proPANEL® Series Installation Guide
Transcription
proPANEL® Series Installation Guide
R A D I A N T H E AT I N G A N D COOLING SYSTEMS p r o PA N E L ® S e r i es INSTALLATION GUIDE proPANEL® Series Installation Guide Uponor proPANEL® Series Installation Guide Published by Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Phone: (800) 321-4739 Fax: (952) 891-1409 www.uponor-usa.com © 2008 Uponor, Inc. All Rights Reserved. Second Edition, January 2008 First Printing, May 2003 Printed in the United States of America 2 www.uponor-usa.com • www.uponor.ca Table of Contents Section 1 — Overview of the proPANEL® Series. . . . . . . . . 3 Uponor proPANEL® 90 . . . . . . . . . . . . . . . . . . . . . . . . 4 Uponor proPANEL® 90M . . . . . . . . . . . . . . . . . . . . . . . 5 Uponor proPANEL® 90Z . . . . . . . . . . . . . . . . . . . . . . . 6 Uponor proPANEL® 90MZ . . . . . . . . . . . . . . . . . . . . . . 7 Section 2 — Sizing Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 proPANEL Selection . . . . . . . . . . . . . . . . . . . . . . . . . 9 proPANEL Sizing . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Additional Charts . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Connecting Multiple Panels . . . . . . . . . . . . . . . . . . . . . . 9 Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Section 3 — Preparing and Mounting the proPANEL. . . . 11 Section 4 — Piping Connections and Configurations. . . . 13 Section 5 — Wiring Connections . . . . . . . . . . . . . . . . . . . . 15 Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Control Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . Zone Wiring in the proPANEL . . . . . . . . . . . . . . . . . . . . proPANEL® 90 Wiring Diagram . . . . . . . . . . . . . . . . . . . . proPANEL® 90M Wiring Diagram . . . . . . . . . . . . . . . . . . . proPANEL® 90Z Wiring Diagram . . . . . . . . . . . . . . . . . . . proPANEL® 90MZ Wiring Diagram . . . . . . . . . . . . . . . . . . . Wiring Diagram for proPANEL® 90 in Stand-alone Application . . . . . . . . Wiring Diagram for proPANEL® 90Z in Stand-alone Application . . . . . . . 15 15 15 16 17 18 19 20 21 Section 6 — Purging of the proPANEL . . . . . . . . . . . . . . . 23 Section 7 — Mechanical Drawings. . . . . . . . . . . . . . . . . . . 25 Section 8 — Quick Reference Flow Charts. . . . . . . . . . . . . 49 Section 9 — Pressure Loss Charts . . . . . . . . . . . . . . . . . . . 57 Section 10 — Troubleshooting. . . . . . . . . . . . . . . . . . . . . . 63 Uponor proPANEL® Series Installation Guide i ii www.uponor-usa.com • www.uponor.ca Section 1 Overview of the proPANEL® Series The time-consuming process of planning and piping the mechanical room is now obsolete. The Uponor proPANEL® Series are pre-assembled, pre-wired and pre-piped control panels designed around the function and capabilities of the Uponor Climate Cŏntrol™ - Multifunction hydronic controller. These panels allow easy integration of multiple hydronic system controls into one cost-effective and efficient system. With built-in flexibility, contractors can use a stand-alone proPANEL for a small application or connect multiple panels together to meet the needs of a more demanding application. Wiring is effortless as Cat5 connection cables simply attach between the panels and controller. Easy to mount, the panels help contractors save time and money. Contractors must ensure the primary and secondary systems’ BTU/h requirements and flow rates are within the capability of the proPANEL unit selected for the installation. The Uponor proPANEL Series includes: proPANEL 90 Unit proPANEL 90M Unit proPANEL 90Z Unit proPANEL 90MZ Unit proPANEL Units 90 90M 90Z 90MZ Weight (lbs.) 26 32 30 37 Width (inches) 18 18 18 18 Depth (inches) 7 7 7 7 Height (inches) for backplate and enclosure 26 26 26 26 28.5 28.5 28.5 28.5 Inlet pipe size (inches) 1 1 Outlet pipe size (inches) 1 1 UP15-58 (three speed) 1 1 1 1 Three-way Motorized Mixing N/A 1 N/A 1 Zone valves N/A N/A 2 2 BTU/h Output (at 20 degree ΔT) 90k 90k 90k 90k 9 9 4.5 4.5 Height (inches) for actual overall length Maximum gallons per minute (gpm) per outlet Uponor proPANEL® Series Installation Guide 1 /4 3 1 /4 3 3 Uponor proPANEL 90 Unit The proPANEL 90 unit is a single-zone pump panel without mixing. It has a pre-wired control interface for connection of zone input and Cat5 wiring to the Climate Cŏntrol - Multifunction system. If the proPANEL is connected to the Climate Cŏntrol Multifunction system, please refer to the Climate Cŏntrol - Multifunction Installation Guide for setup and more information. 1" Supply from Heat Source 1" Return to Heat Source 1" Isolation Ball Valve 1" Isolation Ball Valve Control Interface Purge Valve Secondary Loop (radiant) Circular 1" Isolation Ball Valve 1" Secondary Return (from radiant) 1" Secondary Supply (to radiant) proPANEL 90 Unit 4 Weight (lbs.) Width (inches) Depth (inches) Height (inches) for backplate and enclosure 26 18 7 26 Height (inches) for actual overall length including pipes 28.5 www.uponor-usa.com • www.uponor.ca Uponor proPANEL 90M Unit The proPANEL 90M unit is a single-zone mixing pump panel using a three-way motorized mixing valve (0-10VAC). It has a pre-wired control interface to connectd to zone input and Cat5 wiring to the Climate Cŏntrol - Multifunction system. The proPANEL 90M unit requires connection to a Climate Cŏntrol - Multifunction system for correct functionality. Please refer to the Climate Cŏntrol - Multifunction Installation Guide for setup and information. 1" Supply from Heat Source 1" Return to Heat Source 1" Isolation Ball Valve 1" Isolation Ball Valve Control Interface Purge Valve Three-way Motorized Mixing Valve Secondary Loop (radiant) Circular 1" Isolation Ball Valve 1" Secondary Return (from radiant) 1" Secondary Supply (to radiant) proPANEL 90M Unit Weight (lbs.) Width (inches) Depth (inches) Height (inches) for backplate and enclosure 30 18 7 26 Uponor proPANEL® Series Installation Guide Height (inches) for actual overall length including pipes 28.5 5 Uponor proPANEL 90Z Unit The proPANEL 90Z unit is a two-zone panel without mixing. It uses two one-inch valves for zoning. It has a prewired control interface for connection of zone inputs and Cat5 wiring to the Climate Cŏntrol - Multifunction system. If the proPANEL 90Z unit is connected to the Climate Cŏntrol - Multifunction system, refer to the Climate Cŏntrol - Multifunction Installation Guide for setup and information. 1" Supply from Heat Source 1" Return to Heat Source 1" Isolation Ball Valve 1" Isolation Ball Valve Control Interface Purge Valve Secondary Loop (radiant) Circular 1" Isolation Ball Valve 1" Zone Valve 24VAC Thermal Actuator 1" Secondary Supply (to radiant) 1" Secondary Supply (to radiant) 1" Secondary Return (from radiant) proPANEL 90Z Unit 6 Weight (lbs.) Width (inches) Depth (inches) Height (inches) for backplate and enclosure 32 18 7 26 Height (inches) for actual overall length including pipes 28.5 www.uponor-usa.com • www.uponor.ca Uponor proPANEL 90MZ Unit The proPANEL 90MZ unit is a two-zone mixing pump panel using a three-way motorized mixing valve (0-10VAC) and two one-inch valves for zoning. It has a pre-wired control interface to connect to zone inputs and Cat5 wiring to the Climate Cŏntrol - Multifunction system. The proPANEL 90MZ unit needs to be connected to a Climate Cŏntrol - Multifunction system for correct functionality. Please refer to the Climate Cŏntrol - Multifunction Installation Guide for setup and information. 