LESCO Power Market Survey Report 2012-13

Transcription

LESCO Power Market Survey Report 2012-13
Executive Summary
Executive Summary
Lahore Electric Supply Company (LESCO) is the largest electric power distribution company and
is supplying power to civil districts of Lahore, Kasur, Okara, Nankana and Sheikhupura. This
company came into existence in the year 2001 after unbundling of WAPDA system, earlier it was
known as Lahore Area Electricity Board (AEB) and its distribution network comprised of sixtyeight 132 kV and fourteen 66 kV sub-stations and at present in the year 2012-13 there are eighty
two 132kV and eight 66kV sub-stations.
Peak demand of LESCO in the year 2012-13 was 3069 MW, energy sale was 14285 GWh and
energy purchased was 16457 GWh. The shares of domestic sector and industrial sector were
41.48% and 42.64 % respectively with respect to total energy sale, which is not a healthy sign.
The total number of consumers in 2012-13 was 3.58 million out of which 2.93 million were
domestic, 0.51 million were commercial and 0.056 million were agricultural. In the year 2012-13
total sale of LESCO in terms of megawatts was 2663 MW, for the domestic sector it was 1512
MW, for medium & large industries it was 1151 MW and for small industries it was 117 MW.
This forecast has been computed on the basis of Power Market Survey (PMS) methodology by
the LESCO (PMS) team under the supervision of planning power, (NTDCL). The year 2012-13
has been taken as base year and the forecast horizon is ten years up to 2022-23. The base year
sale data (feeder wise consumer category-wise energy sale) and the expected spot loads data at
the locations of different sub-stations have been collected by LESCO power market survey team.
Data for the base year has also been adjusted for the estimates of un-served energy (load
shedding) in order to have realistic figures.
Forecast results show that in the years 2016-17 and 2022-23 energy sale will be 23965 GWh and
32839 GWh, peak demand will be 5821 MW and 7758 MW, and energy purchased will be 27117
GWh and 36344 GWh respectively. For the period 2012-13 to 2022-23, annual average
compound growth rate of energy sale, peak demand and energy purchased will be 5.57%, 4.95%
and 5.15% respectively.
To further refine the forecast and making it helpful for planners following additions have been
made in this issue;
 Civil Administrative Division-wise energy and demand forecast
 Civil Administrative District-wise energy and demand forecast
 Month-wise demand projection
 Overloaded 132 kV substations
 List of existing substations with their MVA capacities
A realistic forecast, saves over investment as well as under investment, meaning thereby timely
recovery of revenue and no constraints in the supply of power (load shedding) respectively. This
kind of forecast can only be prepared by applying proper methodology with authentic data. The
results of previous PMS forecasts were very close to the actual which proves the authenticity of
methodology and data. This report highlights the salient features of load forecast of the company.
Planning Power, NTDCL firmly believes that the readers’ comments/suggestions on this report
will help in improving energy and demand forecast in future.
i
Table of Contents
Table of Contents
1
Introduction ......................................................................................................................1
2
Historical Supply And Demand Analysis .......................................................................3
3
4
2.1
Category-wise Sale ...................................................................................................... 3
2.2
Transmission and Distribution Losses ........................................................................ 4
2.3
Recorded and Computed Peak Demand ...................................................................... 5
2.4
Number of Consumers ................................................................................................ 5
Power Market Survey Methodology ...............................................................................6
3.1
Overview ..................................................................................................................... 6
3.2
Survey Base Data ........................................................................................................ 6
3.3
Input Parameters .......................................................................................................... 7
3.4
Growth Rates ............................................................................................................... 7
3.5
Losses .......................................................................................................................... 8
3.6
Load Factors ................................................................................................................ 8
3.7
Coincidence Factors .................................................................................................... 9
3.8
Forecast Calculations .................................................................................................. 9
3.9
Energy Calculations .................................................................................................... 9
3.10
Peak Demand Calculations........................................................................................ 10
3.11
Accumulations ........................................................................................................... 10
PMS Forecast Results .....................................................................................................11
4.1
Recorded Forecast (Excluding Load Shedding)........................................................ 11
4.2
Computed Forecast (Including Load Shedding) ....................................................... 11
4.3
Category-wise Forecasted Energy Sale (GWh) ........................................................ 12
4.4
Category wise Forecasted Energy Sale (MW) .......................................................... 13
4.5
Peak Demand of Substations ..................................................................................... 13
4.6
Per Capita Consumption............................................................................................ 13
4.7
Category-wise Substation-wise Energy and Demand Projections ............................ 14
4.8
Civil Administrative Area Forecast........................................................................... 14
4.9
Monthly Demand (MW) Projections......................................................................... 14
4.10
List of Overloaded Substations ................................................................................. 14
4.11
List of Grids with their Codes and MVA Capacities ................................................ 14
Disclaimer ...............................................................................................................................60
iii
List of Figures
List of Figures
Figure 1- 1: Computed Demand Forecast .................................................................................. 1
Figure 1- 2: Historical Category-wise Sale ............................................................................... 3
Figure 1- 3: Historical Transmission and Distribution Losses ................................................. 4
Figure 1- 4: Historical Recorded and Computed Peak Demand ............................................... 5
Figure 1- 5: Number of Consumers .......................................................................................... 5
Figure 1- 6: Computed Peak Demand ..................................................................................... 11
Figure 1- 7: Energy Purchased VS Energy Sale ..................................................................... 11
Figure 1- 8: Forecasted Category Wise Sale........................................................................... 12
Figure 1- 9: Per Capita Consumption ...................................................................................... 13
Figure 1- 10: Distribution Network Map ................................................................................. 56
Figure 1- 11: Distribution Network Map (Lahore Ring) ......................................................... 58
v
List of Tables
List of Tables
Table 1- 1: PMS Recorded Forecast (Excluding Load Shedding) ................................................. 15
Table 1- 2: PMS Base Forecast ..................................................................................................... 16
Table 1- 3: Category Wise Sale – GWh (Excluding Load Shedding) ........................................... 17
Table 1- 4: Category-wise Sale – GWh (Base Forecast) .............................................................. 18
Table 1- 5: Category-wise Demand – MW (Excluding Load Shedding) ..................................... 19
Table 1- 6: Category-wise Demand – MW (Base Forecast) ......................................................... 20
Table 1- 7: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For
District: Kasur ................................................................................................................................ 21
Table 1- 8: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For
District: Lahore .............................................................................................................................. 22
Table 1- 9: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For
District: Nankana ........................................................................................................................... 23
Table 1- 10: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For
District: Okara ................................................................................................................................ 24
Table 1- 11: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For
District: Sheikhupura ..................................................................................................................... 25
Table 1- 12: Division-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For
Division: Lahore ............................................................................................................................ 26
Table 1- 13: Monthly Peak Demand Forecast ............................................................................... 27
Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23
Overloading Criterion=90% (Continued…) .................................................................................. 28
Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23
Overloading
Criterion=90%................................................................................................................................ 29
Table 1- 15: List of Overloaded Substations during Period 2012-13 to 2022-23
Overloading Criterion=100% (Continued…) ................................................................................ 31
Table 1- 15: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading
Criterion=100% ............................................................................................................................ 32
Table 1- 16: List of Grids with their Codes & MVA Capacities (Continued…) ........................... 33
Table 1- 16: List of Grids with their Codes And MVA Capacities ............................................... 34
Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 35
Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 36
Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 37
vii
List of Tables
Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 38
Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 39
Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 40
Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 42
Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 43
Table 1- 17: Maximum Demand (MW) of Substations ................................................................ 44
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 45
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 46
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 47
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 48
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 49
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 50
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 51
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 52
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 53
Table 1- 18: Category-wise Maximum Demand (MW) of Substations ........................................ 54
ix
LESCO
1 Introduction
The present report of Power Market Survey forecast is the 23rd issue, jointly prepared by LESCO
and Planning Power NTDCL. This report contains year wise detailed forecast of energy and
demand for the whole company and each sub-station within the company. In addition to that civil
administrative area forecast like divisions and districts within the company are also computed and
depicted in different tables. The forecasted peak demand of LESCO has graphically presented in
Figure 1-1.
Load forecasting is an important element of the power planning process involving prediction of
energy and demand. The forecast serves as the basis for demand and supply-side planning. Load
forecasts are typically prepared by utilities for different time frames depending upon the different
planning applications and operations.
Long term planning requires a system level forecast of total generation requirement and peak
demand. On the other hand transmission and distribution planning require more load level and
geographic detail to assess location, timing and loading of individual lines, substation and
transformation facilities.
9000
8000
Mega Watts (MW)
7000
6000
5000
4000
3000
2000
1000
0
Figure 1- 1: Computed Demand Forecast
Forecasting models fall into three general categories:



Trend models
Econometric based models
End-use models
Trend forecasts graphically or mathematically extrapolate past electricity demand trends into the
future. They may be inadequate for shorter time periods where demograhic changes in the
underlying casual factors of load growth are not anticipated. Econometric models represent a
more complex ‘top-down’ approach to forecasting and rely on the observed or the implied
relationship between past energy consumption and other variables defining past economic output,
demographics and price or income variables. Such models employ a combination of econometric,
regression and time series forecast techniques. End-use models relate energy use to the physical
1
LESCO
appliance stock levels, to the use patterns or to the industrial process. These end use models
represent a ‘bottom-up’ forecasting approach and normally incorporate disaggregate end use
forecast and consumer survey techniques.
This report has been prepared on the basis of Power Market Survey Methodology and the model
used is called Power Market Survey (PMS) model. This model is a form of end use model which
provides energy and power projection for all distribution companies and all grid stations within
the company.
The PMS model relies on an extensive data base of historical sales. The data base includes
consumption by consumer type (i.e. domestic, industrial and commercial etc.) on a grid station
and grid station feeder basis. Actual consumption data are adjusted for un-served demands
attributed to load shedding.
Energy forecasts are computed for each consumption category at the sub area level on the basis of
a trend analysis of recent per consumer sales plus new consumer connection applications.
Industrial forecasts are based on interviews with existing consumers, trend projections and a
review of the applications for request of new and increased service. These analyses are repeated
for each sub area for each of the years to be forecast. The annual peak demand is determined from
the resulting energy forecasts by using the load factors and diversity factors developed for each
consumer category. Forecasts are then aggregated to system level.
Because the PMS forecast is based on a mix of end-use, trend projection and known consumer
expansion plans, it cannot be used reliably to predict demand over the longer term. This model
had not been created to predict impacts of changes in growth of different economic sectors or
consumers categories over time, or changes in both the absolute and relative prices of electricity,
and of changes in the relationships between income growth and electricity growth over time as a
result of market saturation and technological change (in order to capture these changes NTDCL is
using another model called regression model). Regression model is used for long term forecasting
as the changes in growth are occurred due to change in technology, life style over a longer time
period.
The Power Market Survey forecast model most closely approaches the requirements of power
system planning. It provides the level of detail required for siting studies and transmission and
substation planning, as well as the sectoral detail necessary to assess different sector growth rates
and their impacts on load shapes, both for the system, DISCOs and grid stations. In addition,
because it also makes specific provision for load shedding i.e. suppressed demand, it provides a
reasonable approximation of unconstrained load growth.
2
LESCO
2 Historical Supply And Demand Analysis
2.1
Category-wise
wise Sale
The costumers within the company can be segregated in different categories
categories. The segregation
is usually based upon the type of applications for which electricity is being used. Major
categories include Domestic, Commercial, Small industries, Medium & Large industries and
Agriculture.
The category-wise
wise percentage sale for the years 2002-03,
2002
2005-06,
06, and 2012
2012-13 are given in
Figure 1-2.
2002-03
5.98%
35.21%
Domestic
Commercial
48.54%
Public Light
5.80%
4.07%
0.41%
Small Industries
M&L Industries
2005-06
6.57%
40.67%
39.88%
Domestic
Commercial
Public Light
Small Industries
M&L Industries
Tube Well
4.48% 0.57% 7.83%
2012-13
7.06%
41.48%
39.61%
3.03%
0.71%
Domestic
Commercial
Public Light
Small Industries
M&L Industries
Tube Well
8.11%
Figure 1- 2: Historical Category-wise Sale
3
LESCO
2.2
Transmission and Distribution Losses
In our system losses are divided into two types;

Transmission Losses

Distribution Losses
The losses on 132 kV and 11kV transmission lines are considered as Transmission Losses
where as the losses on 11 kV and 440 Volts lines supplying the consumers are called
Distribution Losses. In a system, generally the high losses are due
due to lack of proper
maintenance and element of theft. Reduction in losses can be achieved, by installing
proper size of conductor in 11kV feeders,
fee
and low tension lines and by installing capacitor
banks, to reduce reactive power and thereby improving power factor. Energy sent out is
shown in the form of its breakup as sale, distribution losses and transmission losses with
their percentages in the figure 1-3
1 for the year 2010-11, 2011-12
12 and 2012
2012-13.
2223 (GWh)
13.08%
31 (GWh)
0.18%
2010
2010-11
Distribution Losses
Transmission Losses
Sale
14741 (GWh)
86.74%
2118 (GWh)
12.66%
2011
2011-12
142 (GWh)
0.85%
Distribution
Losses
Transmission
Losses
14467 (GWh)
86.49%
2071 (GWh)
12.58%
102.2 (GWh)
0.62%
2012
2012-13
Distribution Losses
Transmission Losses
14285 (GWh)
86.80%
Sale
Figure 11 3: Historical Transmission and Distribution Losses
4
LESCO
2.3
Recorded and Computed Peak Demand
Recorded demand is the highest electricity demand or maximum power supplied to the
consumers during the base year. Computed peak demand
demand is calculated by adding the element
of unserved power into the figure of recorded peak demand. Figure 1-44 shows the recorded
and computed peak demand (MW) from the year 2008-09
2008
to 2012-13.
4787
5000
PEAK DEMAND (MW)
4500
3988
4006
3916
4062
4000
3500
2671
2637
3000
2865
2990
3069
Recorded Peak
Demand
2500
2000
Computed Peak
Demand
1500
1000
500
0
2008-09
2009
2009-10
2010-11
2011-12
2012-13
Figure 1- 4: Historical Recorded and Computed Peak Demand
2.4
Number of Consumer
onsumers
Historical record of number of consumers within LESCO jurisdiction is given in Figure 11-5.
These consumers are from all categories; i.e. Domestic, Commercial, Small industries,
Medium & Large industries, Public Lighting, Bulk and Agriculture.
Agr
4000000
3500000
2870918
2989808
3313233
3433782
3579178
3000000
2500000
2000000
1500000
1000000
500000
0
2008-09
2009-10
2010-11
2011-12
2012
2012-13
Figure 1- 5: Number of Consumers
5
LESCO
3 Power Market Survey Methodology
3.1
Overview
The Power Market Survey Model forms the basis of the medium term forecast. It produces
energy and peak demand forecast over an eleven year period by consumption category and by
grid station for the entire service area. The model has three inter-related components: the
main database, the basic input parameters and the calculations themselves.
The energy consumption data base obtained through the power market survey is immense. It
contains base year consumption data for existing consumers and eleven years’ forecast data
for new consumers for each consumer category within the company. In addition, there is
separate information for peak demand in medium & large industries and traction categories.
Because of its volume this data is not listed as part of this report.
In addition to the data base, a number of basic input parameters form an integral part of the
forecast model which are separately prepared for each DISCO. These include:




Growth rates: the annual increase in consumption per consumer by consumption
category
Loss rates: transmission and distribution losses expressed as a percentage of energy
purchased and energy sold, respectively
Load factors: relating the amount of energy consumed to the rate at which it is
consumed (that is, the peak demand) for each consumption category
Coincidence factors: describing the load diversity within the system.
The forecast calculations within the model combine the energy consumption data and the
input parameters to compute the energy and peak demand requirements within each area for
each year to be forecasted. The data is accumulated from the area basis, to grid stations,
DISCOs and ultimately to produce a forecast for the entire system.
Each of the three model component is discussed in detail below.
3.2
Survey Base Data
An extensive data base has been developed on gross consumption by consumer category
household (domestic), commercial, small industrial, large industrial, tube wells (agriculture),
public lighting, and traction (electric rail). Energy consumption comes from consumer
service meter readings. Maximum demand readings and load factors for large industrial users
and other demand-meteredconsumers are based on service meter readings. The consumption
data is collected from Computer Centers of each DISCO (It is feeder-wise category-wise
consumption data).
Actual consumption data are also adjusted for un-served demands attributed to load shedding
and to voluntary restraint by consumers (e.g. an industrial consumer who agrees to close his
plant or switch to auto-generation during peak hours).
The basic geographic unit represented within the data base is called an area, although many
areas are divided into two or more subareas. This occurs when portions of the area are served
by different feeders or where a single feeder services different administrative districts. Each
area is assigned a series of codes which identify the technical boundaries associated with the
area.
6
LESCO
The technical boundaries, which are emphasized in this report, start at the grid station. Thus,
all areas and subareas are assigned to one of the all the sub-stations in each DISCO. These are
distribution grid stations supplying power at 11 kV after transformation from a 132kV or
66 kV source. Grid stations are combined to form DISCO.
There can be up to eleven records in the data base for each area or subarea, one record for
each year of forecast. The first year is typically year zero and records the base year level of
consumption for each consumption category as determined in the survey. The remaining
records for the area list the incremental consumption associated with new consumers to be
added to the area within the specified year.
This incremental consumption is based on applications for new or extended service which are
filed at each revenue office and from discussions with the relevant industries and government
agencies. Incremental industrial consumption is based on a combination of interviews, trend
projections, and reviews of applications for new and/or increased service. Interviews are held
with major industrial consumers to identify their current capacity utilization and any longterm plans they have for future expansion or changes in their electricity consumption. Autogeneration is also recorded. In addition, the various branches of the Ministry of Industries are
interviewed to determine how many applications for new developments or plant expansions
have been received, and what the anticipated electrical load associated with each is likely to
be. These anticipated new demands are added to the basic forecast of industrial consumption.
Extension of electricity to new areas over the forecast period is dealt with separately. The
number of new communities to be electrified is also obtained. Initial loads and load growth
are calculated based on past experience in terms of market penetration and consumption per
consumer in newly electrified communities. This analysis is conducted at DISCO level.
There are over 10,000 area/subarea/year records in the data base.
3.3
Input Parameters
A number of input parameters are defined for use in the Power Market Survey model, these
parameters are:





Transmission and distribution loss rates
The rates of growth in consumption per consumer
Load factors for each consumption category
Coincidence or diversity factors
Load Shedding or Unserved Energy
The definition and basic derivation of each is discussed below.
3.4
Growth Rates
The forecast calculations, as will be discussed below, use per consumer growth rates to
update the previous year's consumption before adding the incremental consumption estimate
for the current year. The Power Market Survey model requires per consumer growth rates to
be specified by DISCO for each consumption category (domestic, commercial, etc). The
rates selected for the forecast are based on average annual compound growth rates, calculated
from the last six years data of each consumer category in each DISCO.
7
LESCO
3.5
Losses
For every 100 units of electricity purchased from a power station only 75 to 85 units are
actually sold to the ultimate end-user. The remainder is consumed by the power system itself
in the transmission and distribution of the sold energy. These transmission and distribution
losses must be added to the sales forecast in order to determine the total generation
requirement for the system. An additional source of "loss" is the consumption in auxiliaries
(also called station service) used by the power plants in the process of generating electricity.
Auxiliary consumption cannot be avoided and is totally dependent on the type of generation
system. For example, a thermal plant would have a higher station service than a hydro plant
to account for the energy consumed by fuel and waste handling systems. Auxiliary losses are
determined and incorporated in the forecast outside the model.
