Montoursville Area School District

Transcription

Montoursville Area School District
Montoursville Area School District
Montoursville Area High School
Additions & Renovations
Crabtree, Rohrbaugh & Associates, Architects
EXISTING SITE PLAN
NEW SITE PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
THIRD FLOOR PLAN
MAIN ENTRANCE CORRIDOR
CAFETERIA
TYPICAL CLASSROOM
TYPICAL COMPUTER LAB
TYPICAL SCIENCE LAB
ART CLASSROOMS
FLEX CLASSROOM
LARGE GROUP INSTRUCTION
LIBRARY
BAND CLASSROOM
CHORAL CLASSROOM
AUDITORIUM
VINYL
COMPOSITION
TILE
PAINT
TERRAZZO
FIRST FLOOR
FLOOR PATTERNS
SECOND & THIRD FLOOR
FLOOR PATTERNS
Main Entrance
Classroom Wing
District Administration Entrance
Bird’s Eye View
Memorial Field Ticket Booth
1931 Stone Building Option
1931
Stone Building
New Addition
Existing Building
Montoursville Area School District
Loyalsock Valley Elementary School
Plancon Part A
June 23, 2015
Loyalsock Valley Elementary
Existing Site
CR
964 SF
T
LS
1006 SF
21
22
T
COMPUTER
LAB
645 SF
SMALL
GROUP
24
610 SF
T
T
CR
963 SF
18
20
23b
19a
GUIDANCE
COMPUTER LAB
CUSTODIAN
110 SF
23a
SMALL
985 SF
19
GROUP
CR
959 SF
T
T
T
16
SE
986 SF
15
17
CR
846 SF
T
14
T
CR
867 SF
13
CR
933 SF
MUSIC
844 SF
T
12
T
MEDIA
CENTER
1154 SF
ART
841 SF
23
28 27MECH
ELEC
150 SF
KITCHEN
1100 SF
34
CAFETERIA
1718 SF
STAGE
570 SF
33 32
478 SF
34
35
T
T
63 SF 60 SF
FACULTY
ADMINISTRATION
37
PRINCIPAL
WORK ROOM
442 SF
493 SF
643 SF
36
MECH.
159 SF
OFF
348 SF
31
26
T
251 SF
44 SF T
CONFERENCE
T
248 SF
30 29 6
CR
941 SF
11
25
CONF
1
T
FACULTY
CR
1028 SF
CR
938 SF
7
2
CR
954 SF
CR
1027 SF
CR
941 SF
T
510 SF
44 SF
9a
CUSTODIAN
8
3
4
CR
844 SF
T
T
10
T
9
STORAGE
251 SF
CR
847 SF
1278 SF
Loyalsock Valley Elementary
Existing Floorplan
5
CR
CR
CR
CR
CR
LS
COMPUTER
LAB
COMPUTER
LAB
SMALL
GROUP
MEDIA
CENTER
1677 SF
MEDIA
CENTER
ADDITION
1085 SF
SE
CR
MEDIA
CENTER + ADDITION = 2791 SF
ART
MECH
CAFETERIA
STAGE
K
MECH. OFFICE
T
T
CR
MUSIC
CR
CR
T
FACULTY
T
STORAGE
T T
NEW
SECURITY
VESTIBULE
800 SF
WORK
ROOM
CR
CR
CR
CR
CR
FACULTY PRINCIPAL
Loyalsock Valley Elementary School
Proposed Additons - approx. 2000 SF
Option 2
Option 1
Montoursville Area School District
Additions and Renovations
17-Jun-14
Loyalsock Valley Elementary
Option 2
1 AREA SUMMARY
Existing Building Area
Renovation Area
New Construction Area
Total Planned Area
40,920
40,920
2,000
42,920
SF
SF
SF
SF
95%
5%
2 STRUCTURE COSTS including site development
$ / SF
$
ADDITIONS
200
NEW
$
$ / SF
400,000
RENOVATIONS
General Construction
Asbestos Abatement
Lead Paint Abatement
HVAC Construction
Plumbing Construction
Electrical Construction
$
25
Allowance
Allowance
Subtotal
$
Renovation
400,000
BUILDING SITE
Sanitary Sewer System Inspection
New Septic System
Well Improvements/Storage Tank
Subtotal - Demolition, Structure and Site Costs
$
$
$
$
30
12
28
95
COST
$
400,000
$
$
$
$
$
$
$
1,023,000
25,000
10,000
1,227,600
491,040
1,145,760
3,922,400
$
$
$
$
$
$
1,023,000
25,000
10,000
1,227,600
491,040
1,145,760
$
$
$
$
150,000
20,000
115,000
55,000
4,262,400
$
$
$
$
150,000
20,000
115,000
55,000
ESCALATION TO MID-POINT CONST
ESTIMATING CONTINGENCY
Subtotal Adjusted Structure Costs
2.0%
5.0%
$
85,248
$ 213,120
$ 4,560,768
$