1" Supply from Heat Source 1" Return to Heat Source 1" Isolation Ball Valve 1" Isolation Ball Valve Control Interface Purge Valve Three-way Motorized Mixing Valve Secondary Loop (radiant) Circular 1" Isolation Ball Valve 1" Zone Valve 24VAC Thermal Actuator 1" Secondary Supply (to radiant) 1" Secondary Supply (to radiant) 1" Secondary Return (from radiant) proPANEL 90MZ Unit Weight (lbs.) Width (inches) Depth (inches) Height (inches) for backplate and enclosure 37 18 7 26 Uponor proPANEL® Series Installation Guide Height (inches) for actual overall length including pipes 28.5 7 8 www.uponor-usa.com • www.uponor.ca Section 2 Sizing Data proPANEL Unit Selection Connecting Multiple Panels A quick overview of the proPANEL series capabilities is outlined in Table 2-1. For a more detailed description, as well as component identification and mechanical schematics, refer to Section 7. The proPANEL series is designed to be connected together in order to meet specific requirements of a project if needed. proPANEL Unit Sizing The system designer and installing contractor must ensure the primary and secondary systems’ BTU/h requirements and flow rates are within the capability of the proPANEL unit selected for the installation. The maximum flow rates shown in Table 2-1 are based on the ASHRAE recommendation of 4 feet of head drop per 100 feet of pipe. proPANEL Piping — The size of the piping is 1-inch stainless steel. It is designed to support a recommended maximum flow rate of 9 gpm. The minimum flow of 4 gpm represents a velocity greater than 1.5 feet per second in order to evacuate air from the system. Refer to Table 2-1 for the proPANEL pipe sizing information by BTU/h as it pertains to the respective differential temperature. Refer to Section 8 for additional flow information for 1-inch piping at different differential temperatures. Additional Charts Pressure loss charts and quick reference flow charts are available for 1-inch and 11/2 -inch copper piping in Sections 8 and 9. The charts provide pressure loss information in feet of head required for pump sizing. The quick reference flow charts allow the designer to select applicable flow ranges for 1-inch and 11/2 -inch copper as the flow pertains to differential temperatures. Quick Reference Flow Charts — The charts shown in Table 2-1 only show the minimum and maximum flows for 1-inch copper piping. The charts in Section 8 provide flow information throughout the range of the respective piping. The gray areas of the charts are not recommended for use and should be avoided. Pressure Loss Charts — The pressure loss charts in Section 9 to determine the feet of head drop within any segment length based on flow. Use these charts together with the mechanical design of the primary piping to determine the flow and head requirements for the primary pump. Uponor proPANEL® Series Installation Guide Secondary (Radiant) Piping Using 1" Copper Minimum Sizing BTU/h ∆T Flow (gpm) 20,000 30,000 40,000 50,000 10ºF 15ºF 20ºF 25ºF 4 4 4 4 Maximum Sizing BTU/h ∆T Flow (gpm) 45,000 67,500 90,000 112,500 10ºF 15ºF 20ºF 25ºF 9 9 9 9 Secondary (Radiant) Piping Using 3/4" Copper Minimum Sizing BTU/h 12,500 18,750 25,000 31,250 ∆T 10ºF 15ºF 20ºF 25ºF Flow (gpm) 2.5 2.5 2.5 2.5 Maximum Sizing BTU/h 22,500 33,750 45,000 56,250 ∆T 10ºF 15ºF 20ºF 25ºF Flow (gpm) 4.5 4.5 4.5 4.5 Table 2-1: Pipe Sizing Information by BTU/h 9 Pumps is acceptable. The exception is the extreme ends of the pump curve. For best results, do not design systems that force the selected pump to fall along the far ends of the pump curve. Uponor has standardized the pump used with the proPANEL series. Refer to the pump curve chart (Figure 2-1) for flow and feet of head capabilities for each pump speed. Any point along the pump curve chart UPS15-58RU 115V 60Hz 20.0 18.0 16.0 Head (feet) 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0 0 2 4 6 8 10 12 14 Flow (gpm) Figure 2-1: Pump Curve Chart for Flow and Feet of Head Capabilities for Pump Speed 10 www.uponor-usa.com • www.uponor.ca Section 3 Preparing and Mounting the proPANEL 1: U npack and ensure the following contents are included: • proPANEL unit • proPANEL Installation Guide • Gaskets (four) • Adapters (one per connection) • Mounting Washers (four) • Mounting Screws (four) Inspect the product to ensure no damage occurred during shipping. Mounting holes 2: Lay the proPANEL unit flat on the floor or a stable surface. 3: Remove the cover and enclosure. Pull the cover away from the bottom of the enclosure. Set the cover aside to avoid damage. 4: Remove the loose contents (e.g., adapters, gaskets, mounting washers, etc.). 5: Position the proPANEL unit at the recommended height (between 60 and 72 inches) to ensure the unit is at or near eye level. 6: Using a level, mark a reference line for the top of the proPANEL unit. 7: Place the proPANEL unit on the line. Secure the proPANEL to the studs or wall using appropriate equipment (depending on what the proPANEL unit is mounting to) to support the proPANEL unit's weight. (See Figure 3-1.) Mounting holes Figure 3-1: Preparing and Mounting the proPANEL Unit Uponor proPANEL® Series Installation Guide 11 12 www.uponor-usa.com • www.uponor.ca Section 4 Supply to Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifolds) Return from Radiant Zone (2 Manifolds) Return from Radiant Zone (1 Manifolds) Control Interface Figure 4-1: proPANEL fed Directly From a Heat Source Control Interface 1. D etermine the sizing and installation of heat source, gas/fuel lines, venting and related mechanical equipment such as primary pump, air separator, expansion tank, fill/drain and back-flow preventor etc. per local code requirements and best practices. 2. The proPANEL units use G1" (R25) straight thread union nuts with gasket seal for easy assembly and disassembly for the primary (supply/return piping) and G1" (R25) and G3/4" (R20) for the secondary connections. The proPANEL units come with the appropriate number of adapters. If other types of adapters are needed, please refer to the Uponor Product Catalog for other R25 and R20 transitional adapters. 3. Each proPANEL unit handles flow up to nine gpm and fed either directly from a heat source or as a secondary circuit in a primary/secondary configuration. (See Figures 4-1 and 4-2.) The proPANEL unit comes with a secondary pump that is adequate for the system in most applications. To determine which configuration is appropriate for your installation, please refer to the proPANEL unit sizing information in Section 2. 4. After selecting an appropriate location and mounting the proPANEL unit, use either a direct or primary/secondary configuration and route the supply and return mains to the proPANEL unit. Terminate with the correct connection adapter (G1" (R25) x 1" NPT male is supplied.) thread G1" (R25) union nut on the proPANEL unit onto the G1" (R25) male thread. Make sure to use the supplied gasket. 5. Route the manifold supply and return mains to match up with the secondary connections on the bottom of the proPANEL unit and terminate with the correct connection adapter G1"(R25) or G 3/4 " (R20) x 1" NPT male is supplied thread G1"(R25) or G 3/4 " (R20) union nut on the proPANEL unit onto the G1"(R25) or G 3/4 " (R20) male thread. Make sure to use the supplied gasket. Control Interface Piping Connections and Configurations Supply to Radiant Zone (4 Manifolds) Supply to Radiant Zone (3 Manifolds) Return from Radiant Zone (4 Manifolds) Return from Radiant Zone (3 Manifolds) Supply to Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifolds) Return from Radiant Zone (2 Manifolds) Return from Radiant Zone (1 Manifolds) Figure 4-2: proPANEL as a Secondary Circuit in a Primary/Secondary Configuration Note: To remove the proPANEL unit without draining the system, install isolation ball valves above and below the proPANEL unit. Uponor proPANEL® Series Installation Guide 13 14 www.uponor-usa.com • www.uponor.ca Section 5 proPANEL Unit Zone Wiring Wiring Connections Connect a two-wire thermostat to terminals 2 and 3 (Rh and W) on the Heat Demand 1 terminal block in the control interface in the proPANEL unit. Power 1. Install a disconnect power switch (leave in the off position while wiring) into a standard wall plug, and install a standard 4" x 4" electrical box for the transformer preferably within two feet of the proPANEL unit mounting location. Repeat the previous steps for Heat Demand 2 (for models 90Z and 90MZ, if used). Caution: All wiring must be performed by a licensed professional and comply with local trade practices and codes. Uponor does not take responsibility for any damage caused due to failure to comply. 2. Install a 24VAC transformer of adequate size (a minimum 20VAC per proPANEL unit and 20VAC per Climate Cŏntrol - Multifunction unit) on the 4" x 4" electrical box. 3. Run the low-voltage wiring and connect to the power supply 24VAC terminals on the control interface. Note: If you use the same transformer to power up the Climate Cŏntrol - Multifunction unit or multiple proPANEL units, make sure that the transformer is sized correctly to power both (a minimum 20VAC per proPANEL unit and 20VAC per Climate Cŏntrol - Multifunction). 