indianapolis housing agency
Transcription
indianapolis housing agency
Interior Construction Specifications INDIANAPOLIS HOUSING AGENCY 1919 N. Meridian St Indianapolis, Indiana 46202 Brenner Design 620 N. Delaware St Indianapolis, Indiana 46204 317.262.1220 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATION TABLE OF CONTENTS DIVISION 00 FORMS GENERAL INFORMATION, BIDDING REQUIREMENTS, CONDITIONS, FORMS TO BE COMPLETED BY SUCCESSFUL BIDDER FOR PROJECT COMPLETION: AIA G704 CERTIFICATE OF SUBSTANTIAL COMPLETION AIA G715 ATTACHMENT FOR CERTIFICATE OF INSURANCE AIA G805 SUBCONTRACTOR LIST SUBMITTAL FORM AIA A103 ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR – LIMITED SCOPE – STIPULATED SUM EXHIBIT “A” GENERAL CONDITIONS ITEMIZATION EXHIBIT “B” PROJECT SCHEDULE AIA A201 GENERAL CONDITIONS OF THE CONTRACT DIVISION 00 PROCUREMENT & CONTRACTING REQUIREMENTS 00 01 05 00 63 13 00 63 16 00 63 33 01 31 19 01 62 11 DIVISION 01 GENERAL REQUIREMENTS 01 11 00 01 26 00 01 29 00 01 31 13 01 33 00 01 42 00 01 43 00 01 60 00 01 73 29 01 77 00 01 78 23 01 78 39 DIVISION 02 SUMMARY OF WORK CONTRACT MODIFICATION PROCEDURES PAYMENT PROCEDURES PROJECT COORDINATION SUBMITTAL PROCEDURES REFERENCES QUALITY ASSURANCE PRODUCT REQUIREMENTS CUTTING & PATCHING CLOSEOUT PROCEDURES OPERATIONS & MAINTENANCE DATA PROJECT RECORD DOCUMENTS EXISTING CONDITIONS 02 41 19 DIVISION 06 CERTIFICATIONS PAGE REQUEST FOR INFORMATION (RFI) FORM REQUEST FOR INFORMATION (RFI) LOG ARCHITECT’S SUPPLEMENTAL INSTRUCTION (ASI) LOG MEETING MINUTES FORM SUBMITTAL LOG SELECTIVE STRUCTURAL DEMOLITION WOOD, PLASTIC & COMPOSITES 06 41 16 06 10 00 PLASTIC LAMINATE ARCHITECTURAL CABINETS ROUGH CARPENTRY INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 DIVISION 07 THERMAL & MOISTURE PROTECTION 07 21 00 07 92 00 DIVISION 08 GYPSUM BOARD ASSEMBLIES ACOUSTICAL PANEL CEILINGS RESILIENT FLOORING RESILIENT BASE AND ACCESSORIES CARPET TILE SHEET CARPETING VINYL WALLCOVERING INTERIOR PAINTING SPECIALTIES 10 44 00 DIVISION 21 FLUSH WOOD DOORS HOLLOW METAL FRAMES DOOR HARDWARE FINISHES 09 21 16 09 51 13 09 65 00 09 65 13 09 68 13 09 68 16 09 72 16 09 91 23 DIVISION 10 THERMAL INSULATION JOINT SEALANTS OPENINGS 08 14 16 08 11 13 08 71 00 DIVISION 09 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATION FIRE PROTECTION SPECIALTIES FIRE SUPRESSION – BY DESIGN BUILD CONTRACTOR DIVISION 23 HEATING, VENTILATION, & AIR CONDITIONING – BY DESIGN-BUILD CONTRACTOR 23 05 93 23 37 00 DIVISION 26 TESTING, ADJUSTING & BALANCING AIR OUTLETS & INLETS ELECTRICAL – BY DESIGN-BUILD CONTRACTOR 26 05 00 26 27 26 26 50 00 GENERAL PROVISIONS/ELECTRICAL SWITCHES & RECEPTACLES LIGHTING FIXTURES INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 11 00 - SUMMARY OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and all Specification Sections, apply to this Section. 1.2 PROJECT DESCRIPTION A. The Project consists of the interior renovation of 13,540-sf of existing office space for The Indianapolis Housing Agency in Indianapolis, Indiana as shown on the Construction Documents prepared by Brenner Design Incorporated dated 3 Jan 14 and 4 Aug 14. 1.3 RELATED WORK A. All Mechanical, Electrical Plumbing and Fire Suppression System Work as required for the Work indicated on the Contract Documents shall be provided by Design-Build Contractors. The General Contractor shall coordinate and schedule the Work of the Design-Build Contractors as required. 1. The Design-Build Contractors shall provide all engineering services required including professional certifications, Code compliance, all document submissions to all authorities having jurisdiction and all required inspections in compliance with the Project Schedule and as required for complete and operable systems. 1.4 WORK UNDER OTHER CONTRACTS A. The Owner will provide and install telecommunication-security-signal systems, entry door keypads, security cameras and bank equipment under separate contracts with the vendors for this equipment. The General Contractor shall coordinate the Work required for these installations as indicated on the Contract Documents and schedule this Work for completion in accordance with the Project Schedule. The DesignBuild Contractors shall provide the miscellaneous items such as conduit, electrical boxes and rough-in Work as required for the installation of the Owner-provided equipment indicated on the Drawings. B. The Owner will provide and install all loose furniture under separate contract with the furniture vendor and installer. The General Contractor shall coordinate with the furniture vendor and installer to properly schedule the installation in the Project Schedule. The furniture vendor shall receive all furniture shipments, check for damage and file damage claims as required. The Design-Build Contractors shall provide and install all mechanical and electrical service and connections related to the furniture as indicated on the Contract Documents. 1.5 WORK SEQUENCE A. The Work shall be conducted in phases to provide the least possible interference to the activities of the surrounding facilities. The Work shall be completed according to the Project Schedule or earlier. B. All Sub-Contractor(s) and General Contractor shall cooperate with each other and all others under separate contract with the Owner. A Construction Schedule shall be maintained in current condition at all times by General Contractor. SUMMARY OF WORK 01 11 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS C. The General Contractor and Sub-Contractor(s) shall, as the Work progresses, remove and dispose from the premises all debris and materials occasioned by their construction scope and shall keep and leave the building and premises clean on a daily basis. The General Contractor is responsible for compliance with this requirement. D. Where present construction Work, present services of mechanical and electrical service and other utilities are shown in the Contract Documents, the Drawings have been prepared from drawings provided by Owner. It is the Design-Build Contractor's responsibility before submitting a bid to verify all conditions and, if any discrepancies occur, the General Contractor shall notify the Architect before the bids are submitted, as no extra costs will be allowed for such Work required to provide a finished space useable for its intended purpose as described in the Contract Documents. E. Protection of Existing Materials, Equipment and Finishes: 1. 2. 3. All existing materials, equipment and finishes shall be protected from damage by construction operations and from the elements and freezing during the entire period of construction operations. Existing equipment, and related materials that can not be removed or relocated to accommodate the new construction Work shall be protected. a. Protected means covering with canvas tarps, dust partitions, visqueen and/or the construction of temporary plywood or gypsum board covers or enclosures around such equipment as required. b. Consult with the Architect as to type and extent of such protection as may be required. Any materials, equipment, or finishes damaged during construction operations shall be satisfactorily repaired, or replaced with new materials, equipment or finish. 1.6 CONTRACTOR USE OF PREMISES A. General: Use of the Premises shall be limited to construction activities in the areas indicated on the Drawings and Contractors shall allow for safe Owner access to the areas of construction activities. 1. 2. Confine operations to areas within Contract Limits indicated on the Drawings. Portions of the building beyond areas in which construction operations are indicated are not to be disturbed. Keep all driveways, entrances and public spaces serving the premises clear and available to the public and the Owner at all times. Do not use any exterior areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment prior to installation. PART 2 – PRODUCTS (NOT APPLICABLE) PART 3 - EXECUTION (NOT APPLICABLE) END OF SECTION 01 11 00 SUMMARY OF WORK 01 11 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 26 00 – CONTRACT MODIFICATION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. 1.2 This Section specifies administrative and procedural requirements for handling and processing Contract modifications. MINOR CHANGES IN THE WORK A. 1.3 Architect will issue supplemental instructions authorizing Minor Changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710, "Architect's Supplemental Instructions (ASI)” incorporated herein by this reference. PROPOSAL REQUESTS A. Owner/Architect-Initiated Proposal Requests: Owner/Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Scope, Sum or Time. If necessary, the description will include supplemental or revised Drawings and Specifications prepared by Architect. 1. 2. Proposal Requests issued by Owner/Architect are for information only. Do not consider them instructions either to stop Work in progress or to execute the proposed change. Within the time specified in Proposal Request after receipt of Proposal Request, SubContractor will submit to General Contractor a quotation estimating adjustments to the Contract Sum and the Contract Time necessary to execute the change. General Contractor will combine and coordinate Sub-Contractor proposals and propose a unified change to the Construction Schedule. a. b. c. d. B. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. Include costs of labor and supervision directly attributable to the change. Include a proposed update to General Contractor’s Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to SubContracts, Contractor may propose changes in conjunction with the review and approval of the Owner and Architect. 1. In a submittal to Owner/Architect: include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed CONTRACT MODIFICATION PROCEDURES 01 26 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2. 3. 4. 5. 6. C. 1.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time. Individual requests from Sub-Contractors will not be reviewed. All proposals must meet all aspects of these specifications including thorough coordination by the General Contractor. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. Include costs of labor and supervision directly attributable to the change. Include an updated General Contractor’s Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. Comply with requirements in Division 1 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified. Proposal Request Form: Use forms acceptable to Owner and Architect. Submit a minimum of two copies to Contractor plus one copy each to Owner and Architect. CHANGE ORDER PROCEDURES A. 1.5 Upon signed approval of a Proposal Request by the Architect and Owner, the General Contractor will issue a signed Change Order. CONSTRUCTION CHANGE DIRECTIVE A. Construction Change Directive: General Contractor may, at their own risk, issue a Construction Change Directive. Construction Change Directive instructs Sub-Contractors to proceed with a change in the Work, for subsequent inclusion in a Change Order. 1. B. Construction Change Directive contains a complete description of change in the Work. It also designates method(s) to be followed to determine change in the Contract Sum or the Contract Time. Documentation: General Contractor will maintain detailed records on a time and material basis of Work required by the Construction Change Directive. 1. After completion of change, Sub-Contractor will submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 01 26 00 CONTRACT MODIFICATION PROCEDURES 01 26 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 29 00 - PAYMENT PROCEDURES GENERAL 1. RELATED DOCUMENTS A. 2. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. SUMMARY A. 3. This Section specifies administrative and procedural requirements necessary for the preparation and processing of Applications for Payment. SCHEDULE OF VALUES A. Coordination: Sub-Contractors and Design-Build Contractors shall prepare a Schedule of Values for their individual Work scope and coordinate their Work with the Project Schedule of Values prepared and maintained by the Contractor. A cost-loaded CPM Schedule may serve to satisfy requirements for the Schedule of Values. 1. 2. B. Line items in the Schedule of Values shall be coordinated with other required administrative forms and schedules, including Application for Payment forms with Continuation Sheets, Submittals Schedule, and Contractor’s Construction Schedule. Sub-Contractors shall submit their Schedule of Values to the Contractor at the earliest possible date, but no later than seven (7) days before the date scheduled for submittal of the Initial Applications for Payment. Format and Content: The Project Manual Table of Contents shall be used to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section. 1. Identification: Include the following Project identification on the Schedule of Values: a. b. c. d. e. f. g. 2. 3. Project name and location. Name of Architect. Architect's project number. Contractor's name and address. Sub-contractor’s name and address. Scope of individual Work. Date of submittal. Submit draft of AIA Document G703 Continuation Sheets, incorporated herein by this reference. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual PAYMENT PROCEDURES 01 29 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 4. 5. 6. 7. 8. Table of Contents. Provide several line items for principal subcontract amounts, where appropriate. Include separate line items under required principal subcontracts for operation and maintenance manuals, punch list activities, Project Record Documents, and demonstration and training. Round amounts to nearest whole dollar; total shall equal the Contract Sum. Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work. Allowances: Provide a separate line item in the Schedule of Values for each allowance. Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by measured quantity. Use information indicated in the Contract Documents to determine quantities. Each item in the Schedule of Values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item. a. 9. 4. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Temporary facilities and other major cost items that are not direct cost of actual Work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Sub-contractor's option. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum. APPLICATIONS FOR PAYMENT A. Each Application for Payment shall be consistent with previous applications and payments as certified by Contractor and paid for by Owner. 1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements. B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor and/ or Owner and Sub-Contractor. The period of construction Work covered by each Application for Payment is the period indicated in the Agreement. C. Payment Application Times: Sub-Contractor’s requests for progress payments shall be submitted to Contractor by the first day of the month. The period covered by each Application for Payment is one month, ending on the last day of the month. D. Payment Application Forms: Sub-contractor: Use forms provided by Contractor as form for Applications for Payment. E. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Sub-Contractor. Contractor will return incomplete applications without action. PAYMENT PROCEDURES 01 29 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. 2. F. 2. 3. 4. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage, on each item. When an application shows completion of an item, submit final or full waivers. Owner and Contractor reserve the right to designate which entities involved in the Work must submit waivers. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. I. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from every Sub-contractor with a Contract or Subcontract over $10,000. 1. H. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application. Transmittal: Submit three (3) signed and notarized original copies of each Application for Payment to Contractor by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required. 1. G. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS List of sub-subcontractors. Schedule of Values. Contractor's Construction Schedule (preliminary if not final). Schedule of unit prices. Submittals Schedule (preliminary if not final). List of Contractor's staff assignments. List of Contractor's principal consultants. Copies of building permits. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work. Initial progress report. Report of preconstruction conference. Certificates of insurance and insurance policies. Pre-Demolition Photographs or videotapes. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100-percent completion for portion of the Work claimed as substantially complete. 1. 2. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum. This application shall reflect Certificates of Partial Substantial Completion issued previously for Owner occupancy of designated portions of the Work. PAYMENT PROCEDURES 01 29 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 J. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. Evidence of completion of Project closeout requirements. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid. Updated final statement, accounting for final changes to the Contract Sum. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims" incorporated herein by this reference. AIA Document G706A, "Contractor's Affidavit of Release of Liens" incorporated herein by this reference. AIA Document G707, "Consent of Surety to Final Payment" incorporated herein by this reference. Evidence that claims have been settled. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work. Landfill records and/or receipts. 2.0 PRODUCTS (Not Used) 3.0 EXECUTION (Not Used) END OF SECTION 01 29 00 PAYMENT PROCEDURES 01 29 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 31 13 - PROJECT COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. This Section includes administrative provisions for coordinating construction operations on the Project including, but not limited to, the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. B. Related Sections include the following: 1. 1.3 General Coordination Requirements. Administrative Procedures. Coordination Drawings. Project Meetings. Architect’s Inspections. Requests for Interpretation (RFIs). Architect’s Supplemental Instructions (ASI). Request for Proposal (RFP). Change Order (CO). Division 1 Section “Submittal Procedures” for administrative procedures and coordination of Submittals. DEFINITIONS A. Requests for Interpretation (RFI): Request from Contractor seeking interpretation or clarification of the Contract Documents. B. Architect’s Supplemental Instructions (ASI): Supplemental Instructions from Architect that do not result in a Change Order. C. Request for Proposal (RFP): Request from Architect for a complete quote of all costs including labor, materials, construction fees and Contractor overhead and profit from Contractor. An RFP does not constitute an Approval to Proceed. D. Change Order (CO): A change to the scope of construction, approved by Architect and owner, based on the Contractor’s complete quote as described in the definition of RFP above. A Change Order must be signed by both Architect and Owner to constitute a Notice to Proceed with the Work described in the Contractor’s Proposal. PROJECT COORDINATION 01 31 13 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS GENERAL COORDINATION REQUIREMENTS A. Project Coordination: Contractor shall coordinate all construction operations included in the Drawings and in the different Sections of the Specifications to ensure the efficient and orderly installation of each part of the Work. Contractor shall coordinate all construction operations that depend on each other for proper installation, connection, and operation. 1. 2. 3. 4. 5. B. Contractor shall prepare Memoranda for distribution to each party involved, outlining special procedures required for coordination. Notices, reports, list of attendees at meetings and other related information shall be included as required. 1. 1.5 Construction operations shall be scheduled in the sequence(s) required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation. Contractor shall coordinate the installation of different components with all other contractors and suppliers to ensure maximum accessibility for required maintenance, service, and repair. Contractor shall make adequate provisions to accommodate items scheduled for later installation. Availability of space on this Project is limited, and Contractor shall coordinate the delivery and installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical Work. Contractor shall be responsible for the timely distribution of complete Contract Documents including RFIs, ASIs, changes and other Project documentation as applicable to all Sub-contractors and suppliers for the Project. All costs and expenses including loss of use and damages that result from any party involved in the Project not having complete Contract Documents and Project documentation shall be paid by the Contractor at no additional expense to the Owner or Architect. Prepare similar Memoranda for Owner and separate contractors if coordination of their Work is required. ADMINISTRATIVE PROCEDURES A. Administrative Procedures: Contractor shall coordinate scheduling and timing of required administrative procedures with other construction activities and the activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following: 1. Preparation of General Contractor's Construction Schedule. a. Submit Proposed Construction Schedule to Architect and Owner for approval no later than two weeks after Bid Acceptance. Work shall not commence until Construction Schedule is approved by the Architect and Owner. b. At a minimum, Construction Schedule shall include the following: 1) Start and Completion dates for key Trades, including the Work of all DesignBuild Contractors. 2) Requested dates for Project Coordination Meetings. 3) Estimated delivery dates for key components and all equipment provided by General Contractor and Sub-contractors. PROJECT COORDINATION 01 31 13 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 4) 5) 6) 7) 8) 9) 2. 3. 4. 5. 6. 7. 8. 1.6 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Required delivery dates for all equipment provided by Owner and installed by General Contractor and Sub-contractors. Required delivery dates for all equipment provided and installed by Owner under separate contract. Requested dates for Architect and Owner inspections. a. Architect review of wall layout at time wall lines are chalked on the floor, prior to installation of metal stud framing. b. Architect review of the locations of all electrical and data boxes and plumbing rough-ins, prior to installation of gypsum wall board. c. Architect review of gypsum board installation tolerances after gypsum wall board has been taped and finished, prior to final finish application. d. Architect review of ceiling grid layout, prior to installation of acoustical ceiling panels. e. Architect review of layout of products and applied finishes, prior to application of final finishes and installation of products. f. Owner and Architect review of construction progress and conditions prior to installation of owner-provided furnishings and equipment. Anticipated local Building Official inspection dates. Date of Initial Punch List. Date of Final Completion. Preparation of the Schedule of Values. Installation and removal of temporary facilities and controls. Delivery and processing of Submittals. Requested dates for Progress Meetings. Pre-installation conferences. Startup and adjustment of systems. Project Closeout activities. COORDINATION DRAWINGS A. Coordination Drawings shall be prepared if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities. 1. Content shall include Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable: a. b. 2. 3. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide proposed alternate sketches to Architect for resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract. Sheet Size: Match Architectural Drawings. Number of Copies: Submit three (3) opaque copies of each submittal. Architect will return one copy. PROJECT COORDINATION 01 31 13 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 4. 1.7 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Refer to individual Sections for Coordination Drawing requirements for Work in those Sections. PROJECT MEETINGS A. General: The General Contractor shall schedule and conduct meetings and conferences at the Project site, unless otherwise required by the owner. 1. 2. 3. B. Attendees: Inform participants and other parties involved, including individuals whose presence is required, of the date and time of each meeting. Provide written notification to Owner and Architect of scheduled meeting dates and times. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Architect, not more than three (3) days after the meeting. Pre-construction Conference: Schedule a pre-construction conference prior to the start of construction, at a time convenient to Owner and Architect, but not later than 15 days after execution of the Owner-Contractor Agreement. Hold the conference at Project site or other convenient location. Conduct the meeting to review responsibilities and personnel assignments. 1. 2. Attendees: Authorized representatives of Owner, Architect, and their consultants; General Contractor and its superintendent; Design-Build Contractors, major subcontractors; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. Agenda: Discuss items of significance that could affect progress, including the following: a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. Tentative construction schedule. Critical Work sequencing and long-lead time items. Designation of key personnel and their duties. Procedures for processing field decisions and Change Orders. Procedures for RFIs, ASIs and RFPs. Procedures for testing and inspecting. Procedures for processing Applications for Payment. Distribution of the Contract Documents. Submittal Procedures. Preparation of Record Documents. Use of the premises and existing building. Work restrictions. Owner's access and occupancy requirements. Responsibility for temporary facilities and controls. Construction waste management and recycling. Parking availability. Office, work, and storage areas. Equipment deliveries and priorities. Safety precautions, regulations, procedures and First aid. Security. Progress cleaning. Working hours. PROJECT COORDINATION 01 31 13 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 3. C. Minutes: Record and distribute meeting minutes to all attendees not more than three (3) days after the meeting. Pre-installation Conferences: Conduct pre-installation conferences at Project site before each construction activity that requires coordination with other construction. 1. 2. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Provide written notification to Owner and Architect of scheduled meeting dates and times. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following: a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. 3. 4. 5. D. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS The Contract Documents. Options. Related RFIs, ASIs and RFPs. Related Change Orders. Purchases. Deliveries. Submittals. Review of mockups. Possible conflicts. Compatibility problems. Time schedules. Weather limitations. Manufacturer's written recommendations. Warranty requirements. Compatibility of materials. Acceptability of substrates. Temporary facilities and controls. Space and access limitations. Regulations of authorities having jurisdiction. Testing and inspecting requirements. Installation procedures. Coordination with other Work. Required performance results. Protection of adjacent work. Protection of construction and personnel. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date. Progress Meetings: Conduct progress meetings at weekly intervals. Coordinate dates of meetings with preparation of Applications for Payment. PROJECT COORDINATION 01 31 13 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. 2. Attendees: In addition to representatives of Owner and Architect, each Contractor, Subcontractor, Design-Build Contractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. Agenda: Review and correct or approve minutes of previous Progress Meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. General Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to General Contractor's Construction Schedule. Determine how construction that is behind schedule will be expedited and secure commitments from the parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. 1) b. Review schedule for next period. Review present and future needs of each entity present, including the following: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) 20) 21) 3. 4. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Interface requirements. Sequence of operations. Status of submittals. Deliveries. Off-site fabrication. Access. Site utilization. Temporary facilities and controls. Work hours. Safety precautions, regulations and procedures. Progress cleaning. Quality and Work standards. Dates of Architect’s Inspections. Status of correction of deficient items. Field observations. RFIs and ASIs. Status of responses to Request for Proposals (RFPs). Pending changes. Status of Change Orders. Pending claims and disputes. Documentation of information for the current Request for Payment. Minutes: Record the meeting minutes. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present. a. 5. Schedule Updating: Revise Contractor's Construction Schedule after each Progress Meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting. Architect’s Inspections: Contractor shall properly schedule the following Inspections as the Work progresses. These Inspections are in addition to the procedures specified in Division 1 PROJECT COORDINATION 01 31 13 - 6 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Section “Quality Control,” procedures specified in individual Sections relating to installation of individual products and materials, and Inspections specified for the Punch List and procedures for Substantial Completion. Architect shall prepare Inspection Notes and Contractor shall distribute these Notes to the appropriate Sub-contractors if corrective Work is required. a. b. c. c. d. e. 1.8 Verification of interior wall layout when the locations have been marked on the floor, but prior to installation of metal stud framing. Verification of the locations for electrical, plumbing and data prior to installation of gypsum wall board. Verification of metal stud framing installation tolerances prior to installation of gypsum wall board. Verification of gypsum wall board installation tolerances prior to finishing operations per Division 9 Section “Gypsum Wall Board Assemblies.” Verification of Acoustical Ceiling Panel grid when the grid has been installed but prior to acoustical ceiling panels are installed. Verification of locations for finishes indicated on the Finish Drawings when the substrates are prepared but prior to installation of finishes. REQUESTS FOR INTERPRETATION (RFIs) A. Procedure: Immediately upon the discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, General Contractor shall prepare and submit a coordinated RFI on the specified RFI form. 1. 2. 3. 4. B. All RFI’s shall originate with the General Contractor. RFIs submitted by entities other than the General Contractor will be returned with no response. All RFI’s shall be coordinated by the General Contractor, combining multiple SubContractor and Design-Build Contractor questions relative to a single topic. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Sub-Contractors’ Work or Work of Owner’s contractors. RFI’s shall identify Work and schedule for construction by others (Owner’s contractors, Design-Build Contractors, etc.) Content of the RFI: Include a detailed, legible description of item needing interpretation and the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Project name. Date. Name of Sub-Contractors directly effected. Name of Architect and General Contractor. RFI number, numbered sequentially. Specification Section number and title and related paragraphs, as appropriate. Drawing number and detail references, as appropriate. Field dimensions and conditions, as appropriate. General Contractor's/Sub-Contractor’s suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI. General Contractor's signature. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop Drawings, and other information necessary to fully describe items needing interpretation. PROJECT COORDINATION 01 31 13 - 7 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 C. Hard-copy RFIs: 1. 2. D. