, including commercial uses, within the AIOD. Adequate parking to meet market, patron and tenant needs will still need to be provided. IG 386 and 386R Dwight Street are outside the flood plain according to FEMA (Federal Emergency Management Agency). There are no known wetlands or protected vegetation or wildlife in the vicinity of this site. The flood plain map for this area can be found in the Appendix. The 386 and 386R Dwight Street buildings are not presently listed on the National Register of Historic Places. However, the properties have been inventoried. They have the potential to be listed on the National Register. In addition, the properties are directly adjacent to the Holyoke Canal System National Register District. Holyoke Zoning Map McCabe Enterprises Holyoke | 380 / 380R Dwight Street 161 As a consequence, any assistance using state or federal funds, including historic tax credits, will trigger review by the Massachusetts Historical Commission (MHC) so that the renovation and rehabilitation work is consistent with the historic architectural character of the buildings as well as assuring that there is no adverse effect on adjacent Canal System District. Consultation with MHC at the outset is typically more cost effective, particularly if use of the 20% historic tax credit is anticipated. MHC and the National Park Service must certify all 20% historic tax credit projects. Although use of the 10% federal historic tax credit does not require certification, any state or federal assistance does require MHC consultation. IG Holyoke Zoning Map 162 Holyoke | 380 / 380R Dwight Street McCabe Enterprises existing conditions: 380R Dwight 380R DWIGHT STREET: GALLERY 380 BUILDING General The Gallery 380 Building consists of two distinct building sections. A large brick mill building "Building A" constructed perpendicular to the First Level Canal and a second smaller brick building "Building B" which is connected by bridge structures to the Canal Gallery, "Building C", to the south. Building A: This building was constructed as a mill building with waterwheel in the basement to harness power from the First Level Canal. It consists of three floors, an occupiable attic level, and a basement which is exposed on the southern end of the building. The exposed portion of the basement has windows providing very good light levels within. Building B: This addition to Building A is a lower three-story structure. This later addition has a flat roof, as compared to the pitched roof of the main building. The basement level of Building B is fully exposed and gets ample sunlight; there is a first and second floor above the basement. Basement The basement of Building A is generally in good condition. A new mechanical unit and ducts are stored here. At the northern end of the building the basement slopes down to a water wheel room, formerly used to generate power for the mill. The wheel mechanism is still present. A portion of the basement in Building B currently is dug up for access to the common water main for repairs. Areas of this basement have left-over forms, pits and chemicals from a former rubber casting company that occupied the space. There is an area of standing water from an upper level leak. (Water is entering the building from rapidly melting snow and rain outside.) First Floor There is some minor wall damage on the northeast corner of Building A from an upper level/ roof leak. There are a few existing portions in Building A. There are no signs of major structural problems to address. The second floor of building B is in good condition with the exception of a water leak from above in the southwest corner of the building. Second Floor The second floor of Building A is in good condition. There are existing partitions that will need to be removed; trash will need to be cleared from spaces. There are a few windows on the northwest that have been bricked up and could be re-opened again. In Building B, the second floor had been cleared and art studio spaces were built of particle board on wood stud. Spaces have toilets and small kitchenette units. There is a broken window which is part of the source of water below in one of the rooms on the south side. Third Floor The third floor of Building A has been completely cleared. The floor above is hung from the roof framing allowing for an uninterrupted space, save for a new freight elevator shaft. Replacement windows have been installed throughout this floor. There are a few windows on the northwest that have been bricked up and could be re-opened again. The wood ceiling is in excellent condition. The stair to the attic will need replacement. An area of 1,000 - 2,000 sf at the northeast corner of the building is in need of repair. A window is missing and water has been entering the building. The brick is in need of repair as well as floor and ceiling framing. Attic/ Roof Stairs & Elevators Conditions in the attic were not clear as the space was unlit. Framing for roof and floor lined the exterior walls leaving ample space down the middle of the building. Original windows have been infilled and reduced to small vent windows, and will need to be re-opened and replaced. A new freight elevator in a concrete block shaft has been constructed in Building A. Building B has a temporary stock lift mechanism between the basement and first floor. Building plans were not available, and it is unclear the total number of stairwells in the building. One stair on the northwest corner of the building was used for the walk-through, along with a second stair in the southeast corner of the building. Stairs are usable, but in need of some repairs. Exterior Brick on northeast corner and on entire length of west wall is in need of repair/ repointing. Other brick is in generally ok condition. Systems There is a new mechanical unit in the basement of Building A, ready for installation. There is currently electric service to the building, however the panel was not reviewed during the walk through. It is assumed that some upgrades will be required as part of any redevelopment. The building has sprinklers and the system is believed to be functional. Size of piping may not meet current code standards; current coverage may not be adequate. Currently all buildings (A-D) share water service. As part of upgrades to the system, new service for the sprinkler system for both buildings should be planned. Structural Columns, beams and floor framing appeared generally sound despite some areas of pooled water/ damage. There is little or no evidence of changes to the basic floor plates or construction. Building A is heavy timber, wood frame with wood columns and beams. The third floor is free of columns as the ceiling, or floor of the attic level, is hung from the roof framing. In the attic level the rafters and floor support tie rods are close to the exterior walls, leaving a clear space approx. 20ft wide down the center of the building. Building B is primarily heavy timber wood frame. The structure is post and beam, no hung floors are present. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 163 380R Dwight Street Northwest elevation. Southwest elevation. Alley between 380 and 380R Dwight, facing southwest. 164 Holyoke | 380 / 380R Dwight Street McCabe Enterprises 380R Dwight ground floor spaces. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 165 380R Dwight Street Right: northeast elevation. Below: building “B” interior spaces. 166 Holyoke | 380 / 380R Dwight Street McCabe Enterprises All images: building “A” third floor and attic spaces. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 167 existing conditions: 380 Dwight 380 DWIGHT STREET: CANAL GALLERY BUILDING General The Gallery 380 Building consists of two distinct building sections. A large brick mill building"Building C" constructed parallel to the Second Level Canal and a single-story brick building "Building B" at the western end. Until recently, the building had been occupied by small businesses, artists and craftspeople. Businesses ranged from woodworking, to ceramics, to motorcycle repair, to an on-line marketing/web firm. Building C: This building was constructed as a mill building and consists of three floors and an occupiable attic level. Building D: This building is a one-story addition at the south side of Building C. First Floor The first floor of Buildings C & D were almost fully occupied until recently, mainly with small businesses and workshops. Egress corridors and exits should be reviewed. A gallery occupied a space at the east end of the first floor; the primary feature of this space are arched brick vaults and access to the canal. In the center of the building is a mechanical area; equipment appears fairly recent and very well maintained. Second Floor The second floor of Building C is also built out as individual work studios. A fair amount of trash and furniture from previous tenants remains and will need to be cleared from spaces. The second floor on the east end above the gallery has been built-out as a multi-room office space for an advertising company. Egress passages and exits will need to be reviewed, and a new stairwell may need to be added. Third Floor Attic / Roof Stairs & Elevators The third floor of Building C is also built out as individual work studios. The third floor, along with the attic, is hung from the roof structure. A large percentage of the partitions on this floor do not meet code standards and will need to be removed and reconstructed. Egress passages and exits will need to be reviewed, and a new stairwell may need to be added. The attic level is being used for storage for antiques and other items. There are a few small roof leaks evident; measures are being taken to contain these leaks. Similar to the Gallery 380, the attic floor is hung from the roof rafters with tie rods; in this case however, the third floor framing is likewise hung from the roof structure, eliminating columns and creating a fairly clear span (with the exception of the tie rods at regular intervals.) Elevators will need to be removed and reconstructed: new rated shafts will need to be built and new cabs installed. Additional rated egress stairwells are needed. Exterior Brick is generally in good condition with the exception of the northwest wall which is in need of repair/ repointing. A large portion of the windows are single-pane and will need to be upgraded over time or as part of a larger redevelopment. Systems Mechanical systems appear to be new or in good condition. There is currently electric service to the building, however the panel was not reviewed during the walk through. It is assumed that some upgrades will be required as part of any redevelopment. The building has sprinklers and the system is believed to be functional. Size of piping may not meet current code standards; current coverage may not be adequate. Currently all buildings (A-D) share water service. As part of upgrades to the system, new service for the sprinkler system for both buildings should be planned. With multiple owners of the building complex, a formal arrangement regarding utilities is recommended, or investment in separation of the utilities and utility feeds for each building. Structural 168 Columns, beams and floor framing appeared generally sound. Changes to the basic floor plates or framing is minimal. The first floor ceiling/ second floor is framed with heavy timber, wood columns and beams. The second floor ceiling/ third floor and the third floor ceiling/ attic floor are free of columns as the floors are hung from the roof framing. In the attic level the rafters and floor support tie rods are close to the exterior walls, leaving a clear space approx. 10-15ft wide down the center of the building. Holyoke | 380 / 380R Dwight Street McCabe Enterprises 380 Dwight Street Above: northwest elevation. Below: building “D” southwest elevation. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 169 380 Dwight Street Top & middle: ground level spaces - “The Canal Gallery” Bottom: ground floor studio spaces. 170 Holyoke | 380 / 380R Dwight Street McCabe Enterprises All: Stairwell with freight lift and upper level studio spaces. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 171 380 Dwight Street All: structural details showing floors supported by tie-rods from roof structure. 172 Holyoke | 380 / 380R Dwight Street McCabe Enterprises Part B: Approach 380 & 380R Dwight Street 380 and 380 R Dwight Street The mill complex at 380 and 380R Dwight Street consists of four buildings and two owners. Within the complex there are shared water and sewer utilities. Each owner owns two buildings. The complex is situated between the first and second canals. 380R has no direct street frontage but has frontage access directly on the Canalwalk. 380 Dwight Building C is accessed from Dwight Street, and the buildings border the second canal. A financial feasibility analysis of the entire complex was prepared using a full redevelopment model, with all work done at the outset. Expenses and revenue streams were segregated as to each respective owner. The traditional approach to development even with significant financial assistance using state and federal historic tax credits and New Markets Tax Credits required a significant amount of owner equity appears unworkable given the current market rents in Holyoke, which are quite low. This pro forma can be found at the end of the pro forma section. possible uses A second approach was developed to enable a phased incremental redevelopment. This approach differs from a sweat equity approach, in that many initial investments are of the scale and nature requiring professional contractors to undertake the work in a commercial setting. Hence, this approach is termed the Incremental Hybrid Approach. The initial work focuses building stabilization and life safety code compliance. Building stabilization entails making the building envelope and roof water tight, roof and cornice repairs and elimination of leaks around window areas. Life safety code compliance addresses access issues, fire safety, sprinkler systems. The Incremental Hybrid Approach enables a phasing-in of additional improvements, tenant finishes and interior partitions based on market conditions and rental demand. 380R DWIGHT STREET & 380 DWIGHT STREET Live-work Loft Floors could be developed incrementally as live-work lofts. An egress corridor connecting stairs and elevator, and unit demising walls will need to be constructed. Lofts would essentially be 'vanilla boxes' with minimal infrastructure. A kitchen and bathroom will be provided along with a hook-up/ stubs for installation of laundry or slop sinks. These are intended as live-work lofts and plumbing for slop sink should anticipate use by painters, potters, etc. Base levels of lighting and junction boxes at ceiling for installing additional lighting should be provided. Fan coil radiation units with a roof mounted condenser is envisioned for loft units to allow for zoning heat by individual units. Office Office use leasing will require restrooms on each floor. Floors should also be equipped with small kitchenettes. Floors will be leased to a single tenant or subdivided. If subdivided, a rated egress corridor will be constructed along with demising walls between tenant spaces. Manufacturing and Light Industrial Floors or portions of floors could be leased to light manufacturing type uses. Potential upgrades to utilities and mechanical, electrical, and plumbing services may be required to accommodate this type of use. Restrooms would need to be installed along with demising walls and rated egress corridors. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 173 first phase occupancy: 380R Dwight First Canal Dwight Street A B D C Second Canal 380R Dwight Street Applying the Incremental Hybrid Approach to 380R Dwight Street, the focus is on the Building B which is on the Canalwalk. A separate set of cost estimates using the building stabilization approach was prepared for 380R Dwight Street. Leasing the first floor to a small offices and studios is the basis for the revenue stream projection. 380R Dwight Street could benefit from re-branding itself with an address on the Canalwalk, perhaps 280 Canalwalk. This would capitalize on a major new amenity and attraction in downtown Holyoke, and create a “front door” for the property. 380R Dwight Street First Phase Approach 174 Building A will be stabilized per the Phase 1 scope, Building B will be mothballed. The buildings are currently separated by a masonry wall; there are door/ corridor connections on each floor that will need to have a fire separation created. The main building (Building A) is a 10,000sf footprint/ 50,000sf structure and the western addition (Building B) is a 9,500sf footprint/ 28,000sf structure. Holyoke | 380 / 380R Dwight Street McCabe Enterprises 380R Dwight Street: Buildings A & B first phase Dwight St A C B B Se co Ca nd nal D Left, 380R Dwight entry from the Canalwalk. Below, interior of first floor, northeast side. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 175 first phase occupancy: 380 Dwight 380 Dwight Street First Phase Approach The renovations and code upgrades needed over the vast building area (48,000 sf), makes redevelopment of the majority of 380 Dwight costly and difficult to phase. The recommended first phase of work for 380 Dwight is renovation of Building D, which could be broken out as a single leased area or possibly broken out as a separate condo. Building D is a one-story structure of approximately 4,000 sf. Building D appears to be separated from Building C by a masonry wall. Depending on the approach taken with Building D (rental or ownership), some additional separation, such as blocking in an existing doorway between buildings may be needed. Building D will require complete rehabilitation. It will need to either be separately metered or have its own utilities in place. For purposes of this estimate, the latter is used as the basis for costs. Use Renovation of Building D would allow for continued use of a portion of the building while planning for the larger Building C. Its small scale, location along the canal, and proximity to Dwight Street and the Canalwalk make it a potential location for an active use that is accessible by the public. The recommendation for Building D is that the current Canal Gallery in Building C be relocated to Building D and that it be operated in a similar fashion. In this way, the social and arts-related functions can continue to be a part of the Dwight Street area. Relocating the gallery here would also allow for possible incorporation of antique/art/ object sales out of the space which could be used as a means over time for clearing out items stored in Building C. 380 Dwight Street: Buildings C & D Dwight St A C B B Se co Ca nd nal D first phase 176 Holyoke | 380 / 380R Dwight Street McCabe Enterprises 380 Dwight first phase The large floor plate and the numerous code upgrades needed throughout pose a significant challenge for redevelopment of the Canal Gallery Building at 380 Dwight Street (Buildings C & D on the diagram). Given this challenge, the recommended approach for the first phase is to redevelop Building D, the one-story portion of the structure along the canal edge. Building D can easily be broken out from the main building in terms of access and building systems, and at 4,000 sf, the initial redevelopment cost is financeable. This approach will allow for continued occupation and business operations while planning for the complex refurbishment and redevelopment of the larger building is undertaken. As part of the redevelopment process, a number of ownership structures could be considered as a means for planning for eventual improvement of Building C: • Building D could be separated from Building C as a single lease area. • Buildings C & D could be broken into a commercial condominium and Building D could be a single condo unit. Building “D” at rear of 380 Dwight. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 177 • Buildings C & D could be separated into two distinct buildings along the existing party-wall with individual ownership structures. The recommended approach to planning for mechanical, electrical, plumbing and fire protection systems in Phase 1, is to provide for independent building systems for Building D so that any of the above structures could be implemented. In addition to key systems improvements needed to separate Building D from Building C, upgrades to egress routes would be required. Building D currently has two exterior exits that are independent from Building C - one that exits onto the canal and one that exits onto the alley way between 380 and 380R Dwight. In creating an independent building area, upgrades to doors and door hardware, along with construction of a stair and ramp will be required to make these exits viable means of egress from the space. First Phase Uses The 4,000 sf footprint of the one-story building would lend itself to a number of potential uses in keeping with the vision of the Canal Gallery (which occupied the northern end of Building C). Additionally, the tall ceiling height (approx. 15 feet) of this structure would also be appropriate for a public use such as a gallery. In fulfilling on the role of the Canal Gallery, while planning for the main building is undertaken, Building D could: • serve as a center for the arts community to meet and share ideas; • contribute to the growth of the Canalwalk by providing a publicly accessible destination; • provide for potential art gallery, antique shop and place for urban curiosities. As a gallery/ retail space, Building D could feature locally made art and craft items. Establishing this as a primary use for the space would have the added benefit of providing a highly visible and publicly accessible place from which to sell items currently stored on the upper and attic floors of Building C, thereby helping to move Building C improvements forward. 178 Holyoke | 380 / 380R Dwight Street McCabe Enterprises 380 Dwight first phase scope Building C not included in phase 1 scope Building D 1 floor x 4,000sf/ floor = approx 4,000sf Total 4,000sf 380 DWIGHT STREET - BUILDING D STABILIZATION Demolition Clear existing unoccupied spaces of all miscellaneous furniture, materials and other trash left by previous tenants. Remove all existing partitions, lofts, floors and casework. Remove any wiring within partitions. Remove exterior windows and doors. Building Envelope Roof Patch roof as required. Minor repairs are needed across building where there are active leaks (assume 5-10% of total area). Windows Install new insulated glass, double hung windows (4 each) and new vent-type windows (4 each) with divided panes to match existing window profiles. Egress Replace existing egress doors (two pairs of doors). Doors will require egress hardware and proper door closers. Due to elevation differences between interior and exterior, on the canal side (southeast) a new interior stair, landing and rail is required at the egress door; on the northwest side of the building, a new exterior landing and stair is required for egress. Walls Patch/ repair brick where damage has occurred due to leaks. Floors Sand and provide new polyurethane finish. Safety Fire protection Test existing sprinkler systems and repair as needed. Currently it is assumed that systems are fully functional. Size of piping may not meet current code standards; current coverage may not be adequate. Currently all buildings (A-D) share water service. As part of upgrades to the system, new service for the sprinkler system for both buildings should be planned. Separate sprinklers from Building C; provide new control panel and sprinkler main; upgrade existing sprinkler pipes and heads to current code standards as required. Currently it is assumed that existing systems are fully functional, but that size of piping and current sprinkler coverage may not be adequate for current code standards. Currently all buildings (A-D) share water service. As part of upgrades to the system, new service for the sprinkler system for Building D should be planned. Upgrades to existing smoke detectors, alarms and egress signage throughout. Utility Improvements Water main repairs Currently water/ sewer service is shared by all buildings – A, B, C and D – as they were originally constructed under the same ownership. Prior to completion of any repair work, a shared utility maintenance structure should be established among ownership. Once an agreement is in place, any necessary repairs to building utilities that might impact fire safety should be made. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 179 380 DWIGHT STREET - BUILDING D Electrical Install new electrical panel and dedicated electrical service for Building D. Install new fluorescent lighting throughout. HVAC Install new dedicated gas heating unit in Building D as needed. Interior Build-out Restrooms Current extent of plumbing in the space is unknown. It is assumed that the space will function as both a gallery and as a meeting/ gathering space, which would require 2 restrooms. Cost assumption includes installation of two complete ADA compliant restrooms (one men’s, one women’s) in the space. Install utility/ maintenance sink. Kitchenette Provide new kitchenette in space (including sink, refrigerator, dishwasher and 6 ft of counter with base cabinets. Finishes Only restroom partitions and one utility closet will be constructed. All other partitions will be the responsibility of the new tenant or condo owner. New paint for interior walls throughout (exterior walls and restroom walls) and paint for the ceiling throughout are included in the cost estimate. 180 Holyoke | 380 / 380R Dwight Street McCabe Enterprises phasing strategy: 380 R Dwight Part C: Development Scenarios 380 & 380R Dwight Street 380R DWIGHT STREET: BUILDING AREAS (sf) Building A (4 floors+attic) x 10,000sf/ floor = approx 50,000sf Building B 3 floors x 9,500sf/ floor = approx 28,500sf Total Top left: waterworks in basement level along First Canal. Top right: northwest elevation along First Canal. 78,000sf 380R DWIGHT STREET: GALLERY 380 BUILDING STABILIZATION Building Envelope / Stabilization Roof Patch roof as required. Minor repairs are needed across building (assume 5% of total area). At northern corner at the canal, repair to roof, parapet, cap and flashing needed where water damage present inside (assume 2,000sf roof area). Windows Board any broken or missing windows to ensure safety and provide weather protection. Walls, floors Patch/ repair brick where damage has occurred due to upper level leaks. Assume 2 locations of 1,500 sf and 1 location of 2,000sf floor area. Safety Fire protection The building has sprinklers and the system is believed to be functional. Size of piping may not meet current code standards; current coverage may not be adequate. Currently all buildings (A-D) share water service. As part of upgrades to the system, new service for the sprinkler system for all buildings should be planned. Install new smoke detectors, alarms and egress signage throughout. Utility Improvements Water main repairs Currently water/ sewer service is shared by both the Canal Gallery building and the Gallery 380 building as they were originally constructed under the same ownership. Prior to completion of any repair work, a shared utility maintenance structure should be established among ownership. Once an agreement is in place, any necessary repairs to building utilities that might impact fire safety should be made. Electrical Installation of minimum light fixtures required for safety/ security purposes. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 181 phasing strategy: 380R Dwight 380R DWIGHT STREET: GALLERY 380 BUILDING PRE-DEVELOPMENT Demolition Trash removal Clear spaces of all miscellaneous furniture, materials and other trash. Demolition Full demolition of interior spaces required prior to redevelopment. Approximately 50% of the building currently has existing partitions that would need to be cleared. Presence of hazardous materials may need to be assessed and removals made as part of the scope of demolition. Asbestos pipe insulation, oil/ petroleum and other chemical contaminants may be present in small to moderate quantities. Building Envelope / General Construction Roof At the time of redevelopment a new roof system that meets current energy code requirements would need to be installed. Current roof framing is assumed to be sufficient and structural upgrades to roof framing are not anticipated. Windows New double-hung, double-pane insulated windows all floors except the fourth floor of the northern building where new windows have already been installed. Walls Patch, point and repair brick exterior walls. Moderate repair on east and north walls; extensive patching/ repairs to west wall. Moderate repairs to interior of brick walls where water damage has caused cracking. Stairs New egress stairs will need to be constructed. Estimate 3 stairwells. Safety Fire Protection Upgrades to existing sprinkler system will be required for occupancy, including addition of new lines and heads. Utility Improvements Water / sewer separation As part of future development, separation of water/ sewer among properties should be considered. Electric Upgrades to electrical service, panels and metering anticipated for redevelopment. New wiring throughout building also anticipated. New lighting throughout will be required. Provision for telecommunications, high-speed internet and cable service to the building will need to be made. Mechanical A new mechanical unit is on site and can be installed. Capacity for system is not known, but it is assumed that it is sufficient for Building A needs. Assume costs for separate system for Building B. Complete installation needed including ductwork and controls. Renewable Energy Solar The large expanses of roof area provide an opportunity for solar panel installation as part of a future development scenario. Consideration of the benefits of solar panels (financial and environmental) need to be balanced with the benefits and potential use of historic tax credits. Water wheel At the northern canal (First Level Canal) the basement of the Gallery 380 Building still has the building's original water wheel. Significant reconstruction would be required to install a functional wheel, but could be considered as a renewable energy option. If a net-zero development were desired, this would be a potential option. The MA Clean Energy Center is currently soliciting grant requests for hydro-power from existing facilities on a rolling basis through 12/31/2014. 182 Holyoke | 380 / 380R Dwight Street McCabe Enterprises phasing strategy: 380 Dwight Northwest elevation. 380 DWIGHT STREET: BUILDING AREAS (sf) Building C (3 floors+attic) x 12,000sf/ floor = approx 48,000sf Building D 1 floor x 4,000sf/ floor = approx 4,000sf Total 78,000sf 380 DWIGHT STREET: CANAL GALLERY BUILDING STABILIZATION Building Envelope / Stabilization Roof Patch roof as required. Minor repairs are needed across building where there are active leaks (assume 5-10% of total area). Windows Board any broken or missing windows to ensure safety and provide weather protection. Walls, floors Patch/ repair brick where damage has occurred due to upper level leaks. (Only minor repairs at this time.) Safety Fire protection Test existing sprinkler systems and repair as needed. Currently it is assumed that systems are fully functional. Size of piping may not meet current code standards; current coverage may not be adequate. Currently all buildings (A-D) share water service. As part of upgrades to the system, new service for the sprinkler system for all buildings should be planned. Upgrades to existing smoke detectors, alarms and egress signage throughout. Clear furnishings, storage items, trash and other debris from all paths of egress. Utility Improvements Water main repairs Currently water/ sewer service is shared by both the Canal Gallery building and the Gallery 380 building as they were originally constructed under the same ownership. Prior to completion of any repair work, a shared utility maintenance structure should be established among ownership. Once an agreement is in place, any necessary repairs to building utilities that might impact fire safety should be made. Electrical Installation of minimum light fixtures required for safety/ security purposes. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 183 phasing strategy: 380 Dwight 380 DWIGHT STREET: CANAL GALLERY BUILDING PRE-DEVELOPMENT Demolition Trash removal Clear existing unoccupied spaces of all miscellaneous furniture, materials and other trash left by previous tenants. Demolition Partial demolition of interior spaces required for redevelopment as part of life-safety upgrades and as part of any change in tenants. Approximately 50% of the current partitions in the building would need to be cleared and rebuilt to meet code requirements. Presence of hazardous materials may need to be assessed and removals made as part of the scope of demolition. Asbestos pipe insulation, oil/ petroleum and other chemical contaminants may be present in small quantities. Building Envelope / General Construction Roof At the time of redevelopment a new roof system that meets current energy code requirements would need to be installed. Current roof framing is assumed to be sufficient and structural upgrades to roof framing are not anticipated. Windows New double-hung, double-pane insulated windows all floors except the fourth floor of the northern building where new windows have already been installed. Walls Patch, point and repair brick exterior walls. Moderate repair on courtyard, south and west walls; extensive patching/ repairs to north wall. Moderate repairs to interior of brick walls where water damage has caused cracking. Modifications to existing corridors to meet code requirements for egress will be required. Reconfiguration of corridors and demising walls on some levels may be required. Approximately 50% of the current partitions may need to be cleared and rebuilt to meet code requirements. Stairs New egress stairs will need to be constructed. Estimate 2-3 new stairwells. Safety Fire Protection Upgrades to existing sprinkler system will be required for occupancy, including addition of new lines and heads. Utility Improvements Water / sewer separation As part of future development, separation of water/ sewer among properties should be considered. Electric Upgrades to electrical service, panels and metering are needed for occupancy of the building. Electrical needs include new conduit, outlets and lighting throughout. Upgrades to telecommunications, high-speed internet and cable service to the building will need to be made. Mechanical Mechanical systems are present and fully operational. Systems appear to be fairly recent and are well maintained. Renewable Energy Solar 184 The large expanses of roof area provide an opportunity for solar panel installation as part of a future development scenario. Consideration of the benefits of solar panels (financial and environmental) need to be balanced with the benefits and potential use of historic tax credits. Holyoke | 380 / 380R Dwight Street McCabe Enterprises Part D: Pro Formas 380 & 380R Dwight Street 380 R Pro Forma The Incremental Hybrid Approach for 380R Dwight Street focuses on Building A. The Incremental Hybrid Approach focuses on stabilizing the building and making it weather tight and life safety code compliance. Rental income for office and studio space for only one floor of Building A, 10,000 SF, is projected. The office market in downtown Holyoke is soft. Today’s office rental rates in downtown are $12.00/SF, with a range of $5.00 to $14.00. Since Building A does not have street frontage, projected office rents are pegged at $10.00 SF, which is below existing rates for newly upgraded office properties. With rebranding this Building A to a Canalwalk address along with building stabilization and improvements, a higher rent may be generated. As part of the feasibility analysis, sensitivity to interest rates were assessed. A conventional loan at 5% with a 30 year amortization period was tested, as well as a lower interest rate at 4.25% again with a 30 year amortization period. Both approaches yielded a positive result generating a net positive cash flow after debt service and operating expenses of $15,000 to $18,000 annually, much of which could be reinvested in the property enabling additional portions of the building to be eventually leased and income generating. The owners’ equity requirement is 10%, which requires approximately a $70,000 reinvestment by the owner. A summary table comparing the conventional and low-interest approach is on the following page. In addition, to advancing redevelopment using the Incremental Hybrid Approach, Building A had a dormant waterwheel that once was the source of power for this facility. The Massachusetts Clean Energy Center, www.masscec.com, has a current grant solicitation for now through December 31, 2014 for hydropower facilities. Private entities are eligible to apply, and there must be an increase in power utilization. Grants are available for feasibility, as well as capital and construction costs. This may be an opportunity to re-activate the waterwheel and to further “green” the 380R building, enhancing the attractiveness of the space to tenants and lowering long-term operating costs. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 185 274-276 High Street – Incremental Hybrid Scenario Option Financing Tool Base Stabilization Conventional Financing Total Hard & Soft Costs Total Permanent Financing Need $ $ Interest Rate Net Operating Income 656,116 $ 698,447 $ 5.00% $ 656,116 695,225 4.25% 64,818 $ 64,818 Loan Amount $ 628,602 $ 625,703 Annual Debt Service $ 49,782 $ 46,495 Debt Service Cost Per SF of Leased Area $ 4.98 $ 4.65 Debt Service Cost Per Building SF $ 1.00 $ 0.93 Funds Available Annually for Reinvestment in Bldg. Improvements $ 15,036 Owner's Equity 186 Low Interest Loan Financing Holyoke | 380 / 380R Dwight Street $ 69,845 McCabe Enterprises $ $ 18,323 69,523 380R Building D - First Phase Pro Forma The pro forma analysis for the 380 Dwight Street building (Buildings C and D) using a traditional full development methodology found that market rate rents in Holyoke do not support traditional full development approach to total redevelopment of the 52,000 SF building. The recommended first phase approach then, was developed to encourage more immediate development of a portion of 380 Dwight Street. This approach calls for separating the two buildings into separate condominiums, which would enable different or same ownership of each structure as previously described. The initial redevelopment work starts with basic stabilization of the 4,000 SF Building D for relocation of the Canal Gallery. The pro forma for the basic stabilization approach addresses improvements to tighten the basic building envelope – roof, parapets, windows, and walls, as well as life safety measures. The specific work entailed in the incremental hybrid approach is detailed in the scope of work found on the preceding pages. The hard costs of stabilizing Building D are estimated to be $413,269, with an additional add alternate of $70,000 for a heating system (if warranted). The pro forma analysis for Building D using the incremental hybrid approach identified a financing gap of $235,000 with a low-interest rate scenario of 4¼% and a rent structure of $5.50 per SF. Higher interest rates for lending widen the financing gap. The low rent rate is based on the rate for industrial space in Holyoke, which is lower than retail or office uses. The lower rent can be justified by the rear building location, lack of street frontage, and use as a gallery (typically a low-rent retail use). In addition, although Building D is faces the canal, it does not have frontage on the CanalWalk. The $235,000 financing gap constitutes just over half the costs in the incremental hybrid approach. Due to the large financing gap, an ultra-basic approach was developed with a two-step approach to stabilizing Building D. The phasing of stabilization costs is shown on the next page 380R Building D - First Phase Scope Cost estimates were prepared by Project Management & Cost. See detailed estimate in the Appendix to this report. The staircase line item entails providing stairs to the 2 means of ingress and egress to Building D. One of the entrances needs to also be handicap accessible per ADA and Massachusetts Access Board regulations. The ADA-compliant entrance is scheduled for construction in the Ultra-Basic approach in the short-term. This can be done if there is also access through Building C to Building. Otherwise, this expense needs to be moved into the immediate time period. The Canal Gallery is a place of public accommodation and requires a safe means of ingress and egress. The Design & Pricing Contingency is 15% of hard costs in the Basic Stabilization and Shortterm phase of the Ultra-Basic Approach. The Design and Pricing Contingency was reduced to 10% for the Immediate phase of the Ultra-Basic Approach. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 187 BUILDING D: First Phase Incremental Hybrid Stabilization Approach Building D Expense Exterior Closure (Walls, Windows, Doors) Roofing Interior Construction Ultra-Basic Approach Immediate 50,920 12,000 8,000 8,000 Short-Term 6,200 Staircases 32,000 6,200 7,000 25,000 40,000 Interior Finishes 26,000 Plumbing 84,000 44,000 Fire Protection 38,000 38,000 31,000 31,000 Electrical Equipment 26,000 2,700 Haz Mat Removals (Bldg Elements (Demolition) SUB-TOTALS General Conditions 8.00% Bonds 38,920 2,700 16,000 15,000 1,000 294,820 155,000 139,820 23,586 12,400 11,186 0.65% 1,916 1,008 909 Insurance 1.25% 3,685 1,938 1,748 Permit 1.00% 2,948 1,550 1,398 Overhead & Fee 5% 14,741 7,750 6,991 Design & Pricing Contingency 15% 44,223 15,500 20,973 385,919 195,145 183,024 TOTALS Note: if a new mechanical system is to be installed in the immediate or short-term, an additional cost of approximately $70,000 should be planned. It is anticipated that basic life safety improvements and stabilization of the building envelope for Building D will not require the services of an engineer or architect, thereby eliminating this soft cost. However, a small amount is included for the services of a code consultant to assure compliance with all life safety and building codes for the desired re-use of Building. D. It is assumed that a seasoned, experienced licensed general contractor will be used who will incorporate project management services as part of the construction costs. Such an experienced licensed general contractor should be able to address the construction issues of Building D in the Ultra-Basic approach. The cost of taxes is assumed to be ten percent of the existing tax bill for 380 Dwight. Building D is eight percent of the overall area of the two buildings. The improvements using Ultra Basic Approach pro forma for the Immediate phase can be financed using a low-interest rate scenario at 4.25% and a $5.25 per SF rent. The pro forma requires an owner’s equity of $20,000 and use of the 10% federal historic building tax credit. There is a small financing gap of $12,548 with rents at $5.25 per SF. The financing gap is 188 Holyoke | 380 / 380R Dwight Street McCabe Enterprises reduced to $2,987 if the rental rate is raised to $5.50/SF. This financing gap could be closed by additional owner equity or a municipal assistance program, funded perhaps with CDBG funds through a grant or short-term loan. Services of a code consultant or some life safety code assistance could perhaps be provided as part of closing the financing gap for the Immediate phase of the Ultra Basic Approach. The Ultra Basic Approach does generate an annual positive cash flow of $3,000 in the low interest rate loan scenario after debt service and operating expenses with $5.25 rent rates. This cash flow could secure a short-term secondary note with CDBG funds perhaps to close the financing gap in the Immediate phase, or be used for incremental and continued improvements identified in the Short-term Ultra Basic Approach. A conventional rate loan at a 5% interest rate over 30 years was also analyzed using the Ultra-Basic Immediate Phase costs with $5.25 per SF rents. The financing gap is larger with a conventional rate loan amounting to $25,348, after use of the 10% federal historic tax credit for rehabilitation of older properties. The gap is reduced to $16,378 if a higher rent of $5.50/ SF is used. In summary, to move the renovation and re-use of Building D forward, a low-interest loan for thirty years using the Ultra-Basic Immediate phase at $5.25 is the most promising path. This requires a $20,000 owner’s equity, and generates a positive cash flow of approximately $3,000 annually that could be used for continued investment in the necessary improvements outlined in the Ultra-Basic Short-term work scope. McCabe Enterprises Holyoke | 380 / 380R Dwight Street 189 190 Holyoke | 380 / 380R Dwight Street McCabe Enterprises Site Land Area Building Footprint SF Building Footprint SF Floors Buildings 380 & 380R Dwight Street SF per floor & building A 380 R Dwight B 380 R Dwight Bsmt 84,506 16,000 19,500 3 4 10,000 C 380 Dwight D 380 Dwight Assessed Valuation Land Building Extra Features Total total 380 Dwight 380 R Dwight 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for a portion of 380R Dwight Conventional Incremental Hybrid Approach 2nd Floor 3rd Floor 1st Floor 10000 10000 10,000 9500 9500 9,500 12,000 12,000 12,000 Attic Total 10000 50,000 28,500 12,000 48,000 4,000 4,000 380Dwight $40,400 $176,600 $ $ 380R Dwight $ 33,200 $ 197,800 $ 217,000 $ 231,000 Hard Costs Acquisition Site Work Construction Hard Costs General Conditions, Bonds, Insurance, Overhead Escalation Permits Demolition Hazardous Materials/Abatement Tenant Improvements Furniture, Fixtures & Equipment Design & Pricing Contingency LEED Premium (not applied) GrossLeasableSpace 52,000 380Dwight 78,500 380R Dwight 130,500 total 380 Dwight $ $ $ $ 0.06 $ $ $ $ $ $ $ 3% $ - SUB-TOTAL HARD COSTS $ - $ 596,272 $ 596,272 5.00% 1.50% 3.50% 1.00% 0.25% 0.00% Soft Cost Contingency 5.00% $ - $ 2,850 $ 2,850 SUB-TOTAL SOFT COSTS $ - $ 59,844 $ 59,844 Total Hard & Soft Costs, before Financing Costs $ - $ 656,116 $ 656,116 Holyoke | 380 / 380R Dwight Street 380 R Total $ 21,250 $ $ 6,375 $ $ 14,875 $ $ 4,250 $ $ 1,063 $ $ $ $ 9,182 $ 425,000 63,326 25,500 4,671 77,775 - Soft Costs Arch'l & Engineering Other Consultants Project Management Legal Utilities Marketing Real Estate Taxes McCabe Enterprises 380 Dwight $ $ $ $ $ $ $ - 380 R Total $ - $ $ - $ $ 425,000 $ $ 63,326 $ $ 25,500 $ $ 4,671 $ $ - $ $ - $ $ - $ $ - $ $ 77,775 $ $ - $ 21,250 6,375 14,875 4,250 1,063 9,182 191 Site Land Area Building Footprint SF Building Footprint SF Floors Buildings 380 & 380R Dwight Street 84,506 16,000 19,500 3 4 Loan Financing Costs Legal, Escrow, Title Loan Fees Appraisal Interest Construction Loan 12 months Permanent Financing Need total 380 Dwight 380 R Dwight 5.0% 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for a portion of 380R Dwight 380 Dwight $ 1% $ $ $ $ - Conventional Incremental Hybrid Approach 380 R Total $ 10,000 $ $ 6,323 $ $ 5,000 $ $ 21,007 $ $ 698,447 $ 10,000 6,323 5,000 21,007 698,447 Initial Operating Income for 380 R Dwight following Base Stabilization Use Basement First Floor 2nd Floor 3rd Floor Attic Office/Studios Units/ SF 10,000 Average Annual Rent $ $ $ $ $ $ 10.00 - Sub-Total 7.5% Discount for Vacancies Effective Gross Income Expenses Maintenance Taxes Utilities Management Net Operating Income Amortization Period Interest Rate Debt Service Constant 192 7.50% $ $ 10% 7.5% 2.5% Financing Debt Service Coverage Amount Available for Debt Service Maximum Loan at Debt Service Constant Actual Loan Annual Debt Service Payment $ $ $ $ $ $ $ Annual Gross Income 100,000 100,000 (7,500) 92,500 380R Dwight $ 9,250 $ 9,182 $ 6,938 $ 2,313 $ 64,818 Total $ $ $ $ $ 380R Dwight 1.25 $ $ $ $ 51,854 785,670 628,602 49,782 9,250 9,182 6,938 2,313 64,818 Total $ $ $ 51,854 785,670 $ 49,782 30 years 5.00% 6.600% Holyoke | 380 / 380R Dwight Street McCabe Enterprises Site Land Area Building Footprint SF Building Footprint SF Floors Buildings 380 & 380R Dwight Street 84,506 16,000 19,500 3 4 total 380 Dwight 380 R Dwight 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for a portion of 380R Dwight Cash Flow -- Year One 380R Dwight Effective Gross Income Net Operating Income Annual Debt Service Surplus/deficit Year 1 Return on Equity $ $ $ $ 92,500 64,818 49,782 15,036 Conventional Incremental Hybrid Approach Total $ $ $ $ 92,500 64,818 49,782 15,036 21.5% SOURCES & RETURNS Conventional Loan Equity Requirement 380R Dwight $ 628,602 $ 69,845 Owners' Equity Contribution Sub-Total $ Sources to be Identified $ 698,447 - State Abandoned Building Tax Deduction 10% deduction of renovation costs or corporate MA income. Variable Tax Rate of Owner. Surplus funds for continued annual improvements McCabe Enterprises Holyoke | 380 / 380R Dwight Street $ 15,036 193 Site Land Area Building Footprint SF Building Footprint SF Floors Buildings 380 & 380R Dwight Street SF per floor & building A 380 R Dwight B 380 R Dwight Bsmt 84,506 16,000 19,500 3 4 10,000 C 380 Dwight D 380 Dwight Assessed Valuation Land Building Extra Features Total total 380 Dwight 380 R Dwight 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for a portion of 380R Dwight Low Interest Incremental Hybrid Approach 2nd Floor 3rd Floor 1st Floor 10000 10000 10,000 9500 9500 9,500 12,000 12,000 12,000 Attic Total 10000 50,000 28,500 12,000 48,000 4,000 4,000 380Dwight $40,400 $176,600 $ $ 380R Dwight $ 33,200 $ 197,800 $ 217,000 $ 231,000 Hard Costs Acquisition* Site Work Construction Hard Costs General Conditions, Bonds, Insurance, Overhead Escalation Permits Demolition Hazardous Materials/Abatement Tenant Improvements Furniture, Fixtures & Equipment Design & Pricing Contingency LEED Premium (not applied) GrossLeasableSpace 52,000 380Dwight 78,500 380R Dwight 130,500 total 380R Dwight $ $ $ 425,000 $ 63,326 $ 25,500 $ 4,671 $ $ $ $ $ 77,775 $ - 0.06 3% SUB-TOTAL HARD COSTS $ Soft Costs Arch'l & Engineering Other Consultants Project Management Legal Utilities Marketing Real Estate Taxes 5.00% 1.50% 3.50% 1.00% 0.25% 0.00% Soft Cost Contingency 5.00% - Total $ $ $ $ $ $ $ $ $ $ $ $ 425,000 63,326 25,500 4,671 77,775 - 596,272 $ 596,272 380R Dwight $ 21,250 $ 6,375 $ 14,875 $ 4,250 $ 1,063 $ $ 9,182 $ $ $ $ $ $ $ Total 21,250 6,375 14,875 4,250 1,063 9,182 $ $ 2,850 $ 2,850 SUB-TOTAL SOFT COSTS $ 59,844 $ 59,844 Total Hard & Soft Costs, before Financing Costs $ 656,116 $ 656,116 194 Holyoke | 380 / 380R Dwight Street McCabe Enterprises Site Land Area Building Footprint SF Building Footprint SF Floors Buildings 380 & 380R Dwight Street 84,506 16,000 19,500 3 4 Loan Financing Costs Legal, Escrow, Title Loan Fees Appraisal Interest Construction Loan 12 months Permanent Financing Need total 380 Dwight 380 R Dwight 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for a portion of 380R Dwight 380R Dwight $ 10,000 $ 6,291 $ 5,000 $ 17,818 $ 695,225 1% 4.25% Low Interest Incremental Hybrid Approach $ $ $ $ $ Total 10,000 6,291 5,000 17,818 695,225 Initial Operating Income for 380 R Dwight following Base Stabilization Units/ SF Basement First Floor 2nd Floor 3rd Floor Attic 10,000 Average Annual Rent Annual Gross Income $ $ $ $ $ $ $ $ $ $ $ $ $ 10.00 - Sub-Total 7.5% Discount for Vacancies Effective Gross Income Expenses Maintenance Taxes Utilities Management Net Operating Income McCabe Enterprises (7,500) 92,500 10% 7.5% 2.5% Financing Debt Service Coverage Amount Available for Debt Service Maximum Loan at Debt Service Constant Actual Loan Annual Debt Service Payment Amortization Period Interest Rate Debt Service Constant 7.50% $ $ 100,000 100,000 380R Dwight $ 9,250 $ 9,182 $ 6,938 $ 2,313 $ 64,818 Total $ $ $ $ $ 380R Dwight 1.25 $ $ $ $ 51,854 837,439 625,703 46,495 9,250 9,182 6,938 2,313 64,818 Total $ $ $ 51,854 837,439 $ 46,495 30 years 4.25% 6.192% Holyoke | 380 / 380R Dwight Street 195 Site Land Area Building Footprint SF Building Footprint SF Floors Buildings 380 & 380R Dwight Street 84,506 16,000 19,500 3 4 total 380 Dwight 380 R Dwight 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for a portion of 380R Dwight Cash Flow -- Year One 380R Dwight Effective Gross Income Net Operating Income Annual Debt Service Surplus/deficit Year 1 Return on Equity $ $ $ $ 92,500 64,818 46,495 18,323 Low Interest Incremental Hybrid Approach Total $ $ $ $ 92,500 64,818 46,495 18,323 26.4% SOURCES & RETURNS Conventional Loan Equity Requirement 380R Dwight $ 625,703 $ 69,523 Owners' Equity Contribution Sub-Total $ Sources to be Identified $ 695,225 - State Abandoned Building Tax Deduction 10% deduction of renovation costs or corporate MA income. Variable Tax Rate of Owner. Surplus funds for continued annual improvements 196 Holyoke | 380 / 380R Dwight Street $ 18,323 McCabe Enterprises Site Land Area Building Footprint SF 380 Dwight Street Building D 84,506 4,000 Floors total 380 Dwight Building D 1 1 Buildings SF per floor & building D 380 Dwight Bsmt Assessed Valuation Land Building Extra Features Total 380Dwight $40,400 $176,600 $ 2nd Floor 1st Floor 1 Ultra Basic Immediate Stabilization of ultra basic building envelope and life safety code compliance for a portion of 380R Dwight, Building D to be completed with a short-term phase. Conventional Ultra Basic Immediate Approach 3rd Floor Attic Total 4,000 4,000 $ 380R Dwight $ 33,200 $ 197,800 $ 217,000 $ 231,000 Hard Costs Acquisition* Site Work Construction Hard Costs General Conditions, Bonds, Insurance, Overhead Escalation Permits Demolition Hazardous Materials/Abatement Tenant Improvements Furniture, Fixtures & Equipment Design & Pricing Contingency LEED Premium (not applied) Soft Cost Contingency 4,000 380R Dwight 52,000 total 380 Dwight Building D $ $ $ 155,500 $ 23,095 0.06 $ 9,330 $ 1,550 $ $ $ $ $ 15,550 3% $ - SUB-TOTAL HARD COSTS Soft Costs Arch'l & Engineering Other Consultants Project Management Legal Utilities Marketing Real Estate Taxes GrossLeasableSpace 48,000 380Dwight $ 1.50% 1.00% 0.25% 0.00% 205,025 $ Total $ $ $ $ $ $ $ $ $ $ $ $ - $ 380 Dwight Building D Total $ $ $ $ 2,679 $ $ $ $ $ $ 1,786 $ $ $ 893 $ $ $ $ $ $ 863 $ 9,182 $ 155,500 23,095 9,330 1,550 15,550 205,025 2,679 1,786 893 10,045 5.00% $ 311 $ 459 $ 770 SUB-TOTAL SOFT COSTS $ 6,531 $ 9,641 $ 16,173 Total Hard & Soft Costs, before Financing Costs $ 211,556 $ 9,641 $ 221,198 McCabe Enterprises Holyoke | 380 / 380R Dwight Street 197 Site Land Area Building Footprint SF 380 Dwight Street Building D 84,506 4,000 Floors total 380 Dwight Building D 1 1 Buildings Loan Financing Costs Legal, Escrow, Title Loan Fees Appraisal Interest Construction Loan 12 months Permanent Financing Need 5.0% 1 Ultra Basic Immediate Stabilization of ultra basic building envelope and life safety code compliance for a portion of 380R Dwight, Building D to be completed with a short-term phase. 