4. Plug the pump into the wall plug. Control Wiring System pump: Using a Cat5 wire, connect the pump port on the proPANEL unit's control interface to the assigned Climate Cŏntrol - Multifunction unit's Cat5 ports that is assigned for this function. (See Figure 5-5.) Ensure the selection switches on the interface are in position. Option: If the pump control selection switch on the control interface is set to Internal, the proPANEL unit's system pump will automatically start when there is a call for heat, thus no need to connect to Climate Cŏntrol - Multifunction. (See Figure 5-5.) Mixing valve (only for models 90M and 90MZ): Using a Cat5 wire, connect the valve port on the control interface in the proPANEL unit to a Cat5 port on the Climate Cŏntrol - Multifunction unit that is assigned for this function. (See Figure 5-5.) End switch: Connect a wire between the end-switch terminals on the control interface in the proPANEL unit to the dry-contact input terminals on the Climate Cŏntrol - Multifunction unit that are assigned for this function and proPANEL stand-alone applications. Ensure the selection switches in the interface are in their correct position. Uponor proPANEL® Series Installation Guide 15 proPANEL 90 Unit Wiring Diagram End Switch to Input Terminal on Climate Cŏntrol - Multifunction Pump Control to Output Port on Climate Cŏntrol - Multifunction Climate Cŏntrol - Multifunction Hydronic Controller Left Side View Right Side View Cat5 Control Wire 24VAC Transformer FIELD CONNECTIONS PUMP (Cat5) MIX VALVE (Cat5) Cat5 Pump Cat5 Valve N 120 VAC L (AC) System Pump ES AUTO Rh C R 2 3 4 HEAT DEMAND 1 2 3 4 HEAT DEMAND 2 ES ES END SWITCH 1 2 3 POWER SUPPLY 24VAC Y1Y2 Y1Y2 FIELD CONNECTIONS MAN EXT STAT INT Cat5 Internal W OR ES ES Control Interface proPANEL 90 Unit Figure 5-1 16 www.uponor-usa.com • www.uponor.ca proPANEL 90M Unit Wiring Diagram End Switch to Input Terminal on Climate Cŏntrol - Multifunction Modulating Valve Control to Output Port on Climate Cŏntrol - Multifunction Pump Control to Output Port on Climate Cŏntrol Multifunction Right Side View Climate Cŏntrol - Multifunction Hydronic Controller Left Side View Cat5 Control Wires 24VAC Transformer FIELD CONNECTIONS PUMP (Cat5) MIX VALVE (Cat5) Cat5 Pump Cat5 Valve N 120 VAC L (AC) System Pump ES C R 2 3 4 HEAT DEMAND 1 2 3 4 HEAT DEMAND 2 ES ES END SWITCH 1 2 3 Modulating Valve Rh POWER SUPPLY 24VAC Y1Y2 Y1Y2 FIELD CONNECTIONS STAT EXT MAN AUTO INT Cat5 Internal W OR ES ES Control Interface proPANEL 90M Unit Figure 5-2 Uponor proPANEL® Series Installation Guide 17 proPANEL 90Z Unit Wiring Diagram End Switch to Input Terminal on Climate Cŏntrol - Multifunction Pump Control to Output Port on Climate Cŏntrol - Multifunction Climate Cŏntrol - Multifunction Hydronic Controller Left Side View Right Side View Cat5 Control Wire 24VAC Transformer FIELD CONNECTIONS PUMP (Cat5) MIX VALVE (Cat5) Cat5 Pump Cat5 Valve N 120 VAC L (AC) System Pump ES C R 2 3 4 HEAT DEMAND 1 2 3 4 HEAT DEMAND 2 ES ES END SWITCH 1 2 3 Y1Y2 YELLOW YELLOW Y1Y2 YELLOW YELLOW Zone Valve 1 Rh POWER SUPPLY 24VAC FIELD CONNECTIONS STAT EXT MAN AUTO INT Cat5 Internal W AND/OR ES ES Control Interface Zone Valve 2 proPANEL 90Z Unit Figure 5-3 18 www.uponor-usa.com • www.uponor.ca proPANEL 90MZ Unit Wiring Diagram End Switch to Input Terminal on Climate Cŏntrol - Multifunction Modulating Valve Control to Output Port on Climate Cŏntrol - Multifunction Pump Control to Output Port on Climate Cŏntrol Multifunction Climate Cŏntrol - Multifunction Hydronic Controller Left Side View Right Side View Cat5 Control Wires 24VAC Transformer FIELD CONNECTIONS PUMP (Cat5) MIX VALVE (Cat5) Cat5 Pump Cat5 Valve N 120 VAC L (AC) System Pump ES C R 2 3 4 HEAT DEMAND 1 2 3 4 HEAT DEMAND 2 ES ES END SWITCH 1 2 3 Modulating Valve Y1Y2 YELLOW YELLOW Y1Y2 YELLOW YELLOW Zone Valve 1 Rh POWER SUPPLY 24VAC FIELD CONNECTIONS STAT EXT MAN AUTO INT Cat5 Internal W AND/OR ES ES Control Interface Zone Valve 2 proPANEL 90MZ Unit Figure 5-4 Uponor proPANEL® Series Installation Guide 19 System Pump STAT INT Cat5 Internal Cat5 Pump PUMP (Cat5) Cat5 Valve MIX VALVE (Cat5) C R EXT 1 2 3 2 3 4 2 3 4 ES ES Y1Y2 Y1Y2 proPANEL 90 Unit Control Interface END SWITCH ES HEAT DEMAND 2 MAN AUTO HEAT DEMAND 1 POWER SUPPLY 24VAC OR INT FIELD CONNECTIONS Rh W Wiring Diagram for proPANEL 90 Unit in Stand-alone Application STAT FIELD CONNECTIONS 20 MAN AUTO ES EXT Figure 5-5 www.uponor-usa.com • www.uponor.ca End Switch to Enable Other External Devices ES ES L (AC) N 120 VAC 24VAC Transformer Uponor proPANEL® Series Installation Guide C R EXT 1 2 3 POWER SUPPLY 24VAC 2 3 4 2 3 4 ES ES Y1Y2 Y1Y2 proPANEL 90Z Unit Control Interface END SWITCH ES HEAT DEMAND 2 STAT HEAT DEMAND 1 AUTO Zone Valve 2 Cat5 Valve MAN YELLOW YELLOW YELLOW YELLOW INT Cat5 Internal Cat5 Pump MIX VALVE (Cat5) AND/OR EXT Zone Valve 1 System Pump PUMP (Cat5) INT FIELD CONNECTIONS Rh STAT FIELD CONNECTIONS W ES ES L (AC) N 120 VAC 24VAC Transformer End Switch to Enable Other External Devices Wiring Diagram for proPANEL 90Z Unit in Stand-alone Application proPANEL 90Z Stand Alone MAN AUTO ES Figure 5-6 21 22 www.uponor-usa.com • www.uponor.ca Section 6 Purge/fill Procedure proPANEL 90MZ and Purging the proPANEL 90Z Units: Purging is the act of eliminating the majority of air from a closed-loop hydronic system. This process results in a quiet and trouble-free hydronic system. Refer to the process outlined on pages 23 and 24, as well as Figure 6-1. Purging and Preparation: 1. Make sure you have adequate elevated pressure in the form of city water, pump and well system or transfer pump to force the water into the closed loop system if done properly (30 to 60 psi). 2. Confirm the supply water piping is connected to the point-of-no-pressure change (ET1 and AS1 location) as illustrated in Figure 6-1. This shows a typical bypass make-up assembly, which allows the use of elevated city pressure to purge. 3. If the system being purged has been exposed to or is at freezing temperatures, Uponor recommends using a suitable propylene glycol mixture for the initial purging/fill and warm-up period. 4. Before purging or pressurizing the system, confirm that the expansion tank (ET1) has the proper pre-charge of air, typically 12 to 15 psi. This will cover most one- to three-story structures. Primary and Boiler Purge/fill Procedure: 1. B egin by closing BV4, BV5 and BV6 (both panels). Connect a double-ended hose to the hose bib 1 (HB1) ball-valve style. Confirm the other end is in a purge bucket, five-gallon plastic pail or the nearby floor drain. Then open HB1. 2. Confirm that BV1 and three service valves are open. Slowly open BV2, ensuring that the pressure gauge exceeds 30 psi. This allows the higher pressure fluid to flow into the primary system. The fluid fills the piping and the boiler around to the HB1 and then the hose. 3. Slowly close BV2 until the pressure guage reaches 25 psi. Uponor proPANEL® Series Installation Guide 1. C onnect another hose to HB2; it is part of the ball-valve assembly for the panel isolation. Confirm the other end is in a purge bucket,fivegallon plastic pail or near the drain. Then open HB2. 2. Make sure the three-way valve is in the open position by opening it manually. 3. Open BV6. 4. Open zone valve 1 (ZV1) by removing the thermal actuator. 5. Slowly open BV2, ensuring pressure does not exceed 30 psi. The fluid fills the panel and the piping to HB2 and then runs out of the hose. Keep draining the hose until clear, bubble-free fluid runs out of the hose. 6. Focus on one manifold or heat emitter at a time, purging each loop and zone separately. As the fluid and air return from the system, they will purge out of HB2. 7. Slowly close BV2 and HB2, carefully watching the pressure gauge. Before the system powers up, ensure the system pressure is set at the desired psi, typically 12 to 15. Confirm all hose bibs are closed and all ball valves are open with the exception of BV2 — it remains closed. The system is ready to operate. 8. Close ZV1 by mounting the actuator onto the zone valve body. For Zone 2, repeat steps 4 to 7. 