LESCO Power Market Survey Report 2012-13
Transcription
LESCO Power Market Survey Report 2012-13
Executive Summary Executive Summary Lahore Electric Supply Company (LESCO) is the largest electric power distribution company and is supplying power to civil districts of Lahore, Kasur, Okara, Nankana and Sheikhupura. This company came into existence in the year 2001 after unbundling of WAPDA system, earlier it was known as Lahore Area Electricity Board (AEB) and its distribution network comprised of sixtyeight 132 kV and fourteen 66 kV sub-stations and at present in the year 2012-13 there are eighty two 132kV and eight 66kV sub-stations. Peak demand of LESCO in the year 2012-13 was 3069 MW, energy sale was 14285 GWh and energy purchased was 16457 GWh. The shares of domestic sector and industrial sector were 41.48% and 42.64 % respectively with respect to total energy sale, which is not a healthy sign. The total number of consumers in 2012-13 was 3.58 million out of which 2.93 million were domestic, 0.51 million were commercial and 0.056 million were agricultural. In the year 2012-13 total sale of LESCO in terms of megawatts was 2663 MW, for the domestic sector it was 1512 MW, for medium & large industries it was 1151 MW and for small industries it was 117 MW. This forecast has been computed on the basis of Power Market Survey (PMS) methodology by the LESCO (PMS) team under the supervision of planning power, (NTDCL). The year 2012-13 has been taken as base year and the forecast horizon is ten years up to 2022-23. The base year sale data (feeder wise consumer category-wise energy sale) and the expected spot loads data at the locations of different sub-stations have been collected by LESCO power market survey team. Data for the base year has also been adjusted for the estimates of un-served energy (load shedding) in order to have realistic figures. Forecast results show that in the years 2016-17 and 2022-23 energy sale will be 23965 GWh and 32839 GWh, peak demand will be 5821 MW and 7758 MW, and energy purchased will be 27117 GWh and 36344 GWh respectively. For the period 2012-13 to 2022-23, annual average compound growth rate of energy sale, peak demand and energy purchased will be 5.57%, 4.95% and 5.15% respectively. To further refine the forecast and making it helpful for planners following additions have been made in this issue; Civil Administrative Division-wise energy and demand forecast Civil Administrative District-wise energy and demand forecast Month-wise demand projection Overloaded 132 kV substations List of existing substations with their MVA capacities A realistic forecast, saves over investment as well as under investment, meaning thereby timely recovery of revenue and no constraints in the supply of power (load shedding) respectively. This kind of forecast can only be prepared by applying proper methodology with authentic data. The results of previous PMS forecasts were very close to the actual which proves the authenticity of methodology and data. This report highlights the salient features of load forecast of the company. Planning Power, NTDCL firmly believes that the readers’ comments/suggestions on this report will help in improving energy and demand forecast in future. i Table of Contents Table of Contents 1 Introduction ......................................................................................................................1 2 Historical Supply And Demand Analysis .......................................................................3 3 4 2.1 Category-wise Sale ...................................................................................................... 3 2.2 Transmission and Distribution Losses ........................................................................ 4 2.3 Recorded and Computed Peak Demand ...................................................................... 5 2.4 Number of Consumers ................................................................................................ 5 Power Market Survey Methodology ...............................................................................6 3.1 Overview ..................................................................................................................... 6 3.2 Survey Base Data ........................................................................................................ 6 3.3 Input Parameters .......................................................................................................... 7 3.4 Growth Rates ............................................................................................................... 7 3.5 Losses .......................................................................................................................... 8 3.6 Load Factors ................................................................................................................ 8 3.7 Coincidence Factors .................................................................................................... 9 3.8 Forecast Calculations .................................................................................................. 9 3.9 Energy Calculations .................................................................................................... 9 3.10 Peak Demand Calculations........................................................................................ 10 3.11 Accumulations ........................................................................................................... 10 PMS Forecast Results .....................................................................................................11 4.1 Recorded Forecast (Excluding Load Shedding)........................................................ 11 4.2 Computed Forecast (Including Load Shedding) ....................................................... 11 4.3 Category-wise Forecasted Energy Sale (GWh) ........................................................ 12 4.4 Category wise Forecasted Energy Sale (MW) .......................................................... 13 4.5 Peak Demand of Substations ..................................................................................... 13 4.6 Per Capita Consumption............................................................................................ 13 4.7 Category-wise Substation-wise Energy and Demand Projections ............................ 14 4.8 Civil Administrative Area Forecast........................................................................... 14 4.9 Monthly Demand (MW) Projections......................................................................... 14 4.10 List of Overloaded Substations ................................................................................. 14 4.11 List of Grids with their Codes and MVA Capacities ................................................ 14 Disclaimer ...............................................................................................................................60 iii List of Figures List of Figures Figure 1- 1: Computed Demand Forecast .................................................................................. 1 Figure 1- 2: Historical Category-wise Sale ............................................................................... 3 Figure 1- 3: Historical Transmission and Distribution Losses ................................................. 4 Figure 1- 4: Historical Recorded and Computed Peak Demand ............................................... 5 Figure 1- 5: Number of Consumers .......................................................................................... 5 Figure 1- 6: Computed Peak Demand ..................................................................................... 11 Figure 1- 7: Energy Purchased VS Energy Sale ..................................................................... 11 Figure 1- 8: Forecasted Category Wise Sale........................................................................... 12 Figure 1- 9: Per Capita Consumption ...................................................................................... 13 Figure 1- 10: Distribution Network Map ................................................................................. 56 Figure 1- 11: Distribution Network Map (Lahore Ring) ......................................................... 58 v List of Tables List of Tables Table 1- 1: PMS Recorded Forecast (Excluding Load Shedding) ................................................. 15 Table 1- 2: PMS Base Forecast ..................................................................................................... 16 Table 1- 3: Category Wise Sale – GWh (Excluding Load Shedding) ........................................... 17 Table 1- 4: Category-wise Sale – GWh (Base Forecast) .............................................................. 18 Table 1- 5: Category-wise Demand – MW (Excluding Load Shedding) ..................................... 19 Table 1- 6: Category-wise Demand – MW (Base Forecast) ......................................................... 20 Table 1- 7: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Kasur ................................................................................................................................ 21 Table 1- 8: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Lahore .............................................................................................................................. 22 Table 1- 9: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Nankana ........................................................................................................................... 23 Table 1- 10: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Okara ................................................................................................................................ 24 Table 1- 11: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Sheikhupura ..................................................................................................................... 25 Table 1- 12: Division-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For Division: Lahore ............................................................................................................................ 26 Table 1- 13: Monthly Peak Demand Forecast ............................................................................... 27 Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=90% (Continued…) .................................................................................. 28 Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=90%................................................................................................................................ 29 Table 1- 15: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=100% (Continued…) ................................................................................ 31 Table 1- 15: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=100% ............................................................................................................................ 32 Table 1- 16: List of Grids with their Codes & MVA Capacities (Continued…) ........................... 33 Table 1- 16: List of Grids with their Codes And MVA Capacities ............................................... 34 Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 35 Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 36 Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 37 vii List of Tables Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 38 Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 39 Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 40 Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 42 Table 1- 17: Maximum Demand (MW) of Substations (Continued…) ........................................ 43 Table 1- 17: Maximum Demand (MW) of Substations ................................................................ 44 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 45 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 46 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 47 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 48 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 49 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 50 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 51 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 52 Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…)................ 53 Table 1- 18: Category-wise Maximum Demand (MW) of Substations ........................................ 54 ix LESCO 1 Introduction The present report of Power Market Survey forecast is the 23rd issue, jointly prepared by LESCO and Planning Power NTDCL. This report contains year wise detailed forecast of energy and demand for the whole company and each sub-station within the company. In addition to that civil administrative area forecast like divisions and districts within the company are also computed and depicted in different tables. The forecasted peak demand of LESCO has graphically presented in Figure 1-1. Load forecasting is an important element of the power planning process involving prediction of energy and demand. The forecast serves as the basis for demand and supply-side planning. Load forecasts are typically prepared by utilities for different time frames depending upon the different planning applications and operations. Long term planning requires a system level forecast of total generation requirement and peak demand. On the other hand transmission and distribution planning require more load level and geographic detail to assess location, timing and loading of individual lines, substation and transformation facilities. 