Within the Power Market Survey model, distribution losses are expressed as a percentage of
sales and transmission losses as a percentage of the energy purchased from the generating
stations. The model is capable of handling different loss rates of each year for each DISCO.
The distribution and transmission losses used in the Power Market Survey Model are based
on the review of current loss rates and an evaluation of existing loss reduction initiatives
within PEPCO. The losses proposed, distribution losses at 11kV and transmission losses at
132 kV, are applied DISCO-wise. A separate excel sheet has been developed outside the
model to calculate the loss rates needed for the model. The loss rates have been set to match
observed performance.
3.6
Load Factors
Energy sale in each consumption category is converted to peak power demand through the
use of a load factor. It expresses the ratio of the amount of energy actually consumed to the
amount that would have been consumed had the peak rate been continued over the entire
period. Load factors can be calculated over any time period but the most common are daily,
weekly and annual.
The load factors utilized in the Power Market Survey Model relate annual energy sales to
peak capacity for each consumer category (domestic, commercial, public lighting, small
industries and private tube wells). Input load factors are not required for medium/large
industry, public tube well and traction sales as consumption for these sectors is provided
through the survey in both energy and power terms.
Maximum demand readings are available directly for large industrial and other demand
metered consumers such as public tube wells. Load factors for non-demand metered
consumers are determined on a sample basis. For example, peak demand is based on
maximum demand readings from substation feeders which are identified as serving predominantly one sector.
Domestic and commercial load factors are differentiated by community size (village, town or
city). Whereas a single load factor is used for small industrial, private tube wells, public
lighting and traction because of the similar nature in the operation of these loads. While there
is some variation in the load factors within the domestic and commercial sectors, there are no
differences in any of the load factors by DISCO or year.
8
LESCO
3.7
Coincidence Factors
The total energy demand of a number of individual consumers is determined as the simple
sum of their individual energy consumption values. The total peak load, however, is
calculated as the diversified sum of their individual peak load levels. The coincidence factor,
as its name implies, is a general term which measures the coincidence between the peak loads
of any number of individual consumers or consumer groups over a specified time period in
order to compute a combined peak. Mathematically, it is the inverse of the diversity factor.
The daily coincidence factor is determined by comparing the daily load patterns of each
consumer or group under consideration. In this case, the sum of the individual hourly (or
15-minute) peaks would determine the overall daily load pattern and the overall peak load. If,
for example, one consumer (or group) consumes energy only in the morning and a second
group consume only in the evening, the coincidence factor between these two consumers
would be zero and the peak load of the combined group would be the peak of the larger
consumer. Conversely, if both groups consumed all energy at the same hour, the coincidence
factor would be one and the combined peak would be the sum of the two peaks. In practice,
the coincidence factor is found between these two extremes.
Coincidence factors can be determined between any group and sub-group of consumers
whether it is domestic versus commercial or Lahore versus Islamabad, provided that
reasonable estimates of the appropriate load patterns are available. Typically, these patterns
are not readily available and must be synthesized from incomplete or estimated data. In
addition, all coincidence factors calculated from these load patterns are approximations of the
corresponding instantaneous peak faced by the system. In fact, a common practice is to
define this instantaneous peak as the bench mark and specify all coincidence factors in
relation to this peak and time. The advantage of this approach is that all peak can be easily
converted into their contribution to the overall system peak, the disadvantage is that the
relationship between any two groups cannot be so clearly specified and will likely be
incorrectly specified.
The Power Market Survey Model depends upon specified coincidence factors between
consumption categories and between consumption areas in the aggregation of peak loads
from consumers to the peaks at grid stations and at DISCO level and at the level of overall
system peak. The coincidence factors estimated for the medium term model have been based
on the limited available PEPCO records of the peak loads at various points in their respective
systems.
3.8
Forecast Calculations
The forecast calculations involve three basic steps. Firstly, an energy forecast is determined
at the area (or subarea) level using per consumer growth rates and incremental consumption
estimates from the data base. This is then converted to a peak demand forecast, again at the
area (or subarea) level using the input load and diversity factors. Then transmission and
distribution losses are added and final step is to accumulate the areas into their corresponding
grid stations, and grid stations into their DISCO and finally all DISCOs to form the system.
3.9
Energy Calculations
The basic calculation unit is the area or subarea. The data base provides the base year energy
consumption level for each of six consumption categories: domestic, commercial, public
lighting, small industrial, private tube wells and medium and large industry. The database
9
LESCO
also includes the peak demand associated with the medium and large industry category. The
domestic energy forecast for year 1 (the base year is year 0) is calculated by multiplying the
base year consumption by the domestic per consumer growth rate to account for growth in the
intensity of use in the sector then adding the incremental consumption listed in the data base
to account for new use in the sector. This process is repeated for the remaining five energy
sectors (plus the medium and large industrial demand) for each of the remaining 10 years.
The total energy consumed in the subarea within the year is then computed.
3.10 Peak Demand Calculations
The annual energy values for each of the domestic, commercial, public lighting, small
industry and private tube well categories are converted to peak demand using the load factors
listed in the appropriate input parameter file and adjusted to account for coincidence within
the category. The annual peak demand for the area or subarea is computed as the sum of the
individual category peaks multiplied by coincidence factors within the subarea and for each
subarea within an area.
3.11 Accumulations
The total energy and peak demand at a given grid station is calculated as the sum of all the
areas and subareas in that grid station's service area plus an allowance for distribution losses.
Peak demand estimates are accumulated and different coincidence factors applied to city,
town and village areas within the service area. The total energy and peak demand within a
given DISCO is the sum of all grid stations in that DISCO plus traction and an allowance for
transmission losses. Peak demands are again diversified in the accumulation, and the system
totals are obtained from DISCO’s total with some coincidence.
10
LESCO
4 PMS Forecast Results
4.1
Recorded Forecast (Excluding
(
Load Shedding)
The term ‘recorded’ means the sale used in forecast has not been adjusted for un
un-served
energy (load shedding). Forecasted sale, transmission and distribution losses, generation
requirements and peak demand without load shedding has been shown on Table 11-1.
4.2
Computed Forecast (Including Load Shedding)
The term ‘computed’ means the sale used in forecast has been adjusted for un
un-served energy
(load shedding). Forecasted sale, transmission and distribution losses, generation requirement
and peak demand with load shedding has been shown on Table 1-2.
1 2. Peak demand of this table
has been demonstrated graphically in Figure 1-6.
1 Similarly energy
gy sale and energy Purchased
also have been shown in Figure 1-7,
1 7, the difference shows all losses of the DISCO. This is
also the base forecast. If there had not been the load shedding the recorded forecast would
have been the actual forecast i.e. the base forecast.
f
8000
7000
6000
5000
4000
3000
2000
1000
0
Figure 1- 6: Computed Peak Demand
40000
35000
30000
25000
Energy
Purchased
(GWh)
20000
15000
10000
Energy Sale
(GWh)
5000
0
Figure 1- 7: Energy Purchased VS Energy Sale
11
LESCO
4.3
Category-wise
wise Forecasted Energy Sale (GWh)
Percentage share of each consumer category in total sale of year 2016-17
17 and year 2022
2022-23
has been depicted in Figure 1-8.
1
1751 (GWh)
7.31
31%
9873 (GWh)
41.20%
9506(GWh)
39.67%
2016
2016-17
Domestic
Commercial
Public Light
Small Industries
M&L Industries
720 (GWh)
3..00%
192 (GWh)
0.80%
2487 (GWh)
7.57%
12581 (GWh)
38.31%
1923 (GWh)
8.02%
13816(GWh)
42.07%
Tube Well
2022
2022-23
Domestic
Commercial
Public Light
Small Industries
981 (GWh)
2.99%
%
299 (GWh)
0.91%
2676(GWh)
8.15%
M&L Industries
Tube Well
Figure 1- 8: Forecasted Category Wise Sale
The category-wise forecasted sale with and without load shedding are shown in Table 11-3 and 1-4
respectively.
12
LESCO
4.4
Category wise Forecasted Energy Sale (MW)
The forecast of consumption (sale) in terms of Mega Watts with and without load shedding is
shown in Table 1-5
5 and Table 1-6
1 respectively.
4.5
Peak Demand of Substations
A projection at a sub-station
station is the most peculiar feature of this report. It is indeed a very rare
and useful forecast. It’s the base of transmission system expansion planning. It also provides
a very solid ground for proposing a new sub-station
sub
or augmentation
augmentation, extension and
conversion of a sub-station.
station. Only distribution losses have been considered in preparing the
grid station peak demand.
The peak demand of each substation, existing as well as proposed, situated in the service area
of the DISCO has been shown in the Table 1-17.
1
4.6
Per Capita Consumption
Per capita consumption is a very vivid indicator of development in a country. Usually
developed
loped countries have very high per capita consumption. The consumption for the years
2016-17, 2018-19
19 and 2022-23
2022 23 are obtained from forecasted data. Per capita consumption
(kWh/person) is given in Figure 1-9.
1
1200
1000
800
600
936
400
1035
1063
1109
2016-17
2018-19
2022
2022-23
727
200
0
2004-05
05
2012-13
Figure 1- 9: Per Capita Consumption
13
LESCO
4.7
Category-wise Substation-wise Energy and Demand Projections
The category-wise substation-wise energy and demand projections have been presented in
Table 1-18. The last column of the table contains power factor and reactive power values. In
order to reduce the volume of the report, only the values of the last year i.e. 2022-23 have
been presented in the table.
4.8
Civil Administrative Area Forecast
The LESCO service area comprises of one civil administrative division i-e Lahore which has
five districts; Kasur, Lahore, Nankana, Okara and Sheikhupura. The District-wise and civil
administrative Division-wise energy and demand projections have been presented in Tables
1-7 to 1-12. The last column of the table contains peak demand.
4.9
Monthly Demand (MW) Projections
The Month–wise demand (MW) projections have been presented in Table 1-13. To develop
this projection, monthly demand factors are computed for last five years and then its average
is taken as a base for monthly demand projection.
4.10 List of Overloaded Substations
There have been several incidents of damage and fire at a number of sub-stations across the
country due to overloading and they need augmentation or addition of a transformer. The list
of overloaded substation will inform about that particular year in which a substation will be
overloaded. The overloading criterion of a substation has been considered as 85% i.e. when
any substation is 85% loaded the remedial measures should be taken in the form of new
substation or augmentation of the existing transformers but in case of LESCO, 90% is
considered as overloading criterion according to their policy. Table 1-14 & Table 1-15 shows
the list of overloaded substations based on overloading criterion of 90% and 100%
respectively.
4.11 List of Grids with their Codes and MVA Capacities
The list of Grids contains each substation having their codes and tranformers’ MVA
capacities are enlisted in the Table 1-16.
14
LESCO
Table 1- 1: PMS Recorded Forecast (Excluding Load Shedding)
Year
Energy
Sale
(GWh)
Distribution
Losses
G.R
Transmission
Losses
Energy
Sent out
Load
Factor
Peak
Demand
(GWh)
(%)
(GWh)
(%)
(GWh)
(%)
(MW)
2071
12.6
102
0.62
16457
61
3069
2012-13
14285
2013-14
15534
8.7
2144
12.1
108
0.61
17786
62
3275
2014-15
16529
6.4
2205
11.7
112
0.60
18847
62
3466
2015-16
17486
5.8
2262
11.4
117
0.59
19865
62
3654
2016-17
18754
7.3
2329
11.0
122
0.58
21205
62
3894
2017-18
19973
6.5
2397
10.7
128
0.57
22498
62
4125
2018-19
21180
6.0
2458
10.3
132
0.56
23771
62
4354
2019-20
22456
6.0
2523
10.0
137
0.55
25116
62
4598
2020-21
23801
6.0
2584
9.7
142
0.54
26527
62
4853
2021-22
25166
5.7
2634
9.4
147
0.53
27946
62
5110
2022-23
26561
5.5
2672
9.1
153
0.52
29387
62
5370
Ave. Growth
(2013-2023)
6.40%
5.97%
5.75%
15
LESCO
Table 1- 2: PMS Base Forecast
Year
Computed
Energy
Sale
G.R
(GWh)
(%)
Distribution
Losses
Transmission
Losses
Computed
Energy
Sent Out
Load
Factor
Computed
Peak Demand
(GWh)
(%)
(GWh)
(%)
(GWh)
(%)
(MW)
2768
12.7
136.6
0.62
22002
52
4787
2012-13
19097
2013-14
20414
6.9
2830
12.2
141.8
0.61
23386
53
5033
2014-15
21485
5.2
2881
11.8
146.2
0.60
24512
53
5270
2015-16
22545
4.9
2930
11.5
150.3
0.59
25626
53
5509
2016-17
23965
6.3
2996
11.1
156.4
0.58
27117
53
5821
2017-18
25343
5.7
3062
10.8
161.9
0.57
28567
53
6122
2018-19
26715
5.4
3121
10.5
167.1
0.56
30003
53
6424
2019-20
28164
5.4
3182
10.2
172.4
0.55
31518
53
6742
2020-21
29690
5.4
3238
9.8
177.8
0.54
33107
53
7077
2021-22
31245
5.2
3283
9.5
183.0
0.53
34711
53
7415
2022-23
32839
5.1
3316
9.2
189.8
0.52
36344
53
7758
Ave. Growth
(2013-2023)
5.57%
5.15%
4.95%
16
LESCO
Table 1- 3: Category Wise Sale – GWh (Excluding Load Shedding)
Domestic
Commercial
Public Light
Year
Energy
G.R
Energy
G.R
1159
Energy
G.R
Energy
G.R
Energy
G.R
Energy
G.R
Energy
G.R
6332
6.9
1241
7.1
113
11.9
462
6.6
6293
11.2
1094
8.5
15534
8.7
2014-15
6789
7.2
1327
6.9
125
11.0
492
6.6
6615
5.1
1181
7.9
16529
6.4
2015-16
7254
6.8
1416
6.7
138
10.5
528
7.4
6876
3.9
1275
8.0
17486
5.8
2016-17
7730
6.6
1508
6.5
152
10.0
565
7.0
7427
8.0
1372
7.7
18754
7.3
2017-18
8265
6.9
1604
6.4
166
9.5
603
6.7
7861
5.8
1474
7.4
19973
6.5
2018-19
8818
6.7
1718
7.1
182
9.1
642
6.4
8241
4.8
1579
7.2
21180
6.0
2019-20
9442
7.1
1845
7.4
197
8.7
682
6.2
8601
4.4
1688
6.9
22456
6.0
2020-21
10112
7.1
1969
6.7
214
8.3
723
6.0
8983
4.4
1800
6.6
23801
6.0
2021-22
10772
6.5
2094
6.4
231
8.0
765
5.8
9389
4.5
1916
6.4
25166
5.7
2022-23
11433
6.1
2220
6.0
248
7.7
807
5.6
9818
4.6
2034
6.2
26561
5.5
Ave. Growth
(2013-2023)
6.79%
5.67%
1009
Total
2013-14
6.43%
5658
Tube Well
5925
9.44%
433
M&L
Industries
2012-13
6.72%
101
Small
Industries
7.27%
14285
6.40%
17
LESCO
Table 1- 4: Category-wise Sale – GWh (Base Forecast)
