our presentation - argogroup-exact.com argogroup

Transcription

our presentation - argogroup-exact.com argogroup
ARGOGROUP EXACT Ltd.
General information

“Argogroup Exact” Ltd. has active presence on the construction market since
1997. During the period of its existence the company has completed successfully
and handed over to the investors over 270 sites with Developed Built up Area of
400,000 sq.m. The company is certified in:
ISO 9001:2000 – Quality Management System;
ISO 14001:2004 – Environment Management System;
OHSAS 18001:2002 – Occupational Health and Safety Management System;

“ Argogroup Exact “ Ltd. is invariable associated with excellent quality of services
, personal commitment to the customers and loyalty. The company owns a
modern construction machinery and technological equipment of very high level
to ensure quality and timely completion of construction processes. The company
has all required licenses and certificates, which gives it the right to perform works
of all categories in Bulgaria .

“Argogroup Exact “ Ltd employs a team of well qualified experts in the area of
construction, finance, marketing and management. We encourage our employees
to express and develop their potential. With innovatory ideas, experience and
striving for personal growth, they set up the potential of the company.

“Argogroup Exact“ Ltd fulfills its commitments well and on schedule. We strive to
improve ourselves in order to respond to the dynamics and challenges, for the
implementation of modern technologies and modern solutions in harmony with
the environment.
Activitiy
'Argogroup Exact' Ltd. carries out a wide spectrum of activities in the
field of building construction. The company has completed a great
number of significant sites in the field of industrial, public and residential
construction as well as infrastructure projects.
 Industrial Construction
'Argogroup Exact' Ltd. is one of the leading companies in Bulgaria in the
field of industrial construction. By combining the professionalism of its
employees with the contemporary construction machinery and
technologies, materials and highly productive mechanisation, 'Argogroup
Exact' Ltd. supplies on the market finished products of excellent quality.
The company has realised a large number of significant industrial sites.
 Public Construction
The public construction is widely developed in the work of 'Argogroup
Exact' Ltd. A large number of sites of national significance, among which
trade centres, hotels,churches, and other public buildings, are
completed all over the country. They are distinguished with
multifunctionality , secure exploitation and provide accessibility for wide
audience.
 Residential Building
'Argogroup Exact' Ltd. is specialized in the complete construction of
residential buildings and settlements of closed type. In order to create a
safe and beautiful place for living combining comfort, functionality and
peaceful environment, our firm applies contemporary construction
machinery, technologies and materials.
We value our customers and build partnerships with them based on
honesty and professionalism. We strive to find the optimal solution for our
customers. We contribute to the success of our partners and work in a way
that makes them feel the commitment of our employees to each of their
individual projects.
RESIDENTIAL BUILDING
Ellipse center – Office Building with
stores , restaurants, an underground
car park and a power substation ,
Sofia, Tsarigradsko Shosse Blvd. 7 – 11
km.
Total floorage: 18 500 sq.m.
• Project Features: Unique reinforced
concrete structure, own design and
manufacture of formwork system for
grid façade, joining the
reinforcement grid with high –
strength joints, after the certification
of the company for this activity.
Office Building with stores,
underground garages, a power
substation on Stamboliysky Blvd.,
Sofia
Total floorage: 10 000 sq.m.
- Construction period of structural
works: May 2010 –April 2011.
Complete construction of façade and
roof works of office building with
stores, underground garages, a power
substation on Stamboliysky Blvd., Sofia.
Execution period : February 2011 –
October 2011.
 Project Features: Complicated
logistics due to the location in the
central part of the city and a unique
solution for the facades designed
completely by our designers
PUBLIC CONSTRUCTION
Office Building on Todor
Aleksandrov Blvd. Sofia