9000 8000 Mega Watts (MW) 7000 6000 5000 4000 3000 2000 1000 0 Figure 1- 1: Computed Demand Forecast Forecasting models fall into three general categories: Trend models Econometric based models End-use models Trend forecasts graphically or mathematically extrapolate past electricity demand trends into the future. They may be inadequate for shorter time periods where demograhic changes in the underlying casual factors of load growth are not anticipated. Econometric models represent a more complex ‘top-down’ approach to forecasting and rely on the observed or the implied relationship between past energy consumption and other variables defining past economic output, demographics and price or income variables. Such models employ a combination of econometric, regression and time series forecast techniques. End-use models relate energy use to the physical 1 LESCO appliance stock levels, to the use patterns or to the industrial process. These end use models represent a ‘bottom-up’ forecasting approach and normally incorporate disaggregate end use forecast and consumer survey techniques. This report has been prepared on the basis of Power Market Survey Methodology and the model used is called Power Market Survey (PMS) model. This model is a form of end use model which provides energy and power projection for all distribution companies and all grid stations within the company. The PMS model relies on an extensive data base of historical sales. The data base includes consumption by consumer type (i.e. domestic, industrial and commercial etc.) on a grid station and grid station feeder basis. Actual consumption data are adjusted for un-served demands attributed to load shedding. Energy forecasts are computed for each consumption category at the sub area level on the basis of a trend analysis of recent per consumer sales plus new consumer connection applications. Industrial forecasts are based on interviews with existing consumers, trend projections and a review of the applications for request of new and increased service. These analyses are repeated for each sub area for each of the years to be forecast. The annual peak demand is determined from the resulting energy forecasts by using the load factors and diversity factors developed for each consumer category. Forecasts are then aggregated to system level. Because the PMS forecast is based on a mix of end-use, trend projection and known consumer expansion plans, it cannot be used reliably to predict demand over the longer term. This model had not been created to predict impacts of changes in growth of different economic sectors or consumers categories over time, or changes in both the absolute and relative prices of electricity, and of changes in the relationships between income growth and electricity growth over time as a result of market saturation and technological change (in order to capture these changes NTDCL is using another model called regression model). Regression model is used for long term forecasting as the changes in growth are occurred due to change in technology, life style over a longer time period. The Power Market Survey forecast model most closely approaches the requirements of power system planning. It provides the level of detail required for siting studies and transmission and substation planning, as well as the sectoral detail necessary to assess different sector growth rates and their impacts on load shapes, both for the system, DISCOs and grid stations. In addition, because it also makes specific provision for load shedding i.e. suppressed demand, it provides a reasonable approximation of unconstrained load growth. 2 LESCO 2 Historical Supply And Demand Analysis 2.1 Category-wise wise Sale The costumers within the company can be segregated in different categories categories. The segregation is usually based upon the type of applications for which electricity is being used. Major categories include Domestic, Commercial, Small industries, Medium & Large industries and Agriculture. The category-wise wise percentage sale for the years 2002-03, 2002 2005-06, 06, and 2012 2012-13 are given in Figure 1-2. 2002-03 5.98% 35.21% Domestic Commercial 48.54% Public Light 5.80% 4.07% 0.41% Small Industries M&L Industries 2005-06 6.57% 40.67% 39.88% Domestic Commercial Public Light Small Industries M&L Industries Tube Well 4.48% 0.57% 7.83% 2012-13 7.06% 41.48% 39.61% 3.03% 0.71% Domestic Commercial Public Light Small Industries M&L Industries Tube Well 8.11% Figure 1- 2: Historical Category-wise Sale 3 LESCO 2.2 Transmission and Distribution Losses In our system losses are divided into two types; Transmission Losses Distribution Losses The losses on 132 kV and 11kV transmission lines are considered as Transmission Losses where as the losses on 11 kV and 440 Volts lines supplying the consumers are called Distribution Losses. In a system, generally the high losses are due due to lack of proper maintenance and element of theft. Reduction in losses can be achieved, by installing proper size of conductor in 11kV feeders, fee and low tension lines and by installing capacitor banks, to reduce reactive power and thereby improving power factor. Energy sent out is shown in the form of its breakup as sale, distribution losses and transmission losses with their percentages in the figure 1-3 1 for the year 2010-11, 2011-12 12 and 2012 2012-13. 2223 (GWh) 13.08% 31 (GWh) 0.18% 2010 2010-11 Distribution Losses Transmission Losses Sale 14741 (GWh) 86.74% 2118 (GWh) 12.66% 2011 2011-12 142 (GWh) 0.85% Distribution Losses Transmission Losses 14467 (GWh) 86.49% 2071 (GWh) 12.58% 102.2 (GWh) 0.62% 2012 2012-13 Distribution Losses Transmission Losses 14285 (GWh) 86.80% Sale Figure 11 3: Historical Transmission and Distribution Losses 4 LESCO 2.3 Recorded and Computed Peak Demand Recorded demand is the highest electricity demand or maximum power supplied to the consumers during the base year. Computed peak demand demand is calculated by adding the element of unserved power into the figure of recorded peak demand. Figure 1-44 shows the recorded and computed peak demand (MW) from the year 2008-09 2008 to 2012-13. 4787 5000 PEAK DEMAND (MW) 4500 3988 4006 3916 4062 4000 3500 2671 2637 3000 2865 2990 3069 Recorded Peak Demand 2500 2000 Computed Peak Demand 1500 1000 500 0 2008-09 2009 2009-10 2010-11 2011-12 2012-13 Figure 1- 4: Historical Recorded and Computed Peak Demand 2.4 Number of Consumer onsumers Historical record of number of consumers within LESCO jurisdiction is given in Figure 11-5. These consumers are from all categories; i.e. Domestic, Commercial, Small industries, Medium & Large industries, Public Lighting, Bulk and Agriculture. Agr 4000000 3500000 2870918 2989808 3313233 3433782 3579178 3000000 2500000 2000000 1500000 1000000 500000 0 2008-09 2009-10 2010-11 2011-12 2012 2012-13 Figure 1- 5: Number of Consumers 5 LESCO 3 Power Market Survey Methodology 3.1 Overview The Power Market Survey Model forms the basis of the medium term forecast. It produces energy and peak demand forecast over an eleven year period by consumption category and by grid station for the entire service area. The model has three inter-related components: the main database, the basic input parameters and the calculations themselves. The energy consumption data base obtained through the power market survey is immense. It contains base year consumption data for existing consumers and eleven years’ forecast data for new consumers for each consumer category within the company. In addition, there is separate information for peak demand in medium & large industries and traction categories. Because of its volume this data is not listed as part of this report. In addition to the data base, a number of basic input parameters form an integral part of the forecast model which are separately prepared for each DISCO. These include: Growth rates: the annual increase in consumption per consumer by consumption category Loss rates: transmission and distribution losses expressed as a percentage of energy purchased and energy sold, respectively Load factors: relating the amount of energy consumed to the rate at which it is consumed (that is, the peak demand) for each consumption category Coincidence factors: describing the load diversity within the system. The forecast calculations within the model combine the energy consumption data and the input parameters to compute the energy and peak demand requirements within each area for each year to be forecasted. The data is accumulated from the area basis, to grid stations, DISCOs and ultimately to produce a forecast for the entire system. Each of the three model component is discussed in detail below. 3.2 Survey Base Data An extensive data base has been developed on gross consumption by consumer category household (domestic), commercial, small industrial, large industrial, tube wells (agriculture), public lighting, and traction (electric rail). Energy consumption comes from consumer service meter readings. Maximum demand readings and load factors for large industrial users and other demand-meteredconsumers are based on service meter readings. The consumption data is collected from Computer Centers of each DISCO (It is feeder-wise category-wise consumption data). Actual consumption data are also adjusted for un-served demands attributed to load shedding and to voluntary restraint by consumers (e.g. an industrial consumer who agrees to close his plant or switch to auto-generation during peak hours). The basic geographic unit represented within the data base is called an area, although many areas are divided into two or more subareas. This occurs when portions of the area are served by different feeders or where a single feeder services different administrative districts. Each area is assigned a series of codes which identify the technical boundaries associated with the area. 6 LESCO The technical boundaries, which are emphasized in this report, start at the grid station. Thus, all areas and subareas are assigned to one of the all the sub-stations in each DISCO. These are distribution grid stations supplying power at 11 kV after transformation from a 132kV or 66 kV source. Grid stations are combined to form DISCO. There can be up to eleven records in the data base for each area or subarea, one record for each year of forecast. The first year is typically year zero and records the base year level of consumption for each consumption category as determined in the survey. The remaining records for the area list the incremental consumption associated with new consumers to be added to the area within the specified year. This incremental consumption is based on applications for new or extended service which are filed at each revenue office and from discussions with the relevant industries and government agencies. Incremental industrial consumption is based on a combination of interviews, trend projections, and reviews of applications for new and/or increased service. Interviews are held with major industrial consumers to identify their current capacity utilization and any longterm plans they have for future expansion or changes in their electricity consumption. Autogeneration is also recorded. In addition, the various branches of the Ministry of Industries are interviewed to determine how many applications for new developments or plant expansions have been received, and what the anticipated electrical load associated with each is likely to be. These anticipated new demands are added to the basic forecast of industrial consumption. Extension of electricity to new areas over the forecast period is dealt with separately. The number of new communities to be electrified is also obtained. Initial loads and load growth are calculated based on past experience in terms of market penetration and consumption per consumer in newly electrified communities. This analysis is conducted at DISCO level. There are over 10,000 area/subarea/year records in the data base. 3.3 Input Parameters A number of input parameters are defined for use in the Power Market Survey model, these parameters are: Transmission and distribution loss rates The rates of growth in consumption per consumer Load factors for each consumption category Coincidence or diversity factors Load Shedding or Unserved Energy The definition and basic derivation of each is discussed below. 3.4 Growth Rates The forecast calculations, as will be discussed below, use per consumer growth rates to update the previous year's consumption before adding the incremental consumption estimate for the current year. The Power Market Survey model requires per consumer growth rates to be specified by DISCO for each consumption category (domestic, commercial, etc). The rates selected for the forecast are based on average annual compound growth rates, calculated from the last six years data of each consumer category in each DISCO. 7 LESCO 3.5 Losses For every 100 units of electricity purchased from a power station only 75 to 85 units are actually sold to the ultimate end-user. The remainder is consumed by the power system itself in the transmission and distribution of the sold energy. These transmission and distribution losses must be added to the sales forecast in order to determine the total generation requirement for the system. An additional source of "loss" is the consumption in auxiliaries (also called station service) used by the power plants in the process of generating electricity. Auxiliary consumption cannot be avoided and is totally dependent on the type of generation system. For example, a thermal plant would have a higher station service than a hydro plant to account for the energy consumed by fuel and waste handling systems. Auxiliary losses are determined and incorporated in the forecast outside the model. Within the Power Market Survey model, distribution losses are expressed as a percentage of sales and transmission losses as a percentage of the energy purchased from the generating stations. The model is capable of handling different loss rates of each year for each DISCO. The distribution and transmission losses used in the Power Market Survey Model are based on the review of current loss rates and an evaluation of existing loss reduction initiatives within PEPCO. The losses proposed, distribution losses at 11kV and transmission losses at 132 kV, are applied DISCO-wise. A separate excel sheet has been developed outside the model to calculate the loss rates needed for the model. The loss rates have been set to match observed performance. 