9. Close BV1* from page 24, BV2, HB1 and HB2 10. Open BV3, BV4, BV5 and BV6. * BV1 (Ball-Valve 1) can only be left open after purge is complete if you have an approved back flow preventer in the system. Please check local codes for additional requirements. Purge/fill Procedure proPANEL 90 and 90M Units: 1. C onnect another hose to HB2, (part of the ball-valve assembly for the panel isolation). Confirm the other end is in a purge bucket, five-gallon plastic pail or by the nearby floor drain. Then open HB2. 2. Open BV6, making sure the three-way valve is in the fully open position (e.g., this may be done by manually opening the valve.) 3. Slowly open BV2 again, making sure the pressure gauge doesn't exceed 30 psi. The fluid fills the panel and the piping all the way around to HB2 and then out of the hose. Keep draining the hose until clear, bubble-free fluid runs out of the hose. 23 6. Close BV1*, BV2, HB1 and HB2. 7. Open BV3, BV4, BV5 and BV6. 4. F ocus on one manifold or heat emitter at a time, purging each loop and zone separately. As the fluid and air return from the system, they purge from HB2. 5. Slowly close BV2 and HB2, carefully watching the pressure guage. Before the system is powered up, ensure the system pressure is set at the prescribed psi, typically 12 to 15 psi. Confirm all hose bibs are closed and all ball valves are open with the exception of BV2 — it remains closed. The system is ready to operate. * BV1 (Ball-Valve 1) can only be left open after purge is complete if you have an approved backflow preventer in the system. Please check local codes for additional requirements. Post-purge notes: Confirm that the system’s heating appliance, controls, thermostats, zone valves, actuators and safety devices are working properly before leaving the building for an extended time. AS1 BV4 PRV HB1 C1 BFP BV1 BV2 BV3 BV6 BV5 BV5 HB2 HB2 Control Interface ET1 BV6 C2 Control Interface Make-up Water Connected Here C3 ZV1 ZV2 Supply to Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) Return from Radiant Zone (1 Manifold) Supply To Radiant (Manifold) Return from Radiant (Manifold) Figure 6-1 24 www.uponor-usa.com • www.uponor.ca Section 7 Mechanical Drawings Application Drawing. . . . . . . . . . . . . . . . . . . . . Page proPANEL 90. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 proPANEL 90M . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 proPANEL 90Z. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 proPANEL 90MZ . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 proPANEL 90 Condensing . . . . . . . . . . . . . . . . . . . . . 30 proPANEL 90M Condensing. . . . . . . . . . . . . . . . . . . . 31 proPANEL 90Z Condensing . . . . . . . . . . . . . . . . . . . . 32 proPANEL 90MZ Condensing. . . . . . . . . . . . . . . . . . . 33 proPANEL 90 + 90Z Condensing . . . . . . . . . . . . . . . . 34 proPANEL 90 + 90MZ . . . . . . . . . . . . . . . . . . . . . . . . 35 proPANEL 90 + 90MZ Condensing. . . . . . . . . . . . . . . 36 proPANEL 90M + 90M. . . . . . . . . . . . . . . . . . . . . . . . 37 proPANEL 90M + 90M Condensing. . . . . . . . . . . . . . 38 proPANEL 90M + 90MZ. . . . . . . . . . . . . . . . . . . . . . . 39 proPANEL 90M + 90MZ Condensing. . . . . . . . . . . . . 40 proPANEL 90Z + 90MZ . . . . . . . . . . . . . . . . . . . . . . . 41 proPANEL 90Z + 90MZ Condensing. . . . . . . . . . . . . . 42 proPANEL DHW + 90Z. . . . . . . . . . . . . . . . . . . . . . . . 43 proPANEL DHW + 90Z Condensing. . . . . . . . . . . . . . 44 proPANEL DHW + 90Z + 90MZ. . . . . . . . . . . . . . . . . 45 proPANEL DHW + 90Z + 90MZ Condensing . . . . . . . 46 proPANEL DHW + 90MZ . . . . . . . . . . . . . . . . . . . . . . 47 proPANEL DHW + 90MZ Condensing. . . . . . . . . . . . . 48 Uponor proPANEL® Series Installation Guide 25 26 www.uponor-usa.com • www.uponor.ca Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90 Unit Application Drawing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve = Drain Valve = Spring Check Supply to Radiant Manifold Return from Radiant Manifold Control Interface Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor proPANEL® Series Installation Guide 27 Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90M Unit Application Drawing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve = Drain Valve = Spring Check Supply to Radiant Manifold Return from Radiant Manifold Control Interface Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical 28 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90 + 90MZ Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Manifold Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Return from Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifold) = Drain Valve = Spring Check Supply to Radiant Zone (2 Manifolds) Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Manifold Control Interface Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor proPANEL® Series Installation Guide 29 Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90 + 90Z Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger Return from Radiant Manifold = Globe Valve = Ball Valve Supply to Radiant Manifold = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (1 Manifold) Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Supply to Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) Control Interface 30 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90 Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Supply to Radiant Manifold Return from Radiant Manifold Control Control Interface Interface = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor proPANEL® Series Installation Guide 31 Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90M Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Supply to Radiant Manifold Return from Radiant Manifold Control Interface = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical 32 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90Z Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Return From Radiant Zone (1 Manifold) Return From Radiant Zone (2 Manifolds) Supply To Radiant Zone (1 Manifold) = Drain Valve = Spring Check Supply To Radiant Zone (2 Manifolds) Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor proPANEL® Series Installation Guide 33 Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90MZ Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Return From Radiant Zone (1 Manifold) = Drain Valve = Spring Check Supply to Radiant Zone (2 Manifolds) Supply To Radiant Zone (1 Manifold) Return From Radiant Zone (2 Manifolds) Control Interface Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical 34 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90 + 90Z Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Zone (1 Manifold) Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger Return from Radiant Manifold = Globe Valve = Ball Valve Supply to Radiant Manifold = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (1 Manifold) Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Supply to Radiant Zone (2 Manifolds) Return from Radiant Zone (2 Manifolds) Control Interface Uponor proPANEL® Series Installation Guide 35 Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90 + 90MZ Application Drawing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Manifold Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Return from Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) = Drain Valve = Spring Check Supply to Radiant Zone (1 Manifold) Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Supply to Radiant Zone (2 Manifolds) Return from Radiant Manifold Control Interface Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical 36 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90 + 90MZ Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Manifold Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Return from Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifold) = Drain Valve = Spring Check Supply to Radiant Zone (2 Manifolds) Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Manifold Control Interface Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor proPANEL® Series Installation Guide 37 Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90M + 90M Application