Reverse Electro Dialysis from concept to realisation
Transcription
Reverse Electro Dialysis from concept to realisation
REDstack Update RED Pilot on the Afsluitdijk, The Netherlands Stakeholdersbijeenkomst Afsluitdijk, Leeuwarden 30 oktober 2012 Rik Siebers October 30, 2012 [email protected] REDstack Update RED Pilot on the Afsluitdijk, The Netherlands INES, Singapore, 2012 Rik Siebers October 19, 2012 [email protected] Contents • • • • • • History REDstack Market expectations Projects Afsluitdijk project Questions 3 History (1) • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions • 2005 Foundation REDStack BV • 2006 - … Fundamental Research Wetsus • 2007 – 2010 First tests on surface water • 2010 Pilot Plan Afsluitdijk • December 2011 Public Funding • May 2012 Private Funding • May 2012 Start Design process 4 History (2) • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 5 REDstack (1) • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions • • • • Founded in 2005 Office in Sneek 9 employees – 6 FTE Funding – Private, shareholders – Public, subsidies (regional, national and EU) • Shareholder structure – W&F Magneto, Production of Special Anodes – A. Hak, Contractor and Builder for Transportation Solutions – Alliander, Manage and Design Energy Infrastructures 6 REDstack (2) Characteristics of RED technology: • History • REDstack • Market expectations • • • • No fossil fuels No CO2-emmisions No chimneys or high buildings Contributes to political targets • Projects • Afsluitdijk project • Questions Goal of REDstack: • Development • Up-scaling • Commercialization 7 REDstack (3) • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions Markets: • Surface water; Large flow – low energy density • Industrial water; Small flow – high energy density Products sales worldwide: • Key components • Licenses • Process design 8 Market expectations (1) • History Maximum practical RED potential worldwide: • Variation in estimations between 1.4 - 2.6 TW • REDstack • Market expectations • Projects • Afsluitdijk project Potential (technical/economical) in Netherlands: • Estimated 1,5 GW • Is about 10-15% of total Dutch electricity consumption • Questions 9 Market expectations (2) • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 10 Market expectations (3) Energy consumption worldwide • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 11 Market expectations (4) Prediction energy consumption • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions http://dx.doi.org/10.1016/j.rser.2010.08.002 12 Projects REAPower, www.reapower.eu • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions • EU-funded (FP7) • Consortium of 11 project partners • RED on brine and seawater CAPmix, www.capmix.eu • EU-funded (FP7) • Consortium of 6 project partners • Capacitive bases technology 13 Afsluitdijk Project (1) Project spec’s: • History • REDstack • Market expectations • Projects • • • • Project partners Fuji, Wetsus and REDstack Duration 4 years, start 2012 Regional funded Total budget 7.33 M€ • Afsluitdijk project • Questions 14 Afsluitdijk Project (2) Funding: • History • REDstack • Market expectations • Projects • Afsluitdijk project • Public funding; o SNN and Province of Fryslân • Private funding o FUJIFILM o REDstack o Wetsus (in kind) • Total 3.35 M€ 1.00 M€ 2.36 M€ 0.61 M€ 7.33 M€ • Questions 15 Afsluitdijk Project (3) Planning: • History • REDstack • Market expectations • Projects • Afsluitdijk project • • • • • Final Design Construction Start-up Research phase 1 Research phase 2 • Total 4 months 7 months 1 months 21 months 15 months 48 months • Questions 16 Afsluitdijk Project (4) Scale: • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions • 220 m3/h Seawater input • 220 m3/h Freshwater input • Goal after 4 years 50 kW installed Research Topics; • • • • • Membrane development Pretreatment Stack development Systems integration Environmental impact 17 Afsluitdijk Project (5) Project location • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 18 Afsluitdijk project (6) Location in more detail • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 19 Afsluitdijk project (7) Basic process principal, phase 1 • History • REDstack • Market expectations • Projects • Afsluitdijk project Pre-treatment IJsselmeer water Pre-treatment Waddenzee water Buffer IJsselmeer water Buffer Waddenzee water RED stacks Effluent buffer • Questions 20 Afsluitdijk project (8) Basic process principal, phase 2 • History • REDstack • Market expectations Pre-treatment IJsselmeer water Pre-treatment Waddenzee water • Projects • Afsluitdijk project RED stacks Effluent buffer • Questions 21 Afsluitdijk project (9) The initial design • History 8 Stack positions Prefiltration • REDstack • Market expectations • Projects • Afsluitdijk project • Questions Buffer tanks 22 Afsluitdijk project (10) Renewed design – 3d impression • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 23 Afsluitdijk project (11) Renewed design – 3d impression • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 24 Afsluitdijk project (12) Renewed design – 3d impression • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 25 Afsluitdijk project (13) Renewed design – 3d impression • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 26 Afsluitdijk project (14) Renewed design – 3d impression • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions 27 Afsluitdijk project (15) Environmental impact • History • REDstack • Market expectations • Projects • Afsluitdijk project • Questions • Sustainable energy relates to sustainable environment. • Environmental impact studies needed. • Studied in the broader scope of Afsluitdijk; – – – – Tidal energy Wind energy Solar energy Blue energy 28 Questions • Changes in REDstack • Funding Afsluitdijk • Facts Afsluitdijk • Time schedule Afsluitdijk • Time schedule REDstack • Questions Thank you for your attention, any questions? 29