3.6 Load Factors Energy sale in each consumption category is converted to peak power demand through the use of a load factor. It expresses the ratio of the amount of energy actually consumed to the amount that would have been consumed had the peak rate been continued over the entire period. Load factors can be calculated over any time period but the most common are daily, weekly and annual. The load factors utilized in the Power Market Survey Model relate annual energy sales to peak capacity for each consumer category (domestic, commercial, public lighting, small industries and private tube wells). Input load factors are not required for medium/large industry, public tube well and traction sales as consumption for these sectors is provided through the survey in both energy and power terms. Maximum demand readings are available directly for large industrial and other demand metered consumers such as public tube wells. Load factors for non-demand metered consumers are determined on a sample basis. For example, peak demand is based on maximum demand readings from substation feeders which are identified as serving predominantly one sector. Domestic and commercial load factors are differentiated by community size (village, town or city). Whereas a single load factor is used for small industrial, private tube wells, public lighting and traction because of the similar nature in the operation of these loads. While there is some variation in the load factors within the domestic and commercial sectors, there are no differences in any of the load factors by DISCO or year. 8 LESCO 3.7 Coincidence Factors The total energy demand of a number of individual consumers is determined as the simple sum of their individual energy consumption values. The total peak load, however, is calculated as the diversified sum of their individual peak load levels. The coincidence factor, as its name implies, is a general term which measures the coincidence between the peak loads of any number of individual consumers or consumer groups over a specified time period in order to compute a combined peak. Mathematically, it is the inverse of the diversity factor. The daily coincidence factor is determined by comparing the daily load patterns of each consumer or group under consideration. In this case, the sum of the individual hourly (or 15-minute) peaks would determine the overall daily load pattern and the overall peak load. If, for example, one consumer (or group) consumes energy only in the morning and a second group consume only in the evening, the coincidence factor between these two consumers would be zero and the peak load of the combined group would be the peak of the larger consumer. Conversely, if both groups consumed all energy at the same hour, the coincidence factor would be one and the combined peak would be the sum of the two peaks. In practice, the coincidence factor is found between these two extremes. Coincidence factors can be determined between any group and sub-group of consumers whether it is domestic versus commercial or Lahore versus Islamabad, provided that reasonable estimates of the appropriate load patterns are available. Typically, these patterns are not readily available and must be synthesized from incomplete or estimated data. In addition, all coincidence factors calculated from these load patterns are approximations of the corresponding instantaneous peak faced by the system. In fact, a common practice is to define this instantaneous peak as the bench mark and specify all coincidence factors in relation to this peak and time. The advantage of this approach is that all peak can be easily converted into their contribution to the overall system peak, the disadvantage is that the relationship between any two groups cannot be so clearly specified and will likely be incorrectly specified. The Power Market Survey Model depends upon specified coincidence factors between consumption categories and between consumption areas in the aggregation of peak loads from consumers to the peaks at grid stations and at DISCO level and at the level of overall system peak. The coincidence factors estimated for the medium term model have been based on the limited available PEPCO records of the peak loads at various points in their respective systems. 3.8 Forecast Calculations The forecast calculations involve three basic steps. Firstly, an energy forecast is determined at the area (or subarea) level using per consumer growth rates and incremental consumption estimates from the data base. This is then converted to a peak demand forecast, again at the area (or subarea) level using the input load and diversity factors. Then transmission and distribution losses are added and final step is to accumulate the areas into their corresponding grid stations, and grid stations into their DISCO and finally all DISCOs to form the system. 3.9 Energy Calculations The basic calculation unit is the area or subarea. The data base provides the base year energy consumption level for each of six consumption categories: domestic, commercial, public lighting, small industrial, private tube wells and medium and large industry. The database 9 LESCO also includes the peak demand associated with the medium and large industry category. The domestic energy forecast for year 1 (the base year is year 0) is calculated by multiplying the base year consumption by the domestic per consumer growth rate to account for growth in the intensity of use in the sector then adding the incremental consumption listed in the data base to account for new use in the sector. This process is repeated for the remaining five energy sectors (plus the medium and large industrial demand) for each of the remaining 10 years. The total energy consumed in the subarea within the year is then computed. 3.10 Peak Demand Calculations The annual energy values for each of the domestic, commercial, public lighting, small industry and private tube well categories are converted to peak demand using the load factors listed in the appropriate input parameter file and adjusted to account for coincidence within the category. The annual peak demand for the area or subarea is computed as the sum of the individual category peaks multiplied by coincidence factors within the subarea and for each subarea within an area. 3.11 Accumulations The total energy and peak demand at a given grid station is calculated as the sum of all the areas and subareas in that grid station's service area plus an allowance for distribution losses. Peak demand estimates are accumulated and different coincidence factors applied to city, town and village areas within the service area. The total energy and peak demand within a given DISCO is the sum of all grid stations in that DISCO plus traction and an allowance for transmission losses. Peak demands are again diversified in the accumulation, and the system totals are obtained from DISCO’s total with some coincidence. 10 LESCO 4 PMS Forecast Results 4.1 Recorded Forecast (Excluding ( Load Shedding) The term ‘recorded’ means the sale used in forecast has not been adjusted for un un-served energy (load shedding). Forecasted sale, transmission and distribution losses, generation requirements and peak demand without load shedding has been shown on Table 11-1. 4.2 Computed Forecast (Including Load Shedding) The term ‘computed’ means the sale used in forecast has been adjusted for un un-served energy (load shedding). Forecasted sale, transmission and distribution losses, generation requirement and peak demand with load shedding has been shown on Table 1-2. 1 2. Peak demand of this table has been demonstrated graphically in Figure 1-6. 1 Similarly energy gy sale and energy Purchased also have been shown in Figure 1-7, 1 7, the difference shows all losses of the DISCO. This is also the base forecast. If there had not been the load shedding the recorded forecast would have been the actual forecast i.e. the base forecast. f 8000 7000 6000 5000 4000 3000 2000 1000 0 Figure 1- 6: Computed Peak Demand 40000 35000 30000 25000 Energy Purchased (GWh) 20000 15000 10000 Energy Sale (GWh) 5000 0 Figure 1- 7: Energy Purchased VS Energy Sale 11 LESCO 4.3 Category-wise wise Forecasted Energy Sale (GWh) Percentage share of each consumer category in total sale of year 2016-17 17 and year 2022 2022-23 has been depicted in Figure 1-8. 1 1751 (GWh) 7.31 31% 9873 (GWh) 41.20% 9506(GWh) 39.67% 2016 2016-17 Domestic Commercial Public Light Small Industries M&L Industries 720 (GWh) 3..00% 192 (GWh) 0.80% 2487 (GWh) 7.57% 12581 (GWh) 38.31% 1923 (GWh) 8.02% 13816(GWh) 42.07% Tube Well 2022 2022-23 Domestic Commercial Public Light Small Industries 981 (GWh) 2.99% % 299 (GWh) 0.91% 2676(GWh) 8.15% M&L Industries Tube Well Figure 1- 8: Forecasted Category Wise Sale The category-wise forecasted sale with and without load shedding are shown in Table 11-3 and 1-4 respectively. 12 LESCO 4.4 Category wise Forecasted Energy Sale (MW) The forecast of consumption (sale) in terms of Mega Watts with and without load shedding is shown in Table 1-5 5 and Table 1-6 1 respectively. 4.5 Peak Demand of Substations A projection at a sub-station station is the most peculiar feature of this report. It is indeed a very rare and useful forecast. It’s the base of transmission system expansion planning. It also provides a very solid ground for proposing a new sub-station sub or augmentation augmentation, extension and conversion of a sub-station. station. Only distribution losses have been considered in preparing the grid station peak demand. The peak demand of each substation, existing as well as proposed, situated in the service area of the DISCO has been shown in the Table 1-17. 1 4.6 Per Capita Consumption Per capita consumption is a very vivid indicator of development in a country. Usually developed loped countries have very high per capita consumption. The consumption for the years 2016-17, 2018-19 19 and 2022-23 2022 23 are obtained from forecasted data. Per capita consumption (kWh/person) is given in Figure 1-9. 1 1200 1000 800 600 936 400 1035 1063 1109 2016-17 2018-19 2022 2022-23 727 200 0 2004-05 05 2012-13 Figure 1- 9: Per Capita Consumption 13 LESCO 4.7 Category-wise Substation-wise Energy and Demand Projections The category-wise substation-wise energy and demand projections have been presented in Table 1-18. The last column of the table contains power factor and reactive power values. In order to reduce the volume of the report, only the values of the last year i.e. 2022-23 have been presented in the table. 4.8 Civil Administrative Area Forecast The LESCO service area comprises of one civil administrative division i-e Lahore which has five districts; Kasur, Lahore, Nankana, Okara and Sheikhupura. The District-wise and civil administrative Division-wise energy and demand projections have been presented in Tables 1-7 to 1-12. The last column of the table contains peak demand. 4.9 Monthly Demand (MW) Projections The Month–wise demand (MW) projections have been presented in Table 1-13. To develop this projection, monthly demand factors are computed for last five years and then its average is taken as a base for monthly demand projection. 4.10 List of Overloaded Substations There have been several incidents of damage and fire at a number of sub-stations across the country due to overloading and they need augmentation or addition of a transformer. The list of overloaded substation will inform about that particular year in which a substation will be overloaded. The overloading criterion of a substation has been considered as 85% i.e. when any substation is 85% loaded the remedial measures should be taken in the form of new substation or augmentation of the existing transformers but in case of LESCO, 90% is considered as overloading criterion according to their policy. Table 1-14 & Table 1-15 shows the list of overloaded substations based on overloading criterion of 90% and 100% respectively. 4.11 List of Grids with their Codes and MVA Capacities The list of Grids contains each substation having their codes and tranformers’ MVA capacities are enlisted in the Table 1-16. 14 LESCO Table 1- 1: PMS Recorded Forecast (Excluding Load Shedding) Year Energy Sale (GWh) Distribution Losses G.R Transmission Losses Energy Sent out Load Factor Peak Demand (GWh) (%) (GWh) (%) (GWh) (%) (MW) 2071 12.6 102 0.62 16457 61 3069 2012-13 14285 2013-14 15534 8.7 2144 12.1 108 0.61 17786 62 3275 2014-15 16529 6.4 2205 11.7 112 0.60 18847 62 3466 2015-16 17486 5.8 2262 11.4 117 0.59 19865 62 3654 2016-17 18754 7.3 2329 11.0 122 0.58 21205 62 3894 2017-18 19973 6.5 2397 10.7 128 0.57 22498 62 4125 2018-19 21180 6.0 2458 10.3 132 0.56 23771 62 4354 2019-20 22456 6.0 2523 10.0 137 0.55 25116 62 4598 2020-21 23801 6.0 2584 9.7 142 0.54 26527 62 4853 2021-22 25166 5.7 2634 9.4 147 0.53 27946 62 5110 2022-23 26561 5.5 2672 9.1 153 0.52 29387 62 5370 Ave. Growth (2013-2023) 6.40% 5.97% 5.75% 15 LESCO Table 1- 2: PMS Base Forecast Year Computed Energy Sale G.R (GWh) (%) Distribution Losses Transmission Losses Computed Energy Sent Out Load Factor Computed Peak Demand (GWh) (%) (GWh) (%) (GWh) (%) (MW) 2768 12.7 136.6 0.62 22002 52 4787 2012-13 19097 2013-14 20414 6.9 2830 12.2 141.8 0.61 23386 53 5033 2014-15 21485 5.2 2881 11.8 146.2 0.60 24512 53 5270 2015-16 22545 4.9 2930 11.5 150.3 0.59 25626 53 5509 2016-17 23965 6.3 2996 11.1 156.4 0.58 27117 53 5821 2017-18 25343 5.7 3062 10.8 161.9 0.57 28567 53 6122 2018-19 26715 5.4 3121 10.5 167.1 0.56 30003 53 6424 2019-20 28164 5.4 3182 10.2 172.4 0.55 31518 53 6742 2020-21 29690 5.4 3238 9.8 177.8 0.54 33107 53 7077 2021-22 31245 5.2 3283 9.5 183.0 0.53 34711 53 7415 2022-23 32839 5.1 3316 9.2 189.8 0.52 36344 53 7758 Ave. Growth (2013-2023) 5.57% 5.15% 4.95% 16 LESCO Table 1- 3: Category Wise Sale – GWh (Excluding Load Shedding) Domestic Commercial Public Light Year Energy G.R Energy G.R 1159 Energy G.R Energy G.R Energy G.R Energy G.R Energy G.R 6332 6.9 1241 7.1 113 11.9 462 6.6 6293 11.2 1094 8.5 15534 8.7 2014-15 6789 7.2 1327 6.9 125 11.0 492 6.6 6615 5.1 1181 7.9 16529 6.4 2015-16 7254 6.8 1416 6.7 138 10.5 528 7.4 6876 3.9 1275 8.0 17486 5.8 2016-17 7730 6.6 1508 6.5 152 10.0 565 7.0 7427 8.0 1372 7.7 18754 7.3 2017-18 8265 6.9 1604 6.4 166 9.5 603 6.7 7861 5.8 1474 7.4 19973 6.5 2018-19 8818 6.7 1718 7.1 182 9.1 642 6.4 8241 4.8 1579 7.2 21180 6.0 2019-20 9442 7.1 1845 7.4 197 8.7 682 6.2 8601 4.4 1688 6.9 22456 6.0 2020-21 10112 7.1 1969 6.7 214 8.3 723 6.0 8983 4.4 1800 6.6 23801 6.0 2021-22 10772 6.5 2094 6.4 231 8.0 765 5.8 9389 4.5 1916 6.4 25166 5.7 2022-23 11433 6.1 2220 6.0 248 7.7 807 5.6 9818 4.6 2034 6.2 26561 5.5 Ave. Growth (2013-2023) 6.79% 5.67% 1009 Total 2013-14 6.43% 5658 Tube Well 5925 9.44% 433 M&L Industries 2012-13 6.72% 101 Small Industries 7.27% 14285 6.40% 17 LESCO Table 1- 4: Category-wise Sale – GWh (Base Forecast) Domestic Commercial Public Light Year Energy G.R Energy G.R 1550 Energy G.R Energy G.R Energy G.R Energy G.R Energy G.R 8364 5.6 1638 5.7 148 9.9 608 5.1 8214 8.6 1442 7.0 20414 6.9 2014-15 8858 5.9 1729 5.6 162 9.3 640 5.2 8558 4.2 1538 6.6 21485 5.2 2015-16 9359 5.7 1825 5.5 176 9.0 680 6.1 8863 3.6 1642 6.8 22545 4.9 2016-17 9873 5.5 1923 5.4 192 8.7 720 5.9 9506 7.3 1751 6.6 23965 6.3 2017-18 10446 5.8 2025 5.3 208 8.3 761 5.7 10039 5.6 1864 6.4 25343 5.7 2018-19 11038 5.7 2147 6.0 225 8.1 803 5.5 10522 4.8 1981 6.3 26715 5.4 2019-20 11702 6.0 2280 6.2 242 7.8 846 5.3 10993 4.5 2102 6.1 28164 5.4 2020-21 12412 6.1 2411 5.7 260 7.5 890 5.2 11491 4.5 2226 5.9 29690 5.4 2021-22 13113 5.6 2543 5.5 279 7.3 935 5.1 12020 4.6 2355 5.8 31245 5.2 2022-23 13816 5.4 2676 5.2 299 7.0 981 4.9 12581 4.7 2487 5.6 32839 5.1 Ave. Growth (2013-2023) 5.72% 5.22% 1349 Total 2013-14 5.42% 7564 Tube Well 7921 8.29% 579 M&L Industries 2012-13 5.62% 135 Small Industries 6.31% 19097 5.57% 18 LESCO Table 1- 5: Category-wise Demand – MW (Excluding Load Shedding) Domestic Commercial Public Light Year Demand G.R Demand G.R 348 Demand G.R Demand G.R Demand G.R Demand G.R Demand G.R 1605 6.2 371 6.6 27 11.6 124 6.0 1245 8.2 230 6.3 2860 7.4 2014-15 1720 7.1 396 6.8 30 11.0 132 6.5 1301 4.4 247 7.5 3039 6.3 2015-16 1837 6.8 422 6.6 33 10.5 142 7.3 1350 3.8 266 7.6 3216 5.8 2016-17 1956 6.5 450 6.5 37 10.0 152 7.0 1451 7.5 285 7.3 3443 7.1 2017-18 2088 6.8 479 6.3 40 9.5 162 6.7 1532 5.6 306 7.1 3660 6.3 2018-19 2225 6.5 512 6.9 44 9.1 172 6.4 1605 4.8 327 6.9 3878 5.9 2019-20 2376 6.8 548 7.1 48 8.7 183 6.1 1679 4.6 348 6.6 4109 6.0 2020-21 2540 6.9 584 6.5 51 8.3 194 6.0 1757 4.6 370 6.4 4353 5.9 2021-22 2701 6.3 620 6.2 56 8.0 205 5.8 1839 4.7 393 6.2 4600 5.7 2022-23 2863 6.0 656 5.9 60 7.7 216 5.6 1927 4.8 417 6.0 4853 5.5 Ave. Growth (2013-2023) 6.59% 5.28% 216 Total 2013-14 6.34% 1151 Tube Well 1512 9.42% 117 M&L Industries 2012-13 6.55% 24 Small Industries 6.79% 2663 6.19% 19 LESCO Table 1- 6: Category-wise Demand – MW (Base Forecast) Domestic Commercial Public Light Year Demand G.R Demand G.R 551 Demand G.R Demand G.R Demand G.R Demand G.R Demand G.R 2511 4.9 580 5.2 42 9.6 193 4.6 1935 6.1 282 5.5 4393 5.8 2014-15 2657 5.8 612 5.5 46 9.3 203 5.2 2005 3.7 301 6.6 4619 5.1 2015-16 2807 5.6 645 5.4 50 9.0 216 6.1 2075 3.5 322 6.8 4847 4.9 2016-17 2960 5.4 680 5.4 55 8.7 229 5.9 2218 6.9 343 6.6 5144 6.1 2017-18 3128 5.7 716 5.3 59 8.3 242 5.7 2338 5.4 365 6.5 5430 5.6 2018-19 3301 5.5 758 5.8 64 8.1 255 5.5 2451 4.8 388 6.3 5718 5.3 2019-20 3492 5.8 803 6.0 69 7.8 268 5.3 2565 4.7 412 6.1 6024 5.3 2020-21 3698 5.9 848 5.6 74 7.5 282 5.2 2686 4.7 436 5.9 6346 5.4 2021-22 3901 5.5 893 5.3 80 7.3 297 5.1 2815 4.8 461 5.8 6673 5.2 2022-23 4105 5.2 939 5.1 85 7.0 311 4.9 2951 4.8 487 5.6 7009 5.0 Ave. Growth (2013-2023) 5.54% 4.93% 268 Total 2013-14 5.34% 1823 Tube Well 2393 8.27% 185 M&L Industries 2012-13 5.47% 39 Small Industries 6.17% 4154 5.37% 20 LESCO Table 1- 7: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Kasur Energy Sale Distribution Losses Transmission Losses Generation Load Factor Peak Demand Year (GWh) G.R.