Contents - Superior
Transcription
Contents - Superior
Contents Contact Details....................................................................................... 2 Introduction............................................................................................ 3 Superior Jetties 3 Superior Marinas 3 Superior Plastech 3 Products & Services................................................................................. 4 Superior Marinas 4 Elite Concrete System 4 Capri Composite System 6 Ultimate Modular Dock System 7 Piling Operations Commercial Projects 8 11 Commercial Projects Designed & Constructed by Superior Jetties.............................................................20 Marinas, Pontoons and Boat Ramps 20 International 20 Rowing Facilities 20 Boat Ramp Pontoons 20 Boardwalks 21 Ferry Terminals 21 Restoration 21 Miscellaneous 21 Vehicle Access Bridges 21 Key Personnel........................................................................................22 Professional Service Providers..................................................................24 Awards and Memberships .....................................................................25 www.superiorjetties.com Superior Jetties Atlas Marine International Pty Ltd trading as Superior Jetties ACN 100 384 254 ABN 94 100 384 254 Postal Address PO BOX 920, Nerang Queensland, Australia, 4211 Phone +61 7 5597 1933 Fax +61 75597 0476 Web & Email Address www.superiorjetties.com [email protected] www.superiorjetties.com 2 Introduction Superior Jetties is an Australian owned Gold Coast based company that has over twenty years of industry experience. With three core areas of business, Superior Jetties can provide the full “turn key” package your organisation requires. Superior Jetties Superior Jetties manufactures a large range of marine berthing, boat lift systems and quality pontoons. The company has a significant presence in both local domestic and commercial markets, as well as a growing international clientele. The organisation has a long history of producing high quality products using the latest technology in design and materials. Innovation, inventiveness and astute interpretation of market needs have earned respect within the industry. In addition to standard products, Superior Jetties has the in house ability and expertise to custom design and manufacture products to suit individual and situation specific requirements, thereby guaranteeing satisfaction to individuals, local and state governments, federal agencies, resorts and organisations with industrial flotation requirements. Superior Marinas Superior Marinas is the commercial division of Superior Jetties and can provide the full “turn key” package to include design, engineering, manufacture, project management and installation of any marina project. From small berth boutique marinas to International marinas incorporating Super Yacht facilities, Superior Marinas can provide everything needed to implement a world class facility. Superior Plastech Superior Plastech is also based on the Gold Coast and is a company that provides plastic solutions for a variety of industries. In addition to manufacturing the UMD system for Superior Jetties, Plastech manufactures a wide range of plastic and rotomoulded products such as boat waste tanks, dock boxes, battery boxes, environmental system components and industrial vacuum components. A CNC Routing machine complements this facility. Please visit our website www.superiorjetties.com for more information. www.superiorjetties.com 3 Products and Services Superior Marinas Superior Marinas offers a range of berthing solutions designed and built to be functional, durable, low maintenance and aesthetically pleasing. The range includes: A Elite Concrete System B Capri Composite System C Ultimate Modular Dock System A Elite Concrete System A concrete pontoon system constructed using solid monolithic flotation. This is protected by a heavy duty sealed polyethylene skin that is U.V. stabilised, tough, flexible, and able to withstand heavy impact and allows it to expand and contract independently from the flotation and the reinforced concrete deck. The specially formulated concrete pontoon deck has an average concrete thickness of 125mm. It is smartly finished with a customised aluminium waler incorporating a unique press in bump rubber fender, which eliminates the need for screws. The concrete itself has a “Broom Deck” finish and all concrete surfaces are sealed with an epoxy based (or similar) concrete sealant which impregnates into the concrete