Design considerations in a DVB network
Transcription
Design considerations in a DVB network
Design considerations of a DVB network Why certain choices were made The right equipment, how about suppliers Environmental issues, noise, power cooling, RF radiation Opportunities and limitations; head ends, complex by design. Eric Moerman Curacao, june 15th 2010 Topics • Network topology – • Business case – – – – – • Transport, contribution; legal, max. length, capacity, location encoder Multiplexer, possibillities, statmux proces Transport distribution; quality, capacity, management, reundancy. Tranmitters – – – – – • Video transport(third party, RTL, premier league stadions) Free-to-air Subscriber options, smart card, VOD Theme Channels, vb. football, adult channels User end equipment, standardisation Equipment properties – – – • DVB parameters; hiërarchical modulation, coverage versus radio network planning, SFN, FEC, frequency coördination, capacity per multiplex, SD versus HD, mpeg2/4 Architecture; number of muxes, redundacy, Environmental; power consumption, heat, sound Physical lay-out; in building vs container Building lead time and investment Strategic options and demands. Peripherals – – 6 juni 2010 Availablity Properties MAD Technology DVB-T network, high level topology GPS Uplink RTV GPS DVB-T Multiplexer SDI Studio feeds SD 270Mb HD 1,4Gb SFN network GPS Distribution Netwerk SFN MIP GPS 23 TV, 20 Radio ASI/P Contribution Network Casis/Conax Free/Conax VOD file upload (optional) DVB-H Head-end 6 juni 2010 TV towers MAD Technology Modulation parameters versus SFN size Modulatie on QPSK 16-QAM 64-QAM 6 juni 2010 Guard interval Codering 1/4 1/8 1/16 1/32 1/2 4.976 5.529 5.855 6.032 2/3 6.635 7.373 7.806 8.043 3/4 7.465 8.294 8.782 9.048 5/6 8.294 9.216 9.758 10.053 7/8 8.709 9.676 10.246 10.556 1/2 9.953 11.059 11.709 12.064 2/3 13.271 14.745 15.612 16.086 3/4 14.929 16.588 17.564 18.096 5/6 16.588 18.431 19.516 20.107 7/8 17.418 19.353 20.491 21.112 1/2 14.929 16.588 17.564 18.096 2/3 19.906 22.118 23.419 24.128 3/4 22.394 24.882 26.346 27.144 5/6 24.882 27.647 29.273 30.160 7/8 26.126 29.029 30.737 31.668 Guard interval MAD Technology Symbool time 2k mode Distance 2k mode Symbol time 8k mode Distance 8k mode 1/32 7 µsec 2,1 km 28 µsec 8,4 km 1/16 14 µsec 4,2 km 56 µsec 16,8 km 1/8 28 µsec 8,4 km 112 µsec 33,6 km 1/4 56 µsec 16,8 km 224 µsec 67,2 km RTL4 RTL5 RTL7 SBS6 NET5 Slam FM! Radio 10Gold Q-Music CAZ! Clasic FM Sky Radio Radio veronica Spectrum comparison Analog compared to digital 69 PAL-B versus DVB-T Tele2 Voetbal 1 Tele 2 Voetbal 2/Planet prime TMF MTV Animal Planet CNN BBC Prime BBC World BNR nieuwsradio Arrow Classic rock Radio 538 64 57 50 8 Mhz, In use for just one channel in analog network Nederland 1 Nederland 2 Nederland 3 Regionale TV Radio 1 Radio 2 3FM Radio 4 Radio 5 Radio 6 Concert zender FunX Radio regionaal In digital network 15 a 20 mbit/s Veronica/Jetix per bouquet Tien Één Canvas/ketnet Nickelodeon/AT5 Discovery channel Eurosport 1 Private Spice 24 21 6 juni 2010 MAD Technology Transmitter network DVB-T/-H locations Fase 1+2 locations: Haarlem Amsterdam Y Amsterdam DC2 Hilversum Wormer Almere Alphen Oegstgeest Den Haag Scheveningen(GAP) Naaldwijk DelftGAP) Gouda(GAP) Rotterdam DC Rotterdam Wilhelmin Krimpen Sliedrecht Vlaardingen Gorinchem(GAP) Amersfoort Maarsen Utrecht Lopik 6 juni 2010 DVB-H only locations Woerden Hillegom Zoetermeer Wijk aan Zee Den Haag Kerk. Volendam Purmerend Oostvoorne Hellevoetsluis Nw Bijerland Dordrecht Markelo Fase 3 Locations: Nijmegen, Eindhoven 2 Smilde Oss Alkmaar Lelystad Zwolle Groningen Hengelo Goes Apeldoorn Breda Leeuwarden Heerlen Maastricht Venlo Den Bosch Arnhem Eindhoven 1 Enschede Doetinchem Den Haag II Zoetermeer Gouda Fase 4 locations Sittard Roermond Helmond Loon op Zand Roosendaal Deventer Den Burg Enkhuizen Hoorn Veenendaal MAD Technology Coverage • RF Topology – High power high tower or multiple low power(5-40kW) low towers • Low power – SFN needed. • Calibration of planning tool necessary • Tower lay-out, hight, antenna design(gain, azimuth) • GAP fillers • Customer antenna – Diversity – Indoor/outdoor antenna – Active/passive antenna(power insertion) 6 juni 2010 MAD Technology SFN networks • • • • • • Planning, tooling Timing Calibration SFN gain 0-dB SFN check, pixelmetrix 6 juni 2010 MAD Technology