Domestic
Commercial
Public Light
Year
Energy
G.R
Energy
G.R
1550
Energy
G.R
Energy
G.R
Energy
G.R
Energy
G.R
Energy
G.R
8364
5.6
1638
5.7
148
9.9
608
5.1
8214
8.6
1442
7.0
20414
6.9
2014-15
8858
5.9
1729
5.6
162
9.3
640
5.2
8558
4.2
1538
6.6
21485
5.2
2015-16
9359
5.7
1825
5.5
176
9.0
680
6.1
8863
3.6
1642
6.8
22545
4.9
2016-17
9873
5.5
1923
5.4
192
8.7
720
5.9
9506
7.3
1751
6.6
23965
6.3
2017-18
10446
5.8
2025
5.3
208
8.3
761
5.7
10039
5.6
1864
6.4
25343
5.7
2018-19
11038
5.7
2147
6.0
225
8.1
803
5.5
10522
4.8
1981
6.3
26715
5.4
2019-20
11702
6.0
2280
6.2
242
7.8
846
5.3
10993
4.5
2102
6.1
28164
5.4
2020-21
12412
6.1
2411
5.7
260
7.5
890
5.2
11491
4.5
2226
5.9
29690
5.4
2021-22
13113
5.6
2543
5.5
279
7.3
935
5.1
12020
4.6
2355
5.8
31245
5.2
2022-23
13816
5.4
2676
5.2
299
7.0
981
4.9
12581
4.7
2487
5.6
32839
5.1
Ave. Growth
(2013-2023)
5.72%
5.22%
1349
Total
2013-14
5.42%
7564
Tube Well
7921
8.29%
579
M&L Industries
2012-13
5.62%
135
Small
Industries
6.31%
19097
5.57%
18
LESCO
Table 1- 5: Category-wise Demand – MW (Excluding Load Shedding)
Domestic
Commercial
Public Light
Year
Demand
G.R
Demand
G.R
348
Demand
G.R
Demand
G.R
Demand
G.R
Demand
G.R
Demand
G.R
1605
6.2
371
6.6
27
11.6
124
6.0
1245
8.2
230
6.3
2860
7.4
2014-15
1720
7.1
396
6.8
30
11.0
132
6.5
1301
4.4
247
7.5
3039
6.3
2015-16
1837
6.8
422
6.6
33
10.5
142
7.3
1350
3.8
266
7.6
3216
5.8
2016-17
1956
6.5
450
6.5
37
10.0
152
7.0
1451
7.5
285
7.3
3443
7.1
2017-18
2088
6.8
479
6.3
40
9.5
162
6.7
1532
5.6
306
7.1
3660
6.3
2018-19
2225
6.5
512
6.9
44
9.1
172
6.4
1605
4.8
327
6.9
3878
5.9
2019-20
2376
6.8
548
7.1
48
8.7
183
6.1
1679
4.6
348
6.6
4109
6.0
2020-21
2540
6.9
584
6.5
51
8.3
194
6.0
1757
4.6
370
6.4
4353
5.9
2021-22
2701
6.3
620
6.2
56
8.0
205
5.8
1839
4.7
393
6.2
4600
5.7
2022-23
2863
6.0
656
5.9
60
7.7
216
5.6
1927
4.8
417
6.0
4853
5.5
Ave. Growth
(2013-2023)
6.59%
5.28%
216
Total
2013-14
6.34%
1151
Tube Well
1512
9.42%
117
M&L
Industries
2012-13
6.55%
24
Small
Industries
6.79%
2663
6.19%
19
LESCO
Table 1- 6: Category-wise Demand – MW (Base Forecast)
Domestic
Commercial
Public Light
Year
Demand
G.R
Demand
G.R
551
Demand
G.R
Demand
G.R
Demand
G.R
Demand
G.R
Demand
G.R
2511
4.9
580
5.2
42
9.6
193
4.6
1935
6.1
282
5.5
4393
5.8
2014-15
2657
5.8
612
5.5
46
9.3
203
5.2
2005
3.7
301
6.6
4619
5.1
2015-16
2807
5.6
645
5.4
50
9.0
216
6.1
2075
3.5
322
6.8
4847
4.9
2016-17
2960
5.4
680
5.4
55
8.7
229
5.9
2218
6.9
343
6.6
5144
6.1
2017-18
3128
5.7
716
5.3
59
8.3
242
5.7
2338
5.4
365
6.5
5430
5.6
2018-19
3301
5.5
758
5.8
64
8.1
255
5.5
2451
4.8
388
6.3
5718
5.3
2019-20
3492
5.8
803
6.0
69
7.8
268
5.3
2565
4.7
412
6.1
6024
5.3
2020-21
3698
5.9
848
5.6
74
7.5
282
5.2
2686
4.7
436
5.9
6346
5.4
2021-22
3901
5.5
893
5.3
80
7.3
297
5.1
2815
4.8
461
5.8
6673
5.2
2022-23
4105
5.2
939
5.1
85
7.0
311
4.9
2951
4.8
487
5.6
7009
5.0
Ave. Growth
(2013-2023)
5.54%
4.93%
268
Total
2013-14
5.34%
1823
Tube Well
2393
8.27%
185
M&L
Industries
2012-13
5.47%
39
Small
Industries
6.17%
4154
5.37%
20
LESCO
Table 1- 7: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Kasur
Energy Sale
Distribution Losses
Transmission Losses
Generation
Load Factor
Peak
Demand
Year
(GWh)
G.R.(%)
(GWh)
%
(GWh)
%
(GWh)
%
(MW)
2012-13
2997
0.00
423
12.37
21
0.62
3441
45
866
2013-14
3296
9.96
440
11.77
23
0.61
3758
47
918
2014-15
3499
6.18
449
11.37
24
0.60
3972
47
967
2015-16
3654
4.41
456
11.11
24
0.59
4134
47
1006
2016-17
3921
7.31
467
10.63
25
0.58
4413
47
1068
2017-18
4150
5.85
476
10.29
26
0.57
4653
47
1124
2018-19
4388
5.72
484
9.94
27
0.56
4899
47
1181
2019-20
4594
4.70
492
9.67
28
0.55
5114
47
1234
2020-21
4809
4.68
498
9.39
29
0.54
5336
47
1288
2021-22
5034
4.67
504
9.09
29
0.53
5567
47
1345
2022-23
5269
4.66
508
8.79
30
0.52
5807
47
1403
Ave. Growth
(2013-2023)
5.80%
5.37%
4.94%
21
LESCO
Table 1- 8: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Lahore
Energy Sale
Distribution Losses
Transmission Losses
Generation
Load Factor
Peak
Demand
Year
(GWh)
G.R.(%)
(GWh)
%
(GWh)
%
(GWh)
%
(MW)
2012-13
11205
0.29
1660
12.90
80
0.62
12945
40
3698
2013-14
11837
5.64
1681
12.44
82
0.61
13600
40
3871
2014-15
12415
4.89
1706
12.08
85
0.60
14206
40
4034
2015-16
13038
5.02
1733
11.73
87
0.59
14858
40
4210
2016-17
13803
5.87
1765
11.34
90
0.58
15659
40
4429
2017-18
14562
5.50
1802
11.01
93
0.57
16457
40
4644
2018-19
15333
5.30
1833
10.68
96
0.56
17263
41
4865
2019-20
16199
5.64
1870
10.35
99
0.55
18169
41
5110
2020-21
17119
5.68
1906
10.02
103
0.54
19128
41
5371
2021-22
18044
5.40
1932
9.67
106
0.53
20082
41
5630
2022-23
18983
5.20
1951
9.32
110
0.52
21044
41
5892
Ave. Growth
(2013-2023)
5.41%
4.98%
4.77%
22
LESCO
Table 1- 9: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Nankana
Energy Sale
Distribution Losses
Transmission Losses
Generation
Load Factor
Peak
Demand
Year
(GWh)
G.R.(%)
(GWh)
%
(GWh)
%
(GWh)
%
(MW)
2012-13
526
0.00
77
12.75
4
0.62
606
43
162
2013-14
831
58.14
117
12.30
6
0.61
953
46
235
2014-15
884
6.35
121
12.02
6
0.60
1011
46
252
2015-16
942
6.53
125
11.73
6
0.59
1073
45
270
2016-17
1013
7.57
131
11.45
7
0.58
1150
45
292
2017-18
1087
7.27
136
11.14
7
0.57
1230
45
313
2018-19
1163
7.01
141
10.83
7
0.56
1311
45
335
2019-20
1242
6.78
146
10.51
8
0.55
1395
44
358
2020-21
1323
6.57
150
10.17
8
0.54
1481
44
381
2021-22
1408
6.38
153
9.83
8
0.53
1569
44
405
2022-23
1495
6.21
156
9.47
9
0.52
1660
44
429
Ave. Growth
(2013-2023)
11.02%
10.60%
10.23%
23
LESCO
Table 1- 10: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Okara
Energy Sale
Distribution Losses
Transmission Losses
Generation
Load Factor
Peak
Demand
Year
(GWh)
G.R.(%)
(GWh)
%
(GWh)
%
(GWh)
%
(MW)
2012-13
1417
0.00
228
13.86
10
0.62
1655
40
473
2013-14
831
7.44
237
13.49
11
0.61
1770
41
495
2014-15
884
5.51
242
13.11
11
0.60
1859
41
521
2015-16
942
5.92
248
12.73
12
0.59
1961
41
550
2016-17
1013
6.24
255
12.35
12
0.58
2074
41
582
2017-18
1087
6.04
260
11.96
12
0.57
2189
41
615
2018-19
1163
5.85
266
11.57
13
0.56
2307
41
649
2019-20
1242
5.69
270
11.18
13
0.55
2427
41
683
2020-21
1323
5.53
274
10.79
14
0.54
2550
41
718
2021-22
1408
5.39
276
10.39
14
0.53
2675
41
753
2022-23
1495
5.27
278
9.98
15
0.52
2803
41
789
Ave. Growth
(2013-2023)
0.54%
5.41%
5.26%
24
LESCO
Table 1- 11: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Sheikhupura
Energy Sale
Distribution Losses
Transmission Losses
Generation
Load Factor
Peak
Demand
Year
(GWh)
G.R.(%)
(GWh)
%
(GWh)
%
(GWh)
%
(MW)
2012-13
2953
0.00
380
11.41
21
0.62
3354
45
847
2013-14
2929
-0.83
356
10.83
20
0.61
3304
45
838
2014-15
3080
5.19
363
10.54
21
0.60
3464
45
882
2015-16
3210
4.22
368
10.28
21
0.59
3600
45
920
2016-17
3421
6.55
378
9.95
22
0.58
3821
44
980
2017-18
3628
6.04
388
9.65
23
0.57
4038
45
1036
2018-19
3803
4.83
396
9.44
24
0.56
4223
45
1083
2019-20
3986
4.81
404
9.21
24
0.55
4414
45
1131
2020-21
4176
4.78
411
8.96
25
0.54
4612
45
1180
2021-22
4375
4.76
417
8.71
25
0.53
4818
45
1231
2022-23
4582
4.74
422
8.43
26
0.52
5031
45
1284
Ave. Growth
(2013-2023)
4.49%
4.14%
4.26%
25
LESCO
Table 1- 12: Division-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For Division: Lahore
Energy Sale
Distribution Losses
Transmission Losses
Generation
Load Factor
Peak
Demand
Year
(GWh)
G.R.(%)
(GWh)
%
(GWh)
%
(GWh)
%
(MW)
2012-13
19097
0.29
2768
12.66
137
0.62
22002
52
4787
2013-14
20414
6.90
2830
12.18
142
0.61
23386
53
5033
2014-15
21485
5.24
2881
11.83
146
0.60
24512
53
5270
2015-16
22545
4.94
2930
11.50
150
0.59
25626
53
5509
2016-17
23965
6.30
2996
11.11
156
0.58
27117
53
5821
2017-18
25343
5.75
3062
10.78
162
0.57
28567
53
6122
2018-19
26715
5.42
3121
10.46
167
0.56
30003
53
6424
2019-20
28164
5.42
3182
10.15
172
0.55
31518
53
6742
2020-21
29690
5.42
3238
9.83
178
0.54
33107
53
7077
2021-22
31245
5.24
3283
9.51
183
0.53
34711
53
7415
2022-23
32839
5.10
3316
9.17
190
0.52
36344
53
7758
Ave. Growth
(2013-2023)
5.57%
5.15%
4.95%
26
LESCO
Table 1- 13: Monthly Peak Demand Forecast
July
August
September
October
November
December
January
February
March
April
May
June
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
2012-13
4428
4711
4519
4036
2743
2925
2705
2365
3456
4036
4787
4567
2013-14
4656
4953
4751
4243
2884
3075
2844
2486
3634
4243
5033
4802
2014-15
4874
5185
4975
4442
3020
3220
2977
2603
3805
4442
5270
5027
2015-16
5096
5421
5200
4644
3157
3366
3113
2721
3977
4644
5509
5255
2016-17
5384
5728
5495
4907
3335
3557
3289
2876
4203
4907
5821
5553
2017-18
5663
6024
5779
5161
3508
3741
3459
3024
4420
5161
6122
5841
2018-19
5942
6321
6064
5415
3681
3925
3629
3173
4638
5415
6424
6128
2019-20
6237
6635
6365
5684
3863
4120
3809
3331
4868
5684
6742
6432
2020-21
6546
6964
6681
5966
4055
4324
3999
3496
5110
5966
7077
6752
2021-22
6858
7296
6999
6250
4249
4530
4189
3663
5353
6250
7415
7073
2022-23
7176
7634
7323
6540
4445
4740
4383
3832
5601
6540
7758
7401
Year
27
LESCO
Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=90% (Contd…)
S.No.
Name
Rating
Grid #
Total
Capacity
(MVA)
Total
Capacity
(MW)
Overloading
Criterion
(MW)
Overloading
Criterion
(%)
Year of
Overloading
Overloading
Status
(MW)
Power
Factor
KV
1
Batapur
132
13
78
66.30
59.67
90.00
2021-22
57.00
0.85
2
Bhai Pheru
132
15
78
67.86
61.07
90.00
2012-13
75.10
0.87
3
Fateh Garh
132
38
106
94.34
84.91
90.00
2018-19
83.20
0.89
4
Havali
132
60
78
64.74
58.27
90.00
2013-14
57.90
0.83
5
LEFO
132
121
78
67.08
60.37
90.00
2015-16
58.00
0.86
6
Okara City-I
132
152
66
56.76
51.08
90.00
2012-13
56.60
0.86
7
Pattoki
132
158
52
44.20
39.78
90.00
2020-21
39.20
0.85
8
Shahkot
132
193
78
67.86
61.07
90.00
2015-16
58.30
0.87
9
Shalamar-I
132
194
78
67.86
61.07
90.00
2019-20
59.20
0.87
10
Skp. City
132
197
78
67.86
61.07
90.00
2018-19
58.10
0.87
11
Ali Jaj
66
229
26
21.32
19.19
90.00
2016-17
17.40
0.82
12
Chunian
132
254
52
43.68
39.31
90.00
2018-19
38.40
0.84
13
Depalpur
132
265
78
65.52
58.97
90.00
2012-13
60.00
0.84
14
Farooqabad
132
271
78
67.08
60.37
90.00
2017-18
60.30
0.86
15
Hujra
132
287
52
43.16
38.84
90.00
2012-13
39.50
0.83
16
Khuddian
132
310
78
63.96
57.56
90.00
2012-13
58.50
0.82
17
Malikpur
66
320
26
21.84
19.66
90.00
2012-13
18.10
0.84
18
Mohlan
66
330
13
11.44
10.30
90.00
2013-14
10.10
0.88
28
LESCO
Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=90%
S.No.
Name
Rating
Grid #
KV
Total
Capacity
Total
Capacity
Overloading
Criterion
Overloading
Criterion
(MVA)
(MW)
(MW)
(%)
Year of
Overloading
(Contd…)
Overloading
Status
Power
Factor
(MW)
19
Narang Mandi
132
336
26
23.14
20.83
90.00
2012-13
26.40
0.89
20
Sangla Hill
66
362
26
23.14
20.83
90.00
2015-16
19.40
0.89
21
Shahdara New
132
369
92
79.12
71.21
90.00
2021-22
69.60
0.86
22
Sharqpur
132
372
52
44.20
39.78
90.00
2018-19
38.60
0.85
23
UIS
66
399
13
11.70
10.53
90.00
2016-17
10.50
0.90
24
Warburton
132
401
52
46.28
41.65
90.00
2012-13
40.60
0.89
25
Manga Mandi
132
411
78
69.42
62.48
90.00
2012-13
62.00
0.89
26
Rustam
132
412
78
67.86
61.07
90.00
2012-13
61.20
0.87
27
Gulshan Ravi
132
429
80
68.00
61.20
90.00
2012-13
67.00
0.85
28
Wapda Town
220
503
92
82.80
74.52
90.00
2012-13
76.00
0.90
29
Elahabad
132
506
52
44.20
39.78
90.00
2013-14
38.90
0.85
30
Nankana
132
520
52
43.68
39.31
90.00
2014-15
35.90
0.84
31
Sadar Gogera
132
540
52
43.16
38.84
90.00
2019-20
36.90
0.83
32
Bund Road
220
599
52
44.20
39.78
90.00
2021-22
39.60
0.85
33
Boggiwal
132
617
132
116.16
104.54
90.00
2019-20
101.80
0.88
29
LESCO
Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=90% (Contd…)
S.No.
Name
Rating
KV
Grid
#
Total
Capacity
Total
Capacity
Overloading
Criterion
Overloading
Criterion
(MVA)
(MW)
(MW)
(%)
Year of
Overloading
Overloading
Status
(MW)
Power
Factor
34
Mochi Gate
132
710
52
45.76
41.18
90.00
2017-18
40.70
0.88
35
ICI
132
753
52
46.80
42.12
90.00
2018-19
41.40
0.90
36
Chak-65
132
800
104
93.60
84.24
90.00
2016-17
80.40
0.90
37
Valgon Sohial
132
826
52
46.28
41.65
90.00
2018-19
41.50
0.89
38
Okara City-II
132
849
66
56.76
51.08
90.00
2012-13
48.60
0.86
39
Kot Radha Kis
132
850
39
34.71
31.24
90.00
2012-13
30.00
0.89
40
Sharqpur Rd.
132
897
26
22.88
20.59
90.00
2015-16
19.40
0.88
41
SKP-Industrial
132
902
26
22.10
19.89
90.00
2012-13
19.40
0.85
42
Aysha
132
912
52
45.24
40.72
90.00
2014-15
40.30
0.87
43
Lahore Cantt
132
949
52
46.80
42.12
90.00
2017-18
41.70
0.90
44
DHA- Ph. V
132
958
26
23.40
21.06
90.00
2012-13
26.80
0.90
45
Daroghawala
132
962
66
58.08
52.27
90.00
2016-17
51.20
0.88
46
Bahria Town
132
964
13
11.70
10.53
90.00
2012-13
10.40
0.90
47
AWT
132
966
26
22.62
20.36
90.00
2019-20
19.40
0.87
48
Khana Nau
132
972
52
45.24
40.72
90.00
2012-13
47.70
0.87
49
Kasur New
132
1019
52
43.68
39.31
90.00
2012-13
42.90
0.84
50
Raiwind New
132
1059
26
23.40
21.06
90.00
2018-19
20.30
0.90
30
LESCO
Table 1- 15: List of Overloaded Substations during Period 2012-13 to 2022-2
S.No.
Name
Rating
Grid #
Total
Capacity
(MVA)
Total
Capacity
(MW)
Overloading
Criterion
(MW)
Overloading
Criterion
(%)
Year of
Overloading
Overloading
Status
(MW)
Power
Factor
15
60
121
152
193
194
197
229
254
271
287
310
320
330
336
362
372
399
401
411
412
429
78
78
78
66
78
78
78
26
52
78
52
78
26
13
26
26
52
13
52
78
78
80
67.86
64.74
67.08
56.76
67.86
67.86
67.86
21.32
43.68
67.08
43.16
63.96
21.84
11.44
23.14
23.14
44.20
11.70
46.28
69.42
67.86
68.00
67.86
64.74
67.08
56.76
67.86
67.86
67.86
21.32
43.68
67.08
43.16
63.96
21.84
11.44
23.14
23.14
44.20
11.70
46.28
69.42
67.86
68.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
2012-13
2014-15
2020-21
2018-19
2017-18
2021-22
2020-21
2017-18
2020-21
2018-19
2012-13
2019-20
2012-13
2014-15
2012-13
2017-18
2021-22
2018-19
2012-13
2021-22
2020-21
2020-21
75.10
61.50
65.20
56.10
66.20
65.10
66.00
19.40
42.80
64.60
39.50
61.30
18.10
10.90
26.40
22.80
43.60
11.70
40.60
66.00
65.20
66.00
0.87
0.83
0.86
0.86
0.87
0.87
0.87
0.82
0.84
0.86
0.83
0.82
0.84
0.88
0.89
0.89
0.85
0.90
0.89
0.89
0.87
0.85
KV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Bhai Pheru
Havali
LEFO
Okara City-I
Shahkot
Shalamar-I
Skp. City
Ali Jaj
Chunian
Farooqabad
Hujra
Khuddian
Malikpur
Mohlan
Narang Mandi
Sangla Hill
Sharqpur
UIS
Warburton
Manga Mandi
Rustam
Gulshan Ravi
132
132
132
132
132
132
132
66
132
132
132
132
66
66
132
66
132
66
132
132
132
132
Overloading Criterion=100% (Contd…)
31
LESCO
Table 1- 15: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=100%
Grid #
Total
Capacity
(MVA)
Total
Capacity
(MW)
Overloading
Criterion
(MW)
Overloading
Criterion
(%)
Year of
Overloading
Overloading
Status
(MW)
Power
Factor
Rating
S.No.
Name
KV
23
Wapda Town
220
503
92
82.80
82.80
100.00
2021-22
79.10
0.90
24
Elahabad
132
506
52
44.20
44.20
100.00
2015-16
42.60
0.85
25
Nankana
132
520
52
43.68
43.68
100.00
2015-16
41.00
0.84
26
Sadar Gogera
132
540
52
43.16
43.16
100.00
2021-22
41.60
0.83
27
Boggiwal
132
617
132
116.16
116.16
100.00
2021-22
111.50
0.88
28
ICI
132
753
52
46.80
46.80
100.00
2020-21
46.00
0.90
29
Valgon Sohial
132
826
52
46.28
46.28
100.00
2019-20
44.10
0.89
30
Okara City-II
132
849
66
56.76
56.76
100.00
2013-14
53.60
0.86
31
Kot Radha Kis
132
850
39
34.71
34.71
100.00
2013-14
32.40
0.89
32
Sharqpur Rd.
132
897
26
22.88
22.88
100.00
2017-18
22.00
0.88
33
SKP-Industrial
132
902
26
22.10
22.10
100.00
2016-17
21.30
0.85
34
Aysha
132
912
52
45.24
45.24
100.00
2017-18
45.20
0.87
35
Lahore Cantt
132
949
52
46.80
46.80
100.00
2020-21
46.00
0.90
36
DHA- Ph. V
132
958
26
23.40
23.40
100.00
2012-13
26.80
0.90
37
Daroghawala
132
962
66
58.08
58.08
100.00
2018-19
57.60
0.88
38
Bahria Town
132
964
13
11.70
11.70
100.00
2012-13
10.40
0.90
39
AWT
132
966
26
22.62
22.62
100.00
2020-21
21.10
0.87
40
Khana Nau
132
972
52
45.24
45.24
100.00
2012-13
47.70
0.87
41
Kasur New
132
1019
52
43.68
43.68
100.00
2012-13
42.90
0.84
42
Raiwind New
132
1059
26
23.40
23.40
100.00
2020-21
22.60
0.90
32
LESCO
Table 1- 16: List of Grids with their Codes and MVA Capacities (Continued…)
Sr.
No.
