bandar map utama
Transcription
bandar map utama
TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT CONSTRUCTION ALONG THE DAMANSARA- PUCHONG HIGHWAY (LDP) ,PERSIARAN BANDAR UTAMA, TTDI INTERCHANGE AND JALAN DAMANSARA 1. CONTINUATION OF CLOSURE ALONG DAMANSARA- PUCHONG HIGHWAY (LDP) AND PERSIARAN BANDAR UTAMA (KEPONG-BOUND AND SS2-BOUND) Date 1 January 2016 – 29 February 2016 Time CLOSURE A- 12:00 Midnight - 6:00am (Monday – Friday,) 12:00 Midnight - 8:00am (Saturday & Sunday) CLOSURE B – 11:00PM -6:00AM Duration 2 months Reason Mobilisation of heavy construction vehicles, noise barrier, painting works, beam launching and concreting works for the future MRT Bandar Utama Station The traffic management plan involves the following closure: CLOSURE A: Full road closure along LDP Highway (Kepong-bound) from Persiaran Bandar Utama junction to Lebuh Bandar Utama junction for a stretch of 500m (including U-turn to SS2-bound) (See map 1). During this closure, following diversions will take place: ( ) Motorists from SS2/Jalan Damansara wanting to turn into Lebuh Bandar Utama To be diverted to turn left into Persiaran Bandar Utama and take right turn after the traffic light to Dataran Bandar Utama before heading to Lebuh Bandar Utama. ( ) Motorists from the Sprint Highway intending to go to Bandar Utama may also continue to travel on the Sprint Highway (E23) and approach One Utama from the southern entry i.e. Lebuh Bandar Utama. CLOSURE B: Closure along Persiaran Bandar Utama and in front of Sri Pentas B1: Two-lane closure at LDP Highway (Kepong-bound, in front of Sri Pentas) B2: Closure of lanes along Persiaran Bandar Utama exiting into LDP Highway (Kepong-bound, next to Sri Pentas) During this night closure, the following diversions will take place: Motorist from First Avenue heading to LDP Highway will be directed to make a U-turn at Persiaran Bandar Utama, then turn right at the traffic light to Dataran Bandar Utama and take another right at the traffic light of Lebuh Bandar Utama. Motorist from Persiaran Bandar Utama heading to LDP will be directed to turn into Dataran Bandar Utama and turn right at the traffic light of Lebuh Bandar Utama. (*Both diversions indicated in GREEN ) Map 1: CONTINUATION OF CLOSURE ALONG DAMANSARA- PUCHONG HIGHWAY (LDP) AND PERSIARAN BANDAR UTAMA (KEPONG-BOUND AND SS2-BOUND) 2. CONTINUATION OF LONG TERM NIGHT TRAFFIC MANAGEMENT PLAN AT TTDI INTERCHANGE FLYOVER ALONG LDP HIGHWAY (KEPONG-BOUND & SS2-BOUND) Date 1 January 2016 – 29 February 2016 Time 12 midnight to 6:00am Duration 2 months Reason Mobilisation of heavy construction vehicles, concreting and parapet works for special span across LDP Highway There will be a continuation of night Traffic Management Plan (TMP) involving the bound closure on the flyover at the TTDI Interchange from 1 January 2016 – 29 February 2016 from 12 midnight to 6:00am, intermittently. The closure will alternate between the SS2 and Kepong bounds of the flyover as follow: C1: Full bound closure (heading to SS2) on the flyover at the TTDI Interchange C2: Full bound closure (heading to Kepong) on the flyover at the TTDI Interchange During this night closure, the following diversions will take place: ( ) Motorists from Kepong wanting to use the flyover at TTDI Interchange to head to SS2 To be diverted left to the traffic light at the Underpass of the TTDI Interchange where they can drive straight ahead. ( ) Motorists from SS2 wanting to use the flyover at TTDI Interchange to head to Kepong To be diverted to the left-side of the flyover and drive straight ahead. Map 2: CONTINUATION OF LONG TERM NIGHT TRAFFIC MANAGEMENT PLAN AT