Reverse Electro Dialysis from concept to realisation

Transcription

Reverse Electro Dialysis from concept to realisation
REDstack
Update
RED Pilot on the Afsluitdijk, The Netherlands
Stakeholdersbijeenkomst Afsluitdijk, Leeuwarden
30 oktober 2012
Rik Siebers
October 30, 2012
[email protected]
REDstack
Update
RED Pilot on the Afsluitdijk, The Netherlands
INES, Singapore, 2012
Rik Siebers
October 19, 2012
[email protected]
Contents
•
•
•
•
•
•
History
REDstack
Market expectations
Projects
Afsluitdijk project
Questions
3
History (1)
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
• 2005 Foundation REDStack BV
• 2006 - … Fundamental Research
Wetsus
• 2007 – 2010 First tests on surface water
• 2010 Pilot Plan Afsluitdijk
• December 2011 Public Funding
• May 2012 Private Funding
• May 2012 Start Design process
4
History (2)
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
5
REDstack (1)
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
•
•
•
•
Founded in 2005
Office in Sneek
9 employees – 6 FTE
Funding
– Private, shareholders
– Public, subsidies (regional, national and EU)
• Shareholder structure
– W&F Magneto, Production of Special Anodes
– A. Hak, Contractor and Builder for Transportation Solutions
– Alliander, Manage and Design Energy Infrastructures
6
REDstack (2)
Characteristics of RED technology:
• History
• REDstack
• Market
expectations
•
•
•
•
No fossil fuels
No CO2-emmisions
No chimneys or high buildings
Contributes to political targets
• Projects
• Afsluitdijk project
• Questions
Goal of REDstack:
• Development
• Up-scaling
• Commercialization
7
REDstack (3)
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
Markets:
• Surface water; Large flow – low energy density
• Industrial water; Small flow – high energy density
Products sales worldwide:
• Key components
• Licenses
• Process design
8
Market expectations (1)
• History
Maximum practical RED potential worldwide:
• Variation in estimations between 1.4 - 2.6 TW
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
Potential (technical/economical) in Netherlands:
• Estimated 1,5 GW
• Is about 10-15% of total Dutch electricity
consumption
• Questions
9
Market expectations (2)
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
10
Market expectations (3)
Energy consumption worldwide
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
11
Market expectations (4)
Prediction energy consumption
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
http://dx.doi.org/10.1016/j.rser.2010.08.002
12
Projects
REAPower, www.reapower.eu
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
• EU-funded (FP7)
• Consortium of 11 project partners
• RED on brine and seawater
CAPmix, www.capmix.eu
• EU-funded (FP7)
• Consortium of 6 project partners
• Capacitive bases technology
13
Afsluitdijk Project (1)
Project spec’s:
• History
• REDstack
• Market
expectations
• Projects
•
•
•
•
Project partners Fuji, Wetsus and REDstack
Duration 4 years, start 2012
Regional funded
Total budget 7.33 M€
• Afsluitdijk project
• Questions
14
Afsluitdijk Project (2)
Funding:
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Public funding;
o SNN and Province of Fryslân
• Private funding
o FUJIFILM
o REDstack
o Wetsus (in kind)
• Total
3.35 M€
1.00 M€
2.36 M€
0.61 M€
7.33 M€
• Questions
15
Afsluitdijk Project (3)
Planning:
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
•
•
•
•
•
Final Design
Construction
Start-up
Research phase 1
Research phase 2
• Total
4 months
7 months
1 months
21 months
15 months
48 months
• Questions
16
Afsluitdijk Project (4)
Scale:
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
• 220 m3/h Seawater input
• 220 m3/h Freshwater input
• Goal after 4 years 50 kW installed
Research Topics;
•
•
•
•
•
Membrane development
Pretreatment
Stack development
Systems integration
Environmental impact
17
Afsluitdijk Project (5)
Project location
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
18
Afsluitdijk project (6)
Location in more detail
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
19
Afsluitdijk project (7)
Basic process principal, phase 1
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
Pre-treatment
IJsselmeer water
Pre-treatment
Waddenzee water
Buffer
IJsselmeer water
Buffer
Waddenzee water
RED stacks
Effluent buffer
• Questions
20
Afsluitdijk project (8)
Basic process principal, phase 2
• History
• REDstack
• Market
expectations
Pre-treatment
IJsselmeer water
Pre-treatment
Waddenzee water
• Projects
• Afsluitdijk project
RED stacks
Effluent buffer
• Questions
21
Afsluitdijk project (9)
The initial design
• History
8 Stack positions
Prefiltration
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
Buffer tanks
22
Afsluitdijk project (10)
Renewed design – 3d impression
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
23
Afsluitdijk project (11)
Renewed design – 3d impression
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
24
Afsluitdijk project (12)
Renewed design – 3d impression
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
25
Afsluitdijk project (13)
Renewed design – 3d impression
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
26
Afsluitdijk project (14)
Renewed design – 3d impression
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
27
Afsluitdijk project (15)
Environmental impact
• History
• REDstack
• Market
expectations
• Projects
• Afsluitdijk project
• Questions
• Sustainable energy relates to sustainable
environment.
• Environmental impact studies needed.
• Studied in the broader scope of Afsluitdijk;
–
–
–
–
Tidal energy
Wind energy
Solar energy
Blue energy
28
Questions
• Changes in
REDstack
• Funding
Afsluitdijk
• Facts Afsluitdijk
• Time schedule
Afsluitdijk
• Time schedule
REDstack
• Questions
Thank you for your attention,