Grid
No. KV
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
43
45
47
1
13
20
30
40
45
60
84
113
152
158
173
176
191
194
206
229
241
265
271
303
314
330
338
132
132
132
132
132
132
132
220
220
132
132
220
132
132
132
132
66
66
132
132
66
132
66
132
Grid
Name
A.I.Town
Batapur
Bucheki
Chung
Fort
Ghazi
Havali
Kala Shah Kaku
K.Lakhpat.New
Okara City-I
Pattoki
Ravi
Renala Khurd
Shadman
Shalamar-I
Sunny View
Ali Jaj
Basirpur
Depalpur
Farooqabad
Kanganpur
Lalyani
Mohlan
Okara Cantt
Transformer
T1
T2
T3
40
26
26
26
26
40
26
40
26
40
26
26
26
40
26
26
13
13
26
26
13
26
13
26
40
26
26
40
26
40
26
26
26
26
26
26
26
40
26
40
13
13
26
26
19
26
26
26
T4
26
40
26
26
26
26
15
26
26
8
13
(MVA)
Total
Sr.
No.
Grid
No.
KV
106
78
52
92
52
133
78
66
78
66
52
52
52
106
78
66
26
41
78
78
39
52
13
26
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
6
15
23
38
43
82
99
121
153
167
175
184
193
197
221
233
254
270
287
310
320
336
353
362
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
66
132
132
66
132
132
66
Grid
Name
Attabad
Bhai Pheru
Chah Miran
Fateh Garh
Garden Town
K.Lakhpat.Old
Kasur
LEFO
P.W.R
Qartaba
Rehman Park
Saidpur
Shahkot
Skp. City
W.Radha Ram
Badami Bagh
Chunian
EMCO
Hujra
Khuddian
Malikpur
Narang Mandi
Raiiwind
Sangla Hill
Transformer
T1
T2
T3
40
26
40
40
26
40
26
26
26
40
26
40
26
26
26
40
26
13
26
26
13
13
40
13
26
26
40
40
40
40
40
26
40
40
40
26
26
26
26
40
26
13
26
26
13
13
26
13
26
26
26
40
26
26
26
40
40
40
26
26
26
26
13
26
26
T4
26
26
(MVA)
Total
92
78
80
106
132
106
118
78
106
120
106
92
78
78
52
106
52
39
52
78
26
26
92
26
33
LESCO
Table 1- 16: List of Grids with their Codes And MVA Capacities
Sr. Grid
No. No.
KV
357
369
399
411
426
504
506
508
540
599
647
711
753
782
826
850
893
902
949
958
966
1019
2042
66
132
132
66
132
132
132
132
132
132
220
132
132
132
132
132
132
132
132
132
132
132
132
132
132
49
51
53
55
57
59
61
63
65
67
69
71
73
75
77
79
81
83
85
87
89
91
93
95
Grid
Name
Rewaz Garden
Shahdara New
UIS
Manga Mandi
Defence
Model Town
Elahabad
Shamky
Sadar Gogera
Bund Road
Khanqa Dogran
Bhati Gate
ICI
Johar Town
Valgon Sohial
Kot Radha Kis
Shalamar-II
SKP-Industrial
Lahore Cantt
DHA- Ph. V
AWT
Kasur New
Mobile
Ittehad Chemi
Transformer
T1
T2
40
40
13
26
26
40
26
26
26
26
26
40
26
40
26
13
26
13
26
26
26
26
15
13
40
26
26
40
26
26
26
26
26
26
40
26
40
26
26
26
13
26
26
0
13
T3
(MVA)
T4 Total
26
26
40
26
26
40
26
26
26
26
0
0
0
0
80
92
13
78
106
118
52
118
52
52
52
80
52
132
52
39
78
26
52
26
26
52
15
13
Sr.
Transformer
No.
Grid
No.
KV
Grid
Name
T1
T2
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
86
88
90
92
94
96
372
401
412
428
429
503
505
507
520
583
617
710
737
781
800
849
871
897
912
950
962
972
1059
2045
132
132
132
132
132
220
132
132
132
132
132
132
220
132
132
132
132
132
132
132
132
132
132
132
Sharqpur
Warburton
Rustam
Town Ship
Gulshan Ravi
Wapda Town
Shahdara Scarp
Green View
Nankana
Mcleod Road
Boggiwal
Mochi Gate
Sarfraz Nagar
WillongtonMall
Chak-65
Okara City-II
Bhikki
Sharqpur Rd.
Aysha
Sabzazar
Daroghawala
Khana Nau
Raiwind New
Sukh Chain
26
26
26
26
40
26
13
26
26
40
40
26
40
26
26
26
26
26
26
26
40
26
26
26
26
26
26
40
40
40
10
26
26
40
40
26
26
40
26
40
26
26
26
26
26
26
T3
26
26
T4
40
26
40
26
26
26
26
26
26
26
26
(MVA)
Total
52
52
78
132
80
92
23
118
52
80
132
52
66
92
104
66
78
26
52
78
66
52
26
52
34
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------1. 599 Bund Road
220
39.7
41.1
42.6
44.3
46.3
48.3
50.3
37.1
38.3
39.6
40.9
2.
113 K.Lakhpat.New
220
62.0
51.7
54.6
37.8
40.0
42.3
44.6
47.0
37.3
39.0
40.8
3.
84 Kala Shah Kak
220
39.9
24.8
30.2
33.2
36.7
40.3
43.9
47.7
51.6
43.1
46.0
4.
173 Ravi
220
43.7
44.7
46.0
47.7
49.7
51.8
44.5
46.5
26.8
28.1
29.5
5.
737 Sarfraz Nagar
220
39.4
52.0
48.0
44.1
46.5
48.9
39.8
42.4
45.2
21.4
22.9
6.
503 Wapda Town
220
76.0
86.3
95.8
80.0
64.2
68.5
67.9
71.5
75.3
79.1
83.0
7.
1 A.I.Town
132
65.2
67.5
69.7
53.1
55.1
57.1
59.1
61.2
46.9
35.2
36.3
8. 1000 A.I.Town-II
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
26.6
27.5
28.5
9.
132
8.5
10.0
11.5
13.0
14.6
16.2
17.8
19.4
21.1
22.8
24.5
966 AWT
10. 2083 Air Avenue
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
10.6
13.3
16.0
16.2
11.
931 Al- Shafi
132
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
12. 2015 Ali Asia Stee
132
0.0
0.0
0.0
0.0
0.0
6.3
6.3
6.3
6.3
6.3
6.3
13. 1032 Amir-Sapphire
132
7.1
7.9
7.9
7.9
7.9
7.9
7.9
7.9
7.9
7.9
7.9
14. 2076 Askari XI B&C
132
0.0
0.0
0.0
0.0
3.3
7.1
11.3
16.0
21.1
26.3
31.6
15. 1041 Askari- X
132
0.0
0.0
21.9
24.1
26.5
28.9
31.3
33.8
36.3
38.8
41.3
16.
132
53.3
53.7
54.4
55.8
58.7
61.7
64.9
68.2
71.8
62.6
66.1
6 Attabad
17.
983 Audit & Accou
132
0.0
0.0
0.0
0.0
10.4
12.8
15.2
17.6
20.1
22.5
25.0
18.
912 Aysha
132
39.4
39.2
40.3
41.6
43.4
45.2
47.1
49.1
51.1
53.2
55.3
19.
233 Badami Bagh
132
49.3
51.9
51.3
52.9
55.6
58.4
43.4
45.7
48.1
50.6
53.2
20. 1047 Baggrian
132
0.0
0.0
0.0
0.0
35.6
36.7
37.9
39.1
40.3
41.6
43.0
21. 2051 Baghbanpura
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
38.8
40.2
41.5
42.9
22.
132
10.4
13.9
17.4
20.9
24.3
27.8
31.3
34.7
38.2
41.6
45.1
964 Bahria Town
23. 1061 Bakkar Mandi
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
30.9
32.7
34.6
36.4
24.
132
12.5
14.6
14.6
14.6
8.7
8.7
8.7
8.7
8.7
8.7
8.7
132
0.0
0.0
0.0
0.0
12.2
12.2
12.2
12.2
12.2
12.2
12.2
650 Barkat Textil
25. 2073 Bashir Steel
35
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------26.
13 Batapur
132
56.1
59.1
37.5
39.8
42.5
45.2
48.1
51.0
53.9
57.0
60.1
27. 2031 Bhadarpura Ka
132
0.0
0.0
0.0
0.0
0.0
32.8
34.1
35.4
36.8
38.2
39.7
28.
15 Bhai Pheru
132
75.1
78.1
83.4
73.5
77.2
81.1
85.1
89.4
93.7
98.3
103.1
29.
711 Bhati Gate
132
60.7
41.4
42.4
43.6
45.0
46.4
47.9
49.4
37.4
38.7
40.0
30. 2068 Bhenro K.R.K
132
0.0
0.0
0.0
0.0
5.7
5.7
5.7
5.7
5.7
5.7
5.7
31.
871 Bhikki
132
51.1
54.8
46.2
47.5
49.8
41.3
43.8
46.3
48.9
51.7
54.6
32.
916 Black Gold
132
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
33. 1036 Blessed
132
0.0
0.0
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
34.
132
93.6
95.0
104.3
103.7
91.4
99.3
97.3
101.8
106.5
111.5
116.8
35.
617 Boggiwal
132
4.0
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5.0
36. 1007 Broadway
18 Bongha Hayat
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6.1
10.9
15.7
20.6
37.
132
21.8
22.0
22.9
24.0
25.4
26.8
28.3
29.8
31.4
33.0
34.7
20 Bucheki
38.
981 Central Park
132
0.0
0.0
9.5
10.4
11.4
12.5
13.5
14.6
15.7
16.8
17.9
39.
651 Century Paper
132
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
132
58.8
60.3
61.8
63.4
65.1
66.9
55.1
56.7
58.3
60.0
61.7
41. 1018 Chak 40/D
132
0.0
0.0
0.0
0.0
28.5
30.4
32.4
34.5
36.6
38.8
41.0
42.
40.
23 Chah Miran
132
69.4
70.6
74.0
76.1
80.4
84.9
89.6
94.6
99.9
87.7
92.6
43. 1072 Chaurasta
800 Chak-65
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
35.1
37.5
39.9
42.4
44. 2012 Chichoke Mall
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12.4
13.5
45.
132
0.0
0.0
0.0
0.0
0.0
0.0
11.9
12.5
14.9
17.4
19.8
46. 1071 Chucak
986 Chinar Bagh
132
0.0
0.0
18.9
20.1
21.3
22.5
23.8
25.0
26.3
27.6
28.9
47.
30 Chung
132
70.4
75.2
67.9
71.9
77.1
76.4
59.4
62.2
49.6
52.1
54.7
48.
254 Chunian
132
27.4
28.3
30.1
32.1
34.1
36.2
38.4
40.5
42.8
45.0
47.3
49.
997 City Steel SK
132
7.4
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
132
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
50. 1025 Coca Cola
36
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------51. 1030 Colony Indust 132
7.2
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
52.
980 DHA -P- VI-3
132
0.0
0.0
0.0
18.1
19.9
21.7
23.5
25.3
27.2
29.1
31.0
53. 2084 DHA Phase IX
132
0.0
0.0
0.0
0.0
0.0
0.0
4.3
8.7
13.1
17.6
22.1
54.
132
0.0
0.0
0.0
0.0
0.0
7.9
13.3
18.5
23.8
29.2
34.5
55. 1021 DHA Rahber
132
0.0
0.0
5.6
7.0
8.2
9.6
10.9
12.2
13.5
14.9
16.3
56. 2049 DHA- P-VI. 2
132
0.0
0.0
0.0
7.1
10.4
13.7
17.0
20.4
23.8
27.2
30.6
57.
958 DHA- Ph. V
132
26.8
30.1
33.5
37.0
40.7
44.4
48.2
52.0
55.8
59.8
63.7
58.
962 Daroghawala
132
45.0
47.0
45.0
48.2
51.2
54.4
57.6
61.0
64.5
68.1
71.9
59.
426 Defence
132
79.7
84.2
88.8
93.5
93.9
98.8
103.7
67.6
70.4
73.3
76.1
60.
992 Defence XXY
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
26.8
27.2
27.6
28.0
61.
265 Depalpur
132
60.0
63.7
66.3
69.6
64.7
67.9
71.1
66.4
69.5
62.2
65.3
62.
998 Descon Oxy. S
132
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
63. 2058 Dew Kalan
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9.8
10.6
11.4
64. 2014 Diamond Fabri
132
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
65. 2082 Dina Nath
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
26.7
28.2
66.
132
0.0
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
67. 2066 EME
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.5
6.4
7.3
68.
987 Eden City
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6.4
8.2
10.1
69. 2063 Eden Value Ho
132
0.0
0.0
0.0
0.0
0.0
0.0
21.8
23.8
25.9
28.0
30.2
70. 2041 Ejaz Textile
132
0.0
0.0
0.0
5.3
5.3
5.3
5.3
5.3
5.3
5.3
5.3
71.
506 Elahabad
132
37.8
38.9
40.6
42.6
44.8
47.0
49.3
51.7
54.1
56.6
59.1
72. 2075 Ellcot Spinni
132
0.0
0.0
0.0
0.0
0.0
5.4
5.4
5.4
5.4
5.4
5.4
73.
271 Farooqabad
132
53.2
56.3
60.4
64.9
65.9
60.3
64.6
69.1
73.6
78.3
83.1
74.
38 Fateh Garh
132
83.9
87.4
81.5
83.6
86.0
88.4
83.2
85.6
88.0
90.5
93.0
132
0.0
0.0
0.0
0.0
0.0
0.0
6.1
9.5
12.7
15.9
19.2
75.
990 DHA Phase-VII
999 Dost Steel
982 Fazzia
37
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------76. 1022 Ferozepur Roa 132
0.0
0.0
0.0
0.0
0.0
0.0
33.5
34.1
34.7
35.4
36.0
77.
40 Fort
132
38.2
39.3
22.0
22.8
23.8
24.7
25.7
26.7
27.7
28.7
29.7
78. 2059 Fruit Mandi
132
0.0
0.0
0.0
38.1
41.6
45.1
48.7
52.4
55.4
58.4
61.5
79.
43 Garden Town
132
96.5
100.9
105.3
99.9
104.6
109.4
81.2
85.5
89.9
94.3
98.9
80. 2069 Ghani Gases
132
0.0
0.0
0.0
0.0
0.0
0.0
11.7
11.7
11.7
11.7
11.7
81.
132
90.6
97.3
83.6
73.5
59.9
62.9
65.9
68.9
63.3
66.2
69.2
45 Ghazi
82. 1034 Ghazi Fabirc
132
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
83.
507 Green View
132
70.3
84.9
88.1
94.2
75.7
70.6
74.8
63.0
66.5
70.1
74.0
84.
960 Gulberg Lahor
132
0.0
0.0
0.0
0.0
0.0
0.0
36.0
36.5
37.0
37.5
38.1
85.
429 Gulshan Ravi
132
67.0
57.2
61.5
66.0
70.6
55.6
59.0
62.5
66.0
69.5
73.1
86. 2086 Hadeed Pakist
132
0.0
0.0
0.0
0.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
87. 1092 Hadyara
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
8.7
8.9
9.1
88. 2057 Hanjarwal
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
29.3
30.5
89.
132
55.6
57.9
61.5
65.4
69.4
73.6
77.7
72.6
76.7
80.9
85.1
90. 1029 Hira Terry
132
21.6
24.7
24.7
24.7
24.7
19.3
19.3
19.3
19.3
19.3
19.3
91.
287 Hujra
132
39.5
43.3
47.3
51.6
56.2
60.9
65.7
70.5
66.6
71.4
76.2
92.
753 ICI
60 Havali
132
39.7
38.3
38.7
39.5
41.5
39.2
41.4
43.6
46.0
48.5
51.1
93. 2061 IEEP Town
132
0.0
0.0
0.0
0.0
0.0
0.0
4.9
5.7
6.5
7.3
8.0
94. 2064 Indus Home
132
0.0
0.0
0.0
4.7
7.1
7.1
7.1
7.1
7.1
7.1
7.1
95.
132
35.8
35.8
35.8
35.8
35.8
35.8
35.8
35.8
35.8
35.8
35.8
96. 2028 Jail Road
132
0.0
0.0
0.0
0.0
0.0
0.0
20.9
21.3
21.6
21.9
22.2
97.
952 Jamber
132
0.0
0.0
0.0
25.9
27.1
28.3
29.5
30.8
32.2
33.5
34.9
98.
985 Jandiala S.Kh
132
0.0
0.0
0.0
0.0
14.7
16.4
18.1
19.8
21.6
23.4
25.2
99.
782 Johar Town
132
106.1
77.1
80.3
83.7
87.4
68.3
71.5
74.7
77.9
81.2
84.6
957 Johar Town-II
132
0.0
34.7
37.3
40.0
46.0
52.0
58.1
64.3
70.5
76.8
83.1
100.
66 Ittahad Chemi
38
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------101. 1020 Jubli Town
132
0.0
0.0
11.8
12.8
13.8
14.9
16.0
17.1
18.3
19.4
20.6
102.
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
14.8
20.0
26.4
132
83.0
86.0
89.1
92.5
75.1
77.5
71.7
74.1
76.6
79.1
81.6
104. 2044 Kala Khatai
132
0.0
0.0
0.0
0.0
0.0
0.0
16.8
17.7
18.8
19.8
20.9
105. 1026 Kamran Steel
132
0.0
0.0
0.0
6.9
6.9
6.9
6.9
6.9
6.9
6.9
6.9
106. 1087 Karol
132
0.0
0.0
0.0
0.0
32.7
34.7
36.7
38.8
41.0
43.3
45.8
107. 2055 Kashmir Colon
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.5
7.3
108.
132
69.2
71.7
75.0
78.6
82.8
54.3
57.3
52.7
55.6
58.5
61.5
109. 1019 Kasur New
132
42.9
45.0
47.1
49.4
51.9
54.3
56.8
59.3
61.9
64.5
67.1
110. 1015 Kasur-II
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
7.7
8.0
8.4
8.7
111.
972 Khana Nau
132
47.7
49.3
51.0
35.2
37.5
39.8
42.2
39.6
41.9
44.3
46.7
112.
647 Khanqa Dogran
132
19.1
20.5
22.2
24.1
26.1
28.1
30.2
32.3
22.5
23.9
25.3
113. 2046 Khay. Amin
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6.0
8.7
11.4
14.1
114. 1093 Khokkar Road
132
0.0
0.0
0.0
0.0
0.0
0.0
24.5
25.4
26.4
27.4
28.5
115.
310 Khuddian
132
58.5
61.7
66.3
71.1
51.2
54.5
57.9
61.3
64.9
68.4
72.1
116.
850 Kot Radha Kis
132
30.0
32.4
35.5
38.7
42.0
45.4
48.8
52.2
55.7
59.2
62.8
117.
984 LDA Ave-I
132
0.0
0.0
7.1
10.0
12.8
15.6
18.4
21.3
24.2
27.1
30.1
118.
121 LEFO
132
54.7
54.5
56.1
58.0
60.5
63.0
65.6
68.3
65.2
68.0
70.8
119. 2067 LHR SKP Road
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
17.8
19.0
20.2
21.5
120.
994 LUMS
132
4.5
7.3
10.1
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
121.
949 Lahore Cantt
132
35.1
36.3
37.6
38.9
40.3
41.7
43.1
44.5
46.0
47.5
49.0
122. 2047 Lake City
132
0.0
0.0
0.0
0.0
0.0
6.2
7.4
8.6
9.8
10.9
12.1
123.
314 Lalyani
132
31.8
33.2
25.6
26.8
28.4
30.1
31.9
33.7
35.5
37.4
39.4
124.