TTDI INTERCHANGE FLYOVER ALONG LDP HIGHWAY (KEPONG-BOUND & SS2-BOUND) 3. CONTINUATION OF LONG-TERM NIGHT ROAD CLOSURE FROM PIZZA HUT TO IWK ALONG JALAN DAMANSARA (KL/ SPRINT HIGHWAY-BOUND) (CLOSURE A) Date 1 January 2016 - 29 February 2016 Time 11:00pm - 6:00am Duration 2 months Reason To facilitate construction works for the future MRT TTDI Station and Entrances There will be a continuation of long-term, night road closure on Jalan Damansara from Jalan Tun Mohd Fuad junction to IWK (SPRINT Highway-bound) (as indicated in RED in the map). During the closure, the following diversions will take place: Motorists from Jalan Tun Mohd Fuad going to Jalan Damansara (KL / SPRINT Highway-bound): ( ) Turn right at the traffic light junction at Jalan Tun Mohd Fuad, then turn left at the next traffic light into LDP (SS2-bound) to access SPRINT Highway at the Damansara Utama Interchange near the Police Station. Motorists from Jalan Leong Yew Koh going to Jalan Damansara (KL/ SPRINT Highway-bound): ( ) Go to TTDI Interchange Underpass towards SS2 and proceed to SPRINT Highway at the Damansara Utama Interchange OR Go to Jalan Damansara, make a U-turn at the Jalan Tun Mohd Fuad traffic light and head towards LDP Highway (SS2-bound) to access SPRINT Highway at the Damansara Utama Interchange. Motorists from Kepong going to Jalan Damansara (KL/ SPRINT Highway-bound): ( ) Proceed to the flyover and turn left at Damansara Utama Interchange to join the SPRINT Highway. Motorists on LDP Highway from SS2 heading to Jalan Damansara (KL/ SPRINT Highway-bound): ( ) Will be directed to the Bandar Utama Interchange to make a U-turn. Motorists are required to take the flyover at the TTDI Interchange towards SS2 to connect to the SPRINT Highway at the Damansara Utama Interchange. Motorists on the SPRINT Highway going to TTDI ( ) will be diverted to drive to TTDI Interchange and make a U-Turn before the traffic light and proceed to Jalan Tun Mohd Fuad . Map 3: CONTINUATION OF LONG-TERM NIGHT ROAD CLOSURE FROM PIZZA HUT TO IWK ALONG JALAN DAMANSARA (KL/ SPRINT HIGHWAY-BOUND) (CLOSURE A) 4. CONTINUATION OF CONTRAFLOW FROM PIZZA HUT TO ENTRANCE B OF FUTURE MRT TTDI STATION (CLOSURE B) Date 1 January 2016 - to 29 February 2016 Time 11:00 pm to 6:00 am Duration 2 months Reason To facilitate construction of Entrance A, Entrance B and related construction works for the future MRT TTDI Station There will be a continuation of a night closure to facilitate the TTDI MRT station works from the traffic light junction at Jalan Tun Mohd Fuad to the former Caltex, and will be implemented intermittently from 11:00PM to 6:00AM in both directions (as indicated in RED in the map). A contra-flow will be implemented during this closure.Motorists from LDP/TTDI heading towards KL/SPRINT Highway will be diverted to the opposite lane and one traffic lane will be made available for each direction (SPRINT Highway- and LDP Highway-bounds). The junctions of Jalan Wan Kadir and Jalan Wan Kadir 3 with Jalan Damansara will be temporarily closed/inaccesible during the contra-flow period. As such, motorists are advised to use the following alternative routes : ( ) Motorists from Jalan Damansara heading towards Jalan Wan Kadir and Jalan Wan Kadir 3 will be be directed to turn left into Jalan Tun Mohd Fuad, and turn right to Jalan Wan Kadir 5. ( ) Motorists from Jalan Wan Kadir and Jalan Wan Kadir 3 heading towards Jalan Damansara will have to turn left to Jalan Wan Kadir 5, and left again to Jalan Tun Mohd Fuad. Alternatively, motorists on LDP Highway (from Kepong) heading towards Kuala Lumpur can opt to bypass Jalan Damansara by using Penchala