Table of Contents[14] - UW Tacoma Home

Transcription

Table of Contents[14] - UW Tacoma Home
University of Washington Tacoma
Infrastructure Master Plan
Spring 2009
University of
Washington
Tacoma
Infrastructure
Master Plan
Spring 2009
prepared by:
Table of Contents
Acknowledgements . . . . . . . . . . . . . . . . . 7
Introduction
Executive Summary. . . . . . . . . . . . . . . . . . . . . 10
Site Context. . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Campus Utility Providers. . . . . . . . . . . . . . . . . 15
2008 Campus Master Plan Update. . . . . . . . . 17
Planning Process. . . . . . . . . . . . . . . . . . . . . . . 22
UW Facilities Services Design Guide . . . . . . . 22
Infrastructure Master Plan Goals. . . . . . . . . . . 22
Sustainability
Civil Development Overview. . . . . . . . . . . . . . 44
Soils. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Water. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
Existing Water Infrastructure. . . . . . . . . . . . . . 46
Water Improvements. . . . . . . . . . . . . . . . . . . . 47
Water Demands. . . . . . . . . . . . . . . . . . . . . . . . 48
Sanitary Sewer System Overview. . . . . . . . . . 48
Existing Sanitary Sewer Infrastructure . . . . . . 49
Sewer System Demands. . . . . . . . . . . . . . . . . 50
Sewer System Improvements. . . . . . . . . . . . . 51
Alternate Sewage Treatment Systems . . . . . . 52
Drainage Overview . . . . . . . . . . . . . . . . . . . . . 53
Existing Drainage Infrastructure . . . . . . . . . . . 55
Drainage Opportunities Cleanse, Display and Reuse. . . . . . . . . . . . . . 56
Water Generators . . . . . . . . . . . . . . . . . . . . . . 57
Water Balance. . . . . . . . . . . . . . . . . . . . . . . . . 58
Life-Cycle Cost . . . . . . . . . . . . . . . . . . . . . . . . 64
Water Balance Recommendation. . . . . . . . . . 64
Existing Overhead Electricity and Gas Utility . 67
Road Network Overview. . . . . . . . . . . . . . . . . 69
Transportation. . . . . . . . . . . . . . . . . . . . . . . . . 69
Existing Roadway and Roadway
Improvements. . . . . . . . . . . . . . . . . . . . . . . . . 70
Civil Infrastructure Plan Cost Estimate . . . . . . 75
Spring 2009
Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
National Sustainable Design Standards . . . . . 24
Greenhouse Gas Emissions. . . . . . . . . . . . . . 27
Campus Water Use. . . . . . . . . . . . . . . . . . . . . 28
Campus Drainage Opportunities. . . . . . . . . . . 29
Campus Energy Use and Cost . . . . . . . . . . . . 30
Step 1: Analyzing the Climate. . . . . . . . . . . . . 31
Step 2: Integrating Design to Reduce
Energy Use. . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Step 3: Utilizing Renewable Energy Sources . 38
Step 4: Verifying Building Performance. . . . . . 41
Carbon Neutral Campus Option . . . . . . . . . . . 41
Civil Infrastructure Plan
University of Washington Tacoma - Infrastructure Master Plan
5
Table of Contents
ME Infrastructure Plan Introduction
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . .
Mechanical Infrastructure . . . . . . . . . . . . . . . .
Electrical Infrastructure. . . . . . . . . . . . . . . . . .
Telecommunications. . . . . . . . . . . . . . . . . . . .
Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mechancial Infrastructure Plan
78
78
80
82
83
Existing Campus Mechanical Systems. . . . . . 86
Campus Mechanical Load Projections . . . . . . 89
Heating and Cooling Systems Concepts. . . . . 91
Condenser Water Loop System . . . . . . . . . . . 94
Heating and Cooling Option 1 . . . . . . . . . . . . 99
Heating and Cooling Option 2 . . . . . . . . . . . 100
Heating and Cooling Option 3 . . . . . . . . . . . 102