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS All RFI’s shall be submitted to Architect in physical format. Identify each page of attachments with the RFI number and sequential page number. Architect's Action: Architect will review each RFI, determine action required, and return it. Contractor shall allow seven (7) working days for Architect's response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day. 1. The following RFIs will be returned without action: a. b. c. d. e. f. Requests for approval of Submittals. Requests for approval of substitutions. Requests for coordination information already indicated in the Contract Documents. Requests for adjustments in the Contract Time or the Contract Sum. Requests for interpretation of Architect's actions on Submittals. Incomplete RFIs, uncoordinated Sub-contractor’s RFI’s, or RFI’s with numerous errors. 2. Architect's action may include a request for additional information, in which case Architect's time for response will start again with the submittal of the revised RFI. 3. If General Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, the General contractor shall notify Architect in writing within ten (10) days of receipt of the RFI response. E. On receipt of Architect's action, Contractor shall update the RFI log and immediately distribute the RFI response to all affected parties. Contractor shall review response and notify Architect within seven (7) working days if Contractor or Sub-contractors disagree with response. F. RFI Log: Contractor shall prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Contractor shall submit the RFI Log on a weekly basis to Architect, including the following information: 1. 2. 3. 4. 5. 6. 7. 8. 9. 1.9 Project name. Name and address of General Contractor. Name and address of Primarily Affected Sub-Contractor(s). Name and address of Architect. RFI number including RFIs that were dropped and not submitted. RFI description. Date the RFI was submitted. Date Architect's response was received. Identification of related Minor Change in the Work and Proposal Request, as appropriate. ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS (ASI) A. The Architect may issue supplemental instructions authorizing minor changes in the Work that do not involve adjustment to the Contract Sum or contract Time on AIA Document G710 “Architect’s Supplemental Instructions (ASI)” incorporated herein by this reference. PROJECT COORDINATION 01 31 13 - 8 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS B. The Contractor shall distribute the ASI to all parties involved in the topic of the ASI within three working days of receipt from Architect. C. If Contractor or any other party believe the ASI involves an adjustment to the Contract Sum or Contract Time, the contractor shall submit such notice to Architect in compliance with the Request for Information (RFI) procedures in this Section. 1.10 A. REQUEST FOR PROPOSAL (RFP) Owner and Architect-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Scope, Sum or Time. If necessary, the description will include supplemental or revised Drawings and Specifications prepared by Architect. 1. 2. Proposal Requests issued by Owner/Architect are for information only. Do not consider them instructions either to stop Work in progress or to execute the proposed change. Within the time specified in Proposal Request after receipt of Proposal Request, SubContractor shall submit to General Contractor a quotation estimating adjustments to the Contract Sum and the Contract Time necessary to execute the change. General Contractor shall combine and coordinate Sub-Contractor proposals and propose a unified change to the Contract Sum and/or Contract Time as appropriate. a. b. c. d. B. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. Include only the costs of labor and supervision directly attributable to the change. Include a proposed update to Contractor’s Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to SubContracts, Contractor may propose changes in conjunction with the review and approval of the Owner and Architect. 1. 2. 3. 4. 5. In a Submittal to Owner/Architect, include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time. Individual requests from Sub-Contractors will not be reviewed. All proposals must meet all aspects of these Specifications including coordination by the Contractor. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. Include costs of labor and supervision directly attributable to the change. Include an updated Contractor’s Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and PROJECT COORDINATION 01 31 13 - 9 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 6. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS activity relationship. Use available total float before requesting an extension of the Contract Time. Comply with requirements in Division 1 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified. C. Proposal Request Form: Use forms acceptable to or as provided by Architect. Submit a minimum of two copies to Contractor plus one copy to Architect. D. Architect’s Action: Architect will review each RFP, submit to Owner for approval signature, and return to Contractor. Contractor shall allow not less than ten (10) working days from date of submission for Owner’s review and response for each RFP. 1.11 A. CHANGE ORDER (CO) Upon signed approval of a Proposal Request by the Owner and the Architect, the Contractor will issue a signed Change Order and submit to Architect for processing. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 01 31 13 PROJECT COORDINATION 01 31 13 - 10 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 33 00 – SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section. B. Section 01 31 13 “Project Coordination” – Coordination Drawings. 1.2 SUMMARY A. This Section specifies administrative and procedural requirements for submittals required for performance of the Work, including; 1. 2. 3. 4. B. Shop Drawings. Product Data. Samples. Architect’s Inspections. Administrative Submittals: Refer to other Division-1 Sections and other Contract Documents for requirements for administrative submittals. Such submittals include, but are not limited to: 1. 2. 3. Permits. Applications for payment. Insurance certificates. 1.3 SUBMITTAL PROCEDURES A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. Transmit each submittal sufficiently in advance of performance of related construction activities to avoid delay. 1. Contractor shall provide Architect and Owner with proposed Submittal Log for approval within 10 working days of Bid Acceptance. Submittal Log shall include the following: information as indicated on the attached sample. a. Product Division in CSI Master Format 2004 format to match these Specifications. b. Sample / Product Data / Shop Drawing Description. c. Estimated date of delivery to Architect. d. Requested date of return from Architect. e. Deadline for Review Return to General Contractor to maintain Approved Construction Schedule. 2. Submittal Log shall be organized by the following: a. Product Division in ascending order. b. Individual Entry Line for each Sample / Product Data / Shop Drawing Set. Multiple products shall not be combined within one submittal. c. Electronic Spreadsheet Format: provide data file to Architect with Initial Submittal, minimum Tab-Delineated Text File. Contact Architect of Record for sample file and compatibility requirements. SUBMITTAL PROCEDURES 01 33 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 3. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals and related activities that require sequential activity. 4. Coordinate transmittal of different types of submittals for related elements of the Work so processing will not be delayed by the need to review submittals concurrently for coordination. a. 5. b. c. d. Allow five (5) business days for initial review. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. The Architect will promptly advise the Contractor when a submittal being processed must be delayed for coordination. If an intermediate submittal is necessary, process the same as the initial submittal. Allow three (3) business days for reprocessing each submittal. No extension of Contract Time will be authorized because of failure to transmit submittals to the Architect sufficiently in advance of the Work to permit processing. Submittal Preparation: Place a permanent label or title block on each submittal for identification. Indicate the name of the entity that prepared each submittal on the label or title block. 1. 2. Provide a space approximately 4-inch by 5-inch on the label or beside the title block on Shop Drawings to record the General Contractor's review and acceptance markings and the action taken. Include the following information on the label for processing and recording action taken. a. b. c. d. e. f. g. h. i. j. C. The Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. Processing: Allow sufficient review time so that installation will not be delayed as a result of the time required to process submittals, including time for re-submittals. a. B. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Project name. Date. Name and address of Architect. Name and address of Contractor. Name and address of Sub-contractor. Name and address of Supplier. Name of Manufacturer. Number and title of appropriate Specification Section. Drawing number and detail references, as appropriate. Clearly identify each submittal with the tag, referenced in construction documents (i.e. Wall Covering Tag VWC-3) 3. Include minimum of 3 copies of each submittal, unless otherwise noted in Construction Documents. 4. Include only those samples indicated on Drawings. Do not send unmarked chain sets unless Architect is required to make color or finish selection. Submittal Transmittal: Package each Submittal appropriately for transmittal and handling. Transmit each Submittal from Contractor to Architect using a transmittal form. Submittals received from sources other than the Contractor will be returned without action. SUBMITTAL PROCEDURES 01 33 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Record relevant information and requests for data on the Transmittal. On the form, or separate sheet, record deviations from Contract Document requirements, including minor variations and limitations. Include Sub-Contractor's certification that information complies with Contract Document requirements. 1.4 SHOP DRAWINGS A. Submit newly prepared information, drawn to accurate scale. Highlight, encircle, or otherwise indicate deviations from the Contract Documents. Do not reproduce Contract Documents or copy standard information as the basis of Shop Drawings. Standard information prepared without specific reference to the Project is not considered Shop Drawings. B. Shop Drawings include fabrication and installation drawings, setting diagrams, schedules, patterns, templates and similar drawings. Include the following information: 1. 2. 3. 4. 5. 6. 7. Dimensions/Field Verified Dimensions. Identification of products and materials included. Compliance with specified standards. Notation of coordination requirements. Notation of dimensions established by field measurement. Sheet Size: Except for templates, patterns and similar full- size Drawings, submit Shop Drawings on sheets at least 8-1/2-inches by 11-inches but no larger than 30-inches by 42-inches. Submittal: Submit 3 blue- or black-line prints and 2 additional prints where required for maintenance manuals, plus the number of prints needed by the Architect for distribution. Two prints will be retained (Contractor, Architect); the remainder returned. a. 8. C. One of the prints returned shall be marked-up and maintained as a "Record Document". Do not use Shop Drawings by the General Contractor without an Architect’s appropriate final stamp of review indicating action taken in connection with construction. Coordination Drawings are a special type of Shop Drawing that show the relationship and integration of different construction elements that require careful coordination during fabrication or installation to fit in the space provided or function as intended. 1. 2. 3. Preparation of Coordination Drawings may include components previously shown in detail on Shop Drawings or Product Data. Submit Coordination Drawings for integration of different construction elements. Show sequences and relationships of separate components to avoid conflicts in use of space. Contact Architect to determine if Coordination Drawings are required for a specific issue. 1.5 PRODUCT DATA A. Collect Product Data into a single submittal for each element of construction or system. Product Data includes printed information such as manufacturer's installation instructions, catalog cuts, standard color charts, roughing-in diagrams and templates, standard wiring diagrams and performance curves. Where Product Data must be specially prepared because standard printed data is not suitable for use, submit as "Shop Drawings." 1. Mark each copy to show applicable choices and options. Where printed Product Data includes SUBMITTAL PROCEDURES 01 33 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS information on several products, some of which are not required, mark copies to indicate the applicable information. Include the following information: a. b. c. d. e. f. 2. Do not submit Product Data until compliance with requirements of the Contract Documents has been confirmed. a. 3. Manufacturer's printed recommendations. Compliance with recognized trade association standards. Compliance with recognized testing agency standards. Application of testing agency labels and seals. Notation of dimensions verified by field measurement. Notation of coordination requirements. Unless noncompliance with Contract Document provisions is observed, the Submittal may serve as the final Submittal. Distribution: Furnish copies of final submittal to installers, subcontractors, suppliers, manufacturers, fabricators, and others required for performance of construction activities. Show distribution on transmittal forms. a. b. 4. Do not proceed with installation until an applicable copy of Product Data applicable is in the installer's possession. Do not permit use of unmarked copies of Product Data in connection with construction. Include a minimum of three (3) physical samples and two (2) copies of written data for each Submittal and Sample, unless otherwise noted in the Specifications. 1.6 SAMPLES A. Submit full-size, fully-fabricated Samples cured and finished as specified and physically identical with the material or product proposed. Samples include partial sections of manufactured or fabricated components, cuts or containers of materials, color range sets, and swatches showing color, texture and pattern. 1. Mount, display, or package Samples in the manner specified to facilitate review of qualities indicated. Prepare Samples to match the Architect's Sample. Include the following: a. b. c. d. e. 2. Generic description of the Sample. Sample source. Product name or name of manufacturer. Compliance with recognized standards. Availability and delivery time. Submit Samples for review of kind, color, pattern, and texture, for a final check of these characteristics with other elements, and for a comparison of these characteristics between the final submittal and the actual component as delivered and installed. a. Where variation in color, pattern, texture or other characteristics are inherent in the material or product represented, submit multiple units (not less than three 3 each of three (3) variations), that show approximate limits of the variation range. SUBMITTAL PROCEDURES 01 33 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 b. 3. Refer to other Specification Sections for requirements for Samples that illustrate workmanship, fabrication techniques, details of assembly, connections, operation and similar construction characteristics. Preliminary submittals: Where Samples are for selection of color, pattern, texture or similar characteristics from a range of standard choices, submit a full set of choices for the material or product. a. Preliminary submittals will be reviewed and returned with the Architect's mark indicating selection and other action. 4. Submittals: Except for Samples illustrating assembly details, workmanship, fabrication techniques, connections, operation and similar characteristics, submit three (3) sets; one will be returned marked with the action taken. 5. Quantity: Three (3) physical samples minimum 5-inches by 6-inches, unless otherwise noted. 6. Contractor shall maintain sets of Samples, as returned, at the Project site, for quality comparisons throughout the course of construction. a. b. B. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Unless non-compliance with Contract Document provisions is observed, the Submittal may serve as the final Submittal. Sample sets may be used to obtain final acceptance of the construction associated with each set. Distribution of Samples: Prepare and distribute additional sets to Sub-contractors, manufacturers, fabricators, suppliers, installers, and others as required for performance of the Work. Show distribution on transmittal forms. 1. Field Samples specified in individual Sections are special types of Samples. Field Samples are fullsize examples erected on site to illustrate finishes, coatings, or finish materials and to establish the standard by which the Work will be judged. a. Comply with submittal requirements to the fullest extent possible. Process transmittal to Architect to document activity for approval. 1.7 ARCHITECT'S INSPECTIONS A. Except for submittals for record, information or similar purposes, where action and return is required or requested, Contractor will pre-review each Submittal, and send to Architect for review. 1. 2. B. Review all Submittal information for accuracy and completeness prior to issuing to Architect for approval. Improperly tagged, untagged and incomplete Submittals shall be returned to Contractor without review. Compliance with specified characteristics is ultimately the Contractor's responsibility. Action Stamp: The Architect will stamp each Submittal with a uniform, self-explanatory action stamp. The stamp will be appropriately marked, as follows, to indicate the action taken: 1. Reviewed: Where submittals are marked "Reviewed," that part of the Work covered by the SUBMITTAL PROCEDURES 01 33 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Submittal may proceed provided it complies with requirements of the Contract Documents and final acceptance will depend upon that compliance. 2. Reviewed as Noted: When submittals are marked "Furnish as Corrected," that part of the Work covered by the Submittal may proceed provided it complies with notations or corrections on the submittal and requirements of the Contract Documents and final acceptance will depend on that compliance. 3. Revise and Resubmit: When submittal is marked "Revise and Resubmit," do not proceed with that part of the Work covered by the Submittal, including purchasing, fabrication, delivery, or other activity. Revise or prepare a new submittal in accordance with the notations; resubmit without delay. Repeat if necessary to obtain a different action mark. a. Do not permit Submittals marked "Revise and Resubmit" to be used at the Project site, or elsewhere where Work is in progress. 4. Rejected: When Submittal is marked “Rejected,” that part of the Work covered has not met the minimum specifications and cannot be accepted. 5. Other Action: Where a Submittal is primarily for information or record purposes, special processing or other activity, the submittal will be returned, marked "Reviewed". When more specific information is requested, the Submittal will note “Submit Specific Item.” PART 2 - PRODUCTS (Not Applicable). PART 3 - EXECUTION (Not Applicable). END OF SECTION 0133 00 SUBMITTAL PROCEDURES 01 33 00 - 6 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 42 00 – REFERENCES PART 1 – GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 DEFINITIONS A. Architect: Architect of Record. B. General: Basic Project Scope notes are included on the Drawing Cover Sheet. C. Indicated: Refers to graphic representations, notes or schedules on the Drawings, or other Paragraphs or Schedules in Specifications, and similar requirements in Contract Documents. Where terms such as "shown," "noted," "scheduled," and "specified" are used, it is to help locate the reference; no limitation on location is intended except as specifically noted. D. Directed: Terms such as "directed", "requested", "authorized", "selected", "approved", "required", and "permitted" mean "directed by the Architect", "requested by the Architect", and similar phrases. However, no implied meaning shall be interpreted to extend the Architect's responsibility into the General Contractor's area of construction supervision. E. Approve: The term "approved," where used in conjunction with the Architect's action on the General Contractor's Applications, and requests is limited to the duties and responsibilities of the Architect as stated in General and Supplementary Conditions. Such approval shall not release the General Contractor or Subcontractors from responsibility to fulfill Contract requirements unless otherwise provided in the Contract Documents. F. Regulation: The term "Regulations" includes laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, as well as rules, conventions, and agreements within the construction industry that control performance of the Work, whether lawfully imposed by authorities having jurisdiction or not. G. Furnish: The term "furnish" is used to mean "supply and deliver to the Project site, ready for unloading, unpacking, assembly, installation, and similar operations." H. Install: The term "install" is used to describe operations at project site including the actual "unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations." I. Provide: The term "provide" means "to furnish and install, complete and ready for the intended use." J. Installer: An "Installer"is the Sub-Contractor(s) or an entity engaged by the Sub-Contractor(s), either as an employee, or sub-subcontractor for performance of a particular construction activity, including installation, erection, application, and similar operations. Installers are required to be experienced in the operations they are engaged to perform. REFERENCES 01 42 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS 1. The term "experienced," when used with the term "Installer" means having a minimum of 5 previous Projects similar in size and scope to this Project, being familiar with the precautions required, and having complied with requirements of the authority having jurisdiction. See additional requirement in selected divisions/sections. K. “Project Site” is the space available to the Sub-contractor(s) for performance of construction activities, either exclusively or in conjunction with others performing other construction activities as part of the Project. The extent of the Project Site is shown on the Drawings and may or may not be identical with the description of the land upon which the Project is to be built. L. Testing Laboratories: A "testing laboratory" is an independent entity engaged to perform specific inspections or tests, either at the Project Site or elsewhere, and to report on and, if required, to interpret results of those inspections or tests. 1.3 SPECIFICATION FORMAT AND CONTENT EXPLANATION A. Specification Format: These Specifications are organized into Divisions and Sections based on the Construction Specifications Institute's 50-Division format and MASTERFORMAT 2004 Edition Numbers and Titles. B. Specification Content: This Specification uses certain conventions in the use of language and the intended meaning of certain terms, words, and phrases when used in particular situations or circumstances. These conventions are explained as follows: 1. Abbreviated Language: Language used in the Specifications and other Contract Documents is the abbreviated type. Implied words and meanings will be appropriately interpreted. Singular words will be interpreted as plural and plural words interpreted as singular where applicable and where the full context of the Contract Documents so indicates. 2. Imperative and streamlined language is used generally in the Specifications. Requirements expressed in the imperative mood are to be performed by the Contractor. At certain locations in the text, for clarity, subjective language is used to describe responsibilities that must be fulfilled indirectly by the Contractor, or by others when so noted. a. The words "shall be" shall be included by inference wherever a colon (:) is used within a sentence or phrase. C. Assignment of Specialists: The Specification requires that certain specific construction activities shall be performed by specialists who are recognized experts in the operations to be performed. The specialists must be engaged for those activities, and assignments are requirements over which the Sub-contractors have no choice or option. The ultimate responsibility for fulfilling Contract requirements remains with the individual Sub-contractors. 1. This requirement shall not be interpreted to conflict with enforcement of building codes and similar regulations governing the Work. It is also not intended to interfere with local trade union jurisdictional settlements and similar conventions. 2. Trades: Use of titles such as "carpentry" is not intended to imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as REFERENCES 01 42 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS "carpenter." It also does not imply that requirements specified apply exclusively to tradespersons of the corresponding generic name. 1.4 DRAWING SYMBOLS A. Graphic symbols: Where not otherwise noted, symbols are defined by the contract documents and "Architectural Graphic Standards," published by John Wiley & Sons, Inc., eighth edition. B. Mechanical/Electrical Drawings: Graphic symbols used on mechanical and electrical Drawings are generally aligned with symbols recommended by ASHRAE. Where appropriate, they are supplemented by more specific symbols recommended by technical associations including ASME, ASPE, IEEE, and similar organizations. Refer instances of uncertainty to the Architect for clarification before proceeding. C. INDUSTRY STANDARDS 1. Applicability of Standards: Except where the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents. Such standards are made a part of the Contract Documents by reference. Individual Sections indicate which codes and standards the Contractor must keep available at the Project Site for reference. 2. Publication Dates: Where the date of issue of a referenced standard is not specified, comply with the standard in effect as of date of Contract Documents. a. Updated Standards: At the request of the Architect, Owner, Contractor, or authority having jurisdiction, submit a Change Order proposal where an applicable code or standard has been revised and reissued after the date of the Contract Documents and before performance of Work affected. The Architect will decide whether to issue a Change Order to proceed with the updated standard. b. Copies of Standards: Each entity engaged in construction on the Project is required to be familiar with industry standards applicable to that entity's construction activity. Copies of applicable standards are not bound with the Contract Documents. c. Where copies of standards are needed for performance of a required construction activity, the Subcontractor(s) shall obtain copies directly from the publication source. d. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. The following acronyms or abbreviations as referenced in Contract Documents are defined to mean the associated names. Names and addresses are subject to change and are believed to be, but are not assured to be, accurate and up to date as of date of Contract Documents. AIA A.I.A. AISC REFERENCES American Institute of Architects 1735 New York Ave., NW Washington, DC 20006 American Insurance Association 85 John St. New York, NY 10038 American Institute of Steel Construction 400 N. Michigan Ave., 8th Floor (202) 626-7300 (212) 669-0400 (312) 670-2400 01 42 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 AISI AITC ANSI ASME ASPE ASTM AWI BHMA FGMA IESNA ICC ML/SFA NEC NECA NEMA NFPA N.F.P.A. REFERENCES IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Chicago, Il 60611 American Iron and Steel Institute 1133 Fifteenth St., NW Washington, DC 20005 American Institute of Timber Construction 333 W. Hampden Ave. Englewood, CO 80110 American National Standards Institute, Inc. 1819 L Street, NW, 6th Floor Washington, DC 20036 American Society of Mechanical Engineers 345 East 47th St. New York, NY 10017 American Society of Plumbing Engineers 3617 Thousand Oaks Blvd., Suite 210 Westlake, CA 91362 American Society for Testing and Materials 1916 Race St. Philadelphia, PA 19103 Architectural Woodwork Institute 2310 S. Walter Reed Drive Arlington, VA 22206 Builders' Hardware Manufacturers Association 60 E. 42nd St., Room 511 New York, NY 10165 Flat Glass Marketing Association 3310 Harrison, White Lakes Professional Bldg. Topeka, KS 66611 Illuminating Engineering Society of North America 345 E. 47th St. New York, NY 10017 International Code Council 4051 W. Flossmoor Road Country Club Hills, IL 60478-5795 Metal Lath/Steel Framing Association 600 S. Federal St., Suite 400 Chicago, IL 60605 National Electric Code (from NFPA) National Electrical Contractors Association 7315 Wisconsin Ave. Bethesda, MD 20814 National Electrical Manufacturers Association 2101 L St., NW, Suite 300 Washington, DC 20037 National Fire Protection Association Batterymarch Park Quincy, MA 02269 National Forest Products Association 1250 Connecticut Ave., NW (202) 452-7100 (303) 761-3212 (202) 293-8020 (212) 705-7722 (805) 495-7120 (215) 299-5400 (703) 671-9100 (212) 682-8142 (913) 266-7013 (212) 705-7926 (708) 799-2300 (312) 922-6222 (301) 657-3110 (202) 457-8400 (617) 770-3000 (202) 463-2700 01 42 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 UL Washington, DC 20036 Underwriters Laboratories 333 Pfingsten Rd. Northbrook, IL 60062 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS (312) 272-8800 1.5 SUBMITTALS A. Permits, Licenses, and Certificates: For the Owner's records, Contractor shall submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, and similar documents, correspondence, and records established in conjunction with compliance with standards and regulations bearing upon performance of the Work. PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable) END OF SECTION 01 42 00 REFERENCES 01 42 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 43 00 - QUALITY ASSURANCE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for quality assurance and quality control. B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Sub-contractor(s) of responsibility for compliance with the Contract Document requirements. 1. 2. C. 1.2 Specified tests, inspections, and related actions do not limit Contractor’s other qualityassurance and -control procedures that facilitate compliance with the Contract Document requirements. Requirements for Contractor and Sub-contractor(s) to provide quality-assurance and control services required by Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section. See other Sections for specific test and inspection requirements. DEFINITIONS A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements. B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Architect. C. Pre-Construction Testing: Tests and inspections that are performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria. D. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with industry standards. E. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop. F. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work. QUALITY ASSURANCE 01 43 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS G. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency. H. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Sub-contractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations. 1. I. 1.3 Using a term such as "carpentry" does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter." It also does not imply that requirements specified apply exclusively to trades people of the corresponding generic name. Experienced: When used with an entity, "experienced" means having successfully completed a minimum of 5 previous projects similar in size and scope to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction. CONFLICTING REQUIREMENTS A. General: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Contractor for a decision before proceeding. B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Contractor for a decision before proceeding. 