Botlek Studiegroep
Transcription
Botlek Studiegroep
Botlek Studiegroep Gerard van Boven 2012-06-14 Process instrumentation and measurement solutions Maintenance “from the cradle to the grave” 1. KROHNE – brief introduction 2. Design, development 3. Production, calibration 4. Installation, commissioning 5. Operation 6. Maintenance 7. Conclusion Title here 24 max. one line “From the again cradleintoArial the grave” Agenda Maintenance Why is it needed?!? 3 | Botlek Studiegroep | June 14, 2012 1. KROHNE – brief introduction 2. Design, development 3. Production, calibration 4. Installation, commissioning 5. Operation 6. Maintenance 7. Conclusion Title here 24 max. one line “From the again cradleintoArial the grave” Agenda Design, development Well thought of in advance • Materials • Construction • Backwards compatibility = 5 | Botlek Studiegroep | June 14, 2012 2 mc Quality Design, development Materials, construction • Injection moulding • PFA • PP • Stainless steel mesh • Dovetail groove 6 | Botlek Studiegroep | June 14, 2012 Design, development Ceramics • Most reliable & robust material available • Long term stability under toughest conditions • Extremely resistant against corrosion and abrasion • Robust & form stable • Design suitable for easy & quick installation • Leak tight • Absolutely vacuum resistant 7 | Botlek Studiegroep | June 14, 2012 Design, development Ceramics – unique design • Measuring tube with typical conical shape • Improves flow profile • Accurate measurement under tough process conditions 8 | Botlek Studiegroep | June 14, 2012 Design, development *) ceramic = Al2O3 or ZrO2 metal = Platinum CERMET = CERamic + METal* CERMET-electrode production Platinum powder preparation forming rasterscan microscope recording ceramic powder preparation mixing 12 µm insertion sintering ceramic = dark Platinum = light 9 | Botlek Studiegroep | June 14, 2012 Design, development Backwards compatibility • Transmitter mostly weakest link • Electronics fail earlier than mechanics • Adding new- or other functionality • New transmitter on old/other sensor • Mechanical adaptation – if required • Basic functionality guaranteed • Back to 1972 10 | Botlek Studiegroep | June 14, 2012 1. KROHNE – brief introduction 2. Design, development 3. Production, calibration 4. Installation, commissioning 5. Operation 6. Maintenance 7. Conclusion Title here 24 max. one line “From the again cradleintoArial the grave” Agenda Production, calibration Delivery of what has been requested • Production segments • Qualified/certified personnel • Quality control • Wet calibration Performance 12 | Botlek Studiegroep | June 14, 2012 Production, calibration The man behind the machine • Little automation • Short production routing • Small production steps • Check after each step 13 | Botlek Studiegroep | June 14, 2012 Production, calibration Quality control to control quality • ISO 9001 • ISO 14001 • ISO 17025 • ATEX • OIML, MID • RvA 14 | Botlek Studiegroep | June 14, 2012 Production, calibration Initial verification • Wet calibration without exception • Water, air, oil, gas • Standard, customized • RvA • OIML, MID 15 | Botlek Studiegroep | June 14, 2012 Production, calibration Costs of 0,25% Example – 12” gas flowmeter • ID = 303 mm • P = 50 bar • V = 15 m/s • Z = 0,89 (20°C) • costs = € 0,10/Nm3 Measurement area clean: π/4 * ID2 = 0,072 m2 Flow per second: (0.072 * 50 * 15) / 0,89 ≈ 60 Nm3/s ≈ € 6,00/s Per year this is 6 * 60 * 60 * 24* 365 ≈ € 190.000.000,00 0,25% uncertainty is 0,0025 * € 190.000.000,00 ≈ € 475.000,00/year 16 | Botlek Studiegroep | June 14, 2012 1. KROHNE – brief introduction 2. Design, development 3. Production, calibration 4. Installation, commissioning 5. Operation 6. Maintenance 7. Conclusion Title here 24 max. one line “From the again cradleintoArial the grave” Agenda Installation, commissioning Locating best location • Site survey • Technical data sheet • Customized settings off factory • Quick start • Assistance during commissioning Plug & play 18 | Botlek Studiegroep | June 14, 2012 1. KROHNE – brief introduction 2. Design, development 3. Production, calibration 4. Installation, commissioning 5. Operation 6. Maintenance 7. Conclusion Title here 24 max. one line “From the again cradleintoArial the grave” Agenda Operation Measurement including self-diagnostics • Indication by instrument • Reducing maintenance intervals • Better insight in required maintenance • Trend visibility Confidence 20 | Botlek Studiegroep | June 14, 2012 Operation On site indication • Graphical display • Actual measured values, dimensions • Status • Diagnostic information • Multimeter • PACTware 21 | Botlek Studiegroep | June 14, 2012 Diagnostics In general, KROHNE flowmeters are: • field proven • very reliable • maintenance free Improved availability provides certainty even in difficult applications Continuous verification of instrument functionality in application “Pro-active maintenance means cost savings” 22 Diagnostics What? Diagnosis of application • information by various field instruments application Diagnosis of installation • process diagnosis/application check • performed in instrument or external installation Diagnosis of flowmeter • self test performed in instrument flowmeter 23 | Botlek Studiegroep | June 14, 2012 Diagnostics Why? Possible causes of malfunctioning • change of process conditions • cavitation • over-temperature & vacuum • incorrect installation • impropriate materials • abrasion through solids • scaling/fouling • external magnetic fields • defective instrument components • … 24 | Botlek Studiegroep | June 14, 2012 Diagnostics Information available 25 | Botlek Studiegroep | June 14, 2012 Diagnostics KROHNE Care 26 | Botlek Studiegroep | June 14, 2012 1. KROHNE – brief introduction 2. Design, development 3. Production, calibration 4. Installation, commissioning 5. Operation 6. Maintenance 7. Conclusion Title here 24 max. one line “From the again cradleintoArial the grave” Agenda Maintenance Back on the right track • Field verification • Recalibration • Replacement • Mechanical, electronical Reliability 28 | Botlek Studiegroep | June 14, 2012 Maintenance Field verification • (Software) tools • Simulator • Trend visualization 29 | Botlek Studiegroep | June 14, 2012 Maintenance Recalibration • Zero calibration • Dry calibration • Prover • Wet calibration 30 | Botlek Studiegroep | June 14, 2012 Maintenance Replacement Sensor • Complete • Parts Transmitter • Complete • Parts Complete instrument 31 | Botlek Studiegroep | June 14, 2012 1. KROHNE – brief introduction 2. Design, development 3. Production, calibration 4. Installation, commissioning 5. Operation 6. Maintenance 7. Conclusion Title here 24 max. one line “From the again cradleintoArial the grave” Agenda Conclusion Maintaining (initial) requirements Affected by every step in circle of life Peace of mind • user is informed should something be wrong Costs savings on maintenance • reduce periodic maintenance of instrumentation • reduce checking of suspicious flow meters Costs savings on plant operation, avoiding • malfunctioning instruments • unforeseen breakdown of instruments 33 | Botlek Studiegroep | June 14, 2012 Trust Botlek Studiegroep Gerard van Boven 2012-06-14 That’s it… what’s next?!?
Similar documents
DE VALK YACHTBROKERS ALUMINIUM MOTORYACHT (450549)
consumption at 1.400 RPM approx.25 - 30 liter/hour, 4 electric bilge pumps with bilge alarm system, electrical system: 12 V for electronics, 24 V for engines and electronics, 220 V, 24 V battery ba...
More information