Link or head straight towards the SPRINT Highway. This contraflow for Closure B and bound Closure A from Pizza Hut to IWK will not be implemented simultaneously on the same night. Map 4: CONTINUATION OF CONTRAFLOW FROM PIZZA HUT TO ENTRANCE B OF FUTURE MRT TTDI STATION (CLOSURE B) 5. THREE-NIGHT ROAD CLOSURE AT PERSIARAN BANDAR UTAMA (ALONG LDP HIGHWAY) Date 5 January 2016 - 7 January 2016 Time 12:00 Midnight - 5:00am Duration 3 nights Reason Mobilisation of construction vehicles for painting of Segmental Box Girders and related works across Persiaran Bandar Utama for the future MRT Bandar Utama Station There will be a 3-night road closure of Persiaran Bandar Utama at the intersection with LDP Highway. Both bounds entering and exiting Persiaran Bandar Utama will be affected. During the three-night closure, alternative routes are available are as follows (please see map appended below): ( ) Motorists from LDP Highway (Kepong-bound) wanting to turn into Persiaran Bandar Utama: Will be diverted to drive 150m ahead and turn right into Lebuh Bandar Utama where they can access the Bandar Utama area via the internal road system. ( ) Motorists wanting to exit to the LDP Highway by using Persiaran Bandar Utama: Will be diverted to use the internal road system and exit via Lebuh Bandar Utama. Map 5: THREE-NIGHT ROAD CLOSURE AT PERSIARAN BANDAR UTAMA (ALONG LDP HIGHWAY) For media enquiries, please contact: Adeline De Cruz Tel: +6012 217 2017 Siti Fadzillah Ismail Tel: +603 7493 3965 [email protected] [email protected] TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT CONSTRUCTION AT SPRINT HIGHWAY 6. CONTINUATION OF LEFT-MOST LANE CLOSURE AT SPRINT HIGHWAY/JALAN SEMANTAN Date 1 January 2016 – 31 March 2016 Time 24 hours Duration 3 months Reason For finishing works including coating, drainage and road works The left-most lane closure will be continued to be implemented at SPRINT Highway/Jalan Semantan from 1 January 2015 to 31 March 2016, 24 hours daily. This 700-metre closure stretch starts in front of 10 Semantan to the junction of Jalan Damansara Endah. During this closure, two (2) lanes will be made available for motorists from Kuala Lumpur heading towards Petaling Jaya. MAP 6: CONTINUATION OF LEFT-MOST LANE CLOSURE AT SPRINT HIGHWAY / JALAN SEMANTAN 7. CONTINUATION OF WORK ALONG JALAN DUTA TOWARDS JALAN SEMANTAN (PJ-BOUND) Date 1 January 2016 – 31 March 2016 Time 24 hours Duration 3 months Reason For finishing works including coating, drainage and road works There will be a continuation of left-most lane closure from the junction of Jalan Kota towards Jalan Semantan (PJ-bound) starting from 1 Januray 2016 until 31 March 2016, 24 hours daily. During the closure, one lane will be made available for the slip road to Jalan Semantan for motorists. MAP 7: CONTINUATION OF WORK ALONG JALAN DUTA TOWARDS JALAN SEMANTAN (PJ-BOUND) 8. CONTINUATION OF FULL NIGHT CLOSURE OF SPRINT HIGHWAY/ JALAN SEMANTAN Date 1 January 2016 – 31 March 2016 Time 10:00 pm – 5:00 am (Monday to Friday) 12 midnight (Saturday) to 12 noon (Sunday) Duration 3 months Reason To facilitate station works of the future MRT Semantan Station The full night closure of the SPRINT Highway/Jalan Semantan (both Kuala Lumpur and Petaling Jayabound) will continue until 31 March 2016. The closure will take place from 10:00pm to 5:00am (Monday – Friday) and 12 midnights (Saturday) to 12 noon (Sunday). The closure will be done intermittently from KM7.4 until KM8.1. (Please see appended map). Motorists will be required to use the following alternative routes: 1. Motorists from Kuala Lumpur heading to Petaling Jaya on the SPRINT Highway/Jalan Semantan will be diverted up the ramp to Istana Pintu 2 into Lorong Dungun, straight to Jalan Gelenggang, and then turn left to Jalan Beringin and underneath the flyover to join the SPRINT Highway (as indicated in BLUE in map). 