batiquitos lagoon double track
Transcription
batiquitos lagoon double track
Transportation BATIQUITOS LAGOON DOUBLE TRACK FACT SHEET Current Budget: $61.4 million Status: The Project The project will add .75 miles of second main railroad track from Avenida Encinas in Carlsbad Engineering/ to La Costa Avenue in Encinitas across the Environmental Review Batiquitos Lagoon. The project also includes Estimated Completion: 2030 replacing a 1930s-era wooden trestle bridge with a modern, double-track concrete rail VISTA OCEANSIDE 78 Buena Vista Lagoon Agua Hedionda Lagoon CARLSBAD Batiquitos Lagoon bridge. As a result of the bridge replacement, lagoon tidal flow will be improved due to a ENCINITAS The primary purpose of this project is to an area for trains to pass. Additionally, the by as many as 50 trains including the NCTD double tracking in this segment directly COASTER, Amtrak Pacific Surfliner, and BNSF supports the objectives of SANDAG, North Railway freight trains. only to accommodate existing train volumes, but also to provide for future passenger and freight demand. The project is also a critical component of the first phase of the North Coast Corridor SANDAGregion @SANDAG SANDAGregion Lomas Santa Fe Dr. The LOSSAN San Diego segment is used daily Luis Obispo (LOSSAN) coastal rail corridor, not Fax (619) 699-1905 sandag.org SOLANA BEACH improve overall lagoon health, and provide reliability of the Los Angeles-San Diego-San (619) 699-1900 San Elijo Lagoon replace the wooden trestle bridge, which will BNSF Railway to increase the efficiency and San Diego, CA 92101 s Blvd. Mar between San Diego and the rest of the nation. Del County Transit District (NCTD), Amtrak, and 401 B Street, Suite 800 Encinita 5 wider channel underneath the bridge. The Need . ort Rd ar Airp Palom This project, combined with others in the corridor, will improve system reliability, facilitate goods movement, help to reduce passenger and truck volumes on I-5, and provide for increased passenger and freight rail services in the future. Over the next 20 years, SANDAG plans to invest approximately $1 billion in (NCC) Program. The first phase includes rail improvements for the San Diego County double tracking projects over the Batiquitos segment of the LOSSAN corridor, including and San Elijo lagoons, extending the carpool a primary effort to double track the corridor lanes on Interstate 5, and environmental from Orange County to Downtown San protection, lagoon restoration, and coastal Diego. To date, more than two-thirds of access improvements. the county’s LOSSAN rail corridor is doubletracked, with more than 20 rail improvement Corridor Strategy projects underway. By 2050, it is anticipated The LOSSAN rail corridor was built more 99 percent of the corridor will be double than 125 years ago and is the second busiest tracked. Other infrastructure improvements intercity passenger rail line in the United include bridge and track replacements, new States. It is the only viable freight rail link platforms, pedestrian undercrossings, and (Continued on reverse) d. hts R Heig The Batiquitos Lagoon lies between Carlsbad and Encinitas other safety and operational enhancements. The rail enhancements are part of an effort to improve all modes of transportation within the congested I-5 North Coast Corridor. Project Budget The estimated cost for the project is $61.4 million. Funding sources include $48.7 million from TransNet, the county’s half-cent sales tax for transportation improvements, and $12.6 million from the Federal Transit Administration (FTA). Project Status The project’s final design and environmental processes are expected to be completed by the end of 2016. For More Information KeepSanDiegoMoving.com/BLDT July 2015 3375