1.4 SUBMITTALS A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority. B. Reports: Prepare and submit certified written reports that include the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Date of issue. Project title and number. Name, address, and telephone number of testing agency. Dates and locations of samples and tests or inspections. Names of individuals making tests and inspections. Description of the Work and test and inspection method. Identification of product and Specification Section. Complete test or inspection data. Test and inspection results and an interpretation of test results. Record of temperature and weather conditions at time of sample taking and testing and inspecting. QUALITY ASSURANCE 01 43 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 11. 12. 13. C. 1.5 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements. Name and signature of laboratory inspector. Recommendations on retesting and reinspection. Permits, Licenses, and Certificates: For Owner's records, Contractor and Sub-contractor(s) will submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work. QUALITY ASSURANCE A. General: Qualifications paragraphs in this Article establish the minimum qualification levels required; individual Specification Sections specify additional requirements. B. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance. C. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units. D. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units. E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or products that are similar to those indicated for this Project in material, design, and extent. F. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 548; and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities. 1. 2. G. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory Accreditation Program. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project. QUALITY ASSURANCE 01 43 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.6 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS QUALITY CONTROL A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services. 1. 2. B. Owner will furnish Contractor/Sub-contractors with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform. Costs for retesting and re-inspecting construction that replaces or is necessitated by Work that failed to comply with the Contract Documents will be charged to Contractor, and the Contract Sum will be adjusted by Change Order. Tests and inspections not explicitly assigned to Owner or Contractor are Sub-contractor's responsibility. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required by authorities having jurisdiction, whether specified or not. 1. Where services are indicated as Sub-contractor's responsibility, engage a qualified testing agency to perform these quality-control services. a. 2. 3. 4. 5. Sub-contractor shall not employ same entity engaged by Owner and/or Contractor, unless agreed to in writing by Owner. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed. Where quality-control services are indicated as Sub-contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service to General Contractor within a minimum of 48 hours before commencing associated work. Testing and inspecting requested by Sub-contractors and not required by the Contract Documents are Sub-contractor's sole responsibility. Contractor may submit additional copies of each written report directly to authorities having jurisdiction, when instructed to do so by such authorities. C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Division 1 Section "Submittal Procedures." D. Retesting/Re-inspection: Regardless of whether original tests or inspections were Sub-contractor's responsibility, provide quality-control services, including retesting and re-inspection, for construction that replaced Work that failed to comply with the Contract Documents. E. Testing Agency Responsibilities: Cooperate with Architect, Contractor and Owner in performance of duties. Provide qualified personnel to perform required tests and inspections. 1. 2. 3. Notify Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services. Determine the location from which test samples will be taken and in which in-situ tests are conducted. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements. QUALITY ASSURANCE 01 43 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 4. 5. 6. F. 4. 5. 6. 7. Access to the Work. Incidental labor and facilities necessary to facilitate tests and inspections. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples. Facilities for storage and field curing of test samples. Delivery of samples to testing agencies. Preliminary design mix proposed for use for material mixes that require control by testing agency. Security and protection for samples and for testing and inspecting equipment at Project site. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting. 1. 1.7 Submit a certified written report, in duplicate, of each test, inspection, and similar qualitycontrol service through General Contractor. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work. Do not perform any duties of Contractor. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following: 1. 2. 3. G. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Schedule times for tests, inspections, obtaining samples, and similar activities. SPECIAL TESTS AND INSPECTIONS A. Special Tests and Inspections: Owner will engage a qualified testing agency to conduct special tests and inspections required by authorities having jurisdiction as the responsibility of Owner. 1. 2. 3. 4. 5. 6. Verifying that manufacturer maintains detailed fabrication and quality-control procedures and reviewing the completeness and adequacy of those procedures to perform the Work. Notifying Contractor promptly of irregularities and deficiencies observed in the Work during performance of its services. Submitting a certified written report of each test, inspection, and similar quality-control service to Contractor for distribution to Architect and to authorities having jurisdiction. Submitting a final report of special tests and inspections at Substantial Completion that includes a list of unresolved deficiencies. Interpreting tests and inspections and stating in each report whether tested and inspected Work complies with or deviates from the Contract Documents. Retesting and re-inspecting corrected Work. QUALITY ASSURANCE 01 43 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 REPAIR AND PROTECTION A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes. 1. Provide materials and comply with installation requirements specified in other Specification Sections. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. B. Protect construction exposed by or for quality-control service activities. C. Repair and protection are sub-contractor's responsibility, regardless of the assignment of responsibility for quality-control services. Sub-Contractors shall bring discrepancies in field conditions to the attention of the General Contractor in writing a maximum of seven (7) days after incident. END OF SECTION 01 43 00 QUALITY ASSURANCE 01 43 00 - 6 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 60 00 - PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products. B. See Division 1 Section "Closeout Procedures" for submitting warranties for Contract closeout. C. See other Specification Sections for specific requirements for warranties on products and installations specified to be warranted. 1.2 DEFINITIONS A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent. 1. 2. 3. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents. New Products: Items that have not previously been incorporated into another project or facility, except that products consisting of recycled-content materials are allowed, unless explicitly stated otherwise. Products salvaged or recycled from other projects are not considered new products. Comparable Product: Product that is demonstrated and approved through submittal process, or where indicated as a product substitution, to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product. B. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Sub-contractor(s). C. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and accompanied by the words "basis of design," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of other named manufacturers. PRODUCT REQUIREMENTS 01 60 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.3 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SUBMITTALS A. Substitution Requests: Submit to Contractor for distribution to Architect three (3) copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. 2. Substitution Request Form: Use agreed upon form. Documentation: Show compliance with requirements for substitutions and the following, as applicable: a. b. c. d. e. f. g. h. i. j. k. l. 3. 1.4 Statement indicating why specified material or product cannot be provided. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by Owner and separate subcontractors that will be necessary to accommodate proposed substitution. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated. Product Data, including drawings and descriptions of products and fabrication and installation procedures. Samples, where applicable or requested. List of similar installations for completed projects with project names and addresses and names and addresses of architects and owners. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated. Research/evaluation reports evidencing compliance with building code in effect for Project, from a model code organization acceptable to authorities having jurisdiction. Detailed comparison of Contractor's Construction Schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating lack of availability or delays in delivery. Cost information, including a proposal of change, if any, in the Contract Sum. Sub-Contractor's certification that proposed substitution complies with requirements in the Contract Documents and is appropriate for applications indicated. Sub-contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within 5 business days of receipt of a request for substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 10 business days of receipt of request, or 5 business days of receipt of additional information or documentation, whichever is later. QUALITY ASSURANCE A. Compatibility of Options: If Contractor or Sub-Contractor is given option of selecting between two or more products for use on Project, product selected shall be compatible with products previously selected, even if previously selected products were also options. PRODUCT REQUIREMENTS 01 60 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.5 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PRODUCT DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions. B. Delivery and Handling: 1. 2. 3. 4. C. Storage: 1. 2. 3. 4. 5. 6. 7. 1.6 Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected. Store products to allow for inspection and measurement of quantity or counting of units. Store materials in a manner that will not endanger Project structure. Store products that are subject to damage by the elements indoors. Store cementitious products and materials on elevated platforms. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage. Protect stored products from damage and liquids from freezing. PRODUCT WARRANTIES A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Sub-Contractor(s) of obligations under requirements of the Contract Documents. 1. 2. B. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a particular product and specifically endorsed by manufacturer to Owner. Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to extend time limit provided by manufacturer's warranty or to provide more rights for Owner. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution. 1. 2. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed. Specified Form: When specified forms are included with the Specifications, prepare a written document using appropriate form properly executed. PRODUCT REQUIREMENTS 01 60 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 3. C. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Refer to other Specification Sections for specific content requirements and particular requirements for submitting special warranties. Submittal Time: Comply with requirements in Division 1 Section "Closeout Procedures." PART 2 - PRODUCTS 2.1 PRODUCT SELECTION PROCEDURES A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged and, unless otherwise indicated, that are new at time of installation. 1. 2. 3. 4. 5. 6. B. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects. Owner reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents. Where products are accompanied by the term "as selected," Architect will make selection. Where products are accompanied by the term "match sample," sample to be matched is Architect's. Submit samples to General Contractor for distribution to Architect as outlined in Division I “Submittal Procedures.” Descriptive, performance, and reference standard requirements in the Specifications establish "salient characteristics" of products. Product Selection Procedures: 1. Available Products: Where Specifications include a list of names of both products and manufacturers, provide one of the products listed, or an unnamed product, that complies with requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product. 2. Available Manufacturers: Where Specifications include a list of manufacturers, provide a product by one of the manufacturers listed, or an unnamed manufacturer, that complies with requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product. 3. Product Options: Where Specifications indicate that sizes, profiles, and dimensional requirements on Drawings are based on a specific product or system, provide the specified product or system. Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed product or system. 4. Basis-of-Design Product: Where Specifications name a product and include a list of manufacturers, provide the specified product or a comparable product by one of the other named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product by the other named manufacturers. 5. Visual Matching Specification: Where Specifications require matching an established Sample, select a product that complies with requirements and matches Architect's sample. Architect's decision will be final on whether a proposed product matches. PRODUCT REQUIREMENTS 01 60 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 a. 6. If no product available within specified category matches and complies with other specified requirements, comply with provisions in Part 2 "Product Substitutions" Article for proposal of product. Visual Selection Specification: Where Specifications include the phrase "as selected from manufacturer's colors, patterns, textures" or a similar phrase, select a product that complies with other specified requirements. a. b. 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Architect will select color, pattern, density, or texture from manufacturer's product line that does not include premium items. Full Range: Where Specifications include the phrase "full range of colors, patterns, textures" or similar phrase, Architect will select color, pattern, density, or texture from manufacturer's product line that includes both standard and premium items. PRODUCT SUBSTITUTIONS A. Timing: Architect and/or Contractor will consider requests for substitution only if received within 30 calendar days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Architect. B. Conditions: Architect and/or Contractor will consider Sub-Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, requests will be returned without action, except to record noncompliance with these requirements: 1. 2. 3. 4. 5. 6. 7. 8. 9. 2.3 Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation for professional redesign and evaluation services, increased cost of other construction by Owner, change in Contractor’s Construction schedule and similar considerations. Requested substitution does not require extensive revisions to the Contract Documents. Requested substitution is consistent with the Contract Documents and will produce indicated results. Substitution request is fully documented and properly submitted. Requested substitution will not adversely affect Contractor's Construction Schedule. Requested substitution has received necessary approvals of authorities having jurisdiction. Requested substitution is compatible with other portions of the Work. Requested substitution has been coordinated with other portions of the Work. Requested substitution provides specified warranty. COMPARABLE PRODUCTS A. Conditions: Architect and/or Contractor will consider Sub-contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, Architect/Contractor will return requests without action, except to record noncompliance with these requirements: PRODUCT REQUIREMENTS 01 60 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. 2. 3. 4. 5. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Evidence that the proposed product does not require extensive revisions to the Contract Documents that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated. Evidence that proposed product provides specified warranty. List of similar installations for completed projects with project names and addresses and names and addresses of architects and owners, if requested. Samples, if requested. PART 3 - EXECUTION (Not Used) END OF SECTION 01 60 00 PRODUCT REQUIREMENTS 01 60 00 - 6 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 73 29 - CUTTING AND PATCHING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes procedural requirements for cutting and patching. B. See Divisions 2 through 30 Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work. 1.2 DEFINITIONS A. Cutting: Removal of existing construction necessary to permit installation or performance of other Work. B. Patching: Fitting and repair Work required to restore surfaces to original conditions after installation of other Work. 1.3 SUBMITTALS A. Cutting and Patching Proposal: Submit a proposal describing procedures at least ten (10) days before the time cutting and patching will be performed, requesting approval to proceed. Include the following information: 1. 2. 3. 4. 5. 6. 7. Extent: Describe cutting and patching, show how they will be performed, and indicate why they cannot be avoided. Changes to Existing Construction: Describe anticipated results. Include changes to structural elements and operating components as well as changes in building's appearance and other significant visual elements. Products: List products to be used and firms or entities that will perform the Work. Dates: Indicate when cutting and patching will be performed. Utility Services and Mechanical/Electrical Systems: List services/systems that cutting and patching procedures will disturb or affect. List services/systems that will be relocated and those that will be temporarily out of service. Indicate how long services/systems will be disrupted. Structural Elements: Where cutting and patching involve adding reinforcement to structural elements, submit details and engineering calculations showing integration of reinforcement with original structure. Architect's Approval: Obtain approval of cutting and patching proposal before cutting and patching. Approval does not waive right to later require removal and replacement of unsatisfactory Work. CUTTING AND PATCHING 01 73 29 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS QUALITY ASSURANCE A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio. B. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety. C. Miscellaneous Elements: Do not cut and patch miscellaneous elements or related components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety. D. Visual Requirements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner. 1. If possible, retain original Installer or Fabricator to cut and patch exposed Work. 1.5 WARRANTY A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during cutting and patching operations, by methods and with materials so as not to void existing warranties. PART 2 - PRODUCTS 2.1 MATERIALS A. General: Comply with requirements specified in other Sections. B. Existing Materials: Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. 1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of existing materials. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed. CUTTING AND PATCHING 01 73 29 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. 2. 3.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected. PREPARATION A. Temporary Support: Provide temporary support of Work to be cut. B. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations. C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas. D. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to prevent interruption to occupied areas. 3.3 PERFORMANCE A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay. 1. B. Cut existing construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition. Cutting: Cut existing construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations. 1. 2. 3. 4. 5. 6. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamondcore drill. Excavating and Backfilling: Comply with requirements in applicable Division 31 and 32 Sections where required by cutting and patching operations. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting. Proceed with patching after construction operations requiring cutting are complete. CUTTING AND PATCHING 01 73 29 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections. 1. 2. 3. 4. D. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Inspection: Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing. Floors and Walls: Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance. Ceilings: Patch, repair, or re-hang existing ceilings as necessary to provide an even-plane surface of uniform appearance. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials. END OF SECTION 01 73 29 CUTTING AND PATCHING 01 73 29 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 77 00 - CLOSEOUT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following: 1. 2. 3. 4. Inspection procedures. Warranties. Final cleaning. Attic stock and excess materials. B. See Division 1 Section "Payment Procedures" for requirements for Applications for Payment for Substantial and Final Completion. C. See Division 1 Section "Payment Procedures" for submitting Record Drawings, Record Specifications, and Record Product Data. D. See other Specification Sections for specific closeout and special cleaning requirements for the Work in those Sections. 1.2 SUBSTANTIAL COMPLETION A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, Contractor shall complete the following. List items below that are incomplete in request. 1. 2. 3. 4. 5. 6. 7. 8. 9. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete. Advise Owner of pending insurance changeover requirements. Submit all specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents to Contractor for compilation on behalf of Owner. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs, damage or settlement surveys, property surveys, and similar final record information for each Sub-Contractor’s Scope of Work. Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions. Complete startup testing of systems. Submit test/adjust/balance records. CLOSEOUT PROCEDURES 01 77 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 10. 11. 12. 13. 14. B. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements. Advise Owner of changeover in heat and other utilities. Submit changeover information related to Owner's occupancy, use, operation, and maintenance. Complete final cleaning requirements, including touchup painting. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects. Inspection: Contractor shall generate a written request for inspection for Substantial Completion. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued. 1. 2. 1.3 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected. Results of completed inspection will form the basis of requirements for Final Completion. FINAL COMPLETION – Individual Sub-Contractors A. Preliminary Procedures: Before requesting inspection for determining Final Completion of SubContract Scope of Work, complete the following, and submit to General Contractor: 1. 2. 3. 4. B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will authorize a Certificate for Payment after inspection or will notify Contractor of Work that must be completed or corrected before certificate will be issued. The final determination / responsibility for Completion and/or Payment lies with the Contractor. 1. 1.4 Submit a final Application for Payment according to Division 1 Section "Payment Procedures." Submit certified copy of Contractor’s Inspection List of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance. Submit evidence of final, continuing insurance coverage complying with insurance requirements. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected. LIST OF INCOMPLETE ITEMS (PUNCH LIST) A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction. CLOSEOUT PROCEDURES 01 77 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. 2. 1.5 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Organize list of spaces in sequential order, starting with exterior areas first and proceeding from lowest floor to highest floor. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems. WARRANTIES A. Submittal Time: Submit written warranties for Work where commencement of warranties other than date of Substantial Completion is indicated. B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual. 1. 2. 3. C. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch paper. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Sub-contractor(s). Provide additional copies of each warranty in operation and maintenance manuals. PART 2 - PRODUCTS 2.1 MATERIALS A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces. PART 3 - EXECUTION 3.1 FINAL CLEANING A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions. 1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project: CLOSEOUT PROCEDURES 01 77 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 a. b. c. d. e. f. g. h. i. Clean Project site in areas disturbed by construction activities of rubbish, waste material, litter, and other foreign substances. Remove tools, construction equipment, machinery, and surplus material from Project site. Clean exposed interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Restore reflective surfaces to their original condition. Remove debris and surface dust from limited access spaces, including plenums, shafts, equipment vaults, and similar spaces. Sweep concrete floors broom clean in unoccupied spaces. Vacuum carpet and similar soft surfaces, removing debris and excess nap; shampoo if visible soil or stains remain. Clean transparent materials, including mirrors and glass in doors and windows. Remove glazing compounds and other noticeable, vision-obscuring materials. Replace chipped or broken glass and other damaged transparent materials. Polish mirrors and glass, taking care not to scratch surfaces. Remove labels that are not permanent. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. 1) j. k. l. m. n. o. C. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Do not paint over "UL" and similar labels, including mechanical and electrical nameplates. Wipe surfaces of mechanical and electrical equipment, elevator equipment, and similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances. Replace parts subject to unusual operating conditions. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace burned-out bulbs, and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures. Leave Project clean and ready for occupancy. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid Project of rodents, insects, and other pests. Contractor to forward a copy of the SubContractor(s) report to Owner for record. D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully. 4.2 ATTIC STOCK AND EXCESS MATERIAL A. Provide at least the minimum quantity of attic stock required per percentages listed per Divisions. CLOSEOUT PROCEDURES 01 77 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. 2. 3. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Clearly label each item or container with finish type & tag. Review items with Architect Schedule Storage of Attic Stock within the facility with Property Management. END OF SECTION 01 77 00 CLOSEOUT PROCEDURES 01 77 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following: 1. 2. 3. Emergency manuals. Operation manuals for systems, subsystems, and equipment. Maintenance manuals for the care and maintenance of products, materials, finishes, and systems and equipment. B. See other Specification Sections for specific operation and maintenance manual requirements for the Work in those Sections. C. Section 01 77 00 “Close out Procedures.” 1.2 SUBMITTALS A. Manual: Sub-Contractor(s) to submit to General Contractor two (2) copies of each manual in final form at least three (3) business days before inspection of Work. PART 2 - PRODUCTS 2.1 MANUALS, GENERAL A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain a title page, table of contents, and manual contents. B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information: 1. 2. 3. 4. 5. 6. C. Subject matter included in manual. Date of submittal. Name, address, and telephone number of General Contractor. Name, address, and telephone number of Sub-Contractor. Name and address of Architect. Cross-reference to related systems in other operation and maintenance manuals. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual. OPERATION AND MAINTENANCE DATA 01 78 23 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder. 1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch (215-by-280-mm) paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets. a. 2. 3. 4. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text. a. b. 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations. EMERGENCY MANUALS A. Content: Organize manual into a separate section for type of emergency, emergency instructions, and emergency procedures. B. Type of Emergency: Where applicable for each type of emergency indicated below, include instructions and procedures for each system, subsystem, piece of equipment, and component for fire, flood, gas leak, water leak, power failure, water outage, equipment failure, and chemical release or spill. C. Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar codes and signals. Include responsibilities of Owner's operating personnel for notification of Installer, supplier, and manufacturer to maintain warranties. D. Emergency Procedures: Include instructions on stopping, shutdown instructions for each type of emergency, operating instructions for conditions outside normal operating limits, and required sequences for electric or electronic systems. OPERATION AND MAINTENANCE DATA 01 78 23 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2.3 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS OPERATION MANUALS A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and equipment descriptions, operating standards, operating procedures, operating logs, wiring and control diagrams, and license requirements. B. Descriptions: Include the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. Product name and model number. Manufacturer's name. Equipment identification with serial number of each component. Equipment function. Operating characteristics. Limiting conditions. Performance curves. Engineering data and tests. Complete nomenclature and number of replacement parts. C. Operating Procedures: Include start-up, break-in, and control procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; and required sequences for electric or electronic systems. D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed. E. Piped Systems: identification. 2.4 Diagram piping as installed, and identify color-coding where required for PRODUCT MAINTENANCE MANUAL A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below. B. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual. C. Product Information: Include the following, as applicable: 1. 2. 3. 4. 5. Product name and model number. Manufacturer's name. Color, pattern, and texture. Material and chemical composition. Reordering information for specially manufactured products. OPERATION AND MAINTENANCE DATA 01 78 23 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS D. Maintenance Procedures: Include manufacturer's written recommendations and inspection procedures, types of cleaning agents, methods of cleaning, schedule for cleaning and maintenance, and repair instructions. E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services. F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. 