954 M.A.Abad
132
0.0
0.0
0.0
18.1
20.0
21.9
23.8
25.7
27.7
29.7
31.7
125.
953 M.Usmanwala
132
0.0
0.0
0.0
0.0
28.7
30.7
32.7
34.8
36.9
39.1
41.3
103.
977 K.E. Medical
82 K.Lakhpat.Old
99 Kasur
39
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------126. 1027 Machikay
132
0.0
0.0
0.0
0.0
0.0
34.2
35.8
37.4
39.0
40.6
42.3
127. 1073 Makhdoom/Doul
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
10.6
10.8
128.
951 Malik Paper &
132
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
129.
411 Manga Mandi
132
62.0
63.7
65.8
63.8
67.7
71.9
76.1
80.5
75.7
66.0
70.0
130. 2056 Manga-II
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
32.0
33.9
131. 1042 Master Textil
132
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
132.
132
44.6
45.7
46.8
48.0
49.3
50.6
52.0
53.4
54.8
45.1
46.4
133. 2052 Mehmood Steel
583 Mcleod Road
132
0.0
0.0
0.0
0.0
6.3
6.3
6.3
6.3
6.3
6.3
6.3
134. 2042 Mobile
132
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
135.
710 Mochi Gate
132
36.9
37.6
38.3
39.0
39.9
40.7
41.6
42.4
43.3
44.2
45.1
136.
504 Model Town
132
77.9
82.4
87.0
74.9
79.4
84.0
88.6
69.2
71.9
74.7
77.5
137. 2050 Model Town So
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
24.2
26.2
28.2
30.3
138. 1040 Momanpura G.T
132
0.0
0.0
29.4
30.6
32.3
34.0
35.7
37.6
39.5
41.4
43.4
139. 2072 Mughal Alloya
132
0.0
0.0
0.0
0.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
140. 1014 Mughal Steel
132
0.0
4.9
9.7
14.6
19.4
19.4
19.4
19.4
19.4
19.4
19.4
141.
132
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
142. 1003 Muridke
132
0.0
18.9
20.0
21.3
22.8
24.3
25.8
27.4
29.0
30.6
32.3
143. 1037 Mustafabad
132
0.0
0.0
0.0
0.0
0.0
0.0
22.1
22.4
22.7
23.1
23.4
144. 2024 Nain Sukh
132
0.0
0.0
0.0
0.0
0.0
13.6
14.0
14.4
14.8
15.2
15.6
145.
520 Nankana
132
26.7
30.8
35.9
41.0
46.5
52.0
57.5
63.2
68.9
74.7
80.6
146.
336 Narang Mandi
132
26.4
27.8
30.1
32.5
35.1
37.7
40.3
42.9
45.6
48.4
51.1
147. 2074 Naveena Expor
132
0.0
0.0
0.0
0.0
0.0
7.8
7.8
7.8
7.8
7.8
7.8
148.
866 New Airport
132
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
149.
995 New Smr St.2
132
0.0
6.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
150.
996 New Smr St.3
132
0.0
5.8
5.8
5.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
679 Muhammad Bukh
40
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------151. 989 Niazi Chowk
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
35.2
36.1
37.2
152. 2007 Nisar Spinnin
132
0.0
0.0
0.0
0.0
0.0
6.3
6.3
6.3
6.3
6.3
6.3
153. 2085 Nishat Chunia
132
0.0
0.0
16.3
16.3
16.3
16.3
16.3
16.3
16.3
16.3
16.3
154. 2080 Nishat Mills
132
0.0
0.0
0.0
0.0
0.0
10.7
10.7
10.7
10.7
10.7
10.7
155. 2054 OPF Lahore
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.3
8.1
11.0
156.
338 Okara Cantt
132
13.4
13.9
14.4
14.9
15.5
16.1
16.7
17.3
18.0
18.6
19.2
157.
152 Okara City-I
132
56.6
58.1
60.9
64.7
49.4
52.8
56.1
59.6
63.1
66.7
70.4
158.
849 Okara City-II
132
48.6
53.6
58.2
63.0
68.2
73.5
60.9
64.5
68.3
72.1
75.9
132
0.0
0.0
0.0
0.0
0.0
0.0
25.6
27.5
29.5
31.5
33.5
159. 1002 Okara FSD Rd
160.
153 P.W.R
132
62.9
64.2
65.4
66.8
68.5
70.3
57.6
41.7
43.0
44.4
45.9
161. 2088 PAEC Mraka
132
0.0
0.0
0.0
0.0
1.8
3.7
5.5
6.5
7.5
8.6
9.6
162.
654 Packages
132
5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.4
163.
946 Packages Kasu
132
19.2
19.2
19.2
19.2
25.2
31.2
37.2
37.2
37.2
37.2
37.2
164. 2053 Pak Arab
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
8.2
8.4
8.5
165. 2017 Panwan
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
17.8
18.4
166. 1082 Park View
132
0.0
0.0
0.0
0.0
24.6
28.3
32.1
35.9
39.8
43.7
47.6
167.
132
37.1
39.3
36.7
29.6
31.5
33.3
35.3
37.2
39.2
41.2
43.2
168. 2036 Press Club
158 Pattoki
132
0.0
0.0
19.7
22.5
25.4
28.3
31.2
34.2
37.3
40.3
43.4
169.
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
29.0
29.5
170. 1043 Punjab Uni
132
0.0
0.0
0.0
45.9
47.0
48.1
49.2
50.4
51.6
52.8
54.0
171.
991 Punjab Univ T
132
0.0
0.0
0.0
12.7
14.3
15.8
17.4
19.0
20.6
22.3
23.9
172.
168 Qadirabad
132
4.8
4.8
4.9
5.0
5.1
5.2
5.4
5.5
5.7
5.8
6.0
173.
993 Punjab Assemb
167 Qartaba
132
54.7
56.2
57.8
59.3
61.0
62.7
64.4
66.2
58.3
60.0
61.7
174. 1080 Qila Sattar S
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12.9
13.4
175. 2062 Quetta Textil
132
0.0
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
41
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------176. 1090 Rachna Town
132
0.0
0.0
0.0
35.9
37.5
39.0
40.7
42.4
44.1
45.9
47.7
177.
353 Raiiwind
132
72.2
79.0
84.2
87.5
57.0
53.4
44.1
46.3
48.5
50.9
53.3
178. 1059 Raiwind New
132
15.9
16.7
16.8
17.3
18.2
19.2
20.3
21.4
22.6
23.9
25.2
179.
956 Raiwind-III/j
132
0.0
0.0
0.0
0.0
35.2
37.5
39.9
42.4
45.1
47.8
50.6
180.
175 Rehman Park
132
59.3
60.9
62.5
64.2
66.2
68.2
42.1
43.8
45.5
47.2
48.9
181. 2071 Rehman Steel
132
0.0
0.0
0.0
0.0
0.0
0.0
6.3
6.3
6.3
6.3
6.3
182.
132
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
183. 2079 Reliance Cott
929 Rehmat Nazir
132
0.0
0.0
0.0
0.0
0.0
6.4
6.4
6.4
6.4
6.4
6.4
184.
176 Renala Khurd
132
28.8
30.7
25.6
27.3
29.0
30.8
32.6
34.4
30.4
32.1
33.9
185.
357 Rewaz Garden
132
59.2
48.2
49.5
50.9
52.4
53.8
55.3
56.8
58.4
59.9
61.5
186. 2005 Riaz Textile
132
0.0
0.0
0.0
6.9
6.9
6.9
6.9
6.9
6.9
6.9
6.9
187. 2020 Roya Golf Clu
132
0.0
0.0
0.0
0.0
0.0
0.0
6.0
8.0
10.0
12.0
14.0
188.
412 Rustam
132
61.2
62.3
63.6
65.3
68.1
57.3
59.8
62.5
65.2
68.1
71.0
189.
902 SKP-Industria
132
19.4
22.4
25.5
28.6
21.3
23.6
26.0
28.3
30.7
33.2
35.7
190.
950 Sabzazar
132
54.9
56.4
57.8
59.3
60.9
63.3
65.7
52.6
54.1
55.7
57.3
191.
540 Sadar Gogera
132
29.2
30.7
32.9
35.1
37.5
39.9
34.6
36.9
39.2
41.6
44.0
192.
973 Safdarabad
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12.3
13.1
13.9
193.
969 Saggian
132
0.0
47.7
48.9
50.5
52.5
54.6
56.7
58.9
61.1
63.5
65.9
194.
184 Saidpur
132
66.2
68.0
69.8
71.7
73.8
75.9
78.1
80.3
82.6
69.1
71.0
195. 1060 Sanda
132
0.0
0.0
0.0
0.0
0.0
19.7
21.1
22.5
24.0
25.4
26.9
196. 2004 Sapphire -3
132
0.0
0.0
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
197. 2016 Sapphire -5
132
9.6
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
198. 2077 Sapphire F (1
132
0.0
0.0
0.0
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
199. 1028 Sapphire Fini
132
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
200.
132
54.2
55.9
57.6
59.3
61.1
63.0
43.9
45.4
47.0
48.6
50.2
191 Shadman
42
LESCO
Table 1- 17: Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------201. 369 Shahdara New
132
68.5
71.5
74.8
61.9
65.3
68.8
60.6
63.5
66.5
69.6
72.7
202.
505 Shahdara Scar
132
14.6
14.7
14.9
15.2
15.8
16.4
12.1
12.6
13.1
13.7
14.3
203.
193 Shahkot
132
51.0
52.4
55.1
58.3
62.2
66.2
70.3
74.5
78.8
69.0
72.9
204. 1010 Shalamar Stee
132
0.0
0.0
0.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
205.
194 Shalamar-I
132
54.5
56.0
57.7
59.9
51.3
53.8
56.5
59.2
62.1
65.1
68.2
206.
893 Shalamar-II
132
53.6
55.6
49.3
51.5
54.0
56.6
59.2
40.6
42.3
44.1
45.9
207.
508 Shamky
132
69.7
69.3
70.6
53.4
56.7
60.1
63.6
67.4
71.3
75.4
79.7
208.
372 Sharqpur
132
25.7
28.2
33.0
34.0
35.5
37.0
38.6
40.2
41.8
43.6
45.4
209.
897 Sharqpur Rd.
132
16.7
17.6
18.4
19.4
20.7
22.0
23.3
24.7
26.1
27.5
29.0
210.
971 Sheranwala
132
0.0
0.0
21.3
21.6
22.0
22.5
23.0
23.5
24.0
24.5
25.1
211.
988 Shergarh
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
14.6
15.0
15.4
212. 2065 Shoaib Steel
132
0.0
0.0
0.0
0.0
0.0
9.1
9.1
9.1
9.1
9.1
9.1
213.
132
60.3
64.0
70.9
68.7
73.6
54.4
58.1
62.0
66.0
70.1
74.3
214. 2060 Spring Medows
197 Skp. City
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.4
8.9
13.4
18.0
215. 2043 State Life (A
132
0.0
15.7
17.5
19.3
21.2
23.1
25.0
26.9
28.9
30.9
33.0
216. 2087 Style Textile
132
0.0
0.0
0.0
0.0
5.7
5.7
5.7
5.7
5.7
5.7
5.7
217. 2048 Sui Gas
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
14.4
16.2
18.1
20.0
218. 2045 Sukh Chain
132
10.6
13.0
15.5
18.0
20.8
19.5
22.4
25.3
28.3
31.3
34.3
219.
132
0.6
0.6
0.7
0.7
0.7
0.7
0.7
0.7
0.4
0.4
0.4
380 Sukheki
220. 2018 Sunder Manga
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
20.3
20.9
21.6
221.
965 Sunder( Ind.
132
35.5
39.3
46.9
58.3
69.7
69.7
69.7
69.7
69.7
69.7
69.7
222.
206 Sunny View
132
42.1
43.1
44.1
45.2
46.3
47.4
48.5
49.6
50.8
34.1
35.1
223. 2078 Tariq Glass
132
0.0
0.0
0.0
0.0
0.0
8.5
8.5
8.5
8.5
8.5
8.5
224. 1084 Thokkar
132
0.0
0.0
0.0
0.0
0.0
28.9
30.3
31.8
33.4
34.9
36.6
225.
132
86.6
88.8
91.2
94.0
74.3
77.3
80.3
83.5
86.7
90.0
93.4
428 Town Ship
43
LESCO
Table 1- 17: Maximum Demand (MW) of Substations
P O W E R M A R K E T S U R V E Y
LOAD
CENTRE
SUMMARY
MAXIMUM DEMAND (MW) OF GRIDSTATIONS
DISCO: LESCO
-------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF
|
|_______________________________________________Y____E____A____R______________________________________________|
|NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
-------------------------------------------------------------------------------------------------------------------------------------226. 2070 Uni Lever
132
0.0
0.0
0.0
0.0
5.9
5.9
5.9
5.9
5.9
5.9
5.9
227.
963 Valancia
132
0.0
0.0
0.0
12.9
15.2
17.5
19.8
22.2
24.6
27.0
29.4
228.
826 Valgon Sohial
132
39.6
43.4
39.1
34.1
36.5
38.9
41.5
44.1
46.8
49.5
52.4
229.
221 W.Radha Ram
132
31.5
33.4
28.1
29.2
30.6
32.0
33.4
34.9
36.4
38.0
39.6
230.
959 Walton Road
132
0.0
0.0
0.0
0.0
41.5
43.1
44.8
46.5
48.2
49.9
51.7
231.
401 Warburton
132
40.6
47.2
50.3
53.1
56.8
54.3
58.2
62.2
66.4
70.7
75.1
232.
970 Wassanpura
132
0.0
0.0
0.0
0.0
0.0
0.0
16.5
16.9
17.2
17.6
17.9
233.
781 Willongton Ma
132
64.8
66.5
68.2
69.9
51.3
52.8
54.4
55.9
57.5
59.1
60.8
234. 1012 Yaqoob Steel
132
0.0
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
235.
658 Zahoor.Textil
132
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
236.
229 Ali Jaj
66
10.0
11.6
13.5
15.4
17.4
19.4
21.5
23.5
25.6
27.8
29.9
237.
241 Basirpur
66
29.9
32.8
36.0
31.8
34.3
36.8
39.4
24.4
25.2
26.1
26.9
238.
270 EMCO
66
28.9
25.3
25.5
19.0
20.1
21.1
22.3
21.9
23.1
24.4
25.7
239.
303 Kanganpur
66
20.5
21.9
23.6
14.9
12.3
13.3
14.2
15.2
16.2
17.2
18.2
240.
320 Malikpur
66
18.1
22.0
26.0
30.1
34.5
38.9
43.4
47.9
52.5
57.2
61.9
241.
330 Mohlan
66
9.3
10.1
10.9
11.7
12.5
13.4
14.2
15.1
16.0
13.3
14.2
242.
362 Sangla Hill
66
15.1
16.2
17.8
19.4
21.1
22.8
24.6
26.3
28.1
29.9
31.7
243.
399 UIS
66
8.4
9.6
9.7
10.0
10.5
11.1
11.7
12.4
13.1
13.8
14.6
244.
447 Chichoke Mall
11
5.2
5.3
5.4
5.4
5.6
5.7
5.9
6.0
6.2
6.3
6.5
245. 1099 Gulistan P/H
11
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
246. 2008 Nishat Power
11
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
247.
11
1.4
1.4
1.4
1.4
1.5
1.5
1.5
1.6
1.6
1.6
1.7
659 Renala P/H
Total
-----------------------------------------------------------------------------------------------------------------4801.0
5125.3
5423.9
5718.2
6096.2
6457.3
6816.9
7198.2
7599.9
8002.0
8410.0
44
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR : 2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------1.
1
132kV A.I.Town
GWh
93.24
12.92
2.13
2.26
4.06
6.31
0.00
0.00
120.92
0.89
MW
35.48
5.27
0.81
0.96
4.23
1.68
0.00
0.00
36.32
19.00
2. 1000
132kV A.I.Town-II
GWh
71.25
13.77
4.00
1.48
0.52
6.67
0.00
0.00
97.69
0.89
MW
27.11
5.80
1.52
0.63
1.11
1.78
0.00
0.00
28.46
15.00
3. 966
132kV AWT
GWh
52.32
15.65
0.05
2.74
19.13
1.04
0.00
0.00
90.93
0.86
MW
19.91
7.15
0.02
1.17
4.18
0.28
0.00
0.00
24.53
15.00
4. 2083
132kV Air Avenue
GWh
60.44
4.52
0.00
0.00
0.00
0.84
0.00
0.00
65.80
0.90
MW
19.71
1.72
0.00
0.00
0.00
0.22
0.00
0.00
16.24
8.00
5. 931
132kV Al- Shafi
GWh
0.00
0.00
0.00
0.00
35.14
0.00
0.00
0.00
35.14
0.90
MW
0.00
0.00
0.00
0.00
13.61
0.00
0.00
0.00
13.61
7.00
6. 2015
132kV Ali Asia Steel GWh
0.00
0.00
0.00
0.00
19.32
0.00
0.00
0.00
19.32
0.90
MW
0.00
0.00
0.00
0.00
6.30
0.00
0.00
0.00
6.30
3.00
7. 229
66kV Ali Jaj
GWh
55.48
2.46
0.00
2.52
1.09
32.07
0.00
0.00
93.62
0.83
MW
23.97
1.05
0.00
1.02
1.03
8.12
0.00
0.00
29.90
20.00
8. 1032
132kV Amir-Sapphire K GWh
0.11
0.00
0.00
0.00
38.41
0.00
0.00
0.00
38.52
0.90
MW
0.04
0.00
0.00
0.00
7.86
0.00
0.00
0.00
7.90
4.00
9. 2076
132kV Askari XI B&C
GWh
107.22
10.72
1.54
1.09
0.00
7.60
0.00
0.00
128.17
0.89
MW
34.97
4.08
0.58
0.46
0.00
2.03
0.00
0.00
31.59
16.00
10. 1041
132kV Askari- X
GWh
99.29
19.97
3.85
3.23
4.51
3.76
0.00
0.00
134.61
0.89
MW
37.78
9.12
1.47
1.38
4.37
1.00
0.00
0.00
41.34
21.00
11.
6
132kV Attabad
GWh
4.62
1.88
0.00
0.36
288.00
1.62
0.00
0.00
296.47
0.90
MW
1.76
0.72
0.00
0.15
74.66
0.43
0.00
0.00
66.06
32.00
12. 983
132kV Audit & Account GWh
77.08
16.76
0.11
2.13
0.20
3.07
0.00
0.00
99.36
0.89
MW
25.14
6.38
0.04
0.91
0.11
0.82
0.00
0.00
25.05
13.00
13. 912
132kV Aysha
GWh
85.04
15.00
0.34
11.42
116.19
15.96
0.00
0.00
243.95
0.87
MW
30.74
6.49
0.12
4.62
27.69
4.04
0.00
0.00
55.34
31.00
14. 233
132kV Badami Bagh
GWh
35.36
5.68
0.02
10.81
139.00
3.31
0.00
0.00
194.19
0.88
MW
11.53
2.16
0.01
4.61
51.80
0.88
0.00
0.00
53.24
29.00
15. 1047
132kV Baggrian
GWh
58.63
12.69
1.17
4.09
89.62
4.59
0.00
0.00
170.80
0.87
MW
21.48
5.47
0.45
1.74
27.00
1.22
0.00
0.00
43.02
24.00
16. 2051
132kV Baghbanpura
GWh
97.38
16.03
11.12
7.84
9.53
9.40
0.00
0.00
151.28
0.89
MW
37.05
7.32
4.23
3.34
2.75
2.50
0.00
0.00
42.90
22.00
17. 964
132kV Bahria Town
GWh
106.17
7.88
2.10
1.75
0.00
0.47
0.00
0.00
118.38
0.90
MW
40.40
3.00
0.80
0.75
0.00
0.13
0.00
0.00
45.07
22.00
18. 1061
132kV Bakkar Mandi
GWh
75.78
9.05
0.81
10.31
20.09
4.57
0.00
0.00
120.60
0.85
MW
29.91
4.42
0.31
4.39
8.36
1.22
0.00
0.00
36.45
23.00
19. 650
132kV Barkat Textile GWh
0.00
0.00
0.00
0.00
24.77
0.00
0.00
0.00
24.77
0.90
MW
0.00
0.00
0.00
0.00
8.72
0.00
0.00
0.00
8.72
4.00
20. 2073
132kV Bashir Steel
GWh
0.00
0.00
0.00
0.00
27.62
0.00
0.00
0.00
27.62
0.90
MW
0.00
0.00
0.00
0.00
12.20
0.00
0.00
0.00
12.20
6.00
21. 241
66kV Basirpur
GWh
39.20
2.62
0.00
3.32
3.13
39.14
0.00
0.00
87.41
0.83
MW
17.01
1.42
0.00
1.34
1.17
14.86
0.00
0.00
26.92
18.00
22.
