FROM BROWNFIELD TO GREENFIELD
International Workshop
Torino, November 9TH
Museo A come Ambiente
Paolo MIGLIETTA - Public Green Works Dept.
[email protected]
1
BROWNFIELD
Reconstructive planning
Recovering industrial mortgages
[email protected]
2
TORINO
aerial photo
BACKBONE 4
BACKBONE 3
BACKBONE 2
BACKBONE 1
surface
130 km2
[email protected]
3
BACKBONE 3 - LOCATION
the proximity with the historical centre
Backbone 3
Hist. Centre
[email protected]
4
BACKBONE 3 - REALIZATION
costs per m2
Plot
Surface
Price
€ / m2
MICHELIN
89.000
8.300.000
93
INGEST
47.000
6.800.000
144
VITALI
89.000
15.000.000
168
MORTARA
62.000
7.000.000
112
VALDOCCO A
32.200
4.800.000
149
VALDOCCO B
39.000
4.000.000
102
45.900.000
[email protected]
5
BACKBONE 3 - HISTORY
1907 - the Michelin district
[email protected]
6
BACKBONE 3 - HISTORY
1924 - the Michelin district
[email protected]
7
BACKBONE 3 - HISTORY
late ’30s - the Valdocco district
[email protected]
8
BACKBONE 3 - HISTORY
mid ’50s - the Michelin district
[email protected]
9
BACKBONE 3 - BEFORE THE TRANSFORMATION
late ’90s - view from the west of Michelin area
[email protected]
10
BACKBONE 3 - BEFORE THE TRANSFORMATION
aerial view
[email protected]
11
BACKBONE 3 - DEMOLITIONS
chimney in the Vitali area
[email protected]
12
BACKBONE 3 - DEMOLITIONS
Michelin area
[email protected]
13
BROWNFIELD
erasing the past
VEDUTA DA OVEST
[email protected]
14
BACKBONE 3 - DEMOLITIONS
warehouse in the Michelin area
[email protected]
15
PARCO DORA - INDIVIDUATION OF CRITICALITIES
Golder Associates - risk analysis
[email protected]
16
PARCO DORA - INDIVIDUATION OF CRITICALITIES
Urban Reorganization Projects Dept. - current state of the industrial slabs
[email protected]
17
PARCO DORA - INDIVIDUATION OF CRITICALITIES
Prof. Ing. Virgilio Anselmo - hydraulic verifications
[email protected]
18
PARCO DORA - INDIVIDUATION OF CRITICALITIES
Public Green New Works Dept. - individuation of pre-existing arboreal presence
[email protected]
19
BROWNFIELD
something “differently agronomic”
VEDUTA DA OVEST
[email protected]
20
BROWNFIELD
Public Green Works Dept.