2.5 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below. B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual. C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including maintenance instructions, drawings and diagrams for maintenance, nomenclature of parts and components, and recommended spare parts for each component part or piece of equipment: D. Maintenance Procedures: Include test and inspection instructions, troubleshooting guide, disassembly instructions, and adjusting instructions that detail essential maintenance procedures: E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment. F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services. G. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent. H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. OPERATION AND MAINTENANCE DATA 01 78 23 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 3 - EXECUTION 3.1 MANUAL PREPARATION A. Emergency Manual: Assemble a complete set of emergency information indicating procedures for use by emergency personnel and by Owner's operating personnel for types of emergencies indicated. B. Product Maintenance Manual(s): Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work. C. Operation and Maintenance Manual(s): Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system. D. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable. E. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in Record Drawings to ensure correct illustration of completed installation. 1. F. Do not use original Project Record Documents as part of operation and maintenance manuals. Comply with Division 1 Section "Closeout Procedures" for schedule for submitting operation and maintenance documentation. END OF SECTION 01 78 23 OPERATION AND MAINTENANCE DATA 01 78 23 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 01 78 39 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for Project Record Documents, including the following: 1. 2. 3. 4. Record Drawings. Record Specifications. Record Product Data. Finish Control Book B. Section 01 77 00 “Closeout Procedures.” C. See other Specification Sections for specific requirements for Project Record Documents of the Work in those Sections. 1.2 SUBMITTALS A. Record Drawings: Each Sub-Contractor shall comply with the following: 1. B. Number of Copies: Submit two (2) sets of marked-up Record Prints to General Contractor. Record Specifications: Each Sub-Contractor shall comply with the following: 1. Number of Copies: Submit two (2) copies of marked-up Project's Specifications, including addenda and contract modifications to General Contractor. C. Record Product Data: submittal. Each Sub-Contractor shall submit two copies of each Product Data D. Finish Control Book: General Contractor shall return one copy of Finish Control Book to owner upon completion of project. Finish Control Book must be intact and in good condition. If Finish Control Book is not returned or is damaged, replacement cost of up to $250.00 shall be the responsibility of the General Contractor. PART 2 - PRODUCTS 2.1 RECORD DRAWINGS A. Record Prints: General Contractor shall maintain one set of blue- or black-line white prints of the Contract Drawings and Shop Drawings on Site. PROJECT RECORD DOCUMENTS 01 78 39 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. Preparation: Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints. a. b. 2. 3. 4. B. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location. Note Contractor Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable. Record Transparencies: Immediately before inspection for Certificate of Substantial Completion, review marked-up Record Prints with Architect. Prepare a full set of corrected Contract Drawings and Shop Drawings. 1. 2. 3. C. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Incorporate changes and additional information previously marked on Record Prints. Erase, redraw, and add details and notations where applicable. Refer instances of uncertainty to Architect for resolution. Print the Contract Drawings and Shop Drawings for use as Record Transparencies. Format: Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. 1. 2. 3. Record Prints: Organize Record Prints and newly prepared Record Drawings into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets. Record Transparencies: Organize into unbound sets matching Record Prints. Place transparencies in durable tube-type drawing containers with end caps. Mark end cap of each container with identification. If container does not include a complete set, identify Drawings included. Identification: As follows: a. b. c. d. e. f. Project name. Date. Designation "PROJECT RECORD DRAWINGS." Name of Architect. Name of General Contractor. Name of Owner. PROJECT RECORD DOCUMENTS 01 78 39 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS RECORD SPECIFICATIONS A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications. 1. 2. 3. 4. 2.3 Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made. Note related Change Orders, Record Product Data, and Record Drawings where applicable. RECORD PRODUCT DATA A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal. 1. 2. 3. 2.4 Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation. Note related Change Orders, Record Specifications, and Record Drawings where applicable. MISCELLANEOUS RECORD SUBMITTALS A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference. PART 3 - EXECUTION 3.1 RECORDING AND MAINTENANCE A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of Project. B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to Project Record Documents for Architect's reference during normal working hours. END OF SECTION 01 78 39 PROJECT RECORD DOCUMENTS 01 78 39 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 02 41 19 - SELECTIVE STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 A. SUMMARY This Section includes the following: 1. 2. 1.2 Demolition and removal of selected portions of building or structure. Salvage of existing items to be reused or recycled. DEFINITIONS A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled. B. Remove and Salvage: Detach items from existing construction and deliver them to Owner ready for reuse. C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, protect and store off site, and reinstall them where indicated. D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled. 1.3 A. 1.4 SUBMITTALS Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition and removal work, with starting and ending dates for each activity, interruption of utility services, use of elevator and stairs, and locations of temporary partitions and means of egress. QUALITY ASSURANCE A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project. B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. C. Standards: Comply with ANSI A10.6 and NFPA 241. D. Pre-demolition Conference: Conduct conference at Project site. SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.5 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PROJECT CONDITIONS A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted. B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical. C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition. D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work. 1. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Owner will remove hazardous materials under a separate contract. E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations. 1. 1.6 A. Maintain fire-protection facilities in service during selective demolition operations. WARRANTY Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that utilities have been disconnected and capped. B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required. C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged. 3.2 A. UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS Existing Services/Systems: Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 B. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished. 1. 2. 3. 3.3 Arrange to shut off indicated utilities with utility companies. If services/systems are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing. PREPARATION A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities. B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain. C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished. 3.4 A. SELECTIVE DEMOLITION General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows: 1. 2. 3. 4. 5. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces. Do not use cutting torches. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. Dispose of demolished items and materials promptly. B. Reuse of Building Elements: As indicated on Drawings. C. Removed and Salvaged Items: 1. 2. Clean salvaged items. Pack or crate items after cleaning. Identify contents of containers. SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 3. 4. 5. D. 2. 3. 4. 3.5 Store items in a secure area until delivery to Owner. Transport items to Owner's storage area. Protect items from damage during transport and storage. Removed and Re-installed Items: 1. E. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment. Pack or crate items after cleaning and repairing. Identify contents of containers. Protect items from damage during transport and storage. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When approved by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete. DISPOSAL OF DEMOLISHED MATERIALS A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill. B. Demolished items and materials shall be removed from the building on a schedule coordinated with Building Management and as approved by the Owner and Architect. Demolition Contractor shall provide protection of existing building finishes as required to prevent damage of any type during all transport of demolished materials and shall repair or replace any materials and surfaces damaged by the demolition Work to the satisfaction of the Architect. All required repair and replacement Work required shall be performed during non-business evening and weekend hours. C. Burning: Do not burn demolished materials. D. Disposal: Transport demolished materials off Owner's property and legally dispose of them. 3.6 A. CLEANING Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began. END OF SECTION 02 41 19 SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 06 10 00 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. SUMMARY A. Extent of Rough Carpentry is indicated on Drawings. B. This Section includes the following: 1. C. 1.3 Wood block and nailers Related Sections include the following: 1. Division 06 Section “Plastic Laminate Cabinets” for plastic laminate countertops and cabinets. 2. Division 09 Section "Gypsum Board Assemblies" for installation in metal framed assemblies. SUBMITTALS A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details. 1. 2. B. Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Indicate type of preservative used, net amount of preservative used, net amount of preservative retained, and chemical treatment manufacturer’s written instructions for handling, storing, installing, and finishing treated material. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Include physical properties of treated materials, both before and after exposure to elevated temperatures when tested according to ASTM D 5516 and ASTM D 5664. Material Certificates: For dimension lumber specified to comply with minimum allowable unit stresses. Indicate species and grade selected for each use and design values approved by American Lumber Standards Committee Board of Review. ROUGH CARPENTRY 06 10 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS DELIVERY, STORAGE & HANDLING A. Stack lumber, plywood, and other panels; place spaces between each bundle to provide air circulation. Provide for air circulation around stacks and under coverings. PART 2 - PRODUCTS 2.1 WOOD PRODUCTS, GENERAL A. Lumber: DOC PS 20 and applicable rules of lumber grading agencies certified by the American Lumber Standards Committee Board of Review. 1. 2. 3. 4. B. Wood Structural Panels: 1. 2. 3. 4. 2.2 Factory mark each piece of lumber with grade stamp of grading agency. For exposed lumber indicated to receive a stained or natural finish, mark grade stamp on end or back of each piece. Provide dressed lumber, S4S, unless otherwise indicated. Provide dry lumber with 19-percent maximum moisture content at time of dressing for 2inch nominal thickness or less, unless otherwise indicated. Plywood: Either DOC PS 1 or DOC PS 2 unless otherwise indicated. Thickness: As needed comply with requirements specified but not less than thickness indicated. Comply with “Code Plus” provisions in APA Form No. E30K, “APA Design/ Construction Guide: Residential & Commercial.” Factory mark panels according to indicated Standard. WOOD-PRESERVATIVE TREATED MATERIALS A. Preservative Treatment by Pressure Process: AWPA C2 (lumber) and AWPA C9 (plywood), except that lumber that is not in contact with the ground and is continuously protected from liquid water may be treated according to AWPA C31 with inorganic boron (SBX)]. 1. 2. Preservative Chemicals: Acceptable to authorities having jurisdiction and the following: a. Ammoniacal, or amine, copper quat (ACQ) For exposed items indicated to receive a stained or natural finish, use chemical formulations that do not require incising, contain colorants, bleed through, or otherwise adversely affects finishes. B. Kiln-dry material after treatment to a maximum moisture content of 19 percent for lumber and 15-percent for plywood. Do not use material that is warped or does not comply with requirements for untreated material. C. Mark each treated item with treatment quality mark of an inspection agency approved by the American Lumber Society Committee Board of Review. ROUGH CARPENTRY 06 10 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. D. 2.3 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS For exposed lumber indicated to receive a stained or natural finish, mark end or back of each piece. Application: Treat all items indicated on Drawings and wood cants, mailers, blocking, stripping and similar members subject to high relative humidity and condensation. FIRE-RETARDANT-TREATED MATERIALS A. General: When fire-retardant-treated materials are indicated, provide materials that comply with performance requirements in AWPA C20 (lumber) and AWPA C27 (plywood). Identify fire-retardant-treated wood with appropriate classification marking of UL, U.S. Testing, Timber Products Inspection or another testing and inspecting agency acceptable to authorities having jurisdiction. 1. 2. 3. Use treatment for which chemical manufacturer publishes physical properties of treated wood after exposure to elevated temperatures, when tested by a qualified independent testing agency according to ASTM D 5664, for lumber and ASTM D 5516, for plywood. Use treatment that does not promote corrosion of metal fasteners. Use Interior Type A, High Temperature (HT), unless otherwise indicated. B. Identify fire-retardant-treated wood with appropriate classification marking of testing and inspecting agency acceptable to authorities having jurisdiction. C. Application: Fire treat plywood backing panels and elsewhere indicated on Drawings. 2.4 MISCELLANEOUS LUMBER A. General: Provide for support or attachment of other construction, including the following: 1. 2. 3. B. For items of dimension lumber size, provide Standard, Stud, or No. 3 grade lumber with 19percent maximum moisture content of the following species: 1. 2.5 Blocking. Cants. Nailers. Spruce-pine-fir (south) or Spruce-pine-fir; NELMA, NLGA, WCLIB, or WWPA. FASTENERS A. General: Provide fasteners of size and type indicated that comply with requirements specified in this Article for material and manufacture. 1. Where rough carpentry is exposed to pressure-preservative treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M. ROUGH CARPENTRY 06 10 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS B. Nails, Brads, and Staples: ASTM F 1667. C. Power-Driven Fasteners: CABO NER-272. D. Wood Screws: ASME B18.6.1 E. Screws for Fastening to Cold-Formed Metal Framing: ASTM C 954, except with wafer heads and reamer wings, length as recommended by screw manufacturer for material being fastened. F. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with capability to sustain, without failure, a load equal to 6 times the load imposed when installed in unit masonry assemblies and equal to 4 times the load imposed when installed in concrete as determined by testing per ASTM E 488 conducted by qualified independent testing and inspecting agency. 1. 2. Material: Carbon-steel components, zinc plated to comply with ASTM B 633, Class Fe/Zn 5. Material: Stainless steel with bolts and nuts complying with ASTM F 593 and ASTM F 594, Alloy Group 1 or 2. PART 3 - EXECUTION 3.1 INSTALLATION, GENERAL A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry to other construction; scribe and cope as needed for accurate fit. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction. B. Do not use materials with defects that impair quality of rough carpentry or pieces that are too small to use with minimum number of joints or optimum joint arrangement. C. Apply field treatment complying with AWPA M4 to cut surfaces of preservative-treated lumber. D. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following: 1. CABO NER-272 for power-driven fasteners 2. Published requirements of metal framing anchor manufacturer 3. Table 602.3(1), "Fastener Schedule for Structural Members.” E. Select fasteners of a size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood; pre-drill as required. ROUGH CARPENTRY 06 10 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 3.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS WOOD BLOCK & NAILER INSTALLATION A. Install where indicated and where required for attaching other Work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other Work involved. B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces, unless otherwise indicated. 3.3 WOOD FRAMING INSTALLATION, GENERAL A. Framing Standard: Comply with AFPA’s “Manual for Wood Frame Construction,” unless otherwise indicated. B. Framing with Engineered Wood Products: Install engineered wood products to comply with manufacturer’s written instructions. C. Do not splice structural members between supports. END OF SECTION 06 10 00 ROUGH CARPENTRY 06 10 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 06 41 16 – PLASTIC LAMINATE ARCHITECTURAL CABINETS PART 1 - GENERAL 1.1 SUMMARY A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B. This Section includes the following: 1. Plastic-laminate countertops. 2. Plastic-laminate cabinets C. Plastic laminate architectural cabinets includes wood furring, blocking, shims, and hanging strips unless concealed within other construction before woodwork installation. D. Related sections include the following: Division 09 Section Gypsum board assemblies for installation secured to metal framed assemblies. 1.2 SUBMITTALS A. Shop Drawings: Show location of each item, dimensioned plans and elevations, large-scale details, attachment devices, and other components. B. Samples: 1. Plastic-laminates, for each type, color, pattern, and surface finish. 2. Thermoset decorative panels, for each type, color, pattern, and surface finish. C. Woodwork Quality Standard Compliance Certificates: certificates. 1.3 AWI Quality Certification Program QUALITY ASSURANCE A. Installer Qualifications: Fabricator of plastic laminate architectural cabinets. B. Quality Standard: Unless otherwise indicated, comply with AWI's "Architectural Woodwork Quality Standards." 1.4 PROJECT CONDITIONS A. Environmental Limitations: Do not deliver or install cabinets until building is enclosed, wet work is complete, and HVAC system is operating and maintaining temperature and relative humidity at occupancy levels during the remainder of the construction period. PLASTIC LAMINATE ARCHITECTURAL CABINETS 06 41 16 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 2 - PRODUCTS 2.1 MATERIALS A. Wood Products: 1. Hardboard: AHA A135.4. 2. Medium-Density Fiberboard: ANSI A208.2, Grade MD, made with binder containing no urea formaldehyde. 3. Particleboard: ANSI A208.1, Grade M-2. 4. Softwood Plywood: DOC PS 1, Medium Density Overlay. B. Thermoset Decorative Panels: Particleboard or medium-density fiberboard finished with thermally fused, melamine-impregnated decorative paper complying with LMA SAT-1. C. High-Pressure Decorative Laminate: NEMA LD 3, grades as indicated or, if not indicated, as required by woodwork quality standard. 2.2 CABINET HARDWARE AND ACCESSORIES A. General: Provide cabinet hardware and accessory materials associated with plastic laminate architectural cabinets as indicated on Drawings or to match existing. B. Exposed Hardware Finishes: For exposed hardware, provide finish that complies with BHMA A156.18 for BHMA finish number indicated and/or to match existing. 1. 2.3 Satin Stainless Steel MISCELLANEOUS MATERIALS A. Furring, Blocking, Shims, and Hanging Strips: Softwood or hardwood lumber, kiln-dried to less than 15 percent moisture content. B. Adhesives, General: Do not use adhesives that contain urea formaldehyde. 2.4 FABRICATION A. General: Complete fabrication to maximum extent possible before shipment to Project site. Where necessary for fitting at site, provide allowance for scribing, trimming, and fitting. B. Plastic-Laminate Countertops: 1. 2. 3. 4. C. High-Pressure Decorative Laminate Grade: HGS. Colors, Patterns, and Finishes: As indicated on Drawings. Edge Treatment: As indicated on Drawings. Core Material at Sinks: Particleboard made with exterior glue. Plastic-Laminate Cabinets: PLASTIC LAMINATE ARCHITECTURAL CABINETS 06 41 16 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2.5 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS 1. 2. AWI Type of Cabinet Construction: As indicated on drawings. Laminate Cladding for exposed surfaces: High-pressure decorative laminate as follows: a. Horizontal Surfaces Other Than Tops: Grade HGL b. Vertical Surfaces: Grade HGS c. Edges: Grade HGS edges banding, thick, matching laminate in color, pattern, and finish. 3. 4. 5. 6. Materials for semiexposed surfaces other than drawer bodies: Thermoset decoratve panels. Drawer sides and backs: Thermoset decorative panels. Drawer bottoms: Thermoset decorative panels. Colors, patterns, finishes: As selected by Architect from laminate manufacturer’s full range. SHOP FINISHING A. Finish architectural cabinets at fabrication shop. Defer only final touchup, cleaning, and polishing until after installation. PART 3 - EXECUTION 3.1 INSTALLATION A. Before installation, condition cabinets to average prevailing humidity conditions in installation areas. Examine shop-fabricated Work for completion and complete Work as required, including removal of packing. B. Grade: Install cabinets to comply with requirements for the same grade specified in Part 2 for fabrication of type of architectural woodwork involved. C. Install cabinets level, plumb, true, and straight to a tolerance of 1/8-inch in 96-inches (3-mm in 2,400-mm). Shim as required with concealed shims. D. Scribe and cut cabinets to fit adjoining work, refinish cut surfaces, and repair damaged finish at cuts. E. Anchor cabinets to anchors or blocking built in or directly attached to substrates. Secure with countersunk, concealed fasteners and blind nailing as required for complete installation. Use fine finishing nails or finishing screws for exposed fastening, countersunk and filled flush with cabinets and matching final finish. F. Cabinets: Install without distortion so doors and drawers fit openings properly and are accurately aligned. Adjust hardware to center doors and drawers in openings and to provide unencumbered operation. 1. Fasten wall cabinets through back, near top and bottom., at ends and not more than 16 inches (400-mm) on center with No. 10 wafer-head screws sized for 1-inch (25-mm) PLASTIC LAMINATE ARCHITECTURAL CABINETS 06 41 16 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS penetration into wood framing, blocking, or hanging strips or toggle bolts through metal backing or metal framing behind wall finish as required. G. Countertops: Anchor securely by screwing through corner blocks of base cabinets or other supports into underside of countertop. Caulk space between backsplash and wall with sealant specified in Division 07 Section "Joint Sealants." END OF SECTION 06 41 16 PLASTIC LAMINATE ARCHITECTURAL CABINETS 06 41 16 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 07 21 00 - THERMAL INSULATION PART 1 - GENERAL 1.1 SUMMARY A. 1.2 This Section includes the following: 1. Cavity-wall insulation. 3. Concealed building insulation. SUBMITTALS A. Product Data: For each type of product indicated. B. Samples for Verification: Full-size units for each type of exposed insulation indicated. C. Related Sections include the following: 1. Division 9 Sections “Gypsum Board Assemblies” for installation in metal-framed assemblies of insulation specified buy reference to this Section. 1.3 QUALITY ASSURANCE A. Retain ASTM test method below based on product and kind of fire-resistance characteristic specified for each product in Part 2. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-test-response characteristics indicated, as determined by testing identical products per ASTM E 84 for surface-burning characteristics and other methods indicated with product, by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection: 1. Products: Subject to compliance with requirements, provide one of the products specified. 2. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified. THERMAL INSULATION 07 21 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS GLASS-FIBER BLANKET INSULATION A. Manufacturers: 1. 2. 3. 4. 5. CertainTeed Corporation. Guardian Fiberglass, Inc. Johns Manville. Knauf Fiber Glass. Owens Corning. B. Unfaced, Glass-Fiber Blanket Insulation: ASTM C 665, Type I (blankets without membrane facing); consisting of fibers; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E 136 for combustion characteristics. C. Where glass-fiber blanket insulation is indicated by the following thicknesses, provide blankets in batt or roll form with thermal resistances indicated: 1. 2. 3. 4. 5. 3-1/2 inches (89 mm) thick with a thermal resistance of 11 deg F x h x sq. ft./Btu deg F (1.9 K x sq. m/W at 24 deg C). 3-5/8 inches (92 mm) thick with a thermal resistance of 11 deg F x h x sq. ft./Btu deg F (1.9 K x sq. m/W at 24 deg C). 5-1/2 inches (140 mm) thick with a thermal resistance of 21 deg F x h x sq. ft./Btu deg F (3.7 K x sq. m/W at 24 deg C). 6-1/2 inches (165 mm) thick with a thermal resistance of 19 deg F x h x sq. ft./Btu deg F (3.3 K x sq. m/W at 24 deg C). 9-1/2 inches (241 mm) thick with a thermal resistance of 30 deg F x h x sq. ft./Btu deg F (5.2 K x sq. m/W at 24 deg C). at 75 at 75 at 75 at 75 at 75 PART 3 - EXECUTION 3.1 INSTALLATION, GENERAL A. Comply with insulation manufacturer's written instructions applicable to products and application indicated. B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any time to ice, rain, and snow. C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement. D. Water-Piping Coordination: If water piping is located within insulated exterior walls, coordinate location of piping to ensure that it is placed on warm side of insulation and insulation encapsulates piping. E. For pre-formed insulating units, provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to THERMAL INSULATION 07 21 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness. 3.2 INSTALLATION OF GENERAL BUILDING INSULATION A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units. B. Seal joints between foam-plastic insulation units by applying adhesive, mastic, or sealant to edges of each unit to form a tight seal as units are shoved into place. Fill voids in completed installation with adhesive, mastic, or sealant as recommended by insulation manufacturer. C. Install mineral-fiber insulation in cavities formed by framing members according to the following requirements: 1. 2. 3. 4. 5. 6. D. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill cavity, provide lengths that will produce a snug fit between ends. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members. Maintain 3-inch (76-mm) clearance of insulation around recessed lighting fixtures. Install eave ventilation troughs between roof framing members in insulated attic spaces at vented eaves. For metal-framed wall cavities where cavity heights exceed 96 inches (2438 mm), support unfaced blankets mechanically and support faced blankets by taping stapling flanges to flanges of metal studs. a. With faced blankets having stapling flanges, lap blanket flange over flange of adjacent blanket to maintain continuity of vapor retarder once finish material is installed over it. Apply insulation standoffs to each spindle to create cavity width indicated between concrete substrate and insulation. Stuff glass-fiber loose-fill insulation into miscellaneous voids and cavity spaces where shown. Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5-lb/cu. ft. (40-kg/cu. m). END OF SECTION 07 21 00 THERMAL INSULATION 07 21 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 07 92 00 - JOINT SEALANTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. 2. B. 1.2 Silicone joint sealants. Latex joint sealants. Related Sections. 1 Division 9 Section “Gypsum Board Assemblies.” 2. Division 8 Section “Hollow Metal Doors & Frames” 3 Division 9 Section “Interior Painting” PRECONSTRUCTION TESTING A. Pre-construction Compatibility and Adhesion Testing: Submit to joint-sealant manufacturers three samples of materials that will contact or affect joint sealants. Use ASTM C 1087 to determine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of joint sealants to joint substrates. B. Pre-construction Field-Adhesion Testing: Before installing sealants, field test their adhesion to Project joint substrates. Test joint sealants according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1 in ASTM C 1193 or Method A, Tail Procedure, in ASTM C 1521. 1.3 SUBMITTALS A. Product Data: For each joint-sealant product indicated. B. Samples: For each kind and color of joint sealant required. For each dimension Backer-Rod required. C. Joint-Sealant Schedule: Include the following information: 1. 2. 3. D. Joint-sealant application, joint location, and designation. Joint-sealant manufacturer and product name. Joint-sealant color. Warranties. JOINT SEALANTS 07 92 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS QUALITY ASSURANCE A. 1.5 Testing Agency Qualifications: indicated. Qualified according to ASTM C 1021 to conduct the testing WARRANTY A. Special Installer's Warranty: Manufacturer's standard form in which Installer agrees to repair or replace joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period. 1. B. Warranty Period: One year from date of Substantial Completion. Special Manufacturer's Warranty: Manufacturer's standard form in which joint-sealant manufacturer agrees to furnish joint sealants to repair or replace those that do not comply with performance and other requirements specified in this Section within specified warranty period. 1. Warranty Period: One year from date of Substantial Completion. PART 2 - PRODUCTS 2.1 MATERIALS, GENERAL A. Liquid-Applied Joint Sealants: Comply with ASTM C 920 and other requirements indicated for each liquid-applied joint sealant specified, including those referencing ASTM C 920 classifications for type, grade, class, and uses related to exposure and joint substrates. 1. B. 2.2 Suitability for Immersion in Liquids. Where sealants are indicated for Use I for joints that will be continuously immersed in liquids, provide products that have undergone testing according to ASTM C 1247. Liquid used for testing sealants is deionized water, unless otherwise indicated. Stain-Test-Response Characteristics: Where sealants are specified to be non-staining to porous substrates, provide products that have undergone testing according to ASTM C 1248 and have not stained porous joint substrates indicated for Project. SILICONE JOINT SEALANTS A. Mildew-Resistant Silicone Joint Sealant: ASTM C 920. 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. b. c. JOINT SEALANTS BASF Building Systems. Dow Corning Corporation. GE Advanced Materials - Silicones. 07 92 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 d. e. f. g. h. i. 2. 3. 4. 5. 2.3 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS May National Associates, Inc. Pecora Corporation. Polymeric Systems, Inc. Schnee-Morehead, Inc. Sika Corporation; Construction Products Division. Tremco Incorporated. Type: Single component (S). Grade: Nonsag (NS). Class: 50. Uses Related to Exposure: Nontraffic (NT). LATEX JOINT SEALANTS A. Latex Joint Sealant: Acrylic latex or siliconized acrylic latex, ASTM C 834, Type OP, Grade NF. 