2. Motorists from Kuala Lumpur heading to Jalan Damansara, Jalan Jelutong and Jalan Damansara Endah will be diverted up the Istana Pintu 2 ramp, into Lorong Dungun, straight to Jalan Gelenggang, then left to Jalan Beringin and underneath the flyover to join the SPRINT Highway, passing Pusat Bandar Damansara and up the ramp before connecting to Jalan Damansara, Jalan Jelutong and Jalan Damansara Endah (as indicated in BLUE followed by PURPLE in map). 3. Motorists from Petaling Jaya heading back to PJ/Bangsar will be diverted onto Jalan Damanlela, left into Jalan Damansuria before connecting back to SPRINT Highway (as indicated in ORANGE in map). MAP 8: CONTINUATION OF FULL NIGHT CLOSURE OF SPRINT HIGHWAY/ JALAN SEMANTAN 9. CONTINUATION OF RIGHT MOST LANE CLOSURE FROM KIARA INTERCHANGE TOWARDS WISMA LENSA (KL-BOUND) AND MEDANG SERAI TOWARDS KIARA INTERCHANGE (PJ-BOUND) Date 1 January 2016 – 31 March 2016 Time 24 hours Duration 3 months Reason For finishing works including coating and skin wall There will be a continuation of the right- most lane closure from Kiara Interchange to Wisma Lensa (KL and PJ-bound) from 1 January 2016 until 1 March 2016, 24 hours daily. During this closure, three (3) lanes will be made available for motorists on KL- bound and two (2) lanes will be available for motorists on PJ- bound. MAP 9: CONTINUATION OF RIGHT MOST LANE CLOSURE FROM KIARA INTERCHANGE TOWARDS WISMA LENSA (KL-BOUND) AND MEDANG SERAI TOWARDS KIARA INTERCHANGE (PJ-BOUND) 10. CONTINUATION OF FULL ROAD NIGHT CLOSURE OF SPRINT HIGHWAY NEAR PUSAT BANDAR DAMANSARA (PJ-BOUND) Date 1 January 2016 – 31 March 2016 Time 10:00 pm – 6:00 am (Monday to Friday) 12:00 midnight (Saturday) – 12:00 noon (Sunday) Duration 3 months Reason To facilitate station works of the future MRT Pusat Bandar Damansara Station SPRINT flyover near Pusat Bandar Damansara (PJ-bound) will undergo a medium- term full road closure starting 1 January 2016 to 31 March 2016, 10:00 pm to 6:00 am (Monday to Friday) and 12:00 midnight (Saturday) until 12:00 noon (Sunday), intermittently. During this closure, motorists from KL heading towads PJ will be diverted to turn into Jalan Johar and then turn left into Jalan Beringin. At the roundabout, take the second exit to continue on Jalan Beringin and turn left at the junction to go to Persiaran Bukit Kiara before joining SPRINT Highway to got to PJ. Motorists from KL to Jalan Ma’arof/ Bangsar will not be affected. MAP 10: CONTINUATION OF FULL ROAD NIGHT CLOSURE OF SPRINT HIGHWAY NEAR PUSAT BANDAR DAMANSARA (PJ-BOUND) 11. CONTINUATION OF SHORT-TERM SLIP ROAD CLOSURE AT KIARA INTERCHANGE (MON’T KIARABOUND) Date 1 January 2016 – 31 March 2016 Time 11:00 pm to 6:00am (Intermittently) Duration 3 moths Reason For finishing works including coating and skin wall There will be a continuation of short- term slip road closure at Kiara Interchange from Petaling Jaya to Mon’t Kiara at SPRINT Highway, starting 1 January 2016 until 31 March 2016 from 11:00 pm – 6:00 am, intermittently. During the closure, motorists from Petaling Jaya heading towards Mon’t Kiara at SPRINT Highway will be directed to drive straight ahead, make a U- turn at Ma’arof Interchange and turn left into the underpass at Kiara Interchange to Mo’t Kiara. This closure will be not implemented simultaneously with other closures in the area. MAP 11: CONTINUATION OF SHORT-TERM SLIP ROAD CLOSURE AT