City of Torino
Piemonte Region
nurserymen
seeds
compost
Backbone 3
Field tests
Province of Torino
UniTO
Faculty of
Agriculture
new agronomy
[email protected]
21
BROWNFIELD
experimental field tests
after
before
[email protected]
22
BROWNFIELD 2005 - 2006
experimental field tests of ornamental shrubs
after
before
Potentilla fructicosa Goldfinger
[email protected]
23
BROWNFIELD 2005 - 2006
experimental field tests of ornamental shrubs
after
before
Lavandula angustifolia
[email protected]
24
BROWNFIELD 2006 - 2007
experimental field tests of natives & ornamentals
before
after
Caryopteris summer sorbet
[email protected]
25
BROWNFIELD 2006 - 2007
experimental field tests of natives & ornamentals
before
after
Stachys lanata
[email protected]
26
BROWNFIELD 2006 - 2010
before
experimental field tests of
flowering meadow
after
[email protected]
27
BROWNFIELD 2006 - 2010
before
experimental field tests of
mediterraneans & xerophytes
with mulching
after
[email protected]
28
BROWNFIELD 2010
experimental field tests in Valdocco Plot
before
after
[email protected]
29
BROWNFIELD
Facies a
Lolium multiflorum
Agrostis stolonifera
Facies a
Polygonum aviculare
Festuca gr.rubra
Facies a
Festuca gr. rubra
Chenopodium album
Facies a
Poa trivialis;
Bromus sterilis
[email protected]
Facies a
Festuca arundinacea
Medicago lupulina
Trifolium repens
30
BROWNFIELD
use of compost from organic urban waste
VEDUTA DA OVEST
[email protected]
31
BROWNFIELD
biomass management
PHYTOREMEDIATION
[email protected]
32
1993 - Municipal Town Plan: structural frame
The PROJECT of the PARK
[email protected]
33
BACKBONE 3 - THE PROJECT
1998 - Urban Redevelopment Programme: main uses classification
[email protected]
34
BACKBONE 3 - THE PROJECT
2001 - BUFFI Associés studio: Masterplan
[email protected]
35
BACKBONE 3 - THE PROJECT
2003 - Urban Redevelopment Programme variation
INGEST
MORTARA
VITALI
PARACCHI
MICHELIN
[email protected]
VALDOCCO
36
BACKBONE 3 - THE PROJECT
zenith view
[email protected]
37
BACKBONE 3 - INFRASTRUCTURES
Mortara Road - before the transformation
[email protected]
38
BACKBONE 3 - INFRASTRUCTURES
Mortara Road - the new layout
[email protected]
39
PARCO DORA - THE PROJECT
Mortara Plot - section
[email protected]
40
PARCO DORA
PREPARATORY
STUDIES
arch. Andreas Kipar
[email protected]
41
PARCO DORA - PLANNING ASSIGNEMENTS
the identified planning board
Board leader
Ugo Marano STUDIO ARCHITETTURA E URBANISTICA
ing. Vittorio Cappato
Landscape
Lighting
Industrial archaeology
Artistic concept
[email protected]
Structure
42
PARCO DORA - THE PROJECT
masterplan
[email protected]
43
PARCO DORA - THE PROJECT
Michelin Plot - view of the Dora river - cross-section
CROSS-SECTION
VIEW OF THE DORA RIVER
[email protected]
44
PARCO DORA - THE PROJECT
Michelin Plot - south-east view
[email protected]
45
PARCO DORA - THE PROJECT
Michelin Plot - evaporation tower recovery
[email protected]
46
PARCO DORA - THE PROJECT
Ingest Plot - water garden
[email protected]
47
PARCO DORA - THE PROJECT
Ingest Plot - hortus conclusus
[email protected]
48
PARCO DORA - THE PROJECT
Valdocco Plot - Sub A - flower bed of the hortus conclusus
[email protected]
49
PARCO DORA - THE PROJECT
Valdocco Plot - Sub A & sub B - west view - cross-section
CROSS-SECTION
WEST VIEW
[email protected]
50
PARCO DORA - THE PROJECT
Vitali PLot - steelworks view
[email protected]
51
PARCO DORA - THE PROJECT
Vitali Plot - steelworks rendering
[email protected]
52
PARCO DORA - THE PROJECT
Vitali Plot - steelworks night rendering
[email protected]
53
VALDOCCO ZERO EMISSIONS YARD
CO2 COMPENSATION
CO2 REDUCTION
[email protected]
54
CO2 COMPENSATION
CO2 emissions of the yard
257 ton/CO2
LOCAL
• 5% of the generated CO2
emissions
• COMPENSATION WOODS
• 130 trees 18-20 cm Confluenza
Park
• surface 2.000 m2
GLOBAL
• 95% of the generated CO2
emissions
• CDM certificates (Clean
Development Mechanism)
• reforestation projects
• Mozambique, Mexico, Uganda
[email protected]
55
CO2 REDUCTION
40 m2 of photovoltaic
surface
production of 6,2 kw
102 led-lit items
[email protected]
56
Thank you