Cost-Benefit Analysis . . . . . . . . . . . . . . . . . . 103
Carbon Footprint and Carbon Neutrality. . . . 104
Non-Economic Evaluation of Options. . . . . . 105
Recommendations. . . . . . . . . . . . . . . . . . . . . 107
Electrical Infrastructure Plan
Existing Electrical Primary Distribution . . . . . 110
Emergency and Standby Power Distribution. 112
Electrical Power Monitoring System . . . . . . . 113
Power Factor. . . . . . . . . . . . . . . . . . . . . . . . . 113
Campus Electrical Load Projections. . . . . . . 114
Normal Electrical Primary Distribution. . . . . . 118
Emergency and Standby Distribution . . . . . . 121
Renewable Power and Sustainable Options. 123
Electrical Master Plan Overview. . . . . . . . . . 126
Electrical System Option 1 . . . . . . . . . . . . . . 128
Electrical System Option 2 . . . . . . . . . . . . . . 130
Electrical System Option 3 . . . . . . . . . . . . . . 132
Electrical System Option 4 . . . . . . . . . . . . . . 134
Emergency and Standby Power Option 1. . . 136
Emergency and Standby Power Option 2. . . 137
Power Factor Correction. . . . . . . . . . . . . . . . 138
Power Factor Correction Option 1. . . . . . . . . 139
Power Factor Correction Option 2. . . . . . . . . 140
Cost-Benefit Analysis . . . . . . . . . . . . . . . . . . 141
Recommendations. . . . . . . . . . . . . . . . . . . . . 142
Existing Telecommunications Systems. . . . . 144
Telecommunications Infrastructure
Development. . . . . . . . . . . . . . . . . . . . . . . . . 144
Existing Exterior Lighting. . . . . . . . . . . . . . . . 146
Campus Lighting Goals/Master Plan Options.147
Exterior Lighting Recommendations. . . . . . . 148
Interior Lighting. . . . . . . . . . . . . . . . . . . . . . . 150
Figure Index. . . . . . . . . . . . . . . . . . . . . . . 154
Appendix. . . . . . . . . . . . . . . . . . . . . . . . . . 158
(Document Supplement*)
*Contact Milt Tremblay, UW Tacoma Director of Facilities
and Campus Services for more information regarding
the Appendix and/or other items referenced within the
Infrastructure Master Plan.
Spring 2009
6
Telecommunications and Lighting
Infrastructure Plans
University of Washington Tacoma - Infrastructure Master Plan
Acknowledgements
UNIVERSITY OF WASHINGTON
TACOMA
Patricia Spakes
Ysabel Trinidad
Milt Tremblay
Hugh Smith
Chancellor
Vice Chancellor for Administrative Services
Director of Facilities and Campus Services
Facilities Supervisor
UNIVERSITY of washington
SEATTLE
Bill Earhart
Tony Fragada
Jim Morin
Drew Ogrodnik
Nancy Rottle*
Facilities Project Engineer - Mechanical
Facilities Project Engineer - Electrical
Facilities Project Engineer - Civil
Facilities Project Engineer - Environmental
Associate Professor, College of Architecture and
Urban Planning
UW Capital Projects Office
Lee Copeland
Mithun
Brodie Bain
Elisabeth Goldstein
Jeff Benesi
Xe Sands Davis
PAE Consulting Engineers
Grant Parthemer
Paul Schwer
Jon Ricket
Scott Bevan
Mark Firestone
Dan Somlea
Luma Lighting Design
Mark Ramsby
Greg Parthemer
Magnusson Klemencic Associates
Drew Gangnes
Brook Jacksha
UW Architectural Advisor
Principal, Project Director
Programmer/Planner
Landscape Architect
Project Assistant
Principal, Project Manager
Principal
Mechanical Engineer
Electrical Engineer
Mechanical Engineer, Sustainability
Mechanical Engineer, Plumbing
Lighting Designer
Lighting Designer
Principal, Project Manager
Civil Engineer
*special thanks to Nancy Rottle’s Fall 2007 Landscape Urbanism/Regional Planning Studio who presented
“Green Infrastructure Frameworks for the UW Tacoma Campus.”
University of Washington Tacoma - Infrastructure Master Plan
Spring 2009
design and consultant team
7

Similar documents