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. b. c. d. e. f. 2.4 BASF Building Systems. Bostik, Inc. May National Associates, Inc. Pecora Corporation. Schnee-Morehead, Inc. Tremco Incorporated. JOINT SEALANT BACKING A. Cylindrical Sealant Backings: ASTM C 1330, Type C (closed-cell material with a surface skin) and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance. B. Bond-Breaker Tape: manufacturer. 2.5 Polyethylene tape or other plastic tape recommended by sealant MISCELLANEOUS MATERIALS A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests. B. Cleaners for Non-porous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials. C. Masking Tape: Non-staining, non-absorbent material compatible with joint sealants and surfaces adjacent to joints. JOINT SEALANTS 07 92 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 3 - EXECUTION 3.1 PREPARATION A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions. 1. Clean non-porous joint substrate surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. B. Joint Priming: Prime joint substrates where recommended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of jointsealant bond; do not allow spillage or migration onto adjoining surfaces. C. Masking Tape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal. 3.2 INSTALLATION A. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated. B. Apply sealant at temperatures between plus 40-degrees F to plus 60-degrees F. C. Install sealant backings of kind indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability. 1. 2. 3. Do not leave gaps between ends of sealant backings. Do not stretch, twist, puncture, or tear sealant backings. Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials. D. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints. E. Install sealants using proven techniques that comply with the following and at the same time backings are installed: 1. 2. 3. F. Place sealants so they directly contact and fully wet joint substrates. Completely fill recesses in each joint configuration. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability. Tooling of Non-sag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified in subparagraphs below to form smooth, JOINT SEALANTS 07 92 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint. 1. 2. 3. G. 3.3 Remove excess sealant from surfaces adjacent to joints. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces. Provide concave joint profile per Figure 8A in ASTM C 1193, unless otherwise indicated. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur. FIELD QUALITY CONTROL A. Field-Adhesion Testing: Field test joint-sealant adhesion to joint substrates in accordance with ASTM C 1193, Method A, to determine of primer is required to achieve adhesion. If necessary, apply primer at rate and in accordance with manufacturer’s instructions. B. Evaluation of Field-Adhesion Test Results: Sealants not evidencing adhesive failure from testing or noncompliance with other indicated requirements will be considered satisfactory. Remove sealants that fail to adhere to joint substrates during testing or to comply with other requirements. Retest failed applications until test results prove sealants comply with indicated requirements. 3.4 JOINT-SEALANT SCHEDULE A. B. Joint-Sealant Application: Interior joints in vertical surfaces and horizontal non-traffic surfaces. 1. Joint Locations: a. Perimeter joints of exterior openings where indicated. b. Vertical joints on exposed surfaces of walls and partitions. c. Perimeter joints between interior wall surfaces and frames of interior doors and windows. d. Other joints as indicated. 2. 3. Joint Sealant: Latex. Joint-Sealant Color: As selected by Architect from manufacturer's full range of colors. Joint-Sealant Application: Mildew-resistant interior joints in vertical surfaces and horizontal nontraffic surfaces. 1. Joint Sealant Location: a. b. c. 2. 3. Joints between plumbing fixtures and adjoining walls, floors, and counters. Tile control and expansion joints where indicated. Other joints as indicated. Joint Sealant: Silicone. Joint-Sealant Color: As selected by Architect from manufacturer's full range of colors. JOINT SEALANTS 07 92 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS END OF SECTION 07 92 00 JOINT SEALANTS 07 92 00 - 6 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 08 11 13 – HOLLOW METAL DOOR FRAMES PART 1 - GENERAL 1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section. 1.2 This Section includes the following: A. 1.3 Standard Hollow Metal Door Frames according to ANSI/SDI A250.8., existing to be relocated RELATED DOCUMENTS A. Related Sections include the following: 1. Division 7 Section “Joint Sealants” 2. Division 8 Section “Door Hardware” for hardware provided by the General Contractor and installed by the Millwork Contractor. 3. Division 9 Section “Gypsum Board Assemblies” for installation of hollow-metal steel door frames. 4. Division 9 Section “Interior Painting” for field painting of hollow metal door frames. PART 2 - PRODUCTS 2.1 FABRICATION A. Hollow Metal Frames: Where frames are fabricated in sections due to shipping or handling limitations, provide alignment plates or angles at each joint, fabricated of same thickness metal as frames. 1. 2. 3. 4. 5. Welded Frames: Weld flush face joints continuously; grind, fill, dress, and make smooth, flush, and invisible. Floor Anchors: Weld anchors to bottom of jambs and mullions with at least four spot welds per anchor. Jamb Anchors: Locate anchors not more than 18-inches from top and bottom of frame. Space anchors not more than 32-inches on center. Provide three anchors per jamb up to 60inches wide and four anchors per jamb from 60-inches to 90-inches wide. Door Silencers: Drill stops to receive door silencers as follows. Provide plastic plugs to keep holes clear during construction. Drill stop in strike jamb to receive three door silencers in single door frames. Provide countersunk, flat- or oval-head exposed screws and bolts for exposed fasteners, unless otherwise indicated. HOLLOW METAL DOORS & FRAMES 08 11 13 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 B. C. Hardware Preparation: Factory prepare hollow metal doors and frames to receive templated mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping, according to the Door Hardware Schedule and templates furnished as specified in Division 8 Section “Door Hardware." 1. Locate hardware according to ANSI/SDI 250.8. 2. Reinforce doors and frames to receive non-templated, mortised and surface-mounted door hardware. 3. Comply with applicable requirements in ANSI A250.6 and ANSI/DHI A115 Series specifications for door and frame preparation for hardware. Stops and Moldings: Provide stops and moldings around glazed lites where indicated on Drawings. Form corners of stops and moldings with mitered hairline joints. 1. 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Single glazed lites: Provide fixed stops and molding welded on secure side of hollow metal Work. FINISHES A. Prime Finish: Apply manufacturer’s standard primer immediately after cleaning and pre-treating. . 1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer complying with ANSI A250.10 acceptance criteria. Primer shall be as recommended by primer manufacturer to substrate, compatible with substrate and field-applied coatings despite prolonged exposure. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, areas and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. B. Examine rough-ins for embedded and built-in anchors to verify actual locations before frame installation. C. Prepare written report, endorsed by Installer, listing any conditions detrimental to performance of the work; submit to Architect immediately upon completion. D. Proceed with installation only after unsatisfactory conditions have been corrected. HOLLOW METAL DOORS & FRAMES 08 11 13 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 3.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS INSTALLATION A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling and dressing as required to make repaired area smooth, flush and invisible on exposed faces. B. Prior to installation, adjust and install hollow metal frames for squareness, alignment, twist and plumbness to the following tolerances: 1. Squareness: Plus or minus 1/16-inch (1.6-mm) measured at door rabbet on a line 90-degrees from jamb perpendicular to frame head. 2. Alignment: Plus or minus 1/16-inch (1.6-mm) measured at jambs on a horizontal line parallel to plane of wall. 3. Twist: Plus or minus 1/16-inch (1.6-mm) measured at opposite face corners of jambs on parallel lines and perpendicular to plane of wall. 4. Plumbness: 1/16-inch (1.6-mm) measured at jambs on a perpendicular line from head to floor. C. Drill and tap doors and frames to receive non-templated, mortised and surface-mounted door hardware. D. Install hollow metal Work plumb, rigid, properly aligned and securely fastened in place. Comply with Drawings and manufacturer’s written instructions. E. Hollow metal frames: Install hollow metal frames of size and profile indicated on drawings. Comply with ANSI/SDI A250.11. 1. Set frames accurately in position; plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces, leaving surfaces smooth and undamaged. a. b. c. d. F. At fire-protection-rated openings, install frames according to NFPA 80. Install frames with removable glazing stops located on secure side of opening. Remove temporary braces necessary for installation only after frames have been properly set and secured. Check plumbness, squareness and twist of frames as walls are constructed. Shim as necessary to comply with installation tolerances. . 2. Floor Anchors: Provide floor anchors for each jamb that extends to floor and secure with post-installed expansion anchors. 3. Metal-Stud Partitions: Solidly pack mineral-fiber insulation behind frames. Final Adjustments: Check and readjust operating hardware items immediately before final inspection. Leave Work in complete and proper operating condition. Remove and replace defective Work, including hollow metal Work that is warped, bowed, or otherwise unacceptable HOLLOW METAL DOORS & FRAMES 08 11 13 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 G. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying primer. END OF SECTION 08 11 13 HOLLOW METAL DOORS & FRAMES 08 11 13 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 081416 - FLUSH WOOD DOORS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. [Shop priming] [Factory finishing] flush wood doors. 2. Factory fitting flush wood doors to frames and factory machining for hardware. B. Related Sections: 1. 2. 3. 1.2 08 11 13 Hollow Metal Frames 08 71 00 Door Hardware 09 21 16 Gypsum Board Assemblies SUBMITTALS A. Product Data: For each type of door indicated. [Include factory-finishing specifications.] B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door; construction details not covered in Product Data; location and extent of hardware blocking; and other pertinent data. 1. 2. 3. 4. 5. C. 1.3 Indicate dimensions and locations of mortises and holes for hardware. Indicate dimensions and locations of cutouts. Indicate requirements for veneer matching. Indicate doors to be factory finished and finish requirements. Indicate fire-protection ratings for fire-rated doors. Samples: For factory-finished doors. QUALITY ASSURANCE A. Manufacturer Qualifications: A qualified manufacturer that is certified for chain of custody by an FSC-accredited certification body. B. Quality Standard: In addition to requirements specified, comply with WDMA I.S.1-A, "Architectural Wood Flush Doors." C. Forest Certification: Provide doors made with [cores] [veneers] [not less than 70 percent of wood products] [all wood products] obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship." FLUSH WOOD DOORS 08 14 16 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 2.2 Algoma Hardwoods, Inc. Ampco, Inc. Buell Door Company Inc. Chappell Door Co. Eagle Plywood & Door Manufacturing, Inc. Eggers Industries. Graham; an Assa Abloy Group company. Haley Brothers, Inc. Ideal Architectural Doors & Plywood. Ipik Door Company. Lambton Doors. Marlite. Marshfield Door Systems, Inc. Mohawk Flush Doors, Inc.; a Masonite company. Oshkosh Architectural Door Company. Poncraft Door Company. Vancouver Door Company. VT Industries Inc. DOOR CONSTRUCTION, GENERAL A. Low-Emitting Materials: Provide doors made with adhesives and composite wood products that do not contain urea formaldehyde. B. Mineral-Core Doors: 1. 2. 3. 2.3 Core: Noncombustible mineral product complying with requirements of referenced quality standard and testing and inspecting agency for fire-protection rating indicated. Blocking: Provide composite blocking with improved screw-holding capability approved for use in doors of fire-protection ratings indicated as needed to eliminate through-bolting hardware. Edge Construction: At hinge stiles, provide laminated-edge construction with improved screw-holding capability and split resistance. Comply with specified requirements for exposed edges. FABRICATION A. Factory fit doors to suit frame-opening sizes indicated. Comply with clearance requirements of referenced quality standard for fitting unless otherwise indicated. 1. Comply with requirements in NFPA 80 for fire-rated doors. FLUSH WOOD DOORS 08 14 16 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 B. 2.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Factory machine doors for hardware that is not surface applied. FACTORY FINISHING A. General: Comply with referenced quality standard for factory finishing. Complete fabrication, including fitting doors for openings and machining for hardware that is not surface applied, before finishing. 1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be omitted on bottom edges, edges of cutouts, and mortises. B. Finish doors at factory that are indicated to receive transparent finish. Field finish doors indicated to receive opaque finish. C. Transparent Finish: 1. 2. 3. 4. Grade: Premium. Finish: Match Existing On-Site Staining: Match Existing On-Site Sheen: Satin. PART 3 - EXECUTION 3.1 INSTALLATION A. Hardware: For installation, see Division 08 Section "Door Hardware." B. Installation Instructions: Install doors to comply with manufacturer's written instructions and the referenced quality standard, and as indicated. 1. C. Install fire-rated doors in corresponding fire-rated frames according to NFPA 80. Job-Fitted Doors: Align and fit doors in frames with uniform clearances and bevels; do not trim stiles and rails in excess of limits set by manufacturer or permitted for fire-rated doors. Machine doors for hardware. Seal edges of doors, edges of cutouts, and mortises after fitting and machining. 1. Clearances: Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs of doors. Provide 1/8 inch (3.2 mm) from bottom of door to top of decorative floor finish or covering unless otherwise indicated. Where threshold is shown or scheduled, provide 1/4 inch (6.4 mm) from bottom of door to top of threshold unless otherwise indicated. a. Comply with NFPA 80 for fire-rated doors. D. Factory-Fitted Doors: Align in frames for uniform clearance at each edge. E. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at Project site. END OF SECTION 081416 FLUSH WOOD DOORS 08 14 16 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 08 71 00 – DOOR HARDWARE PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section. B. Related Sections 1. 1.1 Division 8 Section “Hollow Metal Door Frames.” SUMMARY A. Intent: The intent of this Section is to provide finish hardware for the proper operation and control of all interior doors in the Project. Prior to bidding, notify the Interior Architect of any doors that do not have hardware meeting this intent. B. Definition: “Door Hardware” includes items known commercially as finish hardware that are required for swing, sliding and folding doors, except special types of unique and non-matching hardware specified in Division 8 Sections for doors and frames. C. The extent of interior door hardware required is indicated on the Contract Documents and Schedules. D. Types of door hardware required include the following: 1. 1.2 Commercial door hardware for the proper operation, function, control and protection of all doors as required. SUBMITTALS A. Product Data: Manufacturer’s technical product data for each type of product indicated, including information to indicate compliance with specified requirements. B. Product certificates. C. Hardware Schedule: Submit final hardware schedule and coordinate hardware with doors, frames and related Work to ensure proper size, thickness, hand, function and finish of hardware. 1. Final Hardware Schedule Content: Organize hardware schedule into “hardware sets” indicating complete designations of every item required for each door or opening. Include the following information: fabrication and assembly of door hardware, as well as procedures and diagrams. DOOR HARDWARE 08 71 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 a. b. c. d. e. f. g. h. D. 1.3 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Type, style, function, quantity, size and finish of each hardware item. Use same scheduling sequence and format and use same door numbers as in the Contract Documents. Name and manufacturer of each item. Fastenings and other pertinent information. Location of hardware set cross-referenced to indications on Contract Documents both on Floor Plans and Door and Frame Schedules. Mounting location for hardware. Door and frame sizes and materials. Keying Schedule: Prepared by or under the supervision of Installer, detailing Owner's final keying instructions for locks. Deviations from specifications shall be noted in cover letter. 2. Submittal Sequence: Submit schedule at earliest possible date, particularly when acceptance of hardware schedule must precede fabrication of other Work such as hollow metal frames, which is critical to the Project Construction Schedule. Include with schedule the product data, samples and Shop Drawings of other Work affected by hardware and other information essential to the coordinated review of hardware schedule. 3. Keying Schedule: Submit separate detailed schedule indicating clearly how Owner’s final instructions on keying of locks has been fulfilled. Tools and Maintenance Instructions for Maintenance: Submit a complete set of specialized tools and maintenance instructions as need for Owner’s continued adjustment, maintenance, and removal and replacement of door hardware. QUALITY ASSURANCE A. Manufacturer: Obtain each type of hardware from a single manufacturer. B. Standards: Comply with the requirements of the latest edition of the following Standards unless indicated otherwise: 1. American National Standards Institute (ANSI) Publications: a. A115 Series – Door and Frame Preparation. b. A156 Series – Hardware. 2. Builders Hardware Manufacturers Association (BHMA) Publications: a. 1201 – Auxiliary Hardware. b. 1301 – Materials and Finishes. 3. Door and Hardware Institute (DHI) Publications: a. Keying – Procedures, Systems and Nomenclature. b. Abbreviations and Symbols. c. Hardware for Labeled Fire Doors. d. Recommended Locations for Builder’s hardware for Standard and Custom Steel Doors and Frames. e. Wood Soot Standards W1, W2, WDHS-2 and WDHS-3. 4. National fire Protection Association (NFPA) Publications: a. NFPA Pamphlet No. 80 – Standards for Fire Doors and windows. b. NFPA Pamphlet No. 101. DOOR HARDWARE 08 71 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS C. Supplier: A recognized architectural finish hardware supplier with warehousing facilities that has been furnishing hardware in the Project’s vicinity for a period of not less than 2-years, and that is, or employs an experienced architectural hardware consultant who is available at reasonable times during the course of the Work to the Owner, Architect and Contractor, for consultation regarding the Project hardware requirements. D. ADA Requirements: Where door openings are located in accessible paths, provide hardware complying with ANSI 117.1, Federal ADAAG requirements and applicable requirements of the current edition of the local Building Code. E. Architectural Hardware Consultant Qualifications: A person who is currently certified by DHI as an Architectural Hardware Consultant and who is experienced in providing consulting services for door hardware installations that are comparable in material, design, and extent to that indicated for this Project. F. Source Limitations: Provide electrified door hardware from same manufacturer as mechanical door hardware, unless otherwise indicated. Manufacturers that perform electrical modifications and that are listed by a testing and inspecting agency acceptable to authorities having jurisdiction are acceptable. G. Keying Conference: Conduct conference with the Owner to comply with requirements in Division 1 Section "Project Coordination." Incorporate keying conference decisions into final keying schedule after reviewing door hardware keying system. H. Pre-installation Conference: Conduct conference at Project site. 1.4 DELIVERY, STORAGE, AND HANDLING A. Hardware packaging shall be provided by Supplier. As material is received, sort and re-package in containers clearly marked with appropriate hardware set numbers to match set numbers of approved Hardware Schedule. Two or more identical sets may be packaged in the same container. B. Inventory hardware jointly with representatives of hardware supplier and installer until each is satisfied the quantities are correct. C. Deliver packaged items at the proper times to the proper location (shop or Project site) for installation in compliance with the Project Schedule. Provide a complete packing list showing items, door numbers and hardware headings with each shipment. D. Provide secure lock up for hardware delivered to the Project site but not yet installed. Control handling and installation of hardware items that are not immediately replaceable so that completion of the Work will not be delayed by hardware losses, both before and after installation. E. Store hardware in shipping cartons above ground and under cover to prevent damage. F. Deliver keys to manufacturer of key control system for subsequent delivery to Owner. G. Deliver keys and permanent cores to Owner by registered mail or overnight package service. DOOR HARDWARE 08 71 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.5 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS COORDINATION A. 1.6 Templates: Distribute door hardware templates for doors, frames, and other work specified to be factory prepared for installing door hardware. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements. WARRANTY A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within specified warranty period. 1. Warranty Period: Three years from date of Substantial Completion, except as follows: a. Exit Devices: 2 years from date of Substantial Completion. b. Manual Closers: 10 years from date of Substantial Completion. c. Concealed Floor Closers: 10 years from date of Substantial Completion. PART 2 - PRODUCTS 2.1 SCHEDULED DOOR HARDWARE A. General: Provide door hardware for each door to comply with requirements in this Section and door hardware sets indicated in Door & Frame Schedules. Provide quantity, item, size, finish or color indicated, and named manufacturer’s products. Substitutions will not be permitted except as described in Division 1 Section “Product Requirements.” B. Provide manufacturer’s standard products free of imperfections affecting appearance or serviceability. Provide door hardware complete with all fasteners, anchors, instructions, layout templates and any specialized tools required for successful installation and adjustment. : 1. 2. 3. 4. Named Manufacturers' Products: Manufacturer and product designation are listed for each door hardware type required for the purpose of establishing minimum requirements. Manufacturers' names are abbreviated in Part 3 "Door Hardware Sets" Article. References to BHMA Standards: Provide products complying with these standards and requirements for description, quality, and function. Provide screws for installation with each hardware item. Provide Phillips flat-head screws except as otherwise indicated. Do not provide hardware that has been prepared for selftapping sheet metal screws except as specifically indicated on the contract Documents. Finish screw heads to match surface of hinges. Provide concealed fasteners for hardware units that are exposed when door is closed, except to the extent no standard units of type specified are available with concealed fasteners. Do not use thru-bolts for installation where bolt heads or nut on opposite face is exposed in other Work except where it is not feasible to adequately reinforce the Work. In such cases, provide sleeves for each thru-bolt or use set screw fasteners. DOOR HARDWARE 08 71 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 C. 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Manufacturer’s Name Plate: Do not use manufacturer’s products that have manufacturer’s name or trade name in a visible location and omit removable name plates except required UL labels. Manufacturer’s identification will be permitted on rim of lock cylinders only. HARDWARE FINISHES A. Hardware Finishes, General: Provide matching finishes for hardware units at each door or opening to the greatest extent possible and except as otherwise indicated. Reduce differences in color and textures as much as commercially possible where the base metal or metal forming process is different for individual units of hardware exposed at the same door or opening. In general, match items to the manufacturer’s standard finish for the latch and lock set (or push-pull units if no latchlock sets) for color and texture. B. Provide hardware finishes that match those established by BHMA or if none established, match the existing hardware. 2.3 HINGES, GENERAL A. Template Requirements: Except for hinges and pivots to be installed entirely (both leaves) into wood doors and frames, provide only template-produced units. B. Hinge Base Metal: Match existing. C. Non-removable Pins: Provide set screw in hinge barrel that, when tightened into a groove in hinge pin, prevents removal of pin while door is closed; for exterior and out-swinging corridor doors. D. Provide 2 hinges or pivots for doors up to and including five feet in height, and an additional hinge for each 2-feet or fraction thereof of the height of the door. E. Hinges on all interior doors shall be steel and sized as follows, unless otherwise specified in the Hardware Sets below; Door Thickness Door Width Hinge Weight Height 1-3/4-inches 40-inches and under Regular Weight 4-1/2-inches 2-ball bearing 1-3/4-inches Over 40-inches Extra Heavy Weight 5-inches 4-ball bearing Width of hinge shall be determined by trim condition. DOOR HARDWARE 08 71 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS HINGES A. Butts and Hinges: BHMA A156.1. B. Template Hinge Dimensions: BHMA A156.7. C. All ball-bearing hinges shall have flush bearings and button tips. Plain bearing hinges shall be furnished only on doors so noted in the Hardware Sets. Provide hinge pins as follows: 1. 2. 3. 4. 5. 6. D. 2.5 Steel Hinges: Steel pins. Non-ferrous Hinges: Stainless Steel pins. Exterior Doors: Non-removable pins. Out-Swinging Corridor Doors: Non-removable pins. Interior Doors: Non-rising pins. Tips: Flat bottom and matching plug, finished to match leaves. Butt Hinges: Hager BB1199/BB1168 or to match existing. Pivot Hinges: Dor-O-Matic #340 top pivot and 117-3/4 bottom pivot. Concealed Hinges: Grant. LOCKSETS AND LATCH SETS A. Accessibility Requirements: Provide operating devices that do not require tight grasping, pinching, or twisting of the wrist and that operate with a force of not more than 5-lbf. B. Latches and Locks for Means of Egress Doors: Comply with NFPA 101. Latches shall not require more than 15-lbf to release the latch. Locks shall not require use of a key, tool, or special knowledge for operation. C. All locks and latches shall be: to match existing, as indicated on drawings. The locksets shall have interchangeable Best cores. 2.6 LOCK CYLINDERS A. Standard Lock Cylinders: BHMA A156.5, Grade 1. B. High-Security Lock Cylinders: BHMA A156.30, Grade 1. 1. 2. 3. C. Key Control Level: Category A. Destructive Test Level: Category A. Surreptitious Entry Resistance Level: Category A. Cylinders: Manufacturer's standard tumbler type, constructed from stainless steel or nickel silver, and complying with the following: 1. Number of Pins: Seven. DOOR HARDWARE 08 71 00 - 6 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS D. Permanent Cores: Manufacturer's standard; finish face to match lockset; with interchangeable cores. All cylinders shall be keyed to meet Owner’s requirements for the existing Schlage keying system. Keying Schedule must be approved by Owner prior to ordering any locks. E. Key all locks separately or alike as directed by Owner’s representative. F. Construction Keying: Comply with the following: 1. Construction Cores: Provide construction cores that are replaceable by permanent cores. Provide 10 construction master keys. a. G. 2.7 Furnish permanent cores only to Owner for installation. Manufacturer: Same manufacturer as for locks and latches. CLOSERS A. Surface Closers: BHMA A156.4, Grade 1. Provide type of arm required for closer to be located on non-public side of door, unless otherwise indicated. 1. B. 2.8 Available Manufacturers: a. LCN Closers; an Ingersoll-Rand Company (LCN Model 4030). b. SARGENT Manufacturing Company; an ASSA ABLOY Group company (SGT Model 1250). Coordinators: BHMA A156.3. STOPS AND HOLDERS A. Stops and Bumpers: BHMA A156.16, Grade 1. 1. Provide floor stops or stays for each door and on each leaf of a pair of doors unless wall or other type stops are scheduled or indicated. Do not mount floor stops where they will impede traffic. Where floor or wall stops are not appropriate, provide overhead hinge stops. B. Where floor stops are practical, height must be commensurate with special conditions such as undercut doors, thresholds, etc. Where a carpet occurs and a floor stop is applicable, a base riser must be applied. C. The finish of floor stops shall match hardware finish and shall be attached by means of temping shields and steel flat-head machine screws. Overhead stays shall be concealed type, with brass channel mortised into the head of the door. D. Silencers for Door Frames: BHMA A156.16, Grade 1; neoprene or rubber; fabricated for drilled-in application to frame. All metal door frames shall be provided with door silencers, 3 for each single door and 2 for each pair of doors. Silencers shall be Corbin Hardware Division’s #33 or equal. E. Available Manufacturers: 1. Hager Companies (HAG) Model 241 F Door Stop, Model 237 W Wall Stop. . DOOR HARDWARE 08 71 00 - 7 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2.9 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS MISCELLANEOUS DOOR HARDWARE A. Auxiliary Hardware: BHMA A156.16, Grade 1. 1. Available Manufacturers: a. b. c. d. e. f. g. h. 2.10 Baldwin Hardware Corporation (BH). Cal-Royal Products, Inc. (CRP). Don-Jo Mfg., Inc. (DJO). Hager Companies (HAG). Lawrence Brothers, Inc. (LB). Rockwood Manufacturing Company (RM). Stanley Commercial Hardware; Div. of The Stanley Works (STH). Trimco (TBM). FABRICATION A. Base Metals: Produce door hardware units of base metal, fabricated by forming method indicated, using manufacturer's standard metal alloy, composition, temper, and hardness. Furnish metals of a quality equal to or greater than that of specified door hardware units and BHMA A156.18. Do not furnish manufacturer's standard materials or forming methods if different from specified standard. B. Fasteners: Provide screws according to commercially recognized industry standards for application intended, except aluminum fasteners are not permitted. Provide Phillips flat-head screws with finished heads to match surface of door hardware, unless otherwise indicated. C. Finishes: BHMA A156.18, to match existing. PART 3 - EXECUTION 3.1 INSTALLATION A. Steel Frames: Comply with DHI A115 Series. Drill and tap frames for surface-applied door hardware according to ANSI A250.6. B. Wood Doors: Comply with DHI A115-W Series. C. Mounting Heights: Mount door hardware units at heights indicated as follows unless otherwise indicated or required to comply with governing regulations. Center mortise sets at 38-inches above finished floor. 