Facilities Condition Assessment and Referendum Presentation at 9
Transcription
Facilities Condition Assessment and Referendum Presentation at 9
Haddonfield Public School District Facilities Condition Assessment and Referendum September 10, 2015 1 Facilities Condition Assessment Kick-started by 2013 ROD grant availability In-depth needs assessment by architects and engineers Building envelope Mechanical and electrical systems Technology, security, and communications systems REPLACE WINDOWS ROOF LEGEND WOOD REPAIR / REPLACEMENT 13 LF OF STONE COPING AND BRICK PARAPET WALL B REPLACE WINDOWS TOTAL = 856 SF 1947 12 LF OF STONE COPING WITH BRICK PARAPET WALL 78 LF OF STONE COPING WITH BRICK PARAPET WALL 217 LF OF STONE COPING WITH BRICK PARAPET WALL D L 34 LF OF STONE COPING WITH BRICK PARAPET WALL ? MATERIAL ASPHALT SHINGLES EPDM WARRANTY DATE/ YEAR INSTALLED ? NOTES ? APPROX. AREA (SF) 2,378 1947 / 1964 D ? ? ASPHALT SHINGLES 2000? ? 1964 E SIPLAST PATRIOT ROOFING 2 PLY MOD. BITUMEN 9/5/2005 20 YEARS 1 2,867 1964 F SIPLAST PATRIOT ROOFING 2 PLY MOD. BITUMEN 9/5/2005 20 YEARS 1 14,060 MODIFIED BITUMEN ? GUARANTEE DURATION ? 2000? ? 115 ? 85 13,778 1964 G SIPLAST PATRIOT ROOFING 2 PLY MOD. BITUMEN 9/5/2005 20 YEARS 1 1,681 1964 H SIPLAST PATRIOT ROOFING 2 PLY MOD. BITUMEN 9/5/2005 20 YEARS 1 6,922 I SIPLAST PATRIOT ROOFING 2 PLY MOD. BITUMEN 9/5/2005 20 YEARS 1 5,499 J SIPLAST PATRIOT ROOFING 2 PLY MOD. BITUMEN 9/5/2005 20 YEARS 1 7,870 K SIPLAST PATRIOT ROOFING 2 PLY MOD. BITUMEN 9/5/2005 20 YEARS 1 2,617 2002 L SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 20 YEARS 2 2002 M SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 20 YEARS 2 2002 N SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 20 YEARS 2 5,633 2002 P SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 20 YEARS 2 1,065 2002 P1 SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 20 YEARS 2 506 2002 Q SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 20 YEARS 2 130 2002 Q1 20 YEARS 2 2002 1964 2002 INSTALLER ? 1964 REPLACE WINDOWS ? ? ? 1964 WOOD CORNICE REPAIR/ RESTORATION ROOF REPLACEMENT C REPLACE ALL WINDOWS ON THIS ELEVATION, INCLUDING BAY WINDOWS, TOTAL = 4,616 SF MANUF. B C SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 228 5,816 Architecture/Engineering BRICK MASONRY REPAIR 44 LF OF METAL COPING AND BRICK PARAPET WALL A 1947 79 R SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 20 YEARS 2 191 2002 S SIPLAST BROWN & GUARINO 2 PLY MOD. BITUMEN 8/22/2002 20 YEARS 2 2,249 2005? T SIPLAST A.F. CALLAN & CO. INC. 2 PLY MOD. BITUMEN 8/16/2006 20 YEARS 3 456 NOTES: 1. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 290 SQUARES ARE INSTALLED OVER A GYP. DECK WITH 1/4" STRUCTURAL SLOPE, 2" POLYISO INSULATION AND 1/4" DENS DECK (MECH. ATTACHED), 1" WOOD FIBERBOARD SET IN HOT ASPHALT AND 2 PLY MODIFIED BITUMEN ROOFING IN HOT ASPHALT. 60 SQUARES ARE INSTALLED OVER A GYPSUM DECK WITH 1/4" DENS DECK., 2" POLYISO INSULATION/ 1" WOOD FIBERBOARD (SIMULTANEOUSLY SCREW FASTENED), AND 2 PLY MODIFIED BITUMEN ROOFING IN COLD ADHESIVE. M 2. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 154 SQUARES INSTALLED OVER A METAL ROOF DECK WITH 1-1/2" POLYISO INSULATION, TAPERED INSULATION AND 1/4" DENS DECK PRIME (ALL INSULATION AND DENS DECK MECHANICALLY ATTACHED- SIMULTANEOUSLY) WITH 2 PLY MODIFIED BITUMEN (20 EG & 30 FR SHEETS) IN COLD ADHESIVE. P1 G 527 LF OF SHINGLE ROOF EDGE WITH CAST STONE CORNICE/ INTEGRAL GUTTER 1964 Q 22 LF OF METAL COPING WITH EIFS PARAPET WALL R 1964 K 2005 EXISTING ROOF PLAN 1/16" = 1'-0" I Contractor shall check and verify all conditions and dimensions at the site before proceeding with this work. Revisions Date Description # H 470 LF OF STONE COPING WITH BRICK PARAPET WALL 39 LF STONE COPING WITH CAST STONE PARAPET WALL FINISH 29 LF OF METAL COPING WITH EIFS PARAPET WALL F 470 LF OF STONE COPING WITH BRICK PARAPET WALL Set Issue: Schematic T E 30 SF OF CAST STONE WINDOW HEAD 18 SF OF CAST STONE DOOR TRIM 9 LF OF CAST STONE ORNAMENTAL HEAD DOOR TRIM 50 SF CAST STONE PANELS AND ORNAMENTAL TRIM AT PARAPET. 