380 Dwight Building D $ 10,000 1% $ 2,251 $ 3,000 $ 7,027 $ 233,834 Conventional Ultra Basic Immediate Approach Total $ $ $ $ $ 10,000 2,251 3,000 7,027 233,834 Initial Operating Income for 380 Dwight Building D following Ultra Basic Immediate Phase Units/ SF Basement First Floor 4,000 Average Annual Rent Annual Gross Income $ $ $ $ $ $ $ 5.50 - Sub-Total 7.5% Discount for Vacancies Effective Gross Income 7.50% $ $ Expenses Maintenance Taxes Utilities Management Net Operating Income Cash Flow -- Year One Effective Gross Income Net Operating Income Annual Debt Service Surplus/deficit Year 1 Return on Equity 198 (1,650) 20,350 380 Dwight Building D 10% $ 2,035.00 $ 863 7.5% $ 1,526 2.5% $ 509 $ 15,417 Financing Debt Service Coverage Amount Available for Debt Service Maximum Loan at Debt Service Constant Actual Loan Annual Debt Service Payment Amortization Period Interest Rate Debt Service Constant 22,000 22,000 Total $ $ $ $ $ 380 Dwight Building D Total 1.25 $ 12,334 $186,878 12,334 $ $ $ $ 2,035 863 1,526 509 15,417 - $ $ $ 12,334 186,878 $ 12,334 $ $ $ $ Total 20,350 15,417 12,334 3,083 30 years 5.00% 6.600% 380 Dwight Building D $ 20,350 $ 15,417 12,334 $ 3,083 15.4% Holyoke | 380 / 380R Dwight Street McCabe Enterprises Site Land Area Building Footprint SF Floors Buildings 380 Dwight Street Building D 84,506 4,000 total 380 Dwight Building D 1 1 Ultra Basic Immediate Stabilization of ultra basic building envelope and life safety code compliance for a portion of 380R Dwight, Building D to be completed with a short-term phase. 1 Conventional Ultra Basic Immediate Approach SOURCES & RETURNS Conventional Loan Equity Requirement $ $ 186,878 20,000 Owners' Equity Contribution Sub-Total $ 206,878 Sources to be Identified $ 26,956 Federal 10% Historic Tax Credit (non-certified) $ 10,578 Valued at .5 of credit value; More advantageous for owner to take advantage of credit, if feasible, in lieu of selling credit. Municipal Assistance or Add'l Owners Equity $ 16,378 Surplus funds for continued annual improvements $ 3,083 McCabe Enterprises Holyoke | 380 / 380R Dwight Street 199 Site Land Area Building Footprint SF 380 Dwight Street -- Building D 49,223 total 4,000 380 Dwight Building D Floors 1 1 Buildings SF per floor & building D 380 Dwight Bsmt Assessed Valuation Land Building Extra Features Total 380Dwight $40,400 $176,600 $ D only 2nd Floor 1st Floor 3rd Floor Attic Total 4,000 $ GrossLeasableSpace 48,000 380DwightBldg.C 4,000 380DwightBldg.D 52,000 total 217,000 SUB-TOTAL HARD COSTS Code Consultant Soft Cost Contingency 380 Dwight Building D $ $ $ 155,500 $ 23,095 $ 9,330 $ 1,550 $ $ $ $ $ 15,550 $ $ 0.00% 1.50% 0.00% 1.00% 0.50% 0.00% 205,025 $ 380 Dwight 380 R $ $ $ 2,679 $ $ $ $ 1,786 $ $ 893 $ $ $ $ 863 Total $ $ $ $ $ $ $ $ $ $ $ $ - - $ Total $ $ $ $ $ $ $ 155,500 23,095 9,330 1,550 15,550 205,025 2,679 1,786 893 863 5.00% $ 311 $ - $ 311 8.0% $ 6,531 $ - $ 6,531 $ 211,556 $ - $ 211,556 SUB-TOTAL SOFT COSTS Total Hard & Soft Costs, before Financing Costs 200 Low Interest Ultra Basic Immediate Approach 4,000 Hard Costs Acquisition None assumed Site Work Construction Hard Costs General Conditions, Bonds, Insurance, Overhead Escalation 0.06 Permits Demolition not included Hazardous Materials/Abatement Tenant Improvements Furniture, Fixtures & Equipment Design & Pricing Contingency 10% LEED Premium (not applied) 3% Soft Costs Arch'l & Engineering Other Consultants Project Management Legal Utilities Marketing Real Estate Taxes 1 Phase 1 Stabilization of ultra basic building envelope and life safety code compliance for a portion of 380R Dwight, Building D to be completed with a short-term phase. Holyoke | 380 / 380R Dwight Street McCabe Enterprises Site Land Area Building Footprint SF 380 Dwight Street -- Building D 49,223 total 4,000 380 Dwight Building D Floors 1 1 Buildings Loan Financing Costs Legal, Escrow, Title Loan Fees Appraisal Interest Construction Loan 18 months Permanent Financing Need D only 4.25% 1 Phase 1 Stabilization of ultra basic building envelope and life safety code compliance for a portion of 380R Dwight, Building D to be completed with a short-term phase. 380 Dwight Building D $ 10,000 1% $ 2,240 $ 3,000 $ 5,960 $ 232,756 Low Interest Ultra Basic Immediate Approach Total $ $ $ $ $ 10,000 2,240 3,000 5,960 232,756 Initial Operating Income for 380 Dwight Building D following Ultra- Basic Immediate Phase Units/ SF Basement First Floor 4,000 Average Annual Rent Annual Gross Income $ $ $ $ $ $ $ 5.25 - Sub-Total 7.5% Discount for Vacancies Effective Gross Income 7.50% $ $ Expenses Maintenance Taxes Utilities Management Sub-total Operating Expenses Net Operating Income Cash Flow -- Year One Effective Gross Income Net Operating Income Annual Debt Service Surplus/deficit Year 1 Return on Equity McCabe Enterprises (1,575) 19,425 380 Dwight Building D 10% $ 1,943 $ 863 7.5% $ 1,457 2.5% $ 486 $ 4,748 $ 14,677 Financing Debt Service Coverage Amount Available for Debt Service Maximum Loan at Debt Service Constant Actual Loan Annual Debt Service Payment Amortization Period Interest Rate Debt Service Constant 21,000 21,000 Total $ $ $ $ $ $ 380 Dwight Building D Total 1.25 $ $ 11,742 $189,631 189,631 11,742 $ $ $ $ 1,943 863 1,457 486 4,748 14,677 - $ $ $ 11,742 189,631 $ 11,742 $ $ $ $ Total 19,425 14,677 11,742 2,935 30 years 4.25% 6.192% 380 Dwight Building D $ 19,425 $ 14,677 $ $ 11,742 $ $ 2,935 $ - 14.7% Holyoke | 380 / 380R Dwight Street 201 Site Land Area Building Footprint SF Floors Buildings 380 Dwight Street -- Building D 49,223 total 4,000 380 Dwight Building D 1 1 D only Phase 1 Stabilization of ultra basic building envelope and life safety code compliance for a portion of 380R Dwight, Building D to be completed with a short-term phase. 1 Low Interest Ultra Basic Immediate Approach SOURCES & RETURNS Conventional Loan Equity Requirement $ $ 189,631 20,000 Owners' Equity Contribution Sub-Total $ 209,631 Sources to be Identified $ 23,125 10% federal Historic Tax Credit (non-certified) $ 10,578 Valued at .5 of credit value; More advantageous for owner to take advantage of credit, if feasible, in lieu of selling credit. CDBG Assistance; Other Municipal Assistance; or Additional Equity $ 12,548 Surplus funds for continued annual improvements $ 2,935 202 Holyoke | 380 / 380R Dwight Street McCabe Enterprises Site Land Area Building Footprint SF 380 Dwight Street -- Building D 49,223 total 4,000 380 Dwight Building D Floors 1 1 Buildings SF per floor & building D 380 Dwight Bsmt Assessed Valuation Land Building Extra Features Total 380Dwight $40,400 $176,600 $ D only 2nd Floor 1st Floor 3rd Floor Attic Total 4,000 4,000 $ GrossLeasableSpace 48,000 380DwightBldg.C 4,000 380DwightBldg.D 52,000 total 217,000 SUB-TOTAL HARD COSTS Code Consultant Soft Cost Contingency 380 Dwight Building D $ $ $ 294,820 $ 43,928 $ 17,689 $ 3,240 $ $ $ $ $ 53,952 $ $ 0.00% 1.50% 0.00% 1.00% 0.50% 0.00% 413,629 $ 380 Dwight 380 R $ $ $ 5,081 $ $ $ $ 3,387 $ $ 1,694 $ $ $ $ 863 Total $ $ $ $ $ $ $ $ $ $ $ $ - - $ Total $ $ $ $ $ $ $ 294,820 43,928 17,689 3,240 53,952 413,629 5,081 3,387 1,694 863 5.00% $ 551 $ - $ 551 8.0% $ 11,576 $ - $ 11,576 $ 425,205 $ - $ 425,205 SUB-TOTAL SOFT COSTS Total Hard & Soft Costs, before Financing Costs McCabe Enterprises Low Interest Incremental Hybrid Approach Hard Costs Acquisition* None assumed Site Work Construction Hard Costs General Conditions, Bonds, Insurance, Overhead Escalation 0.06 Permits Demolition not included Hazardous Materials/Abatement Tenant Improvements Furniture, Fixtures & Equipment Design & Pricing Contingency LEED Premium (not applied) 3% Soft Costs Arch'l & Engineering Other Consultants Project Management Legal Utilities Marketing Real Estate Taxes 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for Building D. Holyoke | 380 / 380R Dwight Street 203 Site Land Area Building Footprint SF 380 Dwight Street -- Building D 49,223 total 4,000 380 Dwight Building D Floors 1 1 Buildings Loan Financing Costs Legal, Escrow, Title Loan Fees Appraisal Interest Construction Loan 18 months Permanent Financing Need 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for Building D. Low Interest Incremental Hybrid Approach D only 4.25% 380 Dwight Building D $ 10,000 1% $ 4,383 $ 3,000 $ 11,633 $ 454,221 Total $ $ $ $ $ 10,000 4,383 3,000 11,633 454,221 Initial Operating Income for 380 Dwight Building D following Base Stabilization Units/ SF Basement First Floor 4,000 Average Annual Rent Annual Gross Income $ $ $ $ $ $ $ 5.50 - Sub-Total 7.5% Discount for Vacancies Effective Gross Income Expenses Maintenance Taxes Utilities Management Sub-total Operating Expenses Net Operating Income Financing Debt Service Coverage Amount Available for Debt Service Maximum Loan at Debt Service Constant Actual Loan Annual Debt Service Payment Amortization Period Interest Rate Debt Service Constant 204 30 years 4.25% 6.192% 7.50% $ $ 22,000 22,000 (1,650) 20,350 380 Dwight Building D 10% $ 2,035 $ 863 7.5% $ 1,526 2.5% $ 509 $ 4,933 $ 15,417 Total $ $ $ $ $ $ 380 Dwight Building D Total 1.25 $ $ 12,334 $199,192 408,799 12,334 $ $ $ $ 2,035 863 1,526 509 4,933 15,417 - $ $ $ 12,334 199,192 $ 12,334 The amount of the required loan significantly exceeds the prospective net operating income, based on $5.50 SF gross rental income. Holyoke | 380 / 380R Dwight Street McCabe Enterprises Site Land Area Building Footprint SF Floors Buildings 380 Dwight Street -- Building D 49,223 total 4,000 380 Dwight Building D 1 1 1 Phase 1 Stabilization of basic building envelope and life safety code compliance for Building D. Low Interest Incremental Hybrid Approach D only Cash Flow -- Year One Effective Gross Income Net Operating Income Annual Debt Service Surplus/deficit 380 Dwight Building D $ 20,350 $ 15,417 $ $ 12,334 $ $ 3,083 $ - $ $ $ $ Total 20,350 15,417 12,334 3,083 SOURCES & RETURNS Conventional Loan Equity Requirement $ $ 199,192 20,000 Owners' Equity Contribution Sub-Total $ 219,192 Sources to be Identified $ 235,030 Surplus funds for continued annual improvements $ McCabe Enterprises - Holyoke | 380 / 380R Dwight Street 205 Site Land Area Building Footprint SF Building Footprint SF Floors Buildings 380 & 380R Dwight Street SF per floor & building A 380 R Dwight B 380 R Dwight Bsmt 84,506 16,000 19,500 3 4 total 380 Dwight 380 R Dwight 2 Full Development 2nd Floor 3rd Floor 1st Floor 10000 10000 10,000 9500 9500 9,500 12,000 12,000 12,000 10,000 C 380 Dwight D 380 Dwight Assessed Valuation Land Building Extra Features Total Phase 1 Attic Total 10000 50,000 28,500 12,000 48,000 4,000 4,000 380Dwight $40,400 $176,600 $ $ 380R Dwight $ 33,200 $ 197,800 $ 217,000 $ 231,000 Hard Costs Acquisition* Site Work Construction Hard Costs General Conditions, Bonds,Insurance, Overhead Escalation Permits Demolition Hazardous Materials/Abatement Tenant Improvements Furniture, Fixtures & Equipment Design & Pricing Contingency LEED Premium (not applied) GrossLeasableSpace 52,000 380Dwight 78,500 380R Dwight 130,500 total 380 Dwight 380R Dwight $ $ $ $ $ 2,966,600 $ 4,486,250 $ 442,024 $ 668,452 0.06 $ 177,996 $ 269,175 $ 32,603 $ 49,304 $ $ $ $ $ $ $ $ $ 542,883 $ 820,977 3% $ $ - SUB-TOTAL HARD COSTS $ 4,162,106 $ 6,294,158 $ $ $ $ $ $ $ $ $ $ $ $ 7,452,850 1,110,476 447,171 81,907 1,363,860 - $ 10,456,264 $ $ $ $ $ $ $ Total 540,332 111,793 372,643 74,529 18,632 74,529 35,616 Soft Costs Arch'l & Engineering Other Consultants Project Management Legal Utilities Marketing Real Estate Taxes 7.25% 1.50% 5.00% 1.00% 0.25% 1.00% Soft Cost Contingency 5.00% $ 24,595 $ 36,808 $ 61,404 SUB-TOTAL SOFT COSTS $ 516,503 $ 772,973 $ 1,289,476 Total Hard & Soft Costs, before Financing Costs $ 4,678,609 $ 7,067,131 $ 11,745,740 206 380 Dwight 380R Dwight $ 215,079 $ 325,253 $ 44,499 $ 67,294 $ 148,330 $ 224,313 $ 29,666 $ 44,863 $ 7,417 $ 11,216 $ 29,666 $ 44,863 $ 17,252 $ 18,365 Total Holyoke | 380 / 380R Dwight Street McCabe Enterprises Site Land Area Building Footprint SF Building Footprint SF Floors Buildings Loan Financing Costs Legal, Escrow, Title Loan Fees Appraisal Interest Construction Loan Permanent Financing Need 380 & 380R Dwight Street 84,506 16,000 19,500 3 4 total 380 Dwight 380 R Dwight 24 months 5.0% Phase 1 2 Full Development 380 Dwight 380 R Total $ 10,000 $ 10,000 $ 20,000 1% $ 42,779.18 $ 64,200.51 $ 106,980 $ 5,000 $ 5,000 $ 10,000 $ 100,812 $ 110,893 $ 211,706 $ 4,837,200 $ 7,257,225 $ 12,094,425 Operating Income for 380 Dwight 380 Dwight Units/ SF First Floor -- Canal Gallery 1st Flr: Ofc/Mfg: Maker Space 2nd Flr: Live/Work Lofts 3rd Flr: Live/Work Lofts Attic: Live Work Lofts 3000 10000 10000 10000 8000 Average Annual Rent Annual Gross Income $ $ $ $ $ $ $ $ $ $ $ $ $ 2.00 7.50 13.85 13.85 10.00 - Sub-Total 7.5% Discount for Vacancies Effective Gross Income for 380 Dwight 10.00% $ $ 6,000 75,000 138,500 138,500 80,000 438,000 (43,800) 394,200 Operating Income for 380 R Dwight 380 R Dwight Units/ SF Basement First Floor -- 380 Gallery 1st Flr:- Ofc/Mfg: Maker Space 2nd Flr: Live/Work Lofts 3rd Flr: Live/Work Lofts Attic: Live Work Lofts Sub-Total 7.5% Discount for Vacancies Effective Gross Income for 380 Dwight Expenses Maintenance Taxes Utilities Management Net Operating Income McCabe Enterprises 10000 1500 19500 19500 19500 10000 Average Annual Rent Annual Gross Income $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2.00 5.00 10.00 13.85 13.85 13.85 - 10.00% $ $ 20,000 7,500 195,000 270,075 270,075 138,500 881,150 (43,800) 837,350 380 Dwight 380R Dwight 10% $ 39,420 $ 83,735 $ 8,626 $ 9,182 7.5% $ 29,565 $ 62,801 2.5% $ 9,855 $ 20,934 $ 306,734 $ 660,698 Holyoke | 380 / 380R Dwight Street $ $ $ $ $ Total 123,155 17,808 92,366 30,789 967,432 207 Site Land Area Building Footprint SF Building Footprint SF Floors Buildings 380 & 380R Dwight Street 84,506 16,000 19,500 3 4 total 380 Dwight 380 R Dwight Financing Debt Service Coverage Amount Available for Debt Service Amount of Loan at Debt Service Constant Annual Debt Service Payment Amortization Period Interest Rate Debt Service Constant Cash Flow -- Year One Effective Gross Income Net Operating Income Annual Debt Service Surplus/deficit Year 1 Return on Equity Phase 1 2 Full Development 380 Dwight 380R Dwight 1.25 $ 245,387 $3,809,180 245,387 $ 528,558 $8,204,877 528,558 Total $ $ $ $ 773,946 12,014,058 773,946 $ $ $ $ Total 1,231,550 967,432 773,946 193,486 30 years 5.00% 6.442% $ $ $ $ 380 Dwight 394,200 306,734 245,387 61,347 12.3% 380R Dwight $ 837,350 $ 660,698 528,558 $ 132,140 17.6% SOURCES & RETURNS New Market Tax Credits $ 1,550,000 $ 2,650,000 $3 M & $5M NMTC alloc. sold at $.55/$1 of Historic Tax Credits -- Federal $ 551,441 $ 827,324 20% of HRTC eligible basis sold at $.60 of credit less add'l legal ($100,000) equity per $1 of credit State Historic Tax Credits $ 600,000 $ 600,000 Allocation of $1,000,000/ea anticipated at $0.6 per $1 of credit Equity Requirement $ 500,000 $750,000 Private Equity or Community Investment Grant for Equity 8,204,877 Conventional Financing, 5% at 30 years Permanent Loan $ 3,809,180 $ Sub-Total $ 7,010,621 $ 13,032,201 Sources to be Identified $ 2,173,421 $ 8,195,001 Stronger rent structure is required to support redevelopment. Phased redevelopment by building for 380 R would enable a smaller discrete project, that could be more viable. 