1. Wood Doors: DHI WDHS.3, "Recommended Locations for Architectural Hardware for Wood Flush Doors." D. Prior to hardware installation, the Contractor shall schedule a meeting with the hardware supplier and the hardware installer to ensure the installer has and understands the manufacturer’s installation requirements for all hardware items. DOOR HARDWARE 08 71 00 - 8 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS E. The supplier shall observe the installation of the first lockset, closer and exit device. F. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work specified in Division 9 Sections. Do not install surface-mounted items until finishes have been completed on substrates involved. G. Set units level, plumb and true to line and location. Adjust and reinforce the attachment substrate as necessary for proper installation and operation. H. Drill and countersink units which are not factory-prepared for anchorage fasteners. Space fasteners and anchors in accordance with specified Industry Standards. Provide fasteners and anchoring devices of suitable size, quantity and type to secure hardware in proper position for heavy use and long life. I. Adjustment: Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Adjust door closers immediately upon installation and advance back check to eliminate shock at dead stop. Set closer latching speed to assure unassisted positive latching. The degree of door swing of door for self-limiting closers shall be the maximum available. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements. 1. 3.2 Spring Hinges: Adjust to achieve positive latching when door is allowed to close freely from an open position of 30-degrees. ADJUST AND CLEAN A. Adjust and check each operating item of hardware for each door to ensure proper operation or function of every unit. Replace units that can not be adjusted to operate freely and smoothly as intended for the application. B. Clean adjacent surfaces soiled by hardware installation. C. Final adjustment: Whenever hardware installation is made more than 1-month prior to acceptance or occupancy of a space or area, return to the Work during the week prior to acceptance or occupancy and make final check and adjustment of all hardware items in the space or area. Clean operating items as necessary to restore proper function and finish of hardware and doors. Adjust door control devices to compensate for final operation of heating and ventilating equipment. D. Instruct Owner’s personnel in proper adjustment and maintenance of hardware and hardware finishes during final adjustment of hardware. E. After hardware is installed and adjusted, Supplier shall inspect the Work with the Contractor and Interior Architect to determine if the hardware is functioning properly. Instruction sheets, layout templates and supplementary literature shall be maintained in a readable condition. Replace all such literature that is in deteriorated condition. Transmit all literature to Owner’s representative, together DOOR HARDWARE 08 71 00 - 9 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS with all spare parts, specialized tools and other accessories supplied with hardware, and a copy of the approved Hardware Schedule at the time of inspection. F. 3.3 Continued Maintenance Service: Six months after acceptance of hardware in each area, the Installer and representatives of the latch and lock manufacturer shall return to the Project and re-adjust every item of hardware to restore proper function of doors and hardware. Owner’s personnel shall be consulted in recommended additions to the maintenance procedures. Replace hardware items that have deteriorated or failed due to faulty design, materials or installation of hardware units. Prepare a written report of current and predictable problems of a subsequent nature in the performance of the hardware. HARDWARE LOCATIONS A. Except where scheduled otherwise on the schedule. 1. Push plate: 50-inches to centerline of plate. 2. Pulls: 43-inches to centerline of pull. 3. Pull plates: 42-inches to centerline of plate. a. Cut pull plate where cylinder occurs. 4. Push bars: 45-inches to centerline of bar. 5. Leverset: 38-inches to centerline of lever. 6. Deadlock: 3-inches to centerline of cylinder. 7. Bottom hinge: 10-inches from floor to bottom of hinge. 8. Top hinge: 5-inches from head to top of hinge. 9. Center hinge: equal distance between the top and bottom hinges. 10. Other hardware items shall be located as recommended by the manufacturer unless specified otherwise in the Hardware Schedule. 11. All dimensions are from finished floor. END OF SECTION 08 71 00 DOOR HARDWARE 08 71 00 - 10 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 09 21 16 - GYPSUM BOARD ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and general provisions of the Contract, including, General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. Extent of gypsum board assemblies is shown on Drawings. B. This Section includes the following: 1. C. 1.3 Interior gypsum board. Related Sections include the following: 1. Division 7 Section “Building Insulation.” 2. Division 9 Section “Acoustical Panel Ceilings.” 3. Division 9 Section “Interior Painting.” DEFINITIONS A. 1.4 Gypsum Board Construction Terminology: Refer to ASTM C11 and GA-505 for definitions of terms related to gypsum board assemblies not defined in this Section. SUBMITTALS A. 1.5 Product Data: For each type of product indicated. QUALITY ASSURANCE A. Fire-Test-Response Characteristics: For gypsum board assemblies with fire-resistance ratings, provide materials and construction identical to those tested in assembly indicated according to ASTM E 119 by an independent testing agency and inspecting agency acceptable to authorities having jurisdiction. B. Sound Transmission Characteristics: For gypsum board assemblies with STC ratings, provide materials and construction identical to those tested in assembly indicated according to ASTM E 90 and classified according to ASTM E 413 by a qualified independent agency. GYPSUM BOARD ASSEMBLIES 09 21 16 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.6 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS DELIVERY, STORAGE, AND HANDLING A. Deliver materials in original packages, containers, or bundles bearing brand name and identification of manufacturer or supplier. B. Store materials inside under cover and keep them dry and protected against damage from weather, direct sunlight, surface contamination, corrosion, construction traffic, and other causes. Neatly stack gypsum panels to prevent sagging. 1.7 PROJECT CONDITIONS A. Environment Conditions: Comply with ASTM C 840 requirements or gypsum board manufacturer’s written recommendation, whichever are more stringent. PART 2 - PRODUCTS 2.1 INTERIOR GYPSUM BOARD A. 2.2 Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Steel Framing and Furring: a. Clark Steel Framing Systems. b. Consolidated Systems, Inc. c. Dale Industries, Inc. – Dale/Incor. d. Dietrich Industries, Inc. e. MarinoWare ; Division of Ware, Ind. f. National Gypsum Company. g. Unimast, Inc. 2. Gypsum Board and Related Products: a. G-P Gypsum. b. National Gypsum Company. c. United States Gypsum Co. STEEL PARTITION AND SOFFIT OR BULKHEAD FRAMING A. Components, General: As follows: 1. Comply with ASTM C 754 for conditions indicated. 2. Steel Sheet Components: Complying with ASTM C 645 requirements for metal and with ASTM A 653/A 653M, G60, hot-dip galvanized zinc coating. B. Steel Studs and Runners: ASTM C 645. 1. Minimum Base Metal Thickness and Depth: As indicated. C. Deep-Leg Deflection Track: ASTM C 645 top runner with 2-inch deep flanges. D. Cold-Rolled Channel Bridging: 0.0538-inch bare steel thickness, with minimum ½-inch-wide flange. 1. Depth: 1-1/2-inches. GYPSUM BOARD ASSEMBLIES 09 21 16 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Clip Angle: 1-1/2-inch by 1-1/2-inch, 0.068-inch-thick, galvanized steel. E. Resilient Furring Channels: 7/8-inch deep, steel sheet members designed to reduce sound transmission. F. Fasteners for Metal Framing: Of type, material, size, corrosion resistance, holding power, and other properties required to fasten steel members to substrates. 2.3 INTERIOR GYPSUM WALLBOARD A. Panel Size: Provide in maximum lengths and widths available that will minimize joints in each area and correspond with support system indicated. B. Gypsum Wallboard: ASTM C 36. 1. Type X: a. Thickness: As indicated. b. Long Edges: Tapered and featured (rounded or beveled) for prefilling. C. Moisture Resistant Gypsum Board: ASTM C 931/C 931 M. 2.4 TRIM ACCESSORIES A. 2.5 Interior Trim: ASTM C 1047. 1. Material: Galvanized JOINT TREATMENT MATERIALS A. General: Comply with ASTM C 475. B. Joint Tape: Interior Gypsum Wallboard: Paper. C. Joint Compound for Interior Gypsum Wallboard: For each coat use formulation that is compatible with other compounds applied on previous or for successive coats. 1. 2. 3. 4. 2.6 Pre-filling: At open joints, rounded or beveled panel edges, and damaged surface areas, use setting-type taping compound. Embedding and First Coat: For embedding tape and first coat on joints, fasteners, and trim flanges, use setting-type taping compound. Fill Coat: For second coat, use setting-type, sandable topping compound. Finish Coat: For third coat, use setting-type, sandable topping compound. AUXILIARY MATERIALS A. General: Provide auxiliary materials that comply with referenced installation standards and manufacturer's written recommendations. GYPSUM BOARD ASSEMBLIES 09 21 16 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 B. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Sound Attenuation Blankets: ASTM C 665, Type I (blankets without membrane facing) produced by combining thermosetting resins with mineral fibers manufactured from glass. PART 3 - EXECUTION 3.1 EXAMINATION A. 3.2 Examine areas and substrates, with Installer present, and including welded hollow-metal frames, cast-in anchors, and structural framing, for compliance with requirements and other conditions affecting performance. Proceed with installation only after unsatisfactory conditions have been corrected. INSTALLATION, GENERAL A. Contractor and Installer shall conduct a Layout Conference with Architect prior to setting track base. Verify layout with Architect at pre-installation conference as specified in Division 1 Section “Project Coordination.” At no time is Work to proceed prior to Architect’s approval of layout. B. Contractor and Installer shall conduct metal stud and gypsum board installation tolerances Conference with Architect prior to completing this Work as specified in Division 1 Section “Project Coordination.” At no time is Work to proceed prior to Architect’s approval. C. Installation Standard: ASTM C 754. 3.3 INSTALLING STEEL FRAMING, GENERAL A. Installation Standards: ASTM C 754, and ASTM C 840 requirements that apply to framing installation. B. Install supplementary framing, blocking and bracing at terminations in gypsum board assemblies to support fixtures, equipment services, heavy trim, grab bars, toilet accessories, furnishings, or similar construction. Comply with details indicated and with gypsum board manufacturer’s written recommendations or, if none available, with United States Gypsum’s “Gypsum Construction Handbook.” C. Isolate steel framing from building structure at locations indicated to prevent transfer of loading imposed by structural movement. 1. Isolate ceiling assemblies where they abut or are penetrated by building structure. 2. Isolate partition framing and wall furring where it abuts structure, except at floor. Install slip-type joints at head of assemblies that avoid axial loading of assembly and laterally support assembly. a. Use deep-leg deflection track at all top of wall locations to existing structure and as indicated on Drawings. GYPSUM BOARD ASSEMBLIES 09 21 16 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 3.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS INSTALLING STEEL PARTITION AND SOFFIT FRAMING A. Install tracks (runners) at floors, ceilings, and structural walls and columns where gypsum board assemblies abut other construction. B. Installation Tolerance: Install ach steel framing and furring member so fasting surfaces vary not more than 1/-inch from the plane formed by the faces of adjacent framing. C. Extend partition framing full height to structural supports or substrates above suspended ceilings, except where partitions are indicated to terminate at suspended ceilings. Continue framing over frames for doors and openings and frame around ducts penetrating partitions above ceiling to provide support for gypsum board. 1. Cut studs ½-inch short of full height to provide perimeter relief. Do not fasten studs to top track to allow independent movement of studs and track. D. Install steel studs and furring at 16-inches on center, unless otherwise indicated. E. Install steel studs so flanges point in the same direction and leading edge or end of each panel can be attached to open (unsupported) edges of stud flanges first. F. Frame door openings to comply with GA-600 and with gypsum board manufacturer’s applicable written recommendations, unless otherwise indicated. Screw vertical studs at jambs to jamb anchor clips on door frames; install runner track section (for cripple studs) at head and secure to jamb studs. 1. Install two studs at each jamb, unless otherwise specified. 2. Install cripple studs at head adjacent to each jamb stud, with a minimum 1/2-inch clearance from jamb stud to allow for installation of control joint. 3. Extend jamb studs through suspended ceilings and attach to underside of floor or roof structure above. G. Frame openings other than door openings the same as required for door openings, unless otherwise indicated. Install framing below sills of openings to match framing required above door heads. 3.5 APPLYING AND FINISHING PANELS, GENERAL A. Gypsum Board Application and Finishing Standards: ASTM C 840 and GA-216. B. Install sound attenuation blankets before installing gypsum panels, unless blankets are readily installed after panels have been installed on one side. C. Install ceiling board panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in the central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member. D. Install gypsum panels with face side out. Butt panels together for light contact at edges and ends with not more than 1/16-inch of open space between panels. Do not force into place. E. Located edge and end joints over supports, except in ceiling applications where intermediate supports or gypsum board back-blocking is provided behind end joints. Do not place tapered GYPSUM BOARD ASSEMBLIES 09 21 16 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS edges against cut edges or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings. F. Attach gypsum panels to steel studs so leading edge or end of each panel is attached to open (unsupported) edges of stud flanges first. G. Attach gypsum panels to framing provided at openings and cutouts. H. Do not attach gypsum panels across the flat grain of wide-dimension lumber, including floor joists and headers. Float gypsum panels over these members using resilient channels, or provide control joints to counteract wood shrinkage. I. Form control and expansion joints with space between edges of adjoining gypsum panels. J. Floating Construction: Where feasible, including where recommended in writing by manufacturer, install gypsum panels over wood framing, with floating internal corner construction. K. Sound-Insulated Assemblies: Seal construction at perimeters, behind control and expansion joints, and at openings and penetrations with a continuous bead of acoustical sealant. Install acoustical sealant at both faces of partitions at perimeters through penetrations. Comply with ASTM C 919 and manufacturer’s written recommendations for locating edge trim and closing off sound-flanking paths around or through gypsum board assemblies, including sealing partitions above acoustical ceilings. L. Space fasteners in gypsum panels according to references gypsum board application and finishing standard and manufacturer’s written recommendations. 1. Space screws a maximum of 12-inches on center for vertical applications. M. Space fasteners in panels that are tile substrates a maximum of 8-inches on center. 3.6 PANEL APPLICATION METHODS A. Single-Layer Application: 1. On ceilings, apply gypsum panels before wall/partition board application to the greatest extent possible and at right angles to framing, unless otherwise indicated. 2. On partitions/walls, apply gypsum panels vertically (parallel to framing), unless otherwise indicated or required by fire-resistance-rated assembly, and minimize end joints. a. Stagger abutting end joints not less than one framing member in alternate courses of board. b. At stairwells and other high walls, install panels horizontally, unless otherwise indicated or required by fire-resistance-rated assembly. 3. On Z-furring members, apply gypsum panels vertically (parallel to framing) with no end joints. Locate edge joints over furring members. B. Single-Layer Fastening Methods: Apply gypsum panels to supports with steel drill screws. GYPSUM BOARD ASSEMBLIES 09 21 16 - 6 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 3.7 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS INSTALLING TRIM ACCESSORIES A. General: For trim with back flanges intended for fasteners, attach to framing with same fasteners used for panels. Otherwise, attach trim according to manufacturer's written instructions. B. Control Joints: Install control joints according to ASTM C 840 and in specific locations approved by Architect for visual effect. 3.8 FINISHING GYPSUM BOARD A. General: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration. Promptly remove residual joint compound from adjacent surfaces. B. Pre-fill open joints, rounded or beveled edges, and damaged surface areas. Apply joint tape over gypsum board joints, except those with trim having flanges not intended for tape. C. Gypsum Board Finish Levels: Finish panels to levels indicated below: 1. 2. 3. Level 1: Embed tape at joints in ceiling plenum areas, concealed areas, and where indicated, unless a higher level of finish is required for fire-resistance-rated assemblies and sound-rated assemblies. Level 2: Embed tape and apply separate first coat of joint compound to tape, fasteners, and trim flanges where panels are substrate for tile, not exposed to view and where indicated. Level 5: Embed tape and apply separate first, fill and finish coats of joint compound to tape, fasteners, and trim flanges at panel surfaces that will exposed to view, unless otherwise indicated. END OF SECTION 09 21 00 GYPSUM BOARD ASSEMBLIES 09 21 16 - 7 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 09 51 13 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 SUMMARY A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section. B. This Section includes acoustical panels and concealed suspension systems for ceilings. C. Related Sections: 1. Division 09 Section “Gypsum Board Assemblies” 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Samples: 1. 6-inch by 6-inch samples for each acoustical panel type, pattern and color. 2. Set of concealed suspension system members. 1.3 QUALITY ASSURANCE A. Fire-Test-Response Characteristics: 1. Fire-Resistance Characteristics: Provide acoustical panel ceilings identical to those of assemblies tested for fire resistance per ASTM E 119 by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. a. 2. B. Identify materials with appropriate markings of applicable testing and inspecting agency. Surface-Burning Characteristics: Acoustical panels complying with ASTM E 1264 for Class A materials, when tested per ASTM E 84. a. Flame Spread: 25 or less. b. Smoke-Developed Index: 50 or less. Coordination of Work: Coordinate layout and installation of acoustical ceiling units and suspension system components with other Work supported by, or penetrating through ceilings, including light fixtures, HVAC equipment, fire-suppression system components and partition systems. ACOUSTICAL PANEL CEILINGS 09 51 13 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.4 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS DELIVERY, STORAGE & HANDLING A. Deliver acoustical ceiling units to Project site in original, unopened packages and store them in a fully-enclosed space where they will be protected against damage from moisture, direct sunlight, surface contamination or other causes. B. Before installing acoustical ceiling units, permit them to reach room temperature and a stabilized moisture content. C. Handle acoustical ceiling units carefully to avoid chipping edges or damaging units in any way. D. Do not install interior acoustical ceiling units until space is enclosed and weather proof, wet Work in space is completed and nominally dry, Work above ceilings is complete and ambient conditions of temperature and humidity will be continuously maintained at values near those indicated for final occupancy. 1.5 EXTRA MATERIALS A. Deliver extra materials to Owner per Division 1 “Product Requirements.” Furnish extra materials specified below matching products installed, packaged with protective coating for storage and identified with appropriate labels. 1. Acoustical Ceiling Units: Furnish quantity of full-size units equal to 5-per cent of amount installed. 2. Exposed Suspension System Components: Furnish quantity of each component equal to 5per cent of amount installed. PART 2 - PRODUCTS 2.1 ACOUSTICAL PANEL CEILINGS, GENERAL A. Ceiling Panel and Grid System: to match existing. B. Acoustical Panel Standard: Comply with ASTM E 1264. C. Metal Suspension System Standard: Comply with ASTM C 635, Intermediate Duty Classification, cold-rolled steel, exposed surfaces pre-finished in manufacturer’s standard enamel paint finish, color flat white. D. Attachment Devices: Size for five times the design load indicated in ASTM C 635, Table 1, "Direct Hung," unless otherwise indicated. Comply with seismic design requirements. E. Wire Hangers, Braces, and Ties: Zinc-coated carbon-steel wire; ASTM A 641/A 641M, Class 1 zinc coating, soft temper. 1. Size: Select wire diameter so its stress at 3 times hanger design load (ASTM C 635, Table 1, "Direct Hung") will be less than yield stress of wire, but provide not less than 0.106-inch diameter wire. ACOUSTICAL PANEL CEILINGS 09 51 13 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 F. 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Metal Edge Moldings and Trim: Type and profile indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations that comply with seismic design requirements; formed from sheet metal of same material, finish, and color as that used for exposed flanges of suspension system runners. ACOUSTICAL PANELS A. Match existing acoustical panels in each suite. B. Color: Match existing. C. Thickness: ¾-inch. D. Modular Size: as indicated on Drawings. 2.3 METAL SUSPENSION SYSTEM COMPONENTS A. Basis-of-Design Product: Subject to compliance with requirements, provide the following products and components: 1. Main Tees and Cross Tees: Match existing in each suite. 2. Wall Molding: M9 angle shape with 15/16-inch mounting flange by 9/16-inch face flange, exposed surface pre-finished to match suspension system components. 3. Hanger Wire: #215109 galvanized carbon steel, soft temper, pre-stretched. PART 3 - EXECUTION 3.1 PREPARATION A. Coordination: Furnish layouts for inserts, clips or other supports required to be installed by other trades for support of acoustical ceilings. B. Measure each ceiling area and establish layout of acoustical units to balance border widths at opposite edges of each ceiling. Avoid use of less than half width units at borders and comply with reflected ceiling plans wherever possible. 3.2 INSTALLATION A. Comply with ASTM C 636, UBC Standard 25-2 and seismic design requirements indicated, per manufacturer's written instructions and applicable Standards in CISCA's "Ceiling Systems Handbook." ACOUSTICAL PANEL CEILINGS 09 51 13 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS B. Install materials in accordance with manufacturer’s printed instructions and to comply with governing regulations and fire-resistance requirements indicated in the Contract Documents. C. Locate hangers not less than 6-inches from each end and spaced 4-feet along each carrying channel or direct-hung runner unless otherwise indicated, leveling to a tolerance of 1/8-inch in 12-feet. D. Suspend ceiling hangers from building's structural members, plumb and free from contact with insulation or other objects within ceiling plenum. Splay hangers only where required and, if permitted with fire-resistance-rated ceilings, to miss obstructions; offset resulting horizontal forces by bracing, counter-splaying, or other equally effective means. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with location of hangers, use trapezes or equivalent devices. When steel framing does not permit installation of hanger wires at spacing required, install carrying channels or other supplemental support for attachment of hanger wires. 1. 2. Do not support ceilings directly from permanent metal forms or floor deck; anchor into concrete slabs. Do not attach hangers to steel deck tabs. E. Install edge moldings and trim of type indicated at perimeter of acoustical ceiling area and where necessary to conceal edges of acoustical panels. Screw attach moldings to substrate at intervals not more than 16-inches on center and not more than 3-inches from ends, leveling with ceiling suspension system to a tolerance of 1/8-inch in 12-feet. Miter corners accurately and connect securely. F. Install suspension system runners so they are square and securely interlocked with one another. Remove and replace dented, bent, or kinked members. G. Complete Architect Inspection as specified in Division 1 Section “Project Coordination” before installation of acoustical panels. H. Install acoustical panels with undamaged edges and fit accurately into suspension system runners and edge moldings. Scribe and cut panels at borders and penetrations to provide a neat, precise fit. 3.3 CLEANING A. Clean exposed surfaces of acoustical ceilings, including trim, edge moldings and suspension members. Comply with manufacturer’s instructions for cleaning and touch-up of minor finish damage. Remove and replace Work that can not be successfully cleaned and repaired to permanently eliminate evidence of damage. END OF SECTION 09 51 13 ACOUSTICAL PANEL CEILINGS 09 51 13 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 09 65 00 - RESILIENT FLOORING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. 2. 3. B. 1.2 Vinyl composition floor tile (VCT). Preparation of substrate. Resilient cove base. Related Sections include the following: 1. Division 9 Section “Tile Carpeting” for transition strips at carpet-resilient flooring juncture. 2. Division 9 Section “Gypsum Board Assemblies.” QUALITY ASSURANCE A. Installer Qualifications: Installer shall be skilled and experienced in preparation of substrate and in installation of resilient flooring products. B. Single-Source Responsibility: Provide resilient flooring produced by a single-source manufacturer for each flooring type required, including adhesives. C. Reference Standards: Manufacturer’s printed recommendations and instructions, except as modified herein, shall be the basis for acceptance or rejection of completed installation. 1.3 SUBMITTALS A. Product Data: For each product indicated. B. Samples: 1. Full-size units of each color and pattern of resilient floor tile required. 2. 12-inch long sample of type and color of resilient base required. 3. Prepare samples from the same material to be used for the Work. 1.4 PROJECT CONDITIONS A. Maintain temperatures within range recommended by manufacturer, but not less than 70degrees F or more than 95-degrees F, in spaces to receive resilient flooring during the following time periods: 1. 48 hours before installation. RESILIENT FLOORING 09 65 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2. 3. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS During installation. 48 hours after installation. B. After post-installation period, maintain temperatures within range recommended by manufacturer, but not less than 55-degrees F or more than 95-degrees F. C. Close spaces to traffic during floor covering installation and for 48-hours after installation. D. Install resilient products after other finishing operations, including painting, have been substantially completed. 1.5 EXTRA MATERIALS A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Floor Tile: Furnish 1 box for every 50-boxes or fraction thereof, of each type, color, and pattern of floor tile installed. PART 2 - PRODUCTS 2.1 VINYL COMPOSITION TILE A. Vinyl Composition Tile (VCT): ASTM F 1066. 1. Vinyl Composition Tile: Combination of vinyl, resins, plasticizers, stabilizers, fillers and pigments, through-grained and resistant to alkali, grease and oils, uniform disbursement of color and texture throughout thickness of rile, and asbestos-free. 2. Provide tile with all vertical edges cut perpendicular to tile surface with 0.002-inch manufacturing tolerance. 3. Manufacturers: Subject to compliance with requirements, provide the following products: 4. 5. 6. 7. B. 2.2 a. Resilient Tile: See Drawings for Specifications. Color and Pattern: As indicated by manufacturer’s designations. Thickness: 0.125-inch. Size: 12-inches by 12-inches. Fire-Test-Response Characteristics. a. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm per ASTM E 648. Vinyl Wall Base: See Drawings for Specifications. INSTALLATION MATERIALS A. Trowel-able Leveling and Patching Compounds: Latex-modified, Portland Cement based or blended hydraulic cement based formulation provided or approved by resilient product manufacturer for applications indicated. RESILIENT FLOORING 09 65 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 B. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Adhesives: Water-resistant type recommended by manufacturer for compatibility with resilient products and substrate conditions indicated. PART 3 - EXECUTION 3.1 PREPARATION A. Prepare substrates according to manufacturer's written recommendations to ensure adhesion of resilient products. Do not proceed with installation until unsatisfactory conditions are corrected. B. Concrete Substrates: Prepare according to ASTM F 710. 1. 2. 3. Verify that substrates are dry and free of curing compounds, sealers, and hardeners. Alkalinity and Adhesion Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing. Moisture Testing: a. Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing. C. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents. D. Use trowel-able leveling and patching compound to fill cracks, holes, and depressions in substrates. E. Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation. 1. Do not install resilient products until they are same temperature as space where they are to be installed. F. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation. After cleaning, examine substrates for moisture, alkaline salts, carbonation, and dust. Proceed with installation only after unsatisfactory conditions have been corrected. G. Tolerances: Surfaces receiving resilient flooring shall not vary more than 1/8-inch in any 6-foot distance, nor more than 1/6-inch within any 1-foot distance. Where substrate exceeds specified tolerances but is within tolerances specified for substrate materials, apply underlayment to level deviations to within specified tolerances for vinyl flooring products. H. Apply concrete slab primer if recommended by flooring manufacturer prior to application of adhesive. Apply in compliance with manufacturer’s written instructions. 3.2 INSTALLATION A. General Requirements: RESILIENT FLOORING 09 65 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS All installation shall be in accordance with manufacturer’s recommendations. B. Lay out tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than one half tile at perimeter. Run pattern parallel to short dimension of room or space unless otherwise directed by Interior Architect. C. Match tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so numbered. Patterns on resilient flooring shall run continuously throughout and area. Discard broken, cracked, chipped, or deformed tiles. D. Where resilient flooring terminates or where type or pattern changes between rooms, termination or transition shall occur at centerline of the door in the closed position. E. Scribe, cut, and fit tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, edgings, door frames, thresholds, and nosings. F. Extend tiles into toe spaces, door reveals, closets, and similar openings. G. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent, nonstaining marking device. H. Adhere tiles to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections. I. Perform the following operations immediately after completing resilient product installation: 1. 2. 