KIARA INTERCHANGE (MON’T KIARABOUND) 12. CONTINUATION OF NIGHT CLOSURE AT KIARA INTERCHANGE Date 1 January 2016 until 31 March 2016 Time 11.00pm to 6.00am Duration 3 months Reason For finishing works including coating and skin wall A continuation of night closure will be implemented at Kiara Interchange from 1 Januray 2016 until 31 March 2015. The following temporary closures will be implemented at Kiara Interchange: Lane closure from KL to Mon’t Kiara Lane closure from Federal Highway (Kerinchi Link) to Mon’t Kiara Lane closure from Mon’t Kiara to PJ Lane closure from Mon’t Kiara to Federal Highway (Kerinchi Link) Lane closure at KGPA-slip road During these closures, motorists will have to follow these diversions: a) () From KL (Sprint Highway) and Federal Highway (Kerinchi Link) to Mon’t Kiara: make a Uturn at the flyover underneath Jalan Dato’ Abu Bakar / SPRINT Highway, and turn left to Mon’t Kiara. b) () From Mon’t Kiara to PJ: make a U-turn at Ma’arof Interchange and join SPRINT Highway to go to PJ. c) () From Mon’t Kiara to Federal Highway (Kerinchi Link): make a U-turn at Maarof Interchange and head towards the Federal Highway (Kerinchi Link). MAP 12: CONTINUATION OF NIGHT CLOSURE AT KIARA INTERCHANGE 13. CONTINUATION OF NIGHT TRAFFIC MANAGEMENT AT SPRINT HIGHWAY AND JALAN MA’AROF (KL AND PJ-BOUND) Date 1 January 2016 – 31 March 2016 Time 10:00 pm to 6:00am Duration 3 months Reason To facilitate road work, coating piers and drainage works Jalan Ma’arof (KL bound & PJ bound) will continue to close from 1 Januray 2016 until 31 March 2016, 10:00 pm to 6:00 am, intermittently. The Jalan Ma’arof closure stretches after the junction of Jalan Medang Serai to Ma’arof Interchange (downhill heading towards Jalan Johar) and from Petaling Jaya heading uphill towards Jalan Ma’arof (underneath the SPRINT flyover at Ma’arof Interchange). During the closure, the following diversions will take place: Motorists from PJ heading towards Jalan Ma’arof will be diverted towards Pusat Bandar Damansara, going onto SPRINT flyover above Ma’arof Interchange and make a left turn into Jalan Medang Tanduk, and left again into Jalan Medang Serai before joining Jalan Ma’arof. Motorists from Jalan Ma’arof heading towards PJ will be diverted to turn left into Jalan Medang Serai, and right to Jalan Medang Tanduk to join SPRINT Highway. Motorists from Jalan Ma’arof (from KL direction) returning to KL will be diverted to make a U-turn at the traffic light junction of Jalan Ma’arof/ Jalan Medang Serai. From there, motorists can head straight into Jalan Bangsar, towards Jalan Duta/ KL. MAP 13: CONTINUATION OF NIGHT TRAFFIC MANAGEMENT AT SPRINT HIGHWAY AND JALAN MA’AROF (KL AND PJ-BOUND) 14. CONTINUATION OF SLIP ROAD NIGHT CLOSURE FROM KL (NEAR HELP RESIDENCE) TO JALAN MAAROF (BANGSAR-BOUND) Date 1 January 2016 – 31 March 2016 Time 11.00 pm to 6.00 am Duration 3 months Reason To facilitate surface work for drainage, sewerage, coating and road work Slip road from Kuala Lumpur (near HELP Residence) will be temporarily closed at night starting 1 January 2016 until 31 March 2016 from 11.00 pm – 6.00 am, intermittently. During this closure, motorist from KL heading towards Jalan Ma’arof (Bangsar-bound) should keep right along Pusat Bandar Damansara, and turn left further ahead into Jalan Ma’arof at the underpass. Please also take note that the SPRINT flyover near Pusat Bandar Damansara (PJ-bound) is still undergoing medium-term full closure which was announced on 26 December 2014. However, this closure will not be done simultaneously with other closures announced earlier at this are. MAP 14: CONTINUATION OF SLIP