Reception improvement • Diversity reception • Population “gain” 20% 6 juni 2010 MAD Technology DVB Transmitters • Power efficiency (actual measurement) – Worst 9 % – Best 22 % • Modulation – DVB-T 20 Mbit/s(equals max 8 Sd channels mpeg 2 in stat mux) – DVB-T2 38 Mbit/s(equals 4 HD mpeg4 streams) – Combined(hierarchical or standards) modulation ea DVB-H, HD etc • Redundancy • In building or container lay out • Air cooled versus water cooled 6 juni 2010 MAD Technology Electrical power and cooling • • • • • • • • • ERP 100kW per multiplexer Antenna, 8 to 10 layer antenna gain 8 - 12 dB cable and combiner loss. 1 - 3 dB Required input power per multiplex 12 to 15 kW(net transmitter ouput power) Transmitter efficiency 12,5 - 25 % Total consumed power per multiplex 48 - 120kW, (average coling power 36 - 105 kW per mux) In case of 4 muxes it totals to 200 - 480 kW per transmitter location Secundaire equipment 10 - 30 kW 6 juni 2010 MAD Technology Main drivers and performance (radio network) • In general TV Tower and site build, especially the Construction- and environmental effects permits, are limiting factor on lead times for TV station ‘onair’. • Site acquisition for -in average- 120 meter height masts lead time 8 wks – 2 years – Tranmitter system delivery including combiner and management systems • Strong supplier dependancy – Time between order and delivery on site » Worst 13 month, best 2 month – Transmission lines(glas) and power; average lead time 8 – 12 wks Performance, overall lead times – Fase I and II 2 – 3 years – Fase III 9 – 20 month (21 locations) and – Fase IV 7 – 10 month (10 locations) from formal “go” to commercial introduction – Total staff involved 40 FTE average 6 juni 2010 MAD Technology Comparison N+1 container deliveries Total 2 month lead time to operational site Supplier A 11-10-2007 1-11-2007 site ready Container 22-10-2007 delivery 19-10-2007 29-10-2007 1-9-2007 Order R&S install, 6 days KPN install, 8 days Test&commissioning 5 days Acceptance 2 days Total 6 month lead time to operational site planned 20-12-2006 agreed delivery schedule Actual expected 10 weeks Planned on site 5 weeks Supplier B 19-3-2007 PO 2373292 3 month delay 30-4-2007 Initially agreed delivery 17-08-2007 Contractual delivery date Container 19-9-2007 Planned operational KPN installation, 2wk 16-10-2007 28-09-2007 Actual container delivery 2 wk Thomson Tx install, 1 wk 4 wk Test 1 wk 3 wk Acceptance 3 days 6 juni 2010 9-11-2007 21-12-2007 7-12-2007 14-12-2007 MAD Technology planned Transport • Existing ATM networks proved not to be suitable for uninterrupted video transport • Microwave links troublesome during heavy rain and snow • Jitter, delay • SDH-NG(next generation) over dark fiber was choosen 6 juni 2010 MAD Technology The head end, a strong business case enabler • Head-end capable of processing 23 national TV, 14 regional TV and in total 30 radio streams was taken into service. 14 separate transport streams are generated • Different services can be delivered in parallel. • Full IP based, mpeg 2/4 capable for future options. Displaced encoding techniques available including statcast. • Statistical multiplexing applied on all streams. • For SFN operation a redundant MIP inserter is available for every stream • Conax and casis integrated for pay tv and electronic program guides 6 juni 2010 MAD Technology In building, Alkmaar Combiner and cooling system 6 juni 2010 MAD Technology In building, Alkmaar Transmitter combiner/filters and Antenna Switching Field 6 juni 2010 MAD Technology In building, Alkmaar N+1 coaxial switching and cooling 6 juni 2010 MAD Technology Container setup Container pre-fab R&S 5+1 2.6 kW per mux (not ERP) 6 juni 2010 MAD Technology Container setup(2) 6 juni 2010 MAD Technology The inside of a container 6 juni 2010 MAD Technology Some major components Distribution Antenna Kathrein 6 juni 2010 Transmission backbone optimised for streaming content 40Gbs, Netinsight MAD Technology Impression DVB-T Multiplexer Hilversum 6 juni 2010 MAD Technology Local requests 6 juni 2010 MAD Technology Local requests(2) 6 juni 2010 MAD Technology Antenna design (Kathrein) 6 juni 2010 MAD Technology Some items need planning ahead In Europa no suitable crane is available. A 2800 tons crane was shiped from Dubai 6 juni 2010 MAD Technology Spare slides 6 juni 2010 MAD Technology