25 LF OF ORNAMENTAL TOP OF PARAPET 1 51 LF OF STONE COPING WITH BRICK PARAPET WALL 22 LF OF STONE COPING WITH BRICK PARAPET WALL 36 SF OF CAST STONE DOOR TRIM 145 SF CAST STONE PANELS & ORNAMENTAL DOOR HEAD 50 SF CAST STONE PANELS AND ORNAMENTAL TRIM AT PARAPET. 100 SF OF CAST STONE WINDOW TRIMS 2 REPLACE WINDOWS COURTYARD 'Q' & 'Q1' TOTAL 51 LF OF STONE COPING WITH BRICK PARAPET WALL for the 122 LF OF STONE COPING WITH BRICK PARAPET WALL Q1 Central Elementary School N REPLACE WINDOWS TOTAL = 1,786 SF D 3 Lincoln Ave, Haddonfield, New Jersey 08033 38 LF OF METAL COPING WITH EIFS PARAPET WALL 356 LF OF STONE COPING WITH BRICK PARAPET WALL Preliminary Building Envelope Condition Assessment at J 27 LF OF METAL COPING WITH EIFS PARAPET WALL P 1 Lincoln Ave, Haddonfield, New Jersey 08033 3. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 5 QUARES INSTALLED OVER 1/4" SLOPED METAL ROOF DECK WITH 2" POLYISO INSULATION AND TAPERED INSULATION (SIMULTANEOUSLY MECHANICALLY ATTACHED), 1" HD FIBERBOARD AND 2 PLY MODIFIED BITUMEN ROOFING IN POLYURETHANE ADHESIVE. 98 LF OF METAL COPING WITH EIFS PARAPET WALL Haddonfield Board of Education 64 LF OF SHINGLE ROOF EDGE WITH WOOD FASCIA/ SOFFIT REPLACE WINDOWS 164 LF OF STONE COPING WITH BRICK PARAPET WALL Issue Date: S 2002 309 LF OF STONE COPING WITH BRICK PARAPET WALL 205 LF OF STONE COPING WITH BRICK PARAPET WALL 170 SF, 51 LF OF CAST STONE ORNAMENTAL 30 SF OF CAST STONE DOOR TRIM 90 SF OF CAST STONE JAMB / HEAD WINDOW TRIM 144 SF CAST STONE PANELS April 7, 2015 Drawing Title: Existing Roof Plan & Roof Legend Drawn by: Checked by: RS SAB Project Number: 15HPS00001 Drawing Number: A-2.1 NJ Certificates of Authorization: Architecture - 21AC00027100 / Engineering- 24GA28022600 BRICK MASONRY REPLACEMENT ROOF AREA 1890 1947? BECICA ASSOCIATES LLC 1890 BLDG. YEAR 500 South Kings Highway Cherry Hill, New Jersey 08034 P: 856.795.1180 F: 856.354.6367 W: www.becica.com CAST STONE REPAIR Signature/Date STONE COPING REPAIR A STEVEN A. B ECICA, R.A. N.J.AI 21AI01137600 PARAPET REPAIR / RE-CONSTRUCTION 148 LF OF SHINGLE ROOF EDGE WITH WOOD FASCIA/ SOFFIT AND METAL GUTTER Elizabeth Haddon Elementary School 3 Elizabeth Haddon Elementary School 4 Elizabeth Haddon Elementary School 5 Elizabeth Haddon Elementary School 6 J. Fithian Tatem Elementary School 7 J. Fithian Tatem Elementary School 8 J. Fithian Tatem Elementary School 9 Central Elementary School 10 Haddonfield Middle School Central Elementary School 11 Haddonfield Middle School Central Elementary School 12 Haddonfield Middle School Haddonfield Memorial High School 13 Haddonfield Memorial High School 14 Haddonfield Memorial High School 15 Haddonfield Memorial High School 16 Facilities Challenges Building age Multiple additions Patchwork upgrades Varying educational conditions MS HMHS Haddon Haddon Haddon 1913 17 Taft Tatem 192326 Coolidge HMHS MS HMHS Tatem Tatem Haddon Central Central Tatem Haddon Central 1947-52 1954-55 1963 1964 1971 1989-90 2002-05 Kennedy Johnson Nixon GH Bush GW Bush Truman Eisenhower Critical Infrastructure Issues throughout District Building Envelope: Damaged masonry and eroding mortar joints and corroded lintels Stability issues – masonry walls, stone elements, parapets Deteriorating wood trim with peeling paint Problem roof areas Building Systems: Inefficient and outdated heating plant controls Air-conditioning not in all instructional spaces Inadequate electrical service and distribution 18 Obsolete and/or inadequate special systems (public address, clock, security) Proposed Scope of Work Building Envelope: Roof Replacement Window Replacement Exterior Wall and Structural Repairs Chimney Repairs Building System Improvements: Air Condition Classrooms and Electrical Upgrades Boiler Upgrades and Central Building Controls Security/Cameras Master Clock System Telephone and Public Address Systems Technology Upgrades Education Facility Improvements Haddonfield Memorial High School New Student Commons Food Service / Locker Rooms / Dance Gym / Support Facilities Barrier-Free / ADA Accessibility / Structural Integrity / Program Needs Long Range Facility Plan 19 Master Plan for the Future Elizabeth Haddon Elementary School Proposed Building Envelope Scope of Work 20 J. Fithian Tatem Elementary School Proposed Building Envelope Scope of Work 21 Central Elementary School Haddonfield Middle School Proposed Building Envelope Scope of Work 22 Haddonfield Memorial High School Proposed Building Envelope Scope of Work “B” Wing Gym, Façade Reconstruction and Structural Repairs Construct New Student Commons Reconstruct Cafeteria, Kitchen and Second Floor Dance Gym and Support Spaces 23 Proposed HVAC & Electrical Uprgrades Air Condition Classrooms ELIZABETH HADDON 24 J. FITHIAN TATEM CENTRAL ELEMENTARY / MIDDLE HADDONFIELD HIGH SCHOOL Haddonfield Memorial High School Proposed New Student Commons and Alterations Construct New Student Commons Reconstruct Cafeteria, Kitchen and Second Floor Dance Gym and Support Spaces Provide Gym Level Locker Rooms “B” Wing Gym Façade Reconstruction and Structural Repairs 25 Haddonfield Memorial High School Proposed New Student Commons and Alterations Replace Auditorium HVAC System Air Condition “A” Wing Classrooms Administrative Office Renovations 26 Haddonfield Memorial High School Proposed New Student Commons and Alterations “C” Wing Home Ec Renovations 27 “C” Wing Science Lab Alterations Haddonfield Memorial High School Proposed Long Range Facilities Plan Vision For Future Improvements 28 Haddonfield Memorial High School Long Range Facilities Plan Vision For Future Improvements 29 Haddonfield Memorial High School Proposed Long Range Facilities Plan Vision For Future Improvements 30 Central Haddonfield Middle School Elementary School Proposed Long Range Facilities Plan Vision For Future Improvements 31 Ground Floor Central Haddonfield Middle School Elementary School Proposed Long Range Facilities Plan Vision For Future Improvements 32 First Floor Central Haddonfield Middle School Elementary School Proposed Long Range Facilities Plan Vision For Future Improvements 33 Second Floor Elizabeth Haddon Elementary School Proposed Long Range Facilities Plan Vision For Future Improvements 34 J. Fithian Tatem Elementary School Proposed Long Range Facilities Plan Vision For Future Improvements 35 Bond Referendum Proposal ESTIMATED MOST PROBABLE COST FOR PROPOSED PROJECTS ELIZABETH HADDON SCHOOL $ 3,443,500 CENTRAL ELEMENTARY/MIDDLE SCHOOL $ 8,715,000 J. FITHIAN TATEM SCHOOL $ 7,347,000 HADDONFIELD MEMORIAL HIGH SCHOOL $ 28,700,000 RE-SURFACE RUNNING TRACK $ 437,500 STADIUM STRUCTURAL RESTORATION $ 1,323,000 SUB-TOTAL $ 49,966,000 NJSDA REGULAR OPERATING DISTRICT (ROD) GRANTS OFFER FOR PROPOSED SCOPE OF WORK $ 6,034,500 BOND REFERENDUM $ 43,931,500 36 Facilities Condition Assessment and Referendum Haddonfield Board of Education and Public Comments 37