(%) (GWh) % (GWh) % (GWh) % (MW) 2012-13 2997 0.00 423 12.37 21 0.62 3441 45 866 2013-14 3296 9.96 440 11.77 23 0.61 3758 47 918 2014-15 3499 6.18 449 11.37 24 0.60 3972 47 967 2015-16 3654 4.41 456 11.11 24 0.59 4134 47 1006 2016-17 3921 7.31 467 10.63 25 0.58 4413 47 1068 2017-18 4150 5.85 476 10.29 26 0.57 4653 47 1124 2018-19 4388 5.72 484 9.94 27 0.56 4899 47 1181 2019-20 4594 4.70 492 9.67 28 0.55 5114 47 1234 2020-21 4809 4.68 498 9.39 29 0.54 5336 47 1288 2021-22 5034 4.67 504 9.09 29 0.53 5567 47 1345 2022-23 5269 4.66 508 8.79 30 0.52 5807 47 1403 Ave. Growth (2013-2023) 5.80% 5.37% 4.94% 21 LESCO Table 1- 8: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Lahore Energy Sale Distribution Losses Transmission Losses Generation Load Factor Peak Demand Year (GWh) G.R.(%) (GWh) % (GWh) % (GWh) % (MW) 2012-13 11205 0.29 1660 12.90 80 0.62 12945 40 3698 2013-14 11837 5.64 1681 12.44 82 0.61 13600 40 3871 2014-15 12415 4.89 1706 12.08 85 0.60 14206 40 4034 2015-16 13038 5.02 1733 11.73 87 0.59 14858 40 4210 2016-17 13803 5.87 1765 11.34 90 0.58 15659 40 4429 2017-18 14562 5.50 1802 11.01 93 0.57 16457 40 4644 2018-19 15333 5.30 1833 10.68 96 0.56 17263 41 4865 2019-20 16199 5.64 1870 10.35 99 0.55 18169 41 5110 2020-21 17119 5.68 1906 10.02 103 0.54 19128 41 5371 2021-22 18044 5.40 1932 9.67 106 0.53 20082 41 5630 2022-23 18983 5.20 1951 9.32 110 0.52 21044 41 5892 Ave. Growth (2013-2023) 5.41% 4.98% 4.77% 22 LESCO Table 1- 9: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Nankana Energy Sale Distribution Losses Transmission Losses Generation Load Factor Peak Demand Year (GWh) G.R.(%) (GWh) % (GWh) % (GWh) % (MW) 2012-13 526 0.00 77 12.75 4 0.62 606 43 162 2013-14 831 58.14 117 12.30 6 0.61 953 46 235 2014-15 884 6.35 121 12.02 6 0.60 1011 46 252 2015-16 942 6.53 125 11.73 6 0.59 1073 45 270 2016-17 1013 7.57 131 11.45 7 0.58 1150 45 292 2017-18 1087 7.27 136 11.14 7 0.57 1230 45 313 2018-19 1163 7.01 141 10.83 7 0.56 1311 45 335 2019-20 1242 6.78 146 10.51 8 0.55 1395 44 358 2020-21 1323 6.57 150 10.17 8 0.54 1481 44 381 2021-22 1408 6.38 153 9.83 8 0.53 1569 44 405 2022-23 1495 6.21 156 9.47 9 0.52 1660 44 429 Ave. Growth (2013-2023) 11.02% 10.60% 10.23% 23 LESCO Table 1- 10: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Okara Energy Sale Distribution Losses Transmission Losses Generation Load Factor Peak Demand Year (GWh) G.R.(%) (GWh) % (GWh) % (GWh) % (MW) 2012-13 1417 0.00 228 13.86 10 0.62 1655 40 473 2013-14 831 7.44 237 13.49 11 0.61 1770 41 495 2014-15 884 5.51 242 13.11 11 0.60 1859 41 521 2015-16 942 5.92 248 12.73 12 0.59 1961 41 550 2016-17 1013 6.24 255 12.35 12 0.58 2074 41 582 2017-18 1087 6.04 260 11.96 12 0.57 2189 41 615 2018-19 1163 5.85 266 11.57 13 0.56 2307 41 649 2019-20 1242 5.69 270 11.18 13 0.55 2427 41 683 2020-21 1323 5.53 274 10.79 14 0.54 2550 41 718 2021-22 1408 5.39 276 10.39 14 0.53 2675 41 753 2022-23 1495 5.27 278 9.98 15 0.52 2803 41 789 Ave. Growth (2013-2023) 0.54% 5.41% 5.26% 24 LESCO Table 1- 11: District-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For District: Sheikhupura Energy Sale Distribution Losses Transmission Losses Generation Load Factor Peak Demand Year (GWh) G.R.(%) (GWh) % (GWh) % (GWh) % (MW) 2012-13 2953 0.00 380 11.41 21 0.62 3354 45 847 2013-14 2929 -0.83 356 10.83 20 0.61 3304 45 838 2014-15 3080 5.19 363 10.54 21 0.60 3464 45 882 2015-16 3210 4.22 368 10.28 21 0.59 3600 45 920 2016-17 3421 6.55 378 9.95 22 0.58 3821 44 980 2017-18 3628 6.04 388 9.65 23 0.57 4038 45 1036 2018-19 3803 4.83 396 9.44 24 0.56 4223 45 1083 2019-20 3986 4.81 404 9.21 24 0.55 4414 45 1131 2020-21 4176 4.78 411 8.96 25 0.54 4612 45 1180 2021-22 4375 4.76 417 8.71 25 0.53 4818 45 1231 2022-23 4582 4.74 422 8.43 26 0.52 5031 45 1284 Ave. Growth (2013-2023) 4.49% 4.14% 4.26% 25 LESCO Table 1- 12: Division-wise Sale (GWh), Generation (GWh) and Demand (MW) Forecast For Division: Lahore Energy Sale Distribution Losses Transmission Losses Generation Load Factor Peak Demand Year (GWh) G.R.(%) (GWh) % (GWh) % (GWh) % (MW) 2012-13 19097 0.29 2768 12.66 137 0.62 22002 52 4787 2013-14 20414 6.90 2830 12.18 142 0.61 23386 53 5033 2014-15 21485 5.24 2881 11.83 146 0.60 24512 53 5270 2015-16 22545 4.94 2930 11.50 150 0.59 25626 53 5509 2016-17 23965 6.30 2996 11.11 156 0.58 27117 53 5821 2017-18 25343 5.75 3062 10.78 162 0.57 28567 53 6122 2018-19 26715 5.42 3121 10.46 167 0.56 30003 53 6424 2019-20 28164 5.42 3182 10.15 172 0.55 31518 53 6742 2020-21 29690 5.42 3238 9.83 178 0.54 33107 53 7077 2021-22 31245 5.24 3283 9.51 183 0.53 34711 53 7415 2022-23 32839 5.10 3316 9.17 190 0.52 36344 53 7758 Ave. Growth (2013-2023) 5.57% 5.15% 4.95% 26 LESCO Table 1- 13: Monthly Peak Demand Forecast July August September October November December January February March April May June (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) 2012-13 4428 4711 4519 4036 2743 2925 2705 2365 3456 4036 4787 4567 2013-14 4656 4953 4751 4243 2884 3075 2844 2486 3634 4243 5033 4802 2014-15 4874 5185 4975 4442 3020 3220 2977 2603 3805 4442 5270 5027 2015-16 5096 5421 5200 4644 3157 3366 3113 2721 3977 4644 5509 5255 2016-17 5384 5728 5495 4907 3335 3557 3289 2876 4203 4907 5821 5553 2017-18 5663 6024 5779 5161 3508 3741 3459 3024 4420 5161 6122 5841 2018-19 5942 6321 6064 5415 3681 3925 3629 3173 4638 5415 6424 6128 2019-20 6237 6635 6365 5684 3863 4120 3809 3331 4868 5684 6742 6432 2020-21 6546 6964 6681 5966 4055 4324 3999 3496 5110 5966 7077 6752 2021-22 6858 7296 6999 6250 4249 4530 4189 3663 5353 6250 7415 7073 2022-23 7176 7634 7323 6540 4445 4740 4383 3832 5601 6540 7758 7401 Year 27 LESCO Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=90% (Contd…) S.No. Name Rating Grid # Total Capacity (MVA) Total Capacity (MW) Overloading Criterion (MW) Overloading Criterion (%) Year of Overloading Overloading Status (MW) Power Factor KV 1 Batapur 132 13 78 66.30 59.67 90.00 2021-22 57.00 0.85 2 Bhai Pheru 132 15 78 67.86 61.07 90.00 2012-13 75.10 0.87 3 Fateh Garh 132 38 106 94.34 84.91 90.00 2018-19 83.20 0.89 4 Havali 132 60 78 64.74 58.27 90.00 2013-14 57.90 0.83 5 LEFO 132 121 78 67.08 60.37 90.00 2015-16 58.00 0.86 6 Okara City-I 132 152 66 56.76 51.08 90.00 2012-13 56.60 0.86 7 Pattoki 132 158 52 44.20 39.78 90.00 2020-21 39.20 0.85 8 Shahkot 132 193 78 67.86 61.07 90.00 2015-16 58.30 0.87 9 Shalamar-I 132 194 78 67.86 61.07 90.00 2019-20 59.20 0.87 10 Skp. City 132 197 78 67.86 61.07 90.00 2018-19 58.10 0.87 11 Ali Jaj 66 229 26 21.32 19.19 90.00 2016-17 17.40 0.82 12 Chunian 132 254 52 43.68 39.31 90.00 2018-19 38.40 0.84 13 Depalpur 132 265 78 65.52 58.97 90.00 2012-13 60.00 0.84 14 Farooqabad 132 271 78 67.08 60.37 90.00 2017-18 60.30 0.86 15 Hujra 132 287 52 43.16 38.84 90.00 2012-13 39.50 0.83 16 Khuddian 132 310 78 63.96 57.56 90.00 2012-13 58.50 0.82 17 Malikpur 66 320 26 21.84 19.66 90.00 2012-13 18.10 0.84 18 Mohlan 66 330 13 11.44 10.30 90.00 2013-14 10.10 0.88 28 LESCO Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=90% S.No. Name Rating Grid # KV Total Capacity Total Capacity Overloading Criterion Overloading Criterion (MVA) (MW) (MW) (%) Year of Overloading (Contd…) Overloading Status Power Factor (MW) 19 Narang Mandi 132 336 26 23.14 20.83 90.00 2012-13 26.40 0.89 20 Sangla Hill 66 362 26 23.14 20.83 90.00 2015-16 19.40 0.89 21 Shahdara New 132 369 92 79.12 71.21 90.00 2021-22 69.60 0.86 22 Sharqpur 132 372 52 44.20 39.78 90.00 2018-19 38.60 0.85 23 UIS 66 399 13 11.70 10.53 90.00 2016-17 10.50 0.90 24 Warburton 132 401 52 46.28 41.65 90.00 2012-13 40.60 0.89 25 Manga Mandi 132 411 78 69.42 62.48 90.00 2012-13 62.00 0.89 26 Rustam 132 412 78 67.86 61.07 90.00 2012-13 61.20 0.87 27 Gulshan Ravi 132 429 80 68.00 61.20 90.00 2012-13 67.00 0.85 28 Wapda Town 220 503 92 82.80 74.52 90.00 2012-13 76.00 0.90 29 Elahabad 132 506 52 44.20 39.78 90.00 2013-14 38.90 0.85 30 Nankana 132 520 52 43.68 39.31 90.00 2014-15 35.90 0.84 31 Sadar Gogera 132 540 52 43.16 38.84 90.00 2019-20 36.90 0.83 32 Bund Road 220 599 52 44.20 39.78 90.00 2021-22 39.60 0.85 33 Boggiwal 132 617 132 116.16 104.54 90.00 2019-20 101.80 0.88 29 LESCO Table 1- 14: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=90% (Contd…) S.No. Name Rating KV Grid # Total Capacity Total Capacity Overloading Criterion Overloading Criterion (MVA) (MW) (MW) (%) Year of Overloading Overloading Status (MW) Power Factor 34 Mochi Gate 132 710 52 45.76 41.18 90.00 2017-18 40.70 0.88 35 ICI 132 753 52 46.80 42.12 90.00 2018-19 41.40 0.90 36 Chak-65 132 800 104 93.60 84.24 90.00 2016-17 80.40 0.90 37 Valgon Sohial 132 826 52 46.28 41.65 90.00 2018-19 41.50 0.89 38 Okara City-II 132 849 66 56.76 51.08 90.00 2012-13 48.60 0.86 39 Kot Radha Kis 132 850 39 34.71 31.24 90.00 2012-13 30.00 0.89 40 Sharqpur Rd. 132 897 26 22.88 20.59 90.00 2015-16 19.40 0.88 41 SKP-Industrial 132 902 26 22.10 19.89 90.00 2012-13 19.40 0.85 42 Aysha 132 912 52 45.24 40.72 90.00 2014-15 40.30 0.87 43 Lahore Cantt 132 949 52 46.80 42.12 90.00 2017-18 41.70 0.90 44 DHA- Ph. V 132 958 26 23.40 21.06 90.00 2012-13 26.80 0.90 45 Daroghawala 132 962 66 58.08 52.27 90.00 2016-17 51.20 0.88 46 Bahria Town 132 964 13 11.70 10.53 90.00 2012-13 10.40 0.90 47 AWT 132 966 26 22.62 20.36 90.00 2019-20 19.40 0.87 48 Khana Nau 132 972 52 45.24 40.72 90.00 2012-13 47.70 0.87 49 Kasur New 132 1019 52 43.68 39.31 90.00 2012-13 42.90 0.84 50 Raiwind New 132 1059 26 23.40 21.06 90.00 2018-19 20.30 0.90 30 LESCO Table 1- 15: List of Overloaded Substations during Period 2012-13 to 2022-2 S.No. Name Rating Grid # Total Capacity (MVA) Total Capacity (MW) Overloading Criterion (MW) Overloading Criterion (%) Year of Overloading Overloading Status (MW) Power Factor 15 60 121 152 193 194 197 229 254 271 287 310 320 330 336 362 372 399 401 411 412 429 78 78 78 66 78 78 78 26 52 78 52 78 26 13 26 26 52 13 52 78 78 80 67.86 64.74 67.08 56.76 67.86 67.86 67.86 21.32 43.68 67.08 43.16 63.96 21.84 11.44 23.14 23.14 44.20 11.70 46.28 69.42 67.86 68.00 67.86 64.74 67.08 56.76 67.86 67.86 67.86 21.32 43.68 67.08 43.16 63.96 21.84 11.44 23.14 23.14 44.20 11.70 46.28 69.42 67.86 68.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 2012-13 2014-15 2020-21 2018-19 2017-18 2021-22 2020-21 2017-18 2020-21 2018-19 2012-13 2019-20 2012-13 2014-15 2012-13 2017-18 2021-22 2018-19 2012-13 2021-22 2020-21 2020-21 75.10 61.50 65.20 56.10 66.20 65.10 66.00 19.40 42.80 64.60 39.50 61.30 18.10 10.90 26.40 22.80 43.60 11.70 40.60 66.00 65.20 66.00 0.87 0.83 0.86 0.86 0.87 0.87 0.87 0.82 0.84 0.86 0.83 0.82 0.84 0.88 0.89 0.89 0.85 0.90 0.89 0.89 0.87 0.85 KV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Bhai Pheru Havali LEFO Okara City-I Shahkot Shalamar-I Skp. City Ali Jaj Chunian Farooqabad Hujra Khuddian Malikpur Mohlan Narang Mandi Sangla Hill Sharqpur UIS Warburton Manga Mandi Rustam Gulshan Ravi 132 132 132 132 132 132 132 66 132 132 132 132 66 66 132 66 132 66 132 132 132 132 Overloading Criterion=100% (Contd…) 31 LESCO Table 1- 15: List of Overloaded Substations during Period 2012-13 to 2022-23 Overloading Criterion=100% Grid # Total Capacity (MVA) Total Capacity (MW) Overloading Criterion (MW) Overloading Criterion (%) Year of Overloading Overloading Status (MW) Power Factor Rating S.No. Name KV 23 Wapda Town 220 503 92 82.80 82.80 100.00 2021-22 79.10 0.90 24 Elahabad 132 506 52 44.20 44.20 100.00 2015-16 42.60 0.85 25 Nankana 132 520 52 43.68 43.68 100.00 2015-16 41.00 0.84 26 Sadar Gogera 132 540 52 43.16 43.16 100.00 2021-22 41.60 0.83 27 Boggiwal 132 617 132 116.16 116.16 100.00 2021-22 111.50 0.88 28 ICI 132 753 52 46.80 46.80 100.00 2020-21 46.00 0.90 29 Valgon Sohial 132 826 52 46.28 46.28 100.00 2019-20 44.10 0.89 30 Okara City-II 132 849 66 56.76 56.76 100.00 2013-14 53.60 0.86 31 Kot Radha Kis 132 850 39 34.71 34.71 100.00 2013-14 32.40 0.89 32 Sharqpur Rd. 132 897 26 22.88 22.88 100.00 2017-18 22.00 0.88 33 SKP-Industrial 132 902 26 22.10 22.10 100.00 2016-17 21.30 0.85 34 Aysha 132 912 52 45.24 45.24 100.00 2017-18 45.20 0.87 35 Lahore Cantt 132 949 52 46.80 46.80 100.00 2020-21 46.00 0.90 36 DHA- Ph. V 132 958 26 23.40 23.40 100.00 2012-13 26.80 0.90 37 Daroghawala 132 962 66 58.08 58.08 100.00 2018-19 57.60 0.88 38 Bahria Town 132 964 13 11.70 11.70 100.00 2012-13 10.40 0.90 39 AWT 132 966 26 22.62 22.62 100.00 2020-21 21.10 0.87 40 Khana Nau 132 972 52 45.24 45.24 100.00 2012-13 47.70 0.87 41 Kasur New 132 1019 52 43.68 43.68 100.00 2012-13 42.90 0.84 42 Raiwind New 132 1059 26 23.40 23.40 100.00 2020-21 22.60 0.90 32 LESCO Table 1- 16: List of Grids with their Codes and MVA Capacities (Continued…) Sr. No. Grid No. KV 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 1 13 20 30 40 45 60 84 113 152 158 173 176 191 194 206 229 241 265 271 303 314 330 338 132 132 132 132 132 132 132 220 220 132 132 220 132 132 132 132 66 66 132 132 66 132 66 132 Grid Name A.I.Town Batapur Bucheki Chung Fort Ghazi Havali Kala Shah Kaku K.Lakhpat.New Okara City-I Pattoki Ravi Renala Khurd Shadman Shalamar-I Sunny View Ali Jaj Basirpur Depalpur Farooqabad Kanganpur Lalyani Mohlan Okara Cantt Transformer T1 T2 T3 40 26 26 26 26 40 26 40 26 40 26 26 26 40 26 26 13 13 26 26 13 26 13 26 40 26 26 40 26 40 26 26 26 26 26 26 26 40 26 40 13 13 26 26 19 26 26 26 T4 26 40 26 26 26 26 15 26 26 8 13 (MVA) Total Sr. No. Grid No. KV 