Total floorage: 10 300 sq. m.
- Construction period: 21 May 2010 –
- 31 December 2011.
• Project Features: Complex design solution
in three underground levels and interesting
innovative solution in the part “Hydro Insulation
Below Ground Level”.
Administrative building with a bank
office – Scobelev Blvd. , Sofia
Total floorage: 2 500 sq.m.
• Project Features : Complicated to
implement classical ventilated facade
Reconstruction of “Radisson
Blu Grand Hotel”
Construction period:
25.04.2013 – 27.03.2014 г.
PUBLIC CONSTRUCTION
Orthodox Church "St. Visarion Smoliansky“ City of Smolian
Total floorage: 2 100 sq.m.
Construction period: August 2004-July 2006;
Project Features : Complex architecture, incorporated
innovative technologies into traditional methods
Memorial Monument , City of Hisarya.
Construction period :
July - September 2007г.
Reconstruction of the stands at the stadium "Georgi
Asparuhov" Professional Football Club Levski.
Construction period : 01 Jun - August 2011
PUBLIC CONSTRUCTION
"Pirin" Park Hotel and
Residential Complex,
Sandansky.
Total floorage: 18 000sq.m
Construction period :
February 2006 - October
2007.
• Project features: Perhaps
one of the best vacation
places in Bulgaria
Hotel „Maxi”, Sofia
Construction period:
November 2005 – August 2006 г
“Yantra” hotel in Veliko Tarnovo, :
Total floorage: 11 000 sq.m.
- Construction period: April 2005December 2005
Project Features: Unique location in a
natural gorge of the River “Yantra”
opposite the “Tsarevets” hill
PUBLIC CONSTRUCTION
Construction of chain stores across the country:
DOMKO, LIDL, KAUFLAND, BILLA, PENNY, LABIRINT,
MTEL,GERMANOS,VIVACOM ``
Multifunctional building Domko,Varna city
Project Features: Building of the Year 2013
in the category "Cooperative and administrative
buildings"
Residential Building
Residential building with stores, offices, workshops
and underground garages, “Ivan Vazov”, Sofia,
Declared Building of the Year 2013 in the category
“Residential buildings and complexes”
Total floorage: 12500 sq.m..
• Construction period: April 2012 – January 2013
• Project Features: complex construction and advanced
ventilated system combining past and future
South Park
Total floorage: 7 000 sq. m
- Construction period: May
2010 - February 2012.
- Unique location, full design
and precise execution of the
suspended façade.
Residential estate "Biala
Cherkva”
is a closed-type settlement with access
control and full service of areas in the
complex. Situated at the foot of Vitosha
Mountain, it is home to nearly 100
families.
Industrial Construction
EXTERNAL OPERATIVE SITE NOVO SELO,
Training range in Bulgaria, with Investor U.S.Army Corps of Engineers;
- The site occupies an area of 560 decares. “Argogroup Exact” Ltd is Subcontractor of the constructions
of all subprojects with a total floorage of 47,000 square meters and adjacent flooring of 50,000 square
meters. Complete design and implementation of a Fuel Terminal for aviation fuel with 4 points for
loading and unloading;
- Structural Concrete Works period : March 2010 – December 2010
Construction period of Fuel Terminal : 22 July 2010 - 15 June 2011
Reconstruction of ОМV petrol base in Vidin.
- Construction period– May2010 – August 2010
Industrial Construction
Billa's Central Warehouse in Bulgaria
-Total floorage of 23,000 square meters with adjacent concrete sites with a
total area of 16,000 square meters
- Construction period November 2009 – June 2010
- Features of the site:
development and
implementation of no joints
method of laying of concrete
floors in warehouses and aerated
concrete pavements of exposed
sites. Both methods are very
innovative for Bulgaria.
New manufacturing and warehouse building with reception and administrative areas, city of Shumen
Total floorage: 9 500 sq.m.
Construction period : September2013-July2014г.
Office and Production building of Solid 55
- Sites with total floorage of 17 600 sq.m.
- Construction period June 2008 – February 2009
- Features of the site: Implementation of own production of a rare system - precast
concrete structure including detailed design and implementation of formwork. For this
very short period more than 1500 prefabricated elements are produced and installed
Argogroup Exact Ltd.
Bulgaria, Sofia, 1186
140 Patriarh German str.
office : + 359 2 973 6668
office : + 359 2 973 6968
office: + 359 2 973 6970
fax :+ 359 2 973 0868
E-mail: [email protected]
Web: www.argogroup-exact.com