208 Holyoke | 380 / 380R Dwight Street McCabe Enterprises A appendix McCabe Enterprises A1 HUD Lead-Based Paint Fact Sheet A2 Flood Plain Map A3.1 Cost Estimate: 106-120 High Street A3.2 Cost Estimate: 276 High Street A3.3 Cost Estimate: 200 Race Street A3.4 Cost Estimate: 380/ 380R Dwight Street A.4 Pro Forma Definitions Holyoke 209 A1 HUD Lead-Based Paint Fact Sheet 210 Holyoke McCabe Enterprises A1 HUD Lead-Based Paint Fact Sheet McCabe Enterprises Holyoke 211 212 Holyoke McCabe Enterprises A2 McCabe Enterprises flood plain map Holyoke 213 214 Holyoke McCabe Enterprises FIRM Map with Study Building Locations Identified study building 106-120 High 274 High 380/380R Dwight 200 Race McCabe Enterprises Holyoke 215 Holyoke | Appendix McCabe Enterprises A3.4 cost estimate 380/ 380R Dwight Street McCabe Enterprises Holyoke | Appendix 295 Holyoke | Appendix McCabe Enterprises Feasibility Submission Holyoke; 386 Dwight Street Building PHASE 1 Stabilization Holyoke, MA Prepared for: McCabe Enterprises April 7, 2014 Holyoke; 386 Dwight Street Building PHASE 1 Stabilization 07-Apr-14 Holyoke, MA Feasibility Submission MAIN CONSTRUCTION COST SUMMARY Gross Floor Area $/sf Estimated Construction Cost GALLERY 380 BUILDING STABILIZATION BUILDING 380 STABILIZATION BUILDING A ONLY 50,000 $8.50 $425,000 BUILDING 380 STABILIZATION BUILDING B ONLY (Mothballing no work assumed) 28,000 $0.00 $0 SITEWORK - No Work Assumed NIC HAZMAT REMOVALS SUB-TOTAL 50,000 $8.50 NIC $425,000 GENERAL CONDITIONS BONDS INSURANCE PERMIT 8% 0.65% 1.25% 1.00% $34,000 $2,763 $5,313 $4,671 OVERHEAD AND FEE ESCALATION TO MID-POINT (assumed 2 years) 5% 6.00% $21,250 $25,500 15% $77,775 DESIGN AND PRICING CONTINGENCY TOTAL OF ALL CONSTRUCTION - GALLERY 380 STABILIZATION Summary 50,000 Page 2 $11.93 $596,272 PMC - Project Management Cost Holyoke; 386 Dwight Street Building PHASE 1 Stabilization 07-Apr-14 Holyoke, MA Feasibility Submission These Feasibility Construction cost estimates were produced from drawings, outline specifications and other documentation prepared by McCabe Enterprises and their design team dated March, 2014. Design and engineering changes occurring subsequent to the issue of these documents have not been incorporated in this estimate. This estimate includes all direct construction costs, general contractor’s overhead and profit and design contingency. Cost escalation assumes start dates indicated. Bidding conditions are expected to be public bidding under Chapter 149 of the Massachusetts General Laws to pre-qualified general contractors, and pre-qualified sub-contractors, open specifications for materials and manufactures. The estimate is based on prevailing wage rates for construction in this market and represents a reasonable opinion of cost. It is not a prediction of the successful bid from a contractor as bids will vary due to fluctuating market conditions, errors and omissions, proprietary specifications, lack or surplus of bidders, perception of risk, etc. Consequently the estimate is expected to fall within the range of bids from a number of competitive contractors or subcontractors, however we do not warrant that bids or negotiated prices will not vary from the final construction cost estimate. ITEMS NOT CONSIDERED IN THIS ESTIMATE Items not included in this estimate are: All professional fees and insurance Building Permit costs Land acquisition, feasibility, and financing costs All Furnishings, Fixtures and Equipment Items identified in the design as Not In Contract (NIC) Items identified in the design as by others Owner supplied and/or installed items (e.g. draperies, furniture and equipment) Rock excavation; special foundations (unless indicated by design engineers) Utility company back charges, including work required off-site Work to City streets and sidewalks, (except as noted in this estimate) Summary Page 3 PMC - Project Management Cost Holyoke; 386 Dwight Street Building PHASE 1 Stabilization Holyoke, MA 07-Apr-14 Feasibility Submission GFA BUILDING SYSTEM CONSTRUCTION COST SUMMARY SUB-TOTAL GALLERY 380 STABILIZATION A10 FOUNDATIONS A1010 Standard Foundations A1020 Special Foundations A1030 Lowest Floor Construction A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 TOTAL $/SF 50,000 % $0 $0 $0 $0 $0.00 0.0% BASEMENT CONSTRUCTION A2010 Basement Excavation A2020 Basement Walls $0 $0 $0 $0.00 0.0% SUPERSTRUCTURE B1010 Upper Floor Construction B1020 Roof Construction $0 $0 $0 $0.00 0.0% EXTERIOR CLOSURE B2010 Exterior Walls B2020 Windows B2030 Exterior Doors $105,000 $5,000 $0 $110,000 $2.20 25.9% ROOFING B3010 Roof Coverings B3020 Roof Openings $70,000 $0 $70,000 $1.40 16.5% $0 $0 $7,500 $7,500 $0.15 1.8% STAIRCASES C2010 Stair Construction C2020 Stair Finishes $0 $0 $0 $0.00 0.0% INTERIOR FINISHES C3010 Wall Finishes C3020 Floor Finishes C3030 Ceiling Finishes $0 $0 $0 $0 $0.00 0.0% CONVEYING SYSTEMS D1010 Elevator $0 $0 $0.00 0.0% PLUMBING D20 Plumbing $0 $0 $0.00 0.0% HVAC D30 $0 $0 $0.00 0.0% INTERIOR CONSTRUCTION C1010 Partitions C1020 Interior Doors C1030 Specialties/Millwork HVAC Holyoke 386 Dwight Street Estimate PH1 Only Page 4 PMC - Project Management Cost Holyoke; 386 Dwight Street Building PHASE 1 Stabilization Holyoke, MA 07-Apr-14 Feasibility Submission BUILDING SYSTEM GFA CONSTRUCTION COST SUMMARY SUB-TOTAL GALLERY 380 STABILIZATION D40 FIRE PROTECTION D40 Fire Protection D50 E10 E20 F10 F20 TOTAL $/SF 50,000 % $0 $0 $0.00 0.0% $237,500 $237,500 $4.75 55.9% $0 $0 $0.00 0.0% FURNISHINGS E2010 Fixed Furnishings E2020 Movable Furnishings $0 NIC $0 $0.00 0.0% SPECIAL CONSTRUCTION F10 Special Construction $0 $0 $0.00 0.0% HAZMAT REMOVALS F2010 Building Elements Demolition F2020 Hazardous Components Abatement $0 $0 $0 $0.00 0.0% $425,000 $8.50 100.0% ELECTRICAL D5010 New Electrical Systems EQUIPMENT E10 Equipment TOTAL DIRECT COST (Trade Costs) Holyoke 386 Dwight Street Estimate PH1 Only Page 5 PMC - Project Management Cost Holyoke; 386 Dwight Street Building PHASE 1 Stabilization Holyoke, MA 07-Apr-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 50,000 TOTAL COST GALLERY 380 STABILIZATION 1 GROSS FLOOR AREA CALCULATION 2 3 4 BLDG A BLDG B 10,000 10,000 NIC 10,000 NIC 10,000 NIC 10,000 Basement 1st Floor 2nd Floor 3rd Floor Attic 5 6 7 8 9 10 TOTAL GROSS FLOOR AREA (GFA) 50,000 sf 11 12 13 A10 FOUNDATIONS 14 15 16 A1010 STANDARD FOUNDATIONS No Work in this section 17 SUBTOTAL - 18 19 A1020 SPECIAL FOUNDATIONS 20 No Work in this section 21 SUBTOTAL 22 23 A1030 LOWEST FLOOR CONSTRUCTION 24 No Work in this section 25 SUBTOTAL 26 27 TOTAL - FOUNDATIONS 28 29 30 A20 BASEMENT CONSTRUCTION 31 32 A2010 BASEMENT EXCAVATION 33 No Work in this section 34 SUBTOTAL 35 36 A2020 BASEMENT WALLS 37 No Work in this section 38 SUBTOTAL 39 40 TOTAL - BASEMENT CONSTRUCTION 41 42 43 B10 SUPERSTRUCTURE 44 45 B1010 FLOOR CONSTRUCTION 46 No Work in this section 47 SUBTOTAL 48 49 B1020 ROOF CONSTRUCTION 50 No Work in this section 51 SUBTOTAL 52 53 TOTAL - SUPERSTRUCTURE 54 55 56 B20 EXTERIOR CLOSURE 57 58 B2010 EXTERIOR WALLS Holyoke 386 Dwight Street Estimate PH1 Only Page 6 PMC - Project Management Cost Holyoke; 386 Dwight Street Building PHASE 1 Stabilization Holyoke, MA 07-Apr-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 50,000 TOTAL COST GALLERY 380 STABILIZATION 59 Patch/ repair brick where damage has occurred due to upper level leaks. Assume 2 locations of 1,500 sf and 1 location of 2,000sf floor area. 60 SUBTOTAL 3,000 sf 35.00 105,000 $105,000 61 62 B2020 WINDOWS 63 Board any broken or missing windows to ensure safety and provide weather protection. 64 SUBTOTAL 1 ls 5,000.00 5,000 $5,000 65 66 67 B2030 EXTERIOR DOORS No Work in this section 68 SUBTOTAL - 69 70 TOTAL - EXTERIOR CLOSURE $110,000 71 72 73 B30 ROOFING 74 75 76 77 B3010 ROOF COVERINGS Flat roofing Patch roof as required. Minor repairs are needed across building (assume 5% of total area). 78 At northern corner at the canal, repair to roof, parapet, cap and flashing needed where water damage present inside (assume 2,000sf roof area). 79 SUBTOTAL 500 sf 20.00 10,000 2,000 sf 30.00 60,000 $70,000 80 81 82 B3020 ROOF OPENINGS No Work in this section 83 SUBTOTAL 84 85 86 87 88 TOTAL - ROOFING C10 $70,000 INTERIOR CONSTRUCTION 89 90 91 C1010 PARTITIONS No Work in this section 92 SUBTOTAL 93 94 95 C1020 INTERIOR DOORS No Work in this section 96 SUBTOTAL 97 98 99 C1030 SPECIALTIES / MILLWORK Egress signage 100 50,000 SUBTOTAL gfa 0.15 7,500 $7,500 101 102 TOTAL - INTERIOR CONSTRUCTION $7,500 103 104 105 C20 STAIRCASES 106 107 108 109 C2010 STAIR CONSTRUCTION No Work in this section SUBTOTAL 110 111 112 113 C2020 STAIR FINISHES No Work in this section SUBTOTAL 114 115 TOTAL - STAIRCASES 116 Holyoke 386 Dwight Street Estimate PH1 Only Page 7 PMC - Project Management Cost Holyoke; 386 Dwight Street Building PHASE 1 Stabilization Holyoke, MA 07-Apr-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 50,000 TOTAL COST GALLERY 380 STABILIZATION 117 118 C30 INTERIOR FINISHES 119 120 121 C3010 WALL FINISHES No Work in this section 122 SUBTOTAL 123 124 125 C3020 FLOOR FINISHES No Work in this section 126 SUBTOTAL 127 128 C3030 CEILING FINISHES 129 No Work in this section 130 SUBTOTAL 131 132 TOTAL - INTERIOR FINISHES 133 134 135 D10 CONVEYING SYSTEMS 136 137 138 139 D1010 ELEVATOR No Work in this section SUBTOTAL 140 141 TOTAL - CONVEYING SYSTEMS 142 143 144 D20 PLUMBING D20 PLUMBING, GENERALLY 145 146 147 No Work in this section 148 SUBTOTAL 149 150 TOTAL - PLUMBING 151 152 153 D30 HVAC D30 HVAC, GENERALLY No Work in this section 154 155 156 157 SUBTOTAL 158 159 TOTAL - HVAC 160 161 162 D40 FIRE PROTECTION D40 FIRE PROTECTION, GENERALLY Existing sprinkler system to remain 163 164 165 166 New water service 167 SUBTOTAL 50,000 1 gfa ls 4.00 NIC 30,000.00 NIC 168 169 TOTAL - FIRE PROTECTION 170 171 172 D50 ELECTRICAL 173 174 175 D5010 ELECTRICAL SYSTEMS New smoke detectors 50,000 gfa 0.25 12,500 176 New fire alarm system 50,000 gfa 2.50 125,000 177 Minimal lighting 50,000 gfa 2.00 100,000 178 SUBTOTAL $237,500 179 180 Holyoke 386 Dwight Street Estimate PH1 Only Page 8 PMC - Project Management Cost Holyoke; 386 Dwight Street Building PHASE 1 Stabilization Holyoke, MA 07-Apr-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 50,000 TOTAL COST GALLERY 380 STABILIZATION 181 TOTAL - ELECTRICAL $237,500 182 183 184 E10 EQUIPMENT E10 EQUIPMENT, GENERALLY No Work in this section 185 186 187 188 SUBTOTAL 189 190 TOTAL - EQUIPMENT 191 192 193 E20 FURNISHINGS 194 195 196 E2010 FIXED FURNISHINGS No Work in this section 197 SUBTOTAL 198 199 200 E2020 MOVABLE FURNISHINGS All movable furnishings to be provided and installed by owner 201 SUBTOTAL NIC 202 203 TOTAL - FURNISHINGS 204 205 206 F10 SPECIAL CONSTRUCTION F10 SPECIAL CONSTRUCTION SUBTOTAL 207 208 209 210 211 TOTAL - SPECIAL CONSTRUCTION 212 213 214 F20 SELECTIVE BUILDING DEMOLITION 215 216 F2010 BUILDING ELEMENTS DEMOLITION 217 No Work in this section 218 SUBTOTAL 219 220 221 222 F2020 HAZARDOUS COMPONENTS ABATEMENT Excluded SUBTOTAL See Summary 223 224 TOTAL - SELECTIVE BUILDING DEMOLITION Holyoke 386 Dwight Street Estimate PH1 Only Page 9 PMC - Project Management Cost Feasibility Submission Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D Holyoke, MA Prepared for: McCabe Enterprises June 12, 2014 Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D 12-Jun-14 Holyoke, MA Feasibility Submission MAIN CONSTRUCTION COST SUMMARY Gross Floor Area $/sf Estimated Construction Cost GALLERY 380 BUILDING STABILIZATION 4,000 BUILDING D 380 STABILIZATION $73.71 SITEWORK - No Work Assumed $294,820 NIC HAZMAT REMOVALS SUB-TOTAL 4,000 $73.71 NIC $294,820 GENERAL CONDITIONS BONDS INSURANCE PERMIT 8% 0.65% 1.25% 1.00% $23,586 $1,916 $3,685 $3,240 OVERHEAD AND FEE ESCALATION TO MID-POINT (assumed 2 years) 5% 6.00% $14,741 $17,689 15% $53,952 DESIGN AND PRICING CONTINGENCY TOTAL OF ALL CONSTRUCTION - GALLERY 380 BUILDING D STABILIZATION 4,000 ADD Alternate for new heating system Summary $103.41 ADD Page 2 $413,629 $70,000 PMC - Project Management Cost Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D 12-Jun-14 Holyoke, MA Feasibility Submission These Feasibility Construction cost estimates were produced from drawings, outline specifications and other documentation prepared by McCabe Enterprises and their design team dated June, 2014. Design and engineering changes occurring subsequent to the issue of these documents have not been incorporated in this estimate. This estimate includes all direct construction costs, general contractor’s overhead and profit and design contingency. Cost escalation assumes start dates indicated. Bidding conditions are expected to be public bidding under Chapter 149 of the Massachusetts General Laws to pre-qualified general contractors, and pre-qualified sub-contractors, open specifications for materials and manufactures. The estimate is based on prevailing wage rates for construction in this market and represents a reasonable opinion of cost. It is not a prediction of the successful bid from a contractor as bids will vary due to fluctuating market conditions, errors and omissions, proprietary specifications, lack or surplus of bidders, perception of risk, etc. Consequently the estimate is expected to fall within the range of bids from a number of competitive contractors or subcontractors, however we do not warrant that bids or negotiated prices will not vary from the final construction cost estimate. ITEMS NOT CONSIDERED IN THIS ESTIMATE Items not included in this estimate are: All professional fees and insurance Building Permit costs Land acquisition, feasibility, and financing costs All Furnishings, Fixtures and Equipment Items identified in the design as Not In Contract (NIC) Items identified in the design as by others Owner supplied and/or installed items (e.g. draperies, furniture and equipment) Rock excavation; special foundations (unless indicated by design engineers) Utility company back charges, including work required off-site Work to City streets and sidewalks, (except as noted in this estimate) Summary Page 3 PMC - Project Management Cost Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D Holyoke, MA 12-Jun-14 Feasibility Submission GFA BUILDING SYSTEM CONSTRUCTION COST SUMMARY SUB-TOTAL GALLERY 380 STABILIZATION BUILDING D A10 FOUNDATIONS A1010 Standard Foundations A1020 Special Foundations A1030 Lowest Floor Construction A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 TOTAL $/SF 4,000 % $0 $0 $0 $0 $0.00 0.0% BASEMENT CONSTRUCTION A2010 Basement Excavation A2020 Basement Walls $0 $0 $0 $0.00 0.0% SUPERSTRUCTURE B1010 Upper Floor Construction B1020 Roof Construction $0 $0 $0 $0.00 0.0% EXTERIOR CLOSURE B2010 Exterior Walls B2020 Windows B2030 Exterior Doors $25,000 $13,920 $12,000 $50,920 $12.73 17.3% ROOFING B3010 Roof Coverings B3020 Roof Openings $8,000 $0 $8,000 $2.00 2.7% INTERIOR CONSTRUCTION C1010 Partitions C1020 Interior Doors C1030 Specialties/Millwork $2,000 $0 $4,200 $6,200 $1.55 2.1% STAIRCASES C2010 Stair Construction C2020 Stair Finishes $32,000 $0 $32,000 $8.00 10.9% INTERIOR FINISHES C3010 Wall Finishes C3020 Floor Finishes C3030 Ceiling Finishes $10,000 $16,000 $0 $26,000 $6.50 8.8% $0 $0 $0.00 0.0% $84,000 $84,000 $21.00 28.5% $0 $0 $0.00 0.0% CONVEYING SYSTEMS D1010 Elevator PLUMBING D20 Plumbing HVAC D30 HVAC Holyoke 380 Dwight Street Estimate PH1 Building D Page 4 PMC - Project Management Cost Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D Holyoke, MA 12-Jun-14 Feasibility Submission BUILDING SYSTEM GFA CONSTRUCTION COST SUMMARY SUB-TOTAL GALLERY 380 STABILIZATION BUILDING D D40 FIRE PROTECTION D40 Fire Protection D50 E10 E20 F10 F20 TOTAL $/SF 4,000 % $38,000 $38,000 $9.50 12.9% $31,000 $31,000 $7.75 10.5% $2,700 $2,700 $0.68 0.9% FURNISHINGS E2010 Fixed Furnishings E2020 Movable Furnishings $0 NIC $0 $0.00 0.0% SPECIAL CONSTRUCTION F10 Special Construction $0 $0 $0.00 0.0% $16,000 $0 $16,000 $4.00 5.4% $294,820 $73.71 100.0% ELECTRICAL D5010 New Electrical Systems EQUIPMENT E10 Equipment HAZMAT REMOVALS F2010 Building Elements Demolition F2020 Hazardous Components Abatement TOTAL DIRECT COST (Trade Costs) Holyoke 380 Dwight Street Estimate PH1 Building D Page 5 PMC - Project Management Cost Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D Holyoke, MA 12-Jun-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 4,000 TOTAL COST GALLERY 380 STABILIZATION BUILDING D 1 2 TOTAL GROSS FLOOR AREA (GFA) 4,000 sf 3 4 5 A10 FOUNDATIONS 6 7 8 A1010 STANDARD FOUNDATIONS No Work in this section 9 SUBTOTAL - 10 11 A1020 SPECIAL FOUNDATIONS 12 No Work in this section 13 SUBTOTAL 14 15 A1030 LOWEST FLOOR CONSTRUCTION 16 No Work in this section 17 SUBTOTAL 18 19 TOTAL - FOUNDATIONS 20 21 22 A20 BASEMENT CONSTRUCTION 23 24 A2010 BASEMENT EXCAVATION 25 No Work in this section 26 SUBTOTAL 27 28 A2020 BASEMENT WALLS 29 No Work in this section 30 SUBTOTAL 31 32 TOTAL - BASEMENT CONSTRUCTION 33 34 35 B10 SUPERSTRUCTURE 36 37 B1010 FLOOR CONSTRUCTION 38 No Work in this section 39 SUBTOTAL 40 41 B1020 ROOF CONSTRUCTION 42 No Work in this section 43 SUBTOTAL 44 45 TOTAL - SUPERSTRUCTURE 46 47 48 B20 EXTERIOR CLOSURE 49 50 B2010 EXTERIOR WALLS 51 Patch/ repair brick where damage has occurred due to upper level leaks. 52 SUBTOTAL 1 ls 25,000.00 25,000 $25,000 53 54 B2020 WINDOWS Holyoke 380 Dwight Street Estimate PH1 Building D Page 6 PMC - Project Management Cost Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D Holyoke, MA 12-Jun-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 4,000 TOTAL COST GALLERY 380 STABILIZATION BUILDING D 55 Install new insulated glass, double hung windows (4 each) and new vent-type windows (4 each) with divided panes to match existing window profiles. 