3. Remove adhesive and other blemishes from exposed surfaces. Sweep and vacuum surfaces thoroughly. Damp-mop surfaces to remove marks and soil. a. Do not wash surfaces until after time period recommended by manufacturer. J. Protect resilient products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. Use protection methods recommended in writing by manufacturer. K. Resilient Base: 1. Firmly cement to wall. Press down so bottom edge follows floor. 2. Form external corners by use of pre-molded corners and neatly scribe internal corners. Take extra care for external corners are tight to wall and aligned with tip and ends of adjacent base. END OF SECTION 09 65 00 RESILIENT FLOORING 09 65 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 09 65 13 - RESILIENT BASE AND ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. B. Related Sections: 1. 2. 1.2 Resilient base. Division 09 Section “Gypsum Board Assemblies” Division 09 Section “Sheet Carpeting” PROJECT CONDITIONS A. Maintain ambient temperatures within range recommended by manufacturer in spaces to receive resilient products. B. Until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer. C. Install resilient products after other finishing operations, including painting, have been completed. PART 2 - PRODUCTS 2.1 RESILIENT BASE VB-1 As indicated on Drawings. 2.2 INSTALLATION MATERIALS A. Adhesives: Water-resistant type recommended by manufacturer to suit resilient products and substrate conditions indicated. 1. Use adhesives that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24): a. b. Cove Base Adhesives: Not more than 50 g/L. Rubber Floor Adhesives: Not more than 60 g/L. RESILIENT BASE AND ACCESSORIES 096513 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 3 - EXECUTION 3.1 PREPARATION A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products. B. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate. C. Do not install resilient products until they are same temperature as the space where they are to be installed. 1. D. 3.2 Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation. RESILIENT BASE INSTALLATION A. Comply with manufacturer's written instructions for installing resilient base. B. Apply resilient base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required. C. Install resilient base in lengths as long as practicable without gaps at seams and with tops of adjacent pieces aligned. D. Tightly adhere resilient base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates. E. Do not stretch resilient base during installation. 3.3 RESILIENT ACCESSORY INSTALLATION A. Comply with manufacturer's written instructions for installing resilient accessories. B. Resilient Molding Accessories: Butt to adjacent materials and tightly adhere to substrates throughout length of each piece. Install reducer strips at edges of carpet that would otherwise be exposed. 3.4 CLEANING AND PROTECTION A. Comply with manufacturer's written instructions for cleaning and protection of resilient products. RESILIENT BASE AND ACCESSORIES 096513 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 B. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Cover resilient products until Substantial Completion. END OF SECTION 096513 RESILIENT BASE AND ACCESSORIES 096513 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 09 68 13 - TILE CARPETING PART 1 - GENERAL 1.1 SUMMARY A. 1.2 This Section includes modular, tufted carpet tile. SUBMITTALS A. Product Data: For each product indicated. B. Shop Drawings: Show the following: 1. Carpet tile type, color, and dye lot. 2. Pattern of installation. 3. Insets and borders. 4. Edge, transition, and other accessory strips. 5. Transition details to other flooring materials. C. Samples: For each color and texture required. 1. 2. Carpet Tile: Full-size Samples. Exposed Edge, Transition, and other Accessory Stripping: 12-inch- long Samples. D. Product Schedule: For carpet tile. Use same designations indicated on Drawings. E. Maintenance data. 1.3 QUALITY ASSURANCE A. 1.4 Installer Qualifications: An experienced installer who is certified by the Floor Covering Installation Board or who can demonstrate compliance with its certification program requirements. DELIVERY, STORAGE, AND HANDLING A. 1.5 Comply with CRI 104, Section 5, "Storage and Handling." PROJECT CONDITIONS A. Comply with CRI 104, Section 7.2, "Site Conditions; Temperature and Humidity" and Section 7.12, "Ventilation." TILE CARPETING 09 68 13 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS B. Environmental Limitations: Do not install carpet tiles until wet work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use. C. Do not install carpet tiles over concrete slabs until slabs have cured and are sufficiently dry to bond with adhesive and concrete slabs have pH range recommended by carpet tile manufacturer. D. Where demountable partitions or other items are indicated for installation on top of carpet tiles, install carpet tiles before installing these items. 1.6 WARRANTY A. Special Warranty for Carpet Tiles: Manufacturer's standard form in which manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period. Failures include, but are not limited to, more than 10 percent loss of face fiber, edge raveling, snags, runs, loss of tuft bind strength, dimensional stability, excess static discharge, and delamination. 1. 1.7 Warranty Period: Ten (10) years from date of Substantial Completion. EXTRA MATERIALS A. Furnish extra materials described below, before installation begins, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Carpet Tile: Full-size units equal to 5 percent of amount installed for each type indicated, but not less than 10 sq. yd. PART 2 - PRODUCTS 2.1 CARPET TILE A. Basis-of- Design Product: Subject to compliance with requirements, provide products indicated on the Drawings. B. Backing System: PVC free. C. Size: As indicated on the Drawings. D. Applied Soil-Resistance Treatment: Manufacturer's standard material. E. Antimicrobial Treatment: Manufacturer's standard material. TILE CARPETING 09 68 13 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS INSTALLATION ACCESSORIES A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer. B. Adhesives: Water-resistant, mildew-resistant, nonstaining, pressure-sensitive type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet tile and is recommended by carpet tile manufacturer for releasable installation. 1. VOC Limits: Provide adhesives with VOC content not more than 50 g/L when calculated according to 40 CFR 59, Subpart D (EPA method 24). PART 3 - EXECUTION 3.1 INSTALLATION A. General: Comply with CRI 104, Section 14, "Carpet Modules," and with carpet tile manufacturer's written installation instructions. B. Installation Method: As recommended in writing by carpet tile manufacturer. Glue down; install every tile with full-spread, releasable, pressure-sensitive adhesive. C. Extend carpet tile into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings. D. Install pattern parallel to walls and borders. END OF SECTION 09 68 13 TILE CARPETING 09 68 13 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 09 68 16 – SHEET CARPETING PART 1 - GENERAL 1.1 SUMMARY A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section. B. This Section includes broadloom, woven loop, and cut/loop carpet. C. Related Sections: 1. Division 09 Section: “Base & Accessories” 1.2 SUBMITTALS A. Product Data: For each product indicated. B. Shop Drawings: Show the following: 1. 2. 3. 4. 5. 6. C. Carpet type, color, and dye lot. Seam locations. Pattern type, repeat size, location, direction, and starting point. Pile direction. Edge, transition, and other accessory strips. Transition details to other flooring materials. Samples: For each color and texture required. 1. 2. Carpet: 12-inch-square Sample. Exposed Edge, Transition, and other Accessories: 12-inch-long Samples. D. Product Schedule: For carpet. Use same designations indicated on Drawings. E. Maintenance Instructions: Submit manufacturer’s printed instructions for maintenance of installed Work, including methods and frequency recommended for maintaining optimum condition under anticipated traffic and use conditions. Include precautions against materials and methods which may be detrimental to finish and performance. F. Maintenance data. SHEET CARPETING 09 68 16 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.3 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who is certified by the Floor Covering Installation Board with not less than 2 years experience, or who can demonstrate compliance with its certification program requirements. B. Manufacturer Qualifications: Material Producer with not less than 3 years of production experience, whose published literature clearly indicates general compliance of products with requirements of this section. C. Single Source Responsibility: Provide material produced by a single manufacturer for each carpet type. 1.4 TESTING: A. Test Reports: Submit certified test reports evidencing compliance with requirements for the following: 1. 2. B. 1.5 Fire performance characteristics. Physical properties indicated. Fire Performance Characteristics: Provide carpeting that is identical to that tested for the following fire performance requirements, according to test method indicated, by UL or other testing and inspecting agency acceptable to authorities having jurisdiction. 1. Flammability Rating: Passing Methenamine Pill Test. 2. Surface Burning Characteristics: As follows: a. Flame Spread: Not more than 25. b. Smoke Developed: Not more than 50. DELIVERY, STORAGE, AND HANDLING A. Comply with CRI 104, Section 5, "Storage and Handling.” Deliver materials to Project site in original factory wrappings and containers, clearly labeled with identification of manufacturer, brand name, quality or grad, fire hazard classification, and lot number. Store materials in original undamaged packages and containers, inside well-ventilated area protected from weather, moisture, soiling, extreme temperatures, humidity; laid flat, blocked off ground to prevent sagging and warping. Maintain temperature in storage area above 40-degrees Fahrenheit. B. Comply with instructions and recommendations of manufacturer for special delivery, storage, and handling requirements. 1.6 SEQUENCING & SCHEDULING: A. Sequence carpet installation with other Work to minimize possibility of damage and soiling during remainder of construction period. SHEET CARPETING 09 68 16 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.7 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PROJECT CONDITIONS A. 1.8 Comply with CRI 104, Section 7.2, "Site Conditions; Temperature and Humidity" and Section 7.12, "Ventilation." WARRANTY A. Special Warranty for Carpet: Manufacturer's standard form in which manufacturer agrees to repair or replace components of carpet installation that fail in materials or workmanship within specified warranty period. Failures include, but are not limited to, more than 10 percent loss of face fiber, edge raveling, snags, runs, loss of tuft bind strength, excess static discharge, and delamination. 1. 1.9 Warranty Period: 10 years from date of Substantial Completion. EXTRA MATERIALS A. Furnish extra materials described below, before installation begins, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Carpet: Full-width rolls that match type, color, and pattern equal to 5-percent of amount installed for each type indicated, but not less than 8-square yards. Furnish accessory components as required. Furnish replacement materials from same production run as materials installed. PART 2 - PRODUCTS 2.1 SHEET CARPETING A. Products: 1. As indicated on Drawings. B. No substitutes will be accepted for sheet carpeting specified. 2.2 INSTALLATION ACCESSORIES A. Carpet Edge Guard, Non-metallic: Extruded or molded heavy-duty vinyl or rubber carpet edge guard of size and profile indicated; minimum 2-inches wide anchorage flange; colors selected by Architect from manufacturer’s standard colors. B. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet manufacturer. SHEET CARPETING 09 68 16 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS C. Adhesives: Water-resistant, mildew-resistant, non-staining type to suit products and sub-floor conditions indicated, that complies with flammability requirements for installed carpet and is recommended or provided by carpet manufacturer. D. Seam Adhesive: Hot-melt adhesive tape or similar product recommended by carpet manufacturer for sealing and taping seams and butting cut edges at backing to form secure seams and to prevent pile loss at seams. E. Miscellaneous Materials: As recommended by manufacturers of carpet; selected by Installer to meet Project circumstances and requirements. PART 3 - EXECUTION 3.1 EXAMINATION: A. 3.2 Examine substrates for moisture content and other conditions under which carpeting is to be installed. Notify Contractor in writing of major conditions detrimental to proper completion of Work. Do not proceed until unsatisfactory conditions have been corrected. PREPARATION A. Repair minor holes, cracks, depressions, and rough areas using material recommended by carpet or adhesive manufacturer. B. Clear away debris and scrape up cementitious deposits from surfaces to receive carpeting; vacuum clean immediately before installation. Check concrete surfaces to ensure no dusting through installed carpet; apply sealer where required to prevent dusting. C. Field verify tolerances in existing floor condition. Substrates receiving carpeting shall not vary more than 1/8-inch in any 6-foot distance, nor more than 1/6-inch within any 1-foot distance. Where substrate exceeds specified tolerances but is within tolerances specified for substrate materials, apply underlayment to level deviations to within specified tolerances for carpet products. 3.3 INSTALLATION A. Comply with CRI 104 and carpet manufacturer's written installation instructions for the following: 1. B. Direct-Glue-Down Installation: Installation." Comply with CRI 104, Section 9, "Direct Glue-Down Comply with carpet manufacturer's written recommendations and Shop Drawings for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile. At doorways, center seams under the door in closed position. SHEET CARPETING 09 68 16 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS C. Extend carpet into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings. D. Install pattern parallel to walls and borders. E. Provide transition strips at all tile-to-carpet transitions as indicated on Drawings. 3.4 CLEANING A. 3.5 Remove and dispose of debris and unusable scraps. Vacuum carpet using commercial machine with face-beater element. Remove spots and replace carpet where spots cannot be removed. Remove any protruding face yarn using sharp scissors. PROTECTION A. Provide protective methods and materials needed to ensure that carpeting will be without deterioration or damage at time of Substantial Completion. END OF SECTION 09 68 13 SHEET CARPETING 09 68 16 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 09 72 16 – VINYL WALL COVERINGS PART 1 - GENERAL 1.1 SUMMARY A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section. B. This Section includes the following: 1. C. 1.2 Vinyl wall covering. Related Sections: 1. Division 09 Section “Gypsum Board Assemblies”. 2. Division 09 Section “Interior Painting”. SUBMITTALS A. Product Data: For each type of product indicated. 1. Include technical information, installation instructions for each type of substrate and maintenance instructions. 2. Include data on physical characteristics, durability, fade resistance, and flame resistance characteristics. 3. Include manufacturer’s recommendations for maximum permissible moisture content of substrates. B. Samples: For each type of wall covering and for each color, texture, and pattern required. 8” x 10” inch samples. C. Maintenance data. 1. Include methods and frequency recommended for maintaining optimum condition under anticipated use conditions. 2. Include precautions for use of cleaning materials and methods which could be detrimental to finishes and performance or might damage wall covering material. D. Product certificates signed by manufacturers of wall coverings certifying that materials furnished comply with specified requirements. 1. Include certified test reports evidencing compliance with requirements for fire performance characteristics and physical properties indicated. 1.3 QUALITY ASSURANCE A. Fire-Test-Response Characteristics: Provide wall coverings and adhesives with the following fire-test-response characteristics as determined by testing identical products applied with VINYL WALL COVERINGS 09 72 16 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS identical adhesives to substrates per test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. 1.4 1. Surface-Burning Characteristics: As follows, per ASTM E 84: a. Flame-Spread Index: 25 or less b. Smoke-Developed Index: 450 or less. c. Flame spread: Not more than 75. d. Smoke developed: Not more than 100. 2. Fire-Growth Contribution: Textile wall coverings complying with acceptance criteria of UBC Standard 8-2 EXTRA MATERIALS A. Furnish extra materials described below, before installation begins, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. 1.5 Rolls of Wall-Covering Material: Full-size units equal to five (5) percent of amount of each type installed. DELIVERY, STORAGE, AND HANDLING A. Materials will be delivered to wall covering subcontractor in original factory packages or containers, clearly labeled to identify manufacturer, brand name, lot number, quality or grade, and fire hazard classification. B. Store materials inside in original undamaged packaging, in a well-ventilated area protected from weather, moisture, soiling, extreme temperatures and humidity. Do not store rolled goods upright; lay flat, blocked off the ground to prevent sagging and warping. Maintain temperature in storage area above 40 deg F (4 deg C). C. Comply with recommendations of the manufacturer for special delivery, storage and handling requirements. 1.6 PROJECT CONDITIONS A. Maintain a constant minimum temperature of 60 deg F in installation areas for at least 10 days before and after application of materials. B. Illuminate installation areas using the building’s permanent lighting system; temporary lighting alone will not be acceptable. VINYL WALL COVERINGS 09 72 16 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.7 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SEQUENCING AND SCHEDULING A. 1.8 Schedule installation with other construction activities to minimize the possibility of damage and soiling during the remainder of the construction period. WARRANTY A. 1.9 Special Project Warranty: Submit a written warranty, executed by the Installer and Manufacturer, agreeing to repair or replace wallcovering materials which fail in materials or workmanship within the specified warranty period. This warranty shall be in addition to and not a limitation of other rights the Owner may have against the Contractor under the Contract Documents. 1. Warranty period is 2 years after the date of substantial completion. MAINTENANCE A. Replacement Materials: After completion of work, deliver to the project site overages of each wallcovering type, and of each color and pattern installed, exclusive of material required to properly complete the installation. Furnish replacement materials from same production run as materials installed. 1. Package replacement materials with protective covering or wrapping, clearly identified with appropriate labels as replacement material. 2. Furnish accessory components as required. PART 2 - PRODUCTS 2.1 WALL-COVERING PRODUCTS A. General: Provide rolls of each type of wall covering from the same run number or dye lot. B. Vinyl Wall Covering: 1. Products: As indicated in Construction Drawings. 2.2 ACCESSORIES A. Adhesive: Mildew-resistant, non-staining, strippable adhesive, for use with specific wall covering and substrate application, as recommended in writing by wall-covering manufacturer, and with a VOC content of 50 g/L or less when calculated according to 40CFR 59, Subpart D (EPA Method 24). B. Primer/Sealer: Mildew-resistant primer/sealer complying with requirements in Section 09 91 23 Interior Painting and recommended in writing by wall-covering manufacturer for intended substrate. VINYL WALL COVERINGS 09 72 16 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS C. Wall Liner: Non-woven, synthetic underlayment and adhesive as recommended by wallcovering manufacturer. D. Seam Tape: As recommended in writing by wall-covering manufacturer. PART 3 - EXECUTION 3.1 EXAMINATION/PREPARATION A. Prepare substrates to achieve a smooth, dry, clean, structurally sound surface free of flaking, unsound coatings, cracks, and defects. 1. 2. 3. 4. Moisture Content: Maximum of 5 percent on new plaster, concrete, and concrete masonry units when tested with an electronic moisture meter. Plaster: Allow new plaster to cure. Neutralize areas of high alkalinity. Metals: If not factory primed, clean and apply metal primer. Gypsum Board: Prime with primer recommended by wall-covering manufacturer. Check painted surfaces for pigment bleeding. Sand gloss, semi-gloss, and eggshell finishes with fine sand paper. B. Contractor and Installer to examine the substrates scheduled to receive wall coverings for compliance with requirements and conditions affecting performance of wall covering work. Do not proceed until unsatisfactory conditions have been corrected. If the wall covering Installer installs goods over defective wall conditions, the Installer will be responsible for removing and replacing materials incorrectly installed. C. Remove hardware and hardware accessories, electrical plates and covers, light fixture trims, and similar items. D. Acclimatize wall-covering materials by removing them from packaging in the installation areas not less than 24-hours before installation. E. Install wall liner, with no gaps or overlaps, where required by wall-covering manufacturer. F. Do not install wall coverings over oil-based wood stains or felt-tip pen markings. G. Check painted surfaces for possibility of pigment bleed-through. Light colored fabric wall coverings should be painted with one coat of finish paint by others prior to installation. H. Defective Goods: Notify Interior Architect immediately if any goods are defective or do not match approved submittals. 1. Inspect all goods prior to cutting. Do not cut or hang defective wall covering. 3.2 INSTALLATION A. Verify that colors and patterns of wall coverings are those specified before beginning installation. VINYL WALL COVERINGS 09 72 16 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Installer shall be responsible for removing and replacing any wall covering incorrectly installed or defective goods installed unless otherwise approved in writing by the Interior Architect. B. Cut wall-covering strips in roll number sequence. Change roll numbers at partition breaks and corners. C. Install strips in order as recommended by manufacturer. D. Install wall covering with no gaps or overlaps, no lifted or curling edges, and no visible shrinkage. E. Match pattern 72-inches above the finish floor. F. Install seams vertical and plumb at least 6-inches from outside corners and 3-inches from inside corners unless a change of pattern or color exists at corner. No horizontal seams are permitted. G. Fully bond wall covering to substrate. Remove air bubbles, wrinkles, blisters, and other defects. H. Trim edges and seams for color uniformity, pattern match, and tight closure. Butt seams without any overlay or spacing between strips. I. Vinyl Wall Covering: Place panels as recommended by manufacturer including filling spaces above or below openings. Hang in accordance with manufacturer’s instructions. 1. Apply adhesive to the back of the wall covering and place in accordance with the manufacturer’s instructions. 2. Seams: Install seams plumb, and at least 6 inches away from corners. Horizontal seams will not be permitted. Overlap seams and double-cut to assure tight closure. 3. Roll, brush or use a broad knife to remove all air bubbles, wrinkles, blisters, and other defects. Cut wall coverings evenly to the edges of wall penetrations. 4. Trim salvages as required to assure color uniformity and pattern match. 3.3 PROTECTION A. 3.4 Provide protective methods and materials needed to ensure that wall coverings will be without deterioration or damage at time of substantial completion. CLEANING A. Vinyl Wall Covering: Remove excess adhesive along finished seams and perimeter edges while still wet using warm water and a clean sponge; wipe dry. END OF SECTION 09 72 16 VINYL WALL COVERINGS 09 72 16 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 09 91 23 – INTERIOR PAINTING PART 1 – GENERAL 1.1 SUMMARY A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section. B. This Section includes surface preparation, painting, and finishing of exposed interior items and surfaces. 1. C. Surface preparation, priming, and finish coats specified in this Section are in addition to shop priming and surface treatment specified under other Sections. Related Sections: 1. Division 9 Section "Gypsum Board Assemblies" for wall preparation instructions. D. Paint exposed surfaces whether or not colors are designated in "Finish Schedules," except where a surface or material is specifically indicated not to be painted or is to remain natural. Where an item or surface is not specifically mentioned, paint the same as similar adjacent materials or surfaces. If color or finish is not designated, the Architect will select from either Project finishes or standard colors or finishes available. E. Painting is not required on pre- finished items, finished metal surfaces, concealed surfaces, operating parts, and labels. 1. 2. F. Pre-finished items not to be painted include the following factory-finished components: a. Architectural woodwork and casework. b. Finished mechanical and electrical equipment. c. Light fixtures. Labels: Do not paint over Underwriter's Laboratories, Factory Mutual or other code-required labels or equipment name, identification, performance rating, or nomenclature plates. Paint exposed appurtenances such as grilles, registers, elec. cabinet covers, etc., as indicated on the Drawings and directed by Architect. 1.3 DEFINITIONS A. "Paint" includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate, or finish coats. 1.4 SUBMITTALS A. Product Data: Manufacturer's technical information, label analysis, and application instructions for each material proposed for use. 1. List each material and cross-reference the specific coating and finish system and application. Identify each material by the manufacturer's catalog number and general classification. 2. Provide 6-inch by 6-inch actual paint samples for each color and each finish for approval. INTERIOR PAINTING 09 91 23 -1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS 1.5 QUALITY ASSURANCE A. Single-Source Responsibility: Provide primers and undercoat paint produced by the same manufacturer as the finish coats. B. Coordination of Work: Review other sections in which primers are provided to ensure compatibility of the total systems for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers. 1. Notify the Interior Architect of problems anticipated using the materials specified. C. Material Quality: Provide the manufacturer's best quality trade sale paint material of the various coating types specified. Paint material containers not displaying manufacturer's product identification will not be acceptable. D. Inspection: Provide periodic inspection of painting work by manufacturer's technical representatives for material and workmanship quality. The technical representatives shall check purchased quantities against recommended spreading rates and report to Architect and Contractor on calculated coverages. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver materials to the Project site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label and the following information: 1. Product name or title of material. 2. Color name and number. B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45-degrees F. Maintain containers used in storage in a clean condition, free of foreign materials and residue. 1. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily. 2. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and application. 1.7 JOB CONDITIONS A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50-degrees F and 90-degrees F. B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 45-degrees F and 95-degrees F. 1.8 EXTRA MATERIAL A. Furnish extra material described below, before installation begins, that match products installed and that are packaged with protective covering for storage and identified with labels per instructions in Division 1 Section “Closeout Procedures.” 1. Gallons of Paint Material: Not less than ½ Gallon for each color and type of paint, as indicated on drawings. INTERIOR PAINTING 09 91 23 -2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 2 – PRODUCTS 2.1 MANUFACTURERS A. B. Manufacturer: Benjamin Moore. Manufacturer: Sherwin Williams 2.2 PRIMERS A. Interior Flat Latex-Based Paint: Flat latex paint used as a primer on plaster under flat, Semi-gloss, and full-gloss alkyd finishes: 1. Benjamin Moore: Latex Quick-Dry Prime Seal #201. PART 3 – EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions under which painting will be performed for compliance with requirements for application of paint. Do not begin paint application until unsatisfactory conditions have been corrected. 1. Start of painting will be construed as the Applicator's acceptance of surfaces and conditions within a particular area. 3.2 PREPARATION A. General Procedures: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items in place that are not to be painted, or provide surface-applied protection prior to surface preparation and painting. Remove these items if necessary for complete painting of the items and adjacent surfaces. Following completion of painting operations in each space or area, have items reinstalled by workers skilled in the trades involved. 1. Clean surfaces before applying paint or surface treatments. Remove oil and grease prior to cleaning. Schedule cleaning and painting so that dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces. B. Surface Preparation: Clean and prepare surfaces to be painted in accordance with the manufacturer's instructions for each particular substrate condition and as specified. 1. Provide barrier coats over incompatible primers or remove and re-prime. Notify Architect in writing of problems anticipated with using the specified finish-coat material with substrates primed by others. 2. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off. a. Scrape and clean small, dry, seasoned knots and apply a thin coat of white shellac or other recommended knot sealer before application of primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried. b. Prime, stain, or seal wood to be painted immediately upon delivery. Prime edges, ends, faces, undersides, and backsides of wood, including cabinets, counters, cases, and paneling. c. When transparent finish is required, back-prime with spar varnish. d. Back-prime paneling on interior partitions where masonry, plaster, or other wet wall construction occurs on backside. INTERIOR PAINTING 09 91 23 -3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS e. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer immediately upon delivery. C. Materials Preparation: Carefully mix and prepare paint materials in accordance with manufacturer's written directions. 1. Maintain containers used in mixing and application of paint in a clean condition, free of foreign materials and residue. 2. Stir material before application to produce a mixture of uniform density; stir as required during application. Do not stir surface film into material. Remove film and, if necessary, strain material before using. 3. Use only thinners approved by the paint manufacturer, and only within recommended limits. 3.3 APPLICATION A. Apply paint in accordance with manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied. B. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film. 1. Paint colors, surface treatments, and finishes are indicated in Drawing "Schedules." 2. Provide finish coats that are compatible with primers used. 3. The number of coats and film thickness required is the same regardless of the application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. Sand between applications where sanding is required to produce an even smooth surface in accordance with the manufacturer's directions. 4. Apply additional coats when undercoats, stains, or other conditions show through final coat of paint until paint film is of uniform finish, color, and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners, receive a dry film thickness equivalent to that of flat surfaces. 5. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned tube radiation, grilles, and similar components are in place. Extend coatings in these areas as required to maintain the system integrity and provide desired protection. 6. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces. Paint surfaces behind permanently fixed equipment or furniture with prime coat only before final installation of equipment. 7. Paint interior surfaces of ducts, where visible through registers or grilles, with a flat, nonspecular black paint. 8. Paint back sides of access panels and removable or hinged covers to match exposed surfaces. 9. Finish doors on tops, bottoms, and side edges same as exposed faces. 10. Sand lightly between each succeeding enamel or varnish coat. 11. Omit primer on metal surfaces that have been shop-primed and touch up painted. C. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration. 1. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure and where application of another coat of paint does not cause lifting or loss of adhesion of the undercoat. INTERIOR PAINTING 09 91 23 -4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS D. Minimum Coating Thickness: Apply materials at not less than the manufacturer's recommended spreading rate. Provide a total dry film thickness of the entire system as recommended by the manufacturer. E. Mechanical and Electrical Work: Painting of Mechanical and Electrical Work is limited to items exposed in occupied spaces including air diffusers and grills. F. Prime Coats: Before application of finish coats, apply a prime coat of material as recommended by the manufacturer to material that is required to be painted or finished and has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to assure a finish coat with no burn through or other defects due to insufficient sealing. G. Pigmented (Opaque) Finishes: Completely cover to provide an opaque, smooth surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, or other surface imperfections will not be acceptable. H. Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint work not in compliance with specified requirements. 3.4 CLEANING A. Cleanup: At the end of each work day, remove empty cans, rags, rubbish, and other discarded paint materials from the site. B. Upon completion of painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping, using care not to scratch or damage adjacent finished surfaces. 3.5 PROTECTION A. Protect work of other trades, whether to be painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting, as acceptable to Architect. B. Provide "wet paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others for protection of their Work after completion of painting operations. 1. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. 3.6 INTERIOR PAINT SCHEDULE A. General: Provide the following paint systems for the various substrates indicated. B. Ferrous Metals: 1. Semi-gloss Alkyd Finish: 2-coats over primer with total dry film thickness not less than 2.5mils. a. Primer: 073-132 Rust-O-Lastic Anti-Corrosive Primer. b. Undercoat: 403 FreshKote Alkyd Semi-Gloss. c. Finish Coat: 403 FreshKote Alkyd Semi-Gloss. E. Gypsum Drywall Systems: 1. Lusterless (Flat) Emulsion Finish: 3-coats. INTERIOR PAINTING 09 91 23 -5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 a. b. c. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Primer: Latex-Based Interior White Primer. First Coat: Latex-Based Interior Flat Paint. Finish Coat: Latex-Based Interior Eggshell Paint. END OF SECTION 09 91 23 INTERIOR PAINTING 09 91 23 -6 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 10 44 00 - FIRE-PROTECTION SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. 1.2 Portable fire extinguishers. SUBMITTALS A. Product Data: For each type of product indicated. 1. B. 1.3 Fire Extinguishers: Include rating and classification. Maintenance data. QUALITY ASSURANCE A. NFPA Compliance: Fabricate and label fire extinguishers to comply with NFPA 10, "Portable Fire Extinguishers." B. Fire Extinguishers: Listed and labeled for type, rating, and classification by an independent testing agency acceptable to authorities having jurisdiction. 1.4 WARRANTY A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of portable fire extinguishers which fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. b. 2. Failure of hydrostatic test according to NFPA 10. Faulty operation of valves or release levers. Warranty Period: 6-years from date of Substantial Completion. FIRE-PROTECTION SPECIALTIES 10 44 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 2 - PRODUCTS 2.1 MANUFACTURERS A. 2.2 Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, manufacturers specified. PORTABLE FIRE EXTINGUISHERS A. Available Manufacturers: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. B. General: Provide fire extinguishers of type, size, and capacity for each fire-protection cabinet and mounting bracket indicated. 1. C. 2.3 Amerex Corporation. Ansul Incorporated. Badger Fire Protection. Buckeye Fire Equipment Company. Fire End & Croker Corporation. General Fire Extinguisher Corporation. JL Industries, Inc. Kidde Fyrnetics. Larsen's Manufacturing Company. Modern Metal Products; Div. of Technico. Moon American. Potter Roemer; Div. of Smith Industries, Inc. Watrous; Div. of American Specialties, Inc. Instruction Labels: Include pictorial marking system complying with NFPA 10, Appendix B and bar coding for documenting fire extinguisher location, inspections, maintenance, and recharging. Multipurpose Dry-Chemical Type in Steel Container FE1: UL-rated 4-A:60-B:C, 10-lb (4.5-kg) nominal capacity, with monoammonium phosphate-based dry chemical in enameled-steel container. MOUNTING BRACKETS A. Manufacturers: 1. 2. 3. 4. 5. 6. Amerex Corporation. Ansul Incorporated. Badger Fire Protection. Buckeye Fire Equipment Company. Fire End & Croker Corporation. General Fire Extinguisher Corporation. FIRE-PROTECTION SPECIALTIES 10 44 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 7. 8. 9. B. JL Industries, Inc. Larsen's Manufacturing Company. Potter Roemer; Div. of Smith Industries, Inc. Mounting Brackets: Manufacturer's standard galvanized steel, designed to secure fire extinguisher to wall or structure, of sizes required for types and capacities of fire extinguishers indicated, with plated or baked-enamel finish. 1. C. IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Color: Red. Identification: Lettering complying with authorities having jurisdiction for letter style, size, spacing, and location. Locate as indicated by Architect. 1. Identify bracket-mounted fire extinguishers with the words "FIRE EXTINGUISHER" in red letter decals applied to mounting surface. a. Orientation: Vertical. PART 3 - EXECUTION 3.1 INSTALLATION A. Examine fire extinguishers for proper charging and tagging. defective, or undercharged units. B. Install fire-protection specialties in locations and at mounting heights indicated or, if not indicated, at heights acceptable to authorities having jurisdiction. C. Mounting Brackets: indicated. D. Identification: Apply vinyl lettering at locations indicated. 3.2 Remove and replace damaged, Fasten mounting brackets to surfaces, square and plumb, at locations LOCATION OF FIRE EXTINGUISHERS A. Locate Fire Extinguisher in accordance with local codes. Review proposed locations with Architect prior to installation. END OF SECTION 10 44 00 FIRE-PROTECTION SPECIALTIES 10 44 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 23 05 93 - TESTING, ADJUSTING & BALANCING PART 1 – GENERAL 1.1 DESCRIPTION OF WORK A. Extent of testing, adjusting, and balancing Work required by this Section is defined to include, but is not necessarily limited to air distribution systems, hydronic distribution systems, and associated equipment and apparatus of mechanical Work. The Work consists of setting speed and volume adjusting facilities provided for systems, recording data, conducting tests, preparing and submitting reports, and recommending modifications to Work as required by contract documents. B. Component types of testing, adjusting, and balancing specified in this section include the following as applied to mechanical equipment: 1. 2. 3. 4. Fans Air-conditioning units Ductwork systems Terminal units C. Refer to Division 23 Sections for installations and start-up of equipment to be tested, adjusted, and balanced; not Work of this section. D. Refer to Division 26 Sections for electrical hook-up and wiring of equipment to be tested, adjusted, and balanced; not Work of this section. 1.2 QUALITY ASSURANCE A. Tester's Qualifications: Firm with a least 3 years of successful testing, adjusting, and balancing experience on projects which are similar to the requirements of this project, who is not the installer of the system to be tested and is otherwise independent of this project. B. Tester's Qualifications: With prior approval of the engineer, the original installer of the system shall be approved for testing, adjusting, and balancing provided that installer is certified by National Environmental Balancing Bureau (NEBB) or Associated Air Balance Council (AABC) and has at least 3 years of successful testing, adjusting, and balancing experience on similar projects. C. Codes and Standards: 1. NEBB Compliance: Comply with NEBB's Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems" as applicable to mechanical air and hydronic distribution systems and associated equipment. 2. ABC Compliance: Comply with AABC Manual MN-1 "AABC National Standards" as applicable to mechanical air and hydronic distribution systems and associated equipment and apparatus. 3. Industry Standards: Comply with ASHRAE recommendations pertaining to measurements, instruments and testing, adjusting and balancing. 1.3 SUBMITTALS TESTING, ADJUSTING & BALANCING 23 05 93 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS A. Submit certified test reports, signed by Test and Balance Supervisor who performed the Work. 1.4 JOB CONDITIONS A. Do not proceed with testing, adjusting, and balancing Work until work has been completed and is operable. Ensure that there is not additional Work to systems which may alter the report. PART 2 PRODUCTS 2.1 PATCHING MATERIALS A. Except as otherwise indicated, use same products as used by original installer for patching holes in insulation, ductwork and housings which have been cut or drilled for test procedures. B. At tester's option, plastic plugs with retainers may be used to patch drilled holes in ductwork and housings. PART 3 EXECUTION 3.1 INSTALLATION A. Examine installed Work and conditions under which testing is to be done to ensure that work has been completed, cleaned and is operable. Do not proceed with balance Work until unsatisfactory conditions have been corrected in manner acceptable to tester. B. Test, adjust, and balance environmental systems and components, as indicated, in accordance with procedures outlined in applicable standards. C. Test, adjust, and balance system during summer season for air conditioning systems and during winter season for heating systems. D. Prepare report of test results, including instruments used, equipment settings, fan speed, control lever positions, equipment nameplate data showing horsepowers, amp draw, rpm, capacities, model numbers, sheave sizes, belt sizes and static pressures. E. Balance system initially at maximum flow capabilities, resetting to final design conditions. F. Prepare a report of recommendations for correcting unsatisfactory mechanical performances when system cannot be successfully balanced; including modifications which exceed requirements of contract documents for mechanical work G. Retest, adjust and balance systems subsequent to significant system modifications, and resubmit test results. END OF SECTION 23 05 93 TESTING, ADJUSTING & BALANCING 23 05 93 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 23 37 00 – AIR OUTLETS & INLETS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes air outlets and inlets as indicated on the Drawings and Schedules and by the requirements of this Section. B. Types of air outlets and inlets specified in this Section include the following: 1. 2. C. 1.2 Supply/return/exhaust air diffusers. Registers and grilles. Refer to other Division 23 Sections for balancing of air outlets and inlets, Work not included in this Section. QUALITY ASSURANCE A. Manufacturer’s Qualifications: Firms regularly engaged in the manufacture of air outlets and inlets of the types and capacities required for this Project, whose products have been in satisfactory use in similar service for not less than 3 years. B. Codes and Standards: C. 1. ARI Compliance: Test and rate air outlets and inlets in accordance with ARI 650 “Standards for Air Outlets and Inlets.” 2. ASHRAE Compliance: Test and rate air outlets and inlets in accordance with ASHRAE 70 “Method of Testing for Rating and Air Flow Performance of Outlets and Inlets.” 3. AMCA Compliance: Test and rate louvers in accordance with AMCA 500 “Test Method for Louvers, Dampers and Shutters.” 4. AMCA Seal: Provide louvers bearing the AMCA Certified Rating Seal. 5. NFPA Compliance: Install air outlets and inlets in accordance with NFPA 90A “Standard for the Installation of Air Conditioning and Ventilating Systems.” Shop Drawings: Submit manufacturer’s assembly-type Shop Drawings for each type of air outlet and inlet indicating materials and methods of assembly of components. AIR OUTLETS & INLETS 23 37 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 1.3 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS DELIVERY, STORAGE & HANDLING A. Deliver air outlets and inlets wrapped in factory-fabricated fiber-board type containers. Identify on outside of container type of outlet or inlet and location to be installed. Avoid crushing or bending and prevent dirt and debris from entering and settling in devices. B. Store air outlets and inlets indoors in original cartons and protect from weather and construction Work traffic. PART 2 - PRODUCTS 2.1 CEILING AIR DIFFUSERS A. General: Unless otherwise indicated, provide manufacturer’s standard ceiling air diffusers where shown on the Drawings. Provide the size, shape, capacity and type indicated, constructed of materials and components as indicated and as required for a complete installation. B. Performance: Provide ceiling air diffusers that have, as a minimum, temperature and velocity traverses, throw and drop, and noise criteria ratings for each size device as listed in manufacturer’s current Product Data. C. Ceiling Compatibility: Provide diffusers with border styles that are compatible with adjacent ceiling systems and that are specifically manufactured to fit into ceiling module with accurate fit and support. Refer to Drawings and Specifications for types of ceilings that contain each type of ceiling air diffuser. D. Types: Provide ceiling diffusers of the type, capacity and with accessories and finished as indicated on Drawings and as indicated below. The following requirements shall apply to the nomenclature indicated. E. Diffuser Faces: F. 1. Square (S): Square housing, core of square concentric louvers, square or round duct connection. 2. To match existing. Diffuser Mountings: 1. G. Lay-In (L-I): Diffuser housing sized to fit between ceiling exposed suspension tee bars and rest on top surface of tee bar. Diffuser Dampers: 1. Fire Damper (F-D): Combination adjustable opposed blade damper and fusible link fire damper with UL approved link and assembly designed to meet the requirements of NFPA 90A. AIR OUTLETS & INLETS 23 37 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 H. 2.2 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Manufacturer: Subject to compliance with requirements, provide diffusers to match existing. REGISTERS & GRILLES A. General: Except as otherwise indicated, provide manufacturer’s standard ceiling registers and grilles where shown on the Drawings of the size, shape, capacity and type indicated, constructed of materials and components as indicated and as required for a complete installation. B. Performance: Provide ceiling registers and grilles that have, as a minimum, temperature and velocity traverses, throw and drop, and noise criteria ratings for each size device as listed in manufacturer’s current Product Data. C. Ceiling Compatibility: Provide registers and grilles with border styles that are compatible with adjacent ceiling systems and that are specifically manufactured to fit into ceiling module with accurate fit and support. Refer to Drawings and Specifications for types of ceilings that contain each type of ceiling air diffuser.. PART 3 - EXECUTION 3.1 INSPECTION A. 3.2 Examine areas and conditions under which air outlets and inlets are to be installed. Do not proceed with Work until unsatisfactory conditions have been corrected. INSTALLATION A. General: Install air outlets and inlets in accordance with manufacturer’s written instructions and in accordance with recognized industry practices to ensure that products serve intended functions. B. Coordinate with other Work including ductwork and duct accessories, as required to interface installation of air outlets and inlets with other Work. C. Locate ceiling air diffusers, registers and grilles as indicated on the “Reflected Ceiling Plans.” Unless otherwise indicated, locate units in center of acoustical ceiling modules. 3.3 SPARE PARTS A. Furnish to Owner, with receipt, 3 operating keys for each type of air outlet and inlet that requires them. END OF SECTION 23 37 00 AIR OUTLETS & INLETS 23 37 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 26 05 00 – GENERAL PROVISIONS/ ELECTRICAL PART 1 - GENERAL 1.1 GENERAL A. 1.2 The Electrical Contractor shall comply with all applicable provisions of the General Conditions, Supplementary General Conditions, Special Conditions and Instructions to Bidders. The Electrical Contractor shall comply with all provisions of the Electrical Specifications under Division 26. SCOPE OF WORK: A. The Electrical Contractor shall furnish all labor and materials required to provide a complete electrical system. Work shall include but not be limited to the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 1.3 1.3 Electrical service entrance Feeder conduits and conductors Panelboards for lighting and power circuits as required Branch circuit wiring to lighting and receptacles Connections to all equipment furnished by owner and other trades Exit and emergency lighting Interior lighting system Wiring devices Grounding Electrical demolition Temporary electrical power and lighting for construction Temporary removal of existing light fixtures to be re-installed. GENERAL REQUIREMENTS: A. Work covered by this Section of the Specifications shall consist of providing all materials, labor, equipment and services necessary for a complete electrical installation as specified herein or as shown on the drawings. B. References in the Specifications to any article, device, product, material, fixture, form or type of construction by name, model or catalog number shall be interpreted as establishing a standard of quality and shall not be construed as limiting competition. The Electrical Contractor may substitute articles, devices, products, materials, fixtures, forms or types of construction which in the judgement of the Architect/Engineer is comparable to the specified materials. Submission of proposed alternate materials must be received in writing by the Architect a minimum of 7 days prior to the bid date. Notification of approved alternate materials will be provided by addendum. Bid proposal shall be based on specified materials and approved substitutes only. ADDITIONS AND CHANGES TO WORK INCLUDED: GENERAL PROVISIONS/ ELECTRICAL 26 05 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 A. 1.4 B. C. D. 1.7 The Electrical Contractor shall arrange his work such that all equipment, panelboards, disconnect switches, etc., have adequate access for maintenance purposes. The Electrical Contractor shall comply strictly with all NEC requirements for working space about electrical equipment. PROTECTION DURING CONSTRUCTION: A. 1.6 Any changes to work or additional work above and beyond that included in the Contract Documents must be authorized in writing by the Architect. ACCESS TO EQUIPMENT: A. 1.5 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS Equipment and trim shall be protected against damage incidental to construction. All damaged equipment shall be repaired or replaced at no cost to the Owner. Where materials to be installed are being stored at or near the project during construction, this Contractor shall arrange such materials so as to minimize the possibility of contaminations, corrosion and damage. This Contractor shall take care to avoid causing damage to materials and workmanship of other trades. Fixtures, trim, and accessories removed during construction and to be re-installed, shall be moved to a secured area, provided by Owner. Electrical Contractor is responsible to inventory items and provide wrapping as required. MINOR DEVIATIONS: A. The Drawings accompanying these Specifications indicate, generally, the design and arrangements of equipment, apparatus, fixtures, accessories, conduits and cables necessary to complete the installation of the system. The exact location or arrangement of the apparatus and equipment, unless otherwise indicated, is subject to minor changes necessitated by field conditions and shall be made as required without additional cost to the Owner. B. Measurements shall be verified by actual observation at the construction site. This Contractor shall be responsible for all of his work fitting into place in a satisfactory and workmanlike manner to the approval of the Owner. C. This contractor shall provide full cooperation with other contractors during the course of the construction and shall plan and execute his work such that interference between his work and the installations performed by other trades is minimized. LOCAL CONDITIONS: A. This Contractor shall inform himself of the conditions under which the work is to be performed, the site of the work, the existing conditions within the existing structure, GENERAL PROVISIONS/ ELECTRICAL 26 05 00 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS structure of the ground that may be encountered, availability and location of necessary facilities and utilities and all relevant matters concerning the work. 1.8 1.9 1.10 CLEANING: A. On a daily basis this Contractor shall clean work areas and shall remove all rubbish, and/or other debris occasioned by their installation. B. No painting shall be included in this contract with the exception that all bare metal equipment, apparatus or supports installed by this Contractor shall be painted one (1) coat of Rustoleum or Rust-Alum rust inhibiting paint. Additionally, any surfaces marred during installation shall be properly restored using factory provided touch-up paint. HOISTING: A. This Contractor shall be responsible for hoisting of materials furnished under this Section of the Specifications. B. All hoisting shall be done in strict accordance with applicable city, state and federal rules and regulations. TEMPORARY ELECTRICAL SERVICE: A. Temporary wiring for lighting and power used during construction shall comply with the provisions of the latest Edition of the National Electrical Safety Code, OSHA Rules and Regulations, and regulations of the National Electric Code. B. All temporary light and power service connections shall be entirely removed at the completion of the new construction. C. Power service and distribution systems shall be properly grounded in accordance with the provisions and requirements of the standards listed above. D. All receptacles shall be 15A, NEMA GFCI protected type. All receptacles shall be duplex. GFCI protected receptacles for small power tools shall be provided in sufficient quantities so that no extension cords longer than 100 ft. will be required. E. Branch circuits feeding receptacles shall be protected with ground fault circuit interrupters, if grounding type duplex receptacles are utilized in lieu of GFCI receptacles. F. All lamps shall be furnished and installed by the Electrical Contractor and he shall replace all burned out and missing lamps as required during regular working hours. G. Temporary facilities shall be routed in a manner that will cause minimum conflict with the construction work. Cords shall be kept clear of working spaces and walkways where they are readily exposed to damage. GENERAL PROVISIONS/ ELECTRICAL 26 05 00 - 3 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION 3.01 3.02 TESTING, ADJUSTING AND ALIGNING: A. All circuits shall be tested for continuity, opens, shorts and grounds. They shall be connected to the proper phase and arranged as required to maintain a load balanced to within 10%. B. Motor starters shall be adjusted and fused or provided with suitable thermal overload strips to operate smoothly without chatter or excessive hum. C. Switch, power and lighting panels shall be properly phased to distribute the load and shall be connected and adjusted to operate as specified. TOOLS, SCAFFOLDING, ETC.: A. 3.03 3.04 This Contractor shall furnish all tools, transportation, scaffolding apparatus, and utensils required for the installation of his work. ACCEPTANCE OF CONTRACTOR'S WORK: A. The Electrical Contractor shall submit Operating and Service Manuals to the Architect prior to final acceptance of the work. B. This Contractor shall coordinate, through the Architect, an instruction period for the owner. He shall assign a responsible person from his staff who is thoroughly familiar with the installed systems and their operation. This individual shall conduct a formal verbal instruction to the Owner of such operation in the presence of the Architect. C. A letter indicating compliance with all codes and completion of the work shall be submitted with the Contractor's request for final payment. Contractor's warranty period begins upon receipt of this letter by the Architect. GUARANTEE: A. In entering into a Contract for this work, the Contractor accepts the Specifications and guarantees that the work will be performed in accordance with the requirements of the Specifications or such modifications as may be made in the Contract Documents. Contractor further guarantees that the workmanship and material will be of the best procurable and that none but experienced workmen familiar with each particular class of work will be employed. Should any defects develop in the Contractor's work within one (1) year after final payment and acceptance by the Architect has been made, the Contractor GENERAL PROVISIONS/ ELECTRICAL 26 05 00 - 4 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS guarantees to replace or repair materials or equipment found to be defective as a result of faulty material or workmanship. Such repair or replacement shall be made at the Contractor's expense upon written notification from the Architect. END OF SECTION 26 05 00 GENERAL PROVISIONS/ ELECTRICAL 26 05 00 - 5 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 26 27 26 – SWITCHES AND RECEPTACLES PART 1 - GENERAL 1.01 GENERAL: A. The electrical Contractor shall provide all wiring devices as indicated on the Drawings. All wiring devices shall be Underwriter's listed. PART 2 - PRODUCTS 2.01 MATERIALS: A. Switches shall be of the specification grade, quiet operating type rated at 20 amperes, 120/277 volts A.C., and comparable to: Description Single pole 3-way B. Standard Type Number 1221-I 1223-I Receptacles shall be of the specifications grade, grounding type, rated at 15 or 20 amperes as noted on the drawings, 120 volts A.C. and comparable to the following Hubbell Inc. models: Description 15A Duplex Receptacle 20A Single Receptacle 20A Duplex Receptacle NEMA 5-15R 5-20R 5-20R Number 5252-I 5351-I 5352-I C. Color of switches and receptacles shall match existing. D. All switches and receptacles furnished for the project shall be the product of a single manufacturer. Comparable wiring devices as manufactured by the following will be considered as acceptable. Hubbell/General Electric Arrow-Hart Sierra E. Pass and Semour Leviton Eagle Ground fault interrupter receptacles shall be provided in all toilet rooms and other areas as noted on the Drawings. Ground fault interrupter receptacles shall be of the duplex type, rated at 15 amperes, 120 volts, 2 pole - 3 wire with testing and resetting buttons. Ground fault interrupter receptacles shall be comparable to Harvey Hubbell No. GF-5252 and shall be mounted in standard two and one eighth (2-1/8) inch (minimum) deep outlet boxes. SWITCHES AND RECEPTACLES 26 27 26 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS F. Occupancy Sensor shall be Hubbell Inc. switch AT1277W, to 1800 watts; Adjustable from 5-30 minutes; Color: white w/green LED sensor. G. Special purpose outlets, where applicable, shall be comparable to the following Hubbell Inc. models: Description 20A-250V 30A-250V 50A-250V 60A-250V 2 Pole-3 Wire (GRD) 6-20R #5461 6-30R #9350 6-50R #7961 15-60R #8460 Dual Voltage Combination 20A-120/250V(GRD) 5-20R/6-20R 3 Pole-4 Wire (GRD) 15-20R #8420 15-20R #8430 15-50R #8450 #4792 H. Cover plates of the appropriate type and size shall be provided to accommodate all outlets. Unless otherwise required for special devices or specific equipment supplies, all plates shall conform to the following: I. Flush outlets in finished areas shall be provided with plastic cover plates to match existing. PART 3 - EXECUTION 3.01 INSTALLATION: A. Where any outlet is shown in the same location as any heating ventilating, air conditioning or plumbing equipment, verify physical dimensions of such equipment with the respective trade and install the outlet with a minimum clearance of three (3) inches from any such apparatus. This Contractor shall be responsible for determining such conflicts. B. Where more than four (4) switches occur at a single location, appropriate gang boxes and interchangeable devices shall be used with a single plate. C. Refer to Drawings and Specification Section 16130 for device mounting heights. END OF SECTION 26 27 26 SWITCHES AND RECEPTACLES 26 27 26 - 2 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS SECTION 26 50 00 – LIGHTING FIXTURES PART 1 - GENERAL 1.01 GENERAL A. The Electrical Contractor shall provide and install all lighting fixtures required for the Project. Lighting fixtures shall be equipped with proper accessories, lenses, louvers, reflectors, shields, hangers, clips, frames, lamps, ballasts, and other essentials to properly install the fixtures and accessories in or upon walls, ceilings, or other construction features. All lighting fixtures shall be properly painted for protection and preservation appropriate to the place installed. B. It shall be the responsibility of the Electrical Contractor to check all ceiling construction, finishes, lamping, mounting accessories, etc., as required for the approved installation of the equipment. C. All lighting fixtures shall be Underwriters' Laboratories approved. PART 2 - PRODUCTS 2.01 MATERIAL A. All lighting fixtures shall be as called for in the Lighting Fixture Schedule and/or noted on the Drawings. Light fixtures of equal quality, performance and finishes by alternate manufacturers may be considered for approval by the architect and engineer. Alternate light fixtures shall be submitted at least 3 working days prior to bid for review and approval. B. Special lighting equipment shall be as herein specified or noted on the Drawings. C. Ballasts for all fluorescent, metal halide or high pressure sodium fixtures shall be of the high power factor Class "P" type and their design and construction shall conform to CBM Standards and be identified as such with the CBM-ETL label. See Section 16515. PART 3 - EXECUTION 3.01 INSTALLATION A. The Electrical Contractor shall cooperate with the Ceiling Contractor to assure proper spacing, attachments, and fittings to assure a first class workmanlike installation. B. All recessed fixtures shall be installed with flanges installed tight to the finished ceilings. Facilities shall be provided to eliminate light leaks. Fixtures shall be supported from the building structural system by wires or chain, independent of the suspended ceiling system. LIGHTING FIXTURES 26 50 00 - 1 INDIANAPOLIS HOUSING AGENCY 1919 N. MERIDIAN ST. INDIANAPOLIS, IN 46202 IHAIS01C INTERIOR CONSTRUCTION SPECIFICATIONS C. Incandescent fixtures weighing less than fifty (50) pounds may be supported from the outlet box. D. All surface mounted fixtures shall be installed in proper alignment with the ceiling. E. All fixtures, including existing fixtures to be reinstalled, shall be clean and free of shipping debris prior to final acceptance of the installation. END OF SECTION 26 50 00 LIGHTING FIXTURES 26 50 00 - 2