106 78 52 92 52 133 78 66 78 66 52 52 52 106 78 66 26 41 78 78 39 52 13 26 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 6 15 23 38 43 82 99 121 153 167 175 184 193 197 221 233 254 270 287 310 320 336 353 362 132 132 132 132 132 132 132 132 132 132 132 132 132 132 132 132 132 66 132 132 66 132 132 66 Grid Name Attabad Bhai Pheru Chah Miran Fateh Garh Garden Town K.Lakhpat.Old Kasur LEFO P.W.R Qartaba Rehman Park Saidpur Shahkot Skp. City W.Radha Ram Badami Bagh Chunian EMCO Hujra Khuddian Malikpur Narang Mandi Raiiwind Sangla Hill Transformer T1 T2 T3 40 26 40 40 26 40 26 26 26 40 26 40 26 26 26 40 26 13 26 26 13 13 40 13 26 26 40 40 40 40 40 26 40 40 40 26 26 26 26 40 26 13 26 26 13 13 26 13 26 26 26 40 26 26 26 40 40 40 26 26 26 26 13 26 26 T4 26 26 (MVA) Total 92 78 80 106 132 106 118 78 106 120 106 92 78 78 52 106 52 39 52 78 26 26 92 26 33 LESCO Table 1- 16: List of Grids with their Codes And MVA Capacities Sr. Grid No. No. KV 357 369 399 411 426 504 506 508 540 599 647 711 753 782 826 850 893 902 949 958 966 1019 2042 66 132 132 66 132 132 132 132 132 132 220 132 132 132 132 132 132 132 132 132 132 132 132 132 132 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 85 87 89 91 93 95 Grid Name Rewaz Garden Shahdara New UIS Manga Mandi Defence Model Town Elahabad Shamky Sadar Gogera Bund Road Khanqa Dogran Bhati Gate ICI Johar Town Valgon Sohial Kot Radha Kis Shalamar-II SKP-Industrial Lahore Cantt DHA- Ph. V AWT Kasur New Mobile Ittehad Chemi Transformer T1 T2 40 40 13 26 26 40 26 26 26 26 26 40 26 40 26 13 26 13 26 26 26 26 15 13 40 26 26 40 26 26 26 26 26 26 40 26 40 26 26 26 13 26 26 0 13 T3 (MVA) T4 Total 26 26 40 26 26 40 26 26 26 26 0 0 0 0 80 92 13 78 106 118 52 118 52 52 52 80 52 132 52 39 78 26 52 26 26 52 15 13 Sr. Transformer No. Grid No. KV Grid Name T1 T2 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96 372 401 412 428 429 503 505 507 520 583 617 710 737 781 800 849 871 897 912 950 962 972 1059 2045 132 132 132 132 132 220 132 132 132 132 132 132 220 132 132 132 132 132 132 132 132 132 132 132 Sharqpur Warburton Rustam Town Ship Gulshan Ravi Wapda Town Shahdara Scarp Green View Nankana Mcleod Road Boggiwal Mochi Gate Sarfraz Nagar WillongtonMall Chak-65 Okara City-II Bhikki Sharqpur Rd. Aysha Sabzazar Daroghawala Khana Nau Raiwind New Sukh Chain 26 26 26 26 40 26 13 26 26 40 40 26 40 26 26 26 26 26 26 26 40 26 26 26 26 26 26 40 40 40 10 26 26 40 40 26 26 40 26 40 26 26 26 26 26 26 T3 26 26 T4 40 26 40 26 26 26 26 26 26 26 26 (MVA) Total 52 52 78 132 80 92 23 118 52 80 132 52 66 92 104 66 78 26 52 78 66 52 26 52 34 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------1. 599 Bund Road 220 39.7 41.1 42.6 44.3 46.3 48.3 50.3 37.1 38.3 39.6 40.9 2. 113 K.Lakhpat.New 220 62.0 51.7 54.6 37.8 40.0 42.3 44.6 47.0 37.3 39.0 40.8 3. 84 Kala Shah Kak 220 39.9 24.8 30.2 33.2 36.7 40.3 43.9 47.7 51.6 43.1 46.0 4. 173 Ravi 220 43.7 44.7 46.0 47.7 49.7 51.8 44.5 46.5 26.8 28.1 29.5 5. 737 Sarfraz Nagar 220 39.4 52.0 48.0 44.1 46.5 48.9 39.8 42.4 45.2 21.4 22.9 6. 503 Wapda Town 220 76.0 86.3 95.8 80.0 64.2 68.5 67.9 71.5 75.3 79.1 83.0 7. 1 A.I.Town 132 65.2 67.5 69.7 53.1 55.1 57.1 59.1 61.2 46.9 35.2 36.3 8. 1000 A.I.Town-II 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 26.6 27.5 28.5 9. 132 8.5 10.0 11.5 13.0 14.6 16.2 17.8 19.4 21.1 22.8 24.5 966 AWT 10. 2083 Air Avenue 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.6 13.3 16.0 16.2 11. 931 Al- Shafi 132 13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6 12. 2015 Ali Asia Stee 132 0.0 0.0 0.0 0.0 0.0 6.3 6.3 6.3 6.3 6.3 6.3 13. 1032 Amir-Sapphire 132 7.1 7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 14. 2076 Askari XI B&C 132 0.0 0.0 0.0 0.0 3.3 7.1 11.3 16.0 21.1 26.3 31.6 15. 1041 Askari- X 132 0.0 0.0 21.9 24.1 26.5 28.9 31.3 33.8 36.3 38.8 41.3 16. 132 53.3 53.7 54.4 55.8 58.7 61.7 64.9 68.2 71.8 62.6 66.1 6 Attabad 17. 983 Audit & Accou 132 0.0 0.0 0.0 0.0 10.4 12.8 15.2 17.6 20.1 22.5 25.0 18. 912 Aysha 132 39.4 39.2 40.3 41.6 43.4 45.2 47.1 49.1 51.1 53.2 55.3 19. 233 Badami Bagh 132 49.3 51.9 51.3 52.9 55.6 58.4 43.4 45.7 48.1 50.6 53.2 20. 1047 Baggrian 132 0.0 0.0 0.0 0.0 35.6 36.7 37.9 39.1 40.3 41.6 43.0 21. 2051 Baghbanpura 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 38.8 40.2 41.5 42.9 22. 132 10.4 13.9 17.4 20.9 24.3 27.8 31.3 34.7 38.2 41.6 45.1 964 Bahria Town 23. 1061 Bakkar Mandi 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.9 32.7 34.6 36.4 24. 132 12.5 14.6 14.6 14.6 8.7 8.7 8.7 8.7 8.7 8.7 8.7 132 0.0 0.0 0.0 0.0 12.2 12.2 12.2 12.2 12.2 12.2 12.2 650 Barkat Textil 25. 2073 Bashir Steel 35 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------26. 13 Batapur 132 56.1 59.1 37.5 39.8 42.5 45.2 48.1 51.0 53.9 57.0 60.1 27. 2031 Bhadarpura Ka 132 0.0 0.0 0.0 0.0 0.0 32.8 34.1 35.4 36.8 38.2 39.7 28. 15 Bhai Pheru 132 75.1 78.1 83.4 73.5 77.2 81.1 85.1 89.4 93.7 98.3 103.1 29. 711 Bhati Gate 132 60.7 41.4 42.4 43.6 45.0 46.4 47.9 49.4 37.4 38.7 40.0 30. 2068 Bhenro K.R.K 132 0.0 0.0 0.0 0.0 5.7 5.7 5.7 5.7 5.7 5.7 5.7 31. 871 Bhikki 132 51.1 54.8 46.2 47.5 49.8 41.3 43.8 46.3 48.9 51.7 54.6 32. 916 Black Gold 132 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 33. 1036 Blessed 132 0.0 0.0 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 34. 132 93.6 95.0 104.3 103.7 91.4 99.3 97.3 101.8 106.5 111.5 116.8 35. 617 Boggiwal 132 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 5.0 36. 1007 Broadway 18 Bongha Hayat 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.1 10.9 15.7 20.6 37. 132 21.8 22.0 22.9 24.0 25.4 26.8 28.3 29.8 31.4 33.0 34.7 20 Bucheki 38. 981 Central Park 132 0.0 0.0 9.5 10.4 11.4 12.5 13.5 14.6 15.7 16.8 17.9 39. 651 Century Paper 132 7.8 7.8 7.8 7.8 7.8 7.8 7.8 7.8 7.8 7.8 7.8 132 58.8 60.3 61.8 63.4 65.1 66.9 55.1 56.7 58.3 60.0 61.7 41. 1018 Chak 40/D 132 0.0 0.0 0.0 0.0 28.5 30.4 32.4 34.5 36.6 38.8 41.0 42. 40. 23 Chah Miran 132 69.4 70.6 74.0 76.1 80.4 84.9 89.6 94.6 99.9 87.7 92.6 43. 1072 Chaurasta 800 Chak-65 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 35.1 37.5 39.9 42.4 44. 2012 Chichoke Mall 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.4 13.5 45. 132 0.0 0.0 0.0 0.0 0.0 0.0 11.9 12.5 14.9 17.4 19.8 46. 1071 Chucak 986 Chinar Bagh 132 0.0 0.0 18.9 20.1 21.3 22.5 23.8 25.0 26.3 27.6 28.9 47. 30 Chung 132 70.4 75.2 67.9 71.9 77.1 76.4 59.4 62.2 49.6 52.1 54.7 48. 254 Chunian 132 27.4 28.3 30.1 32.1 34.1 36.2 38.4 40.5 42.8 45.0 47.3 49. 997 City Steel SK 132 7.4 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 132 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 50. 1025 Coca Cola 36 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------51. 1030 Colony Indust 132 7.2 9.7 9.7 9.7 9.7 9.7 9.7 9.7 9.7 9.7 9.7 52. 980 DHA -P- VI-3 132 0.0 0.0 0.0 18.1 19.9 21.7 23.5 25.3 27.2 29.1 31.0 53. 2084 DHA Phase IX 132 0.0 0.0 0.0 0.0 0.0 0.0 4.3 8.7 13.1 17.6 22.1 54. 132 0.0 0.0 0.0 0.0 0.0 7.9 13.3 18.5 23.8 29.2 34.5 55. 1021 DHA Rahber 132 0.0 0.0 5.6 7.0 8.2 9.6 10.9 12.2 13.5 14.9 16.3 56. 2049 DHA- P-VI. 2 132 0.0 0.0 0.0 7.1 10.4 13.7 17.0 20.4 23.8 27.2 30.6 57. 958 DHA- Ph. V 132 26.8 30.1 33.5 37.0 40.7 44.4 48.2 52.0 55.8 59.8 63.7 58. 962 Daroghawala 132 45.0 47.0 45.0 48.2 51.2 54.4 57.6 61.0 64.5 68.1 71.9 59. 426 Defence 132 79.7 84.2 88.8 93.5 93.9 98.8 103.7 67.6 70.4 73.3 76.1 60. 992 Defence XXY 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 26.8 27.2 27.6 28.0 61. 265 Depalpur 132 60.0 63.7 66.3 69.6 64.7 67.9 71.1 66.4 69.5 62.2 65.3 62. 998 Descon Oxy. S 132 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 63. 2058 Dew Kalan 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.8 10.6 11.4 64. 2014 Diamond Fabri 132 8.2 8.2 8.2 8.2 8.2 8.2 8.2 8.2 8.2 8.2 8.2 65. 2082 Dina Nath 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 26.7 28.2 66. 132 0.0 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 67. 2066 EME 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.5 6.4 7.3 68. 987 Eden City 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.4 8.2 10.1 69. 2063 Eden Value Ho 132 0.0 0.0 0.0 0.0 0.0 0.0 21.8 23.8 25.9 28.0 30.2 70. 2041 Ejaz Textile 132 0.0 0.0 0.0 5.3 5.3 5.3 5.3 5.3 5.3 5.3 5.3 71. 506 Elahabad 132 37.8 38.9 40.6 42.6 44.8 47.0 49.3 51.7 54.1 56.6 59.1 72. 2075 Ellcot Spinni 132 0.0 0.0 0.0 0.0 0.0 5.4 5.4 5.4 5.4 5.4 5.4 73. 271 Farooqabad 132 53.2 56.3 60.4 64.9 65.9 60.3 64.6 69.1 73.6 78.3 83.1 74. 38 Fateh Garh 132 83.9 87.4 81.5 83.6 86.0 88.4 83.2 85.6 88.0 90.5 93.0 132 0.0 0.0 0.0 0.0 0.0 0.0 6.1 9.5 12.7 15.9 19.2 75. 990 DHA Phase-VII 999 Dost Steel 982 Fazzia 37 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------76. 1022 Ferozepur Roa 132 0.0 0.0 0.0 0.0 0.0 0.0 33.5 34.1 34.7 35.4 36.0 77. 40 Fort 132 38.2 39.3 22.0 22.8 23.8 24.7 25.7 26.7 27.7 28.7 29.7 78. 2059 Fruit Mandi 132 0.0 0.0 0.0 38.1 41.6 45.1 48.7 52.4 55.4 58.4 61.5 79. 43 Garden Town 132 96.5 100.9 105.3 99.9 104.6 109.4 81.2 85.5 89.9 94.3 98.9 80. 2069 Ghani Gases 132 0.0 0.0 0.0 0.0 0.0 0.0 11.7 11.7 11.7 11.7 11.7 81. 132 90.6 97.3 83.6 73.5 59.9 62.9 65.9 68.9 63.3 66.2 69.2 45 Ghazi 82. 1034 Ghazi Fabirc 132 7.4 7.4 7.4 7.4 7.4 7.4 7.4 7.4 7.4 7.4 7.4 83. 507 Green View 132 70.3 84.9 88.1 94.2 75.7 70.6 74.8 63.0 66.5 70.1 74.0 84. 960 Gulberg Lahor 132 0.0 0.0 0.0 0.0 0.0 0.0 36.0 36.5 37.0 37.5 38.1 85. 429 Gulshan Ravi 132 67.0 57.2 61.5 66.0 70.6 55.6 59.0 62.5 66.0 69.5 73.1 86. 2086 Hadeed Pakist 132 0.0 0.0 0.0 0.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 87. 1092 Hadyara 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.7 8.9 9.1 88. 2057 Hanjarwal 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 29.3 30.5 89. 132 55.6 57.9 61.5 65.4 69.4 73.6 77.7 72.6 76.7 80.9 85.1 90. 1029 Hira Terry 132 21.6 24.7 24.7 24.7 24.7 19.3 19.3 19.3 19.3 19.3 19.3 91. 287 Hujra 132 39.5 43.3 47.3 51.6 56.2 60.9 65.7 70.5 66.6 71.4 76.2 92. 753 ICI 60 Havali 132 39.7 38.3 38.7 39.5 41.5 39.2 41.4 43.6 46.0 48.5 51.1 93. 2061 IEEP Town 132 0.0 0.0 0.0 0.0 0.0 0.0 4.9 5.7 6.5 7.3 8.0 94. 2064 Indus Home 132 0.0 0.0 0.0 4.7 7.1 7.1 7.1 7.1 7.1 7.1 7.1 95. 132 35.8 35.8 35.8 35.8 35.8 35.8 35.8 35.8 35.8 35.8 35.8 96. 2028 Jail Road 132 0.0 0.0 0.0 0.0 0.0 0.0 20.9 21.3 21.6 21.9 22.2 97. 952 Jamber 132 0.0 0.0 0.0 25.9 27.1 28.3 29.5 30.8 32.2 33.5 34.9 98. 985 Jandiala S.Kh 132 0.0 0.0 0.0 0.0 14.7 16.4 18.1 19.8 21.6 23.4 25.2 99. 782 Johar Town 132 106.1 77.1 80.3 83.7 87.4 68.3 71.5 74.7 77.9 81.2 84.6 957 Johar Town-II 132 0.0 34.7 37.3 40.0 46.0 52.0 58.1 64.3 70.5 76.8 83.1 100. 66 Ittahad Chemi 38 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------101. 1020 Jubli Town 132 0.0 0.0 11.8 12.8 13.8 14.9 16.0 17.1 18.3 19.4 20.6 102. 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.0 14.8 20.0 26.4 132 83.0 86.0 89.1 92.5 75.1 77.5 71.7 74.1 76.6 79.1 81.6 104. 2044 Kala Khatai 132 0.0 0.0 0.0 0.0 0.0 0.0 16.8 17.7 18.8 19.8 20.9 105. 1026 Kamran Steel 132 0.0 0.0 0.0 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 106. 1087 Karol 132 0.0 0.0 0.0 0.0 32.7 34.7 36.7 38.8 41.0 43.3 45.8 107. 2055 Kashmir Colon 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.5 7.3 108. 132 69.2 71.7 75.0 78.6 82.8 54.3 57.3 52.7 55.6 58.5 61.5 109. 1019 Kasur New 132 42.9 45.0 47.1 49.4 51.9 54.3 56.8 59.3 61.9 64.5 67.1 110. 1015 Kasur-II 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.7 8.0 8.4 8.7 111. 972 Khana Nau 132 47.7 49.3 51.0 35.2 37.5 39.8 42.2 39.6 41.9 44.3 46.7 112. 647 Khanqa Dogran 132 19.1 20.5 22.2 24.1 26.1 28.1 30.2 32.3 22.5 23.9 25.3 113. 2046 Khay. Amin 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.0 8.7 11.4 14.1 114. 1093 Khokkar Road 132 0.0 0.0 0.0 0.0 0.0 0.0 24.5 25.4 26.4 27.4 28.5 115. 310 Khuddian 132 58.5 61.7 66.3 71.1 51.2 54.5 57.9 61.3 64.9 68.4 72.1 116. 850 Kot Radha Kis 132 30.0 32.4 35.5 38.7 42.0 45.4 48.8 52.2 55.7 59.2 62.8 117. 984 LDA Ave-I 132 0.0 0.0 7.1 10.0 12.8 15.6 18.4 21.3 24.2 27.1 30.1 118. 121 LEFO 132 54.7 54.5 56.1 58.0 60.5 63.0 65.6 68.3 65.2 68.0 70.8 119. 2067 LHR SKP Road 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 17.8 19.0 20.2 21.5 120. 994 LUMS 132 4.5 7.3 10.1 12.9 12.9 12.9 12.9 12.9 12.9 12.9 12.9 121. 949 Lahore Cantt 132 35.1 36.3 37.6 38.9 40.3 41.7 43.1 44.5 46.0 47.5 49.0 122. 2047 Lake City 132 0.0 0.0 0.0 0.0 0.0 6.2 7.4 8.6 9.8 10.9 12.1 123. 314 Lalyani 132 31.8 33.2 25.6 26.8 28.4 30.1 31.9 33.7 35.5 37.4 39.4 124. 954 M.A.Abad 132 0.0 0.0 0.0 18.1 20.0 21.9 23.8 25.7 27.7 29.7 31.7 125. 953 M.Usmanwala 132 0.0 0.0 0.0 0.0 28.7 30.7 32.7 34.8 36.9 39.1 41.3 103. 977 K.E. Medical 82 K.Lakhpat.Old 99 Kasur 39 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------126. 1027 Machikay 132 0.0 0.0 0.0 0.0 0.0 34.2 35.8 37.4 39.0 40.6 42.3 127. 1073 Makhdoom/Doul 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.6 10.8 128. 951 Malik Paper & 132 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 129. 411 Manga Mandi 132 62.0 63.7 65.8 63.8 67.7 71.9 76.1 80.5 75.7 66.0 70.0 130. 2056 Manga-II 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 32.0 33.9 131. 1042 Master Textil 132 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 132. 132 44.6 45.7 46.8 48.0 49.3 50.6 52.0 53.4 54.8 45.1 46.4 133. 2052 Mehmood Steel 583 Mcleod Road 132 0.0 0.0 0.0 0.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3 134. 2042 Mobile 132 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 135. 710 Mochi Gate 132 36.9 37.6 38.3 39.0 39.9 40.7 41.6 42.4 43.3 44.2 45.1 136. 504 Model Town 132 77.9 82.4 87.0 74.9 79.4 84.0 88.6 69.2 71.9 74.7 77.5 137. 2050 Model Town So 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 24.2 26.2 28.2 30.3 138. 1040 Momanpura G.T 132 0.0 0.0 29.4 30.6 32.3 34.0 35.7 37.6 39.5 41.4 43.4 139. 2072 Mughal Alloya 132 0.0 0.0 0.0 0.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 140. 1014 Mughal Steel 132 0.0 4.9 9.7 14.6 19.4 19.4 19.4 19.4 19.4 19.4 19.4 141. 132 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 142. 1003 Muridke 132 0.0 18.9 20.0 21.3 22.8 24.3 25.8 27.4 29.0 30.6 32.3 143. 1037 Mustafabad 132 0.0 0.0 0.0 0.0 0.0 0.0 22.1 22.4 22.7 23.1 23.4 144. 2024 Nain Sukh 132 0.0 0.0 0.0 0.0 0.0 13.6 14.0 14.4 14.8 15.2 15.6 145. 520 Nankana 132 26.7 30.8 35.9 41.0 46.5 52.0 57.5 63.2 68.9 74.7 80.6 146. 336 Narang Mandi 132 26.4 27.8 30.1 32.5 35.1 37.7 40.3 42.9 45.6 48.4 51.1 147. 2074 Naveena Expor 132 0.0 0.0 0.0 0.0 0.0 7.8 7.8 7.8 7.8 7.8 7.8 148. 866 New Airport 132 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 149. 995 New Smr St.2 132 0.0 6.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 150. 996 New Smr St.3 132 0.0 5.8 5.8 5.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8 679 Muhammad Bukh 40 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------151. 989 Niazi Chowk 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 35.2 36.1 37.2 152. 2007 Nisar Spinnin 132 0.0 0.0 0.0 0.0 0.0 6.3 6.3 6.3 6.3 6.3 6.3 153. 