deck. Superior Jetties Commercial “T Head” Pontoon anchored with Spun Concrete Piles www.superiorjetties.com 4 Commercial Elite Pontoons (Marina application). Hope Harbour Marina, Gold Coast Commercial Elite Pontoons (Marina application). Hope Harbour Marina, Gold Coast Utility services such as power, water, telephone and fire services can easily be incorporated via purpose built conduit ducts running inside the pontoon. The finished product is attractive, durable, element resistant and functional. www.superiorjetties.com 5 B Capri Composite System The Capri is a medium duty marina system which incorporates similar custom extruded waler design as in the Elite system. The flotation uses polyethylene floats which bolt to the aluminium superstructure. Hardwood timber decking or composite decking completes the system. Superior Jetties was awarded the contract to supply and install the Capri Marina System at A Pier, Sanctuary Cove. This project was constructed and operational in time for the Sanctuary Cove International Boat Show. Superior Capri Marina units installed at A Pier, Sanctuary Cove Marina Superior Capri Marina units installed at A Pier, Sanctuary Cove Marina www.superiorjetties.com 6 C Ultimate Modular Dock System The Ultimate Modular Dock system is an option that is applicable to situations where a smart appearance, flexibility and an easily demountable and moveable option is appropriate. This product is manufactured by the rotational moulding of polyethylene and allows the production of modular pieces that are tough, flexible, U.V. stabilised and do not deteriorate in a marine environment. The modules can withstand heavy conditions and tough treatment, making them ideal for public use applications. Accessories such as hand rails and child safety ladders can be added. A specially profiled surface ensures slip resistance and the ease with which modules can be connected make this style of pontoon particularly useful for swimming platforms, floating walkways, aquaculture, marinas, helipads, floating work platforms, settlement ponds, sewage treatment works and ramps for boat launching and retrieval. Superior Jetties Ultimate Modular Dock Marine System with Optional Fenders and Cleats www.superiorjetties.com 7 Products and Services Piling Operations Superior Jetties own and operate four piling barges, capable of installing timber, steel, spun concrete and cast insitu piles: Yabbie Drill Rig only. Capable of 500kg lift for insitu and timber piles Lobster Piles to 12 metres long, to Ø400mm Mud Crab Piles to 14 metres long, to Ø450mm Barramundi Piles to 24 metres long, to Ø650mm All barges are fully mobile and can be transported by land for easy establishment and disestablishment anywhere in Australia or overseas. “Mud Crab” Installing Ø400mm Spun Concrete Piles “Barramundi” Installing Ø450mm Timber Piles www.superiorjetties.com 8 Products and Services Boardwalks Superior Jetties also design, engineer and construct stylish timber boardwalks to meet a multitude of specifications. Available for both domestic and commercial applications, the boardwalks can be either attached to a concrete footing or free standing, depending on installation requirements. All timber decking used is AQU treated (dressed) Select Grade, fittings are galvanised and/or stainless steel, and piles can be either timber, cast insitu, spun concrete or steel. 700 metre Free Standing Boardwalk at Hope Harbour, Queensland. Optional Timber Bollards and Rope shown, cast insitu pile installation. 40 metre Boardwalk for Aqua Apartments, Labrador, Queensland. Optional Timber Bollard and Stainless Steel Runs shown. Timber Pile installation www.superiorjetties.com 9 Public Boardwalk for Gold Coast City Council, Southport, Queensland. Optional Shade Sails shown, spun concrete pile installation. Boardwalk for Gold Coast City Council, Rosser Park at Ashmore, Queensland www.superiorjetties.com 10 Products and Services Commercial Projects Superior Jetties is well regarded within the Commercial Sector as being an excellent manufacturer of commercial grade berthing applications. Some of Superior Jetties commercial clients include the Brisbane City Council, Gold Coast City Council, ABI Group, Queensland Department of Transport, Fish Developments and Solmac Developments. Superior Jetties has provided various berthing applications, as well as boat storage facilities, commercial piling fit-outs and boardwalks. Bongaree Jetty upgrade & Commercial Piling & Ferry Pontoons supplied & installed by Superior Jetties at Bribie Island Extension to Port of Bundaberg Marina - Bundaberg www.superiorjetties.com 11 Couran Cove International Resort Ferry Terminal, Hope Island International Resort Water Sports Facility. Amby Valley Resort – India Murwillumbah Heritage Jetty restoration and Pontoon extension project www.superiorjetties.com 12 Runaway Bay Marina Fuel Dock replacement – 55 metres Ultimate Modular Dock Swimming Pontoon at Lake Tinaroo – Atherton Shire Council, NQ St Margarets Anglican Girls School Rowing Pontoon – Brisbane www.superiorjetties.com 13 Project Overview Superyacht Marina 2009 Abu Dhabi Superyacht Show Client Abu Dhabi National Exhibitions Company Period of Involvement December 2008 – March 2009 Project Description In conjunction with our Dealer in the UAE, Al Masaood, we designed, constructed and installed the superyacht marina for the Abu Dhabi Superyacht Show at the Abu Dhabi National Exhibitions Centre. The project presented many challenges, with the delivery window limited to a period of just over 12 weeks. Overall the project features 373 metres of concrete pontoons, requiring over 800 tonnes of concrete and 11,000 man hours to complete. The project was completed on time and on budget. www.superiorjetties.com 14 Project Overview Bongaree Jetty, Bribie Island Client Caloundra Shire Council and Queensalnd Transport Period of Involvement 2003 – 2004 Project Description Refurbishment of historic jetty and add new floating berths to accommodate larger vessels in safe moorings. Erect a new shelter shed and fishing facilities as well as mooring piles for future ferry berthing. Details This project presented a number of challenges as we had to provide a complete public berthing solution, whilst maintaining the historical significance of the structure. The overall Jetty area is approx 80m in length with a deep water drop-off. The floating pontoons are 20 metres long providing disabled access and 710mm diameter sleeved steel piles have been used on the outer. The project included the provision of the following elements: Preparation of detailed engineering drawings Timber reclamation and refurbishment Pile repairs and new steel sleeved pile installation Aluminium and stainless steel fabrication Installation of floating 20 metre articulated berths Of Special Note Historical significance preserved after jetty was used by troops in WWII R&R. www.superiorjetties.com 15 Project Overview Hope Harbour, Gold Coast Client Rothmont Properties Pty Ltd Period of Involvement 2003 – 2004 Project Description Construction of 64 marina berths within existing marina including supply of all services and a new “Lightower” pedestal system. Marina Details The area of the marina is 7.4 hectares and the reclamation of 10.3 hectares, giving a total land area of 16.8 hectares. Involvement Preparation of a complete analysis of the marina including a condition report for every pile. New berths installed while maintaining operations within the marina, refurbishment of fuel dock including supply of repairs, fendering and temporary berths as required. www.superiorjetties.com 16 Project Overview Rosser Park, Gold Coast Client Gold Coast City Council Period of Involvement 2006 Sub Contractors Used Smart Stone Group Project Description Construction of 500m curved boardwalks piled over lakes in botanic gardens, with associated pathways, bridges and landscaping to provide outlooks and rest areas. Details The area of the botanic gardens boardwalks stretch the length of the lake with multiple crossings. Involvement Preparation of detailed drawings, piling set-outs, barge establishment into a park open for visitors. The construction zone was maintained amongst the general public and opened by the Mayor on time and budget. Of Special Note Introduced all timber pre-inspected by 3rd party accreditation, every board symmetrically sawn to achieve high quality product. www.superiorjetties.com 17 Project Overview Sanctuary Cove, Gold Coast Client Mulpha Australia Period of Involvement 2006 - 2007 Sub Consultants Used Beavis and Cochrane Fire Service Engineers and West Plumbing and Maintenance Services Project Description Construction of marina in record time to meet deadline of May 2007 for the Sanctuary Cove International Boatshow. 