56 SUBTOTAL 1 ls 13,920.00 13,920 $13,920 57 58 B2030 EXTERIOR DOORS 59 Replace existing egress doors 60 SUBTOTAL 2 pr 6,000.00 12,000 12,000 61 62 TOTAL - EXTERIOR CLOSURE $50,920 63 64 65 B30 ROOFING 66 67 68 69 B3010 ROOF COVERINGS Flat roofing Patch roof as required. Minor repairs are needed across building (assume 10% of total area). 70 400 sf 20.00 8,000 SUBTOTAL $8,000 71 72 73 B3020 ROOF OPENINGS No Work in this section 74 SUBTOTAL 75 76 77 78 79 TOTAL - ROOFING C10 $8,000 INTERIOR CONSTRUCTION 80 81 82 C1010 PARTITIONS Utility closet 83 1 loc 2,000.00 2,000 SUBTOTAL $2,000 84 85 86 C1020 INTERIOR DOORS No Work in this section 87 SUBTOTAL 88 89 90 C1030 SPECIALTIES / MILLWORK Kitchenette casework 91 Egress signage 92 SUBTOTAL 6 4,000 lf gfa 600.00 3,600 0.15 600 $4,200 93 94 TOTAL - INTERIOR CONSTRUCTION $6,200 95 96 97 C20 STAIRCASES 98 99 100 C2010 STAIR CONSTRUCTION New egress stair and landing 101 New exterior stair and landing for egress door 102 SUBTOTAL 1 flt 25,000.00 25,000 1 flt 7,000.00 7,000 $32,000 103 104 105 C2020 STAIR FINISHES No Work in this section 106 SUBTOTAL 107 108 TOTAL - STAIRCASES $32,000 109 110 111 C30 INTERIOR FINISHES 112 113 114 115 C3010 WALL FINISHES Painting throughout 4,000 SUBTOTAL Holyoke 380 Dwight Street Estimate PH1 Building D gfa 2.50 10,000 $10,000 Page 7 PMC - Project Management Cost Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D Holyoke, MA 12-Jun-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 4,000 TOTAL COST GALLERY 380 STABILIZATION BUILDING D 116 117 118 C3020 FLOOR FINISHES Sand and polyurethane wood floors 119 4,000 sf 4.00 16,000 SUBTOTAL $16,000 120 121 C3030 CEILING FINISHES 122 No Work in this section 123 SUBTOTAL 124 125 TOTAL - INTERIOR FINISHES $26,000 126 127 128 D10 CONVEYING SYSTEMS 129 130 131 132 D1010 ELEVATOR No Work in this section SUBTOTAL 133 134 TOTAL - CONVEYING SYSTEMS 135 136 137 D20 PLUMBING D20 PLUMBING, GENERALLY 138 139 140 New ADA compliant restroom; complete 2 rms 40,000.00 80,000 141 Kitchenette sink 1 fxt 4,000.00 4,000 142 SUBTOTAL $84,000 143 144 TOTAL - PLUMBING $84,000 145 146 147 D30 HVAC D30 HVAC, GENERALLY No Work in this section 148 149 150 151 SUBTOTAL 152 153 TOTAL - HVAC 154 155 156 D40 FIRE PROTECTION D40 159 FIRE PROTECTION, GENERALLY Existing sprinkler system to remain; repair and upgrade as needed 160 New water service 161 SUBTOTAL 157 158 4,000 1 gfa ls 2.00 8,000 30,000.00 30,000 $38,000 162 163 TOTAL - FIRE PROTECTION $38,000 164 165 166 D50 ELECTRICAL 167 168 169 D5010 ELECTRICAL SYSTEMS New smoke detectors 4,000 gfa 0.25 1,000 170 New fire alarm system 4,000 gfa 2.50 10,000 171 New lighting 4,000 gfa 5.00 20,000 172 SUBTOTAL $31,000 173 174 175 TOTAL - ELECTRICAL $31,000 176 177 Holyoke 380 Dwight Street Estimate PH1 Building D Page 8 PMC - Project Management Cost Holyoke; 380 Dwight Street Building PHASE 1 Stabilization Building D Holyoke, MA 12-Jun-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 4,000 TOTAL COST GALLERY 380 STABILIZATION BUILDING D 178 E10 EQUIPMENT 179 180 E10 EQUIPMENT, GENERALLY 181 Dishwasher 1 ea 1,500.00 1,500 182 Refrigerator 1 ea 1,200.00 1,200 183 SUBTOTAL $2,700 184 185 TOTAL - EQUIPMENT $2,700 186 187 188 E20 FURNISHINGS 189 190 191 E2010 FIXED FURNISHINGS No Work in this section 192 SUBTOTAL 193 194 195 E2020 MOVABLE FURNISHINGS All movable furnishings to be provided and installed by owner 196 SUBTOTAL NIC 197 198 TOTAL - FURNISHINGS 199 200 201 F10 SPECIAL CONSTRUCTION F10 SPECIAL CONSTRUCTION SUBTOTAL 202 203 204 205 206 TOTAL - SPECIAL CONSTRUCTION 207 208 209 F20 SELECTIVE BUILDING DEMOLITION 210 211 F2010 BUILDING ELEMENTS DEMOLITION 212 Clear furniture etc 4,000 gfa 0.50 2,000 213 Remove all existing partitions, lofts, floors and casework. Remove any wiring within partitions. 4,000 gfa 3.00 12,000 214 Remove exterior windows and doors 2,000.00 2,000 215 SUBTOTAL 1 ls $16,000 216 217 218 219 F2020 HAZARDOUS COMPONENTS ABATEMENT Excluded SUBTOTAL See Summary 220 221 TOTAL - SELECTIVE BUILDING DEMOLITION Holyoke 380 Dwight Street Estimate PH1 Building D $16,000 Page 9 PMC - Project Management Cost Feasibility Submission Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA Prepared for: McCabe Enterprises March 16, 2014 Holyoke; 386 Dwight Street Building Buildings A,B, C and D 16-Mar-14 Holyoke, MA Feasibility Submission MAIN CONSTRUCTION COST SUMMARY Gross Floor Area $/sf Estimated Construction Cost GALLERY 380 BUILDING STABILIZATION 78,500 BUILDING 380 STABILIZATION $8.21 SITEWORK - No Work Assumed $644,150 NIC HAZMAT REMOVALS SUB-TOTAL 78,500 $8.21 NIC $644,150 GENERAL CONDITIONS BONDS INSURANCE PERMIT 8% 0.65% 1.25% 1.00% $51,532 $4,187 $8,052 $7,079 OVERHEAD AND FEE ESCALATION TO MID-POINT (assumed 2 years) 5% 6.00% $32,208 $38,649 15% $117,879 DESIGN AND PRICING CONTINGENCY TOTAL OF ALL CONSTRUCTION - GALLERY 380 STABILIZATION 78,500 $11.51 $903,736 78,500 $57.15 $4,486,250 GALLERY 380 BUILDING PRE-DEVELOPMENT BUILDING 380 PRE-DEVELOPMENT SITEWORK NIC HAZMAT REMOVALS SUB-TOTAL 78,500 $57.15 NIC $4,486,250 GENERAL CONDITIONS BONDS INSURANCE PERMIT 8% 0.65% 1.25% 1.00% $358,900 $29,161 $56,078 $49,304 OVERHEAD AND FEE ESCALATION TO MID-POINT (assumed 2 years) 5% 6.00% $224,313 $269,175 15% $820,977 DESIGN AND PRICING CONTINGENCY 78,500 TOTAL OF ALL CONSTRUCTION - GALLERY 360 PREDEVELOPMENT Summary Page 2 $80.18 $6,294,158 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D 16-Mar-14 Holyoke, MA Feasibility Submission CANAL GALLERY BUILDING STABILIZATION 52,000 CANAL BUILDING STABILIZATION $7.57 SITEWORK - No Work Assumed $393,800 NIC HAZMAT REMOVALS SUB-TOTAL 52,000 $7.57 NIC $393,800 GENERAL CONDITIONS BONDS INSURANCE PERMIT 8% 0.65% 1.25% 1.00% $31,504 $2,560 $4,923 $4,328 OVERHEAD AND FEE ESCALATION TO MID-POINT (assumed 2 years) 5% 6.00% $19,690 $23,628 15% $72,065 DESIGN AND PRICING CONTINGENCY 52,000 TOTAL OF ALL CONSTRUCTION - CANAL GALLERY STABILIZATION $10.62 $552,498 $57.05 $2,966,600 CANAL GALLERY BUILDING PRE-DEVELOPMENT 52,000 CANAL BUILDING PRE-DEVELOPMENT SITEWORK NIC HAZMAT REMOVALS SUB-TOTAL 52,000 $57.05 NIC $2,966,600 GENERAL CONDITIONS BONDS INSURANCE PERMIT 8% 0.65% 1.25% 1.00% $237,328 $19,283 $37,083 $32,603 OVERHEAD AND FEE ESCALATION TO MID-POINT (assumed 2 years) 5% 6.00% $148,330 $177,996 15% $542,883 DESIGN AND PRICING CONTINGENCY TOTAL OF ALL CONSTRUCTION - CANAL GALLERY PREDEVELOPMENT Summary Page 3 52,000 $80.04 $4,162,106 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D 16-Mar-14 Holyoke, MA Feasibility Submission These Feasibility Construction cost estimates were produced from drawings, outline specifications and other documentation prepared by McCabe Enterprises and their design team dated March, 2014. Design and engineering changes occurring subsequent to the issue of these documents have not been incorporated in this estimate. This estimate includes all direct construction costs, general contractor’s overhead and profit and design contingency. Cost escalation assumes start dates indicated. Bidding conditions are expected to be public bidding under Chapter 149 of the Massachusetts General Laws to pre-qualified general contractors, and pre-qualified sub-contractors, open specifications for materials and manufactures. The estimate is based on prevailing wage rates for construction in this market and represents a reasonable opinion of cost. It is not a prediction of the successful bid from a contractor as bids will vary due to fluctuating market conditions, errors and omissions, proprietary specifications, lack or surplus of bidders, perception of risk, etc. Consequently the estimate is expected to fall within the range of bids from a number of competitive contractors or subcontractors, however we do not warrant that bids or negotiated prices will not vary from the final construction cost estimate. ITEMS NOT CONSIDERED IN THIS ESTIMATE Items not included in this estimate are: All professional fees and insurance Building Permit costs Land acquisition, feasibility, and financing costs All Furnishings, Fixtures and Equipment Items identified in the design as Not In Contract (NIC) Items identified in the design as by others Owner supplied and/or installed items (e.g. draperies, furniture and equipment) Rock excavation; special foundations (unless indicated by design engineers) Utility company back charges, including work required off-site Work to City streets and sidewalks, (except as noted in this estimate) Summary Page 4 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA BUILDING SYSTEM CONSTRUCTION COST SUMMARY SUB-TOTAL GALLERY 380 STABILIZATION A10 FOUNDATIONS A1010 Standard Foundations A1020 Special Foundations A1030 Lowest Floor Construction A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 TOTAL $/SF 78,500 % $0 $0 $0 $0 $0.00 0.0% BASEMENT CONSTRUCTION A2010 Basement Excavation A2020 Basement Walls $0 $0 $0 $0.00 0.0% SUPERSTRUCTURE B1010 Upper Floor Construction B1020 Roof Construction $0 $0 $0 $0.00 0.0% EXTERIOR CLOSURE B2010 Exterior Walls B2020 Windows B2030 Exterior Doors $175,000 $5,000 $0 $180,000 $2.29 27.9% ROOFING B3010 Roof Coverings B3020 Roof Openings $79,500 $0 $79,500 $1.01 12.3% $0 $0 $11,775 $11,775 $0.15 1.8% STAIRCASES C2010 Stair Construction C2020 Stair Finishes $0 $0 $0 $0.00 0.0% INTERIOR FINISHES C3010 Wall Finishes C3020 Floor Finishes C3030 Ceiling Finishes $0 $0 $0 $0 $0.00 0.0% CONVEYING SYSTEMS D1010 Elevator $0 $0 $0.00 0.0% PLUMBING D20 Plumbing $0 $0 $0.00 0.0% HVAC D30 $0 $0 $0.00 0.0% INTERIOR CONSTRUCTION C1010 Partitions C1020 Interior Doors C1030 Specialties/Millwork HVAC Holyoke 386 Dwight Street Estimate Page 5 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission BUILDING SYSTEM GFA CONSTRUCTION COST SUMMARY SUB-TOTAL GALLERY 380 STABILIZATION D40 FIRE PROTECTION D40 Fire Protection D50 E10 E20 F10 F20 TOTAL $/SF 78,500 % $0 $0 $0.00 0.0% $372,875 $372,875 $4.75 57.9% $0 $0 $0.00 0.0% FURNISHINGS E2010 Fixed Furnishings E2020 Movable Furnishings $0 NIC $0 $0.00 0.0% SPECIAL CONSTRUCTION F10 Special Construction $0 $0 $0.00 0.0% HAZMAT REMOVALS F2010 Building Elements Demolition F2020 Hazardous Components Abatement $0 $0 $0 $0.00 0.0% $644,150 $8.21 100.0% ELECTRICAL D5010 New Electrical Systems EQUIPMENT E10 Equipment TOTAL DIRECT COST (Trade Costs) Holyoke 386 Dwight Street Estimate Page 6 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 78,500 TOTAL COST GALLERY 380 STABILIZATION 1 GROSS FLOOR AREA CALCULATION 2 3 4 BLDG A BLDG B 10,000 10,000 9,500 10,000 9,500 10,000 9,500 10,000 Basement 1st Floor 2nd Floor 3rd Floor Attic 5 6 7 8 9 10 TOTAL GROSS FLOOR AREA (GFA) 78,500 sf 11 12 13 A10 FOUNDATIONS 14 15 16 A1010 STANDARD FOUNDATIONS No Work in this section 17 SUBTOTAL - 18 19 A1020 SPECIAL FOUNDATIONS 20 No Work in this section 21 SUBTOTAL 22 23 A1030 LOWEST FLOOR CONSTRUCTION 24 No Work in this section 25 SUBTOTAL 26 27 TOTAL - FOUNDATIONS 28 29 30 A20 BASEMENT CONSTRUCTION 31 32 A2010 BASEMENT EXCAVATION 33 No Work in this section 34 SUBTOTAL 35 36 A2020 BASEMENT WALLS 37 No Work in this section 38 SUBTOTAL 39 40 TOTAL - BASEMENT CONSTRUCTION 41 42 43 B10 SUPERSTRUCTURE 44 45 B1010 FLOOR CONSTRUCTION 46 No Work in this section 47 SUBTOTAL 48 49 B1020 ROOF CONSTRUCTION 50 No Work in this section 51 SUBTOTAL 52 53 TOTAL - SUPERSTRUCTURE 54 55 56 B20 EXTERIOR CLOSURE 57 58 B2010 EXTERIOR WALLS Holyoke 386 Dwight Street Estimate Page 7 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 78,500 TOTAL COST GALLERY 380 STABILIZATION 59 Patch/ repair brick where damage has occurred due to upper level leaks. Assume 2 locations of 1,500 sf and 1 location of 2,000sf floor area. 60 SUBTOTAL 5,000 sf 35.00 175,000 $175,000 61 62 B2020 WINDOWS 63 Board any broken or missing windows to ensure safety and provide weather protection. 64 SUBTOTAL 1 ls 5,000.00 5,000 $5,000 65 66 67 B2030 EXTERIOR DOORS No Work in this section 68 SUBTOTAL - 69 70 TOTAL - EXTERIOR CLOSURE $180,000 71 72 73 B30 ROOFING 74 75 76 77 B3010 ROOF COVERINGS Flat roofing Patch roof as required. Minor repairs are needed across building (assume 5% of total area). 78 At northern corner at the canal, repair to roof, parapet, cap and flashing needed where water damage present inside (assume 2,000sf roof area). 79 SUBTOTAL 975 sf 20.00 19,500 2,000 sf 30.00 60,000 $79,500 80 81 82 B3020 ROOF OPENINGS No Work in this section 83 SUBTOTAL 84 85 86 87 88 TOTAL - ROOFING C10 $79,500 INTERIOR CONSTRUCTION 89 90 91 C1010 PARTITIONS No Work in this section 92 SUBTOTAL 93 94 95 C1020 INTERIOR DOORS No Work in this section 96 SUBTOTAL 97 98 99 C1030 SPECIALTIES / MILLWORK Egress signage 100 78,500 SUBTOTAL gfa 0.15 11,775 $11,775 101 102 TOTAL - INTERIOR CONSTRUCTION $11,775 103 104 105 C20 STAIRCASES 106 107 108 109 C2010 STAIR CONSTRUCTION No Work in this section SUBTOTAL 110 111 112 113 C2020 STAIR FINISHES No Work in this section SUBTOTAL 114 115 TOTAL - STAIRCASES 116 Holyoke 386 Dwight Street Estimate Page 8 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 78,500 TOTAL COST GALLERY 380 STABILIZATION 117 118 C30 INTERIOR FINISHES 119 120 121 C3010 WALL FINISHES No Work in this section 122 SUBTOTAL 123 124 125 C3020 FLOOR FINISHES No Work in this section 126 SUBTOTAL 127 128 C3030 CEILING FINISHES 129 No Work in this section 130 SUBTOTAL 131 132 TOTAL - INTERIOR FINISHES 133 134 135 D10 CONVEYING SYSTEMS 136 137 138 139 D1010 ELEVATOR No Work in this section SUBTOTAL 140 141 TOTAL - CONVEYING SYSTEMS 142 143 144 D20 PLUMBING D20 PLUMBING, GENERALLY 145 146 147 No Work in this section 148 SUBTOTAL 149 150 TOTAL - PLUMBING 151 152 153 D30 HVAC D30 HVAC, GENERALLY No Work in this section 154 155 156 157 SUBTOTAL 158 159 TOTAL - HVAC 160 161 162 D40 FIRE PROTECTION D40 FIRE PROTECTION, GENERALLY Existing sprinkler system to remain 163 164 165 166 New water service 167 SUBTOTAL 78,500 1 gfa ls 4.00 NIC 30,000.00 NIC 168 169 TOTAL - FIRE PROTECTION 170 171 172 D50 ELECTRICAL 173 174 175 D5010 ELECTRICAL SYSTEMS New smoke detectors 78,500 gfa 0.25 19,625 176 New fire alarm system 78,500 gfa 2.50 196,250 177 Minimal lighting 78,500 gfa 2.00 157,000 178 SUBTOTAL $372,875 179 180 Holyoke 386 Dwight Street Estimate Page 9 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 78,500 TOTAL COST GALLERY 380 STABILIZATION 181 TOTAL - ELECTRICAL $372,875 182 183 184 E10 EQUIPMENT E10 EQUIPMENT, GENERALLY No Work in this section 185 186 187 188 SUBTOTAL 189 190 TOTAL - EQUIPMENT 191 192 193 E20 FURNISHINGS 194 195 196 E2010 FIXED FURNISHINGS No Work in this section 197 SUBTOTAL 198 199 200 E2020 MOVABLE FURNISHINGS All movable furnishings to be provided and installed by owner 201 SUBTOTAL NIC 202 203 TOTAL - FURNISHINGS 204 205 206 F10 SPECIAL CONSTRUCTION F10 SPECIAL CONSTRUCTION SUBTOTAL 207 208 209 210 211 TOTAL - SPECIAL CONSTRUCTION 212 213 214 F20 SELECTIVE BUILDING DEMOLITION 215 216 F2010 BUILDING ELEMENTS DEMOLITION 217 No Work in this section 218 SUBTOTAL 219 220 221 222 F2020 HAZARDOUS COMPONENTS ABATEMENT Excluded SUBTOTAL See Summary 223 224 TOTAL - SELECTIVE BUILDING DEMOLITION Holyoke 386 Dwight Street Estimate Page 10 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA BUILDING SYSTEM CONSTRUCTION COST SUMMARY SUB-TOTAL GALLERY 380 PRE-DEVELOPMENT WORK A10 FOUNDATIONS A1010 Standard Foundations A1020 Special Foundations A1030 Lowest Floor Construction A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 TOTAL $/SF 78,500 % $0 $0 $0 $0 $0.00 0.0% BASEMENT CONSTRUCTION A2010 Basement Excavation A2020 Basement Walls $0 $0 $0 $0.00 0.0% SUPERSTRUCTURE B1010 Upper Floor Construction B1020 Roof Construction $0 $0 $0 $0.00 0.0% EXTERIOR CLOSURE B2010 Exterior Walls B2020 Windows B2030 Exterior Doors $521,000 $590,000 $0 $1,111,000 $14.15 24.8% ROOFING B3010 Roof Coverings B3020 Roof Openings $312,000 $0 $312,000 $3.97 7.0% INTERIOR CONSTRUCTION C1010 Partitions C1020 Interior Doors C1030 Specialties/Millwork $231,000 $0 $0 $231,000 $2.94 5.1% STAIRCASES C2010 Stair Construction C2020 Stair Finishes $300,000 $108,000 $408,000 $5.20 9.1% INTERIOR FINISHES C3010 Wall Finishes C3020 Floor Finishes C3030 Ceiling Finishes $0 $0 $0 $0 $0.00 0.0% CONVEYING SYSTEMS D1010 Elevator $0 $0 $0.00 0.0% PLUMBING D20 Plumbing $0 $0 $0.00 0.0% $942,000 $942,000 $12.00 21.0% HVAC D30 HVAC Holyoke 386 Dwight Street Estimate Page 11 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission BUILDING SYSTEM GFA CONSTRUCTION COST SUMMARY SUB-TOTAL GALLERY 380 PRE-DEVELOPMENT WORK D40 FIRE PROTECTION D40 Fire Protection D50 E10 E20 F10 F20 TOTAL $/SF 78,500 % $187,000 $187,000 $2.38 4.2% $667,250 $667,250 $8.50 14.9% $0 $0 $0.00 0.0% FURNISHINGS E2010 Fixed Furnishings E2020 Movable Furnishings $0 NIC $0 $0.00 0.0% SPECIAL CONSTRUCTION F10 Special Construction $0 $0 $0.00 0.0% $314,000 $314,000 $628,000 $8.00 14.0% $4,486,250 $57.15 100.0% ELECTRICAL D5010 New Electrical Systems EQUIPMENT E10 Equipment HAZMAT REMOVALS F2010 Building Elements Demolition F2020 Hazardous Components Abatement TOTAL DIRECT COST (Trade Costs) Holyoke 386 Dwight Street Estimate Page 12 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 78,500 TOTAL COST GALLERY 380 PRE-DEVELOPMENT WORK 1 GROSS FLOOR AREA CALCULATION 2 3 4 BLDG A BLDG B 10,000 10,000 9,500 10,000 9,500 10,000 9,500 10,000 Basement 1st Floor 2nd Floor 3rd Floor Attic 5 6 7 8 9 10 TOTAL GROSS FLOOR AREA (GFA) 78,500 sf 11 12 13 A10 FOUNDATIONS 14 15 16 A1010 STANDARD FOUNDATIONS No Work in this section 17 SUBTOTAL - 18 19 A1020 SPECIAL FOUNDATIONS 20 No Work in this section 21 SUBTOTAL 22 23 A1030 LOWEST FLOOR CONSTRUCTION 24 No Work in this section 25 SUBTOTAL 26 27 TOTAL - FOUNDATIONS 28 29 30 A20 BASEMENT CONSTRUCTION 31 32 A2010 BASEMENT EXCAVATION 33 No Work in this section 34 SUBTOTAL 35 36 A2020 BASEMENT WALLS 37 No Work in this section 38 SUBTOTAL 39 40 TOTAL - BASEMENT CONSTRUCTION 41 42 43 B10 SUPERSTRUCTURE 44 45 B1010 FLOOR CONSTRUCTION 46 No Work in this section 47 SUBTOTAL 48 49 B1020 ROOF CONSTRUCTION 50 No Work in this section 51 SUBTOTAL 52 53 TOTAL - SUPERSTRUCTURE 54 55 56 B20 EXTERIOR CLOSURE 57 58 B2010 EXTERIOR WALLS Holyoke 386 Dwight Street Estimate Page 13 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 78,500 TOTAL COST GALLERY 380 PRE-DEVELOPMENT WORK 59 Patch, point and repair brick exterior walls. Moderate repair on east and north walls; extensive patching/ repairs to west wall. 60 Moderate repairs to interior of brick walls where water damage has caused cracking. 