Drawing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Manifold Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Return from Radiant Manifold Supply to Radiant Manifold = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Manifold Control Interface Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical 38 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90M+90M Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger Return from Radiant Manifold = Globe Valve = Ball Valve Supply to Radiant Manifold = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Supply to Radiant Manifold Return from Radiant Manifold Control Interface Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor proPANEL® Series Installation Guide 39 Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90M + 90MZ Application Drawing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Return from Radiant Manifold = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (1 Manifold) Supply to Radiant Manifold Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Supply to Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) Control Interface 40 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90M+90MZ Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Zone (1 Manifold) Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger Return from Radiant Manifold = Globe Valve = Ball Valve Supply to Radiant Manifold = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (1 Manifold) Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Supply to Radiant Zone (2 Manifolds) Return from Radiant Zone (2 Manifolds) Control Interface Uponor proPANEL® Series Installation Guide 41 Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90Z + 90MZ = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Zone (4 Manifolds) Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Globe Valve = Ball Valve Return from Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Supply to Radiant Zone (2 Manifolds) Return from Radiant Zone (3 Manifolds) Supply to Radiant Zone (1 Manifold) Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Supply to Radiant Zone (3 Manifolds) Return from Radiant Zone (4 Manifolds) Control Interface 42 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® 90Z + 90MZ Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Zone (3 Manifolds) Control Interface = Zone Valve = Pressure By-pass Valve = Three-way Mixing Valve = Heat Exchanger = Ball Valve = Globe Valve Return from Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifold) = Drain Valve = Spring Check Supply to Radiant Zone (2 Manifolds) Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (3 Manifolds) Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Supply to Radiant Zone (4 Manifolds) Return from Radiant Zone (4 Manifolds) Control Interface Uponor proPANEL® Series Installation Guide 43 Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® DHW + 90Z Application Drawing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Zone (1 Manifold) = Zone Valve = Pressure By-pass Valve = Heat Exchanger Control Interface = Three-way Mixing Valve = Globe Valve = Ball Valve = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (1 Manifold) Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Supply to Radiant Zone (2 Manifolds) Return from Radiant Zone (2 Manifolds) Control Interface 44 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® DHW + 90Z Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Zone (1 Manifold) = Zone Valve = Pressure By-pass Valve = Heat Exchanger Control Interface = Three-way Mixing Valve = Globe Valve = Ball Valve = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (1 Manifold) Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Supply to Radiant Zone (2 Manifolds) Return from Radiant Zone (2 Manifolds) Control Interface Uponor proPANEL® Series Installation Guide 45 Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® DHW + 90Z + 90MZ Application Drawing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Zone (1 Manifold) = Pressure By-pass Valve = Heat Exchanger = Globe Valve = Ball Valve = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Supply to Radiant Zone (2 Manifolds) Date: Checked by: Drawn by: Rep: Project: Return from Radiant Zone (3 Manifolds) Return from Radiant Zone (2 Manifolds) Control Interface Return from Radiant Zone (1 Manifold) = Zone Valve Control Interface = Three-way Mixing Valve Supply to Radiant Zone (3 Manifolds) Supply to Radiant Zone (4 Manifolds) Page 1 of 1 Mechanical Return from Radiant Zone (4 Manifolds) Control Interface 46 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® DHW + 90Z + 90MZ Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill Supply to Radiant Zone (1 Manifold) = Pressure By-pass Valve = Heat Exchanger = Globe Valve = Ball Valve = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Supply to Radiant Zone (2 Manifolds) Return from Radiant Zone (3 Manifolds) Return from Radiant Zone (2 Manifolds) Control Interface Return from Radiant Zone (1 Manifold) = Zone Valve Control Interface = Three-way Mixing Valve Supply to Radiant Zone (3 Manifolds) Supply to Radiant Zone (4 Manifolds) 1 of 1 Mechanical Date: Checked by: Drawn by: Rep: Project: Return from Radiant Zone (4 Manifolds) Control Interface Uponor proPANEL® Series Installation Guide 47 Note: NOTE: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® DHW + 90MZ Application Drawing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill = Zone Valve = Pressure By-pass Valve = Heat Exchanger Control Interface = Three-way Mixing Valve Supply to Radiant Zone (1 Manifold) = Globe Valve = Ball Valve = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (1 Manifold) Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Supply to Radiant Zone (2 Manifolds) Return from Radiant Zone (2 Manifolds) Control Interface 48 www.uponor-usa.com • www.uponor.ca Application Drawing Note: This drawing is conceptual only, not an engineered drawing. It is up to the system designer to determine the necessary components for and configuration of the particular system designed, including additional equipment, isolation relays for loads greater than the control’s specified output ratings) and any safety devices which in the judgement of the designer are appropriate, Certain components may have been left out on this drawing for the purpose of clarity. Mechanical considerations such as tee spacing, flow control, pipe sizing, and pump selection is the responsibility of the installing contractor. Local codes and trade practices must be followed. proPANEL® DHW + 90MZ Condensing = Zone Valve = Pump SYMBOLS = Tempering Valve = Air Separator and Expansion Tank and Fill = Zone Valve = Pressure By-pass Valve = Heat Exchanger Control Interface = Three-way Mixing Valve = Globe Valve = Ball Valve = Drain Valve = Spring Check Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Return from Radiant Zone (1 Manifold) Date: Checked by: Drawn by: Rep: Project: Page 1 of 1 Mechanical Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca Supply to Radiant Zone (2 Manifolds) Supply to Radiant Zone (1 Manifold) Return from Radiant Zone (2 Manifolds) Control Interface Section 8 Quick Reference Flow Charts Flow Chart Page /4" Type L Copper. . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 3 1" Type L Copper. . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 1" Wirsbo hePEX plus Tubing. . . . . . . . . . . . . . . . . . . 52 11/4" Wirsbo hePEX plus Tubing . . . . . . . . . . . . . . . . . 53 /4" Uponor Multi-layer Composite (MLC) Tubing. . . . 54 3 1" Uponor Multi-layer Composite (MLC) Tubing . . . . 