Nordkalk and the Bunge limestone quarry project on Gotland island
Transcription
Nordkalk and the Bunge limestone quarry project on Gotland island
© Nordkalk 2011 Nordkalk and the Bunge limestone quarry project on Gotland island, Sweden. - Replacement of a depleting quarry - Application process ongoing since 2006 M.Sc. Håkan Pihl, Project Manager Anders Mattsson, VP Metals & Mining and Managing Director Nordkalk AB 11/5/2013 - member of the Rettig Group - © Nordkalk 2011 - member of the Rettig Group - © Nordkalk 2011 Gotland is very central in the Nordkalk group structure Major Customer • Central geographical location • Efficient logistics chain • Very suitable geological conditions which arn’t found elsewhere in the region - - - member of the Rettig Group - © Nordkalk 2011 Nordkalk operations in the north of the Gotland island - member of the Rettig Group - © Nordkalk 2011 Legislation frame • Limestone is not covered by the Minerals Act of Sweden • Limestone belongs to the group of minerals and rock material which is controlled by the land owner • The permit process is regulated by The Environmental Code 05/11/2013 - member of the Rettig Group - 5 © Nordkalk 2011 Prospecting is just the beginning Bunge 45 Mton 14,2 Mton 4 Mton Mölnermyr Storugns 10 Mton Hoburgsmyr Klinthagen - member of the Rettig Group - © Nordkalk 2011 Geology has moved into the court rooms • County administration – Would handle a normal quarry permit – Due to groundwater issue this case was handled by the court system already from start • (MMD) - Land and Environmental Court • (MMÖD) - Land and Environmental Court of Appeal • (HD) - Supreme Court 05/11/2013 - member of the Rettig Group - 7 © Nordkalk 2011 Bunge Legal Process; ongoing since 2005 MMD MMÖD HD Test quarrying 2005 2006 2006 Preliminary permit 2008 2009 2010 Permit, Terms & Condition 1 2011 2012 2013 Permit, Terms & Condition 2 2014 2015 2016? - member of the Rettig Group - © Nordkalk 2011 The Supreme Court now dislikes a two step permit handling • 2009 ruling granted that the new quarry operation is allowed at this particular location. The ruling was indirectly approved by the Supreme Court • 2012 ruling granted the final permit and terms for the once allowed operation • Now, in 2013 the Supreme Court disliked this two step handling • The Natura 2000 impact assessment must be considered along with the final terms of the operation 05/11/2013 - member of the Rettig Group - 9 © Nordkalk 2011 The new Bunge area is registered as an area of national interest for mineral exploration 05/11/2013 - member of the Rettig Group - 10 © Nordkalk 2011 Common borderlines with two Natura 2000 areas is the challenge Bästeträsk Natura 2000 Ojnaremyr Bräntings haid Natura 2000 Mölnermyr Natura 2000 Hobursmyr Natura 2000 5.11.2013 - member of the Rettig Group - © Nordkalk 2011 Co-existence between nature protection and extraction must be possible “ There is no automatic exclusion of new NEEI activities in and around Natura 2000. Instead, the provisions outlined in Article 6 of the Habitats Directive have to be followed to ensure that these activities are undertaken in a way that does not adversely affect the integrity of Natura 2000 sites. “ 11/5/2013 - member of the Rettig Group - N © Nordkalk 2011 Areal view FÅRÖ BÄSTETRÄSK HAUTRÄSK TVÄRLINGSMYR HÅKAN LINDERS MYR STUCKSBROTTET PROVBROTTEN Östra Västra OJNAREMYR BUNGETÄKTEN SLÄKMYR - member of the Rettig Group - 13 © Nordkalk 2011 Vegetation goes all the way to the quarry front - member of the Rettig Group - © Nordkalk 2011 Nordkalk is investing some 70 m€ in Bunge, Gotland. 11/5/2013 - member of the Rettig Group - © Nordkalk 2011 More than lime, responsibility for a sustainable society development ! - member of the Rettig Group -