13
132kV Batapur
GWh
106.40
8.93
0.85
13.12
60.47
34.79
0.00
0.00
224.56
0.85
MW
36.06
3.23
0.31
5.31
26.30
8.80
0.00
0.00
60.06
37.00
23. 2031
132kV Bhadarpura Kasu GWh
35.71
1.66
0.00
3.40
7.18
43.55
0.00
0.00
91.50
0.83
MW
16.31
0.76
0.00
1.45
4.94
23.20
0.00
0.00
39.66
27.00
24.
15
132kV Bhai Pheru
GWh
87.86
8.54
0.10
4.76
375.12
46.61
0.00
0.00
523.00
0.88
MW
31.76
3.31
0.04
1.93
79.96
11.79
0.00
0.00
103.06
56.00
25. 711
132kV Bhati Gate
GWh
74.76
17.68
2.87
19.34
12.65
4.12
0.00
0.00
131.42
0.85
MW
26.67
8.07
1.09
8.24
8.12
1.10
0.00
0.00
39.97
25.00
45
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------26. 2068
132kV Bhenro K.R.K
GWh
0.00
0.00
0.00
0.00
32.56
0.00
0.00
0.00
32.56
0.90
MW
0.00
0.00
0.00
0.00
5.72
0.00
0.00
0.00
5.72
3.00
27. 871
132kV Bhikki
GWh
14.17
3.89
0.00
2.74
233.37
12.21
0.00
0.00
266.38
0.89
MW
6.47
2.22
0.00
1.17
51.09
3.25
0.00
0.00
54.57
28.00
28. 916
132kV Black Gold
GWh
0.00
0.00
0.00
0.00
25.17
0.00
0.00
0.00
25.17
0.90
MW
0.00
0.00
0.00
0.00
8.88
0.00
0.00
0.00
8.88
4.00
29. 1036
132kV Blessed
GWh
0.02
0.00
0.00
0.00
56.13
0.00
0.00
0.00
56.16
0.90
MW
0.01
0.00
0.00
0.00
11.11
0.00
0.00
0.00
11.12
5.00
30. 617
132kV Boggiwal
GWh
72.63
6.13
5.61
16.34
324.24
9.07
0.00
0.00
434.02
0.88
MW
27.64
2.80
2.14
6.96
113.72
2.42
0.00
0.00
116.75
63.00
31.
18
132kV Bongha Hayat
GWh
3.44
0.10
0.00
0.12
0.80
14.48
0.00
0.00
18.94
0.78
MW
1.57
0.06
0.00
0.05
0.36
3.86
0.00
0.00
5.01
4.00
32. 1007
132kV Broadway
GWh
0.00
72.11
0.00
0.00
0.00
0.00
0.00
0.00
72.11
0.90
MW
0.00
27.44
0.00
0.00
0.00
0.00
0.00
0.00
20.58
10.00
33.
20
132kV Bucheki
GWh
33.63
3.27
0.00
3.12
45.77
28.10
0.00
0.00
113.89
0.86
MW
14.49
1.73
0.00
1.26
16.18
7.11
0.00
0.00
34.67
21.00
34. 599
220kV Bund Road
GWh
109.27
9.73
1.69
9.91
25.05
3.56
0.00
0.00
159.21
0.89
MW
35.64
3.70
0.64
4.22
9.39
0.95
0.00
0.00
40.91
21.00
35. 981
132kV Central Park
GWh
31.58
5.07
0.00
3.39
18.85
1.38
0.00
0.00
60.26
0.86
MW
12.02
2.31
0.00
1.44
4.92
0.37
0.00
0.00
17.90
11.00
36. 651
132kV Century Paper M GWh
0.00
0.00
0.00
0.00
23.14
0.00
0.00
0.00
23.14
0.90
MW
0.00
0.00
0.00
0.00
7.82
0.00
0.00
0.00
7.82
4.00
37.
23
132kV Chah Miran
GWh
158.57
15.38
5.30
9.08
19.29
9.90
0.00
0.00
217.53
0.89
MW
60.34
7.02
2.02
3.87
6.39
2.64
0.00
0.00
61.71
32.00
38. 1018
132kV Chak 40/D
GWh
42.78
7.23
0.00
5.04
37.87
18.73
0.00
0.00
111.64
0.86
MW
17.10
3.30
0.00
2.15
19.24
6.51
0.00
0.00
41.04
24.00
39. 800
132kV Chak-65
GWh
7.92
2.03
0.00
1.03
366.38
0.80
0.00
0.00
378.16
0.90
MW
3.44
1.10
0.00
0.42
103.75
0.20
0.00
0.00
92.57
45.00
40. 1072
132kV Chaurasta
GWh
30.60
1.82
0.00
3.39
12.81
64.31
0.00
0.00
112.93
0.83
MW
13.49
1.04
0.00
1.45
6.49
27.39
0.00
0.00
42.37
28.00
41. 447
11kV Chichoke Mall P GWh
9.16
0.67
0.00
0.46
7.34
2.36
0.00
0.00
19.99
0.86
MW
4.18
0.38
0.00
0.20
2.25
0.63
0.00
0.00
6.49
4.00
42. 2012
132kV Chichoke Mallia GWh
34.29
2.74
0.00
1.62
2.35
2.49
0.00
0.00
43.48
0.89
MW
13.05
1.04
0.00
0.69
0.46
0.66
0.00
0.00
13.52
7.00
43. 986
132kV Chinar Bagh
GWh
22.64
3.53
0.00
1.23
47.84
0.78
0.00
0.00
76.01
0.88
MW
8.61
1.61
0.00
0.52
15.48
0.21
0.00
0.00
19.83
11.00
44. 1071
132kV Chucak
GWh
54.34
5.31
0.00
4.06
3.35
34.81
0.00
0.00
101.88
0.83
MW
20.48
2.55
0.00
1.73
0.51
8.77
0.00
0.00
28.93
19.00
45.
30
132kV Chung
GWh
70.40
9.61
6.64
3.34
167.52
5.89
0.00
0.00
263.39
0.88
MW
21.81
3.47
2.40
1.35
42.36
1.49
0.00
0.00
54.72
30.00
46. 254
132kV Chunian
GWh
84.64
6.08
0.00
5.28
11.65
28.99
0.00
0.00
136.63
0.84
MW
36.71
3.30
0.00
2.14
7.56
8.80
0.00
0.00
47.29
31.00
47. 997
132kV City Steel SK
GWh
0.00
0.00
0.00
0.00
40.01
0.00
0.00
0.00
40.01
0.90
MW
0.00
0.00
0.00
0.00
16.54
0.00
0.00
0.00
16.54
8.00
48. 1025
132kV Coca Cola
GWh
0.00
0.00
0.00
0.00
37.72
0.00
0.00
0.00
37.72
0.90
MW
0.00
0.00
0.00
0.00
9.60
0.00
0.00
0.00
9.60
5.00
49. 1030
132kV Colony Indust
GWh
0.00
0.00
0.00
0.00
41.49
0.00
0.00
0.00
41.49
0.90
MW
0.00
0.00
0.00
0.00
9.70
0.00
0.00
0.00
9.70
5.00
50. 980
132kV DHA -P- VI-3
GWh
63.53
12.17
2.72
3.67
2.11
26.30
0.00
0.00
110.50
0.84
MW
24.17
5.56
1.04
1.56
2.04
7.00
0.00
0.00
31.03
20.00
46
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------51. 2084
132kV DHA Phase IX
GWh
75.03
7.54
1.05
0.76
0.00
5.27
0.00
0.00
89.65
0.89
MW
24.47
2.87
0.40
0.32
0.00
1.40
0.00
0.00
22.10
11.00
52. 990
132kV DHA Phase-VII-4 GWh
128.75
9.12
0.00
0.00
0.00
2.27
0.00
0.00
140.13
0.90
MW
41.99
3.47
0.00
0.00
0.00
0.60
0.00
0.00
34.55
17.00
53. 1021
132kV DHA Rahber
GWh
52.60
7.17
0.00
3.80
0.00
0.66
0.00
0.00
64.22
0.89
MW
17.16
2.73
0.00
1.62
0.00
0.17
0.00
0.00
16.26
8.00
54. 2049
132kV DHA- P-VI. 2
GWh
118.96
4.94
0.00
0.00
0.00
0.64
0.00
0.00
124.54
0.90
MW
38.80
1.88
0.00
0.00
0.00
0.17
0.00
0.00
30.64
15.00
55. 958
132kV DHA- Ph. V
GWh
113.25
21.94
2.59
2.86
7.95
12.10
0.00
0.00
160.68
0.89
MW
58.76
12.52
0.99
1.22
8.26
3.22
0.00
0.00
63.73
33.00
56. 962
132kV Daroghawala
GWh
45.11
4.41
0.36
26.04
146.05
1.06
0.00
0.00
223.04
0.88
MW
20.60
2.52
0.14
11.10
61.21
0.28
0.00
0.00
71.89
39.00
57. 426
132kV Defence
GWh
158.76
38.95
6.28
1.71
8.45
11.37
0.00
0.00
225.51
0.89
MW
72.49
17.79
2.39
0.73
5.10
3.03
0.00
0.00
76.14
39.00
58. 992
132kV Defence XXY
GWh
54.91
21.89
0.90
0.30
2.98
0.00
0.00
0.00
80.98
0.90
MW
25.07
10.00
0.34
0.13
1.80
0.00
0.00
0.00
28.00
14.00
59. 265
132kV Depalpur
GWh
94.14
11.19
0.03
2.91
40.24
74.47
0.00
0.00
222.98
0.84
MW
35.82
5.11
0.01
1.24
15.10
29.75
0.00
0.00
65.28
42.00
60. 998
132kV Descon Oxy. S
GWh
0.00
0.00
0.00
0.00
14.42
0.00
0.00
0.00
14.42
0.90
MW
0.00
0.00
0.00
0.00
2.40
0.00
0.00
0.00
2.40
1.00
61. 2058
132kV Dew Kalan
GWh
12.55
1.94
2.34
2.34
22.51
3.03
0.00
0.00
44.71
0.87
MW
4.09
0.74
0.89
1.00
7.66
0.81
0.00
0.00
11.39
6.00
62. 2014
132kV Diamond Fabrics GWh
0.00
0.00
0.00
0.00
33.61
0.00
0.00
0.00
33.61
0.90
MW
0.00
0.00
0.00
0.00
8.16
0.00
0.00
0.00
8.16
4.00
63. 2082
132kV Dina Nath
GWh
0.05
0.00
0.00
0.00
87.21
0.00
0.00
0.00
87.26
0.90
MW
0.02
0.00
0.00
0.00
33.13
0.00
0.00
0.00
28.18
14.00
64. 999
132kV Dost Steel
GWh
0.00
0.00
0.00
0.00
23.90
0.00
0.00
0.00
23.90
0.90
MW
0.00
0.00
0.00
0.00
9.10
0.00
0.00
0.00
9.10
4.00
65. 270
66kV EMCO
GWh
0.00
0.00
0.00
0.00
105.72
0.00
0.00
0.00
105.73
0.90
MW
0.00
0.00
0.00
0.00
30.29
0.00
0.00
0.00
25.75
12.00
66. 2066
132kV EME
GWh
29.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29.81
0.90
MW
9.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.29
4.00
67. 987
132kV Eden City
GWh
38.45
2.01
0.00
0.00
0.00
0.81
0.00
0.00
41.27
0.90
MW
12.54
0.76
0.00
0.00
0.00
0.22
0.00
0.00
10.14
5.00
68. 2063
132kV Eden Value Home GWh
59.88
14.99
2.45
4.92
37.40
5.80
0.00
0.00
125.43
0.86
MW
19.53
5.70
0.93
2.10
10.49
1.54
0.00
0.00
30.22
18.00
69. 2041
132kV Ejaz Textile
GWh
0.02
0.00
0.00
0.00
32.75
0.00
0.00
0.00
32.76
0.90
MW
0.01
0.00
0.00
0.00
5.28
0.00
0.00
0.00
5.29
3.00
70. 506
132kV Elahabad
GWh
55.82
5.26
0.00
4.87
55.64
54.62
0.00
0.00
176.22
0.85
MW
24.22
2.85
0.00
1.97
13.46
27.64
0.00
0.00
59.10
37.00
71. 2075
132kV Ellcot Spinning GWh
0.10
0.00
0.00
0.00
19.24
0.00
0.00
0.00
19.34
0.90
MW
0.04
0.00
0.00
0.00
5.38
0.00
0.00
0.00
5.42
3.00
72. 271
132kV Farooqabad
GWh
112.32
6.04
0.04
5.42
109.04
90.89
0.00
0.00
323.75
0.85
MW
48.62
3.23
0.02
2.19
29.09
23.00
0.00
0.00
83.07
51.00
73.
38
132kV Fateh Garh
GWh
236.33
25.90
7.36
21.90
19.03
11.49
0.00
0.00
322.01
0.89
MW
84.31
11.82
2.80
9.33
12.71
3.06
0.00
0.00
93.03
48.00
74. 982
132kV Fazzia
GWh
74.59
2.56
0.00
0.00
0.00
1.30
0.00
0.00
78.45
0.90
MW
24.33
0.97
0.00
0.00
0.00
0.34
0.00
0.00
19.24
9.00
75. 1022
132kV Ferozepur Road GWh
73.51
20.93
0.43
1.39
8.03
2.49
0.00
0.00
106.78
0.90
MW
29.71
10.38
0.16
0.59
6.56
0.66
0.00
0.00
36.05
17.00
47
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------76.
40
132kV Fort
GWh
60.37
13.39
5.74
5.73
9.40
4.45
0.00
0.00
99.08
0.89
MW
22.97
6.11
2.18
2.44
4.75
1.19
0.00
0.00
29.74
15.00
77. 2059
132kV Fruit Mandi
GWh
56.00
30.24
0.48
6.20
97.29
10.87
0.00
0.00
201.09
0.87
MW
22.40
12.05
0.18
2.64
41.88
2.90
0.00
0.00
61.54
35.00
78.
43
132kV Garden Town
GWh
150.49
96.58
2.45
1.93
6.77
17.95
0.00
0.00
276.16
0.89
MW
63.63
55.12
0.93
0.82
6.52
4.78
0.00
0.00
98.85
51.00
79. 2069
132kV Ghani Gases
GWh
0.00
0.00
0.00
0.00
52.02
0.00
0.00
0.00
52.02
0.90
MW
0.00
0.00
0.00
0.00
11.71
0.00
0.00
0.00
11.71
6.00
80.
45
132kV Ghazi
GWh
183.46
24.05
5.37
9.65
7.93
8.97
0.00
0.00
239.41
0.89
MW
66.32
10.43
1.94
3.91
7.30
2.27
0.00
0.00
69.18
35.00
81. 1034
132kV Ghazi Fabirc
GWh
0.00
0.00
0.00
0.00
36.37
0.00
0.00
0.00
36.37
0.90
MW
0.00
0.00
0.00
0.00
7.44
0.00
0.00
0.00
7.44
4.00
82. 507
132kV Green View
GWh
14.75
2.71
0.00
1.87
254.59
6.01
0.00
0.00
279.94
0.89
MW
6.74
1.55
0.00
0.80
87.94
1.60
0.00
0.00
73.97
38.00
83. 960
132kV Gulberg Lahore GWh
47.96
59.84
0.20
0.66
8.05
1.06
0.00
0.00
117.78
0.90
MW
18.39
29.17
0.08
0.28
2.55
0.28
0.00
0.00
38.06
18.00
84. 1099
11kV Gulistan P/H
GWh
0.00
0.00
0.00
0.00
2.78
0.00
0.00
0.00
2.78
0.90
MW
0.00
0.00
0.00
0.00
0.64
0.00
0.00
0.00
0.64
0.00
85. 429
132kV Gulshan Ravi
GWh
144.05
38.52
9.34
20.58
12.19
22.63
0.00
0.00
247.32
0.88
MW
54.82
17.59
3.56
8.77
6.69
6.03
0.00
0.00
73.09
39.00
86. 2086
132kV Hadeed Pakistan GWh
0.00
0.00
0.00
0.00
33.82
0.00
0.00
0.00
33.82
0.90
MW
0.00
0.00
0.00
0.00
7.02
0.00
0.00
0.00
7.02
3.00
87. 1092
132kV Hadyara
GWh
12.97
2.04
0.19
0.98
1.15
17.44
0.00
0.00
34.78
0.83
MW
4.94
0.93
0.07
0.42
1.11
4.65
0.00
0.00
9.09
6.00
88. 2057
132kV Hanjarwal
GWh
59.91
6.74
1.18
5.23
12.44
5.94
0.00
0.00
91.43
0.85
MW
23.58
2.93
0.45
2.23
9.95
1.58
0.00
0.00
30.54
19.00
89.
60
132kV Havali
GWh
95.04
7.22
0.00
7.96
11.26
98.62
0.00
0.00
220.11
0.83
MW
41.23
5.22
0.00
3.22
3.73
49.91
0.00
0.00
85.07
57.00
90. 1029
132kV Hira Terry
GWh
0.05
0.00
0.00
0.00
66.75
0.00
0.00
0.00
66.80
0.90
MW
0.02
0.00
0.00
0.00
19.31
0.00
0.00
0.00
19.33
9.00
91. 287
132kV Hujra
GWh
122.69
5.62
0.02
5.89
15.01
68.26
0.00
0.00
217.49
0.84
MW
53.22
3.05
0.01
2.38
11.29
25.91
0.00
0.00
76.24
49.00
92. 753
132kV ICI
GWh
1.38
0.23
0.00
0.15
253.85
2.29
0.00
0.00
257.90
0.90
MW
0.52
0.11
0.00
0.06
66.89
0.61
0.00
0.00
51.15
25.00
93. 2061
132kV IEEP Town
GWh
27.43
1.57
0.00
0.54
0.00
0.44
0.00
0.00
29.97
0.90
MW
9.78
0.60
0.00
0.23
0.00
0.12
0.00
0.00
8.05
4.00
94. 2064
132kV Indus Home
GWh
0.22
0.00
0.00
0.00
28.51
0.00
0.00
0.00
28.73
0.90
MW
0.08
0.00
0.00
0.00
6.97
0.00
0.00
0.00
7.05
3.00
95.
66
132kV Ittahad Chemi
GWh
0.40
0.30
0.00
0.11
169.14
0.06
0.00
0.00
170.02
0.90
MW
0.15
0.11
0.00
0.05
35.52
0.02
0.00
0.00
35.85
17.00
96. 2028
132kV Jail Road
GWh
46.38
12.87
1.68
0.81
1.98
3.03
0.00
0.00
66.74
0.89
MW
21.18
5.88
0.64
0.34
0.78
0.81
0.00
0.00
22.21
11.00
97. 952
132kV Jamber
GWh
43.53
6.57
0.00
3.89
85.15
30.49
0.00
0.00
169.63
0.86
MW
16.12
2.68
0.00
1.66
12.51
8.12
0.00
0.00
34.92
21.00
98. 985
132kV Jandiala S.Khan GWh
30.65
3.31
0.00
3.45
0.43
22.90
0.00
0.00
60.74
0.83
MW
16.11
2.20
0.00
1.47
0.25
9.63
0.00
0.00
25.21
17.00
99. 782
132kV Johar Town
GWh
164.64
45.84
4.90
4.78
6.57
13.41
0.00
0.00
240.13
0.89
MW
75.18
26.16
1.87
2.04
3.92
3.57
0.00
0.00
84.55
43.00
100. 957
132kV Johar Town-II
GWh
106.89
90.40
5.94
4.29
4.23
14.11
0.00
0.00
225.86
0.89
MW
48.81
51.60
2.26
1.83
2.52
3.76
0.00
0.00
83.08
43.00
48
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------101. 1020
132kV Jubli Town
GWh
39.58
10.20
1.70
4.60
27.59
1.30
0.00
0.00
84.97
0.86
MW
12.91
3.88
0.65
1.96
7.74
0.35
0.00
0.00
20.61
12.00
102. 977
132kV K.E. Medical H/ GWh
62.03
0.51
0.00
0.27
10.48
0.82
0.00
0.00
74.11
0.90
MW
28.32
0.29
0.00
0.12
6.22
0.22
0.00
0.00
26.38
13.00
103. 113
220kV K.Lakhpat.New
GWh
77.22
10.34
3.18
4.37
69.96
4.82
0.00
0.00
169.90
0.87
MW
25.19
3.94
1.21
1.86
20.93
1.29
0.00
0.00
40.81
23.00
104.
82
132kV K.Lakhpat.Old
GWh
201.21
29.15
5.39
8.42
44.71
17.91
0.00
0.00
306.78
0.89
MW
71.78
11.09
2.05
3.59
15.55
4.77
0.00
0.00
81.62
42.00
105. 2044
132kV Kala Khatai
GWh
31.39
4.42
0.00
2.93
20.32
4.75
0.00
0.00
63.82
0.86
MW
12.41
1.79
0.00
1.25
11.08
1.27
0.00
0.00
20.85
12.00
106.
84
220kV Kala Shah Kaku GWh
45.09
12.01
0.07
3.07
141.32
19.52
0.00
0.00
221.07
0.88
MW
16.30
4.34
0.02
1.24
27.28
4.94
0.00
0.00
46.01
25.00
107. 1026
132kV Kamran Steel
GWh
0.00
0.00
0.00
0.00
19.15
0.00
0.00
0.00
19.15
0.90
MW
0.00
0.00
0.00
0.00
6.92
0.00
0.00
0.00
6.92
3.00
108. 303
66kV Kanganpur
GWh
13.47
8.84
0.00
2.49
0.84
29.37
0.00
0.00
55.01
0.82
MW
5.85
4.79
0.00
1.01
2.36
7.43
0.00
0.00
18.22
13.00
109. 1087
132kV Karol
GWh
18.57
2.20
3.15
6.23
109.40
11.80
0.00
0.00
151.35
0.88
MW
6.07
0.84
1.20
2.65
47.11
3.14
0.00
0.00
45.76
25.00
110. 2055
132kV Kashmir Colony GWh
27.55
1.18
0.00
0.39
0.00
0.26
0.00
0.00
29.39
0.90
MW
8.99
0.45
0.00
0.17
0.00
0.07
0.00
0.00
7.25
4.00
111.
99
132kV Kasur
GWh
103.89
12.17
0.50
6.57
29.73
22.86
0.00
0.00
175.73
0.85
MW
45.07
5.28
0.18
2.66
17.17
11.57
0.00
0.00
61.51
38.00
112. 1019
132kV Kasur New
GWh
123.80
10.14
0.53
32.68
20.69
28.51
0.00
0.00
216.36
0.84
MW
56.53
5.79
0.20
13.93
5.41
7.59
0.00
0.00
67.09
43.00
113. 1015
132kV Kasur-II
GWh
4.89
0.25
0.00
0.25
10.59
1.03
0.00
0.00
17.01
0.88
MW
2.23
0.11
0.00
0.10
7.29
0.55
0.00
0.00
8.74
5.00
114. 972
132kV Khana Nau
GWh
72.38
4.69
0.01
4.39
41.27
0.72
0.00
0.00
123.46
0.86
MW
33.05
2.68
0.00
1.87
24.48
0.19
0.00
0.00
46.71
28.00
115. 647
132kV Khanqa Dogran
GWh
29.96
3.13
0.00
1.76
6.16
39.69
0.00
0.00
80.71
0.83
MW
12.90
1.66
0.00
0.71
4.46
10.04
0.00
0.00
25.31
17.00
116. 2046
132kV Khay. Amin
GWh
56.36
0.90
0.00
0.00
0.00
0.50
0.00
0.00
57.76
0.90
MW
18.38
0.34
0.00
0.00
0.00
0.13
0.00
0.00
14.14
7.00
117. 1093
132kV Khokkar Road
GWh
25.70
2.49
0.10
10.64
74.76
2.06
0.00
0.00
115.75
0.88
MW
8.80
0.95
0.04
4.54
23.13
0.55
0.00
0.00
28.50
15.00
118. 310
132kV Khuddian
GWh
77.69
3.82
0.00
5.82
7.20
79.26
0.00
0.00
173.79
0.83
MW
33.70
2.07
0.00
2.36
9.61
40.11
0.00
0.00
72.09
48.00
119. 850
132kV Kot Radha Kis
GWh
137.91
11.15
0.00
8.21
13.38
7.79
0.00
0.00
178.44
0.89
MW
59.82
6.05
0.00
3.32
4.91
1.97
0.00
0.00
62.81
32.00
120. 984
132kV LDA Ave-I
GWh
118.51
2.80
0.00
0.00
0.00
1.46
0.00
0.00
122.77
0.90
MW
38.65
1.07
0.00
0.00
0.00
0.39
0.00
0.00
30.08
15.00
121. 121
132kV LEFO
GWh
116.36
31.93
3.20
6.63
77.97
6.67
0.00
0.00
242.76
0.86
MW
42.06
11.54
1.16
2.68
35.23
1.69
0.00
0.00
70.83
42.00
122. 2067
132kV LHR SKP Road
GWh
15.27
2.85
0.00
3.15
51.29
3.06
0.00
0.00
75.62
0.88
MW
6.97
1.63
0.00
1.34
17.96
0.82
0.00
0.00
21.54
12.00
123. 994
132kV LUMS
GWh
0.00
28.35
0.00
0.00
0.00
0.00
0.00
0.00
28.35
0.90
MW
0.00
12.95
0.00
0.00
0.00
0.00
0.00
0.00
12.95
6.00
124. 949
132kV Lahore Cantt
GWh
122.93
24.33
0.64
2.72
6.85
0.76
0.00
0.00
158.23
0.90
MW
46.78
11.11
0.24
1.16
5.84
0.20
0.00
0.00
49.00
24.00
125. 2047
132kV Lake City
GWh
43.72
4.56
0.00
0.00
0.00
0.60
0.00
0.00
48.88
0.90
MW
14.26
1.73
0.00
0.00
0.00
0.16
0.00
0.00
12.12
6.00
49
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
Y EAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------126. 314
132kV Lalyani
GWh
44.72
5.58
0.00
6.55
99.59
6.18
0.00
0.00
162.62
0.88
MW
16.17
2.42
0.00
2.65
24.53
1.56
0.00
0.00
39.42
21.00
127. 954
132kV M.A.Abad
GWh
35.16
10.12
0.00
4.24
1.14
37.76
0.00
0.00
88.42
0.83
MW
16.06
5.78
0.00
1.81
1.36
12.28
0.00
0.00
31.68
21.00
128. 953
132kV M.Usmanwala
GWh
34.76
1.32
0.00
2.63
1.20
59.56
0.00
0.00
99.46
0.82
MW
15.87
0.75
0.00
1.12
1.83
28.98
0.00
0.00
41.27
29.00
129. 1027
132kV Machikay
GWh
88.93
10.58
0.24
3.56
15.97
11.02
0.00
0.00
130.29
0.89
MW
34.99
6.04
0.09
1.52
4.17
2.93
0.00
0.00
42.27
22.00
130. 1073
132kV Makhdoom/Doula GWh
12.47
1.53
0.03
0.43
3.56
13.51
0.00
0.00
31.54
0.83
MW
4.75
0.70
0.01
0.18
1.69
5.40
0.00
0.00
10.82
7.00
131. 951
132kV Malik Paper &
GWh
0.00
0.00
0.00
0.00
33.70
0.00
0.00
0.00
33.70
0.90
MW
0.00
0.00
0.00
0.00
7.20
0.00
0.00
0.00
7.20
3.00
132. 320
66kV Malikpur
GWh
93.59
12.97
0.00
21.83
5.61
12.49
0.00
0.00
146.50
0.84
MW
42.74
7.40
0.00
9.30
10.06
3.33
0.00
0.00
61.91
40.00
133. 411
132kV Manga Mandi
GWh
70.59
7.84
0.12
1.97
238.63
6.46
0.00
0.00
325.61
0.89
MW
26.86
3.58
0.04
0.84
49.26
1.72
0.00
0.00
69.96
36.00
134. 2056
132kV Manga-II
GWh
2.74
0.28
0.00
0.19
146.91
1.75
0.00
0.00
151.87
0.90
MW
1.21
0.15
0.00
0.08
37.92
0.47
0.00
0.00
33.86
16.00
135. 1042
132kV Master Textil
GWh
0.00
0.00
0.00
0.00
49.18
0.00
0.00
0.00
49.18
0.90
MW
0.00
0.00
0.00
0.00
9.12
0.00
0.00
0.00
9.12
4.00
136. 583
132kV Mcleod Road
GWh
61.85
50.89
2.42
9.46
5.78
1.68
0.00
0.00
132.09
0.89
MW
28.24
23.24
0.92
4.03
4.94
0.45
0.00
0.00
46.37
24.00
137. 2052
132kV Mehmood Steel
GWh
0.00
0.00
0.00
0.00
16.56
0.00
0.00
0.00
16.56
0.90
MW
0.00
0.00
0.00
0.00
6.30
0.00
0.00
0.00
6.30
3.00
138. 2042
132kV Mobile
GWh
17.13
2.19
0.00
0.01
11.24
0.01
0.00
0.00
30.58
0.87
MW
7.82
1.25
0.00
0.01
5.23
0.00
0.00
0.00
14.31
8.00
139. 710
132kV Mochi Gate
GWh
68.73
29.63
2.74
11.61
5.25
8.85
0.00
0.00
126.80
0.88
MW
31.39
16.91
1.04
4.95
3.55
2.36
0.00
0.00
45.15
24.00
140. 504
132kV Model Town
GWh
155.58
47.66
5.37
2.06
6.48
15.45
0.00
0.00
232.59
0.89
MW
71.04
21.76
2.04
0.88
3.53
4.11
0.00
0.00
77.53
40.00
141. 2050
132kV Model Town Soci GWh
66.62
13.34
2.34
0.00
0.00
11.37
0.00
0.00
93.67
0.89
MW
30.42
6.09
0.89
0.00
0.00
3.03
0.00
0.00
30.32
16.00
142. 330
66kV Mohlan
GWh
31.49
1.01
0.00
0.56
0.34
3.13
0.00
0.00
36.53
0.89
MW
14.38
0.58
0.00
0.24
0.66
0.83
0.00
0.00
14.19
7.00
143. 1040
132kV Momanpura G.T
GWh
58.84
6.42
2.69
9.29
69.79
5.48
0.00
0.00
152.50
0.87
MW
21.53
2.57
1.02
3.96
27.39
1.46
0.00
0.00
43.45
25.00
144. 2072
132kV Mughal Alloya
GWh
0.00
0.00
0.00
0.00
35.57
0.00
0.00
0.00
35.57
0.90
MW
0.00
0.00
0.00
0.00
14.04
0.00
0.00
0.00
14.04
7.00
145. 1014
132kV Mughal Steel
GWh
0.00
0.00
0.00
0.00
47.07
0.00
0.00
0.00
47.07
0.90
MW
0.00
0.00
0.00
0.00
19.41
0.00
0.00
0.00
19.41
9.00
146. 679
132kV Muhammad Bukh
GWh
0.00
0.00
0.00
0.00
16.78
0.00
0.00
0.00
16.78
0.90
MW
0.00
0.00
0.00
0.00
2.36
0.00
0.00
0.00
2.36
1.00
147. 1003
132kV Muridke
GWh
69.22
9.59
0.04
6.11
61.19
8.07
0.00
0.00
154.23
0.87
MW
22.29
3.47
0.02
2.47
11.33
2.04
0.00
0.00
32.26
18.00
148. 1037
132kV Mustafabad
GWh
67.03
8.03
1.44
1.74
1.09
3.09
0.00
0.00
82.42
0.89
MW
24.93
3.67
0.55
0.74
0.48
0.82
0.00
0.00
23.39
12.00
149. 2024
132kV Nain Sukh
GWh
26.48
4.32
0.12
4.09
18.24
4.79
0.00
0.00
58.03
0.86
MW
8.64
1.64
0.04
1.74
7.51
1.28
0.00
0.00
15.64
9.00
150. 520
132kV Nankana
GWh
154.90
15.27
0.07
17.76
12.61
29.01
0.00
0.00
229.63
0.84
MW
67.10
8.24
0.03
7.19
10.97
7.34
0.00
0.00
80.56
52.00
50
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------151. 336
132kV Narang Mandi
GWh
64.58
4.81
0.02
2.87
7.10
9.11
0.00
0.00
88.50
0.89
MW
46.69
2.61
0.01
1.16
6.43
4.61
0.00
0.00
51.14
26.00
152. 2074
132kV Naveena Export GWh
0.00
0.00
0.00
0.00
34.43
0.00
0.00
0.00
34.43
0.90
MW
0.00
0.00
0.00
0.00
7.81
0.00
0.00
0.00
7.81
4.00
153. 866
132kV New Airport
GWh
0.00
22.92
0.00
0.00
0.00
0.00
0.00
0.00
22.92
0.90
MW
0.00
8.72
0.00
0.00
0.00
0.00
0.00
0.00
8.72
4.00
154. 995
132kV New Smr St.2 Lh GWh
0.00
0.00
0.00
0.00
24.24
0.00
0.00
0.00
24.24
0.90
MW
0.00
0.00
0.00
0.00
9.65
0.00
0.00
0.00
9.65
5.00
155. 996
132kV New Smr St.3 Sk GWh
0.00
0.00
0.00
0.00
15.90
0.00
0.00
0.00
15.90
0.90
MW
0.00
0.00
0.00
0.00
10.76
0.00
0.00
0.00
10.76
5.00
156. 989
132kV Niazi Chowk
GWh
41.24
8.71
0.83
28.54
71.71
4.23
0.00
0.00
155.25
0.86
MW
14.71
3.78
0.32
12.16
17.48
1.13
0.00
0.00
37.18
22.00
157. 2007
132kV Nisar Spinning GWh
0.00
0.00
0.00
0.00
14.62
0.00
0.00
0.00
14.62
0.90
MW
0.00
0.00
0.00
0.00
6.25
0.00
0.00
0.00
6.25
3.00
158. 2085
132kV Nishat Chunian GWh
0.02
0.00
0.00
0.00
67.01
0.00
0.00
0.00
67.03
0.90
MW
0.01
0.00
0.00
0.00
16.28
0.00
0.00
0.00
16.29
8.00
159. 2080
132kV Nishat Mills SK GWh
0.00
0.00
0.00
0.01
38.71
0.00
0.00
0.00
38.72
0.90
MW
0.00
0.00
0.00
0.00
10.73
0.00
0.00
0.00
10.74
5.00
160. 2008
11kV Nishat Power
GWh
0.00
0.00
0.00
0.00
0.04
0.00
0.00
0.00
0.04
0.90
MW
0.00
0.00
0.00
0.00
0.06
0.00
0.00
0.00
0.06
0.00
161. 2054
132kV OPF Lahore
GWh
41.80
1.78
0.00
0.60
0.00
0.27
0.00
0.00
44.45
0.90
MW
13.63
0.68
0.00
0.25
0.00
0.07
0.00
0.00
10.98
5.00
162. 338
132kV Okara Cantt
GWh
54.60
1.83
0.03
0.41
4.72
4.38
0.00
0.00
65.97
0.89
MW
20.77
0.83
0.01
0.17
2.68
1.17
0.00
0.00
19.23
10.00
163. 152
132kV Okara City-I
GWh
117.40
21.46
0.15
11.27
46.68
32.34
0.00
0.00
229.30
0.85
MW
45.47
9.31
0.06
4.56
23.02
8.18
0.00
0.00
70.40
44.00
164. 849
132kV Okara City-II
GWh
153.03
20.51
0.36
6.71
41.79
10.49
0.00
0.00
232.89
0.86
MW
69.88
11.70
0.14
2.86
13.83
2.79
0.00
0.00
75.90
45.00
165. 1002
132kV Okara FSD Rd
GWh
54.45
8.66
0.02
2.52
17.46
14.13
0.00
0.00
97.23
0.85
MW
26.04
5.04
0.01
1.07
6.77
4.42
0.00
0.00
33.49
21.00
166. 153
132kV P.W.R
GWh
80.79
26.30
1.26
2.44
54.24
5.26
0.00
0.00
170.29
0.86
MW
30.74
12.01
0.48
1.04
15.48
1.40
0.00
0.00
45.86
27.00
167. 2088
132kV PAEC Mraka
GWh
36.34
1.07
0.77
0.29
0.00
0.38
0.00
0.00
38.86
0.90
MW
11.85
0.41
0.29
0.12
0.00
0.10
0.00
0.00
9.58
5.00
168. 654
132kV Packages
GWh
0.00
0.00
0.00
0.00
11.13
0.00
0.00
0.00
11.13
0.90
MW
0.00
0.00
0.00
0.00
5.42
0.00
0.00
0.00
5.42
3.00
169. 946
132kV Packages Kasur GWh
0.01
0.00
0.00
0.00
182.10
0.00
0.00
0.00
182.11
0.90
MW
0.00
0.00
0.00
0.00
37.20
0.00
0.00
0.00
37.20
18.00
170. 2053
132kV Pak Arab
GWh
22.30
1.28
1.44
0.95
3.05
2.36
0.00
0.00
31.38
0.89
MW
8.04
0.49
0.55
0.40
1.27
0.63
0.00
0.00
8.54
4.00
171. 2017
132kV Panwan
GWh
36.82
1.88
0.00
1.29
1.99
8.81
0.00
0.00
50.78
0.88
MW
16.81
1.07
0.00
0.55
0.87
2.35
0.00
0.00
18.40
10.00
172. 1082
132kV Park View
GWh
133.87
17.51
2.85
1.81
1.11
3.40
0.00
0.00
160.56
0.90
MW
51.80
8.00
1.08
0.77
0.95
0.91
0.00
0.00
47.63
23.00
173. 158
132kV Pattoki
GWh
102.76
11.09
0.68
6.00
25.20
36.88
0.00
0.00
182.62
0.85
MW
34.86
4.31
0.24
2.43
3.64
9.33
0.00
0.00
43.23
27.00
174. 2036
132kV Press Club
GWh
106.23
10.97
5.84
8.03
6.36
21.07
0.00
0.00
158.50
0.88
MW
37.90