55 Uponor proPANEL® Series Installation Guide 49 3/ " 4 Type L Copper Flow in gpm at 10ºF∆T at 15ºF∆T at 20ºF∆T at 25ºF∆T at 30ºF∆T at 12.2ºC∆T at 9.4ºC∆T at 6.6ºC∆T at 3.8ºC∆T at 1.1ºC∆T BTU/h 60,000 58,000 56,000 54,000 52,000 50,000 48,000 46,000 44,000 42,000 40,000 38,000 36,000 34,000 32,000 30,000 28,000 26,000 24,000 22,000 20,000 18,000 16,000 14,000 12,000 10,000 12.0 11.6 11.2 10.8 10.4 10.0 9.6 9.2 8.8 8.4 8.0 7.6 7.2 6.8 6.4 6.0 5.6 5.2 4.8 4.4 4.0 3.6 3.2 2.8 2.4 2.0 8.0 7.7 7.5 7.2 6.9 6.7 6.4 6.1 5.9 5.6 5.3 5.1 4.8 4.5 4.3 4.0 3.7 3.5 3.2 2.9 2.7 2.4 2.1 1.9 1.6 1.3 6.0 5.8 5.6 5.4 5.2 5.0 4.8 4.6 4.4 4.2 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 1.2 1.0 4.8 4.6 4.5 4.3 4.2 4.0 3.8 3.7 3.5 3.4 3.2 3.0 2.9 2.7 2.6 2.4 2.2 2.1 1.9 1.8 1.6 1.4 1.3 1.1 1.0 0.8 4.0 3.9 3.7 3.6 3.5 3.3 3.2 3.1 2.9 2.8 2.7 2.5 2.4 2.3 2.1 2.0 1.9 1.7 1.6 1.5 1.3 1.2 1.1 0.9 0.8 0.7 Note: Shaded areas are not recommended for use. 50 www.uponor-usa.com • www.uponor.ca 1" Type L Copper Flow in gpm at 10ºF∆T at 15ºF∆T at 20ºF∆T at 25ºF∆T at 30ºF∆T at 12.2ºC∆T at 9.4ºC∆T at 6.6ºC∆T at 3.8ºC∆T at 1.1ºC∆T BTU/h 135,000 132,500 130,000 127,500 125,000 122,500 120,000 117,500 115,000 112,500 110,000 107,500 105,000 102,500 100,000 97,500 95,000 92,500 90,000 87,500 85,000 82,500 80,000 77,500 75,000 72,500 70,000 67,500 65,000 62,500 60,000 57,500 55,000 52,500 50,000 47,500 45,000 42,500 40,000 37,500 35,000 32,500 30,000 27,500 25,000 22,500 20,000 27.0 26.5 26.0 25.5 25.0 24.5 24.0 23.5 23.0 22.5 22.0 21.5 21.0 20.5 20.0 19.5 19.0 18.5 18.0 17.5 17.0 16.5 16.0 15.5 15.0 14.5 14.0 13.5 13.0 12.5 12.0 11.5 11.0 10.5 10.0 9.5 9.0 8.5 8.0 7.5 7.0 6.5 6.0 5.5 5.0 4.5 4.0 18.0 17.7 17.3 17.0 16.7 16.3 16.0 15.7 15.3 15.0 14.7 14.3 14.0 13.7 13.3 13.0 12.7 12.3 12.0 11.7 11.3 11.0 10.7 10.3 10.0 9.7 9.3 9.0 8.7 8.3 8.0 7.7 7.3 7.0 6.7 6.3 6.0 5.7 5.3 5.0 4.7 4.3 4.0 3.7 3.3 3.0 2.7 13.5 13.3 13.0 12.8 12.5 12.3 12.0 11.8 11.5 11.3 11.0 10.8 10.5 10.3 10.0 9.8 9.5 9.3 9.0 8.8 8.5 8.3 8.0 7.8 7.5 7.3 7.0 6.8 6.5 6.3 6.0 5.8 5.5 5.3 5.0 4.8 4.5 4.3 4.0 3.8 3.5 3.3 3.0 2.8 2.5 2.3 2.0 10.8 10.6 10.4 10.2 10.0 9.8 9.6 9.4 9.2 9.0 8.8 8.6 8.4 8.2 8.0 7.8 7.6 7.4 7.2 7.0 6.8 6.6 6.4 6.2 6.0 5.8 5.6 5.4 5.2 5.0 4.8 4.6 4.4 4.2 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 9.0 8.8 8.7 8.5 8.3 8.2 8.0 7.8 7.7 7.5 7.3 7.2 7.0 6.8 6.7 6.5 6.3 6.2 6.0 5.8 5.7 5.5 5.3 5.2 5.0 4.8 4.7 4.5 4.3 4.2 4.0 3.8 3.7 3.5 3.3 3.2 3.0 2.8 2.7 2.5 2.3 2.2 2.0 1.8 1.7 1.5 1.3 Note: Shaded areas are not recommended for use. Uponor proPANEL® Series Installation Guide 51 1" Wirsbo hePEX plus Tubing Flow in gpm at 10ºF∆T at 15ºF∆T at 20ºF∆T at 25ºF∆T at 30ºF∆T at 12.2ºC∆T at 9.4ºC∆T at 6.6ºC∆T at 3.8ºC∆T at 1.1ºC∆T 75,000 73,000 71,000 69,000 67,000 65,000 63,000 61,000 59,000 57,000 55,000 53,000 51,000 49,000 47,000 45,000 BTU/h 43,000 41,000 39,000 37,000 35,000 33,000 31,000 29,000 27,000 25,000 23,000 21,000 19,000 17,000 15,000 15.0 14.6 14.2 13.8 13.4 13.0 12.6 12.2 11.8 11.4 11.0 10.6 10.2 9.8 9.4 9.0 8.6 8.2 7.8 7.4 7.0 6.6 6.2 5.8 5.4 5.0 4.6 4.2 3.8 3.4 3.0 10.0 9.7 9.5 9.2 8.9 8.7 8.4 8.1 7.9 7.6 7.3 7.1 6.8 6.5 6.3 6.0 5.7 5.5 5.2 4.9 4.7 4.4 4.1 3.9 3.6 3.3 3.1 2.8 2.5 2.3 2.0 7.5 7.3 7.1 6.9 6.7 6.5 6.3 6.1 5.9 5.7 5.5 5.3 5.1 4.9 4.7 4.5 4.3 4.1 3.9 3.7 3.5 3.3 3.1 2.9 2.7 2.5 2.3 2.1 1.9 1.7 1.5 6.0 5.8 5.7 5.5 5.4 5.2 5.0 4.9 4.7 4.6 4.4 4.2 4.1 3.9 3.8 3.6 3.4 3.3 3.1 3.0 2.8 2.6 2.5 2.3 2.2 2.0 1.8 1.7 1.5 1.4 1.2 5.0 4.9 4.7 4.6 4.5 4.3 4.2 4.1 3.9 3.8 3.7 3.5 3.4 3.3 3.1 3.0 2.9 2.7 2.6 2.5 2.3 2.2 2.1 1.9 1.8 1.7 1.5 1.4 1.3 1.1 1.0 Note: Shaded areas are not recommended for use. 52 www.uponor-usa.com • www.uponor.ca 11/4" Wirsbo hePEX plus Tubing Flow in gpm at 10ºF∆T at 15ºF∆T at 20ºF∆T at 25ºF∆T at 30ºF∆T at 12.2ºC∆T at 9.4ºC∆T at 6.6ºC∆T at 3.8ºC∆T at 1.1ºC∆T 135,000 130,000 125,000 120,000 115,000 110,000 105,000 100,000 95,000 90,000 85,000 80,000 BTU/h 75,000 70,000 65,000 60,000 55,000 50,000 45,000 40,000 35,000 30,000 25,000 20,000 27.0 26.0 25.0 24.0 23.0 22.0 21.0 20.0 19.0 18.0 17.0 16.0 15.0 14.0 13.0 12.0 11.0 10.0 9.0 8.0 7.0 6.0 5.0 4.0 18.0 17.3 16.7 16.0 15.3 14.7 14.0 13.3 12.7 12.0 11.3 10.7 10.0 9.3 8.7 8.0 7.3 6.7 6.0 5.3 4.7 4.0 3.3 2.7 13.5 13.0 12.5 12.0 11.5 11.0 10.5 10.0 9.5 9.0 8.5 8.0 7.5 7.0 6.5 6.0 5.5 5.0 4.5 4.0 3.5 3.0 2.5 2.0 10.8 10.4 10.0 9.6 9.2 8.8 8.4 8.0 7.6 7.2 6.8 6.4 6.0 5.6 5.2 4.8 4.4 4.0 3.6 3.2 2.8 2.4 2.0 1.6 9.0 8.7 8.3 8.0 7.7 7.3 7.0 6.7 6.3 6.0 5.7 5.3 5.0 4.7 4.3 4.0 3.7 3.3 3.0 2.7 2.3 2.0 1.7 1.3 Note: Shaded areas are not recommended for use. Uponor proPANEL® Series Installation Guide 53 3/ " 4 Uponor Multi-layer Composite (MLC) Tubing Flow in gpm at 10ºF∆T at 15ºF∆T at 20ºF∆T at 25ºF∆T at 30ºF∆T at 12.2ºC∆T at 9.4ºC∆T at 6.6ºC∆T at 3.8ºC∆T at 1.1ºC∆T BTU/h 60,000 58,000 56,000 54,000 52,000 50,000 48,000 46,000 44,000 42,000 40,000 38,000 36,000 34,000 32,000 30,000 28,000 26,000 24,000 22,000 20,000 18,000 16,000 14,000 12,000 10,000 12.0 11.6 11.2 10.8 10.4 10.0 9.6 9.2 8.8 8.4 8.0 7.6 7.2 6.8 6.4 6.0 5.6 5.2 4.8 4.4 4.0 3.6 3.2 2.8 2.4 2.0 8.0 7.7 7.5 7.2 6.9 6.7 6.4 6.1 5.9 5.6 5.3 5.1 4.8 4.5 4.3 4.0 3.7 3.5 3.2 2.9 2.7 2.4 2.1 1.9 1.6 1.3 6.0 5.8 5.6 5.4 5.2 5.0 4.8 4.6 4.4 4.2 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 1.2 1.0 4.8 4.6 4.5 4.3 4.2 4.0 3.8 3.7 3.5 3.4 3.2 3.0 2.9 2.7 2.6 2.4 2.2 2.1 1.9 1.8 1.6 1.4 1.3 1.1 1.0 0.8 4.0 3.9 3.7 3.6 3.5 3.3 3.2 3.1 2.9 2.8 2.7 2.5 2.4 2.3 2.1 2.0 1.9 1.7 1.6 1.5 1.3 1.2 1.1 0.9 0.8 Note: Shaded areas are not recommended for use. 54 www.uponor-usa.com • www.uponor.ca 1" Uponor Multi-layer Composite (MLC) Tubing Flow in gpm at 10ºF∆T at 15ºF∆T at 20ºF∆T at 25ºF∆T at 30ºF∆T at 12.2ºC∆T at 9.4ºC∆T at 6.6ºC∆T at 3.8ºC∆T at 1.1ºC∆T 120,000 115,000 110,000 105,000 100,000 95,000 90,000 85,000 80,000 75,000 BTU/h 70,000 65,000 60,000 55,000 50,000 45,000 40,000 35,000 30,000 25,000 20,000 24.0 23.0 22.0 21.0 20.0 19.0 18.0 17.0 16.0 15.0 14.0 13.0 12.0 11.0 10.0 9.0 8.0 7.0 6.0 5.0 4.0 16.0 15.3 14.7 14.0 13.3 12.7 12.0 11.3 10.7 10.0 9.3 8.7 8.0 7.3 6.7 6.0 5.3 4.7 4.0 3.3 2.7 12.0 11.5 11.0 10.5 10.0 9.5 9.0 8.5 8.0 7.5 7.0 6.5 6.0 5.5 5.0 4.5 4.0 3.5 3.0 2.5 2.0 9.6 9.2 8.8 8.4 8.0 7.6 7.2 6.8 6.4 6.0 5.6 5.2 4.8 4.4 4.0 3.6 3.2 2.8 2.4 2.0 1.6 8.0 7.7 7.3 7.0 6.7 6.3 6.0 5.7 5.3 5.0 4.7 4.3 4.0 3.7 3.3 3.0 2.7 2.3 2.0 1.7 1.3 Note: Shaded areas are not recommended for use. Uponor proPANEL® Series Installation Guide 55 56 www.uponor-usa.com • www.uponor.ca Section 9 Pressure Loss Charts Pressure Loss Chart Page /4" Type L Copper. . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 3 1" Type L Copper. . . . . . . . . . . . . . . . . . . . . . . . . . . . 59 11/4" Type L Copper. . . . . . . . . . . . . . . . . . . . . . . . . . . 59 1 " Wirsbo hePEX plus Tubing and Wirsbo AQUAPEX Tubing. . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 11/4" Wirsbo hePEX plus Tubing and Wirsbo AQUAPEX Tubing. . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 /4" Uponor Multi-layer Composite (MLC) Tubing. . . . 61 3 1" Uponor Multi-layer Composite (MLC) Tubing . . . . 61 Uponor proPANEL® Series Installation Guide 57 3/4" Type L Copper Pressure Loss Per Foot Head (Feet of Water) Per Foot of Tubing 58 gpm ft/sec 120ºF 48.9ºC 140ºF 60ºC 160ºF 71.1ºC 180ºF 82.2ºC 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 4.0 1.47 1.54 1.62 1.69 1.76 1.84 1.91 1.98 2.06 2.13 2.21 2.28 2.35 2.43 2.50 2.57 2.65 2.72 2.79 2.87 2.94 0.0076 0.0083 0.0091 0.0098 0.0107 0.0115 0.0124 0.0133 0.0142 0.0151 0.0161 0.0171 0.0182 0.0192 0.0203 0.0214 0.0226 0.0238 0.0250 0.0262 0.0274 0.0073 0.0080 0.0087 0.0095 0.0102 0.0111 0.0119 0.0127 0.0136 0.0145 0.0155 0.0165 0.0175 0.0185 0.0195 0.0206 0.0217 0.0228 0.0240 0.0252 0.0264 0.0070 0.0077 0.0084 0.0091 0.0098 0.0106 0.0114 0.0122 0.0131 0.0140 0.0149 0.0158 0.0168 0.0177 0.0187 0.0198 0.0208 0.0219 0.0230 0.0242 0.0253 0.0069 0.0075 0.0082 0.0089 0.0096 0.0104 0.0112 0.0120 0.0128 0.0137 0.0146 0.0155 0.0164 0.0174 0.0184 0.0194 0.0204 0.0215 0.0226 0.0237 0.0248 www.uponor-usa.com • www.uponor.ca 11/4" Type L Copper 1" Type L Copper Pressure Loss Per Foot Pressure Loss Per Foot Head (Feet of Water) Per Foot of Tubing o gpm 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 9.0 o o 120 F 48.9ºC 140 F ft/sec 60ºC 71.1ºC 82.2ºC 1.56 1.60 1.64 1.68 1.72 1.76 1.80 1.84 1.88 1.92 1.95 1.99 2.03 2.07 2.11 2.15 2.19 2.23 2.27 2.31 2.35 2.38 2.42 2.46 2.50 2.54 2.58 2.62 2.66 2.70 2.74 2.78 2.81 2.85 2.89 2.93 2.97 3.01 3.05 3.09 3.13 3.17 3.21 3.24 3.28 3.32 3.36 3.40 3.44 3.48 3.52 0.0113 0.0118 0.0123 0.0129 0.0134 0.0139 0.0145 0.0150 0.0156 0.0162 0.0168 0.0174 0.0180 0.0186 0.0192 0.0199 0.0205 0.0212 0.0218 0.0225 0.0232 0.0239 0.0246 0.0253 0.0260 0.0267 0.0275 0.0282 0.0290 0.0297 0.0305 0.0313 0.0321 0.0329 0.0337 0.0345 0.0353 0.0361 0.0370 0.0378 0.0387 0.0395 0.0404 0.0413 0.0422 0.0431 0.0440 0.0449 0.0458 0.0468 0.0477 0.0109 0.0114 0.0119 0.0124 0.0129 0.0134 0.0139 