61 SUBTOTAL 78,500 sf 6.00 471,000 1 ls 50,000.00 50,000 $521,000 62 63 B2020 WINDOWS 64 New double-hung, double-pane insulated windows all floors except the fourth floor of the northern building where new windows have already been installed. 65 SUBTOTAL 59,000 sf 10.00 590,000 $590,000 66 67 68 B2030 EXTERIOR DOORS No Work in this section 69 SUBTOTAL - 70 71 TOTAL - EXTERIOR CLOSURE $1,111,000 72 73 74 B30 ROOFING 75 76 77 78 B3010 ROOF COVERINGS Flat roofing At the time of redevelopment a new roof system that meets current energy code requirements would need to be installed. Current roof framing is assumed to be sufficient and structural upgrades to roof framing are not anticipated. 79 19,500 sf 16.00 312,000 SUBTOTAL $312,000 80 81 82 B3020 ROOF OPENINGS No Work in this section 83 SUBTOTAL 84 85 86 87 88 TOTAL - ROOFING C10 $312,000 INTERIOR CONSTRUCTION 89 90 91 C1010 PARTITIONS New walls at stairwells 92 10,500 sf 22.00 231,000 SUBTOTAL $231,000 93 94 95 C1020 INTERIOR DOORS No Work in this section 96 SUBTOTAL 97 98 99 C1030 SPECIALTIES / MILLWORK No Work in this section 100 SUBTOTAL 101 102 TOTAL - INTERIOR CONSTRUCTION $231,000 103 104 105 C20 STAIRCASES 106 107 108 109 C2010 STAIR CONSTRUCTION New stairwells 12 flts 25,000.00 300,000 SUBTOTAL $300,000 110 111 112 C2020 STAIR FINISHES New stairwell finishes Holyoke 386 Dwight Street Estimate 12 Page 14 flts 9,000.00 108,000 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 78,500 TOTAL COST GALLERY 380 PRE-DEVELOPMENT WORK 113 SUBTOTAL $108,000 114 115 TOTAL - STAIRCASES $408,000 116 117 118 C30 INTERIOR FINISHES 119 120 121 C3010 WALL FINISHES No Work in this section 122 SUBTOTAL 123 124 125 C3020 FLOOR FINISHES No Work in this section 126 SUBTOTAL 127 128 C3030 CEILING FINISHES 129 No Work in this section 130 SUBTOTAL 131 132 TOTAL - INTERIOR FINISHES 133 134 135 D10 CONVEYING SYSTEMS 136 137 138 139 D1010 ELEVATOR No Work in this section SUBTOTAL 140 141 TOTAL - CONVEYING SYSTEMS 142 143 144 D20 PLUMBING D20 PLUMBING, GENERALLY 145 146 147 No Work in this section 148 SUBTOTAL 149 150 TOTAL - PLUMBING 151 152 153 D30 HVAC D30 HVAC, GENERALLY Core and shell HVAC upgrades 154 155 156 157 78,500 gfa 12.00 942,000 SUBTOTAL 158 159 $942,000 TOTAL - HVAC $942,000 160 161 162 D40 FIRE PROTECTION D40 FIRE PROTECTION, GENERALLY Modify Existing sprinkler system 163 164 165 166 New water service 167 SUBTOTAL 78,500 1 gfa ls 2.00 157,000 30,000.00 30,000 $187,000 168 169 TOTAL - FIRE PROTECTION $187,000 170 171 172 D50 ELECTRICAL 173 174 175 176 D5010 ELECTRICAL SYSTEMS New power and distribution Upgrade core and shell lighting Holyoke 386 Dwight Street Estimate 78,500 gfa 5.00 392,500 78,500 gfa 2.00 157,000 Page 15 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 78,500 TOTAL COST GALLERY 380 PRE-DEVELOPMENT WORK 177 Tele/Date upgrades 178 SUBTOTAL 78,500 gfa 1.50 117,750 $667,250 179 180 181 TOTAL - ELECTRICAL $667,250 182 183 184 E10 EQUIPMENT E10 EQUIPMENT, GENERALLY No Work in this section 185 186 187 188 SUBTOTAL 189 190 TOTAL - EQUIPMENT 191 192 193 E20 FURNISHINGS 194 195 196 E2010 FIXED FURNISHINGS No Work in this section 197 SUBTOTAL 198 199 200 E2020 MOVABLE FURNISHINGS All movable furnishings to be provided and installed by owner 201 SUBTOTAL NIC 202 203 TOTAL - FURNISHINGS 204 205 206 F10 SPECIAL CONSTRUCTION F10 SPECIAL CONSTRUCTION SUBTOTAL 207 208 209 210 211 TOTAL - SPECIAL CONSTRUCTION 212 213 214 F20 SELECTIVE BUILDING DEMOLITION 215 216 217 218 219 F2010 BUILDING ELEMENTS DEMOLITION Clear spaces of all miscellaneous furniture, materials and other trash. Full demolition of interior spaces required prior to redevelopment. Approximately 50% of the building currently has existing partitions that would need to be cleared. 78,500 gfa 1.00 78,500 78,500 gfa 3.00 235,500 SUBTOTAL $314,000 220 221 222 223 F2020 HAZARDOUS COMPONENTS ABATEMENT Hazardous materials will need to be removed as part of the scope of demolition. Asbestos pipe insulation, oil/ petroleum and other chemical contaminants may be present in small to moderate quantities. 78,500 SUBTOTAL gfa 4.00 314,000 $314,000 224 225 TOTAL - SELECTIVE BUILDING DEMOLITION Holyoke 386 Dwight Street Estimate $628,000 Page 16 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA BUILDING SYSTEM CONSTRUCTION COST SUMMARY SUB-TOTAL CANAL GALLERY STABILIZATION A10 FOUNDATIONS A1010 Standard Foundations A1020 Special Foundations A1030 Lowest Floor Construction A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 TOTAL $/SF 52,000 % $0 $0 $0 $0 $0.00 0.0% BASEMENT CONSTRUCTION A2010 Basement Excavation A2020 Basement Walls $0 $0 $0 $0.00 0.0% SUPERSTRUCTURE B1010 Upper Floor Construction B1020 Roof Construction $0 $0 $0 $0.00 0.0% EXTERIOR CLOSURE B2010 Exterior Walls B2020 Windows B2030 Exterior Doors $50,000 $5,000 $0 $55,000 $1.06 14.0% ROOFING B3010 Roof Coverings B3020 Roof Openings $32,000 $0 $32,000 $0.62 8.1% $0 $0 $7,800 $7,800 $0.15 2.0% STAIRCASES C2010 Stair Construction C2020 Stair Finishes $0 $0 $0 $0.00 0.0% INTERIOR FINISHES C3010 Wall Finishes C3020 Floor Finishes C3030 Ceiling Finishes $0 $0 $0 $0 $0.00 0.0% CONVEYING SYSTEMS D1010 Elevator $0 $0 $0.00 0.0% PLUMBING D20 Plumbing $0 $0 $0.00 0.0% HVAC D30 $0 $0 $0.00 0.0% INTERIOR CONSTRUCTION C1010 Partitions C1020 Interior Doors C1030 Specialties/Millwork HVAC Holyoke 386 Dwight Street Estimate Page 17 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission BUILDING SYSTEM GFA CONSTRUCTION COST SUMMARY SUB-TOTAL CANAL GALLERY STABILIZATION D40 FIRE PROTECTION D40 Fire Protection D50 E10 E20 F10 F20 TOTAL $/SF 52,000 % $52,000 $52,000 $1.00 13.2% $247,000 $247,000 $4.75 62.7% $0 $0 $0.00 0.0% FURNISHINGS E2010 Fixed Furnishings E2020 Movable Furnishings $0 NIC $0 $0.00 0.0% SPECIAL CONSTRUCTION F10 Special Construction $0 $0 $0.00 0.0% HAZMAT REMOVALS F2010 Building Elements Demolition F2020 Hazardous Components Abatement $0 $0 $0 $0.00 0.0% $393,800 $7.57 100.0% ELECTRICAL D5010 New Electrical Systems EQUIPMENT E10 Equipment TOTAL DIRECT COST (Trade Costs) Holyoke 386 Dwight Street Estimate Page 18 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 52,000 TOTAL COST CANAL GALLERY STABILIZATION 1 GROSS FLOOR AREA CALCULATION 2 3 4 BLDG C BLDG D 12,000 4,000 12,000 12,000 12,000 1st Floor 2nd Floor 3rd Floor Attic 5 6 7 8 9 TOTAL GROSS FLOOR AREA (GFA) 52,000 sf 10 11 12 A10 FOUNDATIONS 13 14 15 A1010 STANDARD FOUNDATIONS No Work in this section 16 SUBTOTAL - 17 18 A1020 SPECIAL FOUNDATIONS 19 No Work in this section 20 SUBTOTAL 21 22 A1030 LOWEST FLOOR CONSTRUCTION 23 No Work in this section 24 SUBTOTAL 25 26 TOTAL - FOUNDATIONS 27 28 29 A20 BASEMENT CONSTRUCTION 30 31 A2010 BASEMENT EXCAVATION 32 No Work in this section 33 SUBTOTAL 34 35 A2020 BASEMENT WALLS 36 No Work in this section 37 SUBTOTAL 38 39 TOTAL - BASEMENT CONSTRUCTION 40 41 42 B10 SUPERSTRUCTURE 43 44 B1010 FLOOR CONSTRUCTION 45 No Work in this section 46 SUBTOTAL 47 48 B1020 ROOF CONSTRUCTION 49 No Work in this section 50 SUBTOTAL 51 52 TOTAL - SUPERSTRUCTURE 53 54 55 B20 EXTERIOR CLOSURE 56 57 B2010 EXTERIOR WALLS Holyoke 386 Dwight Street Estimate Page 19 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 52,000 TOTAL COST CANAL GALLERY STABILIZATION 58 Patch/ repair brick where damage has occurred due to upper level leaks. Assume minor work 59 SUBTOTAL 1 ls 50,000.00 50,000 $50,000 60 61 B2020 WINDOWS 62 Board any broken or missing windows to ensure safety and provide weather protection. 63 SUBTOTAL 1 ls 5,000.00 5,000 $5,000 64 65 66 B2030 EXTERIOR DOORS No Work in this section 67 SUBTOTAL - 68 69 TOTAL - EXTERIOR CLOSURE $55,000 70 71 72 B30 ROOFING 73 74 75 76 B3010 ROOF COVERINGS Flat roofing Patch roof as required. Minor repairs are needed across building (assume 10% of total area). 77 1,600 sf 20.00 32,000 SUBTOTAL $32,000 78 79 80 B3020 ROOF OPENINGS No Work in this section 81 SUBTOTAL 82 83 84 85 86 TOTAL - ROOFING C10 $32,000 INTERIOR CONSTRUCTION 87 88 89 C1010 PARTITIONS No Work in this section 90 SUBTOTAL 91 92 93 C1020 INTERIOR DOORS No Work in this section 94 SUBTOTAL 95 96 97 C1030 SPECIALTIES / MILLWORK Egress signage 98 52,000 SUBTOTAL gfa 0.15 7,800 $7,800 99 100 TOTAL - INTERIOR CONSTRUCTION $7,800 101 102 103 C20 STAIRCASES 104 105 106 C2010 STAIR CONSTRUCTION No Work in this section 107 SUBTOTAL 108 109 110 C2020 STAIR FINISHES No Work in this section 111 SUBTOTAL 112 113 TOTAL - STAIRCASES 114 115 116 C30 INTERIOR FINISHES 117 118 C3010 WALL FINISHES Holyoke 386 Dwight Street Estimate Page 20 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 52,000 TOTAL COST CANAL GALLERY STABILIZATION 119 No Work in this section 120 SUBTOTAL 121 122 123 C3020 FLOOR FINISHES No Work in this section 124 SUBTOTAL 125 126 C3030 CEILING FINISHES 127 No Work in this section 128 SUBTOTAL 129 130 TOTAL - INTERIOR FINISHES 131 132 133 D10 CONVEYING SYSTEMS 134 135 136 137 D1010 ELEVATOR No Work in this section SUBTOTAL 138 139 TOTAL - CONVEYING SYSTEMS 140 141 142 D20 PLUMBING D20 PLUMBING, GENERALLY 143 144 145 No Work in this section 146 SUBTOTAL 147 148 TOTAL - PLUMBING 149 150 151 D30 HVAC D30 HVAC, GENERALLY No Work in this section 152 153 154 155 SUBTOTAL 156 157 TOTAL - HVAC 158 159 160 D40 FIRE PROTECTION D40 FIRE PROTECTION, GENERALLY Existing sprinkler system; test and repair 161 162 163 164 New water service 165 SUBTOTAL 52,000 1 gfa ls 1.00 52,000 30,000.00 NIC $52,000 166 167 TOTAL - FIRE PROTECTION $52,000 168 169 170 D50 ELECTRICAL 171 172 173 D5010 ELECTRICAL SYSTEMS New smoke detectors 52,000 gfa 0.25 13,000 New fire alarm system 52,000 gfa 2.50 130,000 Minimal lighting 52,000 gfa 2.00 104,000 174 175 176 SUBTOTAL $247,000 177 178 179 TOTAL - ELECTRICAL $247,000 180 181 182 E10 EQUIPMENT Holyoke 386 Dwight Street Estimate Page 21 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 52,000 TOTAL COST CANAL GALLERY STABILIZATION 183 184 E10 185 186 EQUIPMENT, GENERALLY No Work in this section SUBTOTAL 187 188 TOTAL - EQUIPMENT 189 190 191 E20 FURNISHINGS 192 193 194 E2010 FIXED FURNISHINGS No Work in this section 195 SUBTOTAL 196 197 198 E2020 MOVABLE FURNISHINGS All movable furnishings to be provided and installed by owner 199 SUBTOTAL NIC 200 201 TOTAL - FURNISHINGS 202 203 204 F10 SPECIAL CONSTRUCTION F10 SPECIAL CONSTRUCTION SUBTOTAL 205 206 207 208 209 TOTAL - SPECIAL CONSTRUCTION 210 211 212 F20 SELECTIVE BUILDING DEMOLITION 213 214 F2010 BUILDING ELEMENTS DEMOLITION 215 No Work in this section 216 SUBTOTAL 217 218 219 220 F2020 HAZARDOUS COMPONENTS ABATEMENT Excluded SUBTOTAL See Summary 221 222 TOTAL - SELECTIVE BUILDING DEMOLITION Holyoke 386 Dwight Street Estimate Page 22 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA BUILDING SYSTEM CONSTRUCTION COST SUMMARY SUB-TOTAL CANAL GALLERY PRE-DEVELOPMENT WORK A10 FOUNDATIONS A1010 Standard Foundations A1020 Special Foundations A1030 Lowest Floor Construction A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 TOTAL $/SF 52,000 % $0 $0 $0 $0 $0.00 0.0% BASEMENT CONSTRUCTION A2010 Basement Excavation A2020 Basement Walls $0 $0 $0 $0.00 0.0% SUPERSTRUCTURE B1010 Upper Floor Construction B1020 Roof Construction $0 $0 $0 $0.00 0.0% EXTERIOR CLOSURE B2010 Exterior Walls B2020 Windows B2030 Exterior Doors $342,000 $520,000 $0 $862,000 $16.58 29.1% ROOFING B3010 Roof Coverings B3020 Roof Openings $256,000 $0 $256,000 $4.92 8.6% INTERIOR CONSTRUCTION C1010 Partitions C1020 Interior Doors C1030 Specialties/Millwork $554,600 $0 $0 $554,600 $10.67 18.7% STAIRCASES C2010 Stair Construction C2020 Stair Finishes $225,000 $81,000 $306,000 $5.88 10.3% INTERIOR FINISHES C3010 Wall Finishes C3020 Floor Finishes C3030 Ceiling Finishes $0 $0 $0 $0 $0.00 0.0% CONVEYING SYSTEMS D1010 Elevator $0 $0 $0.00 0.0% PLUMBING D20 Plumbing $0 $0 $0.00 0.0% HVAC D30 $0 $0 $0.00 0.0% HVAC Holyoke 386 Dwight Street Estimate Page 23 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission BUILDING SYSTEM GFA CONSTRUCTION COST SUMMARY SUB-TOTAL CANAL GALLERY PRE-DEVELOPMENT WORK D40 FIRE PROTECTION D40 Fire Protection D50 E10 E20 F10 F20 TOTAL $/SF 52,000 % $130,000 $130,000 $2.50 4.4% $442,000 $442,000 $8.50 14.9% $0 $0 $0.00 0.0% FURNISHINGS E2010 Fixed Furnishings E2020 Movable Furnishings $0 NIC $0 $0.00 0.0% SPECIAL CONSTRUCTION F10 Special Construction $0 $0 $0.00 0.0% $208,000 $208,000 $416,000 $8.00 14.0% $2,966,600 $57.05 100.0% ELECTRICAL D5010 New Electrical Systems EQUIPMENT E10 Equipment HAZMAT REMOVALS F2010 Building Elements Demolition F2020 Hazardous Components Abatement TOTAL DIRECT COST (Trade Costs) Holyoke 386 Dwight Street Estimate Page 24 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 52,000 TOTAL COST CANAL GALLERY PRE-DEVELOPMENT WORK 1 GROSS FLOOR AREA CALCULATION 2 3 4 BLDG C BLDG D 12,000 4,000 12,000 12,000 12,000 1st Floor 2nd Floor 3rd Floor Attic 5 6 7 8 9 TOTAL GROSS FLOOR AREA (GFA) 52,000 sf 10 11 12 A10 FOUNDATIONS 13 14 15 A1010 STANDARD FOUNDATIONS No Work in this section 16 SUBTOTAL - 17 18 A1020 SPECIAL FOUNDATIONS 19 No Work in this section 20 SUBTOTAL 21 22 A1030 LOWEST FLOOR CONSTRUCTION 23 No Work in this section 24 SUBTOTAL 25 26 TOTAL - FOUNDATIONS 27 28 29 A20 BASEMENT CONSTRUCTION 30 31 A2010 BASEMENT EXCAVATION 32 No Work in this section 33 SUBTOTAL 34 35 A2020 BASEMENT WALLS 36 No Work in this section 37 SUBTOTAL 38 39 TOTAL - BASEMENT CONSTRUCTION 40 41 42 B10 SUPERSTRUCTURE 43 44 B1010 FLOOR CONSTRUCTION 45 No Work in this section 46 SUBTOTAL 47 48 B1020 ROOF CONSTRUCTION 49 No Work in this section 50 SUBTOTAL 51 52 TOTAL - SUPERSTRUCTURE 53 54 55 B20 EXTERIOR CLOSURE 56 57 B2010 EXTERIOR WALLS Holyoke 386 Dwight Street Estimate Page 25 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 52,000 TOTAL COST CANAL GALLERY PRE-DEVELOPMENT WORK 58 Patch, point and repair brick exterior walls. Moderate repair on courtyard, south and west walls; extensive patching/ repairs to north wall. 59 Moderate repairs to interior of brick walls where water damage has caused cracking. 60 SUBTOTAL 52,000 sf 6.00 312,000 1 ls 30,000.00 30,000 $342,000 61 62 B2020 WINDOWS 63 New double-hung, double-pane insulated windows all floors 64 SUBTOTAL 52,000 sf 10.00 520,000 $520,000 65 66 67 B2030 EXTERIOR DOORS No Work in this section 68 SUBTOTAL - 69 70 TOTAL - EXTERIOR CLOSURE $862,000 71 72 73 B30 ROOFING 74 75 76 77 B3010 ROOF COVERINGS Flat roofing At the time of redevelopment a new roof system that meets current energy code requirements would need to be installed. Current roof framing is assumed to be sufficient and structural upgrades to roof framing are not anticipated. 78 16,000 sf 16.00 256,000 SUBTOTAL $256,000 79 80 81 B3020 ROOF OPENINGS No Work in this section 82 SUBTOTAL 83 84 85 86 87 TOTAL - ROOFING C10 $256,000 INTERIOR CONSTRUCTION 88 89 90 C1010 PARTITIONS Modifications to existing corridors to meet code requirements for egress will be required. Reconfiguration of corridors and demising walls on some levels may be required. Approximately 50% of the current partitions may need to be cleared and rebuilt to meet code requirements. 91 New walls at stairwells 92 SUBTOTAL 52,000 6,300 gfa 8.00 416,000 sf 22.00 138,600 $554,600 93 94 95 C1020 INTERIOR DOORS No Work in this section 96 SUBTOTAL 97 98 99 C1030 SPECIALTIES / MILLWORK No Work in this section 100 SUBTOTAL 101 102 TOTAL - INTERIOR CONSTRUCTION $554,600 103 104 105 C20 STAIRCASES 106 107 108 C2010 STAIR CONSTRUCTION New stairwells Holyoke 386 Dwight Street Estimate 9 Page 26 flts 25,000.00 225,000 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 52,000 TOTAL COST CANAL GALLERY PRE-DEVELOPMENT WORK 109 SUBTOTAL $225,000 110 111 112 C2020 STAIR FINISHES New stairwell finishes 113 9 flts 9,000.00 81,000 SUBTOTAL $81,000 114 115 TOTAL - STAIRCASES $306,000 116 117 118 C30 INTERIOR FINISHES 119 120 121 C3010 WALL FINISHES No Work in this section 122 SUBTOTAL 123 124 125 C3020 FLOOR FINISHES No Work in this section 126 SUBTOTAL 127 128 C3030 CEILING FINISHES 129 No Work in this section 130 SUBTOTAL 131 132 TOTAL - INTERIOR FINISHES 133 134 135 D10 CONVEYING SYSTEMS 136 137 138 139 D1010 ELEVATOR No Work in this section SUBTOTAL 140 141 TOTAL - CONVEYING SYSTEMS 142 143 144 D20 PLUMBING D20 PLUMBING, GENERALLY 145 146 147 No Work in this section 148 SUBTOTAL 149 150 TOTAL - PLUMBING 151 152 153 D30 HVAC D30 HVAC, GENERALLY Core and shell HVAC upgrades 154 155 156 157 52,000 gfa 12.00 NIC 52,000 gfa 2.50 130,000 SUBTOTAL 158 159 TOTAL - HVAC 160 161 162 D40 FIRE PROTECTION D40 FIRE PROTECTION, GENERALLY Upgrade Existing sprinkler system 163 164 165 166 SUBTOTAL $130,000 167 168 TOTAL - FIRE PROTECTION $130,000 169 170 171 D50 ELECTRICAL 172 173 D5010 ELECTRICAL SYSTEMS Holyoke 386 Dwight Street Estimate Page 27 PMC - Project Management Cost Holyoke; 386 Dwight Street Building Buildings A,B, C and D Holyoke, MA 16-Mar-14 Feasibility Submission GFA CSI CODE DESCRIPTION QTY UNIT UNIT COST EST'D COST SUB TOTAL 52,000 TOTAL COST CANAL GALLERY PRE-DEVELOPMENT WORK 174 New power and distribution 52,000 gfa 5.00 260,000 175 Upgrade core and shell lighting 52,000 gfa 2.00 104,000 176 Tele/Date upgrades 52,000 gfa 1.50 78,000 177 SUBTOTAL $442,000 178 179 180 TOTAL - ELECTRICAL $442,000 181 182 183 E10 EQUIPMENT E10 EQUIPMENT, GENERALLY No Work in this section 184 185 186 187 SUBTOTAL 188 189 TOTAL - EQUIPMENT 190 191 192 E20 FURNISHINGS 193 194 195 E2010 FIXED FURNISHINGS No Work in this section 196 SUBTOTAL 197 198 199 E2020 MOVABLE FURNISHINGS All movable furnishings to be provided and installed by owner 200 SUBTOTAL NIC 201 202 TOTAL - FURNISHINGS 203 204 205 F10 SPECIAL CONSTRUCTION F10 SPECIAL CONSTRUCTION SUBTOTAL 206 207 208 209 210 TOTAL - SPECIAL CONSTRUCTION 211 212 213 F20 SELECTIVE BUILDING DEMOLITION 214 215 216 217 218 F2010 BUILDING ELEMENTS DEMOLITION Clear spaces of all miscellaneous furniture, materials and other trash. Full demolition of interior spaces required prior to redevelopment. Approximately 50% of the building currently has existing partitions that would need to be cleared. 