ROAD NIGHT CLOSURE FROM KL (NEAR HELP RESIDENCE) TO JALAN MAAROF (BANGSAR-BOUND) 15. CONTINUATION OF RIGHT- MOST LANE CLOSURE AT MAAROF INTERCHANGE Date 1 January 2016 – 31 March 2016 Time 24 hours Duration 3 months Reason Drainage works & road kerb The right-most lane closure will be implemented at Maarof Interchange, from Bangsar heading towards Bukit Damansara/ Kuala Lumpur from 1 January 2016 to 31 March 2016, 24 hours daily. During the closure, two (2) lanes will be made available for motorists. PUSAT BANDAR DAMANSARA VICTORIA STATION ENTRANCE B KL BOUND PJ BOUND MEDANG SERAI BANGSAR PUTERI LEGEND: LANE CLOSURE TRAFFIC LIGHTS PBD STATION MAP 15: CONTINUATION OF RIGHT- MOST LANE CLOSURE AT MAAROF INTERCHANGE ENTRANCE A 16. CONTINUATION OF LANE CLOSURE NEXT TO SPRINT HIGHWAY (DAMANSARA TOLL PLAZA) Date 1 January 2016 – 31 March 2016 Time Closure A: 24hours Closure B: 9:00 am to 4:00 pm Duration 3 months Reason Drainage works & road kerb There will be a lane closure next to the SPRINT Highway (Damansara Toll Plaza) from 1 January 2016 until 31 March 2016. The closure will be done in two (2) sections: Closure A (1 January 2016 – 31 March 2016, 24 hours): There will be a one (1) lane closure next to the SPRINT Highway (Damansara Toll Plaza). During this closure one (1) lane will be made available to the motorists from KL heading towards Petaling Jaya. There will be two (2) lanes available for motorists on Jalan 16/11 going towards Petaling Jaya. Closure B (1 January 2016 – 31 March 2016, between 9:00AM to 4:00PM): Additionally, closure B will be implemented concurrently with Closure A between 8:00AM to 4:00PM. During these closures, one lane will be made available to the motorists from KL heading towards Petaling Jaya on Jalan 16/11 and one (1) lane will be made available on SPRINT Highway near Phileo Damansara. MAP 16: CONTINUATION OF LANE CLOSURE NEXT TO SPRINT HIGHWAY (DAMANSARA TOLL PLAZA) To minimize the traffic impact, motorists from KL on SPRINT Highway heading towards Petaling Jaya can opt to turn into Jalan Dato’ Abu Bakar and turn right into Jalan 16/16 and the turn right to Jalan 17/1 and join back Jalan 16/11 to head back to Petaling Jaya. 17. CONTINUATION OF LANE CLOSURE AT SPRINT HIGHWAY AFTER PETRONAS STATION, SECTION 16 (KL-BOUND) Date 1 January 2016 – 31 March 2016 Time 10:00 pm to 6:00 am (Monday – Friday) 12:00 midnight to 6:00 am (Saturday – Sunday) Duration 3 months Reason To facilitate the completion work of link bridge for Phileo Damansara Station and material delivery and unloading for station work There will be two (2) lanes closure for a stretch of 200 m after the Section 16 Petronas Petrol Station at SPRINT Highway (KL-bound), from 1 January 2015 until 31 March 2016. This closure will be divided into a two-lane closure (Monday-Friday, 10:00PM to 6:00AM) and a three-lane closure (Saturday – Sunday, 12 Midnight to 6:00AM). Two (2) lanes (right-most-lane) will be made available for motorists from TTDI and Petaling Jaya heading to Kuala Lumpur from Monday to Friday. One (1) lane (right-most-lane) will be made available for motorists of the same bound during weekend (Saturday-Sunday). MAP 17: CONTINUATION OF LANE CLOSURE AT SPRINT HIGHWAY AFTER PETRONAS STATION, SECTION 16 (KL-BOUND) For media enquiries, please contact: Subba Rao Tel: +6019 7736806 Siti Fadzillah Ismail Tel: +603 7493 3963 [email protected] [email protected] MMC GAMUDA KVMRT (PDP) SDN BHD (927050-H) Block A, Level 7, Menara Mustapha Kamal, PJ Trade Centre, No 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling Jaya, Selangor, Malaysia T: 603 7494 2200 F: 603 7722 2643 www.kvmrt.com.my