0.0145 0.0150 0.0156 0.0162 0.0167 0.0173 0.0179 0.0185 0.0191 0.0198 0.0204 0.0210 0.0217 0.0223 0.0230 0.0237 0.0244 0.0251 0.0258 0.0265 0.0272 0.0279 0.0287 0.0294 0.0302 0.0309 0.0317 0.0325 0.0333 0.0341 0.0349 0.0357 0.0365 0.0373 0.0382 0.0390 0.0399 0.0407 0.0416 0.0425 0.0434 0.0443 0.0452 0.0461 0.0105 0.0110 0.0114 0.0119 0.0124 0.0129 0.0134 0.0140 0.0145 0.0150 0.0156 0.0162 0.0167 0.0173 0.0179 0.0185 0.0191 0.0197 0.0203 0.0209 0.0216 0.0222 0.0229 0.0235 0.0242 0.0249 0.0256 0.0263 0.0270 0.0277 0.0284 0.0291 0.0299 0.0306 0.0314 0.0321 0.0329 0.0337 0.0345 0.0353 0.0361 0.0369 0.0377 0.0385 0.0394 0.0402 0.0411 0.0419 0.0428 0.0437 0.0446 0.0102 0.0107 0.0111 0.0116 0.0121 0.0126 0.0131 0.0136 0.0141 0.0146 0.0152 0.0157 0.0163 0.0168 0.0174 0.0180 0.0186 0.0192 0.0198 0.0204 0.0210 0.0216 0.0223 0.0229 0.0236 0.0242 0.0249 0.0256 0.0263 0.0270 0.0277 0.0284 0.0291 0.0298 0.0306 0.0313 0.0321 0.0328 0.0336 0.0344 0.0352 0.0360 0.0368 0.0376 0.0384 0.0392 0.0401 0.0409 0.0417 0.0426 0.0435 Uponor proPANEL® Series Installation Guide 160 F Head (Feet of Water) Per Foot of Tubing 140 oF 160 oF 180 oF 120 oF o 180 F gpm 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 11.0 ft/sec 48.9ºC 60ºC 71.1ºC 82.2ºC 1.54 1.56 1.59 1.61 1.64 1.66 1.69 1.72 1.74 1.77 1.79 1.82 1.84 1.87 1.90 1.92 1.95 1.97 2.00 2.02 2.05 2.07 2.10 2.13 2.15 2.18 2.20 2.23 2.25 2.28 2.30 2.33 2.36 2.38 2.41 2.43 2.46 2.48 2.51 2.54 2.56 2.59 2.61 2.64 2.66 2.69 2.71 2.74 2.77 2.79 2.82 0.0085 0.0087 0.0090 0.0093 0.0095 0.0098 0.0101 0.0103 0.0106 0.0109 0.0112 0.0114 0.0117 0.0120 0.0123 0.0126 0.0129 0.0132 0.0135 0.0138 0.0141 0.0145 0.0148 0.0151 0.0154 0.0158 0.0161 0.0164 0.0168 0.0171 0.0174 0.0178 0.0181 0.0185 0.0188 0.0192 0.0196 0.0199 0.0203 0.0207 0.0210 0.0214 0.0218 0.0222 0.0226 0.0229 0.0233 0.0237 0.0241 0.0245 0.0249 0.0082 0.0084 0.0087 0.0089 0.0092 0.0094 0.0097 0.0099 0.0102 0.0105 0.0108 0.0110 0.0113 0.0116 0.0119 0.0122 0.0124 0.0127 0.0130 0.0133 0.0136 0.0139 0.0142 0.0146 0.0149 0.0152 0.0155 0.0158 0.0162 0.0165 0.0168 0.0172 0.0175 0.0178 0.0182 0.0185 0.0189 0.0192 0.0196 0.0199 0.0203 0.0207 0.0210 0.0214 0.0218 0.0221 0.0225 0.0229 0.0233 0.0237 0.0241 0.0079 0.0081 0.0084 0.0086 0.0088 0.0091 0.0093 0.0096 0.0099 0.0101 0.0104 0.0106 0.0109 0.0112 0.0115 0.0117 0.0120 0.0123 0.0126 0.0129 0.0132 0.0135 0.0138 0.0141 0.0144 0.0147 0.0150 0.0153 0.0156 0.0159 0.0162 0.0166 0.0169 0.0172 0.0176 0.0179 0.0182 0.0186 0.0189 0.0193 0.0196 0.0200 0.0203 0.0207 0.0210 0.0214 0.0218 0.0221 0.0225 0.0229 0.0233 0.0077 0.0079 0.0081 0.0084 0.0086 0.0089 0.0091 0.0093 0.0096 0.0098 0.0101 0.0104 0.0106 0.0109 0.0112 0.0114 0.0117 0.0120 0.0123 0.0125 0.0128 0.0131 0.0134 0.0137 0.0140 0.0143 0.0146 0.0149 0.0152 0.0155 0.0158 0.0161 0.0165 0.0168 0.0171 0.0174 0.0178 0.0181 0.0184 0.0188 0.0191 0.0195 0.0198 0.0202 0.0205 0.0209 0.0212 0.0216 0.0219 0.0223 0.0227 59 1" Wirsbo hePEX plus Tubing and Wirsbo AQUAPEX Tubing 11/4" Wirsbo hePEX plus Tubing and Wirsbo AQUAPEX Tubing Pressure Loss Per Foot Pressure Loss Per Foot Head (Feet of Water) Per Foot of Tubing gpm 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0 4.2 4.4 4.6 4.8 5.0 5.2 5.4 5.6 5.8 6.0 6.2 6.4 6.6 6.8 7.0 7.2 7.4 7.6 7.8 8.0 8.2 8.4 8.6 8.8 9.0 9.2 9.4 9.6 9.8 10.0 10.2 10.4 10.6 10.8 11.0 60 Head (Feet of Water) Per Foot of Tubing 80ºF 26.7ºC 100ºF 37.8ºC 120ºF 48.9ºC 140ºF 60ºC 160ºF 71.1ºC 180ºF 82.2ºC 0.00757 0.00898 0 .01050 0.01211 0 .01383 0.01565 0.01757 0 .01959 0.02170 0.02391 0 .02621 0.02861 0 .03110 0.03368 0.03635 0.03911 0.04196 0.04491 0.04793 0.05105 0.05426 0.05755 0.06092 0.06439 0.06793 0.07157 0.07528 0.07908 0.08297 0.08693 0.09098 0.09511 0.09932 0.10361 0.10799 0.11244 0.11697 0.12159 0.12628 0.13106 0.13591 0.14084 0.14585 0.15093 0.15610 0.16134 0.00717 0.00850 0.00994 0.01147 0.01310 0.01482 0.01664 0.01855 0.02056 0.02265 0.02484 0.02711 0.02947 0.03192 0.03445 0.03708 0.03978 0.04257 0.04545 0.04841 0.05145 0.05457 0.05778 0.06106 0.06443 0.06788 0.07141 0.07502 0.07870 0.08247 0.08631 0.09023 0.09423 0.09831 0.10246 0.10669 0.11100 0.11538 0.11984 0.12438 0.12899 0.13367 0.13843 0.14326 0.14817 0.15315 0.00685 0.00812 0.00949 0.01096 0.01252 0.01417 0.01591 0.01773 0.01965 0.02165 0.02374 0.02592 0.02818 0.03052 0.03295 0.03545 0.03804 0.04071 0.04347 0.04630 0.04921 0.05220 0.05527 0.05841 0.06164 0.06494 0.06832 0.07177 0.07530 0.07891 0.08259 0.08635 0.09018 0.09408 0.09806 0.10211 0.10624 0.11044 0.11471 0.11905 0.12346 0.12795 0.13251 0.13714 0.14184 0.14662 0.00661 0.00785 0.00917 0.01059 0.01209 0.01369 0.01537 0.01713 0.01899 0.02092 0.02294 0.02505 0.02723 0.02950 0.03184 0.03427 0.03677 0.03936 0.04202 0.04476 0.04757 0.05046 0.05343 0.05648 0.05960 0.06279 0.06606 0.06940 0.07282 0.07630 0.07987 0.08350 0.08721 0.09099 0.09484 0.09876 0.10275 0.10681 0.11095 0.11515 0.11942 0.12377 0.12818 0.13266 0.13721 0.14183 0.00645 0.00765 0.00894 0.01032 0.01179 0.01335 0.01499 0.01671 0.01852 0.02041 0.02238 0.02443 0.02656 0.02877 0.03106 0.03343 0.03588 0.03840 0.04099 0.04367 0.04642 0.04924 0.05214 0.05511 0.05815 0.06127 0.06446 0.06772 0.07106 0.07446 0.07794 0.08149 0.08511 0.08880 0.09256 0.09639 0.10028 0.10425 0.10829 0.11239 0.11657 0.12081 0.12511 0.12949 0.13394 0.13845 0.00632 0.00749 0.00876 0.01011 0.01155 0.01307 0.01468 0.01637 0.01814 0.01999 0.02193 0.02394 0.02603 0.02819 0.03044 0.03276 0.03515 0.03762 0.04017 0.04279 0.04548 0.04825 0.05109 0.05400 0.05699 0.06005 0.06317 0.06637 0.06964 0.07298 0.07639 0.07987 0.08341 0.08703 0.09072 0.09447 0.09829 0.10218 0.10614 0.11016 0.11425 0.11841 0.12264 0.12693 0.13129 0.13571 gpm 3.0 3.2 3.4 3.6 3.8 4.0 4.2 4.4 4.6 4.8 5.0 5.2 5.4 5.6 5.8 6.0 6.2 6.4 6.6 6.8 7.0 7.2 7.4 7.6 7.8 8.0 8.2 8.4 8.6 8.8 9.0 9.2 9.4 9.6 9.8 10.0 10.2 10.4 10.6 10.8 11.0 11.2 11.4 11.6 11.8 12.0 12.2 12.4 12.6 12.8 13.0 13.2 13.4 13.6 13.8 14.0 80ºF 26.7ºC 100ºF 37.8ºC 120ºF 48.9ºC 140ºF 60ºC 160ºF 71.1ºC 180ºF 82.2ºC 0.00597 0.00670 0.00747 0.00828 0.00912 0.01000 0.01091 0.01186 0.01284 0.01386 0.01492 0.01600 0.01712 0.01828 0.01947 0.02069 0.02194 0.02323 0.02455 0.02590 0.02728 0.02870 0.03014 0.03162 0.03313 0.03467 0.03625 0.03785 0.03948 0.04115 0.04285 0.04457 0.04633 0.04812 0.04993 0.05178 0.05366 0.05556 0.05750 0.05947 0.06146 0.06348 0.06554 0.06762 0.06973 0.07187 0.07404 0.07624 0.07847 0.08073 0.08301 0.08532 0.08766 0.09003 0.09243 0.09486 0.00566 0.00635 0.00708 0.00784 0.00864 0.00947 0.01034 0.01124 0.01217 0.01314 0.01413 0.01517 0.01623 0.01732 0.01845 0.01961 0.02080 0.02202 0.02327 0.02455 0.02587 0.02721 0.02858 0.02999 0.03142 0.03288 0.03438 0.03590 0.03745 0.03903 0.04064 0.04228 0.04395 0.04565 0.04737 0.04913 0.05091 0.05272 0.05456 0.05642 0.05832 0.06024 0.06219 0.06417 0.06618 0.06821 0.07027 0.07236 0.07448 0.07662 0.07879 0.08099 0.08321 0.08546 0.08774 0.09005 0.00540 0.00607 0.00676 0.00749 0.00826 0.00905 0.00988 0.01074 0.01163 0.01256 0.01351 0.01450 0.01552 0.01656 0.01764 0.01875 0.01989 0.02106 0.02225 0.02348 0.02474 0.02602 0.02734 0.02868 0.03006 0.03146 0.03289 0.03434 0.03583 0.03734 0.03888 0.04045 0.04205 0.04368 0.04533 0.04701 0.04872 0.05045 0.05221 0.05400 0.05581 0.05766 0.05952 0.06142 0.06334 0.06529 0.06726 0.06927 0.07129 0.07335 0.07543 0.07753 0.07966 0.08182 0.08400 0.08621 0.00522 0.00586 0.00653 0.00724 0.00798 0.00875 0.00955 0.01038 0.01124 0.01213 0.01306 0.01401 0.01499 0.01601 0.01705 0.01812 0.01922 0.02035 0.02151 0.02270 0.02391 0.02516 0.02643 0.02773 0.02906 0.03041 0.03179 0.03320 0.03464 0.03611 0.03760 0.03912 0.04066 0.04223 0.04383 0.04546 0.04711 0.04879 0.05049 0.05222 0.05398 0.05576 0.05757 0.05941 0.06127 0.06315 0.06506 0.06700 0.06896 0.07095 0.07296 0.07500 0.07706 0.07915 0.08126 0.08340 0.00509 0.00571 0.00637 0.00706 0.00778 0.00853 0.00931 0.01012 0.01096 0.01184 0.01274 0.01367 0.01463 0.01562 0.01663 0.01768 0.01875 0.01986 0.02099 0.02215 0.02333 0.02455 0.02579 0.02706 0.02835 0.02968 0.03103 0.03240 0.03380 0.03523 0.03669 0.03817 0.03968 0.04122 0.04278 0.04436 0.04598 0.04762 0.04928 0.05097 0.05268 0.05443 0.05619 0.05798 0.05980 0.06164 0.06351 0.06540 0.06731 0.06925 0.07122 0.07321 0.07522 0.07726 0.07933 0.08141 0.00498 0.00560 0.00624 0.00692 0.00762 0.00836 0.00912 0.00992 0.01074 