FUNDING SOURCE: CONGESTION MITIGATION AND AIR QUALITY (CMAQ)
PROJECT LOCATION: WASHINGTON STREET AND RECHE CANYON ROAD
ESTIMATED START/COMPLETION DATE: FEBRUARY 2015 – JUNE 2015
PROJECT DESCRIPTION: THE PROJECT WILL PROVIDE TWO DEDICATED LEFT TURN AND TWO DEDICATED
RIGHT TURN POCKET ALONG RECHE CANYON ROAD AT THE INTERSECTION OF WASHINGTON STREET.
THE SCOPE OF THE PROJECT INCLUDES WIDENING AT RECHE CANYON ROAD WITHIN CITY RIGHT OF
WAY, STORM DRAIN PIPE EXTENSION AND CATCH BASIN RELOCATION, CURB AND GUTTER
CONSTRUCTION, STRIPING, AND TRAFFIC SIGNAL MODIFICATION. SINCE THIS IS A CMAQ (CONGESTION
MITIGATION AND AIR QUALITY) FUNDED, THIS IS A NON-CAPACITY INCREASING PROJECT BUT WILL
PROVIDE A BETTER LEVEL OF SERVICE (LOS) FOR THE INTERSECTION.