2085 Nishat Chunia 132 0.0 0.0 16.3 16.3 16.3 16.3 16.3 16.3 16.3 16.3 16.3 154. 2080 Nishat Mills 132 0.0 0.0 0.0 0.0 0.0 10.7 10.7 10.7 10.7 10.7 10.7 155. 2054 OPF Lahore 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.3 8.1 11.0 156. 338 Okara Cantt 132 13.4 13.9 14.4 14.9 15.5 16.1 16.7 17.3 18.0 18.6 19.2 157. 152 Okara City-I 132 56.6 58.1 60.9 64.7 49.4 52.8 56.1 59.6 63.1 66.7 70.4 158. 849 Okara City-II 132 48.6 53.6 58.2 63.0 68.2 73.5 60.9 64.5 68.3 72.1 75.9 132 0.0 0.0 0.0 0.0 0.0 0.0 25.6 27.5 29.5 31.5 33.5 159. 1002 Okara FSD Rd 160. 153 P.W.R 132 62.9 64.2 65.4 66.8 68.5 70.3 57.6 41.7 43.0 44.4 45.9 161. 2088 PAEC Mraka 132 0.0 0.0 0.0 0.0 1.8 3.7 5.5 6.5 7.5 8.6 9.6 162. 654 Packages 132 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 163. 946 Packages Kasu 132 19.2 19.2 19.2 19.2 25.2 31.2 37.2 37.2 37.2 37.2 37.2 164. 2053 Pak Arab 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.2 8.4 8.5 165. 2017 Panwan 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 17.8 18.4 166. 1082 Park View 132 0.0 0.0 0.0 0.0 24.6 28.3 32.1 35.9 39.8 43.7 47.6 167. 132 37.1 39.3 36.7 29.6 31.5 33.3 35.3 37.2 39.2 41.2 43.2 168. 2036 Press Club 158 Pattoki 132 0.0 0.0 19.7 22.5 25.4 28.3 31.2 34.2 37.3 40.3 43.4 169. 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 29.0 29.5 170. 1043 Punjab Uni 132 0.0 0.0 0.0 45.9 47.0 48.1 49.2 50.4 51.6 52.8 54.0 171. 991 Punjab Univ T 132 0.0 0.0 0.0 12.7 14.3 15.8 17.4 19.0 20.6 22.3 23.9 172. 168 Qadirabad 132 4.8 4.8 4.9 5.0 5.1 5.2 5.4 5.5 5.7 5.8 6.0 173. 993 Punjab Assemb 167 Qartaba 132 54.7 56.2 57.8 59.3 61.0 62.7 64.4 66.2 58.3 60.0 61.7 174. 1080 Qila Sattar S 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.9 13.4 175. 2062 Quetta Textil 132 0.0 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 41 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------176. 1090 Rachna Town 132 0.0 0.0 0.0 35.9 37.5 39.0 40.7 42.4 44.1 45.9 47.7 177. 353 Raiiwind 132 72.2 79.0 84.2 87.5 57.0 53.4 44.1 46.3 48.5 50.9 53.3 178. 1059 Raiwind New 132 15.9 16.7 16.8 17.3 18.2 19.2 20.3 21.4 22.6 23.9 25.2 179. 956 Raiwind-III/j 132 0.0 0.0 0.0 0.0 35.2 37.5 39.9 42.4 45.1 47.8 50.6 180. 175 Rehman Park 132 59.3 60.9 62.5 64.2 66.2 68.2 42.1 43.8 45.5 47.2 48.9 181. 2071 Rehman Steel 132 0.0 0.0 0.0 0.0 0.0 0.0 6.3 6.3 6.3 6.3 6.3 182. 132 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 183. 2079 Reliance Cott 929 Rehmat Nazir 132 0.0 0.0 0.0 0.0 0.0 6.4 6.4 6.4 6.4 6.4 6.4 184. 176 Renala Khurd 132 28.8 30.7 25.6 27.3 29.0 30.8 32.6 34.4 30.4 32.1 33.9 185. 357 Rewaz Garden 132 59.2 48.2 49.5 50.9 52.4 53.8 55.3 56.8 58.4 59.9 61.5 186. 2005 Riaz Textile 132 0.0 0.0 0.0 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 187. 2020 Roya Golf Clu 132 0.0 0.0 0.0 0.0 0.0 0.0 6.0 8.0 10.0 12.0 14.0 188. 412 Rustam 132 61.2 62.3 63.6 65.3 68.1 57.3 59.8 62.5 65.2 68.1 71.0 189. 902 SKP-Industria 132 19.4 22.4 25.5 28.6 21.3 23.6 26.0 28.3 30.7 33.2 35.7 190. 950 Sabzazar 132 54.9 56.4 57.8 59.3 60.9 63.3 65.7 52.6 54.1 55.7 57.3 191. 540 Sadar Gogera 132 29.2 30.7 32.9 35.1 37.5 39.9 34.6 36.9 39.2 41.6 44.0 192. 973 Safdarabad 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.3 13.1 13.9 193. 969 Saggian 132 0.0 47.7 48.9 50.5 52.5 54.6 56.7 58.9 61.1 63.5 65.9 194. 184 Saidpur 132 66.2 68.0 69.8 71.7 73.8 75.9 78.1 80.3 82.6 69.1 71.0 195. 1060 Sanda 132 0.0 0.0 0.0 0.0 0.0 19.7 21.1 22.5 24.0 25.4 26.9 196. 2004 Sapphire -3 132 0.0 0.0 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 197. 2016 Sapphire -5 132 9.6 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 198. 2077 Sapphire F (1 132 0.0 0.0 0.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3 6.3 199. 1028 Sapphire Fini 132 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 200. 132 54.2 55.9 57.6 59.3 61.1 63.0 43.9 45.4 47.0 48.6 50.2 191 Shadman 42 LESCO Table 1- 17: Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------201. 369 Shahdara New 132 68.5 71.5 74.8 61.9 65.3 68.8 60.6 63.5 66.5 69.6 72.7 202. 505 Shahdara Scar 132 14.6 14.7 14.9 15.2 15.8 16.4 12.1 12.6 13.1 13.7 14.3 203. 193 Shahkot 132 51.0 52.4 55.1 58.3 62.2 66.2 70.3 74.5 78.8 69.0 72.9 204. 1010 Shalamar Stee 132 0.0 0.0 0.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 205. 194 Shalamar-I 132 54.5 56.0 57.7 59.9 51.3 53.8 56.5 59.2 62.1 65.1 68.2 206. 893 Shalamar-II 132 53.6 55.6 49.3 51.5 54.0 56.6 59.2 40.6 42.3 44.1 45.9 207. 508 Shamky 132 69.7 69.3 70.6 53.4 56.7 60.1 63.6 67.4 71.3 75.4 79.7 208. 372 Sharqpur 132 25.7 28.2 33.0 34.0 35.5 37.0 38.6 40.2 41.8 43.6 45.4 209. 897 Sharqpur Rd. 132 16.7 17.6 18.4 19.4 20.7 22.0 23.3 24.7 26.1 27.5 29.0 210. 971 Sheranwala 132 0.0 0.0 21.3 21.6 22.0 22.5 23.0 23.5 24.0 24.5 25.1 211. 988 Shergarh 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.6 15.0 15.4 212. 2065 Shoaib Steel 132 0.0 0.0 0.0 0.0 0.0 9.1 9.1 9.1 9.1 9.1 9.1 213. 132 60.3 64.0 70.9 68.7 73.6 54.4 58.1 62.0 66.0 70.1 74.3 214. 2060 Spring Medows 197 Skp. City 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.4 8.9 13.4 18.0 215. 2043 State Life (A 132 0.0 15.7 17.5 19.3 21.2 23.1 25.0 26.9 28.9 30.9 33.0 216. 2087 Style Textile 132 0.0 0.0 0.0 0.0 5.7 5.7 5.7 5.7 5.7 5.7 5.7 217. 2048 Sui Gas 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.4 16.2 18.1 20.0 218. 2045 Sukh Chain 132 10.6 13.0 15.5 18.0 20.8 19.5 22.4 25.3 28.3 31.3 34.3 219. 132 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.4 0.4 0.4 380 Sukheki 220. 2018 Sunder Manga 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.3 20.9 21.6 221. 965 Sunder( Ind. 132 35.5 39.3 46.9 58.3 69.7 69.7 69.7 69.7 69.7 69.7 69.7 222. 206 Sunny View 132 42.1 43.1 44.1 45.2 46.3 47.4 48.5 49.6 50.8 34.1 35.1 223. 2078 Tariq Glass 132 0.0 0.0 0.0 0.0 0.0 8.5 8.5 8.5 8.5 8.5 8.5 224. 1084 Thokkar 132 0.0 0.0 0.0 0.0 0.0 28.9 30.3 31.8 33.4 34.9 36.6 225. 132 86.6 88.8 91.2 94.0 74.3 77.3 80.3 83.5 86.7 90.0 93.4 428 Town Ship 43 LESCO Table 1- 17: Maximum Demand (MW) of Substations P O W E R M A R K E T S U R V E Y LOAD CENTRE SUMMARY MAXIMUM DEMAND (MW) OF GRIDSTATIONS DISCO: LESCO -------------------------------------------------------------------------------------------------------------------------------------|GRID| NAME OF | |_______________________________________________Y____E____A____R______________________________________________| |NO. | GRIDSTATION |KV | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | -------------------------------------------------------------------------------------------------------------------------------------226. 2070 Uni Lever 132 0.0 0.0 0.0 0.0 5.9 5.9 5.9 5.9 5.9 5.9 5.9 227. 963 Valancia 132 0.0 0.0 0.0 12.9 15.2 17.5 19.8 22.2 24.6 27.0 29.4 228. 826 Valgon Sohial 132 39.6 43.4 39.1 34.1 36.5 38.9 41.5 44.1 46.8 49.5 52.4 229. 221 W.Radha Ram 132 31.5 33.4 28.1 29.2 30.6 32.0 33.4 34.9 36.4 38.0 39.6 230. 959 Walton Road 132 0.0 0.0 0.0 0.0 41.5 43.1 44.8 46.5 48.2 49.9 51.7 231. 401 Warburton 132 40.6 47.2 50.3 53.1 56.8 54.3 58.2 62.2 66.4 70.7 75.1 232. 970 Wassanpura 132 0.0 0.0 0.0 0.0 0.0 0.0 16.5 16.9 17.2 17.6 17.9 233. 781 Willongton Ma 132 64.8 66.5 68.2 69.9 51.3 52.8 54.4 55.9 57.5 59.1 60.8 234. 1012 Yaqoob Steel 132 0.0 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 235. 658 Zahoor.Textil 132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 236. 229 Ali Jaj 66 10.0 11.6 13.5 15.4 17.4 19.4 21.5 23.5 25.6 27.8 29.9 237. 241 Basirpur 66 29.9 32.8 36.0 31.8 34.3 36.8 39.4 24.4 25.2 26.1 26.9 238. 270 EMCO 66 28.9 25.3 25.5 19.0 20.1 21.1 22.3 21.9 23.1 24.4 25.7 239. 303 Kanganpur 66 20.5 21.9 23.6 14.9 12.3 13.3 14.2 15.2 16.2 17.2 18.2 240. 320 Malikpur 66 18.1 22.0 26.0 30.1 34.5 38.9 43.4 47.9 52.5 57.2 61.9 241. 330 Mohlan 66 9.3 10.1 10.9 11.7 12.5 13.4 14.2 15.1 16.0 13.3 14.2 242. 362 Sangla Hill 66 15.1 16.2 17.8 19.4 21.1 22.8 24.6 26.3 28.1 29.9 31.7 243. 399 UIS 66 8.4 9.6 9.7 10.0 10.5 11.1 11.7 12.4 13.1 13.8 14.6 244. 447 Chichoke Mall 11 5.2 5.3 5.4 5.4 5.6 5.7 5.9 6.0 6.2 6.3 6.5 245. 1099 Gulistan P/H 11 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 246. 2008 Nishat Power 11 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 247. 11 1.4 1.4 1.4 1.4 1.5 1.5 1.5 1.6 1.6 1.6 1.7 659 Renala P/H Total -----------------------------------------------------------------------------------------------------------------4801.0 5125.3 5423.9 5718.2 6096.2 6457.3 6816.9 7198.2 7599.9 8002.0 8410.0 44 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR : 2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------1. 1 132kV A.I.Town GWh 93.24 12.92 2.13 2.26 4.06 6.31 0.00 0.00 120.92 0.89 MW 35.48 5.27 0.81 0.96 4.23 1.68 0.00 0.00 36.32 19.00 2. 1000 132kV A.I.Town-II GWh 71.25 13.77 4.00 1.48 0.52 6.67 0.00 0.00 97.69 0.89 MW 27.11 5.80 1.52 0.63 1.11 1.78 0.00 0.00 28.46 15.00 3. 966 132kV AWT GWh 52.32 15.65 0.05 2.74 19.13 1.04 0.00 0.00 90.93 0.86 MW 19.91 7.15 0.02 1.17 4.18 0.28 0.00 0.00 24.53 15.00 4. 2083 132kV Air Avenue GWh 60.44 4.52 0.00 0.00 0.00 0.84 0.00 0.00 65.80 0.90 MW 19.71 1.72 0.00 0.00 0.00 0.22 0.00 0.00 16.24 8.00 5. 931 132kV Al- Shafi GWh 0.00 0.00 0.00 0.00 35.14 0.00 0.00 0.00 35.14 0.90 MW 0.00 0.00 0.00 0.00 13.61 0.00 0.00 0.00 13.61 7.00 6. 2015 132kV Ali Asia Steel GWh 0.00 0.00 0.00 0.00 19.32 0.00 0.00 0.00 19.32 0.90 MW 0.00 0.00 0.00 0.00 6.30 0.00 0.00 0.00 6.30 3.00 7. 229 66kV Ali Jaj GWh 55.48 2.46 0.00 2.52 1.09 32.07 0.00 0.00 93.62 0.83 MW 23.97 1.05 0.00 1.02 1.03 8.12 0.00 0.00 29.90 20.00 8. 1032 132kV Amir-Sapphire K GWh 0.11 0.00 0.00 0.00 38.41 0.00 0.00 0.00 38.52 0.90 MW 0.04 0.00 0.00 0.00 7.86 0.00 0.00 0.00 7.90 4.00 9. 2076 132kV Askari XI B&C GWh 107.22 10.72 1.54 1.09 0.00 7.60 0.00 0.00 128.17 0.89 MW 34.97 4.08 0.58 0.46 0.00 2.03 0.00 0.00 31.59 16.00 10. 1041 132kV Askari- X GWh 99.29 19.97 3.85 3.23 4.51 3.76 0.00 0.00 134.61 0.89 MW 37.78 9.12 1.47 1.38 4.37 1.00 0.00 0.00 41.34 21.00 11. 6 132kV Attabad GWh 4.62 1.88 0.00 0.36 288.00 1.62 0.00 0.00 296.47 0.90 MW 1.76 0.72 0.00 0.15 74.66 0.43 0.00 0.00 66.06 32.00 12. 983 132kV Audit & Account GWh 77.08 16.76 0.11 2.13 0.20 3.07 0.00 0.00 99.36 0.89 MW 25.14 6.38 0.04 0.91 0.11 0.82 0.00 0.00 25.05 13.00 13. 912 132kV Aysha GWh 85.04 15.00 0.34 11.42 116.19 15.96 0.00 0.00 243.95 0.87 MW 30.74 6.49 0.12 4.62 27.69 4.04 0.00 0.00 55.34 31.00 14. 233 132kV Badami Bagh GWh 35.36 5.68 0.02 10.81 139.00 3.31 0.00 0.00 194.19 0.88 MW 11.53 2.16 0.01 4.61 51.80 0.88 0.00 0.00 53.24 29.00 15. 1047 132kV Baggrian GWh 58.63 12.69 1.17 4.09 89.62 4.59 0.00 0.00 170.80 0.87 MW 21.48 5.47 0.45 1.74 27.00 1.22 0.00 0.00 43.02 24.00 16. 2051 132kV Baghbanpura GWh 97.38 16.03 11.12 7.84 9.53 9.40 0.00 0.00 151.28 0.89 MW 37.05 7.32 4.23 3.34 2.75 2.50 0.00 0.00 42.90 22.00 17. 964 132kV Bahria Town GWh 106.17 7.88 2.10 1.75 0.00 0.47 0.00 0.00 118.38 0.90 MW 40.40 3.00 0.80 0.75 0.00 0.13 0.00 0.00 45.07 22.00 18. 1061 132kV Bakkar Mandi GWh 75.78 9.05 0.81 10.31 20.09 4.57 0.00 0.00 120.60 0.85 MW 29.91 4.42 0.31 4.39 8.36 1.22 0.00 0.00 36.45 23.00 19. 650 132kV Barkat Textile GWh 0.00 0.00 0.00 0.00 24.77 0.00 0.00 0.00 24.77 0.90 MW 0.00 0.00 0.00 0.00 8.72 0.00 0.00 0.00 8.72 4.00 20. 2073 132kV Bashir Steel GWh 0.00 0.00 0.00 0.00 27.62 0.00 0.00 0.00 27.62 0.90 MW 0.00 0.00 0.00 0.00 12.20 0.00 0.00 0.00 12.20 6.00 21. 241 66kV Basirpur GWh 39.20 2.62 0.00 3.32 3.13 39.14 0.00 0.00 87.41 0.83 MW 17.01 1.42 0.00 1.34 1.17 14.86 0.00 0.00 26.92 18.00 22. 13 132kV Batapur GWh 106.40 8.93 0.85 13.12 60.47 34.79 0.00 0.00 224.56 0.85 MW 36.06 3.23 0.31 5.31 26.30 8.80 0.00 0.00 60.06 37.00 23. 2031 132kV Bhadarpura Kasu GWh 35.71 1.66 0.00 3.40 7.18 43.55 0.00 0.00 91.50 0.83 MW 16.31 0.76 0.00 1.45 4.94 23.20 0.00 0.00 39.66 27.00 24. 15 132kV Bhai Pheru GWh 87.86 8.54 0.10 4.76 375.12 46.61 0.00 0.00 523.00 0.88 MW 31.76 3.31 0.04 1.93 79.96 11.79 0.00 0.00 103.06 56.00 25. 711 132kV Bhati Gate GWh 74.76 17.68 2.87 19.34 12.65 4.12 0.00 0.00 131.42 0.85 MW 26.67 8.07 1.09 8.24 8.12 1.10 0.00 0.00 39.97 25.00 45 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------26. 2068 132kV Bhenro K.R.K GWh 0.00 0.00 0.00 0.00 32.56 0.00 0.00 0.00 32.56 0.90 MW 0.00 0.00 0.00 0.00 5.72 0.00 0.00 0.00 5.72 3.00 27. 871 132kV Bhikki GWh 14.17 3.89 0.00 2.74 233.37 12.21 0.00 0.00 266.38 0.89 MW 6.47 2.22 0.00 1.17 51.09 3.25 0.00 0.00 54.57 28.00 28. 916 132kV Black Gold GWh 0.00 0.00 0.00 0.00 25.17 0.00 0.00 0.00 25.17 0.90 MW 0.00 0.00 0.00 0.00 8.88 0.00 0.00 0.00 8.88 4.00 29. 1036 132kV Blessed GWh 0.02 0.00 0.00 0.00 56.13 0.00 0.00 0.00 56.16 0.90 MW 0.01 0.00 0.00 0.00 11.11 0.00 0.00 0.00 11.12 5.00 30. 617 132kV Boggiwal GWh 72.63 6.13 5.61 16.34 324.24 9.07 0.00 0.00 434.02 0.88 MW 27.64 2.80 2.14 6.96 113.72 2.42 0.00 0.00 116.75 63.00 31. 18 132kV Bongha Hayat GWh 3.44 0.10 0.00 0.12 0.80 14.48 0.00 0.00 18.94 0.78 MW 1.57 0.06 0.00 0.05 0.36 3.86 0.00 0.00 5.01 4.00 32. 1007 132kV Broadway GWh 0.00 72.11 0.00 0.00 0.00 0.00 0.00 0.00 72.11 0.90 MW 0.00 27.44 0.00 0.00 0.00 0.00 0.00 0.00 20.58 10.00 33. 20 132kV Bucheki GWh 33.63 3.27 0.00 3.12 45.77 28.10 0.00 0.00 113.89 0.86 MW 14.49 1.73 0.00 1.26 16.18 7.11 0.00 0.00 34.67 21.00 34. 599 220kV Bund Road GWh 109.27 9.73 1.69 9.91 25.05 3.56 0.00 0.00 159.21 0.89 MW 35.64 3.70 0.64 4.22 9.39 0.95 0.00 0.00 40.91 21.00 35. 981 132kV Central Park GWh 31.58 5.07 0.00 3.39 18.85 1.38 0.00 0.00 60.26 0.86 MW 12.02 2.31 0.00 1.44 4.92 0.37 0.00 0.00 17.90 11.00 36. 651 132kV Century Paper M GWh 0.00 0.00 0.00 0.00 23.14 0.00 0.00 0.00 23.14 0.90 MW 0.00 0.00 0.00 0.00 7.82 0.00 0.00 0.00 7.82 4.00 37. 23 132kV Chah Miran GWh 158.57 15.38 5.30 9.08 19.29 9.90 0.00 0.00 217.53 0.89 MW 60.34 7.02 2.02 3.87 6.39 2.64 0.00 0.00 61.71 32.00 38. 1018 132kV Chak 40/D GWh 42.78 7.23 0.00 5.04 37.87 18.73 0.00 0.00 111.64 0.86 MW 17.10 3.30 0.00 2.15 19.24 6.51 0.00 0.00 41.04 24.00 39. 800 132kV Chak-65 GWh 7.92 2.03 0.00 1.03 366.38 0.80 0.00 0.00 378.16 0.90 MW 3.44 1.10 0.00 0.42 103.75 0.20 0.00 0.00 92.57 45.00 40. 1072 132kV Chaurasta GWh 30.60 1.82 0.00 3.39 12.81 64.31 0.00 0.00 112.93 0.83 MW 13.49 1.04 0.00 1.45 6.49 27.39 0.00 0.00 42.37 28.00 41. 447 11kV Chichoke Mall P GWh 9.16 0.67 0.00 0.46 7.34 2.36 0.00 0.00 19.99 0.86 MW 4.18 0.38 0.00 0.20 2.25 0.63 0.00 0.00 6.49 4.00 42. 2012 132kV Chichoke Mallia GWh 34.29 2.74 0.00 1.62 2.35 2.49 0.00 0.00 43.48 0.89 MW 13.05 1.04 0.00 0.69 0.46 0.66 0.00 0.00 13.52 7.00 43. 986 132kV Chinar Bagh GWh 22.64 3.53 0.00 1.23 47.84 0.78 0.00 0.00 76.01 0.88 MW 8.61 1.61 0.00 0.52 15.48 0.21 0.00 0.00 19.83 11.00 44. 1071 132kV Chucak GWh 54.34 5.31 0.00 4.06 3.35 34.81 0.00 0.00 101.88 0.83 MW 20.48 2.55 0.00 1.73 0.51 8.77 0.00 0.00 28.93 19.00 45. 30 132kV Chung GWh 70.40 9.61 6.64 3.34 167.52 5.89 0.00 0.00 263.39 0.88 MW 21.81 3.47 2.40 1.35 42.36 1.49 0.00 0.00 54.72 30.00 46. 