0.01160 0.01248 0.01339 0.01433 0.01530 0.01630 0.01732 0.01838 0.01946 0.02057 0.02170 0.02286 0.02405 0.02527 0.02651 0.02778 0.02908 0.03040 0.03175 0.03313 0.03453 0.03596 0.03741 0.03889 0.04039 0.04193 0.04348 0.04506 0.04667 0.04830 0.04996 0.05164 0.05334 0.05508 0.05683 0.05861 0.06042 0.06225 0.06410 0.06598 0.06788 0.06981 0.07176 0.07374 0.07574 0.07776 0.07981 www.uponor-usa.com • www.uponor.ca 3/4" Uponor Multi-layer Composite (MLC) Tubing 1" Uponor Multi-layer Composite (MLC) Tubing Pressure Loss Per Foot Pressure Loss Per Foot Head (Feet of Water) Per Foot of Tubing Head (Feet of Water) Per Foot of Tubing gpm 80ºF 26.7ºC 100ºF 37.8ºC 140ºF 60ºC 160ºF 71.1ºC 180ºF 82.2ºC 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0 4.2 4.4 4.6 4.8 5.0 5.2 5.4 5.6 5.8 6.0 6.2 6.4 6.6 6.8 7.0 7.2 7.4 7.6 7.8 8.0 8.2 8.4 8.6 8.8 9.0 120ºF 48.9ºC 0.00329 0.00456 0.00600 0.00762 0.00941 0.01136 0.01348 0.01575 0.01817 0.02075 0.02348 0.02636 0.02939 0.03256 0.03588 0.03933 0.04293 0.04667 0.05054 0.05456 0.05870 0.06299 0.06740 0.07195 0.07663 0.08144 0.08639 0.09146 0.09666 0.10198 0.10744 0.11302 0.11873 0.12456 0.13051 0.13659 0.14279 0.14912 0.15557 0.16214 0.16883 0.00311 0.00431 0.00568 0.00721 0.00891 0.01076 0.01276 0.01491 0.01721 0.01966 0.02225 0.02498 0.02785 0.03086 0.03400 0.03728 0.04069 0.04424 0.04791 0.05172 0.05566 0.05972 0.06391 0.06823 0.07267 0.07724 0.08193 0.08674 0.09168 0.09674 0.10192 0.10722 0.11264 0.11817 0.12383 0.12960 0.13550 0.14150 0.14763 0.15387 0.16022 0.00297 0.00412 0.00542 0.00689 0.00851 0.01028 0.01219 0.01425 0.01645 0.01879 0.02126 0.02387 0.02662 0.02950 0.03250 0.03564 0.03891 0.04230 0.04582 0.04946 0.05323 0.05712 0.06113 0.06526 0.06951 0.07389 0.07838 0.08299 0.08771 0.09256 0.09752 0.10259 0.10778 0.11308 0.11850 0.12403 0.12967 0.13543 0.14129 0.14727 0.15336 0.00287 0.00397 0.00524 0.00665 0.00822 0.00992 0.01177 0.01376 0.01589 0.01815 0.02054 0.02307 0.02572 0.02850 0.03141 0.03444 0.03760 0.04088 0.04428 0.04781 0.05145 0.05521 0.05909 0.06309 0.06720 0.07143 0.07578 0.08024 0.08481 0.08950 0.09430 0.09920 0.10423 0.10936 0.11460 0.11995 0.12541 0.13098 0.13666 0.14244 0.14833 0.0028 0.0038 0.0051 0.0064 0.0080 0.0096 0.0114 0.0134 0.0155 0.0177 0.0200 0.0225 0.0250 0.0278 0.0306 0.0336 0.0366 0.0398 0.0432 0.0466 0.0502 0.0538 0.0576 0.0615 0.0655 0.0697 0.0739 0.0783 0.0827 0.0873 0.0920 0.0968 0.1017 0.1067 0.1118 0.1170 0.1224 0.1278 0.1333 0.1390 0.1447 0.00274 0.00379 0.00500 0.00635 0.00785 0.00948 0.01125 0.01315 0.01518 0.01734 0.01963 0.02204 0.02458 0.02724 0.03002 0.03292 0.03594 0.03908 0.04233 0.04570 0.04919 0.05279 0.05650 0.06032 0.06426 0.06831 0.07246 0.07673 0.08111 0.08559 0.09018 0.09488 0.09969 0.10460 0.10962 0.11474 0.11997 0.12530 0.13073 0.13627 0.14191 Uponor proPANEL® Series Installation Guide gpm 3.0 3.2 3.4 3.6 3.8 4.0 4.2 4.4 4.6 4.8 5.0 5.2 5.4 5.6 5.8 6.0 6.2 6.4 6.6 6.8 7.0 7.2 7.4 7.6 7.8 8.0 8.2 8.4 8.6 8.8 9.0 9.2 9.4 9.6 9.8 10.0 10.2 10.4 10.6 10.8 11.0 11.2 11.4 11.6 11.8 12.0 12.2 12.4 12.6 12.8 13.0 13.2 13.4 13.6 13.8 14.0 80ºF 26.7ºC 100ºF 37.8ºC 120ºF 48.9ºC 140ºF 60ºC 160ºF 71.1ºC 180ºF 82.2ºC 0.00719 0.00807 0.00899 0 .00996 0 .01098 0.01203 0.01313 0.01428 0 .01546 0.01669 0.01795 0.01926 0.02061 0 .02200 0.02343 0.02490 0.02641 0.02796 0.02955 0.03118 0.03284 0.03455 0.03629 0.03807 0.03989 0.04174 0.04364 0.04557 0.04754 0.04954 0.05158 0.05366 0.05578 0.05793 0.06012 0.06234 0.06460 0.06690 0.06923 0.07160 0.07400 0.07644 0.07891 0.08142 0.08396 0.08654 0.08915 0.09180 0.09448 0.09720 0.09995 0.10273 0.10555 0.10841 0.11129 0.11422 0.00681 0.00764 0.00852 0.00944 0.01040 0.01140 0.01244 0.01353 0.01465 0.01581 0.01702 0.01826 0.01954 0.02086 0.02221 0.02361 0.02504 0.02651 0.02802 0.02956 0.03114 0.03276 0.03441 0.03610 0.03783 0.03959 0.04139 0.04322 0.04509 0.04699 0.04893 0.05091 0.05292 0.05496 0.05704 0.05915 0.06130 0.06348 0.06569 0.06794 0.07022 0.07254 0.07489 0.07727 0.07969 0.08214 0.08462 0.08713 0.08968 0.09226 0.09488 0.09752 0.10020 0.10291 0.10566 0.10843 0.00650 0.00730 0.00814 0.00902 0.00994 0.01090 0.01189 0.01293 0.01400 0.01512 0.01627 0.01746 0.01868 0.01994 0.02124 0.02257 0.02395 0.02535 0.02679 0.02827 0.02979 0.03133 0.03292 0.03454 0.03619 0.03787 0.03960 0.04135 0.04314 0.04496 0.04682 0.04871 0.05063 0.05259 0.05458 0.05660 0.05866 0.06075 0.06287 0.06502 0.06721 0.06943 0.07168 0.07396 0.07628 0.07862 0.08100 0.08341 0.08585 0.08833 0.09083 0.09337 0.09593 0.09853 0.10116 0.10382 0.00628 0.00705 0.00786 0.00871 0.00960 0.01053 0.01149 0.01249 0.01353 0.01461 0.01572 0.01687 0.01805 0.01927 0.02053 0.02182 0.02315 0.02451 0.02590 0.02733 0.02879 0.03029 0.03182 0.03339 0.03499 0.03662 0.03828 0.03998 0.04171 0.04348 0.04527 0.04710 0.04896 0.05086 0.05278 0.05474 0.05673 0.05875 0.06080 0.06289 0.06500 0.06715 0.06933 0.07154 0.07378 0.07605 0.07835 0.08068 0.08305 0.08544 0.08787 0.09032 0.09281 0.09532 0.09787 0.10044 0.00613 0.00688 0.00767 0.00850 0.00936 0.01027 0.01121 0.01219 0.01320 0.01425 0.01534 0.01646 0.01761 0.01880 0.02003 0.02129 0.02258 0.02391 0.02527 0.02667 0.02809 0.02956 0.03105 0.03258 0.03414 0.03573 0.03736 0.03902 0.04071 0.04243 0.04418 0.04597 0.04779 0.04963 0.05151 0.05342 0.05537 0.05734 0.05934 0.06138 0.06345 0.06554 0.06767 0.06983 0.07201 0.07423 0.07648 0.07876 0.08106 0.08340 0.08577 0.08817 0.09059 0.09305 0.09554 0.09805 0.00600 0.00674 0.00751 0.00833 0.00917 0.01006 0.01098 0.01194 0.01293 0.01396 0.01503 0.01612 0.01726 0.01842 0.01962 0.02086 0.02213 0.02343 0.02476 0.02613 0.02753 0.02896 0.03043 0.03193 0.03346 0.03502 0.03661 0.03824 0.03989 0.04158 0.04330 0.04505 0.04683 0.04864 0.05049 0.05236 0.05427 0.05620 0.05817 0.06016 0.06219 0.06424 0.06633 0.06844 0.07059 0.07276 0.07496 0.07720 0.07946 0.08175 0.08407 0.08643 0.08880 0.09121 0.09365 0.09612 61 62 www.uponor-usa.com • www.uponor.ca Section 10 Troubleshooting Issue Indication Thermostats are calling for heat, but the actuators are not on. The actuators are not warm. The temperature does not rise on the secondary side (supply to the floor). The piping after the proPANEL unit is not warm. The interface's yellow LED is not lit. Causes Solution Faulty thermostat or faulty actuator wiring Check wiring and connections correct; if necessary. Faulty control interface Replace the interface. The mixing is not working. Check that the wiring for the mixing valve is correct. The pump is not running. Isolation valves are closed. Ensure the sensors are connected correctly. Make sure that the interface has power. Check the isolation valves. Consult the Climate Cŏntrol - Multifunction Installation Guide. Pump is not running. The pump relay's red LED is not lit. No power to the pump Check that the plug is correctly applied. No control signal from the interface Make sure the pump relay is correctly connected and the interface has power. If thermostats are used to start the pump, ensure the stats are active, or check the wiring. Consult the Climate Cŏntrol - Multifunction Installation Guide. The mixing is not working correctly. The mixed temperature is too high or too low. The mixing valve or motor is faulty or malfunctioning. The Climate Cŏntrol Multifunction unit is malfunctioning or setup The electric devices in the panel are not working. The interface's red LED is lit. The green or red LED for power is not lit. Check for loose contacts (sensors). Consult the Climate Cŏntrol - Multifunction Installation Guide. Replace the mixing valve and/or motor. The polarity of the 24VAC power supply to the interface is wrong. Check the polarity of 24VAC power supply to the control interface and the Climate Cŏntrol Multifunction unit. No or faulty wiring Check the wiring between the transformer and the interface. Faulty interface Replace the interface. Thermostats are calling for heat, but the actuators are not opening. The actuators are cold. Faulty wiring Check the wiring. The interface's yellow LED for the heat-demand connections is not lit. Faulty interface Replace the interface. The interface's red LED for the actuator connections is not lit. Uponor proPANEL® Series Installation Guide 63 proPANEL_InsG_1-08, Copyright © 2008 Uponor, Inc. Printed in the United States Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca