Common Application of Busduct
Transcription
Common Application of Busduct
Busduct System Schneider Busway Common Application of Busduct Transformer to Switchboard Schneider Busway Common Application of Busduct Horizontal Plug-in Busduct – Large Scale Factory, e.g. HAECO Schneider Busway Common Application of Busduct Vertical Plug-in Riser – Typical Comm., Ind., Res. in HK Schneider Busway Common Application of Busduct Switchboard to Switchboard – Example: Main Sw Bd to A/C Plant Schneider Busway Basic Construction of Busduct Sandwich type construction Less space requirement Improve heat dissipation Reduce temperature rise Higher current rating available Various IP rating available Schneider Busway High Grade Copper Busbar High conductivity copper Silver plated over full length, enhance low contact resistance and high conductivity Thickness of copper bar = 6.3 mm Rectangular design enhance heat dissipation Schneider Busway Temperature Rise Sandwich construction and high conductivity copper busbar Ætemp.rise less than 55oC at full load Schneider Busway Busbar Insulation 2 layers 0.2mm Mylar insulation (IEC requires 1 layer) Excellent dielectric properties 0.1mm Mylar can withstand 7000V Class B insulation (130oC) Schneider Busway Integral Ground Bus 1.6mm Aluminum enclosure as ground bus 50% continuous capacity Lower ground impedance Comply with international requirement, UL, IEC, IEE wiring regulation Schneider Busway EZ Joint Pak Schneider Patten Design Single bolt connection – Double head – Visible tighten torque – Belleville washer – Tighten torque = 105N-m (70 lb-ft) Schneider Busway EZ Joint Pak Electroplated surface reduce contact resistance Each joint pak allows 3 mm adjustment for thermal expansion Reduce installation time and equipment Improve reliability Schneider Busway Product Range Feeder, Riser , Plug-in Common Rating 200A-600A & 800A-5000A Rated Voltage = 600V IP rating: – Feeder : IP40, IP41, IP54, IP65, IP66 – Plug-in / Riser : IP40, IP54 Schneider Busway Common Fitting Elbows – Standard 90o Schneider Busway Common Fitting Elbows – Other shape available upon request e.g. Double elbows, Offset, Elbow + flanged end Schneider Busway Common Fitting Flanged End – For connection to Switchboard – For connection cable to busduct Schneider Busway Common Fitting Expansion Joint – Allow ±38mm expansion – Apply where busduct pass through structural expansion joint Schneider Busway Vertical Hangers Fixed hangers Spring Hangers – Apply in new building – Eliminate the effect of settlement Schneider Busway Plug-in Units Fusible PIU (30A-1600A) MCCB PIU (16-1600A) Schneider Busway Plug-in Units High level of safety – Complete insulated conductor – Interlocks – Contact earth terminal first Schneider Busway System Design Cable Vs busduct Choice of breaking capacity, IP rating Earthing system arrangement Voltage drop consideration Provision for expansion Harmonic issue Schneider Busway Cable Vs Busduct Busduct system have advantage in high ampere range, say 600A or up Comparison between cable & busduct Cable Busduct Space requirement High Low Heat Dissipation Poor Good Temperature rise Poor Good Voltage Drop High Fair Electromagnetic Interference High Low Labour Cost Higher Lower Schneider Busway Choice of Breaking Capacity Breaking Capacity – Main distribution Vs Submain Distribution – 1 sec and 3 sec requirement Schneider Busway Choice of IP Rating Minimize water hazard Horizontal Vs Vertical Corridor Vs meter room Schneider Busway Earthing System Arrangement IGB through out the whole run of busduct No need for additional or external earthing conductor Each tap-off box bond to IGB Schneider Busway Voltage Drop Consideration 4% Voltage drop from source to final circuit (IEE Wiring Regualtion) Longer the busduct length, Higher the voltage drop Try to shorten length of busduct Upgrade the busduct, e.g use 1200A busduct for 1000A circuit Schneider Busway Provision of Expansion Thermal expansion – Busbar thermal expansion absorbed by joint pack – No need to install any expansion joint Structural expansion – Busduct cannot absorb expansion – Shear force can damage busduct – Expansion fitting should be installed Schneider Busway Harmonic Issues Generated