254 132kV Chunian GWh 84.64 6.08 0.00 5.28 11.65 28.99 0.00 0.00 136.63 0.84 MW 36.71 3.30 0.00 2.14 7.56 8.80 0.00 0.00 47.29 31.00 47. 997 132kV City Steel SK GWh 0.00 0.00 0.00 0.00 40.01 0.00 0.00 0.00 40.01 0.90 MW 0.00 0.00 0.00 0.00 16.54 0.00 0.00 0.00 16.54 8.00 48. 1025 132kV Coca Cola GWh 0.00 0.00 0.00 0.00 37.72 0.00 0.00 0.00 37.72 0.90 MW 0.00 0.00 0.00 0.00 9.60 0.00 0.00 0.00 9.60 5.00 49. 1030 132kV Colony Indust GWh 0.00 0.00 0.00 0.00 41.49 0.00 0.00 0.00 41.49 0.90 MW 0.00 0.00 0.00 0.00 9.70 0.00 0.00 0.00 9.70 5.00 50. 980 132kV DHA -P- VI-3 GWh 63.53 12.17 2.72 3.67 2.11 26.30 0.00 0.00 110.50 0.84 MW 24.17 5.56 1.04 1.56 2.04 7.00 0.00 0.00 31.03 20.00 46 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------51. 2084 132kV DHA Phase IX GWh 75.03 7.54 1.05 0.76 0.00 5.27 0.00 0.00 89.65 0.89 MW 24.47 2.87 0.40 0.32 0.00 1.40 0.00 0.00 22.10 11.00 52. 990 132kV DHA Phase-VII-4 GWh 128.75 9.12 0.00 0.00 0.00 2.27 0.00 0.00 140.13 0.90 MW 41.99 3.47 0.00 0.00 0.00 0.60 0.00 0.00 34.55 17.00 53. 1021 132kV DHA Rahber GWh 52.60 7.17 0.00 3.80 0.00 0.66 0.00 0.00 64.22 0.89 MW 17.16 2.73 0.00 1.62 0.00 0.17 0.00 0.00 16.26 8.00 54. 2049 132kV DHA- P-VI. 2 GWh 118.96 4.94 0.00 0.00 0.00 0.64 0.00 0.00 124.54 0.90 MW 38.80 1.88 0.00 0.00 0.00 0.17 0.00 0.00 30.64 15.00 55. 958 132kV DHA- Ph. V GWh 113.25 21.94 2.59 2.86 7.95 12.10 0.00 0.00 160.68 0.89 MW 58.76 12.52 0.99 1.22 8.26 3.22 0.00 0.00 63.73 33.00 56. 962 132kV Daroghawala GWh 45.11 4.41 0.36 26.04 146.05 1.06 0.00 0.00 223.04 0.88 MW 20.60 2.52 0.14 11.10 61.21 0.28 0.00 0.00 71.89 39.00 57. 426 132kV Defence GWh 158.76 38.95 6.28 1.71 8.45 11.37 0.00 0.00 225.51 0.89 MW 72.49 17.79 2.39 0.73 5.10 3.03 0.00 0.00 76.14 39.00 58. 992 132kV Defence XXY GWh 54.91 21.89 0.90 0.30 2.98 0.00 0.00 0.00 80.98 0.90 MW 25.07 10.00 0.34 0.13 1.80 0.00 0.00 0.00 28.00 14.00 59. 265 132kV Depalpur GWh 94.14 11.19 0.03 2.91 40.24 74.47 0.00 0.00 222.98 0.84 MW 35.82 5.11 0.01 1.24 15.10 29.75 0.00 0.00 65.28 42.00 60. 998 132kV Descon Oxy. S GWh 0.00 0.00 0.00 0.00 14.42 0.00 0.00 0.00 14.42 0.90 MW 0.00 0.00 0.00 0.00 2.40 0.00 0.00 0.00 2.40 1.00 61. 2058 132kV Dew Kalan GWh 12.55 1.94 2.34 2.34 22.51 3.03 0.00 0.00 44.71 0.87 MW 4.09 0.74 0.89 1.00 7.66 0.81 0.00 0.00 11.39 6.00 62. 2014 132kV Diamond Fabrics GWh 0.00 0.00 0.00 0.00 33.61 0.00 0.00 0.00 33.61 0.90 MW 0.00 0.00 0.00 0.00 8.16 0.00 0.00 0.00 8.16 4.00 63. 2082 132kV Dina Nath GWh 0.05 0.00 0.00 0.00 87.21 0.00 0.00 0.00 87.26 0.90 MW 0.02 0.00 0.00 0.00 33.13 0.00 0.00 0.00 28.18 14.00 64. 999 132kV Dost Steel GWh 0.00 0.00 0.00 0.00 23.90 0.00 0.00 0.00 23.90 0.90 MW 0.00 0.00 0.00 0.00 9.10 0.00 0.00 0.00 9.10 4.00 65. 270 66kV EMCO GWh 0.00 0.00 0.00 0.00 105.72 0.00 0.00 0.00 105.73 0.90 MW 0.00 0.00 0.00 0.00 30.29 0.00 0.00 0.00 25.75 12.00 66. 2066 132kV EME GWh 29.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.81 0.90 MW 9.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.29 4.00 67. 987 132kV Eden City GWh 38.45 2.01 0.00 0.00 0.00 0.81 0.00 0.00 41.27 0.90 MW 12.54 0.76 0.00 0.00 0.00 0.22 0.00 0.00 10.14 5.00 68. 2063 132kV Eden Value Home GWh 59.88 14.99 2.45 4.92 37.40 5.80 0.00 0.00 125.43 0.86 MW 19.53 5.70 0.93 2.10 10.49 1.54 0.00 0.00 30.22 18.00 69. 2041 132kV Ejaz Textile GWh 0.02 0.00 0.00 0.00 32.75 0.00 0.00 0.00 32.76 0.90 MW 0.01 0.00 0.00 0.00 5.28 0.00 0.00 0.00 5.29 3.00 70. 506 132kV Elahabad GWh 55.82 5.26 0.00 4.87 55.64 54.62 0.00 0.00 176.22 0.85 MW 24.22 2.85 0.00 1.97 13.46 27.64 0.00 0.00 59.10 37.00 71. 2075 132kV Ellcot Spinning GWh 0.10 0.00 0.00 0.00 19.24 0.00 0.00 0.00 19.34 0.90 MW 0.04 0.00 0.00 0.00 5.38 0.00 0.00 0.00 5.42 3.00 72. 271 132kV Farooqabad GWh 112.32 6.04 0.04 5.42 109.04 90.89 0.00 0.00 323.75 0.85 MW 48.62 3.23 0.02 2.19 29.09 23.00 0.00 0.00 83.07 51.00 73. 38 132kV Fateh Garh GWh 236.33 25.90 7.36 21.90 19.03 11.49 0.00 0.00 322.01 0.89 MW 84.31 11.82 2.80 9.33 12.71 3.06 0.00 0.00 93.03 48.00 74. 982 132kV Fazzia GWh 74.59 2.56 0.00 0.00 0.00 1.30 0.00 0.00 78.45 0.90 MW 24.33 0.97 0.00 0.00 0.00 0.34 0.00 0.00 19.24 9.00 75. 1022 132kV Ferozepur Road GWh 73.51 20.93 0.43 1.39 8.03 2.49 0.00 0.00 106.78 0.90 MW 29.71 10.38 0.16 0.59 6.56 0.66 0.00 0.00 36.05 17.00 47 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------76. 40 132kV Fort GWh 60.37 13.39 5.74 5.73 9.40 4.45 0.00 0.00 99.08 0.89 MW 22.97 6.11 2.18 2.44 4.75 1.19 0.00 0.00 29.74 15.00 77. 2059 132kV Fruit Mandi GWh 56.00 30.24 0.48 6.20 97.29 10.87 0.00 0.00 201.09 0.87 MW 22.40 12.05 0.18 2.64 41.88 2.90 0.00 0.00 61.54 35.00 78. 43 132kV Garden Town GWh 150.49 96.58 2.45 1.93 6.77 17.95 0.00 0.00 276.16 0.89 MW 63.63 55.12 0.93 0.82 6.52 4.78 0.00 0.00 98.85 51.00 79. 2069 132kV Ghani Gases GWh 0.00 0.00 0.00 0.00 52.02 0.00 0.00 0.00 52.02 0.90 MW 0.00 0.00 0.00 0.00 11.71 0.00 0.00 0.00 11.71 6.00 80. 45 132kV Ghazi GWh 183.46 24.05 5.37 9.65 7.93 8.97 0.00 0.00 239.41 0.89 MW 66.32 10.43 1.94 3.91 7.30 2.27 0.00 0.00 69.18 35.00 81. 1034 132kV Ghazi Fabirc GWh 0.00 0.00 0.00 0.00 36.37 0.00 0.00 0.00 36.37 0.90 MW 0.00 0.00 0.00 0.00 7.44 0.00 0.00 0.00 7.44 4.00 82. 507 132kV Green View GWh 14.75 2.71 0.00 1.87 254.59 6.01 0.00 0.00 279.94 0.89 MW 6.74 1.55 0.00 0.80 87.94 1.60 0.00 0.00 73.97 38.00 83. 960 132kV Gulberg Lahore GWh 47.96 59.84 0.20 0.66 8.05 1.06 0.00 0.00 117.78 0.90 MW 18.39 29.17 0.08 0.28 2.55 0.28 0.00 0.00 38.06 18.00 84. 1099 11kV Gulistan P/H GWh 0.00 0.00 0.00 0.00 2.78 0.00 0.00 0.00 2.78 0.90 MW 0.00 0.00 0.00 0.00 0.64 0.00 0.00 0.00 0.64 0.00 85. 429 132kV Gulshan Ravi GWh 144.05 38.52 9.34 20.58 12.19 22.63 0.00 0.00 247.32 0.88 MW 54.82 17.59 3.56 8.77 6.69 6.03 0.00 0.00 73.09 39.00 86. 2086 132kV Hadeed Pakistan GWh 0.00 0.00 0.00 0.00 33.82 0.00 0.00 0.00 33.82 0.90 MW 0.00 0.00 0.00 0.00 7.02 0.00 0.00 0.00 7.02 3.00 87. 1092 132kV Hadyara GWh 12.97 2.04 0.19 0.98 1.15 17.44 0.00 0.00 34.78 0.83 MW 4.94 0.93 0.07 0.42 1.11 4.65 0.00 0.00 9.09 6.00 88. 2057 132kV Hanjarwal GWh 59.91 6.74 1.18 5.23 12.44 5.94 0.00 0.00 91.43 0.85 MW 23.58 2.93 0.45 2.23 9.95 1.58 0.00 0.00 30.54 19.00 89. 60 132kV Havali GWh 95.04 7.22 0.00 7.96 11.26 98.62 0.00 0.00 220.11 0.83 MW 41.23 5.22 0.00 3.22 3.73 49.91 0.00 0.00 85.07 57.00 90. 1029 132kV Hira Terry GWh 0.05 0.00 0.00 0.00 66.75 0.00 0.00 0.00 66.80 0.90 MW 0.02 0.00 0.00 0.00 19.31 0.00 0.00 0.00 19.33 9.00 91. 287 132kV Hujra GWh 122.69 5.62 0.02 5.89 15.01 68.26 0.00 0.00 217.49 0.84 MW 53.22 3.05 0.01 2.38 11.29 25.91 0.00 0.00 76.24 49.00 92. 753 132kV ICI GWh 1.38 0.23 0.00 0.15 253.85 2.29 0.00 0.00 257.90 0.90 MW 0.52 0.11 0.00 0.06 66.89 0.61 0.00 0.00 51.15 25.00 93. 2061 132kV IEEP Town GWh 27.43 1.57 0.00 0.54 0.00 0.44 0.00 0.00 29.97 0.90 MW 9.78 0.60 0.00 0.23 0.00 0.12 0.00 0.00 8.05 4.00 94. 2064 132kV Indus Home GWh 0.22 0.00 0.00 0.00 28.51 0.00 0.00 0.00 28.73 0.90 MW 0.08 0.00 0.00 0.00 6.97 0.00 0.00 0.00 7.05 3.00 95. 66 132kV Ittahad Chemi GWh 0.40 0.30 0.00 0.11 169.14 0.06 0.00 0.00 170.02 0.90 MW 0.15 0.11 0.00 0.05 35.52 0.02 0.00 0.00 35.85 17.00 96. 2028 132kV Jail Road GWh 46.38 12.87 1.68 0.81 1.98 3.03 0.00 0.00 66.74 0.89 MW 21.18 5.88 0.64 0.34 0.78 0.81 0.00 0.00 22.21 11.00 97. 952 132kV Jamber GWh 43.53 6.57 0.00 3.89 85.15 30.49 0.00 0.00 169.63 0.86 MW 16.12 2.68 0.00 1.66 12.51 8.12 0.00 0.00 34.92 21.00 98. 985 132kV Jandiala S.Khan GWh 30.65 3.31 0.00 3.45 0.43 22.90 0.00 0.00 60.74 0.83 MW 16.11 2.20 0.00 1.47 0.25 9.63 0.00 0.00 25.21 17.00 99. 782 132kV Johar Town GWh 164.64 45.84 4.90 4.78 6.57 13.41 0.00 0.00 240.13 0.89 MW 75.18 26.16 1.87 2.04 3.92 3.57 0.00 0.00 84.55 43.00 100. 957 132kV Johar Town-II GWh 106.89 90.40 5.94 4.29 4.23 14.11 0.00 0.00 225.86 0.89 MW 48.81 51.60 2.26 1.83 2.52 3.76 0.00 0.00 83.08 43.00 48 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------101. 1020 132kV Jubli Town GWh 39.58 10.20 1.70 4.60 27.59 1.30 0.00 0.00 84.97 0.86 MW 12.91 3.88 0.65 1.96 7.74 0.35 0.00 0.00 20.61 12.00 102. 977 132kV K.E. Medical H/ GWh 62.03 0.51 0.00 0.27 10.48 0.82 0.00 0.00 74.11 0.90 MW 28.32 0.29 0.00 0.12 6.22 0.22 0.00 0.00 26.38 13.00 103. 113 220kV K.Lakhpat.New GWh 77.22 10.34 3.18 4.37 69.96 4.82 0.00 0.00 169.90 0.87 MW 25.19 3.94 1.21 1.86 20.93 1.29 0.00 0.00 40.81 23.00 104. 82 132kV K.Lakhpat.Old GWh 201.21 29.15 5.39 8.42 44.71 17.91 0.00 0.00 306.78 0.89 MW 71.78 11.09 2.05 3.59 15.55 4.77 0.00 0.00 81.62 42.00 105. 2044 132kV Kala Khatai GWh 31.39 4.42 0.00 2.93 20.32 4.75 0.00 0.00 63.82 0.86 MW 12.41 1.79 0.00 1.25 11.08 1.27 0.00 0.00 20.85 12.00 106. 84 220kV Kala Shah Kaku GWh 45.09 12.01 0.07 3.07 141.32 19.52 0.00 0.00 221.07 0.88 MW 16.30 4.34 0.02 1.24 27.28 4.94 0.00 0.00 46.01 25.00 107. 1026 132kV Kamran Steel GWh 0.00 0.00 0.00 0.00 19.15 0.00 0.00 0.00 19.15 0.90 MW 0.00 0.00 0.00 0.00 6.92 0.00 0.00 0.00 6.92 3.00 108. 303 66kV Kanganpur GWh 13.47 8.84 0.00 2.49 0.84 29.37 0.00 0.00 55.01 0.82 MW 5.85 4.79 0.00 1.01 2.36 7.43 0.00 0.00 18.22 13.00 109. 1087 132kV Karol GWh 18.57 2.20 3.15 6.23 109.40 11.80 0.00 0.00 151.35 0.88 MW 6.07 0.84 1.20 2.65 47.11 3.14 0.00 0.00 45.76 25.00 110. 2055 132kV Kashmir Colony GWh 27.55 1.18 0.00 0.39 0.00 0.26 0.00 0.00 29.39 0.90 MW 8.99 0.45 0.00 0.17 0.00 0.07 0.00 0.00 7.25 4.00 111. 99 132kV Kasur GWh 103.89 12.17 0.50 6.57 29.73 22.86 0.00 0.00 175.73 0.85 MW 45.07 5.28 0.18 2.66 17.17 11.57 0.00 0.00 61.51 38.00 112. 1019 132kV Kasur New GWh 123.80 10.14 0.53 32.68 20.69 28.51 0.00 0.00 216.36 0.84 MW 56.53 5.79 0.20 13.93 5.41 7.59 0.00 0.00 67.09 43.00 113. 1015 132kV Kasur-II GWh 4.89 0.25 0.00 0.25 10.59 1.03 0.00 0.00 17.01 0.88 MW 2.23 0.11 0.00 0.10 7.29 0.55 0.00 0.00 8.74 5.00 114. 972 132kV Khana Nau GWh 72.38 4.69 0.01 4.39 41.27 0.72 0.00 0.00 123.46 0.86 MW 33.05 2.68 0.00 1.87 24.48 0.19 0.00 0.00 46.71 28.00 115. 647 132kV Khanqa Dogran GWh 29.96 3.13 0.00 1.76 6.16 39.69 0.00 0.00 80.71 0.83 MW 12.90 1.66 0.00 0.71 4.46 10.04 0.00 0.00 25.31 17.00 116. 2046 132kV Khay. Amin GWh 56.36 0.90 0.00 0.00 0.00 0.50 0.00 0.00 57.76 0.90 MW 18.38 0.34 0.00 0.00 0.00 0.13 0.00 0.00 14.14 7.00 117. 1093 132kV Khokkar Road GWh 25.70 2.49 0.10 10.64 74.76 2.06 0.00 0.00 115.75 0.88 MW 8.80 0.95 0.04 4.54 23.13 0.55 0.00 0.00 28.50 15.00 118. 310 132kV Khuddian GWh 77.69 3.82 0.00 5.82 7.20 79.26 0.00 0.00 173.79 0.83 MW 33.70 2.07 0.00 2.36 9.61 40.11 0.00 0.00 72.09 48.00 119. 850 132kV Kot Radha Kis GWh 137.91 11.15 0.00 8.21 13.38 7.79 0.00 0.00 178.44 0.89 MW 59.82 6.05 0.00 3.32 4.91 1.97 0.00 0.00 62.81 32.00 120. 984 132kV LDA Ave-I GWh 118.51 2.80 0.00 0.00 0.00 1.46 0.00 0.00 122.77 0.90 MW 38.65 1.07 0.00 0.00 0.00 0.39 0.00 0.00 30.08 15.00 121. 121 132kV LEFO GWh 116.36 31.93 3.20 6.63 77.97 6.67 0.00 0.00 242.76 0.86 MW 42.06 11.54 1.16 2.68 35.23 1.69 0.00 0.00 70.83 42.00 122. 2067 132kV LHR SKP Road GWh 15.27 2.85 0.00 3.15 51.29 3.06 0.00 0.00 75.62 0.88 MW 6.97 1.63 0.00 1.34 17.96 0.82 0.00 0.00 21.54 12.00 123. 994 132kV LUMS GWh 0.00 28.35 0.00 0.00 0.00 0.00 0.00 0.00 28.35 0.90 MW 0.00 12.95 0.00 0.00 0.00 0.00 0.00 0.00 12.95 6.00 124. 949 132kV Lahore Cantt GWh 122.93 24.33 0.64 2.72 6.85 0.76 0.00 0.00 158.23 0.90 MW 46.78 11.11 0.24 1.16 5.84 0.20 0.00 0.00 49.00 24.00 125. 2047 132kV Lake City GWh 43.72 4.56 0.00 0.00 0.00 0.60 0.00 0.00 48.88 0.90 MW 14.26 1.73 0.00 0.00 0.00 0.16 0.00 0.00 12.12 6.00 49 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO Y EAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------126. 314 132kV Lalyani GWh 44.72 5.58 0.00 6.55 99.59 6.18 0.00 0.00 162.62 0.88 MW 16.17 2.42 0.00 2.65 24.53 1.56 0.00 0.00 39.42 21.00 127. 954 132kV M.A.Abad GWh 35.16 10.12 0.00 4.24 1.14 37.76 0.00 0.00 88.42 0.83 MW 16.06 5.78 0.00 1.81 1.36 12.28 0.00 0.00 31.68 21.00 128. 953 132kV M.Usmanwala GWh 34.76 1.32 0.00 2.63 1.20 59.56 0.00 0.00 99.46 0.82 MW 15.87 0.75 0.00 1.12 1.83 28.98 0.00 0.00 41.27 29.00 129. 1027 132kV Machikay GWh 88.93 10.58 0.24 3.56 15.97 11.02 0.00 0.00 130.29 0.89 MW 34.99 6.04 0.09 1.52 4.17 2.93 0.00 0.00 42.27 22.00 130. 1073 132kV Makhdoom/Doula GWh 12.47 1.53 0.03 0.43 3.56 13.51 0.00 0.00 31.54 0.83 MW 4.75 0.70 0.01 0.18 1.69 5.40 0.00 0.00 10.82 7.00 131. 951 132kV Malik Paper & GWh 0.00 0.00 0.00 0.00 33.70 0.00 0.00 0.00 33.70 0.90 MW 0.00 0.00 0.00 0.00 7.20 0.00 0.00 0.00 7.20 3.00 132. 320 66kV Malikpur GWh 93.59 12.97 0.00 21.83 5.61 12.49 0.00 0.00 146.50 0.84 MW 42.74 7.40 0.00 9.30 10.06 3.33 0.00 0.00 61.91 40.00 133. 411 132kV Manga Mandi GWh 70.59 7.84 0.12 1.97 238.63 6.46 0.00 0.00 325.61 0.89 MW 26.86 3.58 0.04 0.84 49.26 1.72 0.00 0.00 69.96 36.00 134. 2056 132kV Manga-II GWh 2.74 0.28 0.00 0.19 146.91 1.75 0.00 0.00 151.87 0.90 MW 1.21 0.15 0.00 0.08 37.92 0.47 0.00 0.00 33.86 16.00 135. 1042 132kV Master Textil GWh 0.00 0.00 0.00 0.00 49.18 0.00 0.00 0.00 49.18 0.90 MW 0.00 0.00 0.00 0.00 9.12 0.00 0.00 0.00 9.12 4.00 136. 583 132kV Mcleod Road GWh 61.85 50.89 2.42 9.46 5.78 1.68 0.00 0.00 132.09 0.89 MW 28.24 23.24 0.92 4.03 4.94 0.45 0.00 0.00 46.37 24.00 137. 2052 132kV Mehmood Steel GWh 0.00 0.00 0.00 0.00 16.56 0.00 0.00 0.00 16.56 0.90 MW 0.00 0.00 0.00 0.00 6.30 0.00 0.00 0.00 6.30 3.00 138. 2042 132kV Mobile GWh 17.13 2.19 0.00 0.01 11.24 0.01 0.00 0.00 30.58 0.87 MW 7.82 1.25 0.00 0.01 5.23 0.00 0.00 0.00 14.31 8.00 139. 710 132kV Mochi Gate GWh 68.73 29.63 2.74 11.61 5.25 8.85 0.00 0.00 126.80 0.88 MW 31.39 16.91 1.04 4.95 3.55 2.36 0.00 0.00 45.15 24.00 140. 504 132kV Model Town GWh 155.58 47.66 5.37 2.06 6.48 15.45 0.00 0.00 232.59 0.89 MW 71.04 21.76 2.04 0.88 3.53 4.11 0.00 0.00 77.53 40.00 141. 2050 132kV Model Town Soci GWh 66.62 13.34 2.34 0.00 0.00 11.37 0.00 0.00 93.67 0.89 MW 30.42 6.09 0.89 0.00 0.00 3.03 0.00 0.00 30.32 16.00 142. 330 66kV Mohlan GWh 31.49 1.01 0.00 0.56 0.34 3.13 0.00 0.00 36.53 0.89 MW 14.38 0.58 0.00 0.24 0.66 0.83 0.00 0.00 14.19 7.00 143. 1040 132kV Momanpura G.T GWh 58.84 6.42 2.69 9.29 69.79 5.48 0.00 0.00 152.50 0.87 MW 21.53 2.57 1.02 3.96 27.39 1.46 0.00 0.00 43.45 25.00 144. 2072 132kV Mughal Alloya GWh 0.00 0.00 0.00 0.00 35.57 0.00 0.00 0.00 35.57 0.90 MW 0.00 0.00 0.00 0.00 14.04 0.00 0.00 0.00 14.04 7.00 145. 1014 132kV Mughal Steel GWh 0.00 0.00 0.00 0.00 47.07 0.00 0.00 0.00 47.07 0.90 MW 0.00 0.00 0.00 0.00 19.41 0.00 0.00 0.00 19.41 9.00 146. 679 132kV Muhammad Bukh GWh 0.00 0.00 0.00 0.00 16.78 0.00 0.00 0.00 16.78 0.90 MW 0.00 0.00 0.00 0.00 2.36 0.00 0.00 0.00 2.36 1.00 147. 1003 132kV Muridke GWh 69.22 9.59 0.04 6.11 61.19 8.07 0.00 0.00 154.23 0.87 MW 22.29 3.47 0.02 2.47 11.33 2.04 0.00 0.00 32.26 18.00 148. 1037 132kV Mustafabad GWh 67.03 8.03 1.44 1.74 1.09 3.09 0.00 0.00 82.42 0.89 MW 24.93 3.67 0.55 0.74 0.48 0.82 0.00 0.00 23.39 12.00 149. 2024 132kV Nain Sukh GWh 26.48 4.32 0.12 4.09 18.24 4.79 0.00 0.00 58.03 0.86 MW 8.64 1.64 0.04 1.74 7.51 1.28 0.00 0.00 15.64 9.00 150. 520 132kV Nankana GWh 154.90 15.27 0.07 17.76 12.61 29.01 0.00 0.00 229.63 0.84 MW 67.10 8.24 0.03 7.19 10.97 7.34 0.00 0.00 80.56 52.00 50 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------151. 