Presentation on O`Brien House
Transcription
Presentation on O`Brien House
PUBLIC CONSULTATION – MAY 2007 O`Brien House PUBLIC CONSULTATION • 3 storey, 760 sq.m. house designed by reputable local architect W. E. Noffke • Purchased by federal government in 1964 and used as conference centre • In 1988, designated ‘Recognized’ by Federal Heritage Building Review Office (FHBRO) • Vacant since late 1980’s PUBLIC CONSULTATION – MAY 2007 • Originally constructed in 1930 as a summer residence for Mr. Ambrose O’Brien, known as Kincora Lodge O`Brien House HISTORY of HOUSE Approximately 20 minutes from the core of the capital • Located on high promontory overlooking Meech Lake within Gatineau Park • Adjacent to Willson House which is also a ‘recognized’ structure presently operated by PWGSC as a conference centre for use by federal depts WILLSON House O’BRIEN House O’Brien B each LAC MEECH O’Brien Beach Parking Area PUBLIC CONSULTATION – MAY 2007 • O`Brien House PHYSICAL ENVIRONMENT - building envelope failure permitting water infiltration causing mould, infestation of animals, interior deterioration - advanced erosion of the access road - water supply from lake and septic tank abandoned through non-use - vandalism • Program put in place for phased implementation of rehabilitation and repairs PHASES I to III – completed 2003-2006 • Selective Demolition and Decontamination • Structural Stabilisation and Building Envelope Repairs (preservation) • Fire Protection Systems (sprinklers) THIS PROJECT : IMPLEMENTATION OF PHASE IV in 2007- 08 and future PHASE V (3-5 yrs.) PUBLIC CONSULTATION – MAY 2007 • Showing signs of advanced deterioration in 1990s - structural integrity of exterior stone terraces compromised O`Brien House PROJECT BACKGROUND Preserve heritage asset 2 Re-establish a use for the building PROPOSED USE and OCCUPANCY • Short term (3-5 yrs): re-establish Day-use conference/meeting centre of the ground floor (less than 75 persons) • Long term: Long term lease for operation by private sector: Day-use of ground and second floors as conference/meeting centre for less than 150 persons Exterior Elevations PUBLIC CONSULTATION – MAY 2007 1 O`Brien House PHASE IV GOALS OF PROPOSED BLDG AND SITE REHABILITATION • PLANNING Limited building occupancy and capacity to less 150 persons Use of existing O’Brien beach parking Location of septic field in previously disturbed land Re-use of architectural elements, materials, etc.. • DESIGN HVAC/plumbing and electrical fixtures: low energy use Conventional septic installation – low operation and maintenance req’ts Natural landscape • OPERATION ‘Lite’ approach: centre will use catering services, no commercial kitchen Recycling of garbage PUBLIC CONSULTATION – MAY 2007 Adaptive re-use of existing buildings O`Brien House SUSTAINABLE APPROACH ENVIRONMENTAL CONSIDERATION - Recently significantly upgraded MDEEP regulations for potable water (presence of uranium in well water) - MDEEP strict review of proposed septic system installations – stand alone septic tanks no longer accepted 2 UNIVERSAL ACCESSIBILITY - Act and regulations for barrier free access to federally owned facilities - Front entrance of house approx. 3m from driveway level - Heritage multi split levels and nooks, sizes of openings, etc… 3 ZONING BY-LAWS - parking requirements - difficult to integrate on the heritage site at the upper driveway 4 EMERGENCY VEHICLE ACCESS - Requires slope reduction and increased width and turning radius PUBLIC CONSULTATION – MAY 2007 1 O`Brien House CONSTRAINTS and CHALLENGES PROPOSED SITE REHABILITATION • Septic Field Installation • Slope reduction and road widening • Garage Relocation • Underground service conduits • Terrace Re-Construction • Exterior Lift UA Integration • Soft Landscaping / Service Area SLOPE REDUCTION O`Brien House • Will involve rock and tree removal PUBLIC CONSULTATION – MAY 2007 • Road Re-Alignment / Retaining Wall Day use occupancy No commercial kitchen • Reliability, Operation & Maintenance: conventional system has minimum equipment and operation reqts O’BRIEN HOUSE O’brien Beach Parking Area • Minimize tree cutting impact: location on old path of road/trail and location of original septic installation Septic tank and pumping station Adjacent to road on flat, treeless Area Trees in this area to remain Future Development of 2nd flr. Phase V – 3rd field, tree removal to be Implemented in future Protection of 1000mm tree O`Brien House • Capacity: Bldg capacity ‘frozen’ at < 150 persons WILLSON HOUSE PUBLIC CONSULTATION – MAY 2007 SEPTIC SYSTEM DESIGN CONSIDERATIONS A Additional parking at upper driveway level (12) B Water from lake and Water treatment system for potable water C 3rd Septic Field D Interior fit-up of 2nd floor WILLSON House O’BRIEN House B D A C PUBLIC CONSULTATION – MAY 2007 FUTURE WORK for LONG TERM OBJECTIVES O`Brien House PHASE V (road re-alignment, septic system, 4 UA parking, exterior/interior elevators) Phase V (3-5 yr. future) - Second floor retrofit - Potable water (pump at lake and water treatment system) - 3rd septic field - 12 additional parking at driveway Phase IV - Implementation SUMMER 2007 FALL 2007 - Garage clean-up and modification - Terrace reconstruction and exterior stone masonry work - Road re-alignment and 4 UA parking spaces) - Septic system installations (2 fields) - Exterior lighting JANUARY to AUGUST 2008 - Ground floor retrofit, including interior elevator - Exterior elevator / lift PUBLIC CONSULTATION – MAY 2007 Phase IV - Ground floor retrofit c/w supporting infrastructures O`Brien House PROPOSED IMPLEMENTATION STRATEGY June 2006 NCC subject to Canadian Environmental Assessment Act (CEAA) • Objectives: - no significant environmental effects - public participation in Environmental Assessment • Canadian Environmental Assessment Registry • Environmental effect - change in environment from project • Public concerns PUBLIC CONSULTATION – MAY 2007 • O`Brien House ENVIRONMENTAL ASSESSMENT PROCESS PUBLIC CONSULTATION – MAY 2007 O`Brien House QUESTIONS AND DISCUSSIONS