84 new berths provided in A arm with a new configuration of E arm to allow for large vessels. Marina Details The area of the marina was expanded with new berths added in A arm, a work berth added and large berths in front of the restaurants. Involvement Preparation of plan, marina layout, plus cost estimates for the new Capri marina system. The complete design and construction contract involved all statutory approvals, design signoff, demolition, piling, floats and services. www.superiorjetties.com 18 Project Overview Port Hinchinbrook Boatramp Pontoon, Cardwell NQ Client Cardwell Shire Council Period of Involvement 2004 - 2005 Project Description Conceptual design and budget provided to allow for planning followed by a construction which involved piling and modular polyethylene rotomoulded floats installed to allow safe egress from vessels. Marina Details The length of the pontoons is 40m x 2m wide and this provides safe access to the water when delivering and retrieving vessels from the boatramp, where there are marine stingers and crocodile risks. Involvement Preparation of conceptual drawings and budget costings for council budgets. Construction phase involved piles delivery, barge establishment and float installation. Of Special Note Ultimate modular docks have provided a cost effective method for local authorities providing safer boating facilities. It is also vitally important for Emergency Services. www.superiorjetties.com 19 A selection of commercial projects designed, supplied and installed by Superior Jetties. Marinas, Pontoons and Boat Ramps Sanctuary Cove Marina Port of Bundaberg Marina Hope Harbour Marina Mariner’s Cove Marina bridge Petrac Properties, River Cove, Hope Island, QLD Monterey Keys Marina, QLD Walter Taylor Bridge Pontoon Southport Swimming Enclosure Labrador Boat Ramp Pontoon Olympic Rowing Facility Rowing Facility Lock Weir – Construction of pre-cast stop logs Piling for bridges & decks over water International Inner Harbour, New Zealand Port Denarau, Fiji Amby Valley, India Singapore Navy Eden Island, Seychelles Ferry terminal Rowing Facilities Essendon Rowing Club, VIC Bureau of Sport & Recreation, ACT Total Care, ACT Coomera Water Sports, QLD Indooroopilly Canoe Club, QLD St Margarets Rowing Club, QLD Anglican Church Grammar School, QLD Boat Ramp Pontoons Redland Shire Council Gold Coast City Council Horsham Rural City Council Nowra Council York City Council Copper Coast Council Department of Transport - Brisbane QLD Transport – Karumba Ardrossan Boat Club – South Australia www.superiorjetties.com 20 Auckland City Council, Okahu Bay – New Zealand South Gippsland Shire Council – Port Welshpool East Gippsland Shire Council – Port Welshpool Murwillumbah Shire Council – NSW Boardwalks Gold Coast City Council – QLD – Rosser Park, Gold Coast City Council – QLD – Sundale Bridge Solmac Developments 2kms - Varsity Lakes, Robina Hope Harbour Marina 700 metre Boardwalk St Margarets Anglican Girls School Boardwalk National Parks & Wildlife Services – NSW Boardwalk, Gold Coast Ferry Terminals CityCat Ferry Terminals, Regatta & Riverside, Brisbane Couran Cove Ferry Terminal Ferry terminal and baggage handling facillities National Capital Authority Ferry Pontoon and Walkway Q- BUILD Ferry Terminal Lend Lease QLD Riverside Centre Pontoon - Brisbane City Restoration Nichol Park Heritage Jetty – Tweed Heads Council Bongaree Jetty Bribie Island – Caboolture Shire Council Miscellaneous Witt Island – Gladstone 24m Super Yacht Pontoon BHP - Groote Eylandt, Water testing Pontoon National Parks & Wildlife Services – NSW, Pontoon, Coffs Harbour Melbourne Grand Prix, Pedestrian Access Pontoon Australian Navy 2 Boarding Pontoons Bureau of Sport & Recreation QLD Lake Perseverance Pontoon & Walkway Hamilton Island Resort – QLD Approx 20 x Jet Ski Docks Day Dream Island Resort – QLD Approx 20m ‘Ultimate Pontoon’ Lexmark 300 Indy Carnival – QLD 40 metre ‘Ultimate’ Water Taxi Pontoon Vehicle Access Bridges Trevine Pty Ltd: 2 x 15 metre light vehicle access bridges Big Brother (Channel 10 – Dreamworld) – 2 x 11 metre vehicle access bridge www.superiorjetties.com 21 Key Personnel John Hogan Managing Director Managing Director, John Hogan has had a successful career in Australia and the United States with mining and building products companies such as MIM, Pioneer and Mincom. Prior to returning to Australia, John was the Vice President/General Manager of Anchor Block Company in Minneapolis, MN, USA. He has brought an international perspective to Superior Jetties that builds upon an impressive track record of product development over many years. He is a tradesman Boilermaker and holds an Associate Diploma in Mechanical Engineering and a Bachelor of Business Degree. Simon Dyer Operations Manager With a background in the construction of multi-storey buildings, Simon made the transition into marina construction 15 years ago. He has extensive marine experience in Australia and internationally, covering