336 132kV Narang Mandi GWh 64.58 4.81 0.02 2.87 7.10 9.11 0.00 0.00 88.50 0.89 MW 46.69 2.61 0.01 1.16 6.43 4.61 0.00 0.00 51.14 26.00 152. 2074 132kV Naveena Export GWh 0.00 0.00 0.00 0.00 34.43 0.00 0.00 0.00 34.43 0.90 MW 0.00 0.00 0.00 0.00 7.81 0.00 0.00 0.00 7.81 4.00 153. 866 132kV New Airport GWh 0.00 22.92 0.00 0.00 0.00 0.00 0.00 0.00 22.92 0.90 MW 0.00 8.72 0.00 0.00 0.00 0.00 0.00 0.00 8.72 4.00 154. 995 132kV New Smr St.2 Lh GWh 0.00 0.00 0.00 0.00 24.24 0.00 0.00 0.00 24.24 0.90 MW 0.00 0.00 0.00 0.00 9.65 0.00 0.00 0.00 9.65 5.00 155. 996 132kV New Smr St.3 Sk GWh 0.00 0.00 0.00 0.00 15.90 0.00 0.00 0.00 15.90 0.90 MW 0.00 0.00 0.00 0.00 10.76 0.00 0.00 0.00 10.76 5.00 156. 989 132kV Niazi Chowk GWh 41.24 8.71 0.83 28.54 71.71 4.23 0.00 0.00 155.25 0.86 MW 14.71 3.78 0.32 12.16 17.48 1.13 0.00 0.00 37.18 22.00 157. 2007 132kV Nisar Spinning GWh 0.00 0.00 0.00 0.00 14.62 0.00 0.00 0.00 14.62 0.90 MW 0.00 0.00 0.00 0.00 6.25 0.00 0.00 0.00 6.25 3.00 158. 2085 132kV Nishat Chunian GWh 0.02 0.00 0.00 0.00 67.01 0.00 0.00 0.00 67.03 0.90 MW 0.01 0.00 0.00 0.00 16.28 0.00 0.00 0.00 16.29 8.00 159. 2080 132kV Nishat Mills SK GWh 0.00 0.00 0.00 0.01 38.71 0.00 0.00 0.00 38.72 0.90 MW 0.00 0.00 0.00 0.00 10.73 0.00 0.00 0.00 10.74 5.00 160. 2008 11kV Nishat Power GWh 0.00 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.04 0.90 MW 0.00 0.00 0.00 0.00 0.06 0.00 0.00 0.00 0.06 0.00 161. 2054 132kV OPF Lahore GWh 41.80 1.78 0.00 0.60 0.00 0.27 0.00 0.00 44.45 0.90 MW 13.63 0.68 0.00 0.25 0.00 0.07 0.00 0.00 10.98 5.00 162. 338 132kV Okara Cantt GWh 54.60 1.83 0.03 0.41 4.72 4.38 0.00 0.00 65.97 0.89 MW 20.77 0.83 0.01 0.17 2.68 1.17 0.00 0.00 19.23 10.00 163. 152 132kV Okara City-I GWh 117.40 21.46 0.15 11.27 46.68 32.34 0.00 0.00 229.30 0.85 MW 45.47 9.31 0.06 4.56 23.02 8.18 0.00 0.00 70.40 44.00 164. 849 132kV Okara City-II GWh 153.03 20.51 0.36 6.71 41.79 10.49 0.00 0.00 232.89 0.86 MW 69.88 11.70 0.14 2.86 13.83 2.79 0.00 0.00 75.90 45.00 165. 1002 132kV Okara FSD Rd GWh 54.45 8.66 0.02 2.52 17.46 14.13 0.00 0.00 97.23 0.85 MW 26.04 5.04 0.01 1.07 6.77 4.42 0.00 0.00 33.49 21.00 166. 153 132kV P.W.R GWh 80.79 26.30 1.26 2.44 54.24 5.26 0.00 0.00 170.29 0.86 MW 30.74 12.01 0.48 1.04 15.48 1.40 0.00 0.00 45.86 27.00 167. 2088 132kV PAEC Mraka GWh 36.34 1.07 0.77 0.29 0.00 0.38 0.00 0.00 38.86 0.90 MW 11.85 0.41 0.29 0.12 0.00 0.10 0.00 0.00 9.58 5.00 168. 654 132kV Packages GWh 0.00 0.00 0.00 0.00 11.13 0.00 0.00 0.00 11.13 0.90 MW 0.00 0.00 0.00 0.00 5.42 0.00 0.00 0.00 5.42 3.00 169. 946 132kV Packages Kasur GWh 0.01 0.00 0.00 0.00 182.10 0.00 0.00 0.00 182.11 0.90 MW 0.00 0.00 0.00 0.00 37.20 0.00 0.00 0.00 37.20 18.00 170. 2053 132kV Pak Arab GWh 22.30 1.28 1.44 0.95 3.05 2.36 0.00 0.00 31.38 0.89 MW 8.04 0.49 0.55 0.40 1.27 0.63 0.00 0.00 8.54 4.00 171. 2017 132kV Panwan GWh 36.82 1.88 0.00 1.29 1.99 8.81 0.00 0.00 50.78 0.88 MW 16.81 1.07 0.00 0.55 0.87 2.35 0.00 0.00 18.40 10.00 172. 1082 132kV Park View GWh 133.87 17.51 2.85 1.81 1.11 3.40 0.00 0.00 160.56 0.90 MW 51.80 8.00 1.08 0.77 0.95 0.91 0.00 0.00 47.63 23.00 173. 158 132kV Pattoki GWh 102.76 11.09 0.68 6.00 25.20 36.88 0.00 0.00 182.62 0.85 MW 34.86 4.31 0.24 2.43 3.64 9.33 0.00 0.00 43.23 27.00 174. 2036 132kV Press Club GWh 106.23 10.97 5.84 8.03 6.36 21.07 0.00 0.00 158.50 0.88 MW 37.90 4.86 2.22 3.42 3.90 5.61 0.00 0.00 43.44 23.00 175. 993 132kV Punjab Assembly GWh 24.47 52.60 1.13 2.04 7.71 0.53 0.00 0.00 88.48 0.90 MW 9.49 24.02 0.43 0.87 4.32 0.14 0.00 0.00 29.45 14.00 51 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------176. 1043 132kV Punjab Uni GWh 106.37 37.78 4.98 1.83 7.18 9.39 0.00 0.00 167.52 0.89 MW 43.71 17.81 1.89 0.78 5.31 2.50 0.00 0.00 54.01 28.00 177. 991 132kV Punjab Univ Tow GWh 52.58 11.65 0.17 4.05 12.83 1.22 0.00 0.00 82.51 0.89 MW 18.76 4.43 0.06 1.73 6.61 0.32 0.00 0.00 23.94 12.00 178. 168 132kV Qadirabad GWh 7.41 1.33 0.00 0.28 11.96 0.65 0.00 0.00 21.63 0.88 MW 3.38 0.76 0.00 0.12 2.62 0.17 0.00 0.00 6.00 3.00 179. 167 132kV Qartaba GWh 118.89 38.75 8.36 4.82 3.57 11.99 0.00 0.00 186.39 0.89 MW 52.20 17.69 3.18 2.05 3.88 3.19 0.00 0.00 61.65 32.00 180. 1080 132kV Qila Sattar Sha GWh 11.62 1.14 0.00 1.16 35.16 4.65 0.00 0.00 53.74 0.88 MW 4.42 0.43 0.00 0.50 9.12 1.24 0.00 0.00 13.35 7.00 181. 2062 132kV Quetta Textile GWh 0.06 0.04 0.00 0.00 90.18 0.11 0.00 0.00 90.38 0.90 MW 0.02 0.02 0.00 0.00 12.39 0.03 0.00 0.00 12.46 6.00 182. 1090 132kV Rachna Town GWh 86.45 12.28 0.65 10.27 35.97 8.54 0.00 0.00 154.16 0.86 MW 34.14 5.63 0.25 4.38 16.91 2.27 0.00 0.00 47.69 28.00 183. 353 132kV Raiiwind GWh 88.80 8.88 0.30 4.21 104.01 9.29 0.00 0.00 215.49 0.87 MW 33.79 4.06 0.11 1.79 28.78 2.47 0.00 0.00 53.26 30.00 184. 1059 132kV Raiwind New GWh 0.00 0.00 0.00 0.00 152.50 0.00 0.00 0.00 152.50 0.90 MW 0.00 0.00 0.00 0.00 29.62 0.00 0.00 0.00 25.18 12.00 185. 956 132kV Raiwind-III/jti GWh 37.38 2.02 0.10 2.24 128.71 6.49 0.00 0.00 176.94 0.88 MW 14.22 0.92 0.04 0.95 41.64 1.73 0.00 0.00 50.58 27.00 186. 173 220kV Ravi GWh 52.64 12.50 4.66 9.67 34.71 10.59 0.00 0.00 124.77 0.86 MW 18.78 4.76 1.78 4.12 7.14 2.82 0.00 0.00 29.55 18.00 187. 175 132kV Rehman Park GWh 59.83 61.98 4.50 2.03 35.52 4.94 0.00 0.00 168.80 0.86 MW 22.76 28.30 1.71 0.87 10.29 1.32 0.00 0.00 48.94 29.00 188. 2071 132kV Rehman Steel GWh 0.01 0.00 0.00 0.00 14.24 0.00 0.00 0.00 14.24 0.90 MW 0.00 0.00 0.00 0.00 6.34 0.00 0.00 0.00 6.34 3.00 189. 929 132kV Rehmat Nazir GWh 0.00 0.00 0.00 0.00 0.48 0.00 0.00 0.00 0.49 0.90 MW 0.00 0.00 0.00 0.00 0.49 0.00 0.00 0.00 0.49 0.00 190. 2079 132kV Reliance Cotton GWh 0.00 0.00 0.00 0.00 25.19 0.00 0.00 0.00 25.19 0.90 MW 0.00 0.00 0.00 0.00 6.36 0.00 0.00 0.00 6.36 3.00 191. 176 132kV Renala Khurd GWh 86.02 7.60 0.17 6.97 15.52 14.85 0.00 0.00 131.13 0.85 MW 31.10 3.30 0.06 2.82 2.83 2.82 0.00 0.00 33.93 21.00 192. 659 11kV Renala P/H GWh 3.31 0.06 0.00 0.00 0.40 0.05 0.00 0.00 3.83 0.90 MW 1.51 0.04 0.00 0.00 0.38 0.01 0.00 0.00 1.65 1.00 193. 357 132kV Rewaz Garden GWh 149.67 32.63 6.60 5.44 4.01 10.42 0.00 0.00 208.76 0.89 MW 56.95 14.90 2.51 2.32 2.57 2.77 0.00 0.00 61.52 32.00 194. 2005 132kV Riaz Textile GWh 0.00 0.00 0.00 0.00 26.24 0.00 0.00 0.00 26.24 0.90 MW 0.00 0.00 0.00 0.00 6.89 0.00 0.00 0.00 6.89 3.00 195. 2020 132kV Roya Golf Club GWh 0.00 36.79 0.00 0.00 0.00 0.00 0.00 0.00 36.79 0.90 MW 0.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 7.00 196. 412 132kV Rustam GWh 90.94 12.10 0.12 20.05 123.94 3.21 0.00 0.00 250.35 0.87 MW 29.66 4.60 0.04 8.55 51.02 0.85 0.00 0.00 71.04 40.00 197. 902 132kV SKP-Industrial GWh 62.33 3.33 0.08 2.13 10.93 2.33 0.00 0.00 81.12 0.89 MW 35.57 2.54 0.03 0.91 7.27 1.24 0.00 0.00 35.66 18.00 198. 950 132kV Sabzazar GWh 129.40 11.61 3.54 4.37 8.37 5.19 0.00 0.00 162.48 0.89 MW 59.09 6.62 1.35 1.86 6.06 1.38 0.00 0.00 57.27 29.00 199. 540 132kV Sadar Gogera GWh 64.78 4.01 0.00 2.16 2.27 29.13 0.00 0.00 102.36 0.84 MW 35.13 2.90 0.00 0.87 1.75 11.06 0.00 0.00 43.95 28.00 200. 973 132kV Safdarabad GWh 28.54 2.05 0.00 1.17 0.63 7.98 0.00 0.00 40.38 0.88 MW 13.03 1.17 0.00 0.50 0.48 2.12 0.00 0.00 13.87 7.00 52 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations (Continued…) P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------201. 969 132kV Saggian GWh 87.02 17.10 4.62 36.51 51.66 9.59 0.00 0.00 206.49 0.85 MW 32.35 7.81 1.76 15.56 27.80 2.56 0.00 0.00 65.87 41.00 202. 184 132kV Saidpur GWh 171.35 27.43 4.96 6.37 9.16 10.31 0.00 0.00 229.58 0.89 MW 69.86 12.52 1.89 2.71 4.96 2.75 0.00 0.00 71.02 36.00 203. 1060 132kV Sanda GWh 53.59 11.04 2.23 9.86 2.46 13.81 0.00 0.00 92.99 0.84 MW 20.39 5.04 0.85 4.20 1.74 3.68 0.00 0.00 26.93 17.00 204. 362 66kV Sangla Hill GWh 73.16 5.96 0.09 3.15 3.01 4.81 0.00 0.00 90.19 0.89 MW 31.74 3.23 0.03 1.28 2.72 1.22 0.00 0.00 31.70 16.00 205. 2004 132kV Sapphire -3 GWh 0.00 0.00 0.00 0.00 19.92 0.00 0.00 0.00 19.92 0.90 MW 0.00 0.00 0.00 0.00 5.88 0.00 0.00 0.00 5.88 3.00 206. 2016 132kV Sapphire -5 GWh 0.00 0.00 0.00 0.00 46.46 0.00 0.00 0.00 46.46 0.90 MW 0.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 15.00 7.00 207. 2077 132kV Sapphire F (1, GWh 0.00 0.00 0.00 0.00 26.32 0.00 0.00 0.00 26.32 0.90 MW 0.00 0.00 0.00 0.00 6.33 0.00 0.00 0.00 6.33 3.00 208. 1028 132kV Sapphire Finish GWh 0.12 0.00 0.00 0.00 13.82 0.00 0.00 0.00 13.94 0.90 MW 0.04 0.00 0.00 0.00 6.36 0.00 0.00 0.00 6.40 3.00 209. 737 220kV Sarfraz Nagar GWh 18.53 0.86 0.00 1.81 74.65 0.00 0.00 0.00 95.85 0.89 MW 6.70 0.31 0.00 0.73 19.20 0.00 0.00 0.00 22.90 12.00 210. 191 132kV Shadman GWh 86.14 43.62 5.40 4.41 2.97 9.87 0.00 0.00 152.40 0.89 MW 39.33 19.92 2.05 1.88 1.16 2.63 0.00 0.00 50.23 26.00 211. 369 132kV Shahdara New GWh 120.39 12.39 3.87 22.27 70.71 9.89 0.00 0.00 239.52 0.86 MW 42.95 4.71 1.47 9.49 35.70 2.63 0.00 0.00 72.72 43.00 212. 505 132kV Shahdara Scarp GWh 8.79 0.16 0.00 0.24 23.10 0.90 0.00 0.00 33.19 0.88 MW 5.01 0.12 0.00 0.10 13.58 0.24 0.00 0.00 14.30 8.00 213. 193 132kV Shahkot GWh 92.39 7.63 0.00 5.42 110.24 4.11 0.00 0.00 219.80 0.87 MW 40.08 4.14 0.00 2.20 41.96 1.04 0.00 0.00 72.94 41.00 214. 1010 132kV Shalamar Steel GWh 0.00 0.00 0.00 0.00 16.72 0.00 0.00 0.00 16.72 0.90 MW 0.00 0.00 0.00 0.00 6.97 0.00 0.00 0.00 6.97 3.00 215. 194 132kV Shalamar-I GWh 67.25 8.58 8.16 15.99 143.51 7.81 0.00 0.00 251.30 0.87 MW 21.93 3.26 3.11 6.81 53.70 2.08 0.00 0.00 68.17 39.00 216. 893 132kV Shalamar-II GWh 80.30 8.58 7.84 10.53 57.99 8.47 0.00 0.00 173.72 0.86 MW 30.55 3.92 2.98 4.49 16.97 2.26 0.00 0.00 45.88 27.00 217. 508 132kV Shamky GWh 24.82 4.33 0.00 1.47 233.02 1.32 0.00 0.00 264.95 0.89 MW 10.67 2.31 0.00 0.59 92.27 0.33 0.00 0.00 79.69 41.00 218. 372 132kV Sharqpur GWh 53.62 5.31 0.12 3.33 57.29 17.98 0.00 0.00 137.66 0.86 MW 23.16 2.84 0.04 1.35 23.37 4.55 0.00 0.00 45.37 27.00 219. 897 132kV Sharqpur Rd. GWh 31.47 6.21 0.00 2.94 77.33 5.13 0.00 0.00 123.08 0.88 MW 14.37 2.84 0.00 1.25 14.33 1.37 0.00 0.00 29.03 16.00 220. 971 132kV Sheranwala GWh 27.13 29.56 2.17 1.49 18.78 2.10 0.00 0.00 81.23 0.86 MW 10.32 13.50 0.83 0.63 7.63 0.56 0.00 0.00 25.10 15.00 221. 988 132kV Shergarh GWh 21.82 2.39 0.00 1.91 6.40 8.05 0.00 0.00 40.58 0.85 MW 8.98 1.17 0.00 0.81 4.01 3.09 0.00 0.00 15.36 10.00 222. 2065 132kV Shoaib Steel GWh 0.00 0.00 0.00 0.01 25.45 0.00 0.00 0.00 25.46 0.90 MW 0.00 0.00 0.00 0.00 9.07 0.00 0.00 0.00 9.07 4.00 223. 197 132kV Skp. City GWh 109.99 14.53 0.24 3.43 193.90 13.63 0.00 0.00 335.72 0.88 MW 39.76 7.84 0.09 1.39 46.50 3.45 0.00 0.00 74.33 40.00 224. 2060 132kV Spring Medows GWh 71.38 1.02 0.00 0.00 0.00 1.07 0.00 0.00 73.47 0.90 MW 23.28 0.39 0.00 0.00 0.00 0.29 0.00 0.00 17.97 9.00 225. 2043 132kV State Life (Any GWh 93.86 13.22 3.38 3.86 10.24 7.03 0.00 0.00 131.59 0.89 MW 30.61 5.03 1.29 1.65 3.49 1.87 0.00 0.00 32.95 17.00 53 LESCO Table 1- 18: Category-wise Maximum Demand (MW) of Substations P O W E R M A R K E T S U R V E Y CATEGORY-WISE GRIDSTATION LOAD FOR DISCO DISCO: LESCO YEAR :2022-23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------|SR GRID NAME OF | | | PUBLIC | SMALL | M & L | TUBE WELLS | | TOTAL OF | POWER FACTOR(%) | |No.NUMBER GRID STATION | DOMESTIC | COMMERCIAL | LIGHTING | INDUSTRIES | INDUSTRIES | PRIVATE | PUBLIC | TRACTION | GRIDSTATION | REACT-POWER(Mvar)| ------------------------------------------------------------------------------------------------------------------------------------------------------------------226. 2087 132kV Style Textile GWh 0.00 0.00 0.00 0.00 32.46 0.00 0.00 0.00 32.46 0.90 MW 0.00 0.00 0.00 0.00 5.70 0.00 0.00 0.00 5.70 3.00 227. 2048 132kV Sui Gas GWh 43.50 6.29 2.34 0.00 0.00 11.37 0.00 0.00 63.50 0.88 MW 19.86 2.87 0.89 0.00 0.00 3.03 0.00 0.00 19.99 11.00 228. 2045 132kV Sukh Chain GWh 73.96 7.85 2.34 0.00 5.86 0.60 0.00 0.00 90.60 0.90 MW 28.14 3.58 0.89 0.00 13.01 0.16 0.00 0.00 34.34 17.00 229. 380 132kV Sukheki GWh 0.47 0.00 0.00 0.04 0.00 0.82 0.00 0.00 1.33 0.82 MW 0.21 0.00 0.00 0.02 0.00 0.22 0.00 0.00 0.38 0.00 230. 2018 132kV Sunder Manga GWh 25.67 3.76 0.09 1.79 50.07 7.24 0.00 0.00 88.61 0.87 MW 9.77 1.57 0.03 0.76 13.24 1.93 0.00 0.00 21.64 12.00 231. 965 132kV Sunder( Ind. St GWh 0.00 0.00 0.00 0.00 255.45 0.00 0.00 0.00 255.45 0.90 MW 0.00 0.00 0.00 0.00 69.72 0.00 0.00 0.00 69.72 34.00 232. 206 132kV Sunny View GWh 61.83 41.87 5.63 2.26 5.59 3.57 0.00 0.00 120.75 0.89 MW 22.06 19.12 2.14 0.96 1.51 0.95 0.00 0.00 35.05 18.00 233. 2078 132kV Tariq Glass GWh 0.00 0.00 0.00 0.00 37.99 0.00 0.00 0.00 37.99 0.90 MW 0.00 0.00 0.00 0.00 8.53 0.00 0.00 0.00 8.53 4.00 234. 1084 132kV Thokkar GWh 46.35 13.31 2.91 5.35 37.11 3.68 0.00 0.00 108.71 0.86 MW 18.63 6.91 1.11 2.28 18.88 0.98 0.00 0.00 36.59 22.00 235. 428 132kV Town Ship GWh 162.68 45.37 8.12 6.46 94.14 19.02 0.00 0.00 335.78 0.86 MW 61.90 20.72 3.09 2.75 31.03 5.07 0.00 0.00 93.42 55.00 236. 399 66kV UIS GWh 0.01 0.00 0.00 0.00 85.96 0.00 0.00 0.00 85.96 0.90 MW 0.00 0.00 0.00 0.00 17.12 0.00 0.00 0.00 14.55 7.00 237. 2070 132kV Uni Lever GWh 0.00 0.00 0.00 0.00 30.96 0.00 0.00 0.00 30.96 0.90 MW 0.00 0.00 0.00 0.00 5.89 0.00 0.00 0.00 5.89 3.00 238. 963 132kV Valancia GWh 80.09 16.49 2.59 0.04 0.74 11.37 0.00 0.00 111.32 0.89 MW 28.57 6.27 0.99 0.02 0.38 3.03 0.00 0.00 29.44 15.00 239. 826 132kV Valgon Sohial GWh 58.70 7.65 0.10 4.30 145.80 9.40 0.00 0.00 225.94 0.88 MW 25.47 4.15 0.03 1.74 28.95 2.38 0.00 0.00 52.35 28.00 240. 221 132kV W.Radha Ram GWh 65.69 5.74 0.00 2.09 107.43 21.40 0.00 0.00 202.35 0.87 MW 23.75 3.11 0.00 0.84 13.47 5.42 0.00 0.00 39.61 22.00 241. 959 132kV Walton Road GWh 130.52 21.67 3.42 3.46 10.18 12.06 0.00 0.00 181.32 0.89 MW 49.25 10.30 1.30 1.47 3.39 3.21 0.00 0.00 51.70 26.00 242. 503 220kV Wapda Town GWh 178.44 24.27 3.28 4.36 65.08 11.58 0.00 0.00 287.02 0.86 MW 63.66 9.23 1.25 1.86 31.59 3.09 0.00 0.00 83.01 49.00 243. 401 132kV Warburton GWh 76.01 7.87 0.00 3.44 264.07 25.21 0.00 0.00 376.61 0.88 MW 28.92 3.60 0.00 1.47 47.65 6.72 0.00 0.00 75.10 41.00 244. 970 132kV Wassanpura GWh 37.91 5.04 -0.17 4.92 10.33 5.19 0.00 0.00 63.22 0.85 MW 14.36 2.28 -0.06 2.10 3.84 1.38 0.00 0.00 17.92 11.00 245. 781 132kV Willongton Mall GWh 146.19 29.43 1.98 1.16 10.16 0.57 0.00 0.00 189.49 0.90 MW 59.60 16.80 0.75 0.49 3.24 0.15 0.00 0.00 60.78 29.00 246. 1012 132kV Yaqoob Steel GWh 0.00 0.00 0.00 0.00 35.72 0.00 0.00 0.00 35.72 0.90 MW 0.00 0.00 0.00 0.00 15.89 0.00 0.00 0.00 15.89 8.00 ============================================================================================================================================================== TOTAL OF DISCO : GWh 12752.92 2468.43 277.22 901.36 10715.52 2271.52 0.00 0.00 29386.97 MW 3193.31 729.91 66.78 241.27 2109.16 465.67 0.00 0.00 5370.23 54 LESCO Figure 1- 10: Distribution Network Map 56 LESCO Figure 1- 11: Distribution Network Map (Lahore Ring) 58 LESCO 59 LESCO Disclaimer All data used in this report are provided by LESCO. Planning Power, NTDCL does not own any error responsibility. 60