$
85,248
213,120
CONST TESTING / INSPECTION
CONSTRUCTION CONTINGENCY
1.75%
5%
$
$
79,813
228,038
$
$
79,813
228,038
$ 4,868,620
Renovation
$
5,268,620
PROBABLE CONSTRUCTION COSTS
$
400,000
New
3 FEES
Architect, Structural, MEP Engineering
Civil Engineering/Traffic Study Fees
Kitchen
Asbestos Designer
Code Review
Subtotal
4 MOVEABLE FIXTURES / EQUIPMENT
Subtotal
6.0%
Allowance
Allowance
Allowance
Allowance
1.00%
5 ADDITIONAL CONSTRUCTION RELATED COSTS
District's Construction Representative
1.00%
Asbestos Abatement Monitoring
0.20%
Printing
0.20%
Regulatory Agency Reviews (not testing)
0.25%
Subtotal
6 FINANCING
Financing Fees ( no capitalized interest )
Subtotal
7
2.00%
$
-
Allowance
$
4,000
Allowance
Allowance
$
$
$
$
52,686
10,537
10,537
13,172
Allowance
$
105,372
Allowance
Allowance
Total Project Cost * - Preliminary
* Costs based on date of this estimate. These costs must be adjusted based on anticipated Bid Date.
$
$
$
$
$
$
296,701
65,000
10,000
10,000
3,500
385,201
$
$
$
$
$
$
296,701
65,000
10,000
10,000
3,500
385,201
48,686
$
52,686
$
$
$
$
$
52,686
10,537
10,537
13,172
86,932
$
105,372
$ 5,898,812
23-Jun-15
Montoursville Area School District
Loyal Sock Valley- Additions and Renovations
Reimbursement Estimate
FTE converted to RPC (Plancon Part A, page A22)
479
State allocation per elementary student
$
4,700
Gross Reimbursement
$
2,251,300
0.1 $
225,130
$
2,476,430
Renovation : additional reimbursement
Gross Reimbursement
MASD Aid Ratio
0.5570
2010-11 MVAR
NET Reimbursement approximately :
$ 1,379,372
Discipline
Additional Services for Alternate
Civil
Revised driveway, sidewalks and parking layout
Revised Stormwater systems
Revise Landscaping
Reapply/review with regulatory agencies
Structural
Design enclosure structure of building and roof
MEP
Design backfeed to heating and electrical systems
Design Life/Safety systems to meet code
Design new connections for existing plumbing
Design MEP improvements to existing DAO
Survey existing conditions in 1931 building
Revise/Rerun Energy Model
Architectural
Design end wall enclosure and roof
Design building separation wall between HS and 1931 Bldg.
Design required exit doors and exit pathway alterations
Design improvements to existing DAO spaces
Alternate Bid Document preparation
Plancon documentation revision, review, approval
Survey existing conditions in 1931 building
Related meetings, reviews, presentations
Extended service due to extended Phasing
Delay of construction start will extend phasing/construction approx. 10 months
Construction Admin Extended CRA Construction Services 10 months due to phasing
Full-time
Construction Rep.
Additional 10 months

Similar documents

ÄKTA system Training Guide

ÄKTA system Training Guide the work load on the pump. The system pressure may increase. This pressure is due to the build up of proteins, lipids and nucleic acids, and cellular debris onto the column. By setting a maximum pr...

More information

Group Order Form - Picklemans Gourmet Cafe

Group Order Form - Picklemans Gourmet Cafe Low Fat Honey Mustard, Mustard Vinaigrette, Italian Vinaigrette, Low Fat Yogurt Ranch, Lemon Balsamic, & Balsamic Vinaigrette

More information