52,000 gfa 1.00 52,000 52,000 gfa 3.00 156,000 SUBTOTAL $208,000 219 220 221 222 F2020 HAZARDOUS COMPONENTS ABATEMENT Hazardous materials will need to be removed as part of the scope of demolition. Asbestos pipe insulation, oil/ petroleum and other chemical contaminants may be present in small to moderate quantities. 52,000 SUBTOTAL gfa 4.00 208,000 $208,000 223 224 TOTAL - SELECTIVE BUILDING DEMOLITION Holyoke 386 Dwight Street Estimate $416,000 Page 28 PMC - Project Management Cost A4 pro forma definitions McCabe Enterprises Holyoke | Appendix 343 Notes on Financing – Definitions, Terms, Sources Hard Costs. Hard Costs encompass the costs of rehabilitation, construction, site work, selective (where needed), fixtures and equipment, hard cost contingency. Construction Costs. Construction costs have been estimated by Project Management & Cost, a leading cost estimating firm with experience in experience estimating both private and public sector vertical construction, including rehabilitation. Construction costs are based on the conceptual plans contained in this report and include direct construction costs, general contractor’s overhead and profit and a design contingency. Costs have been escalated to the mid-point of a two-year period, assuming that it will take one-to-two years to ready the project for rehabilitation. The cost estimate represents a reasonable opinion of cost. Demolition. Interior gutting, as needed, is included in the construction cost estimate. No building demolition is required in the projects. Tenant Improvements. No costs were attributed as part of the redevelopment and rehabilitation to tenant improvement and fit-out. The cost of tenant fit-out will be determined on a case-by-case basis and dependent upon the unique needs of each tenant. Tenant improvements are supplemental. Furniture, Fixtures and Equipment. Fixtures and equipment for commercial bathrooms and for requisite plumbing and fixtures for residential housing units have been budgeted and described in the scope for each scenario. Hard Cost Contingency. The hard cost contingency is budgeted at 10% of conceptual construction cost estimate. Soft Costs Architectural & Engineering. Architectural and engineering costs have been budgeted at 7.5% of construction costs, unless otherwise noted. Other Consultants. Other consultants could include a surveyor, preservation consultant, code consultant, energy consultant, Licensed Site Professional, development or financing consultants. The exact constellation of consultant team will depend upon the specifics of each building. Costs are anticipated to be approximately 1.5% of construction costs. Project Management. To successfully coordinate all project elements from design to final completion of renovation and rehabilitation, 5% of the construction budget has been allocated to project management services. Legal fees. Legal services will be needed throughout the development process for contracts, construction, permitting land acquisition, review of easements, loan and financing documents, 344 Holyoke | Appendix McCabe Enterprises etc. One percent of construction costs have been allocated for legal services. In the event that the developer selects to use New Markets Tax Credits or historic tax credits, additional legal expenditures may likely be required. Permit fees. Fees for building permits, gas, plumbing, wiring, site plan and zoning review will be necessary for the project to proceed with municipal and governmental approvals. Permit fees are included in the construction budget, and thus are zero percent in this soft cost budget. Insurance. The contractor’s cost of insurance has been included construction hard costs budget. The property owner/developer should also retain insurance on the property during the course of development. As such, one-half of one percent (0.5%) has been budgeted for insurance costs. Developer’s Fee. It is typical for a developer to derive a fee for their contribution in managing and assembling the project. Although developers’ fees can range from one to five percent of construction costs, a modest 1.5% is used in the pro forma. Although developer’s fees are standard, this cost has not be included in the pro forma analyses for base stabilization scenario under the Incremental Hybrid approach. Utilities. The cost of utilities, heat, electric, water and sewer, for the building during the anticipated two year development and rehabilitation period are budgeted at one-half of one percent (0.5%) of construction costs. Soft Cost Contingency. A contingency for soft costs is budgeted at one percent of construction costs. The soft cost contingency is approximately 5.6% of all soft costs. Marketing. As part of the redevelopment process, marketing costs to attract tenants should be anticipated. One percent of construction costs is budgeted for marketing expenses. Real Estate Taxes. The cost of real estate taxes includes two years of projected real estate taxes and all outstanding taxes. Operating Revenue Sources Rental Income The major source of operating funds for each building will be rental income based on the desired mix of uses for each scenario. We spoke to property owners and downtown tenants regarding current rents in downtown Holyoke and reviewed the current asking prices on available properties. Projected rents are somewhat higher than current 2014 rents, since it will likely be two years before these properties will be ready for occupancy and leasing. Several scenarios include residential housing and live/work space. For purpose of analysis, it is assumed that these units will be market rate rental housing. Rental housing is the only type of multi-family housing currently being financed in today’s marketplace. Thus, scenarios with residential condominium development were not prepared. Market rate housing and affordable housing rents using HUD’s FMR (Fair Market Rents) rents are similar. Thus, the pro formas focus on the feasibility of market rate housing. McCabe Enterprises Holyoke | Appendix 345 Monthly residential rents do not cover the cost of parking. Two properties intensively studied do not have land to provide parking. Tenants with cars or the developer would need to assume an additional $20 to $40 per month above apartment rents for parking. All properties are served by bus and are within two-and-one-half blocks of the Holyoke multi-modal transportation center with PVTA (Pioneer Valley Transit Authority) buses serving Holyoke and nearby communities as well as inner-city bus service offered by Peter Pan. Inner city passenger train service by Amtrak is in the planning stages, with a planned stop in Downtown Holyoke within walking distance of the properties. Moreover, the City of Holyoke’s vision is for a walkable center city. The City is making steady progress towards pedestrian improvements to enhance walkability, most notably the Canalwalk. Thus, the pro formas for building rehabilitation do not incorporate the cost of parking. The pro forma analyses in this report are based on the following triple net commercial rents and residential rents as follows. Housing. The variation in monthly housing rental rates is attributable to the variation in the size of the unit. Live-Work. Live-work space is priced on a per net SF basis. SRECS In addition to the typical rental income for commercial and residential tenants, each scenario includes revenue from SRECS. SRECS stands for Solar Renewable Energy Certificate. Massachusetts has created a program where there is a market subsidy for the generation of solar energy which provides a tradable certificate, called an SREC that represents the clean energy benefits generated from a solar electric system, based on the number of 1000 kilowatt hours generated by the system. The amount of projected electricity at each location as to kilowatt hours was estimated based on the Massachusetts climate and the available roof top for solar. The value of SRECS was estimated at the minimum established base price per Massachusetts regulation. Several of the buildings studied are multi-storied with flat roof tops that have very good sun exposure, which makes them ideal candidates for solar energy production. In two of the cases, construction of new roof systems is anticipated facilitating the deployment of photo voltaic panels for solar energy production. It is anticipated that photo voltaic systems can be installed on the roofs of each building with appropriate rooftop setbacks so that the solar panels are not visible from the street. Although there are federal tax credits for installation of renewable energy, the value of these credits was not factored into the pro forma. The availability of federal solar tax credits expire December 31, 2016 and provide a 30% investment tax credit on allowable costs. Solar tax credits and SRECs could contribute towards a stronger revenue stream. Operating Expenses Since these buildings are principally commercial in nature, it is assumed that tenants will be paying triple net leases (NNN), meaning the tenant will be responsible for payment of real estate taxes, building insurance and maintenance. Since leases are a negotiation between a land- 346 Holyoke | Appendix McCabe Enterprises lord and tenant, funds were nonetheless budgeted for maintenance and utilities, in the event of a vacancy or lease negotiation where the developer assumes some of the maintenance costs and uses a double-net (NN) lease instead. In residential leases, the landlord typically assumes payment of the taxes, common area utilities and general maintenance. Funds for operating expenses inclusive of maintenance costs, utilities, management fees, as well as a pro-rata share of real estate taxes attributable to the residential component are budgeted. Financing At the core of each financial scenario is a conventional market-rate financing component based on an interest rate of 5% for permanent financing (5.5% for construction loans) with a thirty year amortization schedule, and a minimum of ten percent equity, plus existing equity in the land and building. Twenty percent equity is the preferred standard by lenders. Property owners and developers may need to augment the equity levels noted in the pro formas. It is anticipated that some projects may utilize New Markets Tax Credits for additional equity or private partners. In each case, the revenue stream generated by the existing competitive rents in Downtown Holyoke today do not generate sufficient revenue so that a project can rely solely on conventional bank financing. The pro formas contained within this report illustrate what could happen to “make the deal” work for each property. Historic Tax Credits. In all cases it is assumed that the property owner/developer will make full utilization of both state and federal historic tax credits. Each building is over fifty years old and has played an important role in Holyoke’s history as one of America’s first planned industrial cities. The properties are either in a National Register Historic District, or adjacent to an existing district. Each building should be listed individually on the National Register of Historic Places, or at minimum determined to be eligible by the Massachusetts Historical Commission (MHC), to facilitate use of the historic tax credits. Use of historic tax credits requires that the building be renovated in accordance with the Secretary of Interior’s Standards for the Treatment of Historic Properties. The specific value of historic tax credits may vary. The value of the federal historic tax credits assumes sale of historic tax credits to support the project based on 20% of the eligible basis for each project valued at sixty cents per $1.00 of credit. The amount of federal historic tax credits are automatic based on eligible expenses for a certified project done in accordance with the Secretary of Interior’s Standards. The amount of state historic tax credits is based on a competitive application to the MHC for use on income-producing property, up to 20% of the cost of certified rehabilitation expenditures for state income tax credits. These properties are all projected to undertake substantial rehabilitation activities, which will exceed 25% of the property owner’s adjusted basis within a twenty-four month period, a program requirement. The Massachusetts State Historic Tax Credit program is a pilot program funded through 2017. Although it is not required for a property to be listed on the National Register of Historic Places, it must be deemed eligible for listing by MHC in order to use the tax credits. A small award of state historic tax credits is included in each pro forma. McCabe Enterprises Holyoke | Appendix 347 New Markets Tax Credits. The New Markets Tax Credit (NMTC) program provides tax credits for the construction and redevelopment of commercial, industrial or mixed-use properties in eligible census tracts. The federal government with the NMTC program is seeking to encourage the private sector to invest in lower income communities so as to spur revitalization and job creation. Although complex, NMTC are a very flexible tool and can be used for either debt or equity financing for a real estate project. The additional cost of legal services has been factored in each analysis. Prospective users of NMTC can contact an entity that has an allocation of NMTC credits. The allocatee becomes a lender/business partner in the project. Allocatees receiving NMTC in recent rounds in Massachusetts include Massachusetts Housing Investment Corporation (MHIC), Boston Community Capital, MassDevelopment as well as others. Several national entities have substantial NMTC allocations that can be used in Massachusetts, as well. Additional Funding Sources. In some cases, additional funds will be required to enable the redevelopment of each of these properties. Specific funding depends in part on the public benefits of the project and the desired final use. The City of Holyoke receives an annual appropriation of Community Development Block Grant (CDBG) funds. CDBG is a potential source of strategic funding on a limited basis. Holyoke tens to use CDBG funds for community services assisting the City’s very poor. Holyoke Gas and Electric have incentives for energy conservation and can be a partner in redevelopment and rehabilitation. The Massachusetts Clean Energy Center can also be a resource. 348 Holyoke | Appendix McCabe Enterprises McCabe Enterprises About theTeam McCabe Enterprises provides strategic solutions in public financing, community planning and economic development to public and private sector clients with innovative and award-winning work. A wholly woman-owned consulting firm founded by Kathleen McCabe, AICP, EDP in 1990, McCabe Enterprises works with clients to develop customized solutions addressing the unique needs of each client and community. Our approach encompasses planning and economic analysis, financing, community consultation, with a focus on implementation. Our work includes market analysis, feasibility studies, downtown revitalization, public funding, urban renewal, neighborhood planning, industrial retention and redevelopment. McCabe Enterprises can be reached at [email protected] or 617 469-9444. McCabe Enterprises team members on the MassDevelopment Holyoke Consultancy include Kathleen McCabe, AICP, EDP and: Jennifer Mecca, RA, is an architect and experienced urban designer with downtown, and neighborhood revitalization and redevelopment projects, including work with Boston Main Streets and Waterfront Square in Revere. Jennifer has been the urban designer for several redevelopment projects, in both urban settings and new development, in Massachusetts, New York, Virginia and Florida. She brings a breadth of redevelopment experience and work to enable communities to understand proposed redevelopment projects and their impacts. Peter Bradley, LEED AP, is the principal and founder of Project Management & Cost, a cost estimating and project management firm. PM&C offers a full range of cost estimating, cost and project management services to building owners, real estate developers, architects, and financial institutions. McCabe Enterprises Holyoke | Appendix 349 Holyoke Building Redevelopment Studies Prepared for: The City of Holyoke, MA & MassDevelopment June 2014 McCabe Enterprises McCabe Enterprises | 12 Primrose St. Boston, MA 02131 617.469.9444 | www.plan-do.com