by Non-linear load, e.g. UPS, Inverters, High frequency lamps Can overheat neutral conductor Alter the operation of Tx, Capacity bank Affect the normal operation of switchgear Ænuisance tripping 200% neutral busduct cannot solve the problem Apply power control equipment, like harmonic filter OR Upgrade the whole busduct Schneider Busway Installation Procedure Video of Installation (about 8 minutes) Schneider Busway Water / Dust Precaution Provide alternative path / heating point Damage insulation Latent hazard of short circuit Measurement – Double packing (plastic bag+carton box) – Apply “rain coat” provided by manufacturer after installation each day – Proper storage management Schneider Busway Water / Dust Precaution Double packing (plastic bag+carton box) Schneider Busway Water / Dust Precaution Double packing (plastic bag+carton box) Schneider Busway Water / Dust Precaution Apply “rain coat” provided by manufacturer after installation each day Schneider Busway Water / Dust Precaution Proper storage management Schneider Busway Quality Project Management Services Product Training Site Measurement Optimum busduct routing design Detail shop drawing preparation On site technical support Training on installation procedure “Missing Link” and “Remedial Units” Joint inspection (not contractual service) Schneider Busway Missing Links / Remedial Units Missing link – reserve 1 pc of busduct for final measurement – Increase accuracy of busudct dimension – Save time for rectifying installation mistake – Streamline the installation Missing Link Schneider Busway Missing Links / Remedial Units A neighborhood factory enhance fast delivery of missing links and remedial units (within 1 week delivery to HK) Schneider Busway Contractor-Supplier Interaction Project Start Technical support and routing deisgn After sales services and missing links AutoCad Drawing Installation support We are not only a busduct supplier Project Management Support BRASS and manufacturing instruction Fabrication Schneider Busway Testing & Commissioning - Factory Factory Test – 7500V dc Hi-pot Test 100% test before delivery Insulation = 10MΩ/ ft – (IEC require 1MΩ/ ft ) Check weak point of insulation Schneider Busway Testing & Commissioning – On Site Mega test before any energization – NEMA: MΩ =100/ Length of Busduct in Ft (1000V) – HK Code of Practice 0.5 MΩ at 500Vdc Ductile test of entire length Joint inspection by both contractor and supplier – Alignment, Installation procedure,etc Schneider Busway Maintenance Issues Vertical spring hanger adjustment Bowing Symptom Thermal checking/ scanning Schneider Busway Vertical Spring Hanger Adjustment Adjustment need after a period of usage, esp new building Make compensation for settlement and concrete shinkage Schneider Busway Vertical Spring Hanger Adjustment Adjust the length of spring to provide adequate vertical support to busduct Schneider Busway Bowing Symptom Schneider Busway Bowing Symptom Common causes – Misalignment – Improper installation, e.g. loosen bolts – Improper vertical support Uneven pressure or expansion force the busduct to bend at “weak points” Bowing can make permanent deforming of busduct Schneider Busway Thermal Checking / Scanning Improper installation Æ poor contact Abnormal temperature rise (usually happened in joints) Collect temperature data and compare Find out the abnormal heating point and rectify Schneider Busway Trouble shooting Common causes of burnt busduct – Water/dust ingress during installation stage – Water ingress after energize (for IP40 mainly) – Improper installation, e.g. misalignment, lossen bolts Some real examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Some Real Examples Schneider Busway Trouble Shooting Recommend spare parts – 1 pair of flanged ends for each busduct rating used – A number of plug-in units 24-hours services hotline provided by Schneider Busway – 7298 9771(for HK Market) Schneider Busway End of Presentation! Thank you! Schneider Busway
Similar documents
COAXIAL - CeramTec
sometimes referred to as “highvoltage BNCs.” CeramTec’s standard MHV connectors are available as single ended or double ended units with a floating shield or a grounded shield.
More information