design, construction, project and overall operations management. Leon Sines Sales Manager Having come from a varied background including the hospitality industry and guest relations services, Leon also has extensive sales experience in the domestic and commercial marine sector. He has a thorough understanding of the commercial tendering process and is knowledgeable in detail design, scheduling, and cost analysis. Holding an Associate Diploma in Business, Leon prides himself in attending to every client’s specific project requirement. Ram Raghuraman Manager, Plastech Ram has experience in numerous plastics processes and this assists in allowing Superior Plastech to provide a wide range of products and services. He holds a Bachelor of Science and Master of Polymer Science degrees and a Post Graduate Diploma in Plastic Testing and Quality Control. Ram also has extensive international plastics industry experience working with organizations in Africa, India and Australia. www.superiorjetties.com 22 Darren Goody Senior CAD Draftsman Darren is the senior design draftsmen and is skilled in CAD Drawing to produce concepts and final plans for all projects. Darren’s experience in the engineering field is in excess of 20 years and includes a Fitting trade and marine design experience. Jackie Hogan Engineering & Administration Manager Jackie has a varied professional background in the areas of Human Resources and Industrial Relations, predominantly in the coal and oil industries. Following a number of years with M.I.M. and Ampol in Australia she took up the position of HR Director with the Atlantic Richfield Group in the USA and later a similar position with Archway Marketing Services for their North American and Mexican operations. Jackie manages the statutory approvals area for contracts and overall administration. She holds a Bachelor of Business (Management) Degree. Gabriel Tesser Finance Manager Gabriel joined Superior Jetties in 2008 as Finance Manager. With extensive formal qualifications in Accounting, Law and Business Administration, Gabriel provides a wealth of knowledge and hands on experience to the business. Gabriel has worked for many international organizations in a number of locations across the globe, and has developed his expertise in Manufacturing Accounting. Gabriel maintains an active education program developing his knowledge and awareness of the latest trends in Accounting and general business systems. Matt Browning Commercial Sales/Project Manager Matt is a highly experienced construction, operations and project management professional with significant all round business expertise. Matt possesses an extensive hands on and operational management background in both land and water based construction and all associated tendering and reporting requirements. He has very high levels of engineering and technical understanding. www.superiorjetties.com 23 Professional Service Providers Solicitor Matthew Burgess McCullough Robertson Level 12 Central Plaza Two 66 Eagle Street Brisbane Qld. 4000 Accountant Quill Group Level 6 12 Marine Parade SOUTHPORT QLD 4215 Banking Institution Westpac Banking Corporation 19 - 21 Bay Street SOUTHPORT QLD 4215 Account Details Atlas Marine International Pty Ltd trading as Superior Jetties Bank: Westpac Branch: Southport BSB: 034 215 A/C #: 246 652 www.superiorjetties.com 24 Industry Affiliations and Achievements Superior Jetties is a proud member and supporter of a number of marine, marina and plastics industry associations. Plus Superior Jetties and Superior Plastech have consistently been the proud winner and finalist of the Gold Coast Business Excellence Awards. Memberships BIAQ MIAA Australian Rotomoulding Association Commerce Queensland AIMEX UDIA Awards Superior Jetties 2004 Gold Coast Business Excellence Awards, Finalist, Manufacturing & Construction Category 2005 Gold Coast Business Excellence Awards, Finalist, Manufacturing & Construction Category 2005 Queensland Industry Development Scheme Grant, Queensland State Development & Innovation Department 2006 Gold Coast Business Excellence Awards, Winner, Manufacturing & Construction Category 2006 Australian Marine Industries Federation, Innovative Product of the Year 2007 Gold Coast Business Excellence Awards, Finalist, Manufacturing & Construction Category (Winner to be decided Nov 07) Superior Plastech 2006 Gold Coast Business Excellence Awards, Finalist, Emerging Business Category 2007 Gold Coast Business Excellence Awards, Finalist, Emerging Business Category (Winner to be decided Nov 07) www.superiorjetties.com 25