4.86
2.22
3.42
3.90
5.61
0.00
0.00
43.44
23.00
175. 993
132kV Punjab Assembly GWh
24.47
52.60
1.13
2.04
7.71
0.53
0.00
0.00
88.48
0.90
MW
9.49
24.02
0.43
0.87
4.32
0.14
0.00
0.00
29.45
14.00
51
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------176. 1043
132kV Punjab Uni
GWh
106.37
37.78
4.98
1.83
7.18
9.39
0.00
0.00
167.52
0.89
MW
43.71
17.81
1.89
0.78
5.31
2.50
0.00
0.00
54.01
28.00
177. 991
132kV Punjab Univ Tow GWh
52.58
11.65
0.17
4.05
12.83
1.22
0.00
0.00
82.51
0.89
MW
18.76
4.43
0.06
1.73
6.61
0.32
0.00
0.00
23.94
12.00
178. 168
132kV Qadirabad
GWh
7.41
1.33
0.00
0.28
11.96
0.65
0.00
0.00
21.63
0.88
MW
3.38
0.76
0.00
0.12
2.62
0.17
0.00
0.00
6.00
3.00
179. 167
132kV Qartaba
GWh
118.89
38.75
8.36
4.82
3.57
11.99
0.00
0.00
186.39
0.89
MW
52.20
17.69
3.18
2.05
3.88
3.19
0.00
0.00
61.65
32.00
180. 1080
132kV Qila Sattar Sha GWh
11.62
1.14
0.00
1.16
35.16
4.65
0.00
0.00
53.74
0.88
MW
4.42
0.43
0.00
0.50
9.12
1.24
0.00
0.00
13.35
7.00
181. 2062
132kV Quetta Textile GWh
0.06
0.04
0.00
0.00
90.18
0.11
0.00
0.00
90.38
0.90
MW
0.02
0.02
0.00
0.00
12.39
0.03
0.00
0.00
12.46
6.00
182. 1090
132kV Rachna Town
GWh
86.45
12.28
0.65
10.27
35.97
8.54
0.00
0.00
154.16
0.86
MW
34.14
5.63
0.25
4.38
16.91
2.27
0.00
0.00
47.69
28.00
183. 353
132kV Raiiwind
GWh
88.80
8.88
0.30
4.21
104.01
9.29
0.00
0.00
215.49
0.87
MW
33.79
4.06
0.11
1.79
28.78
2.47
0.00
0.00
53.26
30.00
184. 1059
132kV Raiwind New
GWh
0.00
0.00
0.00
0.00
152.50
0.00
0.00
0.00
152.50
0.90
MW
0.00
0.00
0.00
0.00
29.62
0.00
0.00
0.00
25.18
12.00
185. 956
132kV Raiwind-III/jti GWh
37.38
2.02
0.10
2.24
128.71
6.49
0.00
0.00
176.94
0.88
MW
14.22
0.92
0.04
0.95
41.64
1.73
0.00
0.00
50.58
27.00
186. 173
220kV Ravi
GWh
52.64
12.50
4.66
9.67
34.71
10.59
0.00
0.00
124.77
0.86
MW
18.78
4.76
1.78
4.12
7.14
2.82
0.00
0.00
29.55
18.00
187. 175
132kV Rehman Park
GWh
59.83
61.98
4.50
2.03
35.52
4.94
0.00
0.00
168.80
0.86
MW
22.76
28.30
1.71
0.87
10.29
1.32
0.00
0.00
48.94
29.00
188. 2071
132kV Rehman Steel
GWh
0.01
0.00
0.00
0.00
14.24
0.00
0.00
0.00
14.24
0.90
MW
0.00
0.00
0.00
0.00
6.34
0.00
0.00
0.00
6.34
3.00
189. 929
132kV Rehmat Nazir
GWh
0.00
0.00
0.00
0.00
0.48
0.00
0.00
0.00
0.49
0.90
MW
0.00
0.00
0.00
0.00
0.49
0.00
0.00
0.00
0.49
0.00
190. 2079
132kV Reliance Cotton GWh
0.00
0.00
0.00
0.00
25.19
0.00
0.00
0.00
25.19
0.90
MW
0.00
0.00
0.00
0.00
6.36
0.00
0.00
0.00
6.36
3.00
191. 176
132kV Renala Khurd
GWh
86.02
7.60
0.17
6.97
15.52
14.85
0.00
0.00
131.13
0.85
MW
31.10
3.30
0.06
2.82
2.83
2.82
0.00
0.00
33.93
21.00
192. 659
11kV Renala P/H
GWh
3.31
0.06
0.00
0.00
0.40
0.05
0.00
0.00
3.83
0.90
MW
1.51
0.04
0.00
0.00
0.38
0.01
0.00
0.00
1.65
1.00
193. 357
132kV Rewaz Garden
GWh
149.67
32.63
6.60
5.44
4.01
10.42
0.00
0.00
208.76
0.89
MW
56.95
14.90
2.51
2.32
2.57
2.77
0.00
0.00
61.52
32.00
194. 2005
132kV Riaz Textile
GWh
0.00
0.00
0.00
0.00
26.24
0.00
0.00
0.00
26.24
0.90
MW
0.00
0.00
0.00
0.00
6.89
0.00
0.00
0.00
6.89
3.00
195. 2020
132kV Roya Golf Club GWh
0.00
36.79
0.00
0.00
0.00
0.00
0.00
0.00
36.79
0.90
MW
0.00
14.00
0.00
0.00
0.00
0.00
0.00
0.00
14.00
7.00
196. 412
132kV Rustam
GWh
90.94
12.10
0.12
20.05
123.94
3.21
0.00
0.00
250.35
0.87
MW
29.66
4.60
0.04
8.55
51.02
0.85
0.00
0.00
71.04
40.00
197. 902
132kV SKP-Industrial GWh
62.33
3.33
0.08
2.13
10.93
2.33
0.00
0.00
81.12
0.89
MW
35.57
2.54
0.03
0.91
7.27
1.24
0.00
0.00
35.66
18.00
198. 950
132kV Sabzazar
GWh
129.40
11.61
3.54
4.37
8.37
5.19
0.00
0.00
162.48
0.89
MW
59.09
6.62
1.35
1.86
6.06
1.38
0.00
0.00
57.27
29.00
199. 540
132kV Sadar Gogera
GWh
64.78
4.01
0.00
2.16
2.27
29.13
0.00
0.00
102.36
0.84
MW
35.13
2.90
0.00
0.87
1.75
11.06
0.00
0.00
43.95
28.00
200. 973
132kV Safdarabad
GWh
28.54
2.05
0.00
1.17
0.63
7.98
0.00
0.00
40.38
0.88
MW
13.03
1.17
0.00
0.50
0.48
2.12
0.00
0.00
13.87
7.00
52
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------201. 969
132kV Saggian
GWh
87.02
17.10
4.62
36.51
51.66
9.59
0.00
0.00
206.49
0.85
MW
32.35
7.81
1.76
15.56
27.80
2.56
0.00
0.00
65.87
41.00
202. 184
132kV Saidpur
GWh
171.35
27.43
4.96
6.37
9.16
10.31
0.00
0.00
229.58
0.89
MW
69.86
12.52
1.89
2.71
4.96
2.75
0.00
0.00
71.02
36.00
203. 1060
132kV Sanda
GWh
53.59
11.04
2.23
9.86
2.46
13.81
0.00
0.00
92.99
0.84
MW
20.39
5.04
0.85
4.20
1.74
3.68
0.00
0.00
26.93
17.00
204. 362
66kV Sangla Hill
GWh
73.16
5.96
0.09
3.15
3.01
4.81
0.00
0.00
90.19
0.89
MW
31.74
3.23
0.03
1.28
2.72
1.22
0.00
0.00
31.70
16.00
205. 2004
132kV Sapphire -3
GWh
0.00
0.00
0.00
0.00
19.92
0.00
0.00
0.00
19.92
0.90
MW
0.00
0.00
0.00
0.00
5.88
0.00
0.00
0.00
5.88
3.00
206. 2016
132kV Sapphire -5
GWh
0.00
0.00
0.00
0.00
46.46
0.00
0.00
0.00
46.46
0.90
MW
0.00
0.00
0.00
0.00
15.00
0.00
0.00
0.00
15.00
7.00
207. 2077
132kV Sapphire F (1, GWh
0.00
0.00
0.00
0.00
26.32
0.00
0.00
0.00
26.32
0.90
MW
0.00
0.00
0.00
0.00
6.33
0.00
0.00
0.00
6.33
3.00
208. 1028
132kV Sapphire Finish GWh
0.12
0.00
0.00
0.00
13.82
0.00
0.00
0.00
13.94
0.90
MW
0.04
0.00
0.00
0.00
6.36
0.00
0.00
0.00
6.40
3.00
209. 737
220kV Sarfraz Nagar
GWh
18.53
0.86
0.00
1.81
74.65
0.00
0.00
0.00
95.85
0.89
MW
6.70
0.31
0.00
0.73
19.20
0.00
0.00
0.00
22.90
12.00
210. 191
132kV Shadman
GWh
86.14
43.62
5.40
4.41
2.97
9.87
0.00
0.00
152.40
0.89
MW
39.33
19.92
2.05
1.88
1.16
2.63
0.00
0.00
50.23
26.00
211. 369
132kV Shahdara New
GWh
120.39
12.39
3.87
22.27
70.71
9.89
0.00
0.00
239.52
0.86
MW
42.95
4.71
1.47
9.49
35.70
2.63
0.00
0.00
72.72
43.00
212. 505
132kV Shahdara Scarp GWh
8.79
0.16
0.00
0.24
23.10
0.90
0.00
0.00
33.19
0.88
MW
5.01
0.12
0.00
0.10
13.58
0.24
0.00
0.00
14.30
8.00
213. 193
132kV Shahkot
GWh
92.39
7.63
0.00
5.42
110.24
4.11
0.00
0.00
219.80
0.87
MW
40.08
4.14
0.00
2.20
41.96
1.04
0.00
0.00
72.94
41.00
214. 1010
132kV Shalamar Steel GWh
0.00
0.00
0.00
0.00
16.72
0.00
0.00
0.00
16.72
0.90
MW
0.00
0.00
0.00
0.00
6.97
0.00
0.00
0.00
6.97
3.00
215. 194
132kV Shalamar-I
GWh
67.25
8.58
8.16
15.99
143.51
7.81
0.00
0.00
251.30
0.87
MW
21.93
3.26
3.11
6.81
53.70
2.08
0.00
0.00
68.17
39.00
216. 893
132kV Shalamar-II
GWh
80.30
8.58
7.84
10.53
57.99
8.47
0.00
0.00
173.72
0.86
MW
30.55
3.92
2.98
4.49
16.97
2.26
0.00
0.00
45.88
27.00
217. 508
132kV Shamky
GWh
24.82
4.33
0.00
1.47
233.02
1.32
0.00
0.00
264.95
0.89
MW
10.67
2.31
0.00
0.59
92.27
0.33
0.00
0.00
79.69
41.00
218. 372
132kV Sharqpur
GWh
53.62
5.31
0.12
3.33
57.29
17.98
0.00
0.00
137.66
0.86
MW
23.16
2.84
0.04
1.35
23.37
4.55
0.00
0.00
45.37
27.00
219. 897
132kV Sharqpur Rd.
GWh
31.47
6.21
0.00
2.94
77.33
5.13
0.00
0.00
123.08
0.88
MW
14.37
2.84
0.00
1.25
14.33
1.37
0.00
0.00
29.03
16.00
220. 971
132kV Sheranwala
GWh
27.13
29.56
2.17
1.49
18.78
2.10
0.00
0.00
81.23
0.86
MW
10.32
13.50
0.83
0.63
7.63
0.56
0.00
0.00
25.10
15.00
221. 988
132kV Shergarh
GWh
21.82
2.39
0.00
1.91
6.40
8.05
0.00
0.00
40.58
0.85
MW
8.98
1.17
0.00
0.81
4.01
3.09
0.00
0.00
15.36
10.00
222. 2065
132kV Shoaib Steel
GWh
0.00
0.00
0.00
0.01
25.45
0.00
0.00
0.00
25.46
0.90
MW
0.00
0.00
0.00
0.00
9.07
0.00
0.00
0.00
9.07
4.00
223. 197
132kV Skp. City
GWh
109.99
14.53
0.24
3.43
193.90
13.63
0.00
0.00
335.72
0.88
MW
39.76
7.84
0.09
1.39
46.50
3.45
0.00
0.00
74.33
40.00
224. 2060
132kV Spring Medows
GWh
71.38
1.02
0.00
0.00
0.00
1.07
0.00
0.00
73.47
0.90
MW
23.28
0.39
0.00
0.00
0.00
0.29
0.00
0.00
17.97
9.00
225. 2043
132kV State Life (Any GWh
93.86
13.22
3.38
3.86
10.24
7.03
0.00
0.00
131.59
0.89
MW
30.61
5.03
1.29
1.65
3.49
1.87
0.00
0.00
32.95
17.00
53
LESCO
Table 1- 18: Category-wise Maximum Demand (MW) of Substations
P O W E R M A R K E T S U R V E Y
CATEGORY-WISE GRIDSTATION LOAD FOR DISCO
DISCO: LESCO
YEAR :2022-23
------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID
NAME OF
|
|
| PUBLIC
|
SMALL
|
M & L
|
TUBE WELLS
|
| TOTAL OF | POWER FACTOR(%) |
|No.NUMBER GRID STATION
| DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)|
------------------------------------------------------------------------------------------------------------------------------------------------------------------226. 2087
132kV Style Textile
GWh
0.00
0.00
0.00
0.00
32.46
0.00
0.00
0.00
32.46
0.90
MW
0.00
0.00
0.00
0.00
5.70
0.00
0.00
0.00
5.70
3.00
227. 2048
132kV Sui Gas
GWh
43.50
6.29
2.34
0.00
0.00
11.37
0.00
0.00
63.50
0.88
MW
19.86
2.87
0.89
0.00
0.00
3.03
0.00
0.00
19.99
11.00
228. 2045
132kV Sukh Chain
GWh
73.96
7.85
2.34
0.00
5.86
0.60
0.00
0.00
90.60
0.90
MW
28.14
3.58
0.89
0.00
13.01
0.16
0.00
0.00
34.34
17.00
229. 380
132kV Sukheki
GWh
0.47
0.00
0.00
0.04
0.00
0.82
0.00
0.00
1.33
0.82
MW
0.21
0.00
0.00
0.02
0.00
0.22
0.00
0.00
0.38
0.00
230. 2018
132kV Sunder Manga
GWh
25.67
3.76
0.09
1.79
50.07
7.24
0.00
0.00
88.61
0.87
MW
9.77
1.57
0.03
0.76
13.24
1.93
0.00
0.00
21.64
12.00
231. 965
132kV Sunder( Ind. St GWh
0.00
0.00
0.00
0.00
255.45
0.00
0.00
0.00
255.45
0.90
MW
0.00
0.00
0.00
0.00
69.72
0.00
0.00
0.00
69.72
34.00
232. 206
132kV Sunny View
GWh
61.83
41.87
5.63
2.26
5.59
3.57
0.00
0.00
120.75
0.89
MW
22.06
19.12
2.14
0.96
1.51
0.95
0.00
0.00
35.05
18.00
233. 2078
132kV Tariq Glass
GWh
0.00
0.00
0.00
0.00
37.99
0.00
0.00
0.00
37.99
0.90
MW
0.00
0.00
0.00
0.00
8.53
0.00
0.00
0.00
8.53
4.00
234. 1084
132kV Thokkar
GWh
46.35
13.31
2.91
5.35
37.11
3.68
0.00
0.00
108.71
0.86
MW
18.63
6.91
1.11
2.28
18.88
0.98
0.00
0.00
36.59
22.00
235. 428
132kV Town Ship
GWh
162.68
45.37
8.12
6.46
94.14
19.02
0.00
0.00
335.78
0.86
MW
61.90
20.72
3.09
2.75
31.03
5.07
0.00
0.00
93.42
55.00
236. 399
66kV UIS
GWh
0.01
0.00
0.00
0.00
85.96
0.00
0.00
0.00
85.96
0.90
MW
0.00
0.00
0.00
0.00
17.12
0.00
0.00
0.00
14.55
7.00
237. 2070
132kV Uni Lever
GWh
0.00
0.00
0.00
0.00
30.96
0.00
0.00
0.00
30.96
0.90
MW
0.00
0.00
0.00
0.00
5.89
0.00
0.00
0.00
5.89
3.00
238. 963
132kV Valancia
GWh
80.09
16.49
2.59
0.04
0.74
11.37
0.00
0.00
111.32
0.89
MW
28.57
6.27
0.99
0.02
0.38
3.03
0.00
0.00
29.44
15.00
239. 826
132kV Valgon Sohial
GWh
58.70
7.65
0.10
4.30
145.80
9.40
0.00
0.00
225.94
0.88
MW
25.47
4.15
0.03
1.74
28.95
2.38
0.00
0.00
52.35
28.00
240. 221
132kV W.Radha Ram
GWh
65.69
5.74
0.00
2.09
107.43
21.40
0.00
0.00
202.35
0.87
MW
23.75
3.11
0.00
0.84
13.47
5.42
0.00
0.00
39.61
22.00
241. 959
132kV Walton Road
GWh
130.52
21.67
3.42
3.46
10.18
12.06
0.00
0.00
181.32
0.89
MW
49.25
10.30
1.30
1.47
3.39
3.21
0.00
0.00
51.70
26.00
242. 503
220kV Wapda Town
GWh
178.44
24.27
3.28
4.36
65.08
11.58
0.00
0.00
287.02
0.86
MW
63.66
9.23
1.25
1.86
31.59
3.09
0.00
0.00
83.01
49.00
243. 401
132kV Warburton
GWh
76.01
7.87
0.00
3.44
264.07
25.21
0.00
0.00
376.61
0.88
MW
28.92
3.60
0.00
1.47
47.65
6.72
0.00
0.00
75.10
41.00
244. 970
132kV Wassanpura
GWh
37.91
5.04
-0.17
4.92
10.33
5.19
0.00
0.00
63.22
0.85
MW
14.36
2.28
-0.06
2.10
3.84
1.38
0.00
0.00
17.92
11.00
245. 781
132kV Willongton Mall GWh
146.19
29.43
1.98
1.16
10.16
0.57
0.00
0.00
189.49
0.90
MW
59.60
16.80
0.75
0.49
3.24
0.15
0.00
0.00
60.78
29.00
246. 1012
132kV Yaqoob Steel
GWh
0.00
0.00
0.00
0.00
35.72
0.00
0.00
0.00
35.72
0.90
MW
0.00
0.00
0.00
0.00
15.89
0.00
0.00
0.00
15.89
8.00
==============================================================================================================================================================
TOTAL OF DISCO :
GWh 12752.92
2468.43
277.22
901.36
10715.52
2271.52
0.00
0.00
29386.97
MW
3193.31
729.91
66.78
241.27
2109.16
465.67
0.00
0.00
5370.23
54
LESCO
Figure 1- 10: Distribution Network Map
56
LESCO
Figure 1- 11: Distribution Network Map (Lahore Ring)
58
LESCO
59
LESCO
Disclaimer
All data used in this report are provided by LESCO.
Planning Power, NTDCL does not own any error responsibility.
60