6A - Attach 1
Transcription
6A - Attach 1
FIXED LANDING EXISTING PIER TO REMAIN PIER EXTENSION BOARDING PLATFORM APRON E LEASE LIN GANGPLANKS (4 TOTAL) GANGWAY FIXED BOARDING RAMP (2 TOTAL) FLOAT SLIP 2 TEMPORARY PIER BOARDING PLATFORM DONUT FENDER (2 TOTAL) SLIP 1 FLOAT GUIDE PILE (5 TOTAL) (E) PIER, GANGWAY AND FLOAT TO BE REMOVED (SHOWN IN WHITE) VESSEL TO BERTH THIS SIDE ONLY AT TEMPORARY TERMINAL -15 M LLW RELOCATED (E) GANGWAY AND FLOAT FOR TEMPORARY TERMINAL Item 6A - Attach 1 12-02-14 Page 1 of 7 Item 6A - Attach 1 12-02-14 Page 2 of 7 Item 6A - Attach 1 12-02-14 Page 3 of 7 SEQUENCE - PHASE I 2 3 5 6 1 3 DISCONNECT UTILITIES TO EXISTING TERMINAL. UTILITIES ON EXISTING GANGWAY AND EXISTING FLOAT TO REMAIN FOR FUTURE USE AT TEMPORARY TERMINAL. 4 RELOCATE EXISTING GANGWAY AND FLOAT TO TEMPORARY TERMINAL LOCATION. 5 CONNECT TEMPORARY TERMINAL UTILITIES. 6 DEMOLISH EXISTING CONCRETE PIER. 4 SEQUENCE - PHASE I 1 CONSTRUCT TEMPORARY ACCESS PIER INCLUDING UTILITIES FOR FUTURE CONNECTION. 2 CONSTRUCT TEMPORARY BARRIER FENCE. REMOVE EXISTING GUARDRAIL AND INSTALL NEW ACCESS GATE. 5 PHASE I - CONSTRUCT TEMPORARY TERMINAL SEQUENCE - PHASE II 9 SEQUENCE - PHASE II 7 CONSTRUCT NEW CONCRETE PIER. 10 DISCONNECT AND REMOVE TEMPORARY UTILITIES. 8 INSTALL NEW GANGWAY, FLOAT, DONUT FENDERS AND COMPLETE UTILITIES. 11 REMOVE AND DISPOSE OF TEMPORARY TERMINAL. 9 REMOVE AND INSTALL GUARD RAIL ON EXISTING PIER. 8 9 7 8 10 PHASE II - CONSTRUCT NEW TERMINAL & REMOVE TEMPORARY TERMINAL Item 6A - Attach 1 12-02-14 Page 4 of 7 Item 6A - Attach 1 12-02-14 Page 5 of 7 Item 6A - Attach 1 12